TILE OVER HEATED FLOOR SYSTEMS
|
|
|
- Isabella Ellis
- 9 years ago
- Views:
Transcription
1 TILE OVER HEATED FLOOR SYSTEMS SUITABLE SUBSTRATES will be installed shall be in conformance with the Canadian National Building Code 2005 and applicable local building codes taking into consideration anticipated live and dead loads. CLEAVAGE MEMBRANE - 6 mils polyethylene film or 6.8 kg meeting CAN/CGSB-51.34M, asphalt saturated roofing felt, meeting CSA A GALVANIZED DIAMOND METAL LATH kg/m2 (AS C847-95) MORTAR BED (cured minimum of 24 hours) Flextile Dry Pack Mortar with 57 Slurry Bond Coat Flextile 59 or 5900 Flexflo Self levelling Underlayment with Primer SL SUITABLE PANEL SUB-FLOOR Douglas Fir plywood, Canadian Softwood plywood, Poplar plywood, Construction Sheathing or OSB. Minimum16 mm exterior grade plywood meeting CSA 0121 or oriented strandboard meeting CSA or CSA , on joists spaced 406 mm o.c. CRACK ISOLATION MEMBRANE/ SOUND CONTROL (as required) Flextile 1000 or 2000SC Flexilastic Crack Isolation & Sound Reduction Membrane (ANSI A118.12) with Flextile 4000 (Interior) or 4001 (Exterior) Primer (Cured for a minimum of 24 hours) System Flextile Polymer Modified Sanded Grout (ANSI A118.7) Apply polyethylene film lapped at least 102 mm. Nail galvanized diamond metal lath butted, not overlapped, to the plywood. After the heating/electrical contractor has placed the heating element over the metal or plastic lath, apply mortar bed to required thickness of 32 mm min. Allow mortar bed to cure. Apply bond coat to cured mortar bed. Finished tolerance of mortar bed not to exceed 6 mm in 3049 mm or 2 mm in 305 mm. Apply tile to bond coat before bond coat skins over. Use sufficient bond coat to ensure minimum 80% contact. Contact shall be evenly distributed to give full support of the tile. On fresh mortar bed, beat tile into position. On dry-set mortar, slide tile into position. Beat tile into position. Allow bond coat to cure. Force grout into full depth of joint, remove excess grout and clean. The thickness of the mortar bed to be 32 mm minimum interior. For residential or light commercial use only. Do not use lightweight aggregate in mortar bed. If using electric heating cable/conduit, plastic mesh should be used. replace TAC s original generic specification.
2 Where incorporating heating cable on interior or exterior concrete substrates is desired, refer to details 309F-2009/2010 and 310F-2009/2010 and incorporate heating cables in the bottom of the mortar bed. When hydronic heating system is used in mortar bed, increase thickness of mortar bed to achieve a minimum 32 mm thickness over heating tubing. Certain proprietary systems may allow thin-set installation with latex-portland cement. Refer to Notes For The Professional and 301MJ-2009/2010. Movement joints shall be installed at a maximum 3659 mm for radiant heated floors. Width and spacing of joints to be specified by consultant. Insulation layer may be required between joists or on top of subfloor for maximum heating efficiency. Consult heating manufacturer for type and thickness. Waterproof membrane (ANSI A ) or crack isolation membrane if required must be specified. Follow manufacturers recommendations. SUITABLE SUBSTRATES SUITABLE PANEL SUB-FLOOR Douglas Fir plywood, Canadian Softwood plywood, Poplar plywood, Construction Sheathing or OSB. Minimum 16 mm exterior grade plywood meeting CSA 0121 or oriented strandboard meeting CSA or CSA , on joists spaced 406 mm o.c. GYPSUM CONCRETE underlayment meeting performance requirements of AS C 627 minimum. compressive strength of 15 MPa when tested by AS C 472. CRACK ISOLATION MEMBRANE/ SOUND CONTROL (as required) Flextile 1000 or 2000SC Flexilastic Crack Isolation & Sound Reduction Membrane (ANSI A118.12) with Flextile 4000 (Interior) or 4001 (Exterior) Primer (cured for minimum of 72 hours or less than 3% residual moisture.) System PRIMER/SEALER Flextile 4040 Primer SL Flextile Polymer Modified Sanded Grout (ANSI A118.7) Following installation of electric heating cable or hydronic tubing (by others), apply gypsum concrete to required thickness over primer/sealer as required by manufacturer. Finished tolerance of gypsum concrete not to exceed 6 mm in 3049 mm or 2 mm in 305 mm. Apply tile to bond coat before bond coat skins over. Use sufficient bond coat to minimum 80% contact on interior surfaces. Contact shall be evenly distributed to give full support of the tile. Apply dry-set mortar or latex-portland cement mortar over cured gypsum concrete. Slide tile into position. Allow bond coat to cure. Force grout into full depth of joint, remove excess grout and clean. The thickness of the gypsum concrete should be 15 mm minimum. For residential or light commercial use only. replace TAC s original generic specification.
