1 WIND POWER PROJECT BY RAJASTHAN GUM PRIVATE LIMITED (EKI.CDM.JULY-11-01) Document Prepared By EPIC Sustainability Services Private Limited Project Title Report Title Wind Power Project by Rajasthan Gum Private Limited (EKI.CDM.July-11-01) Gap validation and verification of Wind Power Project by Rajasthan Gum Private Limited (EKI.CDM.July-11-01) Version 1.0 Report ID Verification Period Client ESSPL/VCS/2015/ Sep-2011 to 31-December-2012 Rajasthan Gum Private Limited Pages 19 Date of Issue 02 nd August 2016 Prepared By Contact Approved By Work Carried Out By EPIC Sustainability Services Private Limited 41, Anugraha, 1st Cross, Sundarnagar, Near BEL Circle, Bangalore , Karnataka, India Mr. K. Sudheendra (Head-Operations) Mr. A. Prabu Das (Lead Auditor cum Technical expert) Mr R. Vijaya Ragahvan (Technical reviewer) v3.0 1

2 Summary: EKI Energy Services Limited as the authorize representative on behalf of Rajasthan Gum Private Limited has appointed EPIC Sustainability Services Private Limited to perform the gap validation and first periodic verification of the emission reductions reported for the project titled Wind Power Project by Rajasthan Gum Private Limited (EKI.CDM.July-11-01) (UNFCCC Project ID: 7377) for the period from 24-Sep-2011 to 31-December The verification was based on the validated project design document (PDD) version 05 dated 1 st November 2012, VCS PD version 02 dated 22 nd July 2016, corresponding validation report and other supporting documents made available to the verification team by the client. The project activity involves setting up of a 10.8 MW capacity wind project comprising of 6 Wind Electric Generators (WTGs) (3 of 2,100 kw & 3 of 1,500 kw) at Karnataka & Rajasthan. The main purpose of the project activity is to generate electrical energy through sustainable means using wind power resources, to utilize the generated output for selling it to the Karnataka & Rajasthan state and to contribute to climate change mitigation efforts. The verification team identified, through the verification process, 06 CARs and 04 CL. The PP has taken actions and submitted to EPIC the revised monitoring report and supporting evidence. In summary, it is the opinion of EPIC that the proposed VCS project activity has correctly applied the baseline and monitoring methodology AMS I D - Grid connected renewable electricity generation (Version 17, EB 61) for the project activity and meets the relevant VCS standard v3.5 and VCS guideline v3.5 requirements. The estimated GHG reductions from the project would be real, measurable, permanent and additional. The verification team, through the verification process, confirmed that the emission reductions achieved by the project activity during the monitoring period are correctly calculated in the monitoring report, Version 02, dated 22 nd July 2016 based on the approved monitoring methodology. Therefore, EPIC certifies the emission reductions amounting to 22,744 tco2e during the monitoring period. v3.0 2

3 Table of Contents TABLE OF CONTENTS PAGE 1.0 Introduction Validation and verification process Validation findings Verification findings Validation and Verification conclusion 15 Appendix A: Resolution of CAR/CRs Appendix B Reference list v3.0 3

4 1 INTRODUCTION 1.1 Objective JOINT VALIDATION & VERIFICATION REPORT: VCS Version 3 EPIC Sustainability Services Private Limited (hereinafter referred to as EPIC) has been contracted by EKI Energy Services Limited (hereinafter referred to as PP) to undertake the gap validation and first periodic independent verification of the project activity titled Wind Power Project by Rajasthan Gum Private Limited (EKI.CDM.July-11-01) (hereinafter referred to as project activity) The purpose of the validation is to perform an independent, third party assessment of whether the project activity confirms to the qualification criteria set in the VCS standard v3.5 and VCS guideline v3.5to attain real, measurable, additional and permanent emission reduction. The validation statement / opinion is a written assurance that the project complies with all the applicable VCS requirements and has the ability to generate the emission reductions stated over the projects crediting period. To verify that the actual monitoring system and procedures are in full compliance with the system and procedures described in the monitoring plan of validated CDM PDD, version 05 dated 1 st November 2012 (hereinafter referred to as validated PDD) as well as with the applicable methodology; To verify that the data reported were accurate, complete, consistent, transparent and free of material error or omission by checking the monitoring records and the emissions reduction calculation; and To verify and certify GHG emission reduction reported for the project for the period from 24-Sep to 31-December-2012 (hereinafter referred to as current monitoring period). 1.2 Scope and Criteria The validation scope includes an independent and objective review of the Project VCS project description (PD), the project s baseline study, monitoring plan and other relevant documents. Specifically, the objectives of the validation work involve: To verify whether the project activity meets the requirements of VCS standard v3.5 /1/ and VCS guideline v3.5 /2//1/ including additionality, proof of title and compliance with local laws. To assess whether the baseline and monitoring plan are in conformance with the methodology applied from the VCS approved GHG program. To certify that the information presented are complete, consistent, transparent and free of material error. v3.0 4

5 The Project Description was reviewed against VCS standard v3.5 and VCS guideline v3.5and the applied CDM methodology /3/. EPIC has performed the validation based on a risk based approach focusing mainly on the significant risks to meet the qualification criteria and the ability to generate VCUs. The work carried out by EPIC is free from any conflict of interest. The scope of the verification was the independent and objective review and ex-post determination of the monitored reductions in GHG emissions from the project activity. The verification of this CDM project was based on the validated and registered project design documents ((PDD), Validation Report) /5/ and monitoring reports and supporting documents made available to the verification team. These documents were reviewed against the requirements of the VCS standard /1/ version 3.5, VCS guidelines, the CDM Modalities and Procedures, related rules and guidance, and the Validation and Verification standard /4/ Version 9.0. The verification is not meant to provide any consulting towards the client. However, stated request for clarifications and/or corrective actions may provide input for improvement of the project design. 1.3 Level of Assurance In line with VCS standard v3.5 and VCS guideline v3.5requirements and as per ISO :2006 Para A.2.3.2, a reasonable level of assurance has been followed for the validation of the project. Based on the desired level of accuracy EPIC has established an internal quality control process and assures that the information given in the PD /10/ is materially correct and is a fair representation of the of the actual project details, and is prepared in accordance with the VCS requirements and the applied CDM methodology for information pertaining to additionality, GHG quantification, monitoring and reporting. The validation report is carried out as per this requirement and details are presented in the validation statement in section 4 below. 1.4 Summary Description of the Project The project activity involves installation of a 10.8 MW wind power project at Karnataka and Rajasthan States in India. A total of 6 Wind Electric Generators (WTGs) comprising 3 of 2,100 kw & 3 of 1,500 kw have been installed and operational from 24/09/2011 which is the date at which the earliest WTG was commissioned. All WTGs are supplied and manufactured by Suzlon Energy Limited. The power generated will be used to supply to the Southern and NEWNE grids and will displace power which his predominantly fossil fuel generated. The expected operational lifetime of the project is for 20 years. The total emission reductions achieved under this monitoring period is 22,744 tco 2. The project activity category is summarized as below: Project Type: I Renewable Energy Projects Project Category: D. Grid connected renewable electricity generation Sectoral Scope: 1 - Energy Industries (renewable - /nonrenewable sources) 2 VALIDATION AND VERIFICATION PROCESS 2.1 Method and Criteria v3.0 5

6 The EPIC validation and verification process consisted of the following phases: a document review of the project description and preparation of validation and verification protocol; on-site visit to the project activity and interviews with project developer, project consultant relevant stakeholders and O & M operations personnel resolution of outstanding issues and the issuance of final validation report and opinion In order to ensure transparency, a validation and verification protocol was customised for the project according to the VCS standard v3.5 and VCS guideline v3.5. The protocol describes the findings, criteria (requirements), means of verification, results from the validating and how the identified criteria, have been met in a transparent manner. The protocol serves the following purposes: it organizes, details and clarifies the requirements of a VCS project is expected to meet; it ensures a transparent validation process where the validator and verifier will document how a particular requirement has been validated and the result of the validation. The validation protocol consists of Appendix A, where findings established during the validation were classified as non-fulfilment of validation protocol criteria or where risks to the fulfilment of project objectives were identified. Corrective Action Request (CAR) was issued, where: mistakes have been made that directly impact on the project results; or validation protocol requirements have not been met; or there was a risk that the project would not be accepted as a VCS project or that emission reductions will not be certified. The validation team has also raised Clarification (CL), where additional information is needed to fully clarify an issue. APPENDIX : RESOLUTION OF CORRECTIVE ACTION AND CLARIFICATION REQUESTS Draft report clarifications and corrective action requests by validation team Ref. to Section of the PD Summary of project owner response Validation conclusion team If the conclusions from the draft Validation are either a CAR or CL, these should be listed in this section. Reference to the Section of the PD where the relevant CAR or CL is raised. The responses given by the project participants during the communications with the validation team should be summarized in this section. This section should summarise the validation team s responses and final conclusions. v3.0 6

7 The following team members from EPIC are involved in identifying the following: Name Role Components reviewed Mr. A. Prabu Das Lead Auditor cum Technical expert Completeness check, desk review, onsite inspection, Interview with project representatives, issuance of findings, report preparation Mr. R. Vijayaraghavan Technical Reviewer Technical Issues related to project 2.2 Document Review The first PD version 1.0 and MR version 1.0 submitted by the client and additional backgrounds documents related to the project design and baseline were reviewed as an initial step of the validation and verification process. As a result of review and findings, PP had submitted the revised PD version 02 and revised MR version 02 /9/ A desk review was further done to assess the following parameters: 1. Project details as per VCS PD and MR template 2. Applicability and Appropriateness of methodology used 3. Compliance with relevance laws and regulation 4. Correctness of application of baseline and monitoring methodology 5. Demonstration of additionality 6. Monitoring Plan 7. Stakeholders consultation process 8. Proof of title & Rights of use 9. Supporting documents as described in Appendix B 10. Accuracy and quality of the monitoring and estimation of emission reductions 11. Implementation of the monitoring plan in accordance with registered PDD. 2.3 Interviews After the review of the Project description, MR and documents a site visit was carried out on 14 th April During the site visit physical inspection of the project components followed by interviews with the on-site personnel was carried out to verify the project details. A follow-up meeting was also conducted with the project representatives. The following persons were interviewed. Name & Designation Company Details of Interview Mr. Satish Sharma Suzlon Infrastructure Services limited Assistant Manager Mr Yogesh Kumar Site incharge Mr Neeraj Mangal Supervisor Ms. Rucha Natu CDM Consulltant Suzlon Infrastructure Services limited EKIESL Project details, Monitoring system, calibration frequency, Grid connectivity & power evacuation system / Infrastructure. Overall Project management. v3.0 7

8 Applicability to methodology, Monitoring requirements, Emission reduction calculations 2.4 Site Inspections During the site visit, the actual on-site practices adopted and followed for the operation of the project were compared with the description given in the monitoring report. The technical details, cogeneration system, metering practices, calibration and level of accuracy were examined. The archived data of the energy generated was also reviewed. An on-site assessment was conducted as a part of validation and verification activity and involved: 1) an assessment of the implementation and operation of the project activity as per the registered PDD 2) a review of information flows for generating, aggregating and reporting of the monitoring parameters 3) interviews with relevant personnel to confirm that the operational and data collection procedures are implemented in accordance with the Monitoring Plan 4) a cross-check between information provided in the MR and data from other sources 5) a check of the monitoring equipment including calibration performance, and observations of monitoring practices against the requirements of the PDD and the applied methodology 6) A review of calculations and assumptions made in determining the GHG data and ERs, and 7) An identification of QA/QC procedures in place to prevent, or identify and correct, any errors or omissions in the reported monitoring parameters. 2.5 Resolution of Findings Resolution of Clarification and Corrective Action Requests The objective of this phase of the verification was to resolve the corrective action requests and clarifications and any other outstanding issues which needed to be clarified prior to EPIC positive conclusion on the monitoring report and the project design. During the validation and verification process ten CARs were raised. All the CARs and CRs were resolved during this phase. In order to ensure the transparency of the validation process, the concerns raised and responses that were given are summarized in Appendix A of this report and documented in more detail in the Verification in Appendix A. All the corrective actions have been incorporated into the monitoring report Forward Action Requests There is no FAR raised during this verification process. 3 VALIDATION FINDINGS 3.1 Project Details v3.0 8

9 Project identification, design & development and implementation were evaluated as per the requirements of VCS standard v3.5 and VCS guideline v3.5. The project activity involves setting up of a 10.8 MW wind power project in states of Karnataka and Gujarat. The power generated is supplied to the Southern and NEWNE grid respectively. In the baseline scenario, the grid is supplied power by predominantly fossil fuel sources which the supply of power from the project activity displaces. The project applies the baseline and monitoring methodology AMS I.D Grid connected renewable electricity generation version 17. The project falls under sectoral scope no. 1 Energy industries (renewable/non-renewable sources). The following details were verified in accordance with VCS requirements Criteria Project proponent: Rajasthan Gum Private Limited is the project proponent for the project. Other entities involved Right of use: The project proponent is Rajasthan Gum Private Limited and the right of use has been demonstrated accordingly Project scale: The annual emission reductions from the project are expected to be 20,357 tco2e Estimated GHG emission reductions or removals. Justification The same has been confirmed based on the commissioning certificates/7/ as wells as Consent to Operate from the state nodal agency/6/.further the signed PPA agreement was also reviewed./8/ EKI Energy Services Limited (EKIESL) is the other entity involved as verified from the communications agreement between EKIESL and the PP. Based on the review of commissioning certificates and Consent to Operate by the state nodal agency to Rajasthan Gum Private Limited, it is confirmed that Rajasthan Gum Private Limited has successfully demonstrated rights of use as per VCS requirements. The project falls under the category of Project as per VCS requirements as the annual emission reductions from the project is expected to be 20,357 tco2e. Compliance with relevance laws and regulation: The project has received the regulatory clearance in form of Consent to Operate from the State nodal agency and the Consent to Operate is submitted. The document review of the NOC /6/ issued by the state nodal agency confirmed that the project complies with local rules and regulations. The technical specifications of the WTGs were verified with the equipment purchase orders /5/ and cross verified during the on-site visit. These were found to be correct and consistent. The location of the project activity was physically verified during validation site visit. The geographical coordinates of the project activity as mentioned in the PD were crosschecked with globally accessible satellite based imagery data software and found to be consistent. v3.0 9

10 During the on-site visit, the project supporting documents were verified. The validation team has reviewed the commissioning certificate /6/ and Power Purchase Agreement /7/ and found that electricity generated is supplied to the grid. The validation team has reviewed the commissioning certificates and found commercial operation date to be 24/09/2011which is taken as start date of the project activity. PP has chosen a renewable crediting period of 10 years starting from 24/09/2011 to 23/09/2021. The validation team has accepted this considering the technical life of the WTG is 20 years. In line with the VCS requirements, proof of title of the individual investors was verified with the equipment purchase Orders /5/, Commissioning Certificate /6/ and Power Purchase Agreement /7/. The project so far has not created any other form of environmental credit. But, the project is registered under CDM separately. However, the VCUs revenue will be considered only for the period during which no CDM/CER benefits are claimed. To ensure that the environmental credits generated by the project are not double counted under VCS, an undertaking letter /10/ was provided by PP indicating that the project activity is not claiming credits under other forms of GHG program. The project has not been rejected under other GHG programme. The project meets the general requirements of VCS standard v3.5 and VCS guideline v3.5with respect to Project start date, Project scope and Crediting period according to clause 5.1, 5.2 and Participation under Other GHG Programs The project was registered under CDM before 2 years from the start date of the project and is eligible for VCS registration. 3.3 Application of Methodology Title and Reference Sectoral Scope : 01 Energy Industries (renewable-/non renewable) Project Type : Type 1 Renewable Energy Projects Methodology : AMS I. D. Version 17 AMS ID applies the following tool which has been used to calculate the amount of emission factor from the project activity: Tool to calculate the Emission Factor for an Electricity System, Version , Annex 12, EB 61 report. v3.0 10

11 3.3.2 Applicability JOINT VALIDATION & VERIFICATION REPORT: VCS Version 3 As the project activity is registered under Clean Development Mechanism (Ref.No:7377), the validation of the applicable conditions of the project may be referred in the validation report issued to the UNFCCC on 2 nd November Project Boundary Please refer the validation of the applicable conditions of the project may be referred in the validation report issued to the UNFCCC on 2 nd November Baseline Scenario Please refer the validation of the applicable conditions of the project may be referred in the validation report issued to the UNFCCC on 2 nd November Additionality Please refer the details in the validation report issued to the UNFCCC on 2 nd November Quantification of GHG Emission Reductions and Removals Please refer the validation of the applicable conditions of the project may be referred in the validation report issued to the UNFCCC on 2 nd November Methodology Deviations There is no methodology deviation involved. v3.0 11

12 3.3.8 Monitoring Plan JOINT VALIDATION & VERIFICATION REPORT: VCS Version 3 Please refer the validation of the applicable conditions of the project may be referred in the validation report issued to the UNFCCC on 2 nd November Non-Permanence Risk Analysis Not applicable to the non AFOLU project. 3.5 Environmental Impact Please refer the validation of the applicable conditions of the project may be referred in the validation report issued to the UNFCCC on 2nd November Stakeholder Comments Please refer the validation of the applicable conditions of the project may be referred in the validation report validation report issued to the UNFCCC on 2nd November VERIFICATION FINDINGS 4.1 Accuracy of GHG Emission Reduction and Removal Calculations The verification of all the data ex-ante and data ex-post (monitoring parameters) used for the calculation of baseline emissions, project emissions and leakage emissions are tabulated below. Ex-ante Parameters: Data / Parameter Justification of verification team Operating Margin CO 2 emission factor in year y (t CO 2 /MWh) The applied values have been verified from CO 2 Baseline Database for the Indian Power Sector, Version 6, CEA /13/ ( 2 /user_guide_ver6.pdf) NEWNE Grid Southern Grid The values have been Calculated as per Tool to calculate the emission factor for an electricity system, Version EB 63 annex 19 as 3-year generation weighted average using data for the years , , & which is verified to be correct as per the applicable methodology and procedure as per the registered PDD. v3.0 12

13 Data / Parameter Justification of verification team Build Margin CO 2 emission factor in year y (t CO 2 /MWh) The applied values have been verified from CO 2 Baseline Database for the Indian Power Sector, Version 6, CEA ( 2 /user_guide_ver6.pdf) NEWNE Grid Southern Grid Calculated the build margin emission factor ex ante based on Tool to calculate the emission factor for an electricity system, Version EB 63 annex 19 as the most recent information ( ) available on units already built for sample group at the time of CDM-PDD submission to the DOE for validation which is verified to be correct as per the applicable methodology and procedure as per the registered PDD. Data / Parameter Justification of verification team Combined Margin CO 2 emission factor in year y (t CO 2 /MWh) or CO 2 emission factor of the grid in year y (t CO 2 /MWh) The applied values have been calculated to be: NEWNE Grid Southern Grid The combined margin emissions factor is calculated as follows: EFCO2, grid,y = EFgrid, OM, y *WOM + EFgrid, BM, y *WBM Where: EFgrid,BM,y: Build margin CO2 emission factor in year y (tco2/mwh) EF grid, OM, y: Operating margin CO2 emission factor in year y (tco2/mwh) WOM: Weighting of operating margin emissions factor (%) WBM: Weighting of build margin emissions factor (%) In case of wind power generation project WOM = 0.75 and WBM = Hence it is verified to be which is verified to be correct as per the applicable methodology and procedure as per the registered PDD Ex-Post Parameters: Data / Parameter Justification of verification team Quantity of net electricity supplied to the grid from the WTGs in year y For NEWNE Grid WTG Sites (Project activity site in Rajasthan) Thus Quantity of net electricity supplied to the grid from the WTGs v3.0 13

14 in year y is calculated as = Sum of Net Export from all the WTGs Sum of Net Import from all the WTGs. The relevant Break up sheet submitted by SEL (O & M Contractor) on the basis of Joint Meter Reading report /12/ of the complete Wind Farm taken by SEL, RVPN & JVVNL have been reviewed to confirm the electricity generated. For Southern Grid WTG Sites (Project activity site in Karnataka) Thus Quantity of net electricity supplied to the grid from the WTGs in year y is calculated as = Sum of Net Export from all the WTGs Sum of Net Import from all the WTGs. The relevant Credit Report Sheets /12/ were verified to confirm the electricity generated. The electricity generated was further cross verified with the monthly bills / invoices raised for each WTG. The energy meters used are energy meters which are of high accuracy class i.e. (0.2s). The meters are monitored continuously & cumulative readings are taken at the end of the month by joint meter reading procedure. The calibration records of the energy meters have been verified based on the calibration certificates /11/ submitted. Hence it is verified that the monitoring plan has been implemented in accordance with the applicable methodology and procedure as per the registered PDD. The verification team has cross checked the values for each parameter based on the actual data provided in conformance with the requirements of the applicable methodology. Moreover, findings were raised in case data was not provided adequately and only upon review of the submissions the findings have been closed. Hence it is conformed that that there are no manual transposition errors between data sets. The verification team confirms that sampling has not been applied for any parameter in line with the registered monitoring plan. The calibration records as verified from the documents submitted evidenced delay in calibration for which the applicable correction factor was applied. The Verification team concludes that the GHG emission reductions and removals have been quantified correctly in accordance with the monitoring plan and applied methodology. v3.0 14

15 4.2 Quality of Evidence to Determine GHG Emission Reductions and Removals Evidence used to check and cross check has been described for each parameter in the above section 4.1. Further the review of the registered ER sheet available on CDM website for the project (UNFCC ref: 7377) confirmed that the approach for estimating the emission reductions is based on the approved methodology. The verification of the emission reductions estimated was correctly calculated as verified from the emission reduction excel sheet submitted/14/. The details of the baseline and project emissions and the approach for quantifying them was in line with the requirements of the applicable methodology. Based on the evidence provided the Verification team concludes sufficiency of quantity, and appropriateness of quality, of the evidence used to determine the GHG reductions and removals for the current verification period. 5 VALIDATION AND VERIFICATION CONCLUSION EPIC performed a validation of the proposed VCS project Wind Power Project by Rajasthan Gum Private Limited (EKI.CDM.July-11-01) (UNFCCC Project ID: 7377). The validation was carried out to independently assess whether the project confirms to the qualification criteria and requirements of the Voluntary Carbon Standard (VCS) Version 3.5, including the baseline and monitoring methodology applied. The VCS program provides the standard and framework for independent validation based on ISO :2006 and ISO :2006 standards. The validation was performed using a risk based approach, the review of the project description and the subsequent follow-up interviews provided EPIC with sufficient evidence to determine the fulfillment of the stated criteria. The GHG emission calculations are documented in a complete and transparent manner. The formulae and methodologies for accounting GHG emissions are appropriate and emission factors are deemed to be of sufficient accuracy. The emission reductions forecast has been checked and it is deemed likely that the stated amount is achievable on the basis that the underlying assumptions do not change. The monitoring plan is in line with the approved monitoring methodology of AMS ID Version 17. The plan adequately addresses all necessary information for monitoring and reporting of emissions reductions due to the project activity. Responsibilities and authorities for project management, monitoring and reporting, and the data quality control and quality assurance procedures have been described in the PDD. In summary, it is EPIC opinion that the Wind Power Project by Rajasthan Gum Private Limited (EKI.CDM.July-11-01) (UNFCCC Project ID: 7377) in the the PDD version 05 dated 1 st November 2012, meets all relevant VCS standard v3.5 and VCS guideline v3.5 requirements, is eligible as Large scale renewable energy generation project type and correctly applies the baseline and monitoring methodology specified in AMS ID Version 17. As such, EPIC recommends the registration of the project as a VCS project activity. The verification was carried out in accordance with the requirements of the Validation and Verification standard Version 9.0 and VCS Standard 3.5. As a result of the verification, the verification team confirms that for the reporting period: all operations of the project were implemented as described in the registered PDD, (project ID 7377), v3.0 15

16 the monitoring plan is in accordance with the approved monitoring methodology applied by the project activity. the monitoring has been carried out in accordance with the validated PDD version 05 dated 1 st November the monitoring aspects (i.e. additional monitoring parameters, monitoring frequency and calibration frequency) were in place and functional, with the installed equipment essential for generating emission reduction operating appropriately and the calibration of all the equipment had been carried out accordingly, and the GHG emission reductions achieved were calculated correctly on the basis of approved monitoring methodology. EPIC has verified that the information included in the final monitoring report (version 2.0, dated 22 nd July 2016 was correct and that the emission reductions achieved had been determined correctly. In our opinion, the GHG emission reductions for the monitoring period stated in the latest revised monitoring report for the project are fairly stated The verifier confirms that the GHG emission reductions were calculated without material misstatements for the whole monitoring period. Our opinion is based on the project s GHG emissions and resulting GHG emission reductions reported, and, to the valid and registered project baseline and monitoring documents. We confirm the following: Verification period: From [24th September 2011] to [31st December 2012] Verified GHG emission reductions and removals in the above verification period: Year Baseline emissions or removals (tco 2 e) Project emissions or removals (tco 2 e) Leakage emissions (tco 2 e) Net GHG emission reductions or removals (tco 2 e) Year , ,949 Year , ,795 Total 22, ,744 Prepared by Approved by : Mr. A. Prabu Das (Lead Auditor) Mr. K. Sudheendra (Head Operations) v3.0 16

17 APPENDIX A : RESOLUTION OF CORRECTIVE ACTION AND CLARIFICATION REQUESTS Draft report clarifications and corrective action requests by validation team CAR 01 For sections unfilled under the PD template, Not applicable to be indicated as per VCS requirements. Summary of project owner response In line to the, VCS Standard version 03, section sub point 1, all the relevant sections of the revised PD is been updated. DOE is requested to kindly refer the same. Validation and Verification team conclusion The corrected PD is accepted to meet requirements of the VCS PD template Conclusion CAR 01 Resolved CAR 02 Under section 1.11 of the VCS PD, to indicate details of consent to operate (NOC) as per regulations of respective states. CAR 03 Clarify on the observation that the CDM PDD indicated 0.5s accuracy class while site visit and implementation indicated 0.2 s for the energy meters and justify whether this correction is categorised as a project deviation under VCS requirements. VCS PD is section 1.11 is been revised to indicate the details of consent and approvals awarded to WTGs involved in the project activity as per regulations of the respective states. As per the onsite visit, accuracy class of energy meters is denoted as 0.2s throughout the revised MR. The same has now been referred as a project deviation under the section, of the revised MR. This deviation, however is not effecting, the GHG emissions as determined during the current monitoring period. The corrected PD and the documents submitted have been verified to fulfil the requirements. Conclusion CAR 02 Resolved The project deviation as included in the revised in the PDD is included for updating the accuracy of information and as such does not impact on the project design or materiality. Conclusion CAR 03 Resolved CAR 04 Supporting documents for the net electricity generation is not provided for assessment as applicable to the monitoring period under verification. CAR 05 Calibration records for all meters pertaining to this monitoring period to be indicated in annex of the MR. further supporting documents have not been submitted. Supporting documents for the net electricity generation is to DOE for assessment. Calibration records for all meters pertaining to this monitoring period is indicated in annex 1 of the MR. Supporting documents have been submitted. The documents pertaining to the net electricity generated have been verified. Conclusion CAR 04 Resolved Calibration records for the energy meters have been submitted and have been verified. For the delay as noted in some instances the appropriate correction factor is applied. Conclusion CAR 05 Resolved v3.0 17

18 Draft report clarifications and corrective action requests by validation team CAR 06 Provide information to verify whether the project has not applied under any other eligible national schemes for generating incentives / revenues? CL 01 Clarify the inconsistency under section 2.1 of the VCS MR in description of project WTGs as 27 as only 6 WTGS are in this Project activity. CL 02 Clarify on the inconsistency of OM values with registered PDD which indicates different values under section 3.1 of the MR CL 03 Clarify if the WTGs for the applicable monitoring period continue to sell electricity to the grid as per description in the registered CDM PDD. CL 04: Clarify whether EKIESL is eligible for inclusion as PP as per VCS requirements. Summary of project owner response GBI and REC are the two incentive scheme for the renewable energy industry in India, GBI is applicable where in accelerated depreciation is not been claimed by the PP and REC is applicable wherein PP avoid preferential tariff. The said project activity is availing accelerated depreciation benefit and is having PPA signed with SEB at preferential tariff. Hence the project activity under consideration is not eligible under any national schemes for generating incentives / revenues. Consistency is now maintained throughout VCS MR. Consistency is now maintained throughout VCS MR. PP hereby confirms that the WTG for the applicable monitoring period continues to sell the grid as per description on the registered CDM PDD. The contracted PPA s and Invoices raised to the state utility board can be referred for the same. Based on VCS requirements, Now EKIESL is included as other entity while Rajasthan Gum Private Limited is indicated as the PP Validation and Verification team conclusion The project is not under any other national schemes for generating additional revenue as verified from the PPA and information in PDD. Conclusion CAR 06 Resolved The revised PD mentions the information consistently. Conclusion CL 01 Resolved The revised PD mentions the information consistently. Conclusion CL 02 Resolved The PPA and invoices raised indicate that the project is implemented on the model of selling electricity. Conclusion CL 03 Resolved The revised PD and MR (version 02) now indicated Rajasthan Gum Private Limited which is as per VCS requirements. Conclusion CL 04 Resolved v3.0 18

19 APPENDIX B: REFERENCE LIST Reference Details of supporting documents 1 VCS Standard Version VCS program guide CDM methodology AMS I.D version 17 4 CDM Validation Verification Standard V CDM PDD dated 1 st November 2012 & Validation report dated 2 nd November Consent to operate certificate issued by Rajasthan and Karnataka electricity boards 7 Certificate of commissioning of all the WTGs 8 Power Purchase/Supply Agreement with respective State Electricity Board for all WTGs 9 VCS PD version 02 dated 22 nd July 2016 & MR version 02 dated 22 nd July Letters of undertaking submitted by Rajasthan Gum Private Limited 11 Calibration certificates for energy and electricity meters 12 Monthly electricity bills / JMR Reports / Credit reports of all WTGs 13 CEA Database version Emission reduction calculation excel sheet v3.0 19

MONITORING REPORT FORM (CDM-MR) * Version 01 - in effect as of: 28/09/2010 CONTENTS

MONITORING REPORT FORM (CDM-MR) * Version 01 - in effect as of: 28/09/2010 CONTENTS MONITORING REPORT FORM (CDM-MR) * Version 01 - in effect as of: 28/09/2010 CONTENTS A. General description of the project activity A.1. Brief description of the project activity A.2. Project participants

More information

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN Suryachambal Power Limited Chambal Power Limited s (CPL) proposed 7.5 MW biomass based power project at Rangpur, Kota District, Rajasthan,

More information

Draft Large-scale Consolidated Methodology ACM00XX: Construction of a new natural gas power plant

Draft Large-scale Consolidated Methodology ACM00XX: Construction of a new natural gas power plant CLEAN DEVELOPMENT MECHANISM CDM-MP66-A01 Draft Large-scale Consolidated Methodology ACM00XX: Construction of a new natural gas power plant COVER NOTE 1. Procedural background 1. The Executive Board of

More information

Draft consolidated baseline and monitoring methodology ACM00XX

Draft consolidated baseline and monitoring methodology ACM00XX Draft consolidated baseline and monitoring methodology ACM00XX Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology

More information

Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011

Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011 Introduction As more companies and government organizations prepare greenhouse gas (GHG) inventories that reflect the emissions directly and indirectly associated with their operations, they increasingly

More information

Annex 8 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT FORM. (Version 01.0) CONTENTS

Annex 8 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT FORM. (Version 01.0) CONTENTS Page 1 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT FORM (Version 01.0) CONTENTS Paragraphs I. Introduction... 1 4 2 A. Background... 1 3 2 B. Objectives... 4 2 II. Scope and applicability...

More information

Assessment Report for CDM proposed standardized baseline (Version 01.0)

Assessment Report for CDM proposed standardized baseline (Version 01.0) Assessment Report for CDM proposed standardized baseline (Version 01.0) (To be used by the UNFCCC secretariat in assessing the quality of a proposed standardized baseline only when requested by eligible

More information

Standard Clean development mechanism project standard

Standard Clean development mechanism project standard CLEAN DEVELOPMENT MECHANISM CDM-EB65-A05-STAN Standard Clean development mechanism project standard TABLE OF CONTENTS Page 1. INTRODUCTION... 6 1.1. Background... 6 1.2. Objectives... 6 2. SCOPE AND APPLICABILITY...

More information

Annex 26 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT FORM FOR CARBON CAPTURE AND STORAGE CDM PROJECT ACTIVITES. (Version 01.

Annex 26 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT FORM FOR CARBON CAPTURE AND STORAGE CDM PROJECT ACTIVITES. (Version 01. Page 1 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT FORM FOR CARBON CAPTURE AND STORAGE CDM PROJECT ACTIVITES (Version 01.0) CONTENTS Paragraphs Page I. Introduction... 1-4 2 A. Background...

More information

2010 Rating of Designated Operational Entities (DOEs) accredited under the Clean Development Mechanism

2010 Rating of Designated Operational Entities (DOEs) accredited under the Clean Development Mechanism 2010 Rating of Designated Operational Entities (DOEs) accredited under the Clean Development Mechanism (CDM) Report for WWF Corrected version 1 Berlin, 28 July 2010 Lambert Schneider Lennart Mohr 1 The

More information

Annex 1 Tool for the demonstration and assessment of additionality

Annex 1 Tool for the demonstration and assessment of additionality page 1 Tool for the demonstration and assessment of additionality 1. This document provides for a step-wise approach to demonstrate and assess additionality. These steps include: Identification of alternatives

More information

GUIDELINES FOR USERS OF THE JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM. Version 04. Revision history of the document

GUIDELINES FOR USERS OF THE JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM. Version 04. Revision history of the document Joint Implementation Supervisory Committee page 1 GUIDELINES FOR USERS OF THE JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM Document version Adoption Revision Revision history of the document Version

More information

Project Procurement Standard

Project Procurement Standard Project Procurement Standard Version: June 2008 This document presents the procurement standard for all carbon offsetting projects under the myclimate label. It provides a summary of all applicable standards

More information

1. Whether the concept of materiality can be applied in the context of the CDM

1. Whether the concept of materiality can be applied in the context of the CDM Project Developer Forum input on materiality Preamble In the current version of the Draft Clean Development Mechanism Project Standard published in conjunction with annotated agenda to EB63, section 12.8.4.1

More information

Version 03.1 Page 1 of 6

Version 03.1 Page 1 of 6 Monitoring report form (Version 03.1) Monitoring report Title of the project activity Reference number of the project activity Version number of the monitoring report Completion date of the monitoring

More information

Annex 12 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT (CDM-PDD) AND THE PROPOSED NEW BASELINE AND MONITORING METHODOLOGIES (CDM-NM)

Annex 12 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT (CDM-PDD) AND THE PROPOSED NEW BASELINE AND MONITORING METHODOLOGIES (CDM-NM) Page 1 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT (CDM-PDD) AND THE PROPOSED NEW BASELINE AND MONITORING METHODOLOGIES (CDM-NM) (Version 07) PART I (General guidance) A. General Information

More information

VER+ A robust Standard for Verified Emission Reductions (Criteria Catalogue)

VER+ A robust Standard for Verified Emission Reductions (Criteria Catalogue) VER+ A robust Standard for Verified Emission Reductions (Criteria Catalogue) A. Introduction Verified emission reductions are commonly understood as tradable emission reductions that have been generated

More information

Methodological tool Tool for the demonstration and assessment of additionality

Methodological tool Tool for the demonstration and assessment of additionality CLEAN DEVELOPMENT MECHANISM TOOL01 Methodological tool Tool for the demonstration and assessment of additionality TABLE OF CONTENTS Page 1. INTRODUCTION... 3 2. SCOPE, APPLICABILITY, AND ENTRY INTO FORCE...

More information

In Focus. India s Renewable Energy Certificate Market

In Focus. India s Renewable Energy Certificate Market 2011 1 India s Renewable Energy Certificate Market In Focus India s Renewable Energy Certificate Market Carbon Credit Capital LLC 561 Broadway New York, NY 10012 Tel: 212-925-5697 (Main Office) www.carboncreditcapital.com

More information

EURELECTRIC responses to the invitation in Draft decision -/CMP.5 to make submissions to the UNFCCC secretariat on:

EURELECTRIC responses to the invitation in Draft decision -/CMP.5 to make submissions to the UNFCCC secretariat on: EURELECTRIC responses to the invitation in Draft decision -/CMP.5 to make submissions to the UNFCCC secretariat on: 1. Inclusion of CCS in Clean Development project activities 2. Standardized baselines

More information

Addendum. Part Two: Action taken by the Conference of the Parties serving as the meeting of the Parties to the Kyoto Protocol at its first session

Addendum. Part Two: Action taken by the Conference of the Parties serving as the meeting of the Parties to the Kyoto Protocol at its first session UNITED NATIONS Distr. GENERAL FCCC/KP/CMP/2005/8/Add.1 30 March 2006 Original: ENGLISH CONFERENCE OF THE PARTIES SERVING AS THE MEETING OF THE PARTIES TO THE KYOTO PROTOCOL Report of the Conference of

More information

How To Calculate Fuel Type I

How To Calculate Fuel Type I Page 1 Methodological tool Tool to calculate project or leakage CO 2 emissions from fossil fuel combustion (Version 02) I. SCOPE, APPLICABILITY AND PARAMETERS Scope and applicability This tool provides

More information

If you have any questions regarding the results of the verification please call me at the phone number listed below. Yours truly,

If you have any questions regarding the results of the verification please call me at the phone number listed below. Yours truly, KPMG Performance Registrar Inc. Box 10426, 777 Dunsmuir Street Vancouver BC V7Y 1K3 Canada Telephone (604) 691-3000 (604) 691-3401 Telefax (604) 691-3031 www.kpmg.ca Corey Wilson Commercial Manager 141

More information

DELHI ELECTRICITY REGULATORY COMMISSION

DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION AND RENEWABLE ENERGY CERTIFICATE FRAMEWORK IMPLEMENTATION) REGULATIONS, 2011 No. Dated:. NOTIFICATION

More information

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Date(s) of Evaluation: CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Assessor(s) & Observer(s): Organization: Area/Field

More information

GHG Accounting Guidance Note Manufacture of Renewable Energy Climate Related Products

GHG Accounting Guidance Note Manufacture of Renewable Energy Climate Related Products GHG Accounting Guidance Note Manufacture of Renewable Energy Climate Related Products IFC CLIMATE BUSINESS GROUP SEPTEMBER 2011 Introduction The following is an overview guidance for IFC investment staff

More information

Crediting the displacement of non-renewable biomass under the CDM

Crediting the displacement of non-renewable biomass under the CDM Crediting the displacement of non-renewable biomass under the CDM Submission by Öko-Institut to the public call by the Executive Board of the Clean Development Mechanism Berlin, April 2007 Lambert Schneider

More information

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY 1. OBJECTIVE 1.1. This procedure shall provide guidance to the entities to implement Renewable Energy Certificate

More information

Revision to the approved baseline methodology AM0011

Revision to the approved baseline methodology AM0011 CDM Executive Board AM00011 / Version 02 Source Revision to the approved baseline methodology AM0011 Landfill gas recovery with electricity generation and no capture or destruction of methane in the baseline

More information

Draft Small-scale Methodology AMS-III.AV: Low greenhouse gas emitting safe drinking water production systems

Draft Small-scale Methodology AMS-III.AV: Low greenhouse gas emitting safe drinking water production systems CLEAN DEVELOPMENT MECHANISM CDM-SSCWG48-A03 Draft Small-scale Methodology AMS-III.AV: Low greenhouse gas emitting safe drinking water production Sectoral scope(s): 03 COVER NOTE 1. Procedural background

More information

Bundling small-scale energy efficiency projects

Bundling small-scale energy efficiency projects Bundling small-scale energy efficiency projects Issue Paper Introduction Energy efficiency projects are characterised by a large variety of size in terms of reduction of energy inputs and emissions Whereas

More information

Advance unedited version

Advance unedited version Decision -/CP.20 Guidelines for the technical review of information reported under the Convention related to greenhouse gas inventories, biennial reports and national communications by Parties included

More information

Procedure Development, revision and clarification of baseline and monitoring methodologies and methodological tools

Procedure Development, revision and clarification of baseline and monitoring methodologies and methodological tools CLEAN DEVELOPMENT MECHANISM CDM-EB70-A36-PROC Procedure Development, revision and clarification of baseline and monitoring methodologies and TABLE OF CONTENTS Page 1. INTRODUCTION... 4 2. SCOPE, APPLICABILITY

More information

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes 3 Terms and definitions 3.4 third-party certification audit audit carried out by an auditing organization independent of the client and the user, for the purpose of certifying the client's management system

More information

UNFCCC/CCNUCC DRAFT. Annex 1

UNFCCC/CCNUCC DRAFT. Annex 1 Page 1 IMPLEMENTATION PLAN OF THE POLICY FRAMEWORK TO MONITOR PERFORMANCE AND ADDRESS NON-COMPLIANCE BY DESIGNATED OPERATIONAL ENTITIES A. Mandate 1. The conference of the Parties serving as the meeting

More information

Analysis of state-wise RPO Regulation across India

Analysis of state-wise RPO Regulation across India The Renewable Purchase Obligations (RPO) has been the major driving force in India to promote the renewable energy sector. But the State Electricity Regulatory Commissions (SERCs) have defined their respective

More information

COMMISSION STAFF WORKING DOCUMENT. Elements of the Union greenhouse gas inventory system and the Quality Assurance and Control (QA/QC) programme

COMMISSION STAFF WORKING DOCUMENT. Elements of the Union greenhouse gas inventory system and the Quality Assurance and Control (QA/QC) programme EUROPEAN COMMISSION Brussels, 12.8.2013 SWD(2013) 308 final COMMISSION STAFF WORKING DOCUMENT Elements of the Union greenhouse gas inventory system and the Quality Assurance and Control (QA/QC) programme

More information

Annex 49 GUIDELINES FOR QUALITY ASSURANCE AND QUALITY CONTROL OF DATA USED IN THE ESTABLISHMENT OF STANDARDIZED BASELINES. (Version 01.

Annex 49 GUIDELINES FOR QUALITY ASSURANCE AND QUALITY CONTROL OF DATA USED IN THE ESTABLISHMENT OF STANDARDIZED BASELINES. (Version 01. Page 1 GUIDELINES FOR QUALITY ASSURANCE AND QUALITY CONTROL OF DATA USED IN THE ESTABLISHMENT OF STANDARDIZED BASELINES (Version 01.0) I. Background 1. The Executive Board of the clean development mechanism

More information

5.5 QUALITY ASSURANCE AND QUALITY CONTROL

5.5 QUALITY ASSURANCE AND QUALITY CONTROL 0 0 0. QUALITY ASSURANCE AND QUALITY CONTROL.. Introduction The IPCC Good Practice Guidance and Uncertainty Management (GPG000, IPCC, 000), Chapter, Quality Assurance and Quality Control, defines quality

More information

Clean Development Mechanism Status and outlook

Clean Development Mechanism Status and outlook Presented by: Neeta Hooda UNFCCC Secretariat Clean Development Mechanism Status and outlook Presented at: UNFCCC Media Training Workshop, Accra, 26 August 2008 1 The Kyoto Protocol Entry into force on

More information

Data Communications Company (DCC) price control guidance: process and procedures

Data Communications Company (DCC) price control guidance: process and procedures Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required

More information

Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013

Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 EUROPEAN COMMISSION European Social Fund Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 Version of June 2015 Please consult http://ec.europa.eu/esf/sco

More information

The Project Design Document

The Project Design Document Downloaded from orbit.dtu.dk on: Jan 06, 2016 The Project Design Document Olsen, Karen Holm Publication date: 2012 Link to publication Citation (APA): Olsen, K. H. (2012). The Project Design Document [Sound/Visual

More information

Green-e Climate Stakeholder Process Voluntary GHG Project Certification Programs

Green-e Climate Stakeholder Process Voluntary GHG Project Certification Programs VOLUNTARY GHG PROJECT CERTIFICATION PROGRAMS This document provides information to stakeholders about the Gold Standard, a voluntary GHG project certification program. This document is distributed to stakeholders

More information

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-SSC-CPA-DD) Version 01 CONTENTS

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-SSC-CPA-DD) Version 01 CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-SSC-CPA-DD) Version 01 CONTENTS A. General description of CDM programme activity (CPA) B. Eligibility

More information

Spillemyndigheden s Certification Programme Change Management Programme

Spillemyndigheden s Certification Programme Change Management Programme SCP.06.00.EN.1.0 Table of contents Table of contents... 2 1 Objectives of the change management programme... 3 1.1 Scope of this document... 3 1.2 Version... 3 2 Certification... 4 2.1 Certification frequency...

More information

Procedure for Nominating Renewable Energy Credit Offsets

Procedure for Nominating Renewable Energy Credit Offsets Procedure for Nominating Renewable Energy Credit Offsets A. Nominations for renewable energy credit offsets shall be made jointly by the generating facility owner and the intended recipients of the offsets.

More information

Clean Energy and Carbon Finance Consultant, Workshop on CDM Accreditation Standard Mumbai 25 May 2010

Clean Energy and Carbon Finance Consultant, Workshop on CDM Accreditation Standard Mumbai 25 May 2010 Vinay Deodhar Clean Energy and Carbon Finance Consultant, Clean Tech Solutions Workshop on CDM Accreditation Standard Mumbai 25 May 2010 Presentation Outline Introductiont d ti Evolution of Validation/Verification

More information

APX VCS Registry Operating Procedures. September 2012

APX VCS Registry Operating Procedures. September 2012 APX VCS Registry Operating Procedures September 2012 Table of Contents 1 INTRODUCTION... 1 1.1 ABOUT THE APX VCS REGISTRY... 1 1.2 GEOGRAPHIC SCOPE... 1 2 ACCOUNTS AND USER REGISTRATION... 2 2.1 PARTICIPATION

More information

Technical Guidance for Offset Verifiers Verification of Offset Project Data Reports:

Technical Guidance for Offset Verifiers Verification of Offset Project Data Reports: Technical Guidance for Offset Verifiers Verification of Offset Project Data Reports: California Air Resources Board Stationary Source Division Climate Change Program Evaluation Branch October 2013 Page

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. No. L-1/12/2010-CERC Dated: 14 th January, 2010 NOTIFICATION

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. No. L-1/12/2010-CERC Dated: 14 th January, 2010 NOTIFICATION CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No. L-1/12/2010-CERC Dated: 14 th January, 2010 NOTIFICATION In exercise of powers conferred under sub-section (1) of Section 178 and Section 66 read

More information

Polish Green Investment Scheme Setting the benchmark for good practice?

Polish Green Investment Scheme Setting the benchmark for good practice? Polish Green Investment Scheme Setting the benchmark for good practice? Grzegorz Peszko Senior Energy/Environmental Economist European Bank for Reconstruction and Development GIS: Why EBRD? GIS hosts =

More information

Certification Procedure of RSPO Supply Chain Audit

Certification Procedure of RSPO Supply Chain Audit : 1 of 19 Table of Contents 1. Purpose 2. Scope 3. Unit of Certification 3.1 Identity Preserved, Segregation, Mass Balance, 3.2. Book and Claim 4. Definitions 5. Responsibilities 5.1 Head of the Certification

More information

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: pcn@bindt.org CP14 ISSUE 5 DATED 1 st OCTOBER

More information

Environmental Operational Reporting and Offset Management Standard

Environmental Operational Reporting and Offset Management Standard Environmental Operational Reporting and Offset Management Standard PURPOSE AND SCOPE The purpose of this Standard is to specify the National Australia Bank Limited s (NAB Ltd) requirements for managing

More information

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR NOTIFICATION 23 rd December, 2010 No.RERC/Secy/Reg. 82 : In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity Act,

More information

Women Organizing for Change in Agriculture & Natural Resource Management. Women s Carbon Standard (WCS)

Women Organizing for Change in Agriculture & Natural Resource Management. Women s Carbon Standard (WCS) Women Organizing for Change in Agriculture & Natural Resource Management Women s Carbon Standard (WCS) Version: April 2013 Version: April 2013 Executive Summary The Women s Carbon Standard (WCS) is a set

More information

FCCC/TP/2013/5. United Nations. Technical synthesis on the framework for various approaches. Technical paper. Summary. Distr.: General 22 October 2013

FCCC/TP/2013/5. United Nations. Technical synthesis on the framework for various approaches. Technical paper. Summary. Distr.: General 22 October 2013 United Nations FCCC/TP/2013/5 Distr.: General 22 October 2013 English only Technical synthesis on the framework for various approaches Technical paper Summary This technical synthesis draws on the information

More information

Presentation Title ( Arial, Font size 28 )

Presentation Title ( Arial, Font size 28 ) Presentation Title ( Arial, Font size 28 ) Acquisition of 1,140 MW Welspun Renewable Portfolio Date, Venue, etc..( Arial, Font size 18 ) June, 2016 Message Box ( Arial, Font size 18 Bold) Disclaimer Certain

More information

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background Renewable Energy Certificate Mechanism for India Background ABPS Infrastructure Advisory India is abundantly gifted with a variety of renewable energy (RE) sources. However, not all states are endowed

More information

Greenhouse Gas Offsets and Renewable Energy Certificates: Distinct Commodities in an Evolving Market The Climate Trust

Greenhouse Gas Offsets and Renewable Energy Certificates: Distinct Commodities in an Evolving Market The Climate Trust Greenhouse Gas Offsets and Renewable Energy Certificates: Distinct Commodities in an Evolving Market The Climate Trust Introduction The framework for future climate policy is emerging in the United States

More information

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification Protocol] is maintained on the Bonsucro website: www.bonsucro.com.

More information

Spillemyndigheden s Certification Programme Change Management Programme

Spillemyndigheden s Certification Programme Change Management Programme SCP.06.00.EN.2.0 Table of contents Table of contents... 2 1 Introduction... 4 1.1 Spillemyndigheden s certification programme... 4 1.2 Objectives of the change management programme... 4 1.3 Scope of this

More information

Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading

Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading Target Clients v Renewable Energy Generators in India v RPO mandated entities in India v Investors seeking

More information

Draft Scope 2 Accounting Guidance: What it could mean for corporate decisions to purchase environmental instruments

Draft Scope 2 Accounting Guidance: What it could mean for corporate decisions to purchase environmental instruments Draft Scope 2 Accounting Guidance: What it could mean for corporate decisions to purchase environmental instruments September 2014 Corporate Scope 2 accounting has traditionally been relatively straight

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014 the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

CHAPTER 3: WHAT DOES MY COMPANY NEED TO DO TO COMPLY WITH THE CAP-AND-TRADE REGULATION?

CHAPTER 3: WHAT DOES MY COMPANY NEED TO DO TO COMPLY WITH THE CAP-AND-TRADE REGULATION? CHAPTER 3: WHAT DOES MY COMPANY NEED TO DO TO COMPLY WITH THE CAP-AND-TRADE REGULATION? 3.1 Register with the Cap-and-Trade Program The Compliance Instrument Tracking System Service (CITSS) is a market

More information

Carbon Projects and Potential Source of Revenue for Microfinance Institutions to Accelerate Renewable Energy Lending in Nepal

Carbon Projects and Potential Source of Revenue for Microfinance Institutions to Accelerate Renewable Energy Lending in Nepal Carbon Projects and Potential Source of Revenue for Microfinance Institutions to Accelerate Renewable Energy Lending in Nepal By: Marco van der Linden, Carbon Finance Advisor: MarcovanderLinden@snvworld.org

More information

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes

More information

Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments

Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments January 2015 Corporate Scope 2 accounting has traditionally been relatively straight forward. Common

More information

SASSA LOW PRESSURE SOLAR WATER. May 19, 2011 Department of Energy, Pretoria

SASSA LOW PRESSURE SOLAR WATER. May 19, 2011 Department of Energy, Pretoria SASSA LOW PRESSURE SOLAR WATER HEATER PROGRAMME May 19, 2011 Department of Energy, Pretoria AGENDA 1. The Programme 2. Why SWH and this programme? 3. Approach THE PROGRAMME THE PROGRAMME Installs 110 litre

More information

Determination of the CO2 Emissions Factor the electrical system of the Dominican Republic

Determination of the CO2 Emissions Factor the electrical system of the Dominican Republic VI International Symposium on Energy & Innovation & Entrepreneurship Forum San Juan, Puerto Rico [20.feb.2014] Determination of the CO2 Emissions Factor the electrical system of the Dominican Republic

More information

D DAVID PUBLISHING. Voluntary Carbon Market in Turkey. 1. Introduction. Fehiman Ciner 1 and Aydemir Akyurek 2

D DAVID PUBLISHING. Voluntary Carbon Market in Turkey. 1. Introduction. Fehiman Ciner 1 and Aydemir Akyurek 2 Journal of Energy and Power Engineering 8 (2014) 1908-1912 D DAVID PUBLISHING Fehiman Ciner 1 and Aydemir Akyurek 2 1. Department of Environmental Engineering, Faculty of Engineering, Nigde University,

More information

Preparing for Mandatory Carbon reporting webinar questions

Preparing for Mandatory Carbon reporting webinar questions Please note the following are responses made immediately after the webinar on 22 nd May - it is not formal guidance / should not be regarded as such (please treat as verbal response to webinar and suggest

More information

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Twenty-first session Buenos Aires, 6 14 December 2004

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Twenty-first session Buenos Aires, 6 14 December 2004 UNITED NATIONS Distr. GENERAL FCCC/SBSTA/2004/12 29 November 2004 Original: ENGLISH SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Twenty-first session Buenos Aires, 6 14 December 2004 Item 5

More information

Solar City Master Plan - Executive Summary

Solar City Master Plan - Executive Summary Solar City Master Plan - Executive Summary Meeting the growing energy demand is one of the biggest challenges that the world is facing today. Rising population and depleting fossil fuel resources are compelling

More information

UN Carbon Market Mechanisms: Business opportunities for the Caribbean

UN Carbon Market Mechanisms: Business opportunities for the Caribbean UN Carbon Market Mechanisms: Business opportunities for the Caribbean Guest Lecture, 9 th February 2015 Department of Business and Management St. George s University Karla Solís, Eng.D. Team Lead CDM Regional

More information

TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES Approved By: Senior Manager: Mpho Phaloane Created By: Field Manager: John Ndalamo Date of Approval:

More information

Renewable Energy. and Renewal Energy Certificates in Indian Context

Renewable Energy. and Renewal Energy Certificates in Indian Context Renewable Energy and Renewal Energy Certificates in Indian Context With the increasing demand of energy and growing depletion of resources for energy generation, a global movement towards production of

More information

ONTARIO REGULATION proposed to be made under the

ONTARIO REGULATION proposed to be made under the Caution: This draft regulation is provided solely to facilitate dialogue concerning its contents. Should the decision be made to proceed with the proposal, the comments received during consultation will

More information

GOLD STANDARD VERIFICATION REPORT

GOLD STANDARD VERIFICATION REPORT GOLD STANDARD VERIFICATION REPORT - 3RD PERIODIC M/S BAGEPALLI COOLIE SANGHA (BCS) BIOGAS CDM PROJECT OF BAGEPALLI COOLIE SANGHA GOLD STANDARD REF. NO. : GS 768 Monitoring Period: 2013-01-01 to 2014-06-30

More information

GHG data management issues in an Oil Company. Maria Mantini, Corporate HSE Leonardo Gelpi, Corporate M2M Oil & Gas Session New Delhi, 4 th March 2010

GHG data management issues in an Oil Company. Maria Mantini, Corporate HSE Leonardo Gelpi, Corporate M2M Oil & Gas Session New Delhi, 4 th March 2010 GHG data management issues in an Oil Company Maria Mantini, Corporate HSE Leonardo Gelpi, Corporate M2M Oil & Gas Session New Delhi, 4 th March 2010 Agenda Boundaries and approaches definition GHG data

More information

E N G I N E E R I N G

E N G I N E E R I N G Purpose If the customer s proposed project proceeds to Gate 1 of the Integrated Customer Solutions (ICS) process (see the ICS Process and Proposal Submission Guide), the customer must prepare a Load Displacement

More information

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 page 1 CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS A. General description of project activity B. Application of a baseline and

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

ISO/TS 16949:2002 Guidance Document

ISO/TS 16949:2002 Guidance Document ISO/TS 16949:2002 Guidance Document Introduction ISO/TS 16949:2009 emphasizes the development of a process oriented quality management system that provides for continual improvement, defect prevention,

More information

Business Case Template

Business Case Template Business Case Template For new or revised province-wide, regional and local distributor CDM programs The following template outlines the sections to be included in business cases for new distributor CDM

More information

W O R L D R E S O U R C E S I N S T I T U T E A U T H O R

W O R L D R E S O U R C E S I N S T I T U T E A U T H O R The Greenhouse Gas Protocol Guidelines for Quantifying GHG Reductions from Grid-Connected Electricity Projects WORLD RESOUR CES INSTITUTE Contributors W O R L D R E S O U R C E S I N S T I T U T E A U

More information

Project Idea Note: Solar Water Heating Fee-For-Service Program in the Caribbean

Project Idea Note: Solar Water Heating Fee-For-Service Program in the Caribbean PROJECT IDEA NOTE (Based on the World Bank s PIN Template, with Some Adaptations) A. Project description, type, location and schedule Name of Project: Solar Water Heating Fee-for-Service Program in the

More information

Regulations for certification of quality management systems

Regulations for certification of quality management systems Regulations for certification of quality management systems 00 24/04/2013 Annulla e sostituisce il documento Regulations for certification of quality management systems in rev. 14 SG DIR AD Rev. Data Descrizione

More information

P-01 Certification Procedure for QMS, EMS, EnMS & OHSAS. Procedure. Application, Audit and Certification

P-01 Certification Procedure for QMS, EMS, EnMS & OHSAS. Procedure. Application, Audit and Certification Procedure Application, Audit and Certification Document No. P-01 Version 9.00 Date of Issue Nov 02, 2015 Reviewed & Approved by Name Designation Signature Date Kaushal Goyal Managing Director Nov 02, 2015

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS.

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS. CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application

More information

DRAFT REGULATIONS: CARBON OFFSETS. 20 June 2016

DRAFT REGULATIONS: CARBON OFFSETS. 20 June 2016 DRAFT REGULATIONS: CARBON OFFSETS 20 June 2016 DRAFT CARBON TAX BILL: PUBLICATION OF PROPOSED REGULATIONS MADE IN TERMS OF CLAUSE 20(b) OF THE DRAFT CARBON TAX BILL, 2015 Proposed regulations in terms

More information

Dutch Accreditation Council (RvA) Policy rule Nonconformities. Corrective action

Dutch Accreditation Council (RvA) Policy rule Nonconformities. Corrective action Dutch Accreditation Council (RvA) Policy rule Nonconformities and Corrective action Document code: RvA-BR004-UK Version 2, 23-1-2015 RvA policy guidelines describe the RvA rules and the policy on specific

More information

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY 1. OBJECTIVE : 1.1. This procedure shall provide guidance to the entities to implement

More information

Wigton Wind Farm Project Project Design Document

Wigton Wind Farm Project Project Design Document EcoSecurities Environmental Finance Solutions Mauritskade 25 2514 HD Den Haag The Netherlands Telephone (31) 70 3654749 Fax (31) 70 3656495 E-mail: nl@ecosecurities.com Web site: www.ecosecurities.com

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Technical Guideline Audit and Inspection Version 2.0 February 2012 Table of Contents 1. Introduction... 3 2. Definitions... 3 3. Internal Audit... 3 3.1

More information

Tools to support BUR reporting

Tools to support BUR reporting Tools to support BUR reporting The new WRI GHG Protocol Mitigation Accounting Standards Peer-to-peer exchange on BURs Berlin Marion Vieweg 16 October 2014 Overview Context - Reporting of mitigation actions

More information

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS LEC (Company Audit) Guidance Notes Glossary of Terms Transport for London (TfL) London Low Emission

More information

Portfolio Manager and Green Power Tracking

Portfolio Manager and Green Power Tracking Building owners and operators can buy green power products as a way of reducing the environmental impacts associated with purchased electricity use in their facilities. The Environmental Protection Agency

More information