Project Scoping Document. Sherman Terrace Condominium Association Proposed Water Main Replacement Project

Size: px
Start display at page:

Download "Project Scoping Document. Sherman Terrace Condominium Association Proposed Water Main Replacement Project"

Transcription

1 PROJECT SCOPING Project Manager: Project Information: Dennis Cawley, PE Sherman Terrace Condo Assoc. WM Rehab DOCUMENT Draft: 01/27/09 Department: Section: Revised: Madison Water Utility Engineering Approved: Project Scoping Document Sherman Terrace Condominium Association Proposed Water Main Replacement Project Table Of Contents: 1. Project Description 2 2. Alternatives 2 3. Cost Estimate 3 4. Financing 4 5. Operational Costs 5 6. Project Timeline 5 7. Appendix 6 1 of 6

2 PROJECT SCOPING Project Manager: Project Information: Dennis Cawley, PE Sherman Terrace Condo Assoc. WM Rehab DOCUMENT Draft: 01/27/09 Department: Section: Revised: Madison Water Utility Engineering Approved: Scoping Document Sherman Terrace Condo Assoc. WM Rehab 1. Project Description A description of the project, including a map showing existing facilities. The Sherman Terrace Condominium Association currently owns private water mains and building services that serve the residents and facilities on the property (see Exhibit A Existing Infrastructure). The private water infrastructure is connected to a City of Madison s water main at two metered locations on N. Sherman Ave. Under the existing conditions, any water main break or leak events on the private water mains are the responsibility of the condo association. The water mains have a break and leak history that warrants exploring the feasibility of water main replacement by the Madison Water Utility, which would subsequently be owned and maintained by the City of Madison. The Madison Water Utility has prepared three alternative water main replacement plans for the consideration of the Sherman Terrace Condominium Association. 2. Alternatives A description of alternative projects or programs considered. The Madison Water Utility has prepared three preliminary alternatives for consideration by the Sherman Terrace Condominium Association. 1. Alternative 1: Existing Service Alternative (Exhibit B). The Existing Service Alternative was designed to utilize existing building services and plumbing. The proposed water main would be installed in the corridor designated by the yellow dashed line (existing water infrastructure shown as blue). Building service lines would be replaced to a curb-stop to be installed outside each building, with a meter being installed at each building. This alternative requires approximately 3,500 feet of new water main to be installed, and 37 service connections. 2. Alternative 2: Replace 10 Services Alternative (Exhibit C). The Replace 10 Services Alternative was designed to simultaneously conserve the amount of water main to be installed while also limiting the amount building service reconfigurations. The proposed water main corridor is designated by the dashed purple line (existing water infrastructure shown as blue). The buildings designated by a purple circle would require plumbing reconfigurations to allow the building service to enter at a different location. Building service lines would be replaced to a curb stop to be installed at each building, with a meter installed at each building. This alternative requires approximately 3,150 feet of new water main, 27 service connections, and 10 service reconfigurations. M:\DESIGN\WATER\DGN\Sherman Terrace\Engineering Report\Sherman Terrace Scoping Document doc 2 of 6

3 PROJECT SCOPING Project Manager: Project Information: Dennis Cawley, PE Sherman Terrace Condo Assoc. WM Rehab DOCUMENT Draft: 01/27/09 Department: Section: Revised: Madison Water Utility Engineering Approved: Scoping Document Sherman Terrace Condo Assoc. WM Rehab 3. Alternative 3: Replace 19 Services Alternative (Exhibit D). The Replace 19 Services Alternative was designed to minimize the amount of water main to be installed. The proposed water main corridor is designated by the dashed red line (existing water infrastructure shown as blue). The buildings designated by a red circle would require plumbing reconfigurations to allow the building service to enter at a different location. Building service lines would be replaced to a curb stop to be installed at each building, with a meter installed at each building. This alternative requires approximately 2,650 feet of new water main, 18 service connections, and 19 service reconfigurations. 3. Cost Estimate The estimated cost of the project. The following cost estimates are preliminary and are based on general assumptions, not actual or quoted costs. The goal of the preliminary estimates herein is to provide a rough order of magnitude cost for the proposed water main replacement projects in order to determine the feasibility of continuing development of more detailed project plans and estimates. General assumptions:!" Currently, all 37 buildings on the Sherman Terrace Condominium Association property do not have a curb stop between the building and the water main.!" All 37 buildings do not have a meter for building use; subsequently, each condominium also does not have a meter for individual unit use.!"all estimates assume that each building will have a water meter to be billed evenly per unit in each building to minimize building plumbing costs.!" Preliminary estimated cost for curb-curb stop and water meter installation at each building: $2,500.!" Preliminary estimated cost for water service reconfiguration: $5,000.!" Preliminary cost for water main installation: $175 per linear foot of pipe. M:\DESIGN\WATER\DGN\Sherman Terrace\Engineering Report\Sherman Terrace Scoping Document doc 3 of 6

