1 THE EROSION CONTROL BMP MANUAL What are the Major Changes?
2 A GUIDANCE DOCUMENT It was published in the PA Bulletin October 17, 2009 There was a 60 day comment period
3 OVERALL LAYOUT Current Draft Introduction 17 Chapters 12 Appendices List of References pages (excluding cover & indices) YOI!
4 INTRODUCTION Why is erosion & sediment pollution important?
5 CHAPTER 1: REQUIRED PLAN CONTENT Descriptions of the 15 Items listed in Chapter 102 expanded 1. Topographic Features 2. Soil Use Limitations 3. Proposed Alteration 4. Runoff 5. Receiving Surface Waters 6. Perimeter BMPs 7. Sequence (BMP installation & removal) on the plan drawings (not in narrative)
6 CHAPTER 1: REQUIRED PLAN CONTENT Descriptions of the 15 Items listed in Chapter 102 expanded 8. Supporting Calcs 9. Plan Drawings 10. Maintenance Program 11. Recycling & Disposal of Materials 12.Geologic or Soil Conditions that could cause pollution 13.Thermal impacts (in accordance with PCSM plan)
7 CHAPTER 1: REQUIRED PLAN CONTENT Descriptions of the 15 Items listed in Chapter 102 expanded 14. Consistency with PCSM plan 15. Riparian Forest Buffers identified
8 CHAPTER 2: BMP SEQUENCING Expanded to provide better guidance 3 Standard Notes recommended for detail sheets Suggested Outline Provided
9 Exploration & Surveying BMPs should be provided for disturbed areas as well as surface water crossings (streams, wetlands, etc.) May use the BMPs from Chapter 3 Others may be approved on case-by-case basis if found to be equal to or better than those in Chapter 3
10 BMP Ratings for use in Special Protection Watershed BMPs with low sediment removal efficiencies are not ABACTS BMPs with moderate sediment removal efficiencies are ABACTS for HQ watersheds, but not EV watersheds BMPs with high sediment removal efficiencies are ABACTS for HQ & EV watersheds
11 CHAPTER 3: SITE ACCESS Rock Construction Entrance New detail
12 Rock Construction Entrance With Wash Rack ABACT for HQ & EV watersheds
13 Temporary & Permanent Access Roads Addressed for the 1 st time
14 Temporary & Permanent Crowned Roadways Access Roads
15 Insloping Temporary & Permanent Access Roads
16 Waterbar Brought out of the Pipeline text
17 Waterbar The detail has been enlarged & clarified
18 Broad-based Dips 2 details Broad-based Dip
19 Broad-based Dip Spacing Table provided Road Grade (Percent) Spacing Between Dips, Culverts, or Deflectors (feet) <
20 OPEN-TOP CULVERTS Brought into the manual from the Timber Harvesting packet
21 WATER DEFLECTORS May be used in lieu of open-top culverts
22 ROADSIDE DITCH Brought into the manual from the Timber Harvesting packet Need for lined Protective liners is addressed
23 DITCH RELIEF CULVERT Brought back to the manual
24 Road Grade (%) DITCH RELIEF CULVERT Table 3.3 Spacing of Temporary Culverts Culvert Spacing* (ft) Length of Upslope Drainage (ft) < Minimum Culvert Size (in) > *Culvert spacing may be adjusted slightly to take advantage of natural drainageways.