3 If an uncoupling system is used, one single layer of plywood minimum thickness of 20 mm is acceptable providing the floor trusses or I joist are spaced at no more than 480 mm o.c. Some gypsum concrete underlayment manufacturers recommend the use of plastic lath for application over wood substrate, follow manufacturers recommendations for best practice. Cross bridge floor joist but preferably solid blocking. Refer to Notes for The Professional and 301MJ- 2009/2010. Heating system: design, installation and inspection by others. Movement joints shall be installed at a maximum 3659 mm for radiant heated floors. Width and spacing of joints to be specified by consultant. Consult membrane manufacturer for maximum residual moisture before installation. SUITABLE SUBSTRATES CRACK ISOLATION /SOUND CONTROL MEMBRANE (as required) 1000 & 2000SC Flexilastic Crack Isolation & Sound Reduction Membrane (ANSI A118.12) with 4000 or 4001 Flexilastic Primer System Flextile Polymer Modified Sanded Grout (ANSI A118.7) ColourMaxPlus Urethane Grout Underlayment Flextile 59 or 5900 Flexflo Self-leveling Underlayment with Primer SL Following installation of electric heating cable or mat (by others) apply tile to bond coat before bond coat skins over. Use sufficient bond coat to ensure minimum 80% contact. Contact shall be evenly distributed to give full support of the tile. Slide tile firmly into position. Allow bond coat to cure. Force grout into full depth of joint, remove excess grout and clean. Not to be used in wet areas unless recommended by manufacturer. If waterproof/crack isolation membrane is required follow manufacturer s recommendations (ANSI A , ANSI ) Refer to Notes For The Professional and 301MJ-2009/2010. Uncoupling system to be placed over heating system. Insulation layer may be required below plywood subfloor for maximum heating efficiency. Consult heating manufacturer for types and thicknesses. replace TAC s original generic specification.
4 System CRACK ISOLATION/SOUND CONTROL MEMBRANE (as required) 1000 & 2000SC Flexilastic Crack Isolation & Sound Reduction Membrane (ANSI A118.12) with 4000 or 4001 Flexilastic Primer CEMENTITIOUS SELF-LEVELING UNDERLAYMENT Flextile 59 or 5900 Flexflo Self-leveling Underlayment with 4040 Primer SL Flextile Polymer Modified Sanded Grout (ANSI A118.7) FlexEpoxy % Solids Epoxy Grout (ANSI A118.3) Install electric heating cable or mat (by others) Primer must be used over prepared surface as required by self-leveling manufacturer s recommendations Apply thickness of self-leveling to the recommended thickness by manufacturer Curing/drying of cementitious self leveling must be strictly followed as instructed by manufacturer before installation of tile. Apply tile to bond coat before bond coat skins over. Use sufficient bond coat to ensure minimum 80% contact. Contact shall be evenly distributed to give full support of the tile. Slide tile firmly into position. Allow bond coat to cure. Force grout into full depth of joint, remove excess grout and clean. Follow manufacturer s recommendations for manufacturer s maximum applied thicknesses. Depending on Manufacturer double layer plywood may be required see Detail 313F-A. If waterproof/crack isolation membrane is required follow manufacturer s recommendations (ANSI A , ANSI ). Refer to Notes For The Professional and 301MJ- 2009/2010. Uncoupling system to be placed over heating system. Follow manufacturers recommendations. Insulation layer may be required below plywood subfloor for maximum heating efficiency. Consult heating manufacturer for types and thicknesses. Radiant pipe/tube may be substituted for electric wire radiant heat system Electric radiant heat system conforming to UL (CAN/CSA) C22.2 #217 Radiant pipe/tube may be substituted for electric wire radiant heat system replace TAC s original generic specification.
5 dead loads Interior: System Exterior: Flextile 51 or 53 / 44 two component Latex Portland Cement Mortar System WATERPROOF MEMBRANE: Meets ANSI A MODULAR SCREED PANEL Expanded polystyrene panel with density no less than 32 kg/m 3 Interior: Flextile Polymer Modified Grout (ANSI A118.7) FlexEpoxy % Solids Epoxy Grout (ANSI A118.3) ColourMaxPlus Urethane Grout Exterior: Flextile 600 Polymer Modified Sanded Grout (ANSI A118.7) ColourMaxPlus Urethane Grout Apply mortar bed (see Tile Guide Specification Section 2.5.5) to required thickness (see Tile Guide Specification Section 2.5.2). Finished tolerance of mortar bed not to exceed 6 mm in 3049 mm or 2 mm in 305 mm. Apply membrane to mortar bed as recommended by manufacturer. Apply tile to bond coat before bond coat skins over. Use sufficient bond coat to ensure a minimum 80% contact on tile back. If 95% coverage is specified refer to Contact shall be evenly distributed to give full support of the tile. Allow bond coat and grout to cure as recommended by the manufacturer for the type of environment and exposure anticipated. Force grout into full depth of joint, flush with tile surface. Remove excess grout by using float at a 90º angle and clean with a sponge and plenty of water. Thickness of the mortar bed should not exceed more than 25 mm above the top of the pedestals of the modular screed panel. Verify with manufacturer maximum weight capacity. Refer to Notes For The Professional and 301MJ-2009/2010. Insulation layer may be required between joists or on top of subfloor for maximum heating efficiency. Consult manufacturer for type and thickness Heating system - design, installation and inspection by others Movement joints to be installed only at the tile surface at a maximum of 3659 mm for radiant heated floors. Width and spacing to be determined by consultant or manufacturer. Gypsum cement may be substituted for cementitious mortar bed Modular screed panel can be used without radiant heat replace TAC s original generic specification.
6 Floor systems over which the tile will be installed shall be in conformance with the Canadian National Building Code 2005 and applicable local building codes taking into consideration anticipated live and MORTAR BED (cured for minimum of 24 hours) Flextile Dry Pack Mortar with Flextile 57 Slurry Bond Coat Flextile 59 or 5900 Flexflo Self levelling Underlayment with Flextile 4040 Primer SL Interior: System Exterior: Flextile 51 or 53 / 44 two component Latex Portland Cement Mortar System Interior: Flextile Polymer Modified Grout (ANSI A118.7) Exterior: Flextile 600 Polymer Modified Sanded Grout (ANSI A118.7) Following installation of electric heating cable or hydronic tubing (by others), apply mortar bed (see Tile Guide Specification Section Mixes 2.5.3) to required thickness over fresh slurry bond coat (see Tile Guide Specification Section Mixes 2.5.2). Finished tolerance of mortar bed not to exceed 6 mm in 3049 mm or 2 mm in 305 mm. Apply tile to bond coat before bond coat skins over. Use sufficient bond coat to ensure minimum 95% contact on exterior surfaces and wet areas and a minimum 80% contact on interior surfaces. Contact shall be evenly distributed to give full support of the tile. Apply Portland cement paste on fresh mortar bed, and dry-set mortar or latex-portland cement mortar over mortar bed cured for minimum of 24 hours. On fresh mortar bed, beat tile into position. On cured mortar bed, slide tile into position. Allow bond coat to cure. Force grout into full depth of joint, remove excess grout and clean. The thickness of the mortar bed / cementitious self levelling underlayment should be 32 mm minimum interior and 38 mm minimum exterior above heating pipes. Follow manufacturers requirements for maximum moisture content in concrete slab prior to application of underlayment. e.g. 1.36Kg per 93m2 per 24 hours. Do not use light weight aggregate in mortar bed. For residential or light commercial use only. Latex additive is recommended for Portland cement bond coat, and may be used in modification of mortar bed. Follow manufacturer s recommendations. Use of latex additive in mortar bed and bond coat is mandatory in exterior applications. Tile used on exterior applications must be frost resistant. Refer to Notes for The Professional and 301MJ-2009/2010. Where incorporating heating cable on interior or exterior concrete substrates is desired, refer to details 309F-2009/2010 and 310F-2009/2010 and incorporate heating cables in the bottom of the mortar bed. When hydronic heating is used in mortar bed, increase thickness of mortar bed to give minimum 32 mm of mortar bed over heating tubing. Certain proprietary systems may allow thin-set installation with latex-portland cement as per Detail C and Detail E. Heating system: design, installation and inspection by others. Movement joints shall be installed at a maximum 3659 mm for radiant heated floors. Width and spacing of joints to be specified by consultant. Latex-Portland cement mortars may require days cure before exposure to water. Verify with the manufacturer the correct cure time required. Alternatively, to reduce the curing time required, a rapid set mortar may be more suitable.
7 will be installed, shall be in conformance with the Canadian National Building Code System Flextile Polymer Modified Grout (ANSI A118.7) Following installation of electric heating cable or mat (by others) apply tile to bond coat before bond coat skins over. Use sufficient bond coat to ensure minimum 80% contact. Contact shall be evenly distributed to give full support of the tile. Slide tile firmly into position. Allow bond coat to cure. Force grout into full depth of joint, remove excess grout and clean. If waterproof/crack isolation membrane is required follow manufacturer s recommendations (ANSI A ) Refer to Notes For The Professional and 301MJ- 2009/2010. Uncoupling system to be placed over heating system. Follow manufacturers recommendations. Insulation layer may be required below concrete slab for maximum heating efficiency. Consult heating manufacturer for types and thicknesses. Radiant pipe/tube may be substituted for electric wire radiant heat system Electric radiant heat system confirming to UL (CAN/CSA) C22.2 #217 replace TAC s original generic specification.
8 Interior concrete slabs, steel trowel or fine broom finish where no moisture intrusion occurs. System FlexEpoxy 100 Epoxy Mortar (ANSI A118.3) Gypsum concrete underlayment meeting performance requirements of AS C 627 minimum. compressive strength of 15 MPa when tested by AS C 472. Primer/sealer as per gypsum manufacturer recommendations. Crack isolation / waterproof membrane 1000 or 2000SC Flexilastic Crack Isolation & Sound Reduction Membrane (ANSI A118.12) with 4000 or 4001 Flexilastic Primer Uncoupling system to manufacturer s recommendations. Radiant heat system (by others). Flextile Polymer Modified Grout (ANSI A118.7) Concrete slab to be well cured, dimensionally stable, free of contaminants such as oil, sealers, hardening or curing chemicals applied to the surface or incorporate in the mix. Maximum variation of slab should not exceed 6 mm in 3049 mm. Following installation of radiant heat system, apply a minimum of 19 mm gypsum concrete underlayment over heating tubes, consult the manufacturer for specific recommendations when used with floor heating system. Gypsum underlayment must be fully dry /cured prior to installation of primer / sealer, crack isolation membrane, waterproof membrane or uncoupling membrane, follow manufacturer s recommendations. Primer / sealer must be compatible with setting material. Apply tile to bond coat before bond coat skims over. Use sufficient bond coat to ensure minimum of 80% contact. Contact shall be evenly distributed to give full support of the tile. Slide tile firmly into position. Allow bond coat to cure. Force grout into full depth of joints, remove excess grout and clean. Manufacturers recommendations must be followed. For residential or light commercial use only. Not recommended for below grade installations and areas subject to extreme moisture. Thickness of gypsum concrete should be 15 mm minimum. Prior to application of gypsum concrete underlayment consult with waterproof membrane manufacturer. Consult with gypsum concrete manufacturer for proper curing time prior to application of tile and to the minimal time required before heat system is activated. Gypsum concrete underlayment installation only by a manufacturer qualified installer in accordance with the manufacturer s instructions and recommendations. Gypsum concrete underlayment may also be used over wood floors providing that two layers of plywood are used. See detail 313F-2009/2010 drawing (A). If an uncoupling system is used, one single layer of plywood minimum thickness of 20 mm is acceptable providing the floor trusses or I joist are spaced at no more than 480 mm o.c. Some gypsum concrete underlayment manufacturers recommend the use of plastic lath for application over wood substrate, follow manufacturers recommendations for best practice. Cross bridge floor joist but preferably solid blocking. Refer to Notes For The Professional. Uncoupling system to be placed over heating system. Follow manufacturers recommendations. Control joints as per detail 301 MJ 2009/2010 and gypsum concrete manufacturer recommendations.
9 Interior or exterior concrete slabs. Floor systems over which the tile is installed shall be in conformance with the Canadian National Building Code 2005 and applicable local building codes taking into consideration anticipated live and Interior: System Exterior: System Flextile 58XT Fast Set - two component Latex Mortar System MEMBRANE: MODULAR SCREED PANEL Expanded polystyrene panel with density no less then 32 kg/m3 Interior: Flextile Polymer Modified Grout (ANSI A118.7) Exterior: Flextile 600 Polymer Modified Sanded Grout (ANSI A118.7) Apply mortar bed (see Tile Guide Specification Section 2.5.5) to required thickness (see Tile Guide Specification Section 2.5.2). Finished tolerance of mortar bed not to exceed 6 mm in 3049 mm or 2 mm in 305 mm. Apply membrane to mortar bed as recommended by manufacturer. Apply tile to bond coat before bond coat skins over. Use sufficient bond coat to ensure a minimum 80% contact on tile back. If 95% coverage is specified refer to Contact shall be evenly distributed to give full support of the tile. Allow bond coat and grout to cure as recommended by the manufacturer for the type of environment and exposure anticipated. Force grout into full depth of joint, flush with tile surface. Remove excess grout by using fl oat at a 90º angle and clean with a sponge and plenty of water. Thickness of the mortar bed should not exceed more than 25 mm above the top of the pedestals of the modular screed panel. Verify with manufacturer maximum weight capacity. Refer to Notes For The Professional and 301MJ-2009/2010. Extra insulation layer may be required between concrete slab and Modular screed panel. Consult manufacturer for type and thickness. Movement joints to be installed only at the tile surface at a maximum of 3659 mm for radiant heated floors. Width and spacing to be determined by consultant or manufacturer. Gypsum cement may be substituted for cementitious mortar bed. Modular screed panel can be used without radiant heat. replace TAC s original generic specification.
Asphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
LATICRETE 290 Premium Floor and Wall Thin-set Adhesive PRODUCT DESCRIPTION
LATICRETE 290 Premium Floor and Wall Thin-set Adhesive PRODUCT DESCRIPTION LATICRETE 290 Premium Floor and Wall Thin Set Adhesive is a high performance bagged cementitious powder to be mixed with either
Schluter -DITRA Installation Handbook 2016. The Universal Underlayment for Ceramic and Stone Tile
Schluter -DITRA Installation Handbook 2016 The Universal Underlayment for Ceramic and Stone Tile Schluter -DITRA Specifically designed as an underlayment for ceramic and stone tile Ceramic and stone tiles
Retail Price List 2015
Retail Price List 2015 SETTING MORTARS SERVOFLEX TRIO SUPER TEC Flexible Full Transfer Thin Set and Medium Bed Mortar 20 KG Flexible, cement-based thin set and medium bed mortar with polymer additive for
Section 04810 EXTERIOR STONE VENEER Full Mortar
Full Mortar PART 1 GENERAL 1.1 SUMMARY A. Section includes: 1. Portland cement mortar bed 2. Stone Veneer 3. Expansion and control joints. 4. Portland cement and hydraulic mortar and grout. 5. Sealer and
NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
WATERPROOFING OF WET ROOMS
WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
LAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
Photo courtesy of Delta Stone, Heber City, UT. Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick
Photo courtesy of Delta Stone, Heber City, UT Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick THIN VENEER INSTALLATION SYSTEMS PREMIUM BONDING MORTARS Premium PCL Stone
CHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
B. Related categories: The following categories contain requirements that relate to this section:
ORIENTED STRAND BOARD PART I. - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply
Schluter -Shower System Installation Handbook 2014. Bonded Waterproofing System for Tiled Showers, Steam Showers, Steam Rooms, and Bathtub Surrounds
Schluter -Shower System Installation Handbook 0 Bonded Waterproofing System for Tiled Showers, Steam Showers, Steam Rooms, and Bathtub Surrounds Schluter -Shower System Bonded Waterproofing System for
Low viscosity, solvent free elastic adhesive for wood flooring
Product Data Sheet Edition 25/06/2012 Identification no: 01 05 02 01 250 0 000009 SikaBond -54 54 Wood Floor Low viscosity, solvent free elastic adhesive for wood flooring Construction Product Description
ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.
Two-component flexible, waterproofing and protective cementitious grout. 1504-2 PI-MC-IR Technical features Two-component grout, based on cements, selected aggregates, special additives and synthetic polymers
LEGACY REPORT. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council RETAINED ON U.S.
ICC-ES Legacy Report ER-5043* Reissued March 2004 www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council Legacy report on the 1997 Uniform Building Code DIVISION: 09
Division 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE
Mapeguard WP System ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE Products used: Mapeguard WP 200, Mapeguard ST, Mapeguard IC, Mapeguard EC, Mapeguard WP
RESIDENTIAL MASONRY A BEST PRACTICES GUIDE
RESIDENTIAL MASONRY A BEST PRACTICES GUIDE Build With Brick Build With Boral CONTENTS BRICK :01 MASONRY CEMENT :03 MASONRY SAND :04 WALL TIES :05 STEEL LINTELS :07 DRAINAGE WALL SYSTEM :09 FLASHING :11
Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors
Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes
GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER
CHAPTER 25 GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER User note: Code change proposals to this chapter will be considered by the IBC Structural Code Development Committee during the 2016 (Group B)
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING
APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING Appendix C Moisture Guidelines Determining moisture content is an essential part of quality control within the flooring installation process. Flooring
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
Technical Data wedi Subliner Dry Waterproofing Shower and Wet Area System
Technical Data wedi Subliner Dry Waterproofing Shower and Wet Area System Technical Data wedi Subliner Dry Waterproofing Shower and Wet Area System General Product Description Waterproof, thin-layer, crack
Superform Products Ltd.
TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
Triarch Products Over Various Interior Substrates
Triarch products work well over a variety of substrates, both for interior and exterior settings. This document will only discuss interior substrates and is not intended to be a technical discussion of
AUTHORIZATION TO MARK
AUTHORIZATION TO MARK This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 SECTION ONE A. Objective The objective of this guide is to provide Owners and General Contractors/Construction
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
CHAPTER 3 MOISTURE TESTING
CHAPTER 3 MOISTURE TESTING Part I - Moisture Testing for Wood Subfloors A. Testing Requirements 1. Test for moisture at several locations in the room a minimum of 20 per 1,000 square feet and average the
Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick ARCHITECTURAL SPECIFICATIONS / CAD MODELS TVISTM WARRANTIES
ARCHITECTURAL SPECIFICATIONS / CAD MODELS With more than 40 years of manufacturing high quality, innovative building products in the commercial and residential markets, Custom Building Products TVISTM
How to Install Hardwood Flooring Over a Sub Floor
How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product
Mold Preventing I nterior System
interior insulation and renovation boards A system of components that have been designed to work perfectly together to repair damage caused by mold. The system consists of boards, insulation wedges, reveal
How to build a Pizza Oven in 4 days
How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY
CHESTERFLEX ROOF WATERPROOFING MEMBRANES
CI/SfB (47) Ln2 Chesterfelt Ltd CHESTERFLEX ROOF WATERPROOFING MEMBRANES Certificate No 94/3062 DETAIL SHEET 2 Product THIS DETAIL SHEET RELATES TO CHESTERFLEX ROOF WATERPROOFING MEMBRANES, POLYESTER REINFORCED
Shower Walls and Tub Surrounds
Reverso en español TEC Skill Set How-To Project Guide Shower Walls and Tub Surrounds 3 Steps to a Beautiful Tile Surface! 1. Prepare the surface 2. Set the tile 3. Grout and caulk H.B. Fuller Construction
Construction Specification for Concrete Curb and Concrete Curb and Gutter
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 April 2015 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03
Mineral waterproof coating PCI Dichtschlämme
Mineral waterproof coating PCI Dichtschlämme 305 for basement walls, swimming pools and potable water tanks With official test certificate. FIELDS OF For indoor and outdoor use. For walls and floors. For
Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation
Bella Cera Engineered Hardwood Flooring Installation Instructions Check for Proper Color Selection Prior to Installation 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully
GYPSUM BOARD AND PLASTER
CHAPTER 25 GYPSUM BOARD AND PLASTER SECTION 2501 GENERAL 2501.1 Scope. 2501.1.1 General. Provisions of this chapter shall govern the materials, design, construction and quality of gypsum board, lath, gypsum
R-Value and Densities Chart
R-Value and Densities Chart Material R-Value Per Inch R-Value Per Unit Inside Air Film 0.68 Air Space between Studs 0.95 Building Pa 0.06 ½ in. Fiberboard Sheathing 1.52 Gypsum Wallboard or Drywall 0.90
Additions and Alterations
Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal
STANDARD OPEN PATIO COVER
STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist
Construction. Pre-Bagged Structural Waterproofing System. Product Description. Product Data. Tests. Form
Construction Product Data Sheet Edition 15/07/2013 Identification no: 01 07 05 04 001 0 000001 Sika 1 Pre-Bagged Structural Waterproofing System Product Description Pre-Bagged Structural Waterproofing
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to
BENTLEY ELEMENTS COLLECTION LVT
This document refers to the following products: Product Size Installation direction Seams treatment Elements Tiles See specifications 90 None Elements Planks See specifications Stair Step None Note: This
Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS
AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings
Thin Veneer Stone Installation Guide
Thin Veneer Stone Installation Guide Complete step by step How-to guide for installing Thin Veneer Stone. Important: From pallet to pallet of natural thin veneer stone, as with any natural stone product,
Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap
Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet
Guide Specifications for Maple Flooring Systems
Guide Specifications for Maple Flooring Systems MFMA Guide Specification for Resilient Pre-Engineered Fixed Panel System Purpose This Guide Specification is designed to assist in the production of actual
High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES
High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES ARDEX manufacture a complete range of high performance building
Please read the entire document before purchasing and installing any of these products
Please read the entire document before purchasing and installing any of these products USA SBS UNDERLAYMENT ROOFING UNDERLAYMENT SBS Mineral Surfaced MINERAL SURFACE CAP SHEET Ice and Water Protection
ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials
ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials SECTION 03 92 50 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,
INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS
INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS Introduction This inspection guide is organized to follow the EIF System's Installation Guide.
Rockwool Flexi Insulation Application Guide
Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed
Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM
P r o d u c t a p p l i c a t i o n s a n d t e c h n i c a l i n f o r m a t i o n 2 below and above ground V OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM V The flexible, fast and cost-effective answer
K2 STONE NATURAL VENEER
INTRODUCTION WHAT IS K2 NATURAL THINSTONE VENEER? Natural K2 Stone veneer is real stone, cut 1 inch thick, making it light enough to be installed as a veneer. Sometimes referred to as thin veneer, thin
HYDRO BAN Sheet Membrane
HYDRO BAN Sheet Membrane DS-041.0-0315 1. PRODUCT NAME HYDRO BAN Sheet Membrane 2. MANUFACTURER LATICRETE International, Inc. 1 LATICRETE Park North Bethany, CT 06524-3423 USA Telephone: +1.203.393.0010,
LP OSB Sheathing & Structural 1 Sheathing
Rated OSB Sheathing Roof Panels Span Ratings Max. Live Load Thickness Span Rating for Roofs (lbs)** 3/8" 24/0 30 7/16" 24/16 40 15/32" 32/16 70 1/2" 32/16 70 19/32" 40/20 130 23/32" 48/24 175 1-1/8" 48
The Minnesota Lath and Plaster Bureau Repairing Cracks in Stucco
The Minnesota Lath and Plaster Bureau Repairing Cracks in Stucco Disclaimer: This guide contains general information on stucco installation and related materials. It is provided as a guide only and is
CONSTRUCTION DETAILS & LOAD DESIGN CHARTS
Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description
Wecryl Waterproofing System under surfacing supplied by others
Brief description The Wecryl waterproofing system allows a high-quality, seamless and crack-bridging waterproofing layer to be installed under loose-laid or bonded surfacing supplied by others (stone slabs,
Herringbone Pattern Flooring
Herringbone Pattern Flooring If it s not marked NOFMA, it s not certified. Handling, Storage, Installation and Tips Herringbone is generally manufactured from 3/4 x 2 ¼ or ¾ x 1-1/2 standard tongue & groove
OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com
OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide GeneralShale.com OLD BRICK ORIGINALS THIN BRICK VENEER Page 2 INTRODUCTION Check local building codes for proper installation guidelines
Design No. P736 September 26, 2003. Restrained Assembly Ratings 1, 1-1/2 or 2 Hr. (See Items 3, 7 and 8A)
Design No. P736 September 26, 2003 Restrained Ratings 1, 1-1/2 or 2 Hr (See Items 3, 7 and 8A) Ratings 1, 1-1/2 or 2 Hr (See Items 3, 7 and 8A) Beam Ratings 1, 1-1/2 or 2 Hr (See Items 7 and 8A) 1. Beam
Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)
Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.) Gyproc Plasters The cracks in cement sand plaster are an inherent feature which cannot be completely prevented but can only be controlled and
R E S I D E N T I A L H O U S I N G
HL 252 Rev. April 1997 R E S I D E N T I A L H O U S I N G CONTROLLING EXTERNALWATER PROBLEMS FOR RESIDENCES I II III IV V Lot Drainage Gutter Water Management Foundation Waterproofing Floor Slab Waterproofing
How To Install Hardwood Flooring
phone: 1.855.Ludaire e-mail: [email protected] Solid Flooring Installation Instructions These Instructions and Guidelines are for the typical installation of ¾ Pre-finished Solid Hardwood Flooring manufactured
SikaBond Adhesive Systems for Floor Coverings. Innovation & Consistency. since 1910
SikaBond Adhesive Systems for Floor Coverings Innovation & Consistency since 1910 Sika s Comprehensive Competence in Flooring Sika has an extensive range of products for use in many different types of
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
Minor Cracks in Horizontal Surfaces
Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.