4 PROJECT SCOPING Project Manager: Project Information: Dennis Cawley, PE Sherman Terrace Condo Assoc. WM Rehab DOCUMENT Draft: 01/27/09 Department: Section: Revised: Madison Water Utility Engineering Approved: Scoping Document Sherman Terrace Condo Assoc. WM Rehab 1. Alternative 1 Preliminary Estimate: Existing Service Alternative (Exhibit B). a. Proposed Water Main: 3,500 $175/LF = $612,500 b. Install 37 curb-stops and $2,500 EA = $92,500 c. TOTAL: $705, Alternative 2 Preliminary Estimate: Replace 10 Services Alternative (Exhibit C). d. Proposed Water Main: 3,150 $175/LF = $551,250 e. Install 37 curb-stops and $2,500 EA = $92,500 f. Reconfigure 10 $5,000 EA = $50,000 g. TOTAL: $693, Alternative 3 Preliminary Estimate: Replace 19 Services Alternative (Exhibit D). h. Proposed Water Main: 2,650 $175/LF = $463,750 i. Install 37 curb-stops and $2,500 EA = $92,500 j. Reconfigure 19 $5,000 EA = $95,000 k. TOTAL: $651, Alternative 4 Preliminary Estimate: Maintain Status Quo (Exhibit A). a. Annual water main maintenance and repair costs. Preliminary estimates suggest that a water main replacement project at Sherman Terrace would cost approximately $650,000 to $705,000. Based on these assumptions, Alternative 3 is the lowest cost alternative at approximately $651,250, followed by Alternative 2 at $693,750, and lastly Alternative 1 at $705,000. Given the fact that all of the preliminary estimates vary by a range of less than 8%, it is not recommended that any alternative is designated the preferred alternative until more detailed plans and building service quotes would be determined.!" For example, if building service reconfigurations would be quoted at $8,000 instead of the estimated $5,000, Alternative 3 would be $708,250, Alternative 2 would be $723,750, and Alternative 1 would be the lowest at $705, Financing The proposed method of financing the project. Water main replacement project costs would be the financial responsibility of the Sherman Terrace Condominium Association and would be paid through assessments. M:\DESIGN\WATER\DGN\Sherman Terrace\Engineering Report\Sherman Terrace Scoping Document doc 4 of 6

5 PROJECT SCOPING Project Manager: Project Information: Dennis Cawley, PE Sherman Terrace Condo Assoc. WM Rehab DOCUMENT Draft: 01/27/09 Department: Section: Revised: Madison Water Utility Engineering Approved: Scoping Document Sherman Terrace Condo Assoc. WM Rehab An example estimated assessment is shown below, with the following assumptions:!" There are 37 buildings, 36 of which have condominiums.!" Each condominium building has 6 units (216 total assessments).!" Estimated water main replacement cost of $675,000. Based on these assumptions, each unit would have an assessment of $3,125. Water main assessments would proceed according to City of Madison Ordinance Water Main Assessment Procedure (Appendix A). Also, based upon City of Madison Ordinance Special Assessments Payment In Installments (Appendix B), special assessments may be paid in annual installments with an interest rate determined by the City Comptroller at the time the assessment is levied. 5. Operational Costs The estimated annual operating costs of the project. With a water main replacement project, the operational, maintenance, and repair costs of the infrastructure would be the responsibility of the Madison Water Utility from the water mains to, and including, the curb-stop located at each building. All maintenance between the curb-stop and the customer s units would be the responsibility of the Sherman Terrace Condominium Association. 6. Project Timeline The estimated project timeline, with identifies major project phases and decision points. A water main replacement project at Sherman Terrace will likely require 7 months from authorization to completion. The design phase would require approximately 2 months to prepare construction plans, estimates, specifications, and assessments. The contract approval process would likely take approximately 3 months to allow for public hearings before the Board of Public Works and the Common Council prior to contract execution through the City of Madison standard bidding process. Upon contract authorization, the construction work is estimated to take 2 months to complete. Given that the project is estimated to require 7 months to complete, the Madison Water Utility would need to receive authorization to proceed no later than April 01, 2009 in order to complete the project in M:\DESIGN\WATER\DGN\Sherman Terrace\Engineering Report\Sherman Terrace Scoping Document doc 5 of 6