25 Road Grade Percent DITCH RELIEF CULVERT Table 3.4 Spacing of Permanent Culverts Gravels, Sandy Gravels, Aggregate Surfacing Silty Gravels, Clayey Gravels Soil Type in Ditch Plastic and Non-plastic Inorganic Clays Feet Inorganic Silts, Silty or Clayey Sands Sands, Silty Sands, and Gravelly Sands
26 TURNOUTS
27 COMPOST SOCK SEDIMENT TRAP Addressed in this chapter to emphasize their usefulness in controlling runoff from access roads At entrances or where surface waters are in relatively close proximity to the access road An ABACT for HQ & EV watersheds
28 TEMPORARY STREAM CROSSINGS Should be avoided wherever possible Must be provided wherever construction equipment (including clearing and grubbing) must cross an existing stream channel Appropriate Chapter 105 permits must be obtained from DEP Designs must adhere to the conditions of those permits
29 TEMPORARY STREAM CROSSINGS Ford type crossings may not be used by construction equipment
30 TEMPORARY STREAM CROSSINGS Temporary bridges are the preferred method of crossing
31 TEMPORARY STREAM Culvert Pipes CROSSINGS
32 TEMPORARY WETLAND CROSSINGS Should be avoided wherever possible Must be minimized
33 TEMPORARY WETLAND Figure 3.5 Typical Tire Mat Crossing Figure 3.6 Typical Expanded Metal Grating Crossing Figure 3.7 Typical Wood Mat Crossing CROSSINGS
34 EARTHWORK WITHIN STREAM CHANNELS Excavations done from the top of banks Where it is not possible Temporary crossing Causeway
35 EARTHWORK WITHIN STREAM CHANNELS Figure 3.9 Temporary bypass channel same as old Figure 33 A geotextile protective lining should be provided Channel designed to pass normal base flows if the crossing will be completed in one to three days Otherwise, channel must be designed for bank-full flow
36 EARTHWORK WITHIN STREAM CHANNELS Figure 3.10 Temporary bypass pipe same as old Figure 34 Pipe sized so that the normal flow depth (d) is < ½ the diameter of the pipe (D)
37 EARTHWORK WITHIN STREAM CHANNELS Figure 3.11 Pumped water bypass system revised to show filter bag for work area Also has following note: Pump intake shall be maintained a sufficient distance from bottom to prevent sediment from entering the system
38 CHAPTER 3: SITE ACCESS Earthwork within stream channels Earthwork within lakes or ponds Turbidity barriers
39 CHAPTER 3: SITE ACCESS Earthwork within stream channels Earthwork within lakes or ponds Dewatering work areas New detail for pumped water filter bags
40 CHAPTER 3: SITE ACCESS Earthwork within stream channels Earthwork within lakes or ponds Dewatering work areas New detail for pumped water filter bags Detail provided for sump pits
41 CHAPTER 3: SITE ACCESS Site Housekeeping & Materials Management Waste Management Concrete Washouts
42 CHAPTER 4: SEDIMENT BARRIERS Brought back the alignment figure
43 CHAPTER 4: SEDIMENT Compost Sock ABACT for HQ & EV watersheds Can be used in some locations where silt fence cannot 8 & 9 socks for single lots only BARRIERS
44 CHAPTER 4: SEDIMENT BARRIERS Max Slope Length Nomograph
45 CHAPTER 4: SEDIMENT Compost Filter Berm ABACT for HQ but not EV BARRIERS Compost Berm
46 CHAPTER 4: SEDIMENT Weighted Sediment Filter Tubes ABACT for HQ but not EV BARRIERS
47 Silt Fence CHAPTER 4: SEDIMENT Not an ABACT for HQ or EV Tolerance for support stakes 8 Setback BARRIERS
48 CHAPTER 4: SEDIMENT BARRIERS Max Slope Length Nomograph for Silt Fence
49 CHAPTER 4: SEDIMENT BARRIERS Minimum Silt Fence Fabric Properties are provided
50 CHAPTER 4: SEDIMENT Super Silt Fence BARRIERS Not an ABACT for HQ or EV Posts must be installed with a post-hole drill
51 CHAPTER 4: SEDIMENT Fiber Logs (wattles) Not an ABACT 12 Logs may use Standard Silt Fence slope lengths 18 Logs may use Reinforced Silt Fence slope lengths BARRIERS
52 Wood Chip Berms CHAPTER 4: SEDIMENT ABACT for HQ, but not EV BARRIERS
53 CHAPTER 4: SEDIMENT Straw Bale Barriers Not an ABACT BARRIERS Disallowed for projects lasting more than 3 months
