1 SECTION FUEL OIL STORAGE TANKS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section , "Mechanical General Provisions", govern this Section. 1.2 DESCRIPTION OF WORK: A. Work Included: Provide fuel oil storage tanks as specified, scheduled, and indicated. B. Types: The types of fuel oil tanks required for the project include, but are not limited to, the following: 1. Aboveground fuel oil tanks. C. Specification Sections: Refer to Specification Section Fuel Oil Piping for additional fuel oil system requirements. 1.3 QUALITY ASSURANCE: A. Manufacturers: Provide products complying with these specifications and produced by one of the following: 1. Modern Welding Co., Inc.. 2. Convault. 3. Envirosafe. B. Manufacturer's Qualifications: 1. Manufacturer of tanks to be reputable firm regularly engaged in design and manufacture of equipment specified. 2. Equipment to be substantially manufactured in manufacturer's own facilities. 3. Equipment furnished to be type that has been commercially available and in satisfactory operation for 5 years minimum. C. Regulatory Requirements: 1. Tanks shall be constructed to meet or exceed applicable requirements as set forth for nonmetallic underground flammable liquid storage per following: a. National Fire Protection Association (NFPA): 1) NFPA 30, Flammable and Combustible Liquids Code. 2) NFPA 31, Standard for Installation of Oil Burning equipment. 3) TNRCC, Chapter Underground and Aboveground Storage Tanks. 4) Conform to applicable EPA, State of Texas and Local Regulations for installation of fuel oil systems. 5) Tanks shall be UL-certified per UL Standard UL-2085, as applicable for storage of flammable liquids and an UL-certification plate shall be attached to each tank. E&C Project No Fuel Oil Storage Tanks

2 2. Tanks shall be Factory Mutual approval per FM Standard IM 7A0AF. 3. Equipment and accessories shall meet or exceed applicable federal, state and local requirements for installation and be in conformance with local building code and fire department requirements. 4. Tank construction shall comply with Federal Law (P.L.) D. Warranty: 1. Tanks shall be provided with a minimum 25 year manufacturer s warranty against leaks, corrosion and manufacturing defects. 1.4 SUBMITTALS: A. Shop drawings submittals shall include, but not be limited to, the following: 1. Tank cut sheets with all features and accessories clearly indicated. 2. Cut sheets on tank monitoring system, including accessories, options and wiring diagrams. 3. Certification that tanks are in conformance with all applicable current standards and requirements. 4. Submit complete wiring diagrams for tank monitoring equipment. 5. Manufacturer's written tank installation instructions. 6. Manufacturer s recommended tank test procedure. 7. Tank finish system documentation. 8. Tank warranty documentation. 9. Existing tank disposal procedure documentation. 10. Additional information as required in Section Mechanical General Provisions. 1.5 PRODUCT DELIVERY, STORAGE AND HANDLING: A. Deliver fuel oil tank components in factory-fabricated water-resistant wrapping. B. Handle fuel oil tank components carefully to avoid damage to material component, enclosure and finish. C. Store fuel oil tank components in a clean, dry space and protect from the weather. PART 2 - PRODUCTS 2.1 ABOVEGROUND FUEL OIL TANKS: A. General: Provide Modern Welding Co., Inc. Fireguard series of approved equal UL 2085 Protected Above Ground Storage Tanks (AST) with welded carbon steel (internal) tanks and welded carbon steel secondary (external) tank built to UL 142 standards for fuel oil storage and suitable for concrete pad mounting as shown on the drawings. B. Accessories: Provide all required appurtenances for tanks, support legs, taps, fittings, fill pipes, internal risers, monitoring fittings, UL listed emergency vents and other components and accessories as shown on the drawings and as required for a complete code compliant installation. C. Insulation: Tanks shall have lightweight thermal insulation which allows the tank toi exceed the requirements of the UL 2-hour fire test and which is sufficiently porous to facilitate quick emergency venting and/or leak detection. E&C Project No Fuel Oil Storage Tanks