DUROCK Brand Cement Board. installation guide. Substrate and ceramic tile installation for walls, floors, countertops and wall shields.
DUROCK Brand Cement Board installation guide Substrate and ceramic tile installation for walls, floors, countertops and wall shields. DUROCK Brand Cement Board... Strength beneath the surface A ceramic
Third Party Inspection Guidelines For Inspectors As Part of the dryvitcare EIFS Repair/Restoration
Third Party Inspection Guidelines For Inspectors As Part of the dryvitcare EIFS Repair/Restoration DS497 SECTION ONE A. Objective The objective of this guide is to provide owners and general contractors/construction
Section 03 35 43 Polished Concrete Finishing. Vexcon
SS 120 1-13 Section 03 35 43 Polished Concrete Finishing Specifier Note: This product guide specification is written according to the Construction Specifications Institute (CSI) 3-part format. This section
Vanishing Lid Trays Construction Methods with Tile or Masonry
1-800-447-2838 Installation Instructions Vanishing Lid Trays Construction Methods with Tile or Masonry Table of Contents 1. Tools and Equipment...1 2. Vanishing Lid Trays...3 2.1 Materials for Finished
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS Multi-Layer Technology provides increased strength. Specifically designed for interior applications. Compatible with most internal
Patio Covers / Carports
Patio Covers / Carports Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed
Hardwood Flooring. Urbania Flooring
Engineered Hardwood Flooring Installation Guide for Urbania Flooring BEFORE STARTING THE INSTALATION - Please take the time to read and ensure that you understand the information contained in this document.
Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests
Product Data Sheet Edition 05/12/2014 Identification no: 020204030010000044 Sikadur -41 CF Rapid 3-part thixotropic epoxy patching mortar Construction Product Description Uses Characteristics / Advantages
BLACK JACK ALL WEATHER ROOF COATING
PAGE: 1 of 6 PRINT DATE: 16/09/2004 BLACK JACK ALL WEATHER ROOF COATING DESCRIPTION BLACK JACK ALL WEATHER ROOF COATING is a solvent based, full bodied black brushable compound with added fibres for reinforcement.
Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit
R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed
Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.
Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION
ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill
ENERGY STAR Qualified New Homes Thermal Enclosure Checklist & Water Management Checklist Eli Caudill ENERGY STAR Version 3 Tighter Standards Whole Home Approach Better, More Sustainable Construction Surpasses
Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls.
Improving the flood resistance of your home Advice sheet 4: Flood-resilient walls. This sheet provides guidance on identifying different types of wall, and reducing the flow of floodwater through them
HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
6.1 Schlüter -DITRA. Application and Function
INNOVATIVE PROFILES 6.1 Schlüter -DITRA U N D E R L A Y M E N T UNCOUPLING, WATERPROOFING, AND VAPOUR PRESSURE EQUALISATION Application and Function Schlüter -DITRA is a polyethylene membrane with a grid
How To Replace A Roofing System In Florida
Florida Consumer Considerations in Replacing their Roofing System The Florida Roofing, Sheet Metal and Air Conditioning Contractors Association provides the following general information to help Florida
Ultracolor CG2. Fast setting and drying grout for 2 to 20 mm joints, available in 26 colours; does not produce efflorescence
IN COMPLIANCE WITH EUROPEAN STANDARDS Ultracolor CG2 CEMENTITIOUS GROUT Fast setting and drying grout for 2 to 20 mm joints, available in 26 colours; does not produce efflorescence WHERE TO USE Interior
Waterproofing construction Joints
WaterproofingSystems Waterproofing construction Joints Area waterproofing Backing rod KÖSTER Joint Sealant FS-H KÖSTER FS Primer Contents Basics Connective, loadable and resilient: Joints in building construction
2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS
2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS The LOGIX wall assembly has no need for an additional vapor barrier, the solid concrete core covered with the low permeance EPS (Type II) foam
Manufactured Stone Veneer Installation Instructions
Manufactured Stone Veneer Installation Instructions Published: 8/14/2008 Revised: 6/25/2010 Table of Contents PART 1 -- INTRODUCTION PART 2 -- MATERIAL REQUIREMENTS PART 3 EXECUTION REQUIREMENTS PART 4
CertainTeed. GlasRoc Tile Backer
CertainTeed GlasRoc Tile Backer Diamondback GlasRoc Tile Backer Product Overview is a superior tile substrate for walls and ceilings, especially designed by CertainTeed to meet the demands of high-moisture
4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.
GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders