Downtown Amarillo Strategic Planning
|
|
- Asher Rodgers
- 7 years ago
- Views:
Transcription
1 Downtown Amarillo Strategic Planning
2 Planning and Studies 2009 Downtown Strategic Action Plan Completed 2010 Completion of: Convention Hotel Feasibility and Market Study Land Plan for Civic Center Area Streetscape Plan Housing Market Study Parking Study Ballpark Market Study Result of downtown planning and study over $170 million in development and investment downtown, including $113 million catalyst public-private project in Civic Center area
3 Streetscape Plan
4 Streetscape Investment 1.5 miles implemented over last two years
5 Streetscape Investment 140 new pedestrian lights, 300 walkway trees before after
6
7
8 Creative Finance Options Downtown Loan Consortium $5.7 million Preference for mixed-use residential projects Amarillo National Bank, Happy State Bank, First United Bank, First Bank Southwest, Herring Bank, First Bank of Texas, Interstate Bank
9
10 Need For Catalyst Project
11 50-Block Land Plan Civic Center Area
12 Aerial Rendering - Convention Hotel, Multi-Purpose Ballpark, and Parking Garage Phase I - $113 Million Catalyst Public-Private Project
13 300-Room Wyndham Hotel and 841-Space Parking Garage with Retail
14 Multi-Purpose Ballpark (adjacent to City Hall, Parking Garage on Right)
15 Process ( Major Steps) = Opportunities for public discussion or input Identify Goal, Craft Vision, Define Scope Identify Stakeholder Groups & Interests Adopt Goals (Short, Med & Long Term) Identify Perceived Opportunities & Limitations Set Development Preferences & Guiding Principles Initiate selection process for, Architect, Hotel and MPEV Site Visits Development Agreement Approval Creation of LGC Concept Validation & Market Assessments LOI w/development partner Complete selection process for architect and potential operators Site Assessment for Hotel and updates to project land plan Finalize Development Agreements with selected operator partners Technical Studies & Preliminary Design Update Project Cost Current Progress Project Monitoring Agreements, Design & Construction City Decision on Proceeding with Project and Funding Strategy Recommendation to City Commission Funding Strategy Developed 15
16 Overview of Funding Elements Project Project Budget Asset Ownership Funding Sources Security for Debt Convention Hotel $69.3 million Public But Leased to Developer/ Operator Sr. Project Debt EB5 Loan Bank/Bond Refinancing Private Equity NMTC Private Leasehold Interest Pledged Revenues Hotel Revenue TIRZ Revenue rebate from New hotel (term of debt) Local Sales Tax Rebates from NEW hotel(10 yr) Local HOT - ONLY from NEW HOTEL (20 yr) State Sales/HOT Tax Rebates (10 yr) Parking Garage $13.4 million Public But Leased to Developer/ Operator Bonds: HOT and Project Special Revenue Bonds Private Equity Hotel Leasehold Interest Pledged Revenues Hotel - $1,200 / room lease - $360K Civic Center (2yr at 20%) - $330K Special Event Parking - $150K Ticket Facility Surcharge - $366K 7% Citywide HOT ($0 budgeted for D/S) Sinking Fund (Equity from Hotel) Multi-Purpose Event Venue $30.3 million Public But Leased to Developer/ Operator Bonds: HOT and Project Special Revenue Bonds Private Equity (to be negotiated) Leasehold Interest Pledged Revenues Operator Lease Payment - $200K Naming Rights - $200K Ticket Facility Surcharge - $116K 7% City wide HOT ($1.1million budgeted for D/S) Excess Garage Special Revenues - $470K Center City Funding for streetscape $400k 16 16
17 Economic Impact HOTEL - Source Impact Data Source Model / AEDC Total Estimated Economic Impact over 10 years $112,072,589 Net Present Value $98,072,589 Estimated Total Number of New Permanent Jobs 640 Estimated Number of New Construction Jobs 220 MPV - Source Convention Sports and Leisure (CSL) market Assessment Total Estimated Economic Impact over 30 years $196,983,798 Net Present Value $88,852,151 Estimated Total Number of New Jobs 76 Estimated Number of New Construction Jobs
18 $Over 70 million in investment downtown implemented over last two years
19 First Baptist Church of Amarillo $Over 70 million in investment downtown implemented over last two years Polk St. United Methodist Church
20 Restaurants and People Returning to Downtown
21 Residential Investment Cal Farley Alumni Housing Vineyard Manor, and 1015 S. Polk, Restoration of Historic Buildings for Residentia
22 Demolition of Hotel Garage Site
23 Downtown Development 2007 to 2011 Downtown Property Values Increased 35.7% over the 5 year period Downtown Property Values almost stagnant for 20 years until 2006
24 Additional Projects Underway Working with private developers Consistent wayfinding signage Circulation changes convert some one-way to two-way streets Establishment of Public Improvement District TXDOT STEP funding for streetscape
25
DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012
DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012 Project Review: DCAC Meeting #2 March 8, 2012 Reviewed stakeholder meetings Online survey findings Market Assessment Macro Market Factors,
More informationIf You Build It They Will Come
If You Build It They Will Come June 2007 City of Frisco, Texas City of Frisco Location Located in Collin & Denton Counties 25 miles North of Dallas-Fort Worth International Airport SH121 Southern border
More informationCity of Mequon Town Center
City of Mequon Town Center Business Development Loan Program Participating Partners: City of Mequon First Bank Financial Centre Funding Source: Public/Bank Consortium Description: A revolving loan fund
More informationPROJECT LIST Name of Organization: Entertainment Complex Private $100 million $200 million Joint-Venture Two Themed Hotels; Conference Center/Athletic Complex; Themed Restaurant/Bar; Retail Shopping; Residential
More informationS. BLOCK 68 REDEVELOPMENT PROJECT AREA
S. BLOCK 68 REDEVELOPMENT PROJECT AREA 1. Revitalization Project Description The Block 68 Redevelopment Project Area is located on the block bounded by 10 th, 11 th, M, and N Streets, and is comprised
More informationSOUTH ELM DEVELOPMENT GREENSBORO, NC. June 28, 2012
SOUTH ELM DEVELOPMENT June 28, 2012 The Excitement Has Started SOUTH ELM DEVELOPMENT Site Attributes Walkable Amenities Building Program The South Elm Street redevelopment area is the southern gateway
More informationMILWAUKEE DOWNTOWN, BUSINESS IMPROVEMENT DISTRICT #21 BUSINESS DEVELOPMENT LOAN POOL (BDPL) GUIDELINES & APPLICATION
MILWAUKEE DOWNTOWN, BUSINESS IMPROVEMENT DISTRICT #21 BUSINESS DEVELOPMENT LOAN POOL (BDPL) GUIDELINES & APPLICATION Created in proud partnership with BUSINESS DEVELOPMENT LOAN POOL (BDLP) Milwaukee Downtown,
More informationConvention Center Expansion & Headquarters Hotel Feasibility Study for the Washington Convention Center. Summary of Study Findings
Convention Center Expansion & Headquarters Hotel Feasibility Study for the Washington Convention Center In March 2003, the new $850 million Washington Convention Center (WCC) opened to the public. The
More informationImplementing Plans Through Public / Private Partnerships
Implementing Plans Through Public / Private Partnerships WAPA / WASLA 2006 Spring Conference Mark A. Olinger Department of Planning & Development City of Madison April 7, 2006 Outline Planning s s Role
More informationCCC. THE MEMPHIS MEDICAL DISTRICT MASTER PLAN for the CENTER CITY COMMISSION
CCC THE MEMPHIS MEDICAL DISTRICT MASTER PLAN for the CENTER CITY COMMISSION Positioning the Memphis Medical District as the Premier Medical & Educational Center in the Three-State Region. for more information
More informationto provide a framework within which the City Council and Mayor can evaluate and compare proposed uses of tax increment financing TIF; and
Note: Minneapolis Tax Increment Financing Policy Proposed Amendment July 8, 2011; Revised October 12, 2011 Additions proposed in the July 8 version are indicated by underlining; deletions are indicated
More informationThe Lancaster Medical District Master Plan. The Lancaster Campus District 1
The Lancaster Medical District Master Plan The Lancaster Campus District 1 Table of Contents 1 INTRODUCTION 3 2 THE PLANNING PROCESS 4 Assumptions 6 3 PLANNING CONTEXT AND ECONOMIC OUTLOOK 7 Site Analysis
More informationDOWNTOWN HOUSTON DEVELOPMENT ASSISTANCE
DOWNTOWN HOUSTON DEVELOPMENT ASSISTANCE The following programs have been utilized in the past for downtown Houston developments. This list is meant to provide information that might potentially be applicable
More informationSubmittal Requirements for Development Projects
Submittal Requirements for Development Projects 2004 Mission Statement: The Denver Urban Renewal Authority is a full-service redevelopment agency engaged in neighborhood and downtown revitalization, economic
More informationECONOMIC RECOVERY BOARD FOR CAMDEN
ECONOMIC RECOVERY BOARD FOR CAMDEN GUIDE TO PROGRAM FUNDS April 2012 The Economic Recovery Board for Camden ( ERB ) is a subsidiary of the New Jersey Economic Development Authority. For further information
More informationFinancing Options for the Ford Highland Park Project
Financing Options for the Ford Highland Park Project Prepared for: Woodward Heritage 5401 Woodward Avenue Detroit, Michigan 48202 Prepared by: 76 East Forest Avenue Detroit, Michigan 48201 December 2005
More informationArizona State University & City of Phoenix Partnership: Creating a Downtown Campus
Arizona State University & City of Phoenix Partnership: Creating a Downtown Campus Raising Educational Attainment Location 2012 Population College Degree Income Scottsdale 223,514 51.9% $48,742 Chandler
More informationHistoric Tax Credits in Texas: Combining the New State Credit with the Federal Investment Tax Credit. Downtown Amarillo 17 December 2013
Historic Tax Credits in Texas: Combining the New State Credit with the Federal Investment Tax Credit Downtown Amarillo 17 December 2013 Ben Dupuy Anna Mod Stonehenge is a nationally respected finance company
More informationEnvision Venice Strategic Plan for Fiscal Year Ending. September 30, 2016. Preserving and Enhancing the Venice Quality of Life.
Adopted April 28, 2015 October 1, 2015 through September 30, 2016 Envision Venice Strategic Plan for Fiscal Year Ending September 30, 2016 Preserving and Enhancing the Venice Quality of Life Table of Contents
More informationImpact Analysis: The Atlanta Braves new Stadium Project. March 2014. A Cushman & Wakefield Research Publication
Impact : The new Stadium Project A Cushman & Wakefield Research Publication March 2014 1 Executive Summary The new baseball stadium project will dramatically transform the Cumberland/Galleria area of Northwest
More informationVILLAGE OF GRAFTON DOWNTOWN BUSINESS DEVELOPMENT LOAN PROGRAM
VILLAGE OF GRAFTON DOWNTOWN BUSINESS DEVELOPMENT LOAN PROGRAM PARTICIPATING PARTNERS Village of Grafton First Bank Financial Centre FUNDING SOURCE Government/Bank Consortium DESCRIPTION A revolving loan
More information2/11/2014. How to Improve Odds of Success in Municipal Economic Development. What is Municipal Economic Development?
How to Improve Odds of Success in Municipal Economic Development Advanced Municipal Elected Officials Institute February 4, 2014 What is Municipal Economic Development? A municipality s economic development
More informationLONG-RANGE PROPERTY MANAGEMENT PLAN
LONG-RANGE PROPERTY MANAGEMENT PLAN CITY OF MODESTO REDEVELOPMENT SUCCESSOR AGENCY OCTOBER 2013 Prepared By: KOSMONT COMPANIES 865 S. Figueroa Street, #3500 Los Angeles, CA 90017 Telephone: (213) 417-3300
More information2007 Annual Report Columbus Redevelopment Commission City of Columbus, Indiana
2007 Annual Report Columbus Redevelopment Commission City of Columbus, Indiana Submitted to: Redevelopment Commission & Mayor Fred Armstrong By: Ed Curtin, Executive Director Date: Redevelopment Commission
More informationMERCADO DEL BARRIO Mercado del Barrio Jeff Wells, Opportunity Fund - CDE Kevin McCook, Shea Properties - QALICB Marc Schultz, Snell & Wilmer LLP Maria Bustria Glickman, US Bank CDC - Investor Tracy Burton,
More informationPublic/Private Partnerships and the Public Procurement Process
ELEVATING OUR PROFESSIONALISM 48 TH ANNUAL CONFERENCE MAY 17-20, 2015 ORLANDO, FLORIDA Public/Private Partnerships and the Public Procurement Process By Roman Martinez, MPA, CPPO, CPPB DEFINITION OF P3S
More informationCity of Houston Economic Development Programs. Presented by: Andy Icken Chief Development Officer
City of Houston Economic Development Programs Presented by: Andy Icken Chief Development Officer Economic Development Policy of the Administration is to promote economic development through use of a variety
More informationWelcome to Auburn, NY
CAPITAL FINANCING Need help financing your business? Public lending programs were created to help small businesses access the capital they need to achieve their business goals. Locally administered programs
More informationDowntown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
More informationUrban Houston Framework SAC Web Meeting March 27th Houston, Texas
petersgroup consulting Agenda Introduction Overall process (schedule, scope) Review of Vision Workshop Pilot Projects Discussion Westchase Montrose-Westheimer OST/Griggs Moving Towards Conclusions Process
More informationMarch 3, 2015. Honorable Mayor and Council P.O. Box 27210 Tucson, Arizona 85726-7210. To the Honorable Mayor and Council:
March 3, 2015 Honorable Mayor and Council P.O. Box 27210 Tucson, Arizona 85726-7210 To the Honorable Mayor and Council: We have reviewed the Pima County Bond Advisory Committee Chairs and the County Administrator
More informationDowntown Los Angeles Streetcar Economic Analysis
Downtown Los Angeles Streetcar Economic Analysis Executive Briefing Prepared for: Los Angeles Streetcar, Inc. 550 S. Hope Street, Ste. 2300 Los Angeles, CA 90071 Prepared by: AECOM 515 S. Flower Street,
More informationBUSINESS DEVELOPMENT LOAN POOL (BDPL) GUIDELINES & APPLICATION MENOMONEE FALLS, WISCONSIN
BUSINESS DEVELOPMENT LOAN POOL (BDPL) GUIDELINES & APPLICATION MENOMONEE FALLS, WISCONSIN BUSINESS DEVELOPMENT LOAN POOL (BDLP) VILLAGE OF MENOMONEE FALLS, WISCONSIN PARTICIPATING PARTNERS Participating
More informationwww.thefurlongphase2.co.uk
Welcome Thank you for coming along today to view our plans for Phase 2 of The Furlong Shopping Centre. We are undertaking a consultation programme that will run up to and beyond submission of the planning
More informationNFL Stadium Funding Information. Stadiums Opened Since 1997
NFL Stadium Funding Information Stadiums Opened Since 1997 Total Private Funding Public Funding Year Project Total % of Total % of Stadium/Team Team Opened Cost Private Total Public Total San Francisco
More informationSouthwest Center Mall: Moving Forward. Economic Development Committee August 17, 2009
Southwest Center Mall: Moving Forward Economic Development Committee August 17, 2009 1 Background Southern Dallas Task Force Southwest Oak Cliff Work Team identified redevelopment of Southwest Center Mall
More informationSTRATEGIC PLAN 2015 2020 2030
STRATEGIC PLAN 2015 2020 2030 Boca Raton, Florida May 2015 Lyle Sumek Associates, Inc. Phone: (386) 246-6250 9 Flagship Court Fax: (386) 246-6252 Palm Coast, FL 32137 E-mail: sumekassoc@gmail.com Table
More informationIndianapolis SDAT. Neighborhood Restoration
Neighborhood Restoration Working Toward a Sustainable Future live * work * play October 30 th, 2009 Message Hear concerns Build consensus Provide Recommendations Transition from Fragmentation/disconnect
More informationUSDA RURAL DEVELOPMENT INTERMEDIARY RELENDING PROGRAM FACT SHEET
USDA RURAL DEVELOPMENT INTERMEDIARY RELENDING PROGRAM FACT SHEET Area of Operations The South Central Tennessee Development District will utilize Intermediary Relending Program Loan Fund to assist business
More informationthe music factory las colinas newest entertainment destination For Retail Leasing Information Call Noah Lazes 704.987.0612 noah@arkgroupus.
the music factory For Retail Leasing Information Call Noah Lazes 704.987.0612 noah@arkgroupus.com For Office Leasing Information Call Matthew Schendle 972.663.9634 matt.schendle@cushwake.com John Fancher
More informationBenchmark: Discovery Green Houston, TX
Left: Programmatic features like the model boat basin and the ice rink attract the majority of visitors. Middle: Water features are popular amongst families with young childrens. Right: Quiet paths and
More informationMETROPOLITAN REDEVELOPMENT PLAN II OLD ALBUQUERQUE HIGH SCHOOL
METROPOLITAN REDEVELOPMENT PLAN II OLD ALBUQUERQUE HIGH SCHOOL Preface This revised plan for redevelopment of the Old Albuquerque High School Metropolitan Redevelopment Area has been prepared pursuant
More informationLincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
More informationHow To Build A City Of Virginia Beach Arena
City of Virginia Beach Arena Infrastructure Preliminary Conceptual Cost Estimates Doug Smith, Deputy City Manager Carl Tewksbury, Kimley-Horn City Council Briefing July 8, 2014 July 8, 2014 Presentation
More informationFuture Proof Innovative Ways to Ensure Funding for Maintenance. Monday April 13 th 11am 12:15pm
Future Proof Innovative Ways to Ensure Funding for Maintenance Monday April 13 th 11am 12:15pm Speakers Richard Dolesh Vice President for Conservation and Parks, National Recreation and Parks Association
More informationThe Art of Revitalizing Our Cities
The Art of Revitalizing Our Cities ALLEN THEATRE AT PLAYHOUSE SQUARE June 7, 2014 ABOUT THE SPEAKER PAUL SIEMBORSKI Westlake Reed Leskosky 216.522.1350 psiem@wrldesign.com Paul Siemborski is a Principal
More informationFor the Development of the Miami Beach Convention Center District
For the Development of the Miami Beach Convention Center District RFQ # 22-11/12 RFQ DUE DATE: MARCH 23, 2012, 3:00 P.M. REQUEST FOR QUALIFICATIONS (RFQ) NO. 22-11/12 For the Development of the Miami Beach
More informationConsolidated by Commercial Bank Schedule D Loans Origination
6/30/2015 (a) First mortgage FHA-15 yrs 138 $ 13,642 $ 9 $ 11 3.36 (b) First mortgage VA-15 yrs 25 3,422 1 5 3.30 (c) First mortgage conventional conforming 15 yrs 508 57,084 344 164 3.06 (d) First mortgage
More informationLegacy Crossing Urban Renewal District Redevelopment Plan
Legacy Crossing Urban Renewal District Redevelopment Plan Prepared for the Moscow Urban Renewal Agency by Consultants & Staff to the Urban Renewal Agency June 2, 2008 City Council Resolution 2007-24 Adopted
More informationEXPERIENCE INVESTMENT MANAGEMENT & REAL ESTATE SERVICES
INVESTMENT & REAL ESTATE SERVICES Who We Are A trusted advisor. A consistent presence. A valued resource. Forest City Investment Management & Real Estate Services is the investment management and third-party
More informationTO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM
GB3 Office of the President TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 For Meeting of July 21, 2015 DISCUSSION ITEM PRELIMINARY PLANS FUNDING, MISSION BAY EAST CAMPUS PHASE 1 (BLOCK 33) BUILDING,
More informationFor the non real estate professional
For the non real estate professional An introductory case study of the building of a Transit Oriented Development Views from For Profit vs. Non-Profit Developers For Profit Developer Non-Profit Developer
More informationCharter School Facility Basics and Virtual Tour of Five Charter Schools in Los Angeles
Charter School Facility Basics and Virtual Tour of Five Charter Schools in Los Angeles What is all this, and why are we doing it? Charter school leaders and boards of directors frequently ask ExED for
More informationBlock A-24 REDEVELOPMENT PLAN
Block A-24 REDEVELOPMENT PLAN TABLE OF CONTENTS I. Introduction II. Description of Project Area A. Existing Uses and Conditions