3 D. Materials: Tanks (primary and secondary) shall be manufactured with carbon steel. Tanks shall be sandblasted to a SSPC-6 finish and the outside of the primary tank and the outside and inside of the secondary tank shall be primed and finish painted. E. Tanks Finish: All exposed portions of the tank shall be primed and finish painted with an epoxy primer/finish coat system which is UV and fuel resistant and which will provide a minimum of 25 year tank corrosion resistance service life when the tank is installed in an outdoor non-protected location. F. Certification Plate: Permanently affix Underwriters' Laboratories, Inc. label to each tank. G. Threaded Fittings - NPT: 1. Threaded fittings to be material of construction consistent with the requirements of the tank UL label and shall be 4" in diameter half couplings with cast iron plugs and shall include provisions for terminating a secondary containment system where applicable. 2. Reducers are to be used for smaller sizes where specified and provided with tank. 3. All threaded fittings to have machine tolerances in accordance with ANSI standard for each fitting size. 4. NPT fittings to withstand minimum of 150 feet/pounds of torque and 1,000 feet/pounds of bending, both with 2:1 factor of safety. 5. Fittings shall be provided as required for the project installation. H. Lifting Lugs: Provide lifting lugs on tanks capable of withstanding weight of tank with safety factor of 3:1. I. Warranty: Tanks shall be provided with the manufacturers standard one year materials and workmanship and 20 year leak warranty. J. Monitor Fittings: Tank shall have a minimum two test monitor fittings into the secondary tank. K. Tank Saddles: Provided welded steel support saddles for each tank. Number and location of saddles to be as recommended by the tank manufacturer and shall be capable of supporting the installed tank load. L. Nameplate and Labels: Affix non-corrosive nameplate showing manufacturer's name, address, identifying model number, serial number, fluid, size, capacity, and other pertinent data. PART 3 - EXECUTION 3.1 INSTALLATION: A. Install tanks and accessories in accordance with manufacturer's written installation instructions and all applicable codes, standards, and regulations. B. Install connections, fittings, fill pipes, vents, monitoring devices and other required components as shown on the Drawings and required for each tank. 3.2 FIELD QUALITY CONTROL: A. Testing: Check each individual tank system after installation for satisfactory performance and leakfree operation as recommended by the manufacturer and required by applicable current codes, standards and regulations. Minimum testing shall include pressure testing primary and secondary tanks at 5 psi with pressure gauge and soap solution on tank fittings for one hour with no detectable leakage. B. Certification: Certify that the complete fuel oil storage tank and monitoring systems are installed in accordance with all applicable current local, state and federal codes, standards and regulations. 3.3 ADJUSTMENT AND CLEANING: E&C Project No Fuel Oil Storage Tanks

4 A. Clean loose dirt, dust, and mandrel coatings from inside of tanks prior to filling. B. Verify interior of tank is dirt and dust-free prior to filling tanks. E&C Project No Fuel Oil Storage Tanks

5 3.4 DIESEL FUEL: A. General: Remove existing diesel fuel from the existing above ground storage tank before removing the tank. Existing fuel shall be reconditioned, stored and used to fill the new above ground storage tank. Provide additional diesel fuel as required for fuel oil system testing and to fill tank at the time of project acceptance. 3.5 EXISTING TANK REMOVAL AND DISPOSAL: A. Contractor shall remove the fuel from the existing storage tank, remove the tank and dispose of/recycle that existing tank in accordance with all applicable codes and standards. B. Contractor shall provide all applicable documentation, waste manifests and scrap receipts required to document that the existing tank was disposed of in accordance with all applicable codes and standards. 3.6 IDENTIFICATION: A. Refer to Section Basic Materials and Methods and applicable codes and standards for tank nameplate, labeling and warning sign requirements. END OF SECTION E&C Engineers & Consultants Inc. TX Firm Registration No. F E&C Project No Fuel Oil Storage Tanks

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank This specification describes requirements for a Diesel Fuel Day Tank System consisting of one or more fuel tanks, an Electronic

More information

List of Frequently Utilized Storage Tank Standards and Practices

List of Frequently Utilized Storage Tank Standards and Practices List of Frequently Utilized Storage Tank Standards and Practices Below is a list of frequently used storage tank standards and practices from organizations that are referenced in 25 PA Code, Chapter 245.

