1 CEILING&WALL SYSTEMS Between us, ideas become reality Armstrong Ceiling Systems HEALTH & WELLBEING HEA 01 Visual Comfort HEALTH & WELLBEING HEA 02 Indoor Air Quality HEALTH & WELLBEING HEA 05 Acoustic Performance WASTE WST 01 Construction Waste Management WASTE WST 04 Speculative Floor and Ceiling Finishes MANAGEMENT MAN 04 Stakeholder Participation BREEAM is an environmental assessment method and rating system for buildings. It sets a standard for best practice in sustainable building design, construction and operation and has become one of the most comprehensive and widely recognised measures of a building s environmental performance. A BREEAM assessment uses recognised measures of performance, which are set against established benchmarks, to evaluate a building s specification, design, construction and use. The measures used represent a broad range of categories and criteria from energy to ecology. They include aspects related to energy and water use, the internal environment (health and well-being), pollution, transport, materials, waste, ecology and management processes. BREEAM uses a straightforward scoring system (credits) which are supported by evidence-based science and research. The following BREEAM credit summary has been developed by Armstrong Ceiling Systems to support the design, specification and installation of Armstrong suspended ceiling systems in a wide range of buildings. The relevant credits are identified on each page of this document and contain an extract from the BREEAM New Construction Non-Domestic Buildings Technical Manual SD : 2011 setting out the aim of the credit, the assessment criteria, the compliance requirements and how Armstrong can help at both the design and post construction stage. Supporting evidence is contained in Appendix 1, Armstrong Products Environmental Performance Table and Appendix 2, Armstrong Products Absorption Attenuation Comparison Table. These appendices cover the full range of Armstrong suspended ceiling systems.

2 HEALTH & WELLBEING HEA 01 Visual Comfort To ensure daylighting, artificial lighting and occupant controls are considered at the design stage to ensure best practice visual performance and comfort for building occupants. Pre-requisite Daylighting (1-2 credits) - building type dependent Glare control and view out (1-2 credits) building type dependent Internal and external lighting (1 credit) Visual Arts (1 credit) Healthcare building types only Daylighting Compliance Requirements: Relevant building areas meet good practice daylighting criteria. NB: The daylight criteria differ for each building type. They cover daylight factor, uniformity ratio, and also state a proportion of the area of the building required to comply. Internal Lighting Compliance Requirements Illuminance (lux) levels in all internal relevant building areas of the building are specified in accordance with the CIBSE Code for Lighting 2009 and any other relevant industry standard. For areas where computer screens are regularly used, the lighting design complies with CIBSE Lighting Guide 7, 2005 sections 3.3, 4.6, 4.7, 4.8 and 4.9. This gives recommendations highlighting: 1. Limits to the luminance of the luminaires, to avoid screen reflections. (Manufacturers data for the luminaires should be sought to confirm this). 2. For up-lighting, the recommendations refer to the luminance of the lit ceiling rather than the luminaire; a design team calculation is usually required to demonstrate this. 3. Recommendations for direct lighting, ceiling illuminance, and average wall illuminance. Appendix 1 includes the reflectance of the ceiling tiles which is required to calculate the daylight factor and the uniformity ratio. Armstrong range of mineral fibre and metal ceiling tiles achieve high levels of light reflectance. High light reflectance ceilings enhance indirect lighting by improving overall lighting uniformity returning up to 90% of the light back into the space, compared with 75% with standard ceilings*. A light reflectance of 90% and more allows 20% cost savings with indirect lighting, and can yield total building energy savings of up to 11%. Canopies installed in the work place can improve the light reflection over a working space and provide better comfort for the end user. *Energy and Environmental Effects of High Light Reflectance Ceilings: Brinjac Engineering Post Construction Review Appendix 1 includes light reflectance values and can therefore be used for calculations. Detailed technical information will also be provided for the maintenance manual and will be made available to the BREEAM assessor to confirm compliance. 2 Armstrong Ceiling Systems

3 HEALTH & WELLBEING HEA 02 Indoor Air Quality To recognise and encourage a healthy internal environment through the specification and installation of appropriate ventilation, equipment and finishes. Minimising sources of air pollution (3 credits) Potential for natural ventilation (1 credit) Laboratory fume cupboard and containment areas (2 credits) Minimising Sources of Air Pollution Compliance Requirements 2 of the 3 available credits can be achieved by demonstrating compliance with the following: 1. An indoor air quality plan has been produced. 2. All decorative paints and varnishes have met the requirements listed in Table At least five of the eight remaining product categories listed in Table 5-3, have met the testing requirements and emission levels for Volatile Organic Compound (VOC) emissions against the relevant standards. Product European Standard Emission levels for VOC s required Suspended ceiling tiles (Extract from table 5-3) EN 13964:2004 Formaldehyde E1 (Testing req 1) No asbestos. Non-Domestic Buildings Technical Manual. All Armstrong ceiling tiles have low or zero VOC emission levels and therefore can comply with an Indoor Air Quality Plan which commits to using low or zero VOC finishes. All Armstrong tiles have either been tested by a third party and comply with the requirements of EN 13964:2004 unless they are exempt from testing (e.g metal or wooden ceiling tiles). Appendix 1, Armstrong Products Environmental Performance Table provides the results of the tests for each tile. Post Construction Stage Appendix 1 states the emission levels met by each tile. The BREEAM assessor can provide this document to demonstrate compliance. 3 Armstrong Ceiling Systems