54 CHAPTER 4: SEDIMENT BARRIERS Vegetative Filter Strips ABACT for HQ (when used in conjunction with another BMP) but not EV Minimum width table provided
55 CHAPTER 4: INLET PROTECTION Inlet filter bags ABACT for HQ, not EV
56 CHAPTER 4: INLET PROTECTION Stone Inlet Protection Not an ABACT unless compost layer provided (HQ, not EV)
57 CHAPTER 4: INLET PROTECTION Alternate details for stone & mesh at grade
58 CHAPTER 4: INLET PROTECTION Alternate details for stone & mesh not at grade
59 CHAPTER 5: RUNOFF CALCS Designers referred to NOAA s website for up-to-date rainfall data Runoff coefficient table expanded to give more options New equations for calculating intensity
60 CHAPTER 5: RUNOFF CALCS Penn DOT s updated tables, charts, & maps provided as an alternative method
61 New standard detail provided for vegetated channels CHANNELS
62 CHANNELS Equation provided to calculate Manning s n for vegetated channels (Retardance C) (n = )
63 CHANNELS Tables provided for trapezoidal vegetated channel n values (Retardance C)
64 CHANNELS Standard detail provided for sodded channels
65 CHANNELS New standard detail provided for riprap channels
66 CHANNELS Guidance provided for design of riprap channels using shear stress
67 Nomograph for permissible flow depth of riprap channels (acceptable alternative to shear stress analysis) CHANNELS
68 CHANNELS Table for reno mattress & gabions revised
69 TOP-OF-SLOPE BERMS New standard detail provided for Top-ofslope Berms
70 TOP-OF-SLOPE BERMS Figure provided for maintaining Top-ofslope Berms as fills are built upward
71 CHAPTER 7: SEDIMENT BASINS Additional Design Criteria (Now 26) Forebays and/or turbidity barriers may be substituted for 2:1 flow length:width ratio Routing of peak flow from 25 yr/24 hr storm may be substituted for 2 cfs discharge capacity Principal spillway must have capacity for 10 yr/24 hr storm Some outlet barrels to be set in concrete cradle PVC outlet barrels disallowed
72 CHAPTER 7: SEDIMENT BASINS Additional Design Criteria Guidance provided for discharge analyses Limitations put on soils acceptable for use as embankment material (GC, GM, SC, SM, CL or ML )
73 CHAPTER 7: SEDIMENT BASINS New skimmer detail provided
74 CHAPTER 7: SEDIMENT BASINS Detail for skimmer attached to permanent riser provided
75 CHAPTER 7: SEDIMENT BASINS Detail for stone landing for a skimmer provided
76 CHAPTER 7: SEDIMENT BASINS Design chart for skimmer orifice revised
77 CHAPTER 7: SEDIMENT BASINS Tables provided for outlet barrel capacity
78 CHAPTER 7: SEDIMENT BASINS Standard cross-section has been revised
79 CHAPTER 7: SEDIMENT BASINS Table provided for sizing concrete bases of risers
80 CHAPTER 7: SEDIMENT BASINS Tables provided for sizing emergency spillway
81 CHAPTER 7: SEDIMENT BASINS Figure provided to illustrate forebay
82 CHAPTER 7: SEDIMENT BASINS Confusing chart for sizing anti-seep collars replaced with step-by-step guidance for calculating size & spacing of collars Typical details provided
83 CHAPTER 7: SEDIMENT BASINS Figure provided to illustrate filter diaphragm
84 CHAPTER 7: SEDIMENT BASINS Figure provided to illustrate concrete cradle
85 CHAPTER 8: SEDIMENT TRAPS Additional Design Criteria (Now 14) Minimum surface area to be provided Permanent facilities to meet standards of Stormwater BMP Manual 4:1 Flow length:width ratio for traps in special protection watersheds Discharge requirements added
86 CHAPTER 8: SEDIMENT TRAPS Embankment Spillway Detail revised
87 CHAPTER 8: SEDIMENT TRAPS Table provided for sizing barrel/riser spillways
88 CHAPTER 8: SEDIMENT TRAPS Type M Inlet Trap Detail revised
89 CHAPTER 8: SEDIMENT TRAPS Detail provided for permanent riser with temporary holes
90 STEEP GRADIENT PIPES Slopes > 0.05 ft/ft Manning s equation must be used For pipe with high anticipated velocities (>17.0 FPS), drop structures or other energy reducing structures to reduce velocity prior to discharge
91 MANNING S EQUATION V n D S where: V = Velocity in fps D = Pipe diameter in feet S = Pipe slope in ft/ft