6 PROJECT SCOPING Project Manager: Project Information: Dennis Cawley, PE Sherman Terrace Condo Assoc. WM Rehab DOCUMENT Draft: 01/27/09 Department: Section: Revised: Madison Water Utility Engineering Approved: Scoping Document Sherman Terrace Condo Assoc. WM Rehab 7. Appendix Documents referenced in the Scoping Document. List of Exhibits and Appendices Existing Infrastructure Exhibit A Existing Service Alternative Exhibit B Replace 10 Services Alternative Exhibit C Replace 19 Services Alternative City of Madison Ordinance Water Main Assessment Procedure City of Madison Ordinance Special Assessments Payments In Installments Exhibit D Appendix A Appendix B M:\DESIGN\WATER\DGN\Sherman Terrace\Engineering Report\Sherman Terrace Scoping Document doc 6 of 6

7

8

9

10

11

12

13

14

15

16

17

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Outline Update on Soapstone Emergency Response Provide project background Provide project purpose & need Present proposed

More information

Leak Detection Theory: Optimizing Performance with MLOG

Leak Detection Theory: Optimizing Performance with MLOG Itron White Paper Water Loss Management Leak Detection Theory: Optimizing Performance with MLOG Rich Christensen Vice President, Research & Development 2009, Itron Inc. All rights reserved. Introduction

More information

SEWER SERVICE LINE REPLACEMENT PROGRAM PROCEDURE Revision No. 1 - Effective January 4, 2016

SEWER SERVICE LINE REPLACEMENT PROGRAM PROCEDURE Revision No. 1 - Effective January 4, 2016 11 Clearwater Drive Little Rock, AR 72204 SEWER SERVICE LINE REPLACEMENT PROGRAM PROCEDURE Revision No. 1 - Effective January 4, 2016 Section 1 Procedure Background information At the recommendation of

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Final Report May 2014 EXECUTIVE SUMMARY Adequate municipal infrastructure such as roads, bridges, and underground water and sewage pipes are essential to economic development, citizen

More information

How to Do a Water & Sewer System Inventory - Capital Improvements Plan

How to Do a Water & Sewer System Inventory - Capital Improvements Plan Table of Contents Background, Objective and Method... 2 Capital Outlay - Water System... 3 Capital Outlay - Sewer System... 4 Summary... 4 Water Exhibit... 5 Sewer Exhibit....6 w w w. c a v a n a u g h

More information

Vendor Selection Overview UNIT PRICES FOR ASBESTOS ABATEMENT & DISPOSAL SERVICES VARIOUS SITES

Vendor Selection Overview UNIT PRICES FOR ASBESTOS ABATEMENT & DISPOSAL SERVICES VARIOUS SITES (ATTACHMENT 11) ACTION ON MONTHLY FACILITIES MATTERS: FMS AWARD OF CONTRACTS, RECOMMENDATION AND REQUEST FOR PROPOSAL OFFICE OF THE SUPERINTENDENT 5225 West Vliet Street P O Box 2181 Milwaukee, Wisconsin

More information

Public Involvement Meeting Handout

Public Involvement Meeting Handout Public Involvement Meeting Handout WIS 93 Detloff Drive to WIS 95 Trempealeau County Project ID 7130-01-72 June 18, 2014 5:00 P.M. 401 W. Main Street Arcadia WI Purpose of the meeting The Wisconsin Department

More information

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. 111 Wheatfield Drive, Suite 1 Milford, Pennsylvania 18337 (570) 296-2765 fax: (570) 296-2767 e-mail: mhepa@mhepc.com RICHARD D. McGOEY, P.E. (NY &

More information

Texas Case Studies in Access Management. Ed Hard, TTI

Texas Case Studies in Access Management. Ed Hard, TTI Texas Case Studies in Access Management Ed Hard, TTI 8 th National Conference on Access Management August 15, 2006 Presentation Overview TxDOT Arterial Widenings, College Station, TX Processes for Median

More information

PANTONE Chart Builder 2.5.2 File: MPC2000_2500_3000 Page: 1 of 14

PANTONE Chart Builder 2.5.2 File: MPC2000_2500_3000 Page: 1 of 14 PANTONE Chart Builder 2.5.2 File: MPC2000_2500_3000 Page: 1 of 14 PANTONE Yellow CS C:2 M:9 Y:98 K:0 PANTONE Purple CS C:32 M:74 Y:0 K:0 PANTONE Pro. Yel. CS C:3 M:4 Y:100 K:0 PANTONE Hex. Yel. CS C:0