4 HEALTH & WELLBEING HEA 05 Acoustic Performance To ensure the buildings acoustic performance including sound insulation meet the appropriate standards for its purpose. 1. A suitably qualified acoustician (see relevant definitions) is appointed by the client at pre-bid/briefing stage of the project to provide early design advice on: a. External sources of noise impacting the chosen site b. Site layout and zoning of the building for good acoustics c. Acoustic requirements for users with special hearing and communication needs, d. Acoustic treatment of different zones and facades. 2. The building meets the acoustic performance standards and testing requirements for the relevant building type and function areas as detailed in Table 5-4. Minimising Sources of Air Pollution Compliance Requirements The compliance requirements for this credit are dependent on the building type. Table 5-4, in the BREEAM assessment manual, sets out the detailed requirements for each building type. Detailed information on the acoustic performance of Armstrong ceiling tiles is available from Appendix 2, Armstrong Products Absorption, Attenuation Comparison Table. This information can be used by a suitably qualified acoustician to demonstrate how the ceiling tiles contribute to the acoustic perfomance of each space. Different ceiling tiles are available to contribute to all aspects of a building s acoustic performance, from passive acoustic management of sound absoption and sound attenuation through to control of reverberation times and ambient noise levels. Post Construction Stage The assessor can verify that the correct figures have been used in the acoustician s report by cross referencing the acoustician s report with Appendix 2. 4 Armstrong Ceiling Systems

5 WASTE WST 01 Construction Waste Management To promote resource efficiency via the effective management and reduction of construction waste. Construction resource efficiency (3 credits) Diversion of resources from landfill (1 credit). Construction Resource Efficiency Compliance Requirements Non-hazardous construction waste (excluding demolition and excavation waste) generated by the building s design and construction meets or exceeds the following resource efficiency benchmarks. BREEAM credits Amount of waste generated per 100m 2 (gross internal floor area) m 3 tonnes One credit Two credits Three credits Exemplary Level Diversion of Resources from Landfill Compliance Requirements The following percentages of non-hazardous construction and demolition waste (where applicable) generated by the project have been diverted from landfill: Product Type of waste Volume Tonnage One credit Exemplary level Non demolition 70% 80% Demolition 80% 90% Non demolition 85% 90% Demolition 85% 95% Diversion from landfill includes: 1. Reusing the material on site (in-situ or for new applications) 2. Reusing the material on other sites 3. Salvaging or reclaiming the material for reuse 4. Returning material to the supplier via a take-back scheme 5. Recovery of the material from site by an approved waste management contractor and recycled or sent for energy recovery. Armstrong provide a comprehensive post-consumer mineral fibre ceiling tile take-back scheme covering tiles at the end of their life and off-cuts generated during the instalation process. Accredited professionals and Assessors can use Appendix 1 to identify which tiles are included in the scheme. Full details of the take back scheme are available at Post Construction Review Armstrong can provide BREEAM Accredited Professionals and design teams with verification of weight for inclusion in Site Waste Management Plans. 5 Armstrong Ceiling Systems

6 WASTE WST 04 Speculative Floor and Ceiling Finishes To encourage the specification and fitting of floor and ceiling finishes selected by the building occupant and therefore avoid unnecessary waste of materials. 1. For tenanted areas (where the future occupant is not known), prior to full fit-out works, carpets, other floor finishes and ceiling finishes have been installed in a show area only. 2. In a building developed for a specific occupant, that occupant has selected (or agreed to) the specified floor and ceiling finishes. Compliance Requirements Compliance notes Show area A show area could be either a floor plate or an individual office. However, to award this credit it must be less than 25% of the net lettable floor area. Armstrong s ceiling tiles are not just a finish. They are an integral part of the environmental design of a space, contributing to the acoustic, visual environments and the internal air quality. By providing the end client with information on the environmental credentials of our tiles we ensure that they will be selected. Post Construction Review If the ceiling tiles used to fit out the show area in a speculative office are included in the take back scheme they would be removed by Armstrong post occupancy subject to meeting the schemes terms and conditions. 6 Armstrong Ceiling Systems

7 MANAGEMENT MAN 04 Stakeholder Participation To design, plan and deliver accessible functional and inclusive buildings in consultation with current and future building users and other stakeholders. Consultation (1 credit) Inclusive and accessible design (1 credit) Building user information (1 credit) Post Occupancy Evaluation (POE) and information dissemination (1 credit). Building User Information Compliance Requirements 1. Building User Guides are provided and are appropriate to all users of the building (general users including staff and if applicable residents, as well as the non technical facilities management team/building manager). 2. The Guides cover all functions and uses of the building, ensuring building users are able to use the building effectively. Where relevant, the documents must describe the facilities to be shared and how access to them will be arranged for potential users. 3. Building and site related information is made readily available to all future building users, enabling them to access and use the building, site and local transport infrastructure/amenities effectively. Armstrong provides information relating to the environmental credentials (Appendix 1) of all their ceiling tiles. This gives Accredited Professionals the information they need to demonstrate how the specified ceiling tiles contribute to the overall environmental strategy for the building. This information can be fed into the design team meetings. When specifying Armstrong ceiling tiles the client/developer can be assured that all information required to complete the building user guide will be available for inclusion in the building specification document. This will give the necessary confidence to write the letter of commitment that will be required to gain this credit for a design stage BREEAM assessment. Post Construction Stage Information is available for the assessor to explain how the specified or recommended ceiling tiles contribute to the environmental strategy (including the visual environment, acoustic environment, internal air quality, energy performance) and on how the take back scheme operates. 7 Armstrong Ceiling Systems

