1 SECTION ABOVE-GROUND FIRE PROTECTION WATER STORAGE TANK PART 1 - GENERAL 1.1 DESCRIPTION A. This specification covers the furnishing of all labor, material, equipment, tools, services and erection of three 5,000 gallon (nominal), Factory Powder Coated Bolted Steel fire water storage tanks, as manufactured by Superior Tank Co., Inc., Rancho Cucamonga, CA, United Industries Group, Newport Beach, CA, Central Valley Tank, Fresno CA or an approved equal, and as shown on the plans and specified herein. B. The bolted steel tank shall conform to the requirements of AWWA D and NFPA 22 - Standards for Water Tanks for Private Fire Protection, Current Edition. 1.2 DESIGN CRITERIA A. Design loads: The reservoir structure shall be designed in accordance with the following: 1. Minimum capacity 5,000 gallons (nominal) 2. Inside diameter 10-foot +/- 3. Tank height 8.5-foot +/- 4. Seismic Design Parameters: a. Seismic Use Group II b. I E 1.25 c. Site Class (Soil) D d. S S 2.036g e. S g f. F a 1.00 g. F v Specific Gravity of contents Wind load 100 mph, Exposure Category B 7. Deck load 15 psf 8. Allowable Soil Bearing 1,000 psf, (assumed) 9. Design standard AWWA D and NFPA SUBMITTALS Civil

2 Section Page 2 A. As specified in Section B. Shop Drawings: Submit shop drawings of the bolted steel reservoir and all accessories for review and approval by the State prior to beginning any related shop fabrication or erection. Include sufficient data to show that the reservoir and accessories conform to the requirements to these Specifications. C. Submittals shall include: 1. Complete structural calculations, including forces that must be resisted by the foundation, maximum tension, compression and shear at each anchor bolt or embedded plate, maximum and allowable stresses for bolted steel shell, floor, and roof. The tank shall be designed using rational methods in accordance with accepted engineering practice. Calculations shall be stamped and signed by a civil or structural engineer currently registered in the State of California. 2. Detailed fabrication and erection drawings and details for the tank and all accessories. Include drawings for all shell, roof and floor penetrations and bolt holes for mounting accessories. 3. Submit tank manufacturer s erection manual. 4. Certified mill tests on steel plate and structural members demonstrating that the physical and chemical requirements of this Specification have been met. 5. Submit manufacturer s certificate of compliance with NSF Standard Submit product data and material safety data for sealant and repair materials to be used. 7. Submit foundation design. 8. Submit Seismic Anchor Design. 1.4 QUALIFICATIONS OF TANK MAUNFACTURER AND INSTALLER A. The manufacturer and installer shall have five years experience and be a specialist in the design, fabrication, and erection of factory powder coated bolted steel tanks and appurtenances. Tank erection shall be supervised by tank manufacturer trained personnel. B. Provide a list of at least five (5) tanks presently in fire protection water storage service designed to AWWA D or -97 and NFPA 22 standards, of equal or greater size, operating satisfactory for a minimum of five (5) years, including telephone number of Contracting Officer.

3 Section Page PRODUCT HANDLING A. Packaging: All plates, members and miscellaneous parts shall be packaged for shipment in such a fashion as to prevent abrasion, scratching or marring of the finished coating. Upon arrival at the job site, the shipment will be inspected by the State s Representative and any damaged parts will be rejected. B. Storage: Adequately support materials to prevent warpage and other damage. Do not store directly on the ground and protect from the weather. 1.6 CLOSEOUT, SUBMITTALS A. As specified in Section B. Submit material list and manufacturer s operation and maintenance data for field inspection and repair of coatings and all accessories. 1.7 WARRANTY A. The tank manufacturer shall warrant the tank against any defects in workmanship and materials for a period of one (1) year from the date of project acceptance. In the event any such defect should appear, it should be reported in writing to the manufacturer during the warranty period. PART 2 - GENERAL 2.1 TANK A. The Manufacturer shall furnish, erect and test the tank, as required by AWWA D and NFPA 22. The Manufacturer shall be completely responsible for the construction and satisfactory performance of the tank during the guarantee period. The tank shall conform to AWWA D and NFPA 22, to the latest edition California Building Code, and to the requirements of the plans and these Specifications. The supplier shall submit for approval complete and detailed plans for the tank and appurtenances. B. The Factory Powder Coated, bolted steel tank shall have a cone roof, sloped to drain toward the shell. Provide the reservoir complete with all pipe connections, access openings, nozzles, taps, drains, ladders, vent, and other accessories as shown on the plans or required herein. C. Tank shell sheets shall have mild strength per ASTM A607, Grade 30 and high strength per ASTM A607, Grade 50. Manufacture double bolt line such that holes are vertically staggered and no two holes are in line horizontally. All shell