More information

BLADDER SURGE CONTROL SYSTEM

BLADDER SURGE CONTROL SYSTEM PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures

More information

Shop Fabricated Aboveground Tank Construction Standards

Shop Fabricated Aboveground Tank Construction Standards Shop Fabricated Aboveground Tank Construction Standards Wayne Geyer Steel Tank Institute Fourth Biennial Freshwater Spills Symposium 2002 March 19-12, 2002 Cleveland, OH One key to clean freshwater is

More information

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil)

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil) Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil) References: Comm 10 2009 EDITION / NFPA 30 2008 EDITION ITEM DESCRIPTION Comm 10 / NFPA General

More information

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code Part 1 - GENERAL 1.1 DESCRIPTION OF WORK A. Design and installation of an engineered Kidde ECS Advanced Delivery Systems (ADS), clean agent/waterless fire suppression system employing DuPont FM-200 agent,

More information

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459 SECTION 15459 PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work

More information

Morrison Bros. Co. General Product Specifications

Morrison Bros. Co. General Product Specifications Morrison Bros. Co. General Product Specifications Tank Mounted Spillbox The spill containment device is manufactured to contain spills and drips that may occur at the fill point on aboveground storage

More information

Waste Oil Collection / Storage

Waste Oil Collection / Storage ENVIRONMENTAL & REGULATORY SERVICES Storage Tank Regulation Section P. O. Box 7837 Madison, Wisconsin 53707-7837 TDD #: (608) 264-8777 http://www.commerce.state.wi.us http://www.wisconsin.gov Jim Doyle,

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

SECTION 33 12 19 FIRE HYDRANTS

SECTION 33 12 19 FIRE HYDRANTS SECTION 33 12 19 FIRE HYDRANTS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals.

More information

Design & Construction Standards, Revised January 2013 5.21.30-1

Design & Construction Standards, Revised January 2013 5.21.30-1 PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for fire pumps. This document is not intended to serve as a guide specification.

More information

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI).

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI). SECTION 23 52 30 PART 1 - GENERAL 1.01 RELATED WORK A. Section 23 05 00: Common Work Results for HVAC B. Section 23 25 00: Chemical Water Treatment C. Section 23 51 23: Flue Piping 1.02 QUALITY ASSURANCE

More information

Mechanical Installation

Mechanical Installation Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s

More information

SECTION 16461 DRY-TYPE TRANSFORMERS

SECTION 16461 DRY-TYPE TRANSFORMERS SECTION 16461 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Furnishing and installation of and testing of cast resin dry type MV/LV distribution transformer in accordance with specifications and drawings. Any

More information

ASME Packaged Indirect Fired Water Heater

ASME Packaged Indirect Fired Water Heater Utilizes Or HTHW To Heat Domestic Water, Semi-Instantaneous or Storage Type Model BW Features Reliable Only high grade materials used in construction to ensure long operating life Hydrastone cement lining

More information

Low Voltage Transformers Sealed, General Purpose, Dry Type

Low Voltage Transformers Sealed, General Purpose, Dry Type Low Voltage Transformers Sealed, General Purpose, Dry Type Catalog 7400CT9601R4/08 08 Class 7400 CONTENTS Description..............................................Page Introduction.................................................

More information

Secondary Containment Options for Aboveground and Underground Tanks. Wayne Geyer Steel Tank Institute

Secondary Containment Options for Aboveground and Underground Tanks. Wayne Geyer Steel Tank Institute Secondary Containment Options for Aboveground and Underground Tanks Wayne Geyer Steel Tank Institute Secondary containment tanks first appeared in the United States in the early 1980's, when several local

More information

OREGON FIRE CODE Interpretations and Technical Advisories

OREGON FIRE CODE Interpretations and Technical Advisories OREGON FIRE CODE Interpretations and Technical Advisories A collaborative service by local and state fire professionals, along with our stakeholders and customers, to provide consistent and concise application