92 MAX & MIN TAILWATER Disallowed for box culverts
93 GROUTING Grouting of riprap is not recommended for most installations Where riprap is grouted, the following applies: 1. Precautions must be taken to prevent uncured concrete from coming into contact with any surface waters 2. Grout must be placed in a layer with thickness equivalent to the d50 stone size over the entire extent of the apron prior to rock placement 3. After stone placement, void spaces shall be filled with grout
94 CHAPTER 9: OUTLET Detail provided for outfall without wingwalls PROTECTION
95 CHAPTER 9: OUTLET Detail provided for discharge to existing channel PROTECTION
96 CHAPTER 9: OUTLET PROTECTION Detail provided for transition flow mat
97 CHAPTER 9: OUTLET PROTECTION Figure provided to illustrate drop inlet structure
98 CHAPTER 10: ON-LOT 3 Standard Details provided CONTROLS
99 CHAPTER 11: STABILIZATION Surface roughening techniques should be applied to slopes 3:1 and greater unless it can be shown that no potential for sediment pollution to surface waters Slopes within 50 feet of surface water should be blanketed if seeding is proposed as the means to achieving permanent stabilization Spray-on type blankets should be applied to roughened surfaces
100 CHAPTER 11: STABILIZATION Table provided for various depths of topsoil application
101 CHAPTER 11: STABILIZATION Table provided for application rates of soil amendments
102 CHAPTER 11: STABILIZATION Guidance provided for Bonded Fiber Matrices and Flexible Growth Media Guidance provided for use of PAMs Guidance provided for sodding
103 CHAPTER 11: STABILIZATION Guidance provided cellular confinement systems
104 CHAPTER 12: NEW PRODUCTS & PROCEDURES One requirement added: Applicants should submit their request for approval (along with all pertinent drawings, details, supporting calculations, manufacturer s recommendations, etc.) to the local Conservation District, the appropriate Regional DEP Office (Watershed Management), AND the Area Engineer responsible for the part of the state in which the project is located
105 ADDITIONAL CHAPTERS 17 Areas of Special Concern Sinkhole Repair
106 ADDITIONAL CHAPTERS 17 Areas of Special Concern Sinkhole Repair Contaminated Sites
107 ADDITIONAL CHAPTERS 17 Areas of Special Concern Sinkhole Repair Contaminated Sites Special Protection Watersheds
108 ADDITIONAL CHAPTERS 17 Areas of Special Concern Sinkhole Repair Contaminated Sites Special Protection Watersheds Slope Failures
109 ADDITIONAL CHAPTERS 17 Areas of Special Concern Sinkhole Repair Contaminated Sites Special Protection Watersheds Slope Failures Geothermal Wells
110 APPENDICES A Checklists Complete Plan Checklist Revised Technical Review Checklist Expanded Technical Review Checklist
111 APPENDICES A Checklists B Standard Worksheets
112 APPENDICES A Checklists B Standard Worksheets C - Standard Plan Notes Standard Notes placed on Plan Drawings Optional Notes placed on drawings where appropriate
113 APPENDICES A Checklists B Standard Worksheets C - Standard Plan Notes D Standards for Maps & Drawings
114 APPENDICES A Checklists B Standard Worksheets C - Standard Plan Notes D Standards for Maps & Drawings E Soil Use Limitations If an X appears, go to the NRCS website for more info
115 APPENDICES A Checklists B Standard Worksheets C - Standard Plan Notes D Standards for Maps & Drawings E Soil Use Limitations F Energy Dissipaters
116 APPENDICES A Checklists B Standard Worksheets C - Standard Plan Notes D Standards for Maps & Drawings E Soil Use Limitations F Energy Dissipaters G- Structural Level Spreaders
117 H Dust Control APPENDICES
118 APPENDICES H Dust Control I Guide to Preserving Trees
119 APPENDICES H Dust Control I Guide to Preserving Trees J Tree Planting
120 APPENDICES H Dust Control I Guide to Preserving Trees J Tree Planting K Water Well Drilling Fact Sheet
121 APPENDICES H Dust Control I Guide to Preserving Trees J Tree Planting K Water Well Drilling Fact Sheet L Glossary References
122 QUESTIONS?
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationOutlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationConstruction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More informationStormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More informationCONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
More informationStorm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationSE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
More informationMinimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
More informationStorm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
More informationTown of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
More informationSTORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationCHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION
CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION CONTENTS 2.0 INTRODUCTION 2-1 2.1 MIMINUM REQUIREMENT #2 SWPP 2-1 ELEMENT 1: MARK CLEARING LIMITS 2-1 ELEMENT 2: ESTABLISH CONSTRUCTION ACCESS 2-2
More informationSECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationChapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
More informationEmergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More informationRiprap-lined Swale (RS)
Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This
More informationPLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN
OF WATERWAY PERIMETER CONTROL LESS THAN / THE STREAM/RIVER STEEL FENCE POST ANCHOR TO LAND (TYP.) / DEPTH OF WATER PLOTTED/REVISED:-OCT-0 WIDTH STREAM BANK TEMPORARY ROCK BERM BRIDGE ABUTMENT, CULVERT
More informationSECTION 5. Sediment Control Measures
SECTION 5 Sediment Control Measures 60. STORM DRAIN INLET PROTECTION When Runoff from earth change activities will discharge to a catch basin or storm drain inlet. A newly constructed catch basin or storm
More informationSEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
More informationCOLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
More informationRIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
More informationSAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:
Stormwater Pollution Prevention Plan "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
More informationCity of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
More informationVehicle Tracking Pad
Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls
More informationCompost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Chris Newman US EPA Region 5 Chicago, IL Compost-Based BMPs Compost-based
More informationBMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
More informationPART 2 BEST MANAGEMENT PRACTICES
PART 2 BEST MANAGEMENT PRACTICES This page intentionally left blank. 2.2 Part 2 Best Management Practices Table of Contents Introduction...2.5 Processes And Principles Of Erosion And Sedimentation... 2.5
More informationSUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
More informationA perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
More informationOHIO ENGINEERING JOB APPROVAL AUTHORITY ETHICS STATEMENT
Sheet 1 of 9 NAME TITLE GRADE LOCATION DELEGATED BY (Responsible Engineer) TITLE DATE 210-NEM-501-A, Third Ed., Amend. OH1, February 2015 CONCURRED BY (Line Supervisor) (non-nrcs) TITLE DATE TITLE ETHICS
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationTravel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
More informationDESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
More informationCity of Beaumont, Texas Grading Permit Information
General Information City of Beaumont, Texas Grading Permit Information The permit application shall be signed by the property owner (or lessee) or his authorized representative and by the contractor (if
More informationBlock and Gravel Inlet Protection (BIP)
Block and Gravel Inlet Protection (BIP) Practice Description Block and gravel inlet protection is a sediment control barrier formed around a storm drain inlet by the use of standard concrete block and
More informationSTORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
More informationStorm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
More informationNJ650.1404 Interception Drainage
NJ650.1404 Interception Drainage Interception drainage is used to intercept surface and subsurface water. The investigation, planning, and construction of surface interception drains follow the requirements
More informationCHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations
More informationPost Construction Stormwater Management Checklist Program
Post Construction Stormwater Management Checklist Program Anahid Damerau, CPESC, CPSWQ Christopher Smith, P.E. Department of Environmental Protection Stormwater Section Watershed Management Program The
More informationStormwater Best Management Practice (BMP) Selection and Implementation
Stormwater Best Management Practice (BMP) Selection and Implementation January, 2003 Midwest Research Institute Funding for this program was made possible through a Section 319 Nonpoint Source Management
More informationWaste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
More informationColdwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration
More informationStorm Drain Inlet Protection
Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description Applications Installation and Implementation Requirements Devices installed at storm drain inlets to detain and/or
More informationSTORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES
STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES Prepared by City of Houston Harris County Harris County Flood Control District 2006 Edition NOTICE TO USERS The Storm Water Management Handbook
More informationD R A F T. Best Management Practices Plan (Surface Water, Sediment & Erosion Control) West Carleton Environmental Centre. May 2014
Best Management Practices Plan (Surface Water, Sediment & Erosion Control) West Carleton Environmental Centre D R A F T Prepared for: Waste Management of Canada Corporation 2301 Carp Road Ottawa, Ontario
More informationCHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationStorm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of
More informationErosion Control and Stormwater Quality Field Guide
Perimeter Perimeter Control Control Erosion Control and Stormwater Quality Field Guide [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.
More informationBeseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
More informationErosion Control Blanket (ECB)
Erosion Control Blanket (ECB) Practice Description To aid in controlling erosion on critical areas by providing a protective cover made of straw, jute, wood or other plant fibers; plastic, nylon, paper
More informationStandards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation
Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation 702 E. Johnson Street, Madison, Wisconsin 53703 (608) 441-2677 Fax (608) 441-2676 soc@wlwca.org
More informationFIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE
FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE Author: Audrey G. Beaulac, P.E., CPSWQ Company: (Hoyle, Tanner), Manchester, New Hampshire INTRODUCTION In early July 2013, 2 inches of rain fell
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationA. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
More informationTemporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationSTANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY
STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY Project Name Permittee NOI # Start Time Inspector s Name(s) Green Card Certification # Inspector s Contact Information
More informationInterlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
More informationActivity Yes No N/A Notes
CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3
More informationConstruction Site Inspection. Inspecting to Keep You in Compliance
Construction Site Inspection Inspecting to Keep You in Compliance Inspection/Monitoring/Reporting Know if your plan is working Document corrective actions Ketchikan A Contractor that destroys their site
More informationWelded Mesh Gabions and Mattresses River Protection Design Guide HY-TEN GABION SOLUTIONS Dunstall Hill Trading Estate, Gorsebrook Road,
Welded Mesh Gabions and Mattresses River Protection Design Guide HY-TEN GABION SOLUTIONS Dunstall Hill Trading Estate, Gorsebrook Road, Wolverhampton, WV6 0PJ Tel 01902 712200 Fax 01902 714096 e-mail sales@hy-tengabions.com
More informationErosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155
Minnesota Department of Transportation Office of Environmental Stewardship Erosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155 Memo Office Tel:651-366-3629 Fax:651-366-3603
More informationTopic 8: Open Channel Flow
3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,
More informationTemporary Erosion-Control Measures
A Guide to Temporary Erosion-Control Measures for Contractors, Designers and Inspectors June 2001 North Dakota Department of Health Division of Water Quality A Guide to Temporary Erosion-Control Measures
More informationSC-07 STORM DRAIN INLET PROTECTION
Greenville County Technical Specification for: SC-07 STORM DRAIN INLET PROTECTION 1.0 Storm Drain Inlet Protection 1.1 Description Provide Storm Drain Inlet Protection at all existing and newly installed
More informationVehicle Tracking Control (VTC)
Vehicle Tracking Control (VTC) SM-4 Description Vehicle tracking controls provide stabilized construction site access where vehicles exit the site onto paved public roads. An effective vehicle tracking
More informationPrattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
More informationAnnual Standards and Specifications. Erosion and Sediment Control
Annual Standards and Specifications for Erosion and Sediment Control January 2012 Version: September 15, 2009 INTRODUCTION Virginia Commonwealth University (VCU), Annual Standards and Specifications for
More informationSECTION A: LOCAL STORM WATER POLLUTION PREVENTION PLAN
INSTRUCTIONS FOR PREPARING THE LOCAL STORM WATER POLLUTION PREVENTION PLAN City of Hawthorne For sites between 1 and 5 acres As of March 10, 2003, EPA Phase II rules will supercede this document. The Local
More informationENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
More informationChapter 11 Site Rehabilitation and Stabilization
Chapter 11 Site Rehabilitation and Stabilization Chapter 11 Layout: Part 1 - Page 131 Planning Site Rehab Part 2 - Page 132 Controlling Runoff and Capturing Sediment Part 3 - Page 133 Rehab for Crossings
More informationDefinition of Tower from the Bradley County Zoning Resolution
Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio
More informationEmployee Training Plan Farm A
Employee Training Plan Farm A Table of Contents Training Goals, Objectives, Activities Page Requirements, Standards, Procedures and Practices Training Content Nutrient Management Odor Management Runoff
More informationBMP 6.4.6: Dry Well / Seepage Pit
BMP 6.4.6: Dry Well / Seepage Pit A Dry Well, or Seepage Pit, is a variation on an Infiltration system that is designed to temporarily store and infiltrate rooftop runoff. Key Design Elements Fllow Infiltration
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationGREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure
More informationUnderground Injection Control Storm Water Information
Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management
More informationA. Structures Quantity Item Price Cost @ $3,500 EA
PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,
More informationSTORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION GUIDANCE. Revised 4/2011. Contact information
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT Water Quality Control Division Stormwater Program STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION
More informationHomeowner s Guide to Drainage
Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage
More informationErosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155
Minnesota Department of Transportation Office of Environmental Stewardship Erosion and Storm Water Management Unit Mail Stop 620 395 John Ireland Blvd. St. Paul, MN 55155 Memo Office Tel:651-366-3629 Fax:651-366-3603
More informationBRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the
More informationForestry Operations: Water Quality & BMPs
Forestry Operations: Water Quality & BMPs ESC Planning & Design Workshop, Asheville, NC April 14, 2015 Gail Bledsoe: NCFS Water Quality & Wetlands Staff Forester, RF1377 Adapted from a presentation developed
More informationSeCTion 656 - TemPoRARy Soil erosion and WaTer pollution ConTrol sewpcp requirements
Appendix C SECTION 656 - TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL 656.1 Responsibility of the Contractor-Prepare and Follow Plan. The Contractor shall provide continuous and effective temporary
More informationMosquito Control Guidelines
Appendix G Mosquito Control Guidelines This appendix presents the guidance for designing and maintaining stormwater treatment measures to control mosquitoes from ACCWP s Vector Control Plan. Project sponsors
More informationSTATEMENT OF ACKNOWLEDGMENT
General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, issued 8/21/13, effective 10/1/13 Stormwater Monitoring Report SITE INFORMATION Permittee: BNE Energy
More informationCHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
More informationCHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
More informationFigure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
More informationIndiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING