1 1 1 Replaces Form PQR Rev. B General Requirements The following General requirements apply to all purchase orders: Quality Management System- The supplier shall maintain a quality system which provides the necessary processes and controls to insure that compliance to all purchase order requirements are met. Possession of an AS9100 / AS9120 / ISO 9001 third party certification, or satisfactory completion of the Reinhold Supplier Survey Form F-7.4.1SS is acceptable demonstration of compliance to this system requirement. The supplier shall meet the applicable level of Quality System requirements as shown below: a. AS91XX series and/or ISO 9001 (latest revision) compliant system. b. Mil I 45208, Mil STD compliant system (or equivalent). c. A commercial QA program that shall provide as a minimum: Verification that the supplied item was manufactured and inspected in accordance with purchase order requirements. A calibration system to assure the accuracy of measuring equipment used for product acceptance. Detection of nonconforming material. Such material shall be identified, and segregated. Distributors shall flow down to their supply chain the applicable requirements including customer requirements (ref AS9120 para 7.4.2f). The distributor/organization shall maintain product identification and complete traceability from receipt; during splitting, storage, and packaging until delivery (including subcontracted handling or packaging). Complete traceability includes documenting and delivering to Reinhold all material acquisitions through the distribution chain, from the distributor order to the raw material mil certification. FAA requirements will be identified by the supplier s organization, applicable inspection and testing will be performed in accordance with purchase order requirements. o o All nonmetallic materials must conform to flammability requirements in accordance with 14 CFR Part The supplier shall provide a certification showing acceptance for flammability, smoke and toxicity as required. The use of alternate materials requires Reinhold authorization. Responsibility for Conformance- The supplier is responsible for furnishing material / service which conform to the requirements of the purchase order. Surveillance, inspections, and tests performed by Reinhold, the customer, or the government does not relieve the supplier of this responsibility. Documentation- The supplier must submit legible /reproducible certifications, test data, reports, NDT technique card references, and/or documentation shown in the purchase order. Computer generated documents must include an actual or facsimile signature, or must have on file a letter signed by the corporate or company officer. The letter must state the company is using a computerized system, the typed name on the document is an authorized employee, and the contractor is liable for the information it contains. Repairs of damaged or defective items require written approval from Reinhold after formal MRB submittal. You must have written approval from Reinhold prior to being started. Form F QC Rev NC
2 2 Changes to the supplier s or sub-tier supplier s name, address, tooling, equipment, facilities, materials or processes require advance notification to Reinhold. Designs, processes, materials, and/or procedures originally approved or qualified by Reinhold or our customers require written approval before the start of the production cycle in which the changes would take place. Access to Facilities- Reinhold, our customers and regulatory authorities reserve the right to enter all facilities involved for observation, inspections, and tests. Notify the Reinhold Buyer immediately of changes to facility location. Customer verification shall not be used by the supplier as evidence of effective control of quality by the supplier and shall not absolve the organization of the responsibility to provide acceptable product, nor shall it preclude subsequent rejection by the customer. Measuring Equipment- Gages, measuring and testing devices must be available for use by Reinhold personnel and/or Reinhold customers. Supplier personnel must be made available for the operation of supplier gage, measuring, and testing devices. Sub-Tier Control- - Supplier is responsible for flowing down all applicable quality requirements contained in Reinhold s purchase order to any sub-tier suppliers. The supplier must verify that product from their sub-tier supply chain conforms to purchase order requirements, and notify Reinhold prior to changing sub-tier sources. Materials, records and components forming the items prescribed in the purchase order shall be traceable from the supplier s shipper to the supplier s purchase orders. Production Interruptions- Notify the Reinhold buyer immediately of any interruptions to production lasting ninety (90) days or more. Nonconformance Report- Nonconforming parts or material requires Reinhold s written approval before shipment. Record any deviations from drawings, specifications, or other requirements, on Reinhold s Non Conformance Report (NCR). Submit the NCR to the Reinhold buyer. A copy of the approved NCR form must accompany each affected shipment and be attached to each part/container. The