Penny Bay and Disneyland Theme Park

Size: px
Start display at page:

Download "Penny Bay and Disneyland Theme Park"

Transcription

1 Penny Bay and Disneyland Theme Park A brief review of the development process Raymond Wong City University of Hong Kong

2 Penny Bay and Disneyland Theme Park - Some fast fact: 1. Reclaimed area: 200 hectares (Stage 1), 80 hectares (Stage 2) 2. Contract period for Stage 1 reclamation: May 2000 to Dec Contract sum: - $4 billion (reclamation stage 1) - $6.5 billion (reclamation stage 2 and other associated infrastructure works) 4. Other work quantity: - Dredging of unwanted material 42 million cu meter, with 0.1 million cu meter contaminated material - imported fill 70 million cu meter - total length of sloped and vertical seawall about 3500m

3 Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works: road construction (total 8.8 km), slope cutting and stabilization, slope vegetation, drainage and sewage network, storm water discharge system (4.5 km box-culvert) fresh and salt water supply facilities, construction of a water recreation centre, public transport interchange, other hard and soft landscaping works - Decommissioning of the former Choy Lee Shipyard and the related soil decontamination works - Construction of a public pier - Essential GIC facilities - Stage 2 reclamation and the associated works

4 Various phases of reclamation

5 Major work locations

6 Layout of Phase 1 infrastructure works

7

8

9 Penny Bay in 1999 before the carrying out of Reclamation

10 Early stage of reclamation in early 2001

11 Early stage of reclamation in early 2001 with the old Choy Lee Shipyard still in view

12 Reclamation work as seen in early 2002

13 Reclamation work as seen in early 2002

14 Practically completed Stage 1 reclamation work as seen in early 2003

15 Silt curtain Sand filling using rainbow jetting by dredger ships

16

17 Forming of a channel to reserve portion of the sea coast on the east side of Penny Bay

18 Pile forming for some of the advanced works

19 Forming of the vertical seawall

20 Forming of the vertical seawall

21 Pipe work for sand jetting

22 Consolidate the newly reclaimed land by surcharging method

23 Consolidation by vibro-compaction

24 Final stage of reclamation and the commencement of other civil works

25 Construction of the roadway linking to the North Lantau Expressway

26 Northern part of Penny Bay seeing the linking roadway and the Water Recreation Centre Preserved coastline Water Recreation Centre Surface channel supplying water to the WRC

27 The preserved CLP power station

28 The preserved CLP power station merged into the theme park by earth bund and landscaping provisions

29 Drainage works in the newly reclaimed land

30 Storm discharge system by box culvert

31 Road works and service laying

32 The newly formed water channel seeing the original coastline

33 Marine piling for the public pier

34 Provision of rows of earth berm with green vegetation forms an importation part of vision impression design in the theme park

35 Site of the resort hotel as seen from the landscape berm

36 Landscaping works and vegetation provided in the public areas

37 Forming the hard landscaping works at the Water Recreation Centre

38 Partially completed hard landscaping works at the Water Recreation Centre

39 Water Recreation Centre with the soft landscaping work in place

40 Entrance to the Central Pedestrian Walkway near the Coach parking square

41 The fountain square at the entrance outside the theme park pay-area

42 External frame in galvanized steel for the function/retail buildings

43 Final touch-up of the European-styled town houses

44 Final decoration the town house

45

46

47

48

49

50

51 Final touch-up work at the Courtyard of the Disneyland Castle

52 Final touch-up works to the Disneyland Castle towers

53

54 External decoration to façade of themed buildings

55 Final touch-up works at the entrance of Disneyland Castle

56 Ceiling installation to the function and retail areas

57 Interior decoration to the function and retail areas

58 Forming of various games centre inside the theme park

59 The Space Mountain

60 Cladding detail of the Space Mountain Dome

61 Track of the Space Wagon as seen inside the Space Mountain Dome

62 Setting of the mechanized games in the theme park

63 Setting of the mechanized games in the theme park

64 Forming of the American Street

65 The American Street in the theme park at its final touch-up stage

66 Façade of the buildings in the American Street

67 Paving works

68 Soft landscape and greening items

69 Forming the hard landscape facilities

70 Train wagon encircling the theme part as one of the mechanized games

71 The Disneyland Resort Hotel

72 Trackwork of the MTRC Disneyland Resort Line in Penny Bay

73 Over-run track of the Disneyland Station

74 Interior view of the MTRC Disneyland Station

75 Public bus station at the entrance to the theme park

76 Disneyland Resort Line Sunny Bay Station connecting the MTRC Tung Chung Line with the new Theme Park

77 Detail look of the Sunny Bay Station

78 Connecting carriageway linking the public transport center at Sunny Bay with the Theme Park North Lantau Expressway

79 Public pier at Penny Bay

80 Paving work

81 Stage 2 Reclamation

82 Brand name of Disneyland

83 End of presentation for the Disneyland Theme Park at Penny s Bay

Examples of major projects with environmental permits :

Examples of major projects with environmental permits : Examples of major projects with environmental permits : Cyberport Development at the Telegraph Bay KCRC East Rail Extension From Hung Hom to Tsimshatsui Hong Kong Disneyland West Rail Phase I 1800 MW Gas-fired

More information

Hong Kong means business in sustainable development

Hong Kong means business in sustainable development SHOWCASING THE Achievements the Hong Kong Civil Service of Hong Kong means business in sustainable development ENVIRONMENTAL PROTECTION DEPARTMENT Hong Kong s status as Asia s world city is backed by its

More information

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water 1 P age Module 6 : Quantity Estimation of Storm Water Lecture 6 : Quantity Estimation of Storm Water 2 P age 6.1 Factors Affecting the Quantity of Stormwater The surface run-off resulting after precipitation

More information

Transit Oriented Development and Value Capture Hong Kong

Transit Oriented Development and Value Capture Hong Kong UNESCAP Regional Expert Group Meeting on Sustainable and Inclusive Transport Development and 2 nd Asia BRTS Conference, 29 Sep 1 Oct 2014, Ahmedabad Transit Oriented Development and Value Capture Hong

More information

Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks

Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks Raymond wai-man, Wong Professor chi-ming, Tam City University of Hong Kong The background Before 2007, HK s railway networks

More information

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

A Brief Study Of The Development Of Falmouth Within The Context Of The Cruise Ship Pier

A Brief Study Of The Development Of Falmouth Within The Context Of The Cruise Ship Pier HERITAGE PROTECTION, ECOLOGICAL SUSTAINABILITY AND ECONOMIC DEVELOPMENT... AN UNSUSTAINABLE TRIO? A Brief Study Of The Development Of Falmouth Within The Context Of The Cruise Ship Pier Laleta Davis Mattis

More information

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water

More information

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Glossop Design & Place Making Strategy

Glossop Design & Place Making Strategy Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance

More information

Emergency Safeguarding. of the World Heritage. Site of Byblos

Emergency Safeguarding. of the World Heritage. Site of Byblos Emergency Safeguarding of the World Heritage Site of Byblos Emergency Safeguarding of the World Heritage Site of Byblos Introduction Located on the Eastern Mediterranean, 40 km north of Beirut (Lebanon),

More information

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS

More information

Overview of Land Construction Courses at Kansas State University

Overview of Land Construction Courses at Kansas State University Overview of Land Construction Courses at Kansas State University Developed by Professor Day in the mid 1960 s at KSU, continuing to present time, is a vision of a Land Construction course series that examines

More information

Green and Sustainable Buildings

Green and Sustainable Buildings Green and Sustainable Buildings Design Criteria and Application in Hong Kong Green building is the practice of increasing the efficiency with which buildings use resources energy, water and materials.

More information

SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA

SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA 10.1 Summary Information 10.1.1 Location SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA The limits of Management Unit 5, a 2.9km stretch of shoreline fronting the town of Hornsea on the Holderness coast, are

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Storm Water Management Requirements for Construction Projects Less than One Acre

Storm Water Management Requirements for Construction Projects Less than One Acre Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to

More information

City of Beaumont, Texas Grading Permit Information

City of Beaumont, Texas Grading Permit Information General Information City of Beaumont, Texas Grading Permit Information The permit application shall be signed by the property owner (or lessee) or his authorized representative and by the contractor (if

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information

Property Development

Property Development Property Development The Group will continue strengthening its reputation by enhancing the quality of its products and services and branding individual projects. High project marketability and improved

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET

TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET FISCAL YEAR 2005/2006 TRANSPORTATION SOURCE OF FUNDS: Beginning fund balance and anticipated revenue. Over the course of the past fiscal years

More information

Special Use Commercial Properties

Special Use Commercial Properties Contents Overview of Special Use Commercial Properties...3 Understanding Fast Food Restaurants...3 Understanding Gasoline Service Stations...4 Understanding Self-Service Cashier Booths...5 Understanding

More information

High Capacity Helical Piles Limited Access Projects

High Capacity Helical Piles Limited Access Projects High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices

More information

BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA.

BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA. BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA. Claus Brøgger 1 and Poul Jakobsen 2 The present paper presents measurements and results from a three year full scale Pilot Project with the

More information

C-2 Construction, Inc. - NAICS Codes

C-2 Construction, Inc. - NAICS Codes C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining

More information

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.

More information

Various Environmental Projects at Vanderbijlpark Works. December 2014

Various Environmental Projects at Vanderbijlpark Works. December 2014 Various Environmental Projects at Vanderbijlpark Works December 2014 1 1 Several Air Quality Projects 2 Emission reduction projects FMB DUST CONTROL INSTALLED SYSTEM The dust control system at the FMB

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

MLD: Domestic Maritime Transport Project

MLD: Domestic Maritime Transport Project Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication

More information

Foyer. Main Audutorium. Flytower with understage areas. Production Area

Foyer. Main Audutorium. Flytower with understage areas. Production Area NEW OPERA HOUSE Foyer Main Audutorium Flytower with understage areas Production Area ESSENTIAL NUMBERS OF THE NEW OPERA HOUSE GROSS AREA: 38.500 m 2 PUBLIC AREAS: 11.200 m 2 STAGE AREAS: 8.200 m 2 REHEARSAL

More information

Slavic Village Building Condition Review

Slavic Village Building Condition Review Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities

More information

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model BY Dr. Leo Brewster, Director Coastal Zone Management Unit, Barbados Presented At UNFCCC Expert

More information

APPROVAL AMENDMENT HISTORY

APPROVAL AMENDMENT HISTORY Prepared by: Aurecon South Africa (Pty) Ltd STORMWATER MANAGEMENT PLAN TOKAI ESTATE (DRAFT 1) Submission date: 11 January 2013 Contact Person: Francois du Toit T: +27 21 526 6950 F: +27 21 526 9500 E:

More information

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project

More information

A CASE STUDY: DESIGN AND CONSTRUCTION OF FOUNDATION AND BRACED EXCAVATION AT A RECLAIMED SITE AT WATERFRONT

A CASE STUDY: DESIGN AND CONSTRUCTION OF FOUNDATION AND BRACED EXCAVATION AT A RECLAIMED SITE AT WATERFRONT A CASE STUDY: DESIGN AND CONSTRUCTION OF FOUNDATION AND BRACED EXCAVATION AT A RECLAIMED SITE AT WATERFRONT Rupert KY Leung Hyder Consulting Ltd Dr Eric SF Li Hyder Consulting Ltd Cheuk-lun Leung Drainage

More information

EDWARDSTOWN SOLDIERS MEMORIAL RECREATION GROUND BACKGROUND REPORT

EDWARDSTOWN SOLDIERS MEMORIAL RECREATION GROUND BACKGROUND REPORT EDWARDSTOWN SOLDIERS MEMORIAL RECREATION GROUND BACKGROUND REPORT October 2013 ACKNOWLEDGEMENTS The Edwardstown Soldiers Memorial Recreation Ground Master Plan study has been commissioned and funded by

More information

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE Residential Site Licence Conditions of Licence February 2014 EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES Index of conditions CONDITIONS OF SITE LICENCE 1. Period of use 2. Bases 3. Siting

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

Climate Change and Infrastructure Planning Ahead

Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST THE LEONARDO BUILDING - Designed to meet BREEAM Excellent 2011 & EPC B Rating GATWICK AIRPORT proposed

More information

Broward County Everglades Holiday Park. Gateway to the Everglades

Broward County Everglades Holiday Park. Gateway to the Everglades Broward County Everglades Holiday Park Short and Long Range Plan Gateway to the Everglades 1 Deeded to Broward County in 1964 by Davie Farm Lands, Inc. Sole use of the land shall be for public recreation

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

Building Foundation and Structure

Building Foundation and Structure Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original

More information

Helsinki, Finland. EPA Award 2011

Helsinki, Finland. EPA Award 2011 Stockmann Q-Park Helsinki, Finland EPA Award 2011 Category New projects City environment Stockmann Q-Park car park 2 has 600 spaces in three levels H serving shoppers, tourists, 6 leisure users, hotel

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

Risk Analysis, GIS and Arc Schematics: California Delta Levees

Risk Analysis, GIS and Arc Schematics: California Delta Levees Page 1 of 7 Author: David T. Hansen Risk Analysis, GIS and Arc Schematics: California Delta Levees Presented by David T. Hansen at the ESRI User Conference, 2008, San Diego California, August 6, 2008 Abstract

More information

SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN

SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN Performed February 2003 Performed by: Dr. Lee E. Harris, Ph.D., P.E. Associate Professor of Ocean Engineering & Oceanography

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

Methods for Land Reclamation using Soft Soil and Waste

Methods for Land Reclamation using Soft Soil and Waste NTU-JTC I3C Seminar Methods for Land Reclamation using Soft Soil and Waste Chu Jian 2 August 2012 1 Outline Part 1. Overview of land reclamation methods Part 2. Methods for land reclamation using soft

More information

Technical seminar - Modern Technology for Solid Waste Management

Technical seminar - Modern Technology for Solid Waste Management Technical seminar - Modern Technology for Solid Waste Management co-organized by: Hong Kong Waste Management Association Environmental Division of Hong Kong Institute of Engineers Preparations at Wembley

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

The alternation of the ex-victoria Road Detention Centre site in Mount Davis

The alternation of the ex-victoria Road Detention Centre site in Mount Davis C&WDC CLSAC Paper No. 41/2014 Annex I The alternation of the ex-victoria Road Detention Centre site in Mount Davis The reply of the Education Bureau, Commissioner for Heritage s Office, Antiquities and

More information

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN. A Solid Foundation Solution for Homeowners from Our products are made with 90% Recycled Material Down. Right. Solid. GREEN. Stop the damaging effects of foundation settling... Sinking foundations, cracked

More information

Ariana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration

Ariana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration Future of our coasts: Potential for natural and hybrid infrastructure Ariana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration Green

More information

DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN

DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN Last revised June 5th, 2015 Page 1 of 13 Table of Contents 1. PURPOSE... 2 2. ROLES AND RESPONSIBILITIES... 2 3. SAFETY... 2 4. COAL SPILLS... 3 4.1. COAL

More information

Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow

Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow AutoCAD Civil 3D 2008 Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow The ability to perform storm water hydrology and hydraulic (H&H) tasks is crucial to civil

More information

Mine Plan of Operations Reclamation Bond Checklist

Mine Plan of Operations Reclamation Bond Checklist Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,

More information

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

FIRST STREET NORTH CREATING PLACES FOR PEOPLE About This Consultation Manchester City Council and Ask Property Developments are seeking to develop First Street North, a 2.2 acre site to the north of the Number One Building, within the 20 acre First

More information

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document A1-1 ATTACHMENT A1 Great Lakes Shipyard Expansion

More information

velkommen til københavns FØrSte klimakvarter COPeNHaGeN ClImate resilient NeIGHBOUrHOOd klimakvarter.dk

velkommen til københavns FØrSte klimakvarter COPeNHaGeN ClImate resilient NeIGHBOUrHOOd klimakvarter.dk COPENHAGEN CLIMATE RESILIENT NEIGHBOURHOOD klimakvarter.dk 1 In the future we will get more rain, higher sea levels and warmer weather. This presents Copenhagen with a number of challenges. We must meet

More information

U l t i m a t e e f f i c i e n c y D re D ging

U l t i m a t e e f f i c i e n c y D re D ging 1 Ultimate efficiency Dredging We have a deep attitude. 2 Ultimate efficiency 3 Growth of global population, tourism, transportation of people and goods together with increased awareness of the need to

More information

Water Supplies Department Active WSD Capital Works Contracts

Water Supplies Department Active WSD Capital Works Contracts No. Title Active WSD Capital s Location of or Start 17/WSD/14 Improvement to waterworks facilities at Lantau South and Sha Tin Fuk Shing 42.600 16-Nov-15 Nov-18 Lantau South and mainlaying at Keung South

More information

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT APPLICATION FOR A FILL, ECAVATION AND SITE GRADING PERMIT 1. The first step to obtain a Fill, Excavation and Site Grading permit is to obtain a Broward County Environmental Review Approval. Through the

More information

THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS

THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS What Forus will be CONTENTS WHY A JOINT PLAN FOR FORUS?... 3 WHAT IS A PLAN PROGRAMME?... 3 THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS... 3 THE PLAN AREA... 4 THE LONG-TERM GOALS FOR FORUS...

More information

4 Water supply description

4 Water supply description 4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps

More information

London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015

London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015 London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015 Workshop agenda Presentations Breakout workshop sessions Feedback and outcomes for the masterplan

More information

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.: SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

Ankara, -May 2014. Mr. Rifat HISARCIKLIOGLU President Union of Chambers and Commodity Exchanges of Turkey. Dear Mr.

Ankara, -May 2014. Mr. Rifat HISARCIKLIOGLU President Union of Chambers and Commodity Exchanges of Turkey. Dear Mr. Ankara, -May 2014 Mr. Rifat HISARCIKLIOGLU President Union of Chambers and Commodity Exchanges of Turkey Dear Mr. HISARCIKLIOGLU, In the framework of the contacts this Mission is looking forward to establish

More information

Toronto's New Soil and Tree-based Standards for Boulevards

Toronto's New Soil and Tree-based Standards for Boulevards 2013 ISA Annual Meeting Toronto, August 3-7, 2013 Toronto's New Soil and Tree-based Standards for Boulevards Extended Abstract May 16, 2013 Introduction In 2012, the city of Toronto embarked on a process

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

Member Nation Report 2010 from Denmark.

Member Nation Report 2010 from Denmark. Member Nation Report 2010 from Denmark. The has during the year 2010 arranged 6 member meetings including two technical site visits. The first technical site visit covered the 5.3 km long Leipzig City

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

The Council of the City of New York. Economic Development Corporation

The Council of the City of New York. Economic Development Corporation Hon. Melissa Mark-Viverito Speaker of the Council Hon. Julissa Ferreras Chair, Committee on Finance Hon. Daniel R. Garodnick Chair, Committee on Economic Development The Council of the City of New York

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information

Failing Coastal Wood Infrastructure on the Great Lakes

Failing Coastal Wood Infrastructure on the Great Lakes University of Wisconsin Sea Grant Institute Contact Gene Clark grclark@aqua.wisc.edu 715-392-3246 Failing Coastal Wood Infrastructure on the Great Lakes Gene Clark/UW Sea Grant Institute Introduction Many

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5

More information

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

Chapter 2 OVERVIEW - CITY PROFILE 2.1 REGIONAL SETTING 2.2 PLATTED LANDS

Chapter 2 OVERVIEW - CITY PROFILE 2.1 REGIONAL SETTING 2.2 PLATTED LANDS OVERVIEW - CITY PROFILE C i t y P r o f i l e Chapter 2 To appropriately and adequately plan for parks and recreation, it is necessary to understand the forces that shape the many facets of the City and

More information

53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress

53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress 53km will be added to our Hong Kong network Deliver the New Era Network 4 New Railway Projects are in progress Island Line Extension opened in December 2014 Executive Management s Report Hong Kong Network

More information