Committee on Petitions NOTICE TO MEMBERS

Size: px
Start display at page:

Download "Committee on Petitions NOTICE TO MEMBERS"

Transcription

1 European Parliament Committee on Petitions NOTICE TO MEMBERS Subject: Petition 1160/2009 by Werner Sandig (German), on the erection of two windmill parks in the Czech border region Ústí nad Labem and the associated harmful environmental effects on the nearby German nature areas Petition 1246/2010 by Thomas Kirsten (German), on behalf of the local council in the town of Altenberg in south-east Germany, on contravention of EU environment legislation in connection with the construction of a windmill park in the adjacent Czech border region Petition 1501/2010 by Frank Legler (German), on behalf of 'Erzgebirgezweigverein Geising, bearing some 350 signatures, on breach of EU environmental legislation in connection with the construction of a wind farm in the neighbouring Czech border region 1. Summary of petition 1160/2009 The petitioner, who is Mayor of the municipality of Rechenberg-Bienenmühle, objects to the planned erection of two windmill parks in the Czech border region Ústí nad Labem. This concerns 45 windmills that are 150 metres high in close proximity (35 to 70 metres) to German territory and the nearby nature park Erzgebirge/Vogtland, the habitat area Oberes Freiberger Muldental and Waldgebiete bei Holzhau, designated a Special Protection Area under Council Directive 79/409/EEC on the conservation of wild birds. The project will also have negative visual and noise-related effects on the landscape and, consequently, on tourism, which is an important source of income for the local population. The petitioner therefore calls on the European Parliament to intervene with the competent Czech authorities with a view to ensuring that the project is stopped and the relevant EU legislation observed. CM\ doc PE v06-00 United in diversity

2 Summary of petition 1246/2010 The petitioner, who is the mayor of the town of Altenberg in south-east Germany, protests against plans to build a windmill park (25 windmills) in the adjacent Czech border region and stresses that this project will have a particularly negative impact on the protected Natura 2000 regions in Erzgebirge and, in particular, on the black grouse (Lyrurus tetrix or Tetrao tetrix), which is protected under Council Directive 79/409/EEC on the conservation of wild birds. He also points out that this is not the only case of the Czech authorities failure to implement EU legislation and he refers in that connection to a solar power installation and two windmills in the adjacent Czech areas of Moldava and Krupka. The petitioner also draws attention to the noise pollution connected with the project, which is hazardous to health, and the problems it will create for local tourism. The petitioner therefore calls on the European Parliament to intervene to ensure that the project is halted and that EU environment legislation is respected. Summary of petition 1501/2010 The petitioner, who is the chairman of the above-mentioned association, protests against the planned construction of a wind farm in the neighbouring Czech border region of Fojtovice/Harbatice, and stresses that this project will have particularly adverse effects on the protected Natura 2000 areas in the Erzgebirge, and in particular for a number of protected bird species. The petitioner also draws attention to the health impact of noise pollution associated with this project and the problems this will cause for tourism in the area. The petitioner therefore calls on the European Parliament to intervene to ensure that the project is halted, and that EU environmental legislation is respected. 2. Admissibility Petition 1160/2009 declared admissible on 27 November Petition 1246/2010 declared admissible on 19 January Petition 1501/2010 declared admissible on 18 March Information requested from Commission under Rule 216(6). 3. Commission reply, received on 22 April The petitioner complains about the intended construction of two wind parks of 45 wind turbines on the Czech-German Border, and specifically one of them - "Pastviny u Moldavy" on the territory of Krušné hory, Czech Republic bordering the region of SPA "Waldgebiete bei Holzhau", Germany. The petitioner gives an account of the protected birds, bats and other important species occurring in the "Naturpak Erzgebierge" on the German side of the border. He also stresses the possible negative effects on this attractive area and the connected tourist industry. Pastviny u Moldavy windpark project envisages the construction of 20 wind turbines of 3 MW each (altogether 60 MW). The construction work will include: the reconstruction of m of an existing local road, construction of a further m of a local road 4.5 m wide, and the laying of m of cables. A project of this category - listed in Annex 2 of the EIA Directive PE v /8 CM\ doc

3 1985/337/EEC 1 - is subject to a scoping procedure resulting in a decision as to whether it will be made subject to a systematic environmental assessment. The petitioner expresses concerns about the possible negative visual effects of the project which could lead to serious losses for the tourist industry, upon which the area depends. The petitioner requests the Parliament to make sure that the assessment process is carried out in compliance with the Environmental Acquis. The petitioner explains that the projects are located in an area originally inhabited by German citizens living in four villages and who were expatriated in The area was transformed into arable land afterwards. With the construction of the wind parks, the protected area would lose its value. The petitioner cannot see why the wind parks should be located in this particular area when there are enough other suitable places in the Czech Republic. The "Gegenwind" protest movement has been formed to represent the interests of the inhabitants affected (30 July 2009), and signatures have already been collected and a complaint sent to the Czech Ministry of the Environment in Prague. A media campaign has also been put in place to make their position known. They intend to achieve a definite rejection of the wind park. With regard to the "Wind Park Pastviny u Moldavy", it has been discovered that the EIA process was set in motion with the project announcement by the Administration of the Ústí nad Labem Region issued on 22 December Based on a request from the German side, the assessment of the cross-border impact has been included. That is why the dossier was transferred from the regional administration directly to the Ministry of the Environment of the Czech Republic in January It has also been recognised that the project may have a negative impact on Natura 2000 sites, and a request for an appropriate assessment has been made. However, an EIA should take into account the overall benefits of renewable energy, which displaces fossil energy, a major cause of air pollution and climate change. The progress of the assessment is accessible on the following web-page: As a general principle of European legislation, Member States are responsible for the implementation of Community law, in this case for the implementation of the EIA Directive 1985/337/EEC, the ESPOO Convention and the Habitats Directive 92/43/EEC 2 and in particular its Article 6 (3) "appropriate assessment". The Commission has the possibility to investigate and open an infringement procedure only in those cases where European legislation is being infringed. The Environmental Impact Assessment process has taken into account the request of the German authorities to consider the possible cross-border impact of the project. It has also considered the potential significant impact on Natura 2000 sites. It is understood that the relevant legal proceedings are ongoing and no results are yet available. For further details about the proceedings, the petitioner should be encouraged to communicate with the Czech Authority responsible for the assessment: Mrs. Jaroslava Honová, director of the EIA Department, Ministry of the Environment of the Czech Republic, Prague 10, Czech 1 OJ L 175, , p OJ L 206, CM\ doc 3/8 PE v06-00

4 Republic. 4. Commission reply (REV.), received on 27 March The Commission has been following the development of the project very closely since the petition was received in The project is still in the Environmental Impact Assessment (EIA) phase. Pursuant to Czech legislation this assessment also includes the "Appropriate Assessment" (AA) as required by the Habitats Directive. The body responsible for the EIA is the Czech Ministry of Environment. All the steps undertaken and relevant documents are available on-line on the Czech EIA information system 1. The German authorities were notified about the project in July The project is legally classified as a project listed in Annex 2 to the EIA Directive 85/337/EEC. Therefore, it was subject to a screening procedure completed in 2010 which defined the scope of the EIA including the appropriate assessment of its effects on Natura The EIA Documentation consisting of an EIA study and an Appropriate Assessment study was published and opened for comments from the public in The EIA expert review was published on 19 December 2012 and the public was invited once again to comment by 4 February German translations were sent by the Czech Ministry of the Environment to the following German authorities in December 2012: - Sächsisches Staatministerium für Umwelt und Landwirtschaft, Dresden; - Bundesministerium für Umwelt, Naturschutz und Reaktorsicherheit, Berlin; - Landratsamt Mittelsachsen, Abteilung 23 Umwelt, Forst und Landwirtschaft, Freiberg; - Landratsamt Sächsische Schweiz-Osterzgebirge, Pirna. The Appropriate Assessment (AA) considered 14 Natura 2000 sites in the Czech Republic and Germany. The assessment concluded that -taking into account a set of preventive and mitigation measures- the integrity of these Natura 2000 sites will not be affected by the project. A public consultation of the project was organised on 6 February 2013 in the Cultural Centre in Dubí, Czech Republic. The meeting was attended by approximately 70 participants, about 15 of them from Germany. The German participants raised their objections to the project, essentially with regard to noise pollution caused by the project and its negative impact on local tourism. As the next step the Czech Ministry of the Environment should issue its position on the EIA in March 2013 which should reflect the documents and comments made. On the basis of the concluded assessments, the approval process of the project leading to the possible development consent would continue. In reply to the additional questions raised by MEP Mr Jahr during the Petitions committee meetings of 20 February and 20 March 2013 the Commission has the following comments: - Applicable legislation does not foresee a role for the Commission to act as a mediator. - The Commission does not examine ongoing EIA dossiers, unless it is investigating a possible infringement against EU legislation; or in the context of giving an Opinion under Article PE v /8 CM\ doc

5 of the Habitats Directive. The Commission has not received any complaint regarding this project. - There cannot be a violation of neither the Habitats nor the EIA Directives if a project has not been approved. - Following approval of the project, if the action group or the national authorities discover a particular violation of EU law they can lodge a complaint to the Commission. On the basis of all the available information the Commission cannot determine any breach of EU legislation. 5. Commission reply (II), received on 30 October 2013 The petitioners point at windmill parks and further projects (solar power stations) on the Czech side of the Czech-German Border area in the Ore Mountains (Erzgebirge/Krušné hory). These projects are situated inside the Natura 2000 site (SPA CZ Východní Krušné Hory). The petitioners raise the issue of the compliance of these projects with EU environmental legislation, in particular concerning environmental impact assessment (EIA Directive 2011/92/EU) and Nature conservation (Birds Directive 2009/147/EC and Habitats Directives 92/43/EEC). The petitions address the following projects: Windmill park "VTE Moldava" consisting of 18 wind turbines (3 MW each) that will be situated to the west of Moldava very close to the border Windmill park "VTE Habartice u Krupky" in the cadastral area Habartice u Krupky location Fojtovická stráň consisting of 2 wind turbines (2 x 2 MW) located to the north of Krupka, to the east of Fojtovice Solar Power Plants in the vicinity of Moldava. The Commission is not aware about other projects that would be relevant to these petitions. The project Windmill park "VTE Moldava" is still undergoing procedures aimed at obtaining a development consent (construction permit). The integrated EIA including the Appropriate Assessment of the effects of the project on Natura 2000 and a cross-border assessment were concluded on 19 April 2013 by the Statement of the Czech Ministry of Environment. The Statement concludes only that this project has minor effects on Natura All the relevant documents are available on the web of the Czech Environmental Information Agency (CIA) both in Czech and in German. 1 A derogation procedure from the Czech Environmental Protection Act (that is in a wider sense equivalent with the species protection provisions stipulated in Art 12 of the Habitats Directive but includes also national protected species) was concluded on 26 August CM\ doc 5/8 PE v06-00

6 The Commission has received and registered two complaints concerning this project. On the basis of an analysis of these complaints, the Commission is seeking clarification on several issues concerning compliance with EIA and Habitats Directives with the Czech authorities through the PILOT procedure. The project Windmill park "VTE in the cadastral area Habartice u Krupky location Fojtovická stráň" was subject to a screening procedure concluded on 1 March The screening did not confirm any significant negative effects on Natura 2000 or cross-border effects. Relevant documents are available on the web in Czech only. 1 The Commission has no evidence that this project, as well as other smaller projects such as the Solar Power Plants around Krupka would have significant negative effects on Natura 2000 sites. Nevertheless, the issue of the cumulative effects of all the mentioned projects has also been addressed to the Czech authorities in the above mentioned PILOT. Conclusions The Commission is investigating compliance of the "VTE Moldava" Windmill Park with the EIA, Habitats and Bird Directives through an EU PILOT sent to the Czech authorities on 19 September The questions raised include also the assessment of the cumulative effects of this windmill park with the other projects mentioned in the petitions. 6. Commission reply (III), received on 30 March 2016 It is expected that the approval process of the project Windmill Park "VTE Moldava" will be concluded in For the time being, the procedure aimed at issuing a development consent (construction permit) has been interrupted. The appeal procedure against granting the derogation from the Czech Nature Protection Act (in a wider sense equivalent to the species protection stipulated in Article 12 of the Habitats Directive 2 ) has been interrupted until 31 March In the meantime Czech courts are to address appeals against cancelling the spatial master plan. The Czech authorities have informed the Commission that the appeal procedure against granting the derogation from the Czech Nature Protection Act will address the issues raised in the EU Pilot. This mainly concerns the occurrence of the target species (the Black grouse Tetrao tetrix) in the project area, which was the main objection raised by the petitioner. The Commission remains in touch with the Czech authorities in order to monitor the situation and ensure that the approval process of the Windmill Park "VTE Moldava" is concluded in compliance with EU nature legislation Council Directive 92/43/EC, of 21 May 1992, on the protection of natural habitats and wild fauna and flora, OJ L 206, PE v /8 CM\ doc

7 7. Commission reply (IV), received on 3 August 2016 Petitions 1160/2009, 1246/2010 and 1501/2010 On the basis of the information available to the Commission, it appears that the approval process of the Windmill Park "VTE Moldava" project, aimed to obtain development consent (construction permit), has further progressed. The developer resubmitted his request for a derogation from the species protection under the Czech Nature Protection law. He further elaborated the points that were raised in the decision of the Czech Ministry of Environment to cancel the previous derogation issued by the Regional Office in Ústí nad Labem on 22 nd August Now the Regional Office in Ústí nad Labem is expected to take a decision which could be challenged by interested parties in accordance with national procedural requirements. The Commission is not directly involved in the national approval procedure as this would be beyond its remit. It has been monitoring the development of the case through an EU Pilot and remains in touch with the Czech authorities and the complainants in order to ensure that the approval process is concluded in compliance with EU legislation, including the EIA and Nature Directives. CM\ doc 7/8 PE v06-00

8 PE v /8 CM\ doc

The Århus Convention by Jens Hamer, ERA

The Århus Convention by Jens Hamer, ERA The Århus Convention by Jens Hamer, ERA I. Introduction This dossier deals with the so called Århus Convention, an international environmental treaty aiming at involving citizens in the environmental decision

More information

I. BASIC PROVISIONS. Subject of regulation

I. BASIC PROVISIONS. Subject of regulation LAW ON ENVIRONMENTAL IMPACT ASSESSMENT Published in the Official Gazette of the Republic of Serbia, No. 135/2004 ( Službeni glasnik Republike Srbije, br. 135/04) I. BASIC PROVISIONS Subject of regulation

More information

The Public Participation Process in Cyprus

The Public Participation Process in Cyprus The Public Participation Process in Cyprus Priority Actions Programme Regional Activity Centre Split, February 2007 Table of Contents 1. Introduction... 1 2. Benefits of Public Participation in Decision

More information

Basics of Sustainability. Environmental Impact Assessments (EIA)

Basics of Sustainability. Environmental Impact Assessments (EIA) Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6

More information

Kings Lynn B SoS Decision Letter. The Proposed Palm Paper CCGT 3 Order. Proposed Combined Cycle Gas Turbine by Palm Paper Ltd

Kings Lynn B SoS Decision Letter. The Proposed Palm Paper CCGT 3 Order. Proposed Combined Cycle Gas Turbine by Palm Paper Ltd Proposed Combined Cycle Gas Turbine by Palm Paper Ltd The Proposed Palm Paper CCGT 3 Order Palm Paper Mill, Saddlebow Industrial Estate, King s Lynn PINS Ref: EN010039 Document Ref: 12.11 Kings Lynn B

More information

SEA, EIA and AA in a national context - differences and relationships. General Spatial Plan ex-ante evaluation as an example

SEA, EIA and AA in a national context - differences and relationships. General Spatial Plan ex-ante evaluation as an example SEA, EIA and AA in a national context - differences and relationships. General Spatial Plan ex-ante evaluation as an example Bankia, 06.December.2011 Alexander Dountchev, APB EIA SEA AA in N2000 Legal

More information

2011 No. 1824 TOWN AND COUNTRY PLANNING. The Town and Country Planning (Environmental Impact Assessment) Regulations 2011

2011 No. 1824 TOWN AND COUNTRY PLANNING. The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 STATUTORY INSTRUMENTS 2011 No. 1824 TOWN AND COUNTRY PLANNING The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 Made - - - - 19th July 2011 Laid before Parliament 26th July

More information

Aiding the Hydro-scheme development process. Web-links to useful information sources

Aiding the Hydro-scheme development process. Web-links to useful information sources Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation

More information

Strategy of the German Government on the use of off-shore wind energy

Strategy of the German Government on the use of off-shore wind energy Strategy of the German Government on the use of off-shore wind energy in the context of its national sustainability strategy Ministries involved: Federal Ministry for the Environment, Nature Conservation

More information

EUROPEAN PARLIAMENT 2014-2019. Committee on Petitions NOTICE TO MEMBERS

EUROPEAN PARLIAMENT 2014-2019. Committee on Petitions NOTICE TO MEMBERS EUROPEAN PARLIAMT 2014-2019 Committee on Petitions 29.4.2016 NOTICE TO MEMBERS Subject: Petition 2761/2013 by Marek Suski and Wojciech Surkiewicz (Poland), bearing approximately 10 000 signatures, on distribution

More information

183/2006 Coll. ACT of 14 th March 2006. on town and country planning and building code (Building Act)

183/2006 Coll. ACT of 14 th March 2006. on town and country planning and building code (Building Act) Contents and text 183/2006 Coll. latest wording of the text 183/2006 Coll. ACT of 14 th March 2006 on town and country planning and building code (Building Act) The Parliament passed this Act of the Czech

More information

Environmental impact assessment (EIA)

Environmental impact assessment (EIA) October 2005 Environmental impact assessment (EIA) a campaigner's guide What is this guide for? Environmental Impact Assessment (EIA) is a key aspect of many large scale planning applications. It is a

More information

COMMISSION OF THE EUROPEAN COMMUNITIES GREEN PAPER

COMMISSION OF THE EUROPEAN COMMUNITIES GREEN PAPER EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 11.11.2009 COM(2009) 624 final GREEN PAPER on obtaining evidence in criminal matters from one Member State to another and securing its admissibility

More information

Guidance note E Measure Fiches

Guidance note E Measure Fiches Guidance note E Measure Fiches This guidance note presents a fiche for each under the rural development regulation. Each fiche contains the following elements: Measure Code Rationale of the Target group

More information

Elbe flood in 2002 and 2006 in terms of emergency management

Elbe flood in 2002 and 2006 in terms of emergency management Elbe flood in 2002 and 2006 in terms of emergency management Ing. Jaroslav Pikal, Regional Authority of the Usti Region 10 Years of Transnational Cooperation in Flood Risk Management at the LABe ELbe Saxon

More information

Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) *

Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) * Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) * The Executive Board of the Benelux Trademark Office and the Executive Board of the Benelux Designs

More information

COUNTRY REPORT: SWEDEN New Policy Initiatives, Rules and Case Law. Annika Nilsson

COUNTRY REPORT: SWEDEN New Policy Initiatives, Rules and Case Law. Annika Nilsson Sweden 388 COUNTRY REPORT: SWEDEN New Policy Initiatives, Rules and Case Law Annika Nilsson Ambient Noise and Housing Policy Initiatives and Legislation Swedish law is currently under revision with regards

More information

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016)

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016) Dnro 7202/804/2008 Unofficial translation Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016) 1 The starting points and grounds for the agreement

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

Transformation of the energy system in Germany challenges and opportunities for regional development

Transformation of the energy system in Germany challenges and opportunities for regional development Transformation of the energy system in Germany challenges and opportunities for regional development Spa-ce.net Conference 2012 Kecskemét (Hungary) 26 October 2012 Bernhard Müller Andreas Ortner C.Wachler

More information

Wales Bill EXPLANATORY NOTES. Explanatory notes to the Bill, prepared by the Wales Office, are published separately as Bill 5 EN.

Wales Bill EXPLANATORY NOTES. Explanatory notes to the Bill, prepared by the Wales Office, are published separately as Bill 5 EN. EXPLANATORY NOTES Explanatory notes to the Bill, prepared by the Wales Office, are published separately as Bill EN. EUROPEAN CONVENTION ON HUMAN RIGHTS Secretary Alun Cairns has made the following statement

More information

12 ENERGY. 12.1 Introduction

12 ENERGY. 12.1 Introduction 12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh

More information

City of Sydney Council. Petition Guidelines

City of Sydney Council. Petition Guidelines City of Sydney Council Petition Guidelines The City of Sydney welcomes petitions as one way in which people can let us know their concerns. We set out below how Council will respond to petitions that are

More information

NOTICE OF VACANCY. Ref.: CONS/AST/090

NOTICE OF VACANCY. Ref.: CONS/AST/090 NOTICE OF VACANCY Ref.: CONS/AST/090 A selection procedure is being organised by the General Secretariat of the Council of the European Union on the basis of qualifications and tests with a view to setting

More information

25.11.2004 Official Journal of the European Union L 349/1. (Acts whose publication is obligatory)

25.11.2004 Official Journal of the European Union L 349/1. (Acts whose publication is obligatory) 25.11.2004 Official Journal of the European Union L 349/1 I (Acts whose publication is obligatory) COUNCIL REGULATION (EC) No 2007/2004 of 26 October 2004 establishing a European Agency for the Management

More information

Environmental aspects of offshore wind energy. Jakob Asjes Jakob Asjes IMARES, Institute for Marine Resources and Ecosystem Studies

Environmental aspects of offshore wind energy. Jakob Asjes Jakob Asjes IMARES, Institute for Marine Resources and Ecosystem Studies Environmental aspects of offshore wind energy Jakob Asjes Jakob Asjes IMARES, Institute for Marine Resources and Ecosystem Studies Contents Part 1 8.45 9.30 hrs Overview Dutch/North Sea situation Dutch/European

More information

TO THE MINISTERIAL COUNCIL OF THE ENERGY COMMUNITY represented by the Presidency and the Vice-Presidency of the Energy Community REASONED REQUEST

TO THE MINISTERIAL COUNCIL OF THE ENERGY COMMUNITY represented by the Presidency and the Vice-Presidency of the Energy Community REASONED REQUEST TO THE MINISTERIAL COUNCIL OF THE ENERGY COMMUNITY represented by the Presidency and the Vice-Presidency of the Energy Community REASONED REQUEST in Case ECS-5/13 Submitted pursuant to Article 90 of the

More information

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 This Explanatory Memorandum has been prepared by the Environment and Sustainable Development Department and

More information

Environmental Impact Assessment of Forestry Projects

Environmental Impact Assessment of Forestry Projects Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer

More information

Green Infrastructure Case Study Template

Green Infrastructure Case Study Template Green Infrastructure Case Study Template The aim of the exercise is to provide information on how the elements of the Green Infrastructure Strategy are implemented at national level and to provide case

More information

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW) Zorlu Plaza, 34310 Avcılar ISTANBUL / TURKIYE Tel: + 90 (212) 456-2300 Fax: +90 (212) 422-0099 www.zorlu.com.tr NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM

More information

Journal of Laws No. 19-2117 - Item 101. The Act on Concession for Works or Services 1 2 of 9 January 2009. Chapter 1 General Provisions

Journal of Laws No. 19-2117 - Item 101. The Act on Concession for Works or Services 1 2 of 9 January 2009. Chapter 1 General Provisions Journal of Laws No. 19-2117 - Item 101 101 The Act on Concession for Works or Services 1 2 of 9 January 2009 Chapter 1 General Provisions Art. 1.1. This Act specifies the rules and procedures for concluding

More information

Environmental Protection and Energy Efficiency Fund in financing EE and RES programs and projects

Environmental Protection and Energy Efficiency Fund in financing EE and RES programs and projects Republic of Croatia Environmental Protection and Energy Efficiency Fund Environmental Protection and Energy Efficiency Fund in financing EE and RES programs and projects Marija Šćulac Domac Assistant Director

More information

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests

More information

Community and Renewable Energy Scheme Project Development Toolkit

Community and Renewable Energy Scheme Project Development Toolkit Community and Renewable Energy Scheme Project Development Toolkit Planning Module Contents How to use this toolkit... 2 The planning system... 2 Permitted development... 4 Planning and community groups...

More information

CZECH REPUBLIC ACT ON BONDS

CZECH REPUBLIC ACT ON BONDS CZECH REPUBLIC ACT ON BONDS Important Disclaimer This translation has been generously provided by the Czech National Bank. This does not constitute an official translation and the translator and the EBRD

More information

DRAFT REPORT. EN United in diversity EN 2014/2151(INI) 5.2.2015

DRAFT REPORT. EN United in diversity EN 2014/2151(INI) 5.2.2015 EUROPEAN PARLIAMT 2014-2019 Committee on Legal Affairs 2014/2151(INI) 5.2.2015 DRAFT REPORT on Towards a renewed consensus on the enforcement of Intellectual Property Rights: An EU Action Plan (2014/2151(INI))

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ON MONITORING THE APPLICATION OF COMMUNITY LAW (2003) OVERALL POSITION

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ON MONITORING THE APPLICATION OF COMMUNITY LAW (2003) OVERALL POSITION COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 30.12.2004 COM(2004) 839 final REPORT FROM THE COMMISSION ON MONITORING THE APPLICATION OF COMMUNITY LAW (2003) OVERALL POSITION 21st ANNUAL REPORT {SEC(2004)

More information

The Piatra Craiului Pension in Romania

The Piatra Craiului Pension in Romania The Piatra Craiului Pension in Romania EIA Case Study Justice and Environment 2011 a Dvorakova 13, 602 00, Brno, CZ e info@justiceandenvironment.org 1 t/f 36 1 3228462 / 36 1 4130300 w www.justiceandenvironment.org

More information

DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL 29.3.2014 Official Journal of the European Union L 96/149 DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February 2014 on the harmonisation of the laws of the Member States relating

More information

Country overview and assessment

Country overview and assessment 2. BULGARIA This country fiche provides a comprehensive overview and assessment of climate change adaptation in Bulgaria. After detailing the vulnerability of Bulgaria s coastal zones, the responsibility

More information

adoption the Adjustment of the German Federal Building Law to EU Guidelines (EAGBau). When conducting the Flora and Fauna Sensitivity Audit it is

adoption the Adjustment of the German Federal Building Law to EU Guidelines (EAGBau). When conducting the Flora and Fauna Sensitivity Audit it is Environmental Audits should draw on the status of the environmental stocktake in landscape planning. The nature conservation and landscape management objectives specified in the Landscape Planning Program

More information

Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation

Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation Valerie Fogleman Consultant, Stevens & Bolton LLP Professor of Law, Cardiff University

More information

CHAPTER 7 LOCAL ACCEPTANCE AND THE LEGAL FRAMEWORK THE DANISH WIND ENERGY CASE

CHAPTER 7 LOCAL ACCEPTANCE AND THE LEGAL FRAMEWORK THE DANISH WIND ENERGY CASE CHAPTER 7 LOCAL ACCEPTANCE AND THE LEGAL FRAMEWORK THE DANISH WIND ENERGY CASE BIRGITTE EGELUND OLSEN HELLE TEGNER ANKER 1. INTRODUCTION 1 A crucial challenge to the development of wind power as well as

More information

Table of GRI indicators

Table of GRI indicators 2013 Sustainability Report > Table of GRI indicators Table of GRI indicators The following table of GRI-G3.1 indicators includes a brief description of each, reference to the page in the 2013 Sustainability

More information

National and Major Developments

National and Major Developments National and Major Developments An Agency Joint Statement on Pre-application Engagement A Joint Statement by Architecture and Design Scotland, Forestry Commission Scotland, Historic Scotland, Scottish

More information

Espoo consultation response report

Espoo consultation response report Espoo consultation response report October 2014 Transboundary environmental impact assessment of the Fehmarnbelt Fixed Link Contents Summary... 4 1 Introduction... 6 1.1 Reading guide... 8 2 Espoo Consultation...

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 22 November 2006 15644/06 DATAPROTECT 45 EDPS 3

COUNCIL OF THE EUROPEAN UNION. Brussels, 22 November 2006 15644/06 DATAPROTECT 45 EDPS 3 COUNCIL OF THE EUROPEAN UNION Brussels, 22 November 2006 15644/06 DATAPROTECT 45 EDPS 3 COVER NOTE from: Secretary-General of the European Commission, signed by Mr Jordi AYET PUIGARNAU, Director date of

More information

Wind Energy in Switzerland

Wind Energy in Switzerland Wind Energy in Switzerland Particular challenges with nature conservation - 12.11.2013 Peter Suter, Head of Renewables CKW CKW Group Service area: Central Switzerland page 2 Fully integrated utility page

More information

The Joint Technology Initiative will engage up to 3.7 billion for the period 2014 2024.

The Joint Technology Initiative will engage up to 3.7 billion for the period 2014 2024. VACANCY NOTICE FOR THE POST Legal and Contractual Manager to the Bio-Based Industries Joint Undertaking (BBI-JU) Reference (to be quoted in all your communication regarding this post): BBI/2014/6/AD/LCM

More information

Planning Policy Statement 2015

Planning Policy Statement 2015 Planning Policy Statement 2015 Introduction It is just over 50 years since national planning legislation was first implemented in Ireland. The Government wishes to reaffirm its strong belief in the value

More information

Translating ecological research results into wind farm practice The Danish experience. Niels-Erik Clausen. 2 Risø DTU

Translating ecological research results into wind farm practice The Danish experience. Niels-Erik Clausen. 2 Risø DTU Translating ecological research results into wind farm practice The Danish experience Niels-Erik Clausen We@Sea Conference, Den Helder Holland 12-13 February 2009 Outline The Danish offshore monitoring

More information

23.1 RENEWABLE ENERGY

23.1 RENEWABLE ENERGY Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.

More information

Planning and Environmental Policy Group

Planning and Environmental Policy Group Planning and Environmental Policy Group Planning Policy Statement 18 Renewable Energy August 2009 Planning Policy Statement 18: Renewable Energy Planning Policy Statements (PPSs) set out the policies

More information

PRINCIPLES OF THE TRANSFER OF PERSONAL DATA TO A THIRD COUNTRY. Introduction

PRINCIPLES OF THE TRANSFER OF PERSONAL DATA TO A THIRD COUNTRY. Introduction PRINCIPLES OF THE TRANSFER OF PERSONAL DATA TO A THIRD COUNTRY Introduction The continuous globalization of the world economy influences the international transfer of personal data. The transfer of personal

More information

SUPPLEMENTARY INTERNAL RULES IMPLEMENTING REGULATION (EC) N 45/2001 IN RELATION TO THE DATA PROTECTION OFFICER

SUPPLEMENTARY INTERNAL RULES IMPLEMENTING REGULATION (EC) N 45/2001 IN RELATION TO THE DATA PROTECTION OFFICER SUPPLEMENTARY INTERNAL RULES IMPLEMENTING REGULATION (EC) N 45/2001 IN RELATION TO THE DATA PROTECTION OFFICER 10 September 2009 page 1 / 8 SUPPLEMENTARY INTERNAL RULES IMPLEMENTING REGULATION (EC) N 45/2001

More information

COMMISSION RECOMMENDATION. of 8.6.2015. on a European resettlement scheme

COMMISSION RECOMMENDATION. of 8.6.2015. on a European resettlement scheme EUROPEAN COMMISSION Brussels, 8.6.2015 C(2015) 3560 final COMMISSION RECOMMENDATION of 8.6.2015 on a European resettlement scheme EN EN COMMISSION RECOMMENDATION of 8.6.2015 on a European resettlement

More information

ELECTRONIC COMMERCE DIRECTIVE, DIRECTIVE 2000/31/EC OF THE EUROPEAN PARLIAMENT AND

ELECTRONIC COMMERCE DIRECTIVE, DIRECTIVE 2000/31/EC OF THE EUROPEAN PARLIAMENT AND ELECTRONIC COMMERCE DIRECTIVE, DIRECTIVE 2000/31/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL * * * * THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION, Whereas: (1) The European Union

More information

CHAPTER E12 - ENVIRONMENTAL IMPACT ASSESSMENT ACT

CHAPTER E12 - ENVIRONMENTAL IMPACT ASSESSMENT ACT CHAPTER E12 - ENVIRONMENTAL IMPACT ASSESSMENT ACT ARRANGEMENT OF SECTIONS PART I General principles of environmental impact assessment SECTION 1.Goals and objectives of environmental impact assessment.

More information

(Legislative acts) DECISIONS

(Legislative acts) DECISIONS 4.11.2011 Official Journal of the European Union L 287/1 I (Legislative acts) DECISIONS DECISION No 1104/2011/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 25 October 2011 on the rules for access

More information

Position paper on the CE-marking of sanitary and building valves

Position paper on the CE-marking of sanitary and building valves Position paper on the CE-marking of sanitary and building valves Last update: 26/06/2013 Verband Deutscher Maschinenund Anlagenbau e.v. (German Engineering Federation) Professional association Valves Chairman:

More information

Environmental Impact Assessment of National Road Schemes A Practical Guide

Environmental Impact Assessment of National Road Schemes A Practical Guide Environmental Impact Assessment of National Road Schemes A Practical Guide Revision 1, 20 November, 2008 CONTENTS LIST OF BOXES...iii LIST OF TABLES...iv LIST OF FIGURES...iv 1.0 INTRODUCTION 1.1 Introduction...2

More information

Experiences in the application of Espoo Convention Spain

Experiences in the application of Espoo Convention Spain Environmental Impact Assessment in Spain Experiences in the application of Espoo Convention Spain Aurora Hernando Garcinuño Subdirección General de Evaluación Ambiental Ministerio de Medio Ambiente y Medio

More information

Geography. Curriculum Glance Cards

Geography. Curriculum Glance Cards Geography Curriculum Glance Cards A fundamental principle of the curriculum is that children s current understanding and knowledge should form the basis for new learning. The curriculum is designed to

More information

Obstacles for Wind Energy. Development due to EU Legislation

Obstacles for Wind Energy. Development due to EU Legislation Obstacles for Wind Energy Development due to EU Legislation Henning Sten Hansen Aalborg University Table of Contents Preface 3 Executive summary 4 Introduction 8 General legal frameworks 10 Wind turbines

More information

INTEGRATION OF NATURA 2000 INTO THE COHESION POLICY 2007-2013 WORKING DOCUMENT BY THE EUROPEAN NETWORK OF ENVIRONMENTAL AUTHORITIES (ENEA)

INTEGRATION OF NATURA 2000 INTO THE COHESION POLICY 2007-2013 WORKING DOCUMENT BY THE EUROPEAN NETWORK OF ENVIRONMENTAL AUTHORITIES (ENEA) INTEGRATION OF NATURA 2000 INTO THE COHESION POLICY 2007-2013 WORKING DOCUMENT BY THE EUROPEAN NETWORK OF ENVIRONMENTAL AUTHORITIES (ENEA) NOVEMBER 2008 Table of contents Why this document? 1. Nature &

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 25.9.2014 COM(2014) 592 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation in the period from 4 December 2011 until 31 December

More information

Proposal for a COUNCIL DECISION

Proposal for a COUNCIL DECISION EUROPEAN COMMISSION Brussels, 23.5.2014 COM(2014) 291 final 2014/0152 (NLE) Proposal for a COUNCIL DECISION on the signing, on behalf of the European Union, of the agreement between the European Union

More information

DRAFT ANNUAL TOURISM REPORTING TEMPLATE

DRAFT ANNUAL TOURISM REPORTING TEMPLATE DRAFT ANNUAL TOURISM REPORTING TEMPLATE 1. INTRODUCTION Council Decision 86/664/EEC of 22 December 1986 1 establishing a consultation and cooperation procedure in the field of tourism foresees that each

More information

CALL FOR SUBMISSION OF PROJECTS WITHIN THE OPEI DEVELOPMENT

CALL FOR SUBMISSION OF PROJECTS WITHIN THE OPEI DEVELOPMENT Ministry of Industry and Trade of the Czech Republic Structural Funds Division Managing Authority for the OPEI CALL FOR SUBMISSION OF PROJECTS WITHIN THE OPEI DEVELOPMENT Call identification Programme

More information

LAW FOR THE ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE

LAW FOR THE ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE LAW FOR THE ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE Prom. SG. 34/6 Apr 2001, amend. SG. 112/29 Dec 2001, amend. SG. 30/11 Apr 2006, amend. SG. 34/25 Apr 2006, amend. SG. 38/11 May 2007, amend. SG.

More information

Rules on the secondment of national experts to the European Chemicals Agency (ECHA) (Decision by the Executive Director)

Rules on the secondment of national experts to the European Chemicals Agency (ECHA) (Decision by the Executive Director) Doc: ED/13/2014 Public 1 (16) Helsinki, 6 March 2014 Rules on the secondment of national experts to the European Chemicals Agency (ECHA) (Decision by the Executive Director) Owner: Shay O Malley Validity:

More information

STRATEGIC ACTION PLAN FOR TACKLING ILLEGAL BIRD TRAPPING IN CYPRUS

STRATEGIC ACTION PLAN FOR TACKLING ILLEGAL BIRD TRAPPING IN CYPRUS STRATEGIC ACTION PLAN FOR TACKLING ILLEGAL BIRD TRAPPING IN CYPRUS 2-3 INTRODUCTION Large scale and non-selective illegal bird trapping, killing and trade of birds in Cyprus with the use of mist nets,

More information

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 29 September 2009 13707/09 LIMITE PI 93

COUNCIL OF THE EUROPEAN UNION. Brussels, 29 September 2009 13707/09 LIMITE PI 93 COUNCIL OF THE EUROPEAN UNION Brussels, 29 September 2009 13707/09 LIMITE PI 93 WORKING DOCUMENT from: General Secretariat of the Council to: Working Party on Intellectual Property (Patents) No. prev.

More information

EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending

EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending Any EBRD partner Financial Intermediary (FI) must have clearly defined environmental and social management systems in

More information

Factsheet on the Scope of EU merger control

Factsheet on the Scope of EU merger control BUNDESKARTELLAMT July 2004 GENERAL POLICY DEPARTMENT Factsheet on the Scope of EU merger control This factsheet provides information on the distribution of powers between the European Commission and the

More information

SINGLE RESOLUTION BOARD VACANCY NOTICE DOCUMENT MANAGEMENT OFFICER (DMO) (SRB/AST/2014/008)

SINGLE RESOLUTION BOARD VACANCY NOTICE DOCUMENT MANAGEMENT OFFICER (DMO) (SRB/AST/2014/008) SINGLE RESOLUTION BOARD VACANCY NOTICE DOCUMENT MANAGEMENT OFFICER (DMO) (SRB/AST/2014/008) Type of contract Temporary agent Function group and grade AST4 Duration of contract 3 years (renewable) Area

More information

26.3.2014 A7-0365/133

26.3.2014 A7-0365/133 26.3.2014 A7-0365/133 Amendment 133 Amalia Sartori on behalf of the Committee on Industry, Research and Energy Report A7-0365/2013 Marita Ulvskog Electronic identification and trust services for electronic

More information

COMPARING EIA PROCEDURES AND CONTENTS IN KENYA, TANZANIA, MOZAMBIQUE AND EU 1

COMPARING EIA PROCEDURES AND CONTENTS IN KENYA, TANZANIA, MOZAMBIQUE AND EU 1 COMPARING EIA PROCEDURES AND CONTENTS IN KENYA, TANZANIA, MOZAMBIQUE AND EU 1 Cristina Rebelo and José Guerreiro Instituto Ciência Aplicada e Tecnologia, Faculdade de Ciências da Universidade de Lisboa,

More information

DIRECTIVE 2009/38/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

DIRECTIVE 2009/38/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL L 122/28 Official Journal of the European Union 16.5.2009 DIRECTIVE 2009/38/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 6 May 2009 on the establishment of a European Works Council or a procedure

More information

The importance of Lebanon for the migratory soaring birds & the flyway. April 2012. Bassima Khatib SPNL Assistant Director General

The importance of Lebanon for the migratory soaring birds & the flyway. April 2012. Bassima Khatib SPNL Assistant Director General The importance of Lebanon for the migratory soaring birds & the flyway April 2012 Bassima Khatib SPNL Assistant Director General Outline Who is SPNL? IBA programme Importance of Lebanon for migratory soaring

More information

The Electricity Supply Bill 1

The Electricity Supply Bill 1 Bill no. 234 Folketinget (Danish Parliament) 1998-99 Unauthorised translation 30 June 1999 Submitted on 29 April 1999 by the Minister for Environment and Energy (Svend Auken) Adopted by Folketinget on

More information

Grid-connected electricity generation from wind turbines in Turkey

Grid-connected electricity generation from wind turbines in Turkey Grid-connected electricity generation from wind turbines in Turkey Beyond Carbon, Turkey 2012 Project summary With the carbon offset programme Kores Kocadağ 17.5 MW Wind Power Project, myclimate and its

More information

Electromagnetic Radiation

Electromagnetic Radiation Environmental Protection Technical Advice note 2 Electromagnetic Radiation EP(S) Guidance notes for developers and consultants July 2003 Produced by: Environmental Protection (Specialist) Team ADVICE GUIDE

More information

Environmental Assessment Approval. Approval Date: Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc.

Environmental Assessment Approval. Approval Date: Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc. Environmental Assessment Approval Approval Date: ocr 2 8 zols Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc. Queens County, Nova Scotia The Liverpool Wind Farm (the Undertaking ), proposed

More information

Screening report Turkey

Screening report Turkey 9 March 2007 Screening report Turkey Chapter 29 Customs union Date of screening meetings: Explanatory meeting: 31 January 1 February 2006 Bilateral meeting: 13-14 March 2006 Turkey: chapter 29 Customs

More information

The Parliament has passed the Act of the Czech Republic as follows: PART ONE 1 Purpose of the Act

The Parliament has passed the Act of the Czech Republic as follows: PART ONE 1 Purpose of the Act ACT of the Czech Republic No. 106/1999 Sb. on a free access to information as amended by the Acts No. 101/2000 Sb., No. 159/2000 Sb. and No. 39/2001 Sb. The Parliament has passed the Act of the Czech Republic

More information

Consolidated TEXT CONSLEG: 1991L0414 01/01/2004. produced by the CONSLEG system. of the Office for Official Publications of the European Communities

Consolidated TEXT CONSLEG: 1991L0414 01/01/2004. produced by the CONSLEG system. of the Office for Official Publications of the European Communities EN Consolidated TEXT produced by the CONSLEG system of the Office for Official Publications of the European Communities CONSLEG: 1991L0414 01/01/2004 Number of pages: 194 < Office for Official Publications

More information

ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE

ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE 1. Introduction This guideline follows the Implementation Rules for Company Environmental

More information

10721/16 GSC/lt 1 DGB 2B

10721/16 GSC/lt 1 DGB 2B Council of the European Union Brussels, 28 June 2016 (OR. en) 10721/16 OUTCOME OF PROCEEDINGS From: General Secretariat of the Council On: 28 June 2016 To: Delegations No. prev. doc.: 10320/16 REV 1 Subject:

More information

SHAMS MA AN SOLAR PV POWER PLANT PROJECT (50MW) ANNEX I STAKEHOLDER ENGAGEMENT PLAN (SEP)

SHAMS MA AN SOLAR PV POWER PLANT PROJECT (50MW) ANNEX I STAKEHOLDER ENGAGEMENT PLAN (SEP) SHAMS MA AN SOLAR PV POWER PLANT PROJECT (50MW) ANNEX I STAKEHOLDER ENGAGEMENT PLAN (SEP) 14 July 2014 REV - 0 TABLE OF CONTENT Table of Content... i 1. Introduction... 1 2. Project Description... 2 3.

More information

2015 No. 2059 PROFESSIONAL QUALIFICATIONS. The European Union (Recognition of Professional Qualifications) Regulations 2015

2015 No. 2059 PROFESSIONAL QUALIFICATIONS. The European Union (Recognition of Professional Qualifications) Regulations 2015 S T A T U T O R Y I N S T R U M E N T S 2015 No. 2059 PROFESSIONAL QUALIFICATIONS The European Union (Recognition of Professional Qualifications) Regulations 2015 Made - - - - 17th December 2015 Laid before

More information

Third EU Health Programme 2014-2020

Third EU Health Programme 2014-2020 Third EU Health Programme 2014-2020 THE CHALLENGES - increasingly challenging demographic context threating the sustainability of health systems - fragile economic recovery limiting the resources available

More information

ORDER on the promulgation of the Cultural Heritage Protection Act (CHPA)

ORDER on the promulgation of the Cultural Heritage Protection Act (CHPA) 287. Cultural Heritage Protection Act (CHPA) Pursuant to the second indent of the first paragraph of Article 107 and the first paragraph of Article 91 of the Constitution of the Republic of Slovenia, I

More information

Delegations will find below a compromise revised version of the abovementioned proposal.

Delegations will find below a compromise revised version of the abovementioned proposal. COUNCIL OF THE EUROPEAN UNION Brussels, 31 July 2008 Interinstitutional File: 2008/0077 (CNS) 12059/1/08 REV 1 LIMITE SIRIS 113 SCHENGEN 26 COMIX 592 NOTE from: Presidency to: Mixed Committee at the level

More information

Brussels in Brief. Natura 2000 A Safety Net for Europe s Nature

Brussels in Brief. Natura 2000 A Safety Net for Europe s Nature Brussels in Brief Brussels in Brief is a regular feature of the IUCN Newsletter produced by the Institute for European Environmental Policy (IEEP) in Brussels. It provides a platform to explain the substance

More information

Committee on Petitions NOTICE TO MEMBERS

Committee on Petitions NOTICE TO MEMBERS EUROPEAN PARLIAMT 2009-2014 Committee on Petitions 30.5.2012 NOTICE TO MEMBERS Subject: Petition 1135/2011 by M.G.G. (Spanish), on breach of consumers' rights and contractual terms by an Internet service

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 114 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 114 thereof, 28.8.2014 Official Journal of the European Union L 257/73 REGULATION (EU) No 910/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 23 July 2014 on electronic identification and trust services for electronic

More information