supplier will contact the Reinhold buyer for NCR forms. Latent Defects (Escapes) - Notify the buyer of any latent defects for products that were shipped prior to the discovery of the defects. Notification is by use of a cover letter including product description, shipper number, part number/revision, quantity, serial/lot number, and a corrective action statement. Supplier Corrective/Preventive Action Request- Reinhold may request a corrective action when a quality problem exists. Supplier Corrective/Preventive Action Requests (SCPARs) require complete and timely responses. Record Retention- Maintain all documents associated with this purchase order for a minimum of Ten (10) years from the close of the purchase order or as required by the purchase order. FOD- The supplier shall ship the product free of any foreign object debris (F.O.D.). Documentation Package- must be submitted to Reinhold and be available for review at the point of receipt. The documentation package shall include applicable material certs, test reports, dimensional data, etc. Provide processing and finishing certifications. Examples are surface treatments, coatings, heat treatment, plating, anodizing etc. Material received without applicable documentation will not be processed through receiving and may be returned. Form F QC Rev NC
3 3 Test Reports- A report per referenced or applicable requirements in any of the following categories: Chemical, physical, mechanical, and/or functional test reports as specified by engineering note. o For all test Reports: A legible/ reproducible test report will accompany each shipment. Each test report will identify the specification and revision as stated on the Reinhold purchase order. Include material lot numbers, heat numbers, melt numbers, and grades when they apply. Each test report must identify the serial numbers of serialized parts. Test reports must be dated and signed or stamped by the seller's representative (state title). Reinhold prohibits transcribing of the original supplier s test report to another form. Distributors shall submit legible/ reproducible manufacturer's test reports. Shelf Life and Storage Requirements- Shelf life and storage requirements set by specification require a shelf life statement. The statement will contain the Date of Manufacture (DOM), Date of Shipment (DOS), and/or Date of Test (DOT) as applicable. Include the Reinhold purchase order number, material lot or batch number, and the storage requirements. Do not ship supplies having less than 75% shelf life remaining without the written approval. First Article Inspection- Reinhold requires acceptance of the first article before production begins. Subsequent shipment prior to acceptance requires Reinhold authorization. Label the first article part with the purchase order number, part number, and part name. o Complete a First Article Inspection Report with bubbled print in the AS9102 format listing each inspected characteristic and the actual results. The supplier will maintain the report at their facility and keep it up- to-date (delta FAI's). A copy of the FAI report must be sent with the first shipment, and whenever a new delta FAI has been performed Dimensional Inspection Reports- Provide a 100% dimensional inspection report of actual dimensions, attributes, and applicable drawing notes. The report shall include a statement that all drawing requirements are acceptable. Document the results on your standard inspection report form, or request an Inspection Report form from the buyer. The report will include as a minimum the part name, drawing number & revision, serial number, and the Reinhold purchase order number. Document the minimum to maximum range of the actual dimensions for all parts inspected. o If specified by purchase order note: Record only those dimensions having a tolerance of ±0.030 or less, and any attributes and applicable drawing notes or provide a dimensional inspection report of selected characteristics as referenced on the purchase order Certificate of Conformance- An original Certificate of Conformance must accompany each shipment. The Certificate of Conformance must contain the purchase order number, a certification statement, a listing of specifications, drawings, technique cards, etc. with revisions levels as called out on the purchase order, and the name of the seller's representative. If required by purchase order note, complete a Reinhold Supplied SUPPLIER CERTIFICATION SUMMARY SHEET. Form F QC Rev NC
4 4 Traceability of Materials-Seller will provide copies of the raw material certs for the materials used in the products produced for Reinhold. Seller shall maintain traceability data, on file, for all parts or materials supplied, which identifies the parts/materials to the seller s point of origin. Materials used must be traceable to the manufacturer s records of acceptance and parts fabricated must be identifiable to the lot of material used. Unique identification will be assigned to articles and traceable throughout the associated documentation when serialization is required. o Reinhold supplied Material-All parts or materials furnished by Reinhold will maintain the "as furnished" identification. Do not substitute materials without written authorization from Reinhold. All documents for the parts or materials will show the "as furnished" identification. Control of Special Processes- Examples of special processes are casting, forging, heat treating, welding, plating, surface finishing, coating, treating, and testing (NDT, chemical, physical, etc.). The seller or seller s sub-tier must be approved to perform special processes per the prime contractor, Reinhold, or third party certification body referenced on the Reinhold purchase order (i.e. Nadcap). Provide Process Certifications with each shipment. Certifications will list the special processes performed and the applicable specifications/ drawings/technique cards with revisions. Include the class, type, and grade of the material, and the serial numbers of serialized parts. Certifications will be dated and signed or stamped by an authorized supplier representative (state title). Special Process Techniques- Procedures and applicable technique cards for the special process shown on the purchase order require written approval by Reinhold or Reinhold s customer before the start of work. Procedures will address as a minimum process conditions (temperatures, pressures, times, etc.), tools, and Quality Assurance (calibration, inspection, and test) provisions. Use of Customer Qualified Product List. - The supplier must be listed on the applicable QPL. Raw materials used must be obtained from suppliers listed on the applicable approved source list. Specialty Metals- Any specialty metals incorporated in the Purchase Order must be melted in the United States; it's possessions, Puerto Rico, or qualifying countries per DFAR (Counties listed on DFARS ). Supplier must comply and retain records that parts are in compliance with the above. Counterfeit Parts- The supplier shall establish and maintain a Counterfeit Parts and Material Prevention Control Plan using AS-5553 and/or AS6174 to ensure that that Counterfeit parts are not delivered to Reinhold Industries. The purpose of the supplier s plan shall be to develop a robust process to prevent the delivery of counterfeit commodities and control commodities identified as counterfeit. A copy of Reinhold s RSP 7.4 CCP (counterfeit parts) shall be forwarded to all suppliers providing RI with commodities / parts purchased from other parties. Form F QC Rev NC
5 5 Environmental Conditions for Shipments- Material shall be transported so that the maximum temperature during shipment is no more than the required material shipping temperature. This shall be corroborated by a calibrated temperature recorder that may be attached to the outside or inside of one of the boxes of the shipment, placed in such a manner to be conveniently located upon receipt. Either a chart or a disposable recorder will be left at Reinhold with the shipment as objective evidence that the temperature requirement was met during shipment. The chart shall show the date and time started and a record of temperature. The Reinhold purchase order number and material lot numbers will be added to the chart upon arrival at Reinhold. The following (PQRs) apply as specified in the purchase order: 1. Statistical process control (SPC) as per blueprint noted characteristics or PO text. If the characteristics or information is not identified, please contact Reinhold Industries quality engineering for instructions. a. A process capability index or Cpk must be determined for all specified characteristics. 2. Source Inspection- Notify the Reinhold buyer of hidden dimensions and dimensions difficult to inspect at final inspection. These dimensions require "in-process" inspection. a. Material requires Reinhold source inspection before shipment. Notify the Reinhold buyer forty eight (48) hours in advance of the required inspections(s). b. Prime Contractor - All supplies are subject to source inspection by Reinhold s customer. Notify the Reinhold buyer forty-eight (48) hours in advance of the required inspections. 3. Source Inspection- Governmenta. The government reserves the right of surveillance inspection for any or all of the requirements of this purchase order. b. Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the government representative who normally services your plant so that appropriate planning for government inspection can be accomplished. c. On receipt of this order, promptly furnish a copy to the government representative who normally services your plant, or if none, to the nearest Army, Navy, Air Force, or Defense Logistics Agency inspection office. In the event the representative or office cannot be located, our purchasing agent should be notified immediately.the government has imposed mandatory inspection requirements on this purchase order and a letter of delegation will be sent to the government representative who normally services your plant Form F QC Rev NC
Supplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D
More informationHelical Products Co., Inc.
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
More informationINTRODUCTION: PURPOSE:
UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found
More informationProduct Order Quality Requirements Meggitt (Orange County), Inc.
Product Order Quality Requirements Meggitt (Orange County), Inc. Reference QP8-051, Purchase Order Quality Requirements QP8-055, Review/Control Supplier Documentation PP-401, Quality Assurance Codes 50-2-351,
More informationGLOBAL AEROSPACE PROCEDURE
1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to
More informationSupplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E
9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier
More informationSupplier Quality Requirements and Clauses
Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion
More informationBogue Machine Company, Inc. Business Instruction
Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,
More informationPurchase Order Clauses and Conditions
Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements:
More informationPPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
More informationSupplier Quality Requirements F16 Program
ISRAEL AEROSPACE INDUSTRIES LTD. MILITARY AIRCRAFT GROUP, LAHAV DIVISION DOCUMENT IDENTIFIER : WF16Z/150901 Supplier Quality Requirements F16 Program RESTRICTION ON USE, DUPLICATION, OR DISCLOSURE OF PROPRIETARY
More informationQuality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division
Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...
More informationSupplier Quality Assurance Requirements Manual
1701 West Tacoma Broken Arrow, Ok. 74012 Supplier Quality Assurance Requirements Manual Approved: Bryan Sanderlin President/COO/CEO OSECO, Inc. Darrel Bilke Quality Assurance Manager OSECO, Inc. 1 Record
More informationChandler-Arrow Division Arrow Supplier Quality Requirements
AQR-1 QUALITY SYSTEM Supplier must maintain a quality system that meets, as a minimum, the requirements of ISO9001-2008, unless otherwise directed by Chandler-Arrow Division QA organization. Immediate
More informationGARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL
GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL Issue Number: 1 Issue Date: 12/9/14 1 of 19 Contents Revision Summary... 4 1.0 Introduction... 5 2.0 Supplier Quality System Requirements... 6 3.0
More informationSupplier Requirements Manual M M 0 3
Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.
More information2.1.1. Distributors In addition to the requirements noted herein, Distributors shall have a Quality System
1. Purpose This document defines requirements for suppliers providing aerospace and defense materials, products and services to Electromech Technologies. Supplier acceptance of a purchase order from Electromech
More informationATTACHMENT "Q" PURCHASE ORDER QUALITY CLAUSES
1 of 8 Q0. Instructions: Review your Purchase Order for any Q clauses listed below. Specific clauses other than Q0 apply only when listed on the PO. All certifications provided to CAI are to be complete,
More informationQuality Assurance QUALITY ASSURANCE PLAN
Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File
More informationPURCHASE ORDER APPENDIX QP 7.0-09 PROCUREMENT QUALITY CLAUSES
PURCHASE ORDER APPENDIX QP 7.0-09 PROCUREMENT QUALITY CLAUSES Buyer" = PCA Aerostructures Company "Seller" = Vendor, Supplier, Subcontractor, and/or Agents/Representatives 1.0 PURPOSE This document establishes
More informationPPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS
PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS Approved By Claude Rigsby Sourcing Manager Approved By Doug Nixon Manager,Quality Assurance PPG Industries, Inc. - PPG Aerospace Transparencies 1719
More informationGulfstream Production Certificate Operations
SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.
More informationQuality Requirements for Suppliers
ESC9100 Rev D Quality Requirements for Suppliers This document is the property of The United Technologies Aerospace Corporation and is loaned with the understanding that neither this document, nor any
More informationSupplier Quality Assurance
Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on
More informationCessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing
More informationL-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance
Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and
More informationGENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059
QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office
More informationSelf-Audit Checklist
Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page
More informationCopies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.
INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary
More informationAS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
More informationRTP s NUCLEAR QUALITY ASSURANCE PROGRAM
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).
More informationAppendix QX. Supplier Quality Requirements
Supplier Quality Requirements The latest issue to this document is the version that is available on the Lockheed Martin Aero website: http://www.lockheedmartin.com/us/aeronautics/materialmanagement.html
More informationHow To Ensure Quality Assurance
1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written
More informationSargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared
More informationSUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
More information1) CERTIFICATE OF COMPLIANCE/CONFORMANCE
Standard Supplier Quality Requirements This document defines restrictions and quality system requirements applicable when goods and services are procured to SMART ELECTRONICS part numbers or Military,
More informationTT electronics IMS Supplement to Purchase Order Quality Clauses TT electronics Purchase Order
Q01 Quality System Requirements The supplier shall establish and maintain a quality system that conforms to the requirements of ISO 9001:2008 or AS9100 Rev. C Q02 Supplier s Quality Plan The supplier shall
More informationPurchase Order Attachment 1600 Revision 02 June-2006. Raytheon Aircraft Company Supplier Quality Requirements Document
Purchase Order Attachment 1600 Revision 02 June-2006 Raytheon Aircraft Company Supplier Quality Requirements Document Issued by: Raytheon Aircraft Company Supply Chain Management Quality Assurance 101
More informationQuality Systems Manual
Hardy Machine & Design, Inc. Quality Systems Manual Meeting ISO9001:2008 Requirements Ankur Goel August 21, 2015 Quality Systems Manual Hardy Machine & Design Rev. 015 Page 2 AS 9100 Quality Management
More informationGE Power Electronics Business Total Quality Management for Suppliers
GE Power Electronics Business Total Quality Author: Reviewers: Contributors: Alessandro A. Cervone Technical Manager Component & Reliability Engineering Alicia Scott Title Erika Nannis Title Robert Roessler
More informationNew Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision A New Program Quality Requirements for Suppliers Rev.
More informationQ2A First Article Inspection (FAI) AS9102 * Revised ** Added
Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the
More informationQuality Management System Manual Revision L
This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
More informationVENDOR QUALIFICATION APPROVAL FORM
COMPANY INFORMATION: Company Name: Jet Aviation St. Louis, Inc. Address (Street, City, State) Other Property Locations: Website: Repair Station Certificate No. With Class Rating: Date of Last FAA Audit:
More informationCQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES
1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction
More informationQP-740. Supplier Management Handbook
QP-740 Supplier Management Handbook Revision H Revision Date Reason Signature - 2/02/08 Initial Release Avis Rosenfield A 12/10/10 Complete update Ritchie Lacson B 4/14/11 Add sections: 6.4, 6.5, 9.9,
More informationQuality Supplier Requirements for Beckwith Electric Co., Inc.
Quality Supplier Requirements for Beckwith Electric Co., Inc. This Page Left Intentionally Blank To Our Valued Suppliers: One of the primary goals of Beckwith Electric is to provide the highest Quality
More informationQUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER
QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER Lockheed Martin and LMC hereinafter shall mean Lockheed Martin Maritime Systems & Sensors, Maritime Security & Ship Systems (MS&SS), a Lockheed Martin Company.
More informationSUPPLIER QUALITY ASSURANCE REQUIREMENTS
SUPPLIER QUALITY ASSURANCE REQUIREMENTS The following supplier quality assurance requirements, referenced by number on the Purchase Order, are an integral part of each order placed by Continental Disc
More informationKOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts
Approved By: Elliott Major Date: 11-19-09 Page 1 of 9 Rev ECO Date Approve Rev ECO Date Approve A R01_13541 07-23-10 DWL B R01_14787 12-15-11 DWL C R01_14910 03-07-12 DWL D R01_14964 04-16-12 DWL 1.0 Purpose
More informationTable of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT
More informationCamar Aircraft Parts Co. Procedures Manual
QUALITY ASSURANCE PROCEDURES INDEX Procedure Number Approval Procedure Title 4.2.3 R.F. Control of Documents 4.2.4 R.F. Control of Records 6.2.2 R.F. Competence, Training and Awareness 6.4 R.F. Foreign
More informationQ2A First Article Inspection (FAI) AS9102
Page 1 of 7 Q2A First Article Inspection (FAI) AS9102 A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed Martin network.
More informationSUPPLIER QUALITY MANAGEMENT SPECIFICATION MANUAL
SUPPLIER QUALITY MANAGEMENT SPECIFICATION MANUAL 1. PURPOSE SCM 502 Issued: 02/20/06 Revision: 20 Page: 1 of 12 DISTRIBUTOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS 1.1 This specification stipulates the
More informationCompany Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
More informationAviation Suppliers Association Quality System Standard. ASA-100 Revision 4.0
Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 4.0 Original Issue: March 1994 Revision 4.0 Release Date: August 1, 2015 Effective Date: August 24, 2015 Copyright 1994-2015
More informationISO/IEC 17025 QUALITY MANUAL
1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4
More informationUNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
More informationSUPPLIER QUESTIONNAIRE
SUPPLIER QUESTIONNAIRE January 17, 2014 Dear Valued Customer, It is Summit Aerospace Inc., policy to respond in a timely fashion to every regulatory and quality inquiry as presented by our current and
More informationGeneric CMMS Quality Assurance Plan
Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)
More informationTurbo Resources International Quality Procedure
TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE
More informationIntroduction. Cooper Standard Global Supplier Quality Manual Page 2 of 11
Global Supplier Quality Manual Revision 3 Introduction 1. Purpose: This manual has been created for Cooper Standard s (CS) Production, Prototype and Service Suppliers. The manual includes all CS locations
More informationQUALITY MANUAL REVISION RECORD
Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion
More informationUnincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011
Aerospace Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011 The SPOC Manual is controlled in Electronic format as presented on the Supplier Portal and Honeywell Intranet.
More informationSUPPLIER QUALITY PROGRAM, V (U)
FEDERAL MANUFACTURING & TECHNOLOGIES PQR 1060 PAGE 1 OF 17 SUPPLIER QUALITY PROGRAM, V (U) CHANGE HISTORY ISSUE DESCRIPTION OF CHANGE AUTHOR DATE E CORRECTED CHANGE HISTORY S. L. HALTER 10/18/2000 F UPDATED
More informationStandard Practice for Quality Control Systems for Nondestructive Testing Agencies 1
Designation: E 1212 99 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Practice for
More informationAviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5
Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 3.5 Original Issue: March 1994 Revision 3.5 Release Date: September 1, 2008 Effective Date: November 1, 2008 Copyright 1994-2008
More informationALL PRODUCTS MFG & SUPPLY
ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY
More informationFlexible Circuits Inc. Purchase Order Standard Terms and Conditions
Flexible Circuits Inc. Purchase Order Standard Terms and Conditions 1. Acceptance- This writing, together with any attachments incorporated herein, constitutes the final, complete, and exclusive contract
More informationAMETEK Airtechnology Group Ltd
Page 1 of 16 AMETEK Airtechnology Group Ltd Locations: Airscrew Muirhead Aerospace Traxsys Input Products 111 Windmill Road, Sunbury on Thames, Middlesex, TW16 7EF Oakfield Road, Penge London SE20 8EW
More informationIEC Electronics Terms and Conditions
IEC Electronics Terms and Conditions 1. General: This Purchase Order is placed subject to these terms and conditions including those within the Purchase Order. The terms of any proposal referred to in
More informationAppendix QX. Supplier Quality Requirements
Appendix Q Appendix Q Supplier Quality Requirements The latest issue to this document is the version that is available on the Lockheed Martin Aero website: http://www.lockheedmartin.com/us/aeronautics/materialmanagement.html
More informationQuality Assurance Provisions
Page 1 of 5 1. Purpose and Scope. The purpose of this document is to define the Quality Assurance Provisions FLIR Systems Inc. requires for inventory material received from Suppliers. This document applies
More informationMEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F
MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality
More informationSTEEL fabrication quality SySTEmS guideline
STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written
More informationSUPPLIER QUALITY SYSTEM AUDIT
Company Name: Date: Company Address: Quality Assurance Mgr: President: Number of employees: Is your company receptive to source inspection? List all standards the quality system is based on Web Page: Company
More informationSurgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
More informationPERFORMANCE EXCELLENCE Procurement Standards
PERFORMANCE EXCELLENCE Procurement Standards AEROSPACE PRODUCTS Agile Revision: D Sparton Quality Policy: It is the goal of Sparton Corporation and it subsidiaries ( Sparton ) to deliver value through
More informationDEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation
Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard
More informationPurchase Order Clauses
Purchase Order Clauses Supplier are requested to comply with all of following quality clauses, additional clauses are listed with the purchase order as determine by Impresa Aerospace LLC. (IA.). Buyer
More informationSupplier Quality Requirements Manual SQRM
Supplier Quality Requirements Manual SQRM Approval: Signature on File: 5/25/2016 Beverly Green Director of Corporate Quality Signature on File: 5/25/2016 Brian McCarthy Executive Director of Material Page
More informationHow To Manage A Plant
MALAT 9100 QUALITY REQUIREMENTS For Suppliers of Category 12, 13 This Document is located in the Internet site http://www.iai.co.il/sip_storage/files/2/35782.pdf Date: March 2012 Prepared by : S. Migdal
More informationProduct Liability Risk Control Checklist
Product Liability Risk Control Checklist Appendix C1 This material will help you evaluate your products liability exposure. It is designed to enable you to focus on areas that need to be addressed to safeguard
More informationQuality Control Procedures QCP 5.4 Page 1 of 5
Quality Control Procedures QCP 5.4 Page 1 of 5 1.0 PURPOSE 2.0 SCOPE SOURCE INSPECTION To establish a system for Source Inspection of material supplied to Eaton Corporation, FSD, Euclid. This procedure
More informationEge Fren Ege Fren San. ve Tic. A.Ş.
Page : 1 / 8 1. Purpose: This manual is formed in order to create a business environment based on a partnership understanding with our suppliers, determine and develop our relationships in this context
More informationManagement System Procedure. 4.06 30 004 N 4/01/2012 2 of 14
4.06 30 004 N 4/01/2012 2 of 14 TABLE OF CONTENTS 1. Introduction 1.1 Policy and Vision 1.2 Purpose 1.3 Scope 1.4 Responsibility 2. Quality System Requirements 2.1 ISO/TS 16949: 2009 and Alternatives 2.2
More informationQCI 012.4 Counterfeit Avoidance and Mitigation Procedure
Page 1 of 6 Dept.: Quality Number: Counterfeit Avoidance and Mitigation Procedure Date Issued: 5/13/14 Supersedes Issue Dated: 2/13/14 Issued By: Lorenzo Belluccia, Quality Engineer Issuing Dept. Approval:
More informationSUPPLIER Form #: 007 AUDIT QUESTIONNAIRE
1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior
More informationACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014
ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) 1.0 INTRODUCTION June 2014 1.1 Purpose: The purpose of this acceptance criteria is to establish requirements for information that is provided to ICC-ES
More informationCentury Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER
Century Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER CONDITIONS AND INSTRUCTIONS A HARDCOPY OF THIS DOCUMENT MAY NOT BE THE DOCUMENT IN EFFECT. SEE CFMC DOCUMENT LIBRARY FOR CURRENT REVISION. 1.
More informationCartel Electronics. AS 9100 Quality Systems Manual
Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed
More informationFirst Article Inspection (FAI) Training
First Article Inspection (FAI) Training What is the purpose an FAI? The purpose of the First Article Inspection is to provide objective evidence that all engineering design and specification requirements
More informationQUALITY CONTROL MANUAL
QUALITY CONTROL MANUAL TABLE OF CONTENTS PREFACE I II III IV Title Page Table of Contents Information Page Revision Log SECTION DESCRIPTION 1.0 Introduction 2.0 Organization 3.0 Organization Chart 4.0
More informationQuality Assurance Manual. QAM-2013-Rev2
QAM-2013-Rev2 President s Policy and Authorization of Quality Control The management system for the Steel Structural Fabrication of Pinnacle Industrial Services entrusted through furnishing high quality
More informationSection 100 Contractor Quality Control Program
7/21/2014 AC 150/5370-10G Section 100 Contractor Quality Control Program 100-01 General. When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and
More informationPacific Gas and Electric Company
Pacific Gas and Electric Company Supplier Quality Assurance Mission Statement Our mission is to assure that PG&E has a robust quality program that quantitatively measures supplier performance and drives
More informationQUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010
Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power
More informationSection i POLICY AND AUTHORITY STATEMENT
Section i POLICY AND AUTHORITY STATEMENT It is the policy of Laboratory Testing, Incorporated (LTI)*, as a Material Organization, to furnish and perform testing services in nondestructive, mechanical,
More informationQuality Management System Manual
Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive
More information