8 Appendix 1: Armstrong Products - Environmental Performance Product Content Light Reflectance Environmental Profile EPD Ecopoint - Cradle to Grave 60 year lifecycle Formaldehyde Take Back Scheme BIOGUARD Acoustic 45% 88% E1 a BIOGUARD Plain 52% 90% E1 a CERAMAGUARD 38% 79% E1 n/a CIRRUS 33% 83% E1 a CIRRUS 75 65% 83% E1 a CIRRUS Design 33% 83% E1 a COLOURTONE DUNE 48% 48% a E1 a FINE FISSURED 51% 85% a E1 a FINE FISSURED Black 51% 9% a E1 a GRAPHIS 51% 92% E1 a CLEAN ROOM FL 35% 78% E1 n/a NEWTONE 1% 84% E1 a NEVADA 20% 82% E1 n/a OPTIMA 82% 87% E1 n/a PARAFON Hygien 20% 82% E1 n/a PERLA 45% 86% E1 a PERLA db 63% 86% E1 a PERLA OP 42% 86% E1 a PLAIN 44% 87% a E1 a DUNE MAX 48% 84% a E1 a DUNE Vector 41% 85% a E1 a DUNE db 61% 84% a E1 a DUNE SUPREME 48% 85% a E1 a SIERRA OP 15% 83% E1 a ULTIMA 44% 87% E1 a ULTIMA db 63% 87% E1 a ULTIMA OP 42% 87% E1 a ULTIMA Vector 44% 87% E1 a VISUAL 71% 71% E1 a TATRA 51% 80% a E1 a CORTEGA 51% 80% a E1 a ACADEMY MERIT 51% 85% a E1 a ACADEMY DIPLOMA 34% 84% E1 Grid 25% n/a E1 n/a Wood 3-68% 35-75% E1 n/a Metal 30% Up to 85% E1 n/a 08/2011 VELVET expérience - Armstrong Building Products - RCS Besançon B

9 Appendix 2: Armstrong Products Absorption Attenuation Comparison (July 2011) Sound Absorption Sound Attenuation Armstrong Products α w Comparative D nfw / D ncw Armstrong Products Ultima OP / Optima (all thicknesses) Perla OP / Nevada (all thicknesses) Metal standard perforated + pad (16-40mm) Metal microperforated + pad (16-40mm) Parafon Hygien Class A Very High db Metal Plain + B15 + Metal Plain (no infill) Ultima db SL2 Planks Ultima tiles + glass fibre overlay to both sides* Metal standard perforated + B15 Perla db / Metal microperforated + B15 Metal standard perforated with pad (8mm) Metal microperforated with pad (8mm) Class B High db Metal extramicroperforated + B15 Dune db / Ultima db / Ceramaguard / Cirrus Max / Ultima Newtone / Bioguard Acoustic / Bioguard Plain / PlainMylar / Graphis / Cirrus / Cirrus Designs / Contrast Cirrus Ultima / Perla / Dune Max Ultima db / Perla db / Dune db Bioguard Acoustic / Cirrus 75 Metal standard perforated + fleece or B15 Metal microperforated + fleece or B15 Metal extramicroperforated + B15 Fine Fissured / Academy Merit Metal extramicroperforated + fleece Dune Supreme Mezzanine DL 100 / Ceramaguard Cirrus Cirrus Designs (Image) Contrast Cirrus (Circles, Squares, Linear) Dune Plus / Colortone Dune Plus Academy Diploma Dune Supreme Unperforated Bioguard Plain Plain Graphis Metal Plain Clean Room FL Newtone Class C Good db Class D Moderate db Class E Low db Perla / Dune Max Dune Supreme / Dune Supreme Unperforated Dune Plus / Colortone Dune Plus Mezzanine DL 100 Fine Fissured Academy Merit & Diploma Metal standard perforated + pad (16-40mm) Metal microperforated + pad (16-40mm) Metal extramicroperforated + fleece or pad (16-40mm) Ultima OP Nevada Tegular (18mm) Perla OP Metal perforated + fleece or pad (8mm) Metal microperforated + fleece or pad (8mm) Metal extramicroperforated + pad (8mm) Nevada Board (18mm) / Optima (all thicknesses) Very Low Very Low Below 20 db None 08/2011 VELVET expérience - Armstrong Building Products - RCS Besançon B

HHHHH Outstanding 85%

HHHHH Outstanding 85% Provinciehuis_Assessment_2040204_74,32%Final Score and Rating BREEAM Scheme: Europe 2009: Offices H Pass 30% Building Name: Provinciehuis Antwerpen HH Good 45% BREEAM Registration No.: BREEAM-0048-4626

More information

BREEAM Europe. This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe.

BREEAM Europe. This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe. BREEAM Europe BREEAM Europe This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe. Key objectives Provide consistency and comparability

More information

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust BREEAM Refurbishment and Fit-out 2014 Briefings Part of the BRE Trust BREEAM for Refurbishment and Fit-out Follows 2 years of development Draft scheme published and consultation from 19 th July 2014 Launched

More information

SUSTAINABLE BUILDINGS

SUSTAINABLE BUILDINGS SUSTAINABLE BUILDINGS ACHIEVING A BREEAM EXCELLENT RATING GUIDANCE NOTE FOR BREEAM 2008 ASSESSMENTS Document Issued January 2009 CURRENT REQUIREMENTS: The Welsh Assembly Government has a duty to have a

More information

ACOUSTICS. Axiom Canopy Clouds Absorption Data Sabines (average 500, 1k, 2k, 4k Hz) ACOUSTICS TESTING DATA Sound Absorption in Sabines

ACOUSTICS. Axiom Canopy Clouds Absorption Data Sabines (average 500, 1k, 2k, 4k Hz) ACOUSTICS TESTING DATA Sound Absorption in Sabines ACOUSTICS ACOUSTICS TESTING DATA Sound Absorption in Sabines SABINE DEFINITION A Sabine is a measure of the sound absorption provided by a material when installed within an architectural space. The number

More information

Lead architect: Ron Arad Architects - Executive architect: Jaspers & Eyers

Lead architect: Ron Arad Architects - Executive architect: Jaspers & Eyers SOLUTIONS FOR SUSTAINABLE BUILDINGS THE GUIDE TO BREEAM Lead architect: Ron Arad Architects - Executive architect: Jaspers & Eyers Reynaers develops innovative and sustainable aluminium solutions, for