More information

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 MM-T6-05 Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

More information

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:

More information

City of Crescent City Water Enterprise Fund September 16, 2013

City of Crescent City Water Enterprise Fund September 16, 2013 City of Crescent City Water Enterprise Fund September 16, 2013 Provide overview of City s Water System Recap Capital Improvement Plan Provide update on System s Financial Status June 30, 2013 Update for

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87

ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87 ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87 Overview Although energy-efficiency retrofits generally result in major cost and energy savings, many buildings are not participating in the audits that

More information

Exhibit A. SCOPE OF WORK Consulting Services for City of Durham Swimming Pool Facilities Assessment Study

Exhibit A. SCOPE OF WORK Consulting Services for City of Durham Swimming Pool Facilities Assessment Study Exhibit A SCOPE OF WORK Consulting Services for City of Durham Swimming Pool Facilities Assessment Study Basic Services for this project shall include the following services: A Planning Study to assess

More information

Rehabilitate or Replace 10 Years of the Trenton Water Works Experience

Rehabilitate or Replace 10 Years of the Trenton Water Works Experience Rehabilitate or Replace 10 Years of the Trenton Water Works Experience Michael L. Altland, PE TWW System & Service Area Outline Previous Cleaning and Lining Programs Replace Versus Rehabilitate Construction

More information

PANTONE ColorVANTAGE Process Simulations of PANTONE solid colors Page: 1 of 14

PANTONE ColorVANTAGE Process Simulations of PANTONE solid colors Page: 1 of 14 PANTONE ColorVANTAGE Process Simulations of PANTONE solid colors Page: 1 of 14 PANTONE Yellow CS R:245 G:222 B:0 PANTONE Purple CS R:158 G:56 B:181 PANTONE Pro. Yel. CS R:242 G:227 B:0 PANTONE Hex. Yel.

More information

Alternatives Evaluation Overview

Alternatives Evaluation Overview Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative

More information

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL

More information

Code Requirements for Existing Buildings

Code Requirements for Existing Buildings Code Requirements for Existing Buildings Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS)

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

CID STREET INFRASTRUCTURE ASSESSMENT

CID STREET INFRASTRUCTURE ASSESSMENT ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for

More information

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate AGENDA ITEM C9 DATE: February 2, 2015 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles Carden, Chief Operating Officer South Pasco Transmission Main Condition Assessment Services with Pure Technologies

More information

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees Rates & Fees Residential Accounts Residential Accounts 2015 Calendar Year Initial Charges New Construction or Irrigation 3 Base Meter 2 Account Activation Fee System Development Charge 1 Size Meter Fee

More information

CFDs, SFIDs, and DEVELOPER FEES

CFDs, SFIDs, and DEVELOPER FEES CFDs, SFIDs, and DEVELOPER FEES Sandi Burgoyne, Director Poway Unified School District 13626 Twin Peaks Road Poway, CA 92064 AUGUST 23, 2013 Community Facilities Districts (CFDs) - Just What Are They»

More information

How To Install An Overhead Sewer

How To Install An Overhead Sewer Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

Ship Repair, Maintenance & Modernization Cost Model. March 2014

Ship Repair, Maintenance & Modernization Cost Model. March 2014 Ship Repair, Maintenance & Modernization Cost Model March 2014 1 The Cost Model is a Microsoft EXCEL workbook that contains various tabbed worksheets. There are worksheets to enter basic project information

More information

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way Public Works Department Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way October 2015 HillsboroughCounty.org HILLSBOROUGH COUNTY Office of the County

More information

LAKES REGION SANITARY DISTRICT COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENT DEVICES

LAKES REGION SANITARY DISTRICT COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENT DEVICES PROGRAM REQUIREMENTS The District will provide funds to building owners who have or may experience sanitary sewer backups during periods of heavy rainfall for the installation of overhead sewers or backflow

More information

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS RESPONSE TO BIDDER S QUESTIONS Question #1: Is the Contractor required

More information

THE CORPORATION OF THE CITY OF COURTENAY STAFF REPORT

THE CORPORATION OF THE CITY OF COURTENAY STAFF REPORT THE CORPORATION OF THE CITY OF COURTENAY STAFF REPORT To: Council File No.: 1705-20 / 1830-05 From: Chief Administrative Officer Date: January 21, 2015 Subject: PURPOSE: The purpose of this report is to

More information

Wyoming Idle and Orphan Well Draft Plan. Table of Contents

Wyoming Idle and Orphan Well Draft Plan. Table of Contents Wyoming Idle and Orphan Well Draft Plan December 9, 2013 Table of Contents Introduction... 2 How many idle and orphan wells are there?... 3 Recommendations... 4 Federal Orphan Wells... 5 Recommendation...

More information

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration

More information

ELECTRICITY BILL AUDIT

ELECTRICITY BILL AUDIT ELECTRICITY BILL AUDIT IS YOUR ELECTRICITY BILL CORRECT? Contact us at 613-302-7301 Email at sduthie@retirementresort.ca www.yourelectricbill.ca Your Electricity Bill The first true step. Every prudent

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

Summary of Potential Storm Drain Projects and Programs

Summary of Potential Storm Drain Projects and Programs Summary of Potential Storm Drain Projects and Programs CAPITAL IMPROVMENTS PUMP STATION UPGRADES The storm runoff from a large portion of Palo Alto cannot flow by gravity into one of the local creeks.

More information

Section 5.900 - Emergency Water Shortage Regulations and Staged Water Use Reduction Plan Section 5.905 - Scope and Purpose

Section 5.900 - Emergency Water Shortage Regulations and Staged Water Use Reduction Plan Section 5.905 - Scope and Purpose Section 5.900 - Emergency Water Shortage Regulations and Staged Water Use Reduction Plan Section 5.900 of Chapter 5 of the District Code shall be known and cited as the Heritage Ranch Community Services

More information

Metering of Individual Units

Metering of Individual Units Metering of Irrigation Use and Individual Dwelling Units at Apartments, Condominiums, Townhouses, Mobile-home Parks, and Commercial Facilities From a water management perspective it makes sense to meter

More information

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick

More information

CITY OF SURREY BY-LAW NO. 6569

CITY OF SURREY BY-LAW NO. 6569 CITY OF SURREY BY-LAW NO. 6569 As amended by By-laws No. 7026, 02/01/82; 9960, 03/13/90; 10368, 01/22/90; 10797, 01/28/91; 12268, 04/25/94; 12384, 07/02/94; 12828, 05/13/96; 13171, 07/29/97; 13220, 09/22/97;

More information

Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016

Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016 Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016 Date of Release: September 14, 2015 Pre application

More information

Florida Avenue Multimodal Transportation Study. June 19, 2013

Florida Avenue Multimodal Transportation Study. June 19, 2013 Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights

More information

Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions

Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Seth Anderson, GISP Management Consultant Celine Hyer, P.E. Associate Vice President Presentation Topics The Infrastructure

More information

CITY COMMISSION MEETING AGENDA Tuesday, June 21, 2011

CITY COMMISSION MEETING AGENDA Tuesday, June 21, 2011 CITY COMMISSION MEETING AGENDA Tuesday, June 21, 2011 8:10 a.m. COMMITTEE ON APPOINTMENTS* (Coms. Bliss, Shaffer, White), Conf. Room 901 1) Discussion of the current Board/Commission Vacancy List 8:30

More information

Generator 101: Buying and Installing a Generator for Your Home or Office. bruniandcampisi.com 914-946-5558

Generator 101: Buying and Installing a Generator for Your Home or Office. bruniandcampisi.com 914-946-5558 Generator 101: Buying and Installing a Generator for Your Home or Office 1 Generator 101: Buying and Installing a Generator for Your Home or Office bruniandcampisi.com 914-946-5558 Introduction: An automatic

More information

CHAPTER 7 BUILDING. 7-4 Adoption of the International Plumbing Code and International Fuel Gas Code

CHAPTER 7 BUILDING. 7-4 Adoption of the International Plumbing Code and International Fuel Gas Code CHAPTER 7 BUILDING ARTICLE 7-1 Building Code 7-2 Electric Code 7-3 Mechanical Code 7-4 Adoption of the International Plumbing Code and International Fuel Gas Code 7-5 Uniform Code for the Abatement of

More information

Pantone Matching System Color Chart PMS Colors Used For Printing

Pantone Matching System Color Chart PMS Colors Used For Printing Pantone Matching System Color Chart PMS Colors Used For Printing Use this guide to assist your color selection and specification process. This chart is a reference guide only. Pantone colors on computer

More information

Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects

Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects December 10, 2014 from 2:00-3:00 p.m. Presented by Wayne Cannon Ohio RCAP Rural Development Specialist, hwcannon@wsos.org Why Asset

More information

APPENDIX B LINCOLN HIGHWAY/ROUTE 31 CORRIDOR TAX INCREMENT FINANCING DISTRICT HOUSING IMPACT STUDY

APPENDIX B LINCOLN HIGHWAY/ROUTE 31 CORRIDOR TAX INCREMENT FINANCING DISTRICT HOUSING IMPACT STUDY APPENDIX B LINCOLN HIGHWAY/ROUTE 31 CORRIDOR TAX INCREMENT FINANCING DISTRICT HOUSING IMPACT STUDY Village of North Aurora, Illinois May, 2009 DRAFT Prepared by: Teska Associates, Inc. TABLE OF CONTENTS

More information

LEAK DETECTION GUIDE

LEAK DETECTION GUIDE LEAK DETECTION GUIDE Your Guide to Home Water Conservation CITY OF BELLEVUE UTILITIES WATER & SEWER DEPARTMENTS LEAK DETECTION GUIDE PAGE: 1 WHERE TO START If you receive a high water bill, or think there

More information

Close-Out Documents... 9

Close-Out Documents... 9 Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter

More information

PANTONE Solid to Process

PANTONE Solid to Process PANTONE Solid to Process PANTONE C:0 M:0 Y:100 K:0 Proc. Yellow PC PANTONE C:0 M:0 Y:51 K:0 100 PC PANTONE C:0 M:2 Y:69 K:0 106 PC PANTONE C:0 M:100 Y:0 K:0 Proc. Magen. PC PANTONE C:0 M:0 Y:79 K:0 101

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

Achieving your goals through Financing. Cooperative Financing Models that may work for you

Achieving your goals through Financing. Cooperative Financing Models that may work for you Achieving your goals through Financing Cooperative Financing Models that may work for you Overview Cooperative Financing Overview of the environment Interest Rates Why now is the best time to borrow Reasons

More information

How To Color Print

How To Color Print Pantone Matching System Color Chart PMS Colors Used For Printing Use this guide to assist your color selection and specification process. This chart is a reference guide only. Pantone colors on computer

More information

Wauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013

Wauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013 Wauwatosa Lateral Rehabilitation Pilot Project CSWEA Annual Meeting Madison, WI May 15, 2013 Overview Background Objectives Work Completed Testing Evaluation Conclusions 2 Milwaukee Metropolitan Sewerage

More information

3704-0147 Lithichrome Stone Paint- LT Blue Gallon 3704-0001 Lithichrome Stone Paint- Blue 2 oz 3704-0055 Lithichrome Stone Paint- Blue 6 oz 3704-0082

3704-0147 Lithichrome Stone Paint- LT Blue Gallon 3704-0001 Lithichrome Stone Paint- Blue 2 oz 3704-0055 Lithichrome Stone Paint- Blue 6 oz 3704-0082 Lithichrome Colors Item Number Item Description 120-COL Lithichrome Stone Paint - Any Size or Color 3704-0011 Lithichrome Stone Paint- LT Blue 2 oz 3704-0066 Lithichrome Stone Paint- LT Blue 6 oz 3704-0093

More information

SIOR GREATER KANSAS CITY MUNICIPAL DEVELOPMENT REPORT CARD

SIOR GREATER KANSAS CITY MUNICIPAL DEVELOPMENT REPORT CARD 2 0 1 2 SIOR GREATER KANSAS CITY MUNICIPAL DEVELOPMENT REPORT CARD October 9, 2012 Greater Kansas City Municipal Development Report Card Table of Contents Introduction...3 Methods...4 Disclaimer...5 Office

More information

Residential: Commercial:

Residential: Commercial: Effective 01/01/15 2015 UTILITY [WATER & SEWER] SERVICES APPLICATION NEW PROJECT: RENEWAL: Residential: Commercial: For Residential Connections: Customer Name: Mailing Address: City, County, State, Zip

More information

The New Realities of Water Recycling in San Francisco

The New Realities of Water Recycling in San Francisco The New Realities of Water Recycling in San Francisco World-Leading Technology and Expertise in Commercial Water Recycling Gibran Farrah Manufacturers Representative Mega Western Sales Christian Park Environmental

More information

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) What is a referendum? New Jersey school districts hold public referendum votes to seek approval

More information

Energy Audits. Good energy management begins with an energy audit

Energy Audits. Good energy management begins with an energy audit Energy Audits Good energy management begins with an energy audit Effective management of energy-consuming systems can lead to significant cost and energy savings as well as increased comfort, lower maintenance

More information

How To Process Damage Claims In A City Department

How To Process Damage Claims In A City Department 6.10 1 of 5 POLICY 1. The Department of Public and is designated as the responsible authority for coordinating the processing of all damage claims to which the City is a party. This includes vehicle accidents

