Penny Bay and Disneyland Theme Park
|
|
- Anabel Reed
- 7 years ago
- Views:
Transcription
1 Penny Bay and Disneyland Theme Park A brief review of the development process Raymond Wong City University of Hong Kong
2 Penny Bay and Disneyland Theme Park - Some fast fact: 1. Reclaimed area: 200 hectares (Stage 1), 80 hectares (Stage 2) 2. Contract period for Stage 1 reclamation: May 2000 to Dec Contract sum: - $4 billion (reclamation stage 1) - $6.5 billion (reclamation stage 2 and other associated infrastructure works) 4. Other work quantity: - Dredging of unwanted material 42 million cu meter, with 0.1 million cu meter contaminated material - imported fill 70 million cu meter - total length of sloped and vertical seawall about 3500m
3 Penny Bay and Disneyland Theme Park - Some fast fact: 5. Other Infrastructure and Associated works: - Infrastructure works: road construction (total 8.8 km), slope cutting and stabilization, slope vegetation, drainage and sewage network, storm water discharge system (4.5 km box-culvert) fresh and salt water supply facilities, construction of a water recreation centre, public transport interchange, other hard and soft landscaping works - Decommissioning of the former Choy Lee Shipyard and the related soil decontamination works - Construction of a public pier - Essential GIC facilities - Stage 2 reclamation and the associated works
4 Various phases of reclamation
5 Major work locations
6 Layout of Phase 1 infrastructure works
7
8
9 Penny Bay in 1999 before the carrying out of Reclamation
10 Early stage of reclamation in early 2001
11 Early stage of reclamation in early 2001 with the old Choy Lee Shipyard still in view
12 Reclamation work as seen in early 2002
13 Reclamation work as seen in early 2002
14 Practically completed Stage 1 reclamation work as seen in early 2003
15 Silt curtain Sand filling using rainbow jetting by dredger ships
16
17 Forming of a channel to reserve portion of the sea coast on the east side of Penny Bay
18 Pile forming for some of the advanced works
19 Forming of the vertical seawall
20 Forming of the vertical seawall
21 Pipe work for sand jetting
22 Consolidate the newly reclaimed land by surcharging method
23 Consolidation by vibro-compaction
24 Final stage of reclamation and the commencement of other civil works
25 Construction of the roadway linking to the North Lantau Expressway
26 Northern part of Penny Bay seeing the linking roadway and the Water Recreation Centre Preserved coastline Water Recreation Centre Surface channel supplying water to the WRC
27 The preserved CLP power station
28 The preserved CLP power station merged into the theme park by earth bund and landscaping provisions
29 Drainage works in the newly reclaimed land
30 Storm discharge system by box culvert
31 Road works and service laying
32 The newly formed water channel seeing the original coastline
33 Marine piling for the public pier
34 Provision of rows of earth berm with green vegetation forms an importation part of vision impression design in the theme park
35 Site of the resort hotel as seen from the landscape berm
36 Landscaping works and vegetation provided in the public areas
37 Forming the hard landscaping works at the Water Recreation Centre
38 Partially completed hard landscaping works at the Water Recreation Centre
39 Water Recreation Centre with the soft landscaping work in place
40 Entrance to the Central Pedestrian Walkway near the Coach parking square
41 The fountain square at the entrance outside the theme park pay-area
42 External frame in galvanized steel for the function/retail buildings
43 Final touch-up of the European-styled town houses
44 Final decoration the town house
45
46
47
48
49
50
51 Final touch-up work at the Courtyard of the Disneyland Castle
52 Final touch-up works to the Disneyland Castle towers
53
54 External decoration to façade of themed buildings
55 Final touch-up works at the entrance of Disneyland Castle
56 Ceiling installation to the function and retail areas
57 Interior decoration to the function and retail areas
58 Forming of various games centre inside the theme park
59 The Space Mountain
60 Cladding detail of the Space Mountain Dome
61 Track of the Space Wagon as seen inside the Space Mountain Dome
62 Setting of the mechanized games in the theme park
63 Setting of the mechanized games in the theme park
64 Forming of the American Street
65 The American Street in the theme park at its final touch-up stage
66 Façade of the buildings in the American Street
67 Paving works
68 Soft landscape and greening items
69 Forming the hard landscape facilities
70 Train wagon encircling the theme part as one of the mechanized games
71 The Disneyland Resort Hotel
72 Trackwork of the MTRC Disneyland Resort Line in Penny Bay
73 Over-run track of the Disneyland Station
74 Interior view of the MTRC Disneyland Station
75 Public bus station at the entrance to the theme park
76 Disneyland Resort Line Sunny Bay Station connecting the MTRC Tung Chung Line with the new Theme Park
77 Detail look of the Sunny Bay Station
78 Connecting carriageway linking the public transport center at Sunny Bay with the Theme Park North Lantau Expressway
79 Public pier at Penny Bay
80 Paving work
81 Stage 2 Reclamation
82 Brand name of Disneyland
83 End of presentation for the Disneyland Theme Park at Penny s Bay
Examples of major projects with environmental permits :
Examples of major projects with environmental permits : Cyberport Development at the Telegraph Bay KCRC East Rail Extension From Hung Hom to Tsimshatsui Hong Kong Disneyland West Rail Phase I 1800 MW Gas-fired
More informationHong Kong means business in sustainable development
SHOWCASING THE Achievements the Hong Kong Civil Service of Hong Kong means business in sustainable development ENVIRONMENTAL PROTECTION DEPARTMENT Hong Kong s status as Asia s world city is backed by its
More informationModule 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water
1 P age Module 6 : Quantity Estimation of Storm Water Lecture 6 : Quantity Estimation of Storm Water 2 P age 6.1 Factors Affecting the Quantity of Stormwater The surface run-off resulting after precipitation
More informationTransit Oriented Development and Value Capture Hong Kong
UNESCAP Regional Expert Group Meeting on Sustainable and Inclusive Transport Development and 2 nd Asia BRTS Conference, 29 Sep 1 Oct 2014, Ahmedabad Transit Oriented Development and Value Capture Hong
More informationReshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks
Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks Raymond wai-man, Wong Professor chi-ming, Tam City University of Hong Kong The background Before 2007, HK s railway networks
More informationMandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated
More information720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
More informationA Brief Study Of The Development Of Falmouth Within The Context Of The Cruise Ship Pier
HERITAGE PROTECTION, ECOLOGICAL SUSTAINABILITY AND ECONOMIC DEVELOPMENT... AN UNSUSTAINABLE TRIO? A Brief Study Of The Development Of Falmouth Within The Context Of The Cruise Ship Pier Laleta Davis Mattis
More informationWETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE
WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water
More informationAPPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY
ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer
More informationNATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It
More informationWESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
More informationGlossop Design & Place Making Strategy
Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance
More informationEmergency Safeguarding. of the World Heritage. Site of Byblos
Emergency Safeguarding of the World Heritage Site of Byblos Emergency Safeguarding of the World Heritage Site of Byblos Introduction Located on the Eastern Mediterranean, 40 km north of Beirut (Lebanon),
More informationSULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS
More informationOverview of Land Construction Courses at Kansas State University
Overview of Land Construction Courses at Kansas State University Developed by Professor Day in the mid 1960 s at KSU, continuing to present time, is a vision of a Land Construction course series that examines
More informationGreen and Sustainable Buildings
Green and Sustainable Buildings Design Criteria and Application in Hong Kong Green building is the practice of increasing the efficiency with which buildings use resources energy, water and materials.
More informationSECTION 10.0 MANAGEMENT UNIT 5: HORNSEA
10.1 Summary Information 10.1.1 Location SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA The limits of Management Unit 5, a 2.9km stretch of shoreline fronting the town of Hornsea on the Holderness coast, are
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More informationStorm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
More informationCity of Beaumont, Texas Grading Permit Information
General Information City of Beaumont, Texas Grading Permit Information The permit application shall be signed by the property owner (or lessee) or his authorized representative and by the contractor (if
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationSCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More informationSignificant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk
December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort
More informationProperty Development
Property Development The Group will continue strengthening its reputation by enhancing the quality of its products and services and branding individual projects. High project marketability and improved
More informationENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
More informationTOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET
TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET FISCAL YEAR 2005/2006 TRANSPORTATION SOURCE OF FUNDS: Beginning fund balance and anticipated revenue. Over the course of the past fiscal years
More informationSpecial Use Commercial Properties
Contents Overview of Special Use Commercial Properties...3 Understanding Fast Food Restaurants...3 Understanding Gasoline Service Stations...4 Understanding Self-Service Cashier Booths...5 Understanding
More informationHigh Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
More informationBEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA.
BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA. Claus Brøgger 1 and Poul Jakobsen 2 The present paper presents measurements and results from a three year full scale Pilot Project with the
More informationC-2 Construction, Inc. - NAICS Codes
C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining
More informationCONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
More informationVarious Environmental Projects at Vanderbijlpark Works. December 2014
Various Environmental Projects at Vanderbijlpark Works December 2014 1 1 Several Air Quality Projects 2 Emission reduction projects FMB DUST CONTROL INSTALLED SYSTEM The dust control system at the FMB
More informationFLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House
More informationAPPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
More informationMLD: Domestic Maritime Transport Project
Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication
More informationFoyer. Main Audutorium. Flytower with understage areas. Production Area
NEW OPERA HOUSE Foyer Main Audutorium Flytower with understage areas Production Area ESSENTIAL NUMBERS OF THE NEW OPERA HOUSE GROSS AREA: 38.500 m 2 PUBLIC AREAS: 11.200 m 2 STAGE AREAS: 8.200 m 2 REHEARSAL
More informationSlavic Village Building Condition Review
Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities
More informationCoastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model
Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model BY Dr. Leo Brewster, Director Coastal Zone Management Unit, Barbados Presented At UNFCCC Expert
More informationAPPROVAL AMENDMENT HISTORY
Prepared by: Aurecon South Africa (Pty) Ltd STORMWATER MANAGEMENT PLAN TOKAI ESTATE (DRAFT 1) Submission date: 11 January 2013 Contact Person: Francois du Toit T: +27 21 526 6950 F: +27 21 526 9500 E:
More informationCOLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
More informationA CASE STUDY: DESIGN AND CONSTRUCTION OF FOUNDATION AND BRACED EXCAVATION AT A RECLAIMED SITE AT WATERFRONT
A CASE STUDY: DESIGN AND CONSTRUCTION OF FOUNDATION AND BRACED EXCAVATION AT A RECLAIMED SITE AT WATERFRONT Rupert KY Leung Hyder Consulting Ltd Dr Eric SF Li Hyder Consulting Ltd Cheuk-lun Leung Drainage
More informationEDWARDSTOWN SOLDIERS MEMORIAL RECREATION GROUND BACKGROUND REPORT
EDWARDSTOWN SOLDIERS MEMORIAL RECREATION GROUND BACKGROUND REPORT October 2013 ACKNOWLEDGEMENTS The Edwardstown Soldiers Memorial Recreation Ground Master Plan study has been commissioned and funded by
More informationEAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE
Residential Site Licence Conditions of Licence February 2014 EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES Index of conditions CONDITIONS OF SITE LICENCE 1. Period of use 2. Bases 3. Siting
More informationAPPENDIX I (See Paragraph -6) FORM I
APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage
More informationCarlton Fields Memorandum
Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed
More informationK A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax
More informationClimate Change and Infrastructure Planning Ahead
Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More informationTHE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST
THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST THE LEONARDO BUILDING - Designed to meet BREEAM Excellent 2011 & EPC B Rating GATWICK AIRPORT proposed
More informationBroward County Everglades Holiday Park. Gateway to the Everglades
Broward County Everglades Holiday Park Short and Long Range Plan Gateway to the Everglades 1 Deeded to Broward County in 1964 by Davie Farm Lands, Inc. Sole use of the land shall be for public recreation
More informationCity of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN
Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,
More informationConstruction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
More informationBuilding Foundation and Structure
Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original
More informationHelsinki, Finland. EPA Award 2011
Stockmann Q-Park Helsinki, Finland EPA Award 2011 Category New projects City environment Stockmann Q-Park car park 2 has 600 spaces in three levels H serving shoppers, tourists, 6 leisure users, hotel
More informationProposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationCHAPTER 11 STORM DRAINAGE
CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be
More informationRisk Analysis, GIS and Arc Schematics: California Delta Levees
Page 1 of 7 Author: David T. Hansen Risk Analysis, GIS and Arc Schematics: California Delta Levees Presented by David T. Hansen at the ESRI User Conference, 2008, San Diego California, August 6, 2008 Abstract
More informationSITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN
SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN Performed February 2003 Performed by: Dr. Lee E. Harris, Ph.D., P.E. Associate Professor of Ocean Engineering & Oceanography
More informationBolton s Flood Risk Management Strategy
Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk
More informationMethods for Land Reclamation using Soft Soil and Waste
NTU-JTC I3C Seminar Methods for Land Reclamation using Soft Soil and Waste Chu Jian 2 August 2012 1 Outline Part 1. Overview of land reclamation methods Part 2. Methods for land reclamation using soft
More informationTechnical seminar - Modern Technology for Solid Waste Management
Technical seminar - Modern Technology for Solid Waste Management co-organized by: Hong Kong Waste Management Association Environmental Division of Hong Kong Institute of Engineers Preparations at Wembley
More informationAPPENDIX I. (See Paragraph-6) FORM 1
APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity
More informationThe alternation of the ex-victoria Road Detention Centre site in Mount Davis
C&WDC CLSAC Paper No. 41/2014 Annex I The alternation of the ex-victoria Road Detention Centre site in Mount Davis The reply of the Education Bureau, Commissioner for Heritage s Office, Antiquities and
More informationA Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.
A Solid Foundation Solution for Homeowners from Our products are made with 90% Recycled Material Down. Right. Solid. GREEN. Stop the damaging effects of foundation settling... Sinking foundations, cracked
More informationAriana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration
Future of our coasts: Potential for natural and hybrid infrastructure Ariana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration Green
More informationDIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN
DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN Last revised June 5th, 2015 Page 1 of 13 Table of Contents 1. PURPOSE... 2 2. ROLES AND RESPONSIBILITIES... 2 3. SAFETY... 2 4. COAL SPILLS... 3 4.1. COAL
More informationUsing Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow
AutoCAD Civil 3D 2008 Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow The ability to perform storm water hydrology and hydraulic (H&H) tasks is crucial to civil
More informationMine Plan of Operations Reclamation Bond Checklist
Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,
More informationFIRST STREET NORTH CREATING PLACES FOR PEOPLE
About This Consultation Manchester City Council and Ask Property Developments are seeking to develop First Street North, a 2.2 acre site to the north of the Number One Building, within the 20 acre First
More informationSECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE
A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION
More informationEnvironmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
More informationCuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document
Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document A1-1 ATTACHMENT A1 Great Lakes Shipyard Expansion
More informationvelkommen til københavns FØrSte klimakvarter COPeNHaGeN ClImate resilient NeIGHBOUrHOOd klimakvarter.dk
COPENHAGEN CLIMATE RESILIENT NEIGHBOURHOOD klimakvarter.dk 1 In the future we will get more rain, higher sea levels and warmer weather. This presents Copenhagen with a number of challenges. We must meet
More informationU l t i m a t e e f f i c i e n c y D re D ging
1 Ultimate efficiency Dredging We have a deep attitude. 2 Ultimate efficiency 3 Growth of global population, tourism, transportation of people and goods together with increased awareness of the need to
More informationWater Supplies Department Active WSD Capital Works Contracts
No. Title Active WSD Capital s Location of or Start 17/WSD/14 Improvement to waterworks facilities at Lantau South and Sha Tin Fuk Shing 42.600 16-Nov-15 Nov-18 Lantau South and mainlaying at Keung South
More informationAPPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT
APPLICATION FOR A FILL, ECAVATION AND SITE GRADING PERMIT 1. The first step to obtain a Fill, Excavation and Site Grading permit is to obtain a Broward County Environmental Review Approval. Through the
More informationTHE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS
What Forus will be CONTENTS WHY A JOINT PLAN FOR FORUS?... 3 WHAT IS A PLAN PROGRAMME?... 3 THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS... 3 THE PLAN AREA... 4 THE LONG-TERM GOALS FOR FORUS...
More information4 Water supply description
4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps
More informationLondon Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015
London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015 Workshop agenda Presentations Breakout workshop sessions Feedback and outcomes for the masterplan
More informationSITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:
SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller
More informationDOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the
More informationAnkara, -May 2014. Mr. Rifat HISARCIKLIOGLU President Union of Chambers and Commodity Exchanges of Turkey. Dear Mr.
Ankara, -May 2014 Mr. Rifat HISARCIKLIOGLU President Union of Chambers and Commodity Exchanges of Turkey Dear Mr. HISARCIKLIOGLU, In the framework of the contacts this Mission is looking forward to establish
More informationToronto's New Soil and Tree-based Standards for Boulevards
2013 ISA Annual Meeting Toronto, August 3-7, 2013 Toronto's New Soil and Tree-based Standards for Boulevards Extended Abstract May 16, 2013 Introduction In 2012, the city of Toronto embarked on a process
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationTownship of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
More informationDESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
More informationMember Nation Report 2010 from Denmark.
Member Nation Report 2010 from Denmark. The has during the year 2010 arranged 6 member meetings including two technical site visits. The first technical site visit covered the 5.3 km long Leipzig City
More informationPrattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
More informationThe Council of the City of New York. Economic Development Corporation
Hon. Melissa Mark-Viverito Speaker of the Council Hon. Julissa Ferreras Chair, Committee on Finance Hon. Daniel R. Garodnick Chair, Committee on Economic Development The Council of the City of New York
More informationEngineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.
TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may
More informationFailing Coastal Wood Infrastructure on the Great Lakes
University of Wisconsin Sea Grant Institute Contact Gene Clark grclark@aqua.wisc.edu 715-392-3246 Failing Coastal Wood Infrastructure on the Great Lakes Gene Clark/UW Sea Grant Institute Introduction Many
More informationCITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
More informationLegacy Trail Extension Feasibility Study. Preliminary Cost Estimate
Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5
More information89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto
89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit
More informationChapter 2 OVERVIEW - CITY PROFILE 2.1 REGIONAL SETTING 2.2 PLATTED LANDS
OVERVIEW - CITY PROFILE C i t y P r o f i l e Chapter 2 To appropriately and adequately plan for parks and recreation, it is necessary to understand the forces that shape the many facets of the City and
More information53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress
53km will be added to our Hong Kong network Deliver the New Era Network 4 New Railway Projects are in progress Island Line Extension opened in December 2014 Executive Management s Report Hong Kong Network
More information