More information

Elaine Harvie & Jeremy Cruickshank Jan 10

Elaine Harvie & Jeremy Cruickshank Jan 10 Elaine Harvie & Jeremy Cruickshank Jan 10 3 Assembly Square, Cardiff - EXCELLENT BREEAM International Introduction Elaine Harvie Mechanical Engineer BREEAM Assessor Offices School/Education Industrial

More information

BAM CONSTRUCT. Dunsbury Hill Farm. BREEAM Pre-assessment Summary. BAM Sustainability department 2015

BAM CONSTRUCT. Dunsbury Hill Farm. BREEAM Pre-assessment Summary. BAM Sustainability department 2015 BAM CONSTRUCT Dunsbury Hill Farm BREEAM Pre-assessment Summary BAM Sustainability department 2015 1.0 Introduction This report is intended as a summary of the pre-assessment for the following BREEAM assessment:

More information

Strategic approach to the selection and procurement of construction materials and products

Strategic approach to the selection and procurement of construction materials and products www.breeam.com Briefing Paper Strategic approach to the selection and procurement of construction materials and products Alan Yates 02 The selection and procurement of construction materials makes a major

More information

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING PURPOSE: With this Memorandum of Understanding (MOU), signatory agencies commit to federal leadership in the

More information

IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF

IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF IALN11006400 /05 01 19.06.13 FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF Dear Sir / Madam Re: 12/02994 BCA Sports Hall Condition

More information

sound reduction systems for commercial, educational and industrial environments

sound reduction systems for commercial, educational and industrial environments sound reduction systems for commercial, educational and industrial environments Tel: +44 ()14 3874 Fax: +44 ()14 38957 E-mail: info@soundreduction.co.uk Web: www.soundreduction.co.uk soundblocker Acoustic

More information

BRE, BRE Global, BREEAM, Smartwaste and the Green Guide are all trademarks owned by either BRE or BRE Global Limited and

BRE, BRE Global, BREEAM, Smartwaste and the Green Guide are all trademarks owned by either BRE or BRE Global Limited and blank page Terms & conditions Terms and conditions Disclaimer This scheme document is the property of BRE Global Limited and is made publicly available for information purposes only. Any testing, assessment,

More information

Red Managed Services BREEAM Pre-Assessment. Lidl Head Office. Client. Lidl UK GmbH 19 Worple Road Wimbledon London SW19 4JS

Red Managed Services BREEAM Pre-Assessment. Lidl Head Office. Client. Lidl UK GmbH 19 Worple Road Wimbledon London SW19 4JS Red Managed Services BREEAM Pre-Assessment Lidl Head Office Client Lidl UK GmbH 19 Worple Road Wimbledon London SW19 4JS Date 10 November 2015 Red Managed Services REVISION Issued for Document prepared

More information

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings Duchy Homes Site: Cantley Lane Doncaster Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings 22 nd February 2013 Leanne Brooksbank Accredited Energy & Code

More information

PROJECT QUEEN ELIZABETH UNIVERSITY HOSPITAL GLASGOW

PROJECT QUEEN ELIZABETH UNIVERSITY HOSPITAL GLASGOW PROJECT QUEEN ELIZABETH UNIVERSITY HOSPITAL GLASGOW Armstrong 600 x 1200 Bioguard Acoustic Board on Prelude 24mm Grid with Axiom Plasterboard to Tile Transition The new South Glasgow University Hospital

More information

Code for Sustainable Homes Guidelines

Code for Sustainable Homes Guidelines Canoldir Penrhos Anglesey LL65 2TS Phone: 01407 860666 Email: saps@easonline.co.uk www.easonline.co.uk Code for Sustainable Homes Guidelines A CSH rating is the responsibility of the Developer/ Architect

More information

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010 EFA PSBP Natural Ventilation Strategy Introduction The Baseline Designs Project will provide scheme design details for a number of Primary and Secondary School Exemplars. For the purposes of setting a

More information

APPENDIX 2: BREEAM ASSESSMENT

APPENDIX 2: BREEAM ASSESSMENT APPENDIX 2: ASSESSMENT CONTENTS Introduction... 1 Pre-assessment Estimate Results... 3 Management... 3 Health and Wellbeing... 7 Energy... 13 Transport... 18 Water... 22 Materials... 24 Waste... 29 Land-use

More information

CEPAS. Construction Stage. Comprehensive Environmental Performance Assessment Scheme for Buildings. 2006 Edition

CEPAS. Construction Stage. Comprehensive Environmental Performance Assessment Scheme for Buildings. 2006 Edition Pre-Design CEPAS Comprehensive Environmental Performance Assessment Scheme for Buildings Construction Stage Design 2006 Edition Operation Construction Comprehensive Environmental Performance Assessment

More information

Sika Sarnafil World Class Roofing and Waterproofing

Sika Sarnafil World Class Roofing and Waterproofing The following is a brief summary of the Leadership in Energy and Environmental Design program (LEED, Version 3) and the sections Sika Sarnafil s roofing systems can help contribute to obtaining LEED points.

More information

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Features High-performance HVAC High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Landscaping Recycled and Regional Materials Storm-water Management District

More information

The Integrated Design Process

The Integrated Design Process The Integrated Design Process The Integrated Design Process (IDP) has been developed on the basis of experience gained from a small Canadian demonstration program for high-performance buildings, the C2000

More information

1 0 0 % E C O - F R I E N D LY

1 0 0 % E C O - F R I E N D LY 100% ECO-FRIENDLY COTTO D ESTE CARES FOR THE ENVIRONMENT Cotto d Este s incessant strive for excellence has led us to respect the following principles when dealing with the environment. All the waste that

More information

Bloomsbury Colleges Environmental Policy Statement

Bloomsbury Colleges Environmental Policy Statement 15 December 2011 P a g e 1 Bloomsbury Colleges Environmental Policy Statement The Bloomsbury Colleges are committed to the responsible use of energy, water and other resources with the aim of minimising

More information

Design and Construction policy for sustainable buildings and Campus environments

Design and Construction policy for sustainable buildings and Campus environments ESTATES SUPPORT SERVICE Design and Construction policy for sustainable buildings and Campus environments 1.0 INTRODUCTION The Higher Education Funding Council for England, responding to Governmental direction,

More information

Videoconferencing Room Guide

Videoconferencing Room Guide Videoconferencing Room Guide IVN RoomGuide.doc Page 1 Introduction This guide will serve as a tool to plan the design and implementation of a videoconference room. The information in this guide should

More information

Disclaimer. Copyright. Trade Marks

Disclaimer. Copyright. Trade Marks blank page Disclaimer This Scheme Document is the property of BRE Global Ltd and is made publicly available for information purposes only. Its use for testing, assessment, certification or approval must

More information

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING PURPOSE: With this Memorandum of Understanding (MOU), signatory agencies commit to federal leadership in the

More information

Sustainable Real Estate Investments Policy

Sustainable Real Estate Investments Policy Sustainable Real Estate Investments Policy Usage statement This communication is intended for Global investments High Yield professionals Bond Fund 101 and should not be relied on by anyone else. Standard

More information

Ecophon Focus Ds. System range. XL 1800x600. Size, mm. XL 2400x600 T24 Thickness (THK) XL 2000x600. 1200x600 1200x1200 1600x600 M206, M208, M238

Ecophon Focus Ds. System range. XL 1800x600. Size, mm. XL 2400x600 T24 Thickness (THK) XL 2000x600. 1200x600 1200x1200 1600x600 M206, M208, M238 Ecophon Focus Ds For applications where a suspended ceiling with a concealed grid is required, but individual tiles must be easily demountable. Ecophon Focus Ds has a concealed grid and syetrical edge

More information

Ecophon Focus A. System range. Size, mm. XL 2000x600. XL 1800x600. XL 2400x600 T15 T24 Thickness (THK) Inst. Diagr. 1200x600 1200x1200 1600x600

Ecophon Focus A. System range. Size, mm. XL 2000x600. XL 1800x600. XL 2400x600 T15 T24 Thickness (THK) Inst. Diagr. 1200x600 1200x1200 1600x600 Ecophon Focus A For applications where a robust suspended ceiling system is required. Ecophon Focus A has an exposed grid system. Each tile is easily demountable. The systems consist of Ecophon Focus A

More information

An Introduction to BREEAM and the Code for Sustainable Homes

An Introduction to BREEAM and the Code for Sustainable Homes www.islington.gov.uk An Introduction to BREEAM and the Code for Sustainable Homes Ropemaker, a BREEAM Excellent office development in South Islington 1 Two key methods for assessing the sustainability

More information

BRE Environmental & Sustainability Standard

BRE Environmental & Sustainability Standard BRE Environmental & Sustainability Standard BES 5056: ISSUE 2.0 BREEAM Retail 2008 Assessor Manual The BREEAM Assessor Manuals are technical guidance documents which have been created to aid licensed BREEAM

More information

34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory

34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory HARVARD UNIVERSITY FACULTY OF ARTS AND SCIENCES LEED-CI V3.0 STUBBS LABORATORY GORDON MCKAY LABS BUILDING Gordon McKay Building, 9 Oxford Street, Cambridge, MA 02138 GOLD The Stubbs Laboratory is a 2,035

More information

Systems Selection Enclosure Systems Material Selection Assessment and Mitigation

Systems Selection Enclosure Systems Material Selection Assessment and Mitigation Return to Curriculum Home CES Home Find an AIA/CES Registered Course Self Report a Learning Activity MATERIALS AND METHODS To develop professionally in Practice with a focus on sustainable design, you

More information

Green House, Hungary

Green House, Hungary Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support noel.morrin@skanska.se Green House, Hungary Case Study 109 Aspects of Sustainability This project

More information

Contents BB93 Acoustic Design for Schools

Contents BB93 Acoustic Design for Schools Contents BB93 Acoustic Design for Schools BB93 Background Noise Sound Insulation Rooms Acoustics - Reverberation times Internal Noise Level Example Llwynu School Internal Background Noise BB93 Internal

More information

Helical Bar - Environmental Management System. January 2014

Helical Bar - Environmental Management System. January 2014 Helical Bar - Environmental Management System January 2014 Contents 1 Introduction... 1 1.1 Overview... 1 2 Environmental aspects and impacts register... 2 2.1 Definitions... 2 2.2 Register of environmental

More information

Department of Public Works. Recycling policy for buildings and civil infrastructure

Department of Public Works. Recycling policy for buildings and civil infrastructure Department of Public Works Recycling policy for buildings and civil infrastructure A whole-of-government recycling policy for buildings and civil infrastructure Policy statement The Queensland Government

More information

Improving acoustics. For better learning environments

Improving acoustics. For better learning environments Improving acoustics For better learning environments The natural environment The model for learning spaces Over thousands of years, the human sense of hearing evolved for an outdoor, natural environment.

More information

BREEAM In-Use International

BREEAM In-Use International www.breeam.com BREEAM In-Use International Technical Manual SD221 2.0:2015 February 2016 83561 BRE Global Ltd 2016 Terms and conditions Disclaimer This Scheme Document is the property of BRE Global Limited

More information

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services May 200 Table of Contents NEW CONSTRUCTION/MAJOR RENOVATION Process... Design... 3 MINOR RENOVATIONS/PROJECTS Process...

More information

OEGNB - Open Source Building Assessment

OEGNB - Open Source Building Assessment OEGNB - Open Source Building Assessment Mag. Dr. Susanne Geissler SB13 26th September 2013 Graz ÖGNB sustainable building assessment/quality label The ÖGNB quality label is based on the TQB assessment

More information

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division Management of Asbestos Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division Getting it Wrong! Asbestos What is it? With the Naked Eye! Naturally occurring silicates

More information

[ Between us, ideas become reality. ] Office Acoustics Attaining speech privacy in open and closed plan environments.

[ Between us, ideas become reality. ] Office Acoustics Attaining speech privacy in open and closed plan environments. CEILING SYSTEMS [ Between us, ideas become reality. ] Office Acoustics Attaining speech privacy in open and closed plan environments. office acoustics The message is loud and clear: office employees have

More information

OWAplan1. The seamless acoustic ceiling. Pure acoustics. Pure design.

OWAplan1. The seamless acoustic ceiling. Pure acoustics. Pure design. OWAplan1 The seamless acoustic ceiling. Pure acoustics. Pure design. 3 Perspectives of freedom OWAplan It is time for a new way of thinking, for a new kind of freedom in room design, for taking a different

More information

SD 5066A: ISSUE 1.1 BREEAM

SD 5066A: ISSUE 1.1 BREEAM SD 5066A: ISSUE 1.1 BREEAM Europe Commercial 2009 Assessor Manual The BREEAM Assessor Manuals are technical guidance documents which have been created to aid licensed BREEAM Assessors in carrying out BREEAM

More information

Information paper 20. Prepared by: David Clark. book:

Information paper 20. Prepared by: David Clark. book: Information paper 20 Ventilation rates in offices and natural mechanical Prepared by: David Clark A paper referenced in the book: Cundall Johnston & Partners LLP. 2013 Issue 1.0: 29 July 2013 This information

More information

Issue ID Description No. of Credits Available. Mandatory Elements Storage of Non-recyclable Waste and Recyclable Household Waste

Issue ID Description No. of Credits Available. Mandatory Elements Storage of Non-recyclable Waste and Recyclable Household Waste 150 Code for Sustainable Homes Category 5: te Issue ID Description No. of Credits Available Mandatory Elements 1 Storage of Non-recyclable te and Recyclable Household te 4 Yes Aim To provide adequate internal

More information

Renovation instructions

Renovation instructions 1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following

More information

50 St Mary Axe London EC3

50 St Mary Axe London EC3 50 St Mary Axe London EC3 Letting specification 1.Structure and Envelope The main superstructure comprises of a braced steel fame (app 7m span / 90min fire rated) and the elevations are formed from a series

More information

Innovation #9/12. of all Formaldehyde for up to

Innovation #9/12. of all Formaldehyde for up to Innovation #9/12 of all Formaldehyde for up to Gyproc Activ Air Benefits of Activ Air Improves the indoor air quality, providing healthier interior environments Permanently reduces Formaldehyde and other

More information

The Finnish Classification of Indoor Environment and Material Emissions

The Finnish Classification of Indoor Environment and Material Emissions The Finnish Classification of Indoor Environment and Material Emissions Jorma Säteri Finnish Society of Indoor Air Quality and Climate, FiSIAQ Finnish Classification of Indoor Environment 2008 An update

More information

Omega Warrington. Project Pepe. BREEAM Pre-assessment. Design Stage 14/10/2014

Omega Warrington. Project Pepe. BREEAM Pre-assessment. Design Stage 14/10/2014 Design Stage 14/10/2014 Summary Very Good ( 55%) have been appointed as registered BREEAM assessors to undertake a BREEAM NC 2014, comprising of an outline of the likely score for the proposed Warehouse

More information

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823.

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823. ASBESTOS BUILDING INSPECTION REPORT for the City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823 at the City of East Lansing Waste Water Treatment Plant and Woodingham Pump Station

More information

IEQ-15 Air Distribution System

IEQ-15 Air Distribution System AIM OF CREDIT To encourage and recognise the design and maintenance of air distribution systems that minimise the risk of particulate and microbial contamination to the internal air supply. CREDIT CRITERIA

More information

BREEAM UK New Construction 2014 Assessment Report

BREEAM UK New Construction 2014 Assessment Report BREEAM UK New Construction 2014 Assessment Report General information BRE Assessment reference no. Client name Building end user/occupier Assessor name Assessors role Assessor organisation TBC (rev0.0

More information

Saint-Gobain Ecophon Limited RIBA Accredited CPD Seminar

Saint-Gobain Ecophon Limited RIBA Accredited CPD Seminar Ecophon Limited Module 1: Ceiling Design Solutions Design Issues: Supporting the room function Module size, Edge detail, Shape, Colour Integration (lighting, ventilation, walls, partitions) Layout, Access

More information

Suspension Systems Catalogue 2013 / 2014

Suspension Systems Catalogue 2013 / 2014 CEILING&WALL SYSTEMS CI/SfB (35) Xy September 2012 Between us, ideas become reality Suspension Systems Catalogue 2013 / 2014 S UMMARY ARMSTRONG SUSPENSION SYSTEMS Armstrong s Philosophies 1 Armstrong s

More information

Green Globes for New Construction Pre-Assessment Checklist for Project Managers

Green Globes for New Construction Pre-Assessment Checklist for Project Managers 1 Green Globes for New Construction Pre-Assessment Checklist for Project Managers What is Stage I assessment? As the design phase draws to a close, and your Green Globes questionnaire is completed through

More information

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Page 1 of 6 INTRODUCTION Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Millennium Hall is described as

More information

Midwest Energy Efficiency Alliance Wacker Office Build-out

Midwest Energy Efficiency Alliance Wacker Office Build-out Midwest Energy Efficiency Alliance Wacker Office Build-out Office Energy Reduction Features and Other Efforts Towards Sustainability Image Courtesy of MEEA Image Courtesy of Flicker.com Welcome to MEEA

More information

About this document. UPS Attention: Sustainability Report Editor 55 Glenlake Parkway N.E. Atlanta, Georgia 30328

About this document. UPS Attention: Sustainability Report Editor 55 Glenlake Parkway N.E. Atlanta, Georgia 30328 UPS Corporate Sustainability Report: Supplemental Data Table of Contents Water 2 Effluents and Waste 3 Compliance 5 Key Performance 7 Indicators About this document In, UPS reported its annual Corporate

More information

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS CONTENTS Page 1 Introduction 2 2 Planning Applications 3 3 Internal Segregation of Waste 3 4 Housing Developments 4 5 Apartment Developments 5-6

More information

Acoustic design of schools: performance standards. From 2003 to 2014: a brief guide to the changes in BB 93. by Jack Harvie-Clark, 9th January 2015

Acoustic design of schools: performance standards. From 2003 to 2014: a brief guide to the changes in BB 93. by Jack Harvie-Clark, 9th January 2015 Acoustic design of schools: performance standards From 2003 to 2014: a brief guide to the changes in BB 93. by Jack Harvie-Clark, 9th January 2015 This document should be read in conjunction with the new

More information

ENVIRONMENTAL ASPECTS REGISTER (ISO 14001)

ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) 1. Scope The scope of this Environmental Aspects Register covers the following operational areas: Aberdeen Region (A); Cumbernauld Region (C); Warrington Region

More information

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015 HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015 May 2015 MAYOR OF LONDON Housing Standards: Transition Policy Statement. On 25 March 2015 through a written ministerial statement,

More information

Asbestos Policy & Procedure

Asbestos Policy & Procedure Asbestos Policy & Procedure 1. Purpose & Introduction This policy and procedure sets out Octavia s commitment and approach to ensuring, so far as reasonably practicable, that residents, contractors and

More information

Gold Certification Ska-Rating Report

Gold Certification Ska-Rating Report Gold Certification Ska-Rating Report Eldon Court, 75-77 London Road, Reading, RG1 5BS Eldon Court is a self contained, purpose built, modern office building, with excellent prominence and parking, situated

More information

Characterization of acoustics in open offices - four case studies

Characterization of acoustics in open offices - four case studies Characterization of acoustics in open offices - four case studies J. S Keränen, P. Virjonen and V. O Hongisto Finnish Institute of Occupational Health, Lemminkäisenkatu 14-18 B, 5 Turku, Finland jukka.keranen@ttl.fi

More information

ENGLISH MANUAL FOR NEW CONSTRUCTION AND REFURBISHMENT VERSION 1.0 EDITION 130501

ENGLISH MANUAL FOR NEW CONSTRUCTION AND REFURBISHMENT VERSION 1.0 EDITION 130501 ENGLISH MANUAL FOR NEW CONSTRUCTION AND REFURBISHMENT VERSION 1.0 EDITION 130501 BES 5066: ISSUE 1.1 BREEAM-SE ver. 1.0 The BREEAM Assessor Manuals are technical guidance documents which have been created

More information

Operations Unit Custodial Services Staff and Managers/Supervisors who administer the policy.

Operations Unit Custodial Services Staff and Managers/Supervisors who administer the policy. Facilities Management Policy (FMP) Dalhousie Green Cleaning Area: Operations Title: Green Cleaning Policy Issued by: Director of Operations, Facilities Management Date Issued: 2013-03- 11 Last Revision

More information

Why is lighting in the workplace important?

Why is lighting in the workplace important? OSH Brief No. 3c Why is lighting in the workplace important? From the workers perspective, poor lighting at work can lead to eye strain, fatigue, headaches, stress and accidents. On the other hand, too

More information

Fire Safety Requirements for Child Care Centre

Fire Safety Requirements for Child Care Centre Fire Safety Requirements for Child Care Centre A. Restrictions on Location Child care centre shall not be located : - (a) (b) in any premises designed for residential use; in any industrial building, warehouses,

More information

Asbestos Management Policy

Asbestos Management Policy Asbestos Management Policy Originator: Approval date: Policy and Strategy Team Sovini Board PCHA Board OVH Board/EMT 3 rd December 2012 22 nd November 2012 25 th September 2012 Review date: December 2013

More information

Standard the the Raising

Standard the the Raising Raising the Standard Introduction to BS 5839-1:2013 An Overview of the BS 5839 1:2013 for professionals who are responsible for the provision of fire detection and alarm systems for buildings Agenda Introduction

More information

Sustainability in construction at Creighton

Sustainability in construction at Creighton Sustainability in construction at Creighton Like many other higher education campuses and companies Creighton is striving to draft their own policies, procedures and guidelines. Through the support of

More information

Solar Homes Catch the Sun. Are you planning a new house? Discover how you can apply solar architecture principles to:

Solar Homes Catch the Sun. Are you planning a new house? Discover how you can apply solar architecture principles to: PASSIVE Solar Design Solar Homes Catch the Sun Are you planning a new house? Discover how you can apply solar architecture principles to: keep your heating bills to a minimum enjoy the comfort of a warm

More information

BACKGROUND VENTILATION SOLUTIONS FOR DOMESTIC BUILDINGS

BACKGROUND VENTILATION SOLUTIONS FOR DOMESTIC BUILDINGS CI/SfB (57) Uniclass L753 October 2015 BACKGROUND VENTILATION SOLUTIONS FOR DOMESTIC BUILDINGS... PRODUCT RANGE AND OVERVIEW..................................................................................

More information

Review Timber as a Building Material - An environmental comparison against synthetic building materials

Review Timber as a Building Material - An environmental comparison against synthetic building materials NAFI N a t i o n a l A s s o c i a t i o n o f F o r e s t I n d u s t r i e s L t d Review Timber as a Building Material - An environmental comparison against synthetic building materials By Phil Townsend

More information

Only two floors remaining

Only two floors remaining Only two floors remaining 2,697-20,615 sq ft St Peter s Square www.stpetersstockport.com Stockport town centre s first grade A, BREEAM Excellent office building. TO LET Stockport 51,402 sq ft Full grade

More information

Qualification Snapshot CIH Level 4 Certificate in Managing Responsive Repairs (QCF)

Qualification Snapshot CIH Level 4 Certificate in Managing Responsive Repairs (QCF) Qualification Snapshot CIH Certificate in Managing Responsive Repairs (QCF) The Chartered Institute of Housing (CIH) is an awarding organisation for national qualifications at levels 2, 3 and 4. CIH is

More information

Klosterenga, Oslo, Norway, 1998-2000 page - 1

Klosterenga, Oslo, Norway, 1998-2000 page - 1 Klosterenga, Oslo, Norway, 1998-2000 page - 1 Introduction Klosterenga is an urban revitalisation project close to the city centre of Oslo. The 3 apartments were built with a focus on energy saving. Next

More information

April 25, 2014 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES

April 25, 2014 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES April 25, 2014 Page 1 DESCRIPTION Formed PVC ceiling panels. Low maintenance PRODUCT FEATURES BASIC USES / RELATED USES PVC ceiling panel minimizes the problem of water damage and mold/mildew that are

More information

CEILING SYSTEMS. CI/SfB (35) Xy April 2006. [Between us, ideas become reality.] ULTIMA CANOPY. Data sheet. Acoustic performance meets High Design

CEILING SYSTEMS. CI/SfB (35) Xy April 2006. [Between us, ideas become reality.] ULTIMA CANOPY. Data sheet. Acoustic performance meets High Design CEILING SYSTEMS [Between us, ideas become reality.] CI/SfB (35) Xy April 2006 ULTIMA CANOPY Data sheet Acoustic performance meets High Design ULTIMA CANOPY Installation Instructions I. GENERAL 1. Product

More information

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY. 3.5 ENERGY CONSERVATION AND SUSTAINABILITY As a result of the analysis undertaken in the Initial Study 1 for the Los Angeles Mission College Facilities Master Plan, the LACCD determined that the proposed

More information

Concepts. Products. Service. From one source. Plafotherm Plasterboard Heated and Chilled Ceilings

Concepts. Products. Service. From one source. Plafotherm Plasterboard Heated and Chilled Ceilings Concepts Products Service From one source. Plafotherm Plasterboard Heated and Chilled Ceilings 1 Building new solutions. Lindner undertakes major projects worldwide in all areas of interior fit-out, insulation

More information

A closer look at the major green building rating tools in use around the world: BREEAM

A closer look at the major green building rating tools in use around the world: BREEAM A closer look at the major green building rating tools in use around the world: BREEAM Presented by: tony lee luen len, GBCM May 2010 BREEAM BRE Environmental Assessment Method is the most widely used

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

Rockwool Flexi Insulation Application Guide

Rockwool Flexi Insulation Application Guide Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed

More information

University of Nevada, Reno Facilities Services Department STANDARD OPERATING PROCEDURE. Facilities Maintenance Services

University of Nevada, Reno Facilities Services Department STANDARD OPERATING PROCEDURE. Facilities Maintenance Services University of Nevada, Reno Facilities Services Department STANDARD OPERATING PROCEDURE Facilities Maintenance Services Indoor Flood Cleanup and Mold Prevention DATE: 6/24/15 REVISED: PURPOSE This University

More information

Acoustic Design Practices for Sustainable Buildings

Acoustic Design Practices for Sustainable Buildings Acoustics 2008 Geelong, Victoria, Australia 24 to 26 November 2008 Acoustics and Sustainability: How should acoustics adapt to meet future demands? Acoustic Design Practices for Sustainable Buildings Danny

More information

DuPont Surfaces. Suitable for both horizontal and vertical applications, Corian solid surfaces and Zodiaq

DuPont Surfaces. Suitable for both horizontal and vertical applications, Corian solid surfaces and Zodiaq DuPont Surfaces contributing to sustainable design and leed Durable, easy to maintain, and low-voc emitting, DuPont Corian solid surfaces and DuPont Zodiaq quartz surfaces can contribute to your sustainable

More information

Norwegian Tax Authority - Oslo Norway

Norwegian Tax Authority - Oslo Norway 1. INTRODUCTION Norwegian Tax Authority - Oslo Norway PROJECT SUMMARY Year of construction - 1980 No previous energy renovations SPECIAL FEATURES Main topics in the renovation are: High insulated pre fabricated

More information

CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form:

CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form: CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form: Please complete and submit this form with your building permit application. 80% of all demolition and construction material must be recycled.

More information

Composite Panel Firewall Systems

Composite Panel Firewall Systems Composite Panel Firewall Systems part of the Protecting more than your business Insulated mineral fibre panels have excellent thermal and acoustic properties, ideal for factory and office partition walls.

More information

What Makes A Building Green?

What Makes A Building Green? What Makes A Building Green? Barbara Harrison and Maraline Ashley INTRODUCTION This lesson unit will introduce and examine the concepts of green building and green jobs by researching terms, methodologies

More information

Air-water systems for efficient air conditioning

Air-water systems for efficient air conditioning Air-water systems for efficient air conditioning The art of handling air System overview Passive cooling systems Induction units Façade ventilation units Page 4 Page 6 Page 10 Passive Chilled ceiling Undersill

More information

IEQ Management Plan. Denver Museum of Nature and Science ECF Addition

IEQ Management Plan. Denver Museum of Nature and Science ECF Addition IEQ Management Plan GH Phipps Construction Companies 5995 Greenwood Plaza Blvd., Suite 100 Greenwood Village, Colorado 80111-4710 303.571.5377 PHONE www.ghphipps.com Denver Museum of Nature and Science

More information