More information

Reference Guide for Obtaining Permits and Utility Services For New Construction

Reference Guide for Obtaining Permits and Utility Services For New Construction Reference Guide for Obtaining Permits and Utility Services For New Construction (Revised 04-2012) Table of Contents City Offices Telephone Numbers...1 Application for Utilities...2 Building Permits New

More information

NORTH RED AND PURPLE MODERNIZATION PROJECT

NORTH RED AND PURPLE MODERNIZATION PROJECT RED AD PURPLE MDERIZATI PRJECT Environmental Impact Statement Scoping Information January 2011 ITRDUCTI The Chicago Transit Authority (CTA) is proposing to make improvements, subject to the availability

More information

WHEREAS, on December 20, 2012, Metro Storage NY, LLC submitted an application

WHEREAS, on December 20, 2012, Metro Storage NY, LLC submitted an application CITY PLANNING COMMISSION April 24, 2013/Calendar No. 7 M 840631(B) ZMK IN THE MATTER OF an application submitted by Metro Storage NY, LLC for modification to Restrictive Declaration D-100 pursuant to Section

More information

VILLAGE OF DOWNERS GROVE Report for the Village Council Meeting

VILLAGE OF DOWNERS GROVE Report for the Village Council Meeting ORD 2015-6177 Page 1 of 11 ITEM ORD 2015-6177 VILLAGE OF DOWNERS GROVE Report for the Village Council Meeting 4/14/2015 SUBJECT: Illinois Plumbing Code Adoption SUBMITTED BY: Alex Pellicano Building Division

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601

More information

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS:

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS: CU PROCESS NUMBER FOLIO NUMBER Financial Institution Information Local Agent: Address: Phone: Space above reserved for use of recording office INSPECTION CERTIFICATE OF USE REPORT FOR SINGLE FAMILY RESIDENCE,

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

Chapter 7 Plumbing Connections

Chapter 7 Plumbing Connections Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions

More information

Proposals for Water Conservation Programs in Yavapai County Water Advisory Committee April, 2007

Proposals for Water Conservation Programs in Yavapai County Water Advisory Committee April, 2007 Proposals for Water Conservation Programs in Yavapai County Water Advisory Committee April, 2007 This document provides Water Advisory Committee (WAC) recommendations for water conservation in Yavapai

More information

mobiletws for iphone

mobiletws for iphone mobiletws for iphone Table of Contents Log in to mobiletws... 1 Logging In... 1 Trade... 5 Submit an Order... 5 The Order Ticket... 6 Quotes, Charts, Trading... 7 Add a Contract... 8 View Expanded Ticker...

More information

RESOLUTION NO. 1539 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, PIERCE COUNTY, WASHINGTON, APPROVING THE 192 ND CORRIDOR STUDY AND DIRECTING THE MAYOR TO PROCEED WITH PARTIAL DESIGN AND

More information

SALE OF CONDOMINIUMS, THE NATHANIEL AT BANKS SQUARE 948 MAIN STREET, WALTHAM (Former Banks School)

SALE OF CONDOMINIUMS, THE NATHANIEL AT BANKS SQUARE 948 MAIN STREET, WALTHAM (Former Banks School) THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT SALE OF CONDOMINIUMS, THE NATHANIEL AT BANKS SQUARE 948 MAIN STREET, WALTHAM (Former Banks School) A D D E N D U M N O. 2 Sept. 11, 2015 CHANGES,

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following: ADDENDUM NO. 2 TO REQUEST FOR QUALIFICATIONS FOR NEW DEVELOPMENT OF OAKLAND UNIFIED SCHOOL DISTRICT PROPERTIES, INCLUDING THE PARCELS HOUSING THE PAUL ROBESON ADMINISTRATION BUILDING AND DEWEY HIGH SCHOOL

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Eidelweiss Asset Management. Project Plan. Revision 0 - Draft

Eidelweiss Asset Management. Project Plan. Revision 0 - Draft Eidelweiss Asset Management Project Plan Revision 0 - Draft Written by Larry Leonard Eidelweiss Commissioner / Team Chairperson 5/29/2014 Table of Contents Section Description 1 Overview 2 Development

More information

Special Service Area (SSA) Overview

Special Service Area (SSA) Overview SSA #49 South Shore & Special Service Area (SSA) Overview City of Chicago Department of Housing and Economic Development Andrew J. Mooney, Commissioner What is an SSA? Special real estate taxing district,

More information

TRAFFIC ACCIDENT STUDY GUIDE 2010

TRAFFIC ACCIDENT STUDY GUIDE 2010 TRAFFIC ACCIDENT STUDY GUIDE 2010 SECTION SEVEN This study guide is designed to provide the law enforcement Explorer with basic principles. The guide is not all inclusive, and does not delineate specific

More information

505.3.6 For a building with a crawl space, see Figure 10. 505-1

505.3.6 For a building with a crawl space, see Figure 10. 505-1 505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the

More information

REBUILDING BELMAR ABFE FLOOD MAPS &THE REBUILDING PROCESS

REBUILDING BELMAR ABFE FLOOD MAPS &THE REBUILDING PROCESS REBUILDING BELMAR ABFE FLOOD MAPS &THE REBUILDING PROCESS REBUILDING BELMAR ABFE Maps Preliminary FIRM Maps Flood Insurance Increased Cost of Compliance (ICC) Elevation of Structures Building Permits Acronyms

More information

Question 2: How will changes in the objective function s coefficients change the optimal solution?

Question 2: How will changes in the objective function s coefficients change the optimal solution? Question 2: How will changes in the objective function s coefficients change the optimal solution? In the previous question, we examined how changing the constants in the constraints changed the optimal

More information

Tres Rios del Norte Feasibility Study

Tres Rios del Norte Feasibility Study Tres Rios del Norte Feasibility Study Santa Cruz River Pima County, Arizona February 2011 Study Area: 18 Miles of Santa Cruz River (Prince to Sanders), portions of City of Tucson, Town of Marana, and unincorporated

More information

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering

More information

How To Get A Water Line Repair Program To Pay For A House To Be Fixed

How To Get A Water Line Repair Program To Pay For A House To Be Fixed CITY OF ST. PETERS WATER SERVICE LINE REPAIR APPLICATION Address of Request for Repair: (Nearest Cross Street: ) The property is: owner occupied tenant occupied vacant Owner Name: Mailing Address: City/State/Zip:

More information

2004, 2005, 2010 & 2011

2004, 2005, 2010 & 2011 City of Pasadena, Texas Home Investment Partnerships Program DRAFT Substantial Amendments 2004, 2005, 2010 & 2011 The Community Development Department proposes a Substantial Amendment to reallocate funds

More information

UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF TEXAS DALLAS DIVISION

UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF TEXAS DALLAS DIVISION UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF TEXAS DALLAS DIVISION In re Kitec Plumbing System Products Liability Litigation MDL NO. 2098 Case No. 09-md-2098-F ONTARIO SUPERIOR COURT OF JUSTICE ONTARIO,

More information

514 SUPPLEMENTAL REQUIREMENTS FOR THE FORMER SOUTHEAST POLK RURAL DISTRICT

514 SUPPLEMENTAL REQUIREMENTS FOR THE FORMER SOUTHEAST POLK RURAL DISTRICT 514 SUPPLEMENTAL REQUIREMENTS FOR THE FORMER SOUTHEAST POLK RURAL DISTRICT All Des Moines Water Works Rules and Regulations shall apply to water service within the former SE Polk Rural Water District with

More information

CHAN & PARTNERS ENGINEERING, LLC

CHAN & PARTNERS ENGINEERING, LLC July 2012 CHAN & PARTNERS ENGINEERING, LLC Consulting Civil Engineers Imagine Austin Comprehensive Plan Infrastructure, Operations, Maintenance & Service Cost Comparison Preferred Growth Scenario and Trend

More information

American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE) Procedures for Commercial Building Energy Audits (2004)

American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE) Procedures for Commercial Building Energy Audits (2004) Excerpt from: American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE) Procedures for Commercial Building Energy Audits (2004) 2004 American Society of Heating, Refrigerating and

More information

Monthly Project Report

Monthly Project Report Purpose of this document To identify the requirements for monthly reporting on all projects that will enable appropriate control and management of projects at different levels within its governance structure.

More information

FRONT STREET & MUD ISLAND Interceptor Rehab

FRONT STREET & MUD ISLAND Interceptor Rehab ± 1!(!( 2!(!(!(!( 3!(!( 4!(!( 5!(!(!( 7!(!(!(!(!( 6!(!( 8!(!( 9!( Legend!( Manhole Rehab Mud IslandInterceptor (CIPP) Front St Interceptor (No Rehab) Gravity Main (No Rehab) Manhole (No Rehab) Sheet Boundary

More information

INSERT COMPANY LOGO/HEADER

INSERT COMPANY LOGO/HEADER LICENCE REFERENCE No. Insert licence reference number RISK ASSESSMENT METHODOLOGY STAGE & STEP Insert methodology stage and step, e.g. Stage 3 Step 1 REPORT VERSION Insert report version no., e.g. Draft,

More information