More information

Gas Risers and Transition Fittings

Gas Risers and Transition Fittings 0 Elster Perfection Elster Perfection service line risers and transition fittings In 97, we developed the natural gas industry s first combination plastic/ steel anodeless service line riser. The first

More information

Midwest Industrial Tanks

Midwest Industrial Tanks FOR AGRICULTURE AND INDUSTRY Midwest Industrial Tanks Fuel & Oil Storage Solutions Midwest Industrial Tanks Is Your Source For All Of Your Fuel Storage And Fuel Transportation Needs. Our Satisfied Customers

More information

Above Ground Liquid Storage Solutions

Above Ground Liquid Storage Solutions Above Ground Liquid Storage Solutions AVIATION FARMS/FORRESTRY/MINING FLEET/YARD OPERATION Inside Front Cover-See Cover File for Graphic MARINE MILITARY/PUBLIC SAFETY MISSION CRITICAL OPERATIONS WATER

More information

07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying

More information

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling 250_P1 R10/7/2015 Copyright 2015 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice.

More information

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems Page 1 of 5 Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems New Hampshire Department of Environmental Services

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

SECTION 15140 - PIPE HANGERS AND SUPPORTS

SECTION 15140 - PIPE HANGERS AND SUPPORTS Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the

More information

Pee Dee Empty Oil Storage Tank at

Pee Dee Empty Oil Storage Tank at Mechanical Integrity Report for the Pee Dee Empty Oil Storage Tank at 208 North Palmetto Boulevard Clemson, South Carolina 29631 Inspection: 10 October 2012 Prepared by: George E. Matthews, E.I.T. Senior

More information

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Equipment

More information

DESIGN CLARIFICATION (DC)

DESIGN CLARIFICATION (DC) DESIGN CLARIFICATION (DC) Owner: Victor Valley Wastewater Reclamation Authority Date: 03/03/2015 Contractor: W M Lyles Carollo Project No.: 8299A.20 Project Name: Subregional WRPs DC No.: 001 DC Title:

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

Recommended Fuel Piping Specification For UPP Piping, UL-971

Recommended Fuel Piping Specification For UPP Piping, UL-971 Recommended Fuel Piping Specification For UPP Piping, UL-971 1.0 General The primary delivery piping system shall be for suction or pressure applications and have semi-rigid coaxial type double wall construction,

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

James M. Pleasants Company

James M. Pleasants Company James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:

More information

SECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

SECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL SECTION 14 20 10 - FREIGHT & PARKING GARAGE PART I - GENERAL 1.1 SECTION INCLUDES [NOTE to AE: The following lists requirements that are specific to freight elevators. These requirements are in addition

More information

TECHNICAL DATA 2. LISTINGS AND APPROVALS. Spray Nozzle 11. December 20, 2013

TECHNICAL DATA 2. LISTINGS AND APPROVALS. Spray Nozzle 11. December 20, 2013 Spray Nozzle 11 1. DESCRIPTION Viking Model C-1 Window Sprinklers are non-automatic, open, outside intended for protection of windows, walls, and roofs against exposure fires. The directional discharge

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

A. The latest published edition of a reference shall be applicable to this Project unless identified by a specific edition date.

A. The latest published edition of a reference shall be applicable to this Project unless identified by a specific edition date. SECTION 22 50 00 FUEL OIL PIPING SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00,

More information

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description Worldwide Contacts www.tyco-fire.com Model F thru F3 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description The Mulsifyre Nozzles are open (nonautomatic) nozzles and they are designed

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

Steel Tank Institute AST Inspections. Dana Schmidt, PE STI/SPFA

Steel Tank Institute AST Inspections. Dana Schmidt, PE STI/SPFA Steel Tank Institute AST Inspections Dana Schmidt, PE STI/SPFA Agenda Brief review of SPCC Rule SPCC relevance to small tanks and small facilities. SP001 Standard for Inspection of Aboveground Storage

More information

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved

More information

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00 211100_flexheadin_01_MS_0409 5/22/09 PTC 56 Lowland Street Holliston, MA 01746 Phone: (800) 829-6975 Phone: (508) 893-9596 Fax: (508) 893-6020 E-mail: sales1@flexhead.com www.flexhead.com This MANU-SPEC

More information

FAIRBANKS NIJHUIS FIRE PUMPS. www.fairbanksnijhuis.com

FAIRBANKS NIJHUIS FIRE PUMPS. www.fairbanksnijhuis.com FAIRBANKS NIJHUIS FIRE PUMPS www.fairbanksnijhuis.com FAIRBANKS NIJHUIS Long established as a leading fire pump manufacturer, Fairbanks Nijhuis offers a broad range of horizontal and vertical split case,

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

Model KFR56 Series Quick Response Standard Spray

Model KFR56 Series Quick Response Standard Spray Bulletin 036 Model KFR56 Series Quick Response Standard Spray Bulletin 036 Model KFR56 Sprinkler Types Standard Upright Standard Pendent Horizontal Sidewall Model KFR56 Sprinkler Types Pendent F1/F2/FP

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information

A. Shop Drawing submittals shall include, but not be limited to, the following:

A. Shop Drawing submittals shall include, but not be limited to, the following: SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical

More information

Saves time. Saves money. Up to 2 size for commercial gas piping.

Saves time. Saves money. Up to 2 size for commercial gas piping. Flexible Gas Piping by OmegaFlex Saves time. Saves money. Up to 2 size for commercial gas piping. Cost-effective, safe and completely reliable, TracPipe/CounterStrike is the ideal pipe for new construction,

More information

Cost Evaluation of Black Steel Pipe and Galvanized Pipe When Using a Nitrogen Generator

Cost Evaluation of Black Steel Pipe and Galvanized Pipe When Using a Nitrogen Generator Cost Evaluation of Black Steel Pipe and Galvanized Pipe When Using a Nitrogen Generator Andy L. Kaempfer Business Development Manager Potter Electric Signal Company, LLC 1609 Park 370 Place St. Louis,

More information

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations. PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to December 26, 2015. It is intended for information and reference purposes

More information

City of San Diego, CWP Guidelines

City of San Diego, CWP Guidelines PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

SECTION 17400 ACCESS CONTROL SYSTEM. CONDITIONS OF THE CONTRACT AND DIVISION 1, as applicable, apply to this Section.

SECTION 17400 ACCESS CONTROL SYSTEM. CONDITIONS OF THE CONTRACT AND DIVISION 1, as applicable, apply to this Section. SECTION 17400 ACCESS CONTROL SYSTEM CONDITIONS OF THE CONTRACT AND DIVISION 1, as applicable, apply to this Section. PART 1 - GENERAL 1.1 RELATED WORK A. 16060 Grounding and Bonding B. 16070 Electrical

More information

Highland Aboveground Steel Storage Tanks

Highland Aboveground Steel Storage Tanks Highland Aboveground Steel Storage Tanks Working for You and a Clean Environment C O N T E N T S The Highland Advantage 1 Horizontal Tank Construction 2 Fireguard Tanks 4 Dike Tanks 6 AREO Style Dike Tanks

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities. SECTION 224500 - EMERGENCY PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Section 03 35 43 Polished Concrete Finishing. Vexcon

Section 03 35 43 Polished Concrete Finishing. Vexcon SS 120 1-13 Section 03 35 43 Polished Concrete Finishing Specifier Note: This product guide specification is written according to the Construction Specifications Institute (CSI) 3-part format. This section

More information

LOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete.

LOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete. LOADING DOCK EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Loading dock equipment of the following types: 1. Dock lifts. 2. Control stations. 1.2 RELATED SECTIONS A. Section 03100 - Concrete Forms and

More information

What to Expect From the Examination. How to Study the Plumbing Codes

What to Expect From the Examination. How to Study the Plumbing Codes Texas State Board of Plumbing Examiners Plumbing Inspector Examination Review Course The following Examination Review Course is designed to assist an applicant in preparing for the Plumbing Inspector examination.

More information

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES PART 1 - GENERAL 1.1 SCOPE OF WORK SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS PULTRUDED SQUARE TUBE LADDER

More information

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap 1263050/6 IM-P126-07 ST Issue 6 BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

Light Duty Commercial Electric Water Heater

Light Duty Commercial Electric Water Heater Features Heavy Duty Construction Hydrastone cement lining provides longer tank life Copper-silicon tappings cannot rust or corrode High impact composite jacket eliminates damage during installation and

More information

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is

More information

PBX Series Quick Fit Connector Bimetallic Steam Traps

PBX Series Quick Fit Connector Bimetallic Steam Traps 6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

ELECTRIC/DIESEL FIRE PUMP CHECK LIST BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information

HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12

HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12 SECTION 27 05 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes grounding and bonding products, design requirements and installation for communications

More information

Section 8 Storage Tanks & Equipment

Section 8 Storage Tanks & Equipment Section Storage Tanks & Equipment Table of Contents Section Storage Tanks & Equipment Above Ground Horizontal Tanks... -1-4 Containment Sumps...-5 Fillrite AC & Transfer Pumps... -9-10 Fillrite Diesel

More information

GAS SAFETY PRECAUTIONS

GAS SAFETY PRECAUTIONS GAS SAFETY PRECAUTIONS Instructions on what to do when a user smells gas can be obtained from the local gas supplier. These instructions must be posted in a prominent location where the unit is to be operated.

More information

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes CANTEX INC. 301 Commerce Ste 2700 Fort Worth, Texas 76102 817-215-7000 Fax: 817-215-7001 Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes YOUR FULL

More information

Essentials Welding QA/QC Plan Sample

Essentials Welding QA/QC Plan Sample Essentials Welding QA/QC Plan Sample Good for smaller projects and bid qualifications Has All the Essential Elements of a well-founded Quality Control Plan Contact: Ed Caldeira 410-451-8006 Pat [Pick the

More information

SECTION 260536 - CABLE TRAYS. A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system.

SECTION 260536 - CABLE TRAYS. A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system. SECTION 260536 - CABLE TRAYS PART 1 - GENERAL SECTION INCLUDES: A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system. B. Cable tray systems are defined to include, but

More information

SECTION 03400 PRECAST CONCRETE STRUCTURES

SECTION 03400 PRECAST CONCRETE STRUCTURES SECTION 03400 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for precast concrete structures, including fabrication and erection. 1.02 REFERENCE STANDARDS A. American Society for

More information

HELIPORT FUEL/WATER SEPARATOR MODEL H-200

HELIPORT FUEL/WATER SEPARATOR MODEL H-200 HELIPORT FUEL/WATER SEPARATOR MODEL H-200 Suite 150 Voice 1-973-540-0011 55 Madison Avenue Fax 1-973-540-0131 Morristown, NJ 07960-6012 Email info@heliport.com U.S.A. Web www.heliport.com A. PRINCIPLE

More information

Cleveland Tank & Supply, Inc. School Bus Diesel Fuel Tanks and Accessories. For Immediate Shipment

Cleveland Tank & Supply, Inc. School Bus Diesel Fuel Tanks and Accessories. For Immediate Shipment Cleveland Tank & Supply, Inc. Supplemental Catalog School Bus Diesel Fuel Tanks and Accessories For Immediate Shipment. (216) 771-8265 Fax: (216) 771-8239 www.clevelandtank.com sales_1@clevelandtank.com

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

3-Part Specification Railing Cable Systems

3-Part Specification Railing Cable Systems 3-Part Specification Railing Cable Systems GENERAL NOTES TO SPECIFIER: THIS SPECIFICATION SECTION HAS BEEN PREPARED TO ASSIST DESIGN PROFESSIONALS IN THE PREPARATION OF PROJECT OR OFFICE MASTER SPECIFICATIONS.