4 Section Page 4 penetrations and bolt holes for mounting of accessories shall be factory fabricated after surface preparation and prior to cleaning. Contractor shall furnish one spare sheet of each size and type. If these sheets are not incorporated, they and any other rejected materials shall remain the property of the Contractor and must be removed from the site and the Park prior to final acceptance of the work. Sheet edges of sidewall and floor plates shall be mechanically rounded. 2.2 ROLLED STEEL STRUCTURAL SHAPES A. Material shall conform to AWWA D103-09, Section 2.5 and ASTM A36 or ASTM A992 and NFPA BOLT FASTENERS A. Bolts used in tank lap joints shall be ½ inch 13 UNC-2A tolled thread, and meet the minimum requirements of ANSI/AWWA D103-09, Section 2.2. and NFPA 22. B. Bolt Material: C. Surface Preparation: 1. SAE Grade 2: Tensile strength 74 ksi minimum; proof load 55 ksi minimum; allowable shear stress 18, 164 psi. 2. SAE Grade 5/ASTM A325 (1 ¼" bolt length): Tensile strength 120,000 psi min; proof load 85,000 psi min; allowable shear stress with threads excluded from the shear plane 29,454 psi min. 3. SAE Grade 8/ASTM A490 (> 1 ¼" bolt length): Tensile strength 150,000 psi min; proof load 120,000 psi min; allowable shear stress with threads excluded from the shear plane 36, 818 psi min. 4. ASTM A490-REV A-92: Tensile strength 150 ksi minimum; proof load 120 ksi minimum; allowable shear stress 36,818 psi. 5. Bolt Finish: Zinc Plate: inch minimum under bolt head; inch minimum on shank; inch on last five threads; irridite #3 bronze color coat. 6. Bolts shall include a minimum of four splines on the underside of the bolt head at the shank to resist rotation during torquing. Bolt lengths shall be sized as to achieve a neat and uniform appearance. Excessive threads extending beyond the nut after torquing will not be permitted.

5 Section Page 5 D. Bolt Head Encapsulation: High impact co-polymer encapsulation of entire bolt head up to shank; natural resin only, color ingredients to be added such that color shall appear same color as tank. E. Exterior exposed nut, washer and bolt thread cover, same color as tank. F. All lap joint bolts shall be properly selected such that threaded portions of the bolt will not be exposed to the "shear plane" between tank sheets. 2.4 SEALANTS A. Lap Joint Sealant: Shall be a one component polyurethane compound. The sealant shall cure to a rubber-like consistency having excellent adhesion to the glass coating, low shrinkage and a minimum life of 20 years when subject to exterior exposures. Sealant curing rate at 73 degrees F/50% relative humidity: tack free six to eight hours; final cure: days. The sealant shall be a one component, moisture cured, polyurethane compound. Neoprene gaskets and tape sealer shall not be used. B. Floor: Polyethylene copolymer caps and sealant shall be used to cover the bolts, nuts and washers exposed on the inside of the floor. 2.5 ROOF A. Tank roof shall be radially sectioned roof fabricated from powder-coated, bolted steel panels, as produced by tank manufacturer, and shall be assembled in a similar manner as the sidewall panels utilizing the same sealant and bolting techniques, so as to assure a weather/air tight assembly. The roof shall be clear-span and self-supporting. Both live and dead loads shall be carried by tank walls. The roof shall be of a rolled knuckle design with no rolled angle connection between sidewall and roof panels. B. Materials: All alloys shall be high quality marine grade aluminum. 1. Triangulated dome frame struts: AA6005A-T6 aluminum. 2. Structural frame node plates: 0.375" nominal thickness, AA6061-T6 aluminum. 3. Triangular dome panels: 0.050" nominal thickness, AA3003-H16 aluminum sheet. 4. Triangular skylight panels (if specified); nominal thickness of ¼" thick clear acrylic or polycarbonate. 5. Perimeter tension/compression ring: AA6005A-T6 aluminum.

6 Section Page 6 6. Fasteners: AA2024-T4 aluminum or austenitic series 300 stainless steel as required by the manufacturer's design. 7. Sealant: Silicone conforming to Federal Specification TT-S Gaskets: Silicone conforming to Federal Specification ZZ-R-765, Class 2, Grade 50 or equal or neoprene conforming to ASTM C Dormers, doors, and hatches: AA6061-T6, AA6005A-T6, AA5086-H34 or AA5052-H36 aluminum, 0.090" nominal thickness. C. Roof Access Hatch: Minimum opening size, 24 inch clear. Hatch shall be hinged and have a hasp for locking. Hasp shall be stainless steel. Frame shall have bolted connection to tank roof structure with water tight seal. 2.6 ROOF VENT A. A 12 inch minimum screened vent shall be provided on the roof. The vent shall be fabricated to provide removable screened openings between the vertical support members of the vent. The screened openings of the vent shall be sized by the manufacturer to all venting of a 300 gpm pumping rate. An effective area of 75% of screen opening shall be assumed. The screen shall consist of one layer of Type 316 stainless steel: 16 x 16 x wire mesh insect screen. B. The tank roof shall have a curbed, upward opening 24-inches square, minimum hatch located near the ladder. The curb shall extend at least 4 inches above the tank. The hatch cover shall be hinged and shall have locking provisions. The hatch cover lip shall extend for a distance of 2-inches down on the outside of the curb. 2.7 TANK ACCESSORIES A shell manhole: Provide a 24, minimum, hinged shell manhole located as shown on the drawings. The center of the manhole shall be located 30 inches above the bottom of the tank. B. 1 4 outlet nozzle. C. 1 4 inlet nozzle. D. 1 4 drain nozzle E. 1 4 overflow with downcomer steel internal and external overflow pipe and supports. Overflow pipe assembly shall be powder epoxy lined and coated.

7 Section Page 7 F. Ladder Provide a galvanized steel welded exterior ladder with backguard as shown on the plans. The ladder shall have a lockable closure at the bottom. G. Identification Plate: Manufacturer s nameplate shall list the tank serial number, tank diameter and height, and maximum design capacity. H. 1 liquid level indicator with gauge board. Superior Tank Model #2400, or equal, with Type 316 stainless steel internals and complete with float and target board assembly. 2.8 SPARE SHELL SHEETS A. Contractor shall furnish one spare shell sheet. Spare sheet shall be sized for the first chime or ring. If it is not incorporated in the construction, it and any rejected sheets shall remain the property of the Contractor and shall be removed from the park prior to final acceptance of the work. PART 3 - EXECUTION 3.1 TANK SITE EXCAVATION AND GRADING A. Per Section FOUNDATION A. Construct in accordance with manufacturer s recommendations. B. Prepare subgrade in accordance with the recommendations of Appendix A Geotechnical Investigation, and its addendums. 3.3 PROTECTIVE COATING A. General: All metal plates, supports, members and miscellaneous parts, except bolts, shall be Factory Powder Coated in accordance with AWWA D103, Section 10.6 and this Section. Field coating, other than touch-up, will not be permitted. B. Surface Preparation: 1. Prior to application of coating, all metal plate, supports, members and miscellaneous parts, other than fasteners shall be thoroughly cleaned by a hot-rinse wash process followed immediately by hot air drying.

8 Section Page 8 2. All steel surfaces shall be sandblasted to equivalent of a SP 6 commercial blast metal finish. The surface anchor pattern shall be no less than 1.5 mils. 3. All steel surfaces shall receive an iron phosphate coating applied with a power spray washer with not less than 25 psi pressure, followed by a warm water rinse and by an acidulated sealant. Then spray a final deionized water rinse to prevent rusting prior to the powder coating application. 4. All steel surfaces shall drip dry for seven (7) minutes prior to entering the dry off oven for eight (8) minutes at 425 degrees F. C. Coating: 1. All interior steel surfaces, support members and miscellaneous parts shall receive 5 mils minimum average dry film thickness using Dupont "Tank Tan (an NSF 61 approved, Thermal Set Epoxy Powder Coating). 2. All exterior steel surfaces, support members and miscellaneous parts shall receive 3 mils minimum average dry film thickness using Dupont Superior Sand (a Thermal Set TGlC-Polyester Powder Coating). 3. All exterior surfaces shall be colored Butler-Cote Sandalwood or similar. 3.4 CONSTRUCTION A. Field erection of Factory Powder Coated bolted steel tanks shall be in strict compliance with manufacturer's recommendations and performed by manufacturer s employees or certified erection crew to alleviate any potential disputes in coating quality or erection thereof. Particular care shall be exercised in handling and bolting of the tank plates, supports, and members to avoid abrasion or scratching the coating. Prior to placing water in the tank, a holiday inspection of the entire tank, corners included, will be provided and performed by the manufacturer in the presence of the State s Representative. Touch-up coating shall be done per the manufacturer's recommendations where needed and as directed. 3.5 CLEANING A. General: Cleaning shall not take place until sealant has fully cured. All inside surfaces below the high water level will be inspected by the State s Representative prior to chlorination and leakage testing; touch-up shall be done as directed.

9 Section Page 9 B. Cleaning: Remove all tools, rags and any other material not part of the structure or its accessories from the reservoir interior. Thoroughly clean interior surfaces or the shell floor and accessories of the reservoir using a highpressure water jet, sweeping, scrubbing or other equally effective means. Discharge or otherwise remove all water, dirt and foreign material, accumulated in the cleaning operation from the tank. Dispose as directed by State s Representative 3.6 LEAKAGE TESTING A. Retention of the chlorine solution for a 24-hour period during disinfection will also constitute the tank leakage test. Repair any leaks disclosed in the test, and repeat the required test for leakage. After the holding period, purge all highly chlorinated water from the drain piping. Subject to satisfactory bacteriological sampling and testing, acceptable aesthetic quality, and adjustment of free chlorine residual to a concentration of not more than two parts per million (2 mg/l), the tank may be put into service. 3.7 ANNIVERSARY INSPECTION A. On or before the one year anniversary date of final acceptance of the tanks, the Contractor shall arrange for the manufacturer s factory trained representative to make a visual inspection of the reservoir interior coatings and accessories, and the immediate area surrounding the reservoirs and shall notify the State s Representative at least ten working days prior to the scheduled date of the inspection. The State s Representative will be present during the inspection. A written summary of this inspection shall be filed with the State s Representative. END OF SECTION

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

Preformed Metal Roofing and Siding

Preformed Metal Roofing and Siding Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision

More information

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

SECTION 15420 WATER STORAGE TANK PAINTING

SECTION 15420 WATER STORAGE TANK PAINTING SECTION 15420 WATER STORAGE TANK PAINTING PART 1 GENERAL.01 SCOPE A. Section Includes Surface preparation, shop priming, and field coating for interior wet, interior dry, and exterior surfaces of steel

More information

SECTION 07 61 13 STANDING SEAM METAL ROOFING

SECTION 07 61 13 STANDING SEAM METAL ROOFING SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced

More information

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs. Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12

More information

DENVER MODEL 30 X 30 SPECIFICATIONS

DENVER MODEL 30 X 30 SPECIFICATIONS DENVER MODEL 30 X 30 SPECIFICATIONS Dimensions: Roof Dimensions 30-0 x 30-0 (4) Columns (Center to Center) 25-6½ x 25-6½ Minimum Clearance 8-0 Roof Height @ Peak Dependent on Col. Ht. Hip Roof 4:12 pitch

More information

SECTION 07400 STANDING SEAM METAL ROOF

SECTION 07400 STANDING SEAM METAL ROOF SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

SECTION 33 12 19 FIRE HYDRANTS

SECTION 33 12 19 FIRE HYDRANTS SECTION 33 12 19 FIRE HYDRANTS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals.

More information

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:

More information

SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS

SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS Page 1 of 5 SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS Guarda Security Window Screens in this specification are appropriate for use in windows, storefronts, curtain walls, vents, and any other applications

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,

More information

COLORADO MODEL. 35 x 65 SPECIFICATIONS

COLORADO MODEL. 35 x 65 SPECIFICATIONS COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square

More information

James M. Pleasants Company

James M. Pleasants Company James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

GUIDELINE SPECIFICATIONS

GUIDELINE SPECIFICATIONS GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced

More information

A. The shade structure contractor shall be responsible for the design, engineering, fabrication, and supply of the work specified herein.

A. The shade structure contractor shall be responsible for the design, engineering, fabrication, and supply of the work specified herein. 13310 FABRIC SHADE STRUCTURES FOR PLAYGROUND AREAS ************************************************************************************************************************ SPECIFIER: CSI Master Format

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated. CAST IN PLACE DETECTABLE/TACTILE WARNING SURFACE TILE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions and Division 1 Specifications

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.

More information

ATLANTA MODEL SPECIFICATIONS

ATLANTA MODEL SPECIFICATIONS ATLANTA MODEL 50 SPECIFICATIONS Dimensions: Roof Dimensions (point to point) 50-0 Column Dimensions (out to out of columns) 44-0 Eave Height 8-0 Roof Height @ Peak ±21-8⅞ Hip Roof 6:12 pitch Square Feet

More information

Colorado State University. Durrell Center Roof Repair

Colorado State University. Durrell Center Roof Repair Colorado State University Durrell Center Roof Repair SPECIFICATION: POLYURETHANE FOAM ROOFING l.0 GENERAL REQUIREMENTS The successful application of a polyurethane foam roofing system is dependent upon

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

SECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

SECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL SECTION 14 20 10 - FREIGHT & PARKING GARAGE PART I - GENERAL 1.1 SECTION INCLUDES [NOTE to AE: The following lists requirements that are specific to freight elevators. These requirements are in addition

More information

Since 1978. HMT Inc. 24 Waterway Avenue, Suite 400 The Woodlands, Texas 77380 Ph: +1.281.681.7000 Fax: +1.281.419.7689

Since 1978. HMT Inc. 24 Waterway Avenue, Suite 400 The Woodlands, Texas 77380 Ph: +1.281.681.7000 Fax: +1.281.419.7689 WaTER & wastewater HMT Inc. 24 Waterway Avenue, Suite 400 The Woodlands, Texas 77380 Ph: +1.281.681.7000 Fax: +1.281.419.7689 Locations worldwide to service all your needs. VAPORVAULT and ALUMINATOR are

More information

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

POLYURETHANE LINING AND COATING ON PIPE RAW WATER POLYURETHANE LINING AND COATING ON PIPE RAW WATER PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

City of San Diego, CWP Guidelines

City of San Diego, CWP Guidelines PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,

More information

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,

More information

3-Part Specification Railing Cable Systems

3-Part Specification Railing Cable Systems 3-Part Specification Railing Cable Systems GENERAL NOTES TO SPECIFIER: THIS SPECIFICATION SECTION HAS BEEN PREPARED TO ASSIST DESIGN PROFESSIONALS IN THE PREPARATION OF PROJECT OR OFFICE MASTER SPECIFICATIONS.

More information

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

1.02 SYSTEM DESCRIPTION

1.02 SYSTEM DESCRIPTION 1 OF 7 MODULAR MEZZANINES GUIDE SPECIFICATIONS FOR PART 1 - GENERAL 1.01 RELATED WORK A. SECTION 03 30 00: Cast in Place Concrete (and Concrete Finishing) 1. The area where mezzanine is installed shall

More information

BLADDER SURGE CONTROL SYSTEM

BLADDER SURGE CONTROL SYSTEM PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

INDEX. Sec. No. Items Page Nos.

INDEX. Sec. No. Items Page Nos. INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............

More information

Sports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049

Sports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049 Sports and High Mast Lighting Poles 4 High Mast Lighting Poles General American LitePole offers a raising and lowering system that allows for ease of maintaining the lighting system at ground level. Ideal

More information

Roof Curbs, Extensions and Equipment Supports

Roof Curbs, Extensions and Equipment Supports Roof s, Extensions and Equipment Supports December 2012 Roof Page s, Header Extensions and Equipment Supports Table of Contents Model GPI Standard and Optional Construction Features... 3 Model Number Code....

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent

More information

Engineering Specifications

Engineering Specifications PUREFLOW PEX PRODUCTS PART 1 GENERAL 1.1 SUMMARY 1.1.1 This specification covers Branch & Main, Parallel Water Distribution Systems (MANABLOC), Cross-linked Polyethylene tubing and fittings using PEX Press

More information

COATING & WRAPPING OF UNDERGROUND PIPING

COATING & WRAPPING OF UNDERGROUND PIPING CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification

More information

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,

More information

SECTION 15105 DUCTILE IRON PIPE AND FITTINGS

SECTION 15105 DUCTILE IRON PIPE AND FITTINGS SECTION 15105 DUCTILE IRON PIPE AND FITTINGS PART 1 GENERAL.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of Owner facilities. Closely coordinate construction work and connections

More information

STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS

STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for providing metal fabricated items like castings, gratings, hatchways, ladders,

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance

More information

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description Worldwide Contacts www.tyco-fire.com Model F thru F3 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description The Mulsifyre Nozzles are open (nonautomatic) nozzles and they are designed

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1 C. S. I. Spec 03500 Page 1 PART 1 - GENERAL 1.01 SUMMARY:.01 Provide special glassfiber reinforced cement (GRC) shapes in accordance with the requirements of the contract documents..02 The installing contractor

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC

More information

- - - - Steel Panel Frame. Exterior Steel Sheeting. Optional Rigid Insulation. Optional Steel Insulation Liner

- - - - Steel Panel Frame. Exterior Steel Sheeting. Optional Rigid Insulation. Optional Steel Insulation Liner The Kelly Klosure pre-framed modular panel has 4 components that are factory finished to create an easy and versatile bolt-together system in the field. Steel Panel Frame Exterior Steel Sheeting Optional

More information

238T Standing Seam Metal Roof System (SSMRS)

238T Standing Seam Metal Roof System (SSMRS) 238T Standing Seam Metal Roof System (SSMRS) Text in red are instructions to the specifier and should be deleted. Text in blue are choices that need to be made, with those not selected, deleted. McElroy

More information

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers.. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY July 2008 1.0 SCOPE These guidelines describe the way in which air conditioning units shall be installed or replaced

More information

How to secure your property after a disaster

How to secure your property after a disaster How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,

More information

PC-Concrete Injectable Concrete Anchoring and Repair System

PC-Concrete Injectable Concrete Anchoring and Repair System PC-Concrete Injectable Concrete Anchoring and Repair System DESCRIPTION: PC-Concrete is a two component (1:1 ratio), 100% solids, high modulus, structural epoxy paste. PC-Concrete is a solvent free, no

More information

SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,

More information

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products GUIDE SPECIFICATION FOR GENERAL CLEANING AND REMOVAL OF MOLD AND MILDEW ON EXTERIOR INSULATED AND FINISH SYSTEMS AND STUCCO DIVISION 07240 and DIVISION 09240 8/05 PART I: GENERAL 1.01 DESCRIPTION AND SCOPE

More information

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including general and supplementary conditions and other Division 1

More information

SECTION 11014 WINDOW WASHING SYSTEMS

SECTION 11014 WINDOW WASHING SYSTEMS SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,

More information

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES 1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

Section Four: Linings and Coatings

Section Four: Linings and Coatings Section Four: Linings and Coatings SPIRALWELD PIPE The majority of steel water pipe furnished today is specified to be provided with both an interior lining and an exterior coating. AMERICAN offers a wide

More information

SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS

SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS PART 1 GENERAL SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS 1.1 SUMMARY A. Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control. 1.2 RELATED

More information

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES PART 1 - GENERAL 1.1 SCOPE OF WORK SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS PULTRUDED SQUARE TUBE LADDER

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

VALOR STEEL BUILDINGS STANDARD SPECIFICATIONS

VALOR STEEL BUILDINGS STANDARD SPECIFICATIONS VALOR STEEL BUILDINGS STANDARD SPECIFICATIONS For Rigid/I- Beam Construction as designed, engineered, and fabricated by Valor Steel Buildings. General 1.1) Valor shall use standards, specifications, recommendations,

More information

K2 STONE NATURAL VENEER

K2 STONE NATURAL VENEER INTRODUCTION WHAT IS K2 NATURAL THINSTONE VENEER? Natural K2 Stone veneer is real stone, cut 1 inch thick, making it light enough to be installed as a veneer. Sometimes referred to as thin veneer, thin

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling 250_P1 R10/7/2015 Copyright 2015 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice.

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and

More information

SECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

SECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck. SECTION 07550 - PART I GENERAL 1.01 SECTION INCLUDES A. Vapor barrier (base ply); cover board at existing roof deck. B. Roof insulation at new roof deck. C. Modified bitumen membrane. D. Fluid applied

More information

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved

More information

CHAPTER 7: Building Systems ROOFING SYSTEMS

CHAPTER 7: Building Systems ROOFING SYSTEMS ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen

More information

A. Work on this project shall consist of, but is not limited to, the following:

A. Work on this project shall consist of, but is not limited to, the following: PART 1 - GENERAL CLEANING AND RESTORATION OF SECTION 05900-1 1.1 SUMMARY A. Work on this project shall consist of, but is not limited to, the following: 1. Clean and treat all exposed anodized architectural

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

SECTION 07 42 13 METAL WALL PANELS

SECTION 07 42 13 METAL WALL PANELS Mitsubishi Plastics Composites America, Inc. 401 Volvo Parkway Chesapeake, VA 23320 Phone: (800) 422-7270 Fax: (757) 436-1896 E-mail: info@alpolic.com www.alpolic-northamerica.com This MANU-SPEC utilizes

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems

Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems Method of Test Committee Approval Product Group Approval Approved via 5/21/15 MOT CC Out for Ballot (#805-15) PUBLICATION NO. AAMA 501.2-XX DRAFT #2 DATED 5/21/15 Quality Assurance and Diagnostic Water

More information

Installation Instructions

Installation Instructions PUSH Installation Instructions A DA C O M PLIA NT shown with optional Bradley 90-75 faucet Front-Mounted Barrier Free Rectangular Bowl Stainless Steel Lav Table of Contents Pre-Installation Information...........2

More information

Rooflight INSTALLATION INSTRUCTIONS

Rooflight INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Rooflight These instructions should be used for: Installing Permanent Trickle Ventilation: Constructing & Waterproofing a Timber Upstand Curb: Installing & Waterproofing Proprietary

More information