More information

SECTION 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

SECTION 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY SECTION 28 05 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections, apply

More information

Industrial Generator Set Accessories

Industrial Generator Set Accessories Industrial Generator Set Accessories Weather/Sound Enclosure and Subbase Fuel Tank Package Applicable to the following: 40REOZJC 50/60REOZJD 80/100/150/200REOZJF 125/180REOZJG 230-275REOZJE 300REOZJ Enclosure

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Series DS-1 Dry-Type Sprinklers 5.6K Horizontal Sidewall Standard and Quick Response, Extended Coverage General Description

Series DS-1 Dry-Type Sprinklers 5.6K Horizontal Sidewall Standard and Quick Response, Extended Coverage General Description Worldwide Contacts www.tyco-fire.com Series DS-1 Dry-Type Sprinklers 5.6K Horizontal Sidewall Standard and Quick Response, Extended Coverage General Description TYCO Series DS-1 Dry-Type Sprinklers, 5.6

More information

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series INSTR3010 0406 Installation and Operating Instructions Installation Instructions for SS EPE-316L Series Congratulations on your purchase of this Aqua-Pure high flow, single housing filtration system. This

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

SECTION 22 LIGHTNING PROTECTION SYSTEM

SECTION 22 LIGHTNING PROTECTION SYSTEM SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for

More information

~~~~ Brian L. Harper, M.D., M.P.H. Commissioner of Health. Vito Minei, P.E. Director of Environmental Quality

~~~~ Brian L. Harper, M.D., M.P.H. Commissioner of Health. Vito Minei, P.E. Director of Environmental Quality SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES DIVISION OF ENVIRONMENTAL QUALITY ABOVEGROUND OUTDOOR TANK AND ASSOCIATED PIPING DESIGN STANDARDS ~~~~ Brian L. Harper, M.D., M.P.H. Commissioner of Health

More information

Universal Installation and Maintenance Instructions Double Wall Spill Containment Bucket (5 and 15 gal)

Universal Installation and Maintenance Instructions Double Wall Spill Containment Bucket (5 and 15 gal) Universal Installation and Maintenance Instructions Double Wall Spill Containment Bucket (5 and 15 gal) IMPORTANT: It is imperative that the user read these warnings and use of the assembly instructions

More information

SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 *

SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 * SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 * PRODUCT: Polymer (Foam-Filled) Fuel Cells 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards

More information

If your campus has. Oil Pollution Prevention Rules (con.) Oil Pollution Prevention Rules (con.)

If your campus has. Oil Pollution Prevention Rules (con.) Oil Pollution Prevention Rules (con.) De-Mystifying the Oil SPCC Rules Presented by: Karen Townsend, P.E. Project Manager Woodard & Curran August 9, 2004 Agenda 1. Oil SPCC Regulatory Background 2. Highlights of 2002 Oil SPCC Amendments 3.

More information

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS January 1997 PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS 1.0 PERMIT 1.1 After receipt of a Building Permit from the City of San Jose Building Department, submit

More information

Screw Plug Immersion Heaters

Screw Plug Immersion Heaters Immersion Heaters Overview Immersion Heaters consist of hairpin bent tubular elements brazed or welded into a screw plug and provided with terminal enclosures for electrical connections. Immersion Heaters

More information

Chapter 7 Plumbing Connections

Chapter 7 Plumbing Connections Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions

More information

Dual wall sub-base fuel tanks-ibc Certified 30-230 kw DGHCA/CB/CC/DA/DB (4BT3.3G5) DSFAA/B/C/D/E (QSB5G3) DSGAA/B/C/D/E (QSB7G5) DSHAA/B/C/D (QSL9G2)

Dual wall sub-base fuel tanks-ibc Certified 30-230 kw DGHCA/CB/CC/DA/DB (4BT3.3G5) DSFAA/B/C/D/E (QSB5G3) DSGAA/B/C/D/E (QSB7G5) DSHAA/B/C/D (QSL9G2) Dual wall sub-base fuel tanks-ibc Certified 30-230 kw DGHCA/CB/CC/DA/DB (4BT3.3G5) DSFAA/B/C/D/E (QSB5G3) DSGAA/B/C/D/E (QSB7G5) DSHAA/B/C/D (QSL9G2) Description Features Cummins Power Generation diesel

More information

Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling

Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling 405_P1 R1/27/2012 Copyright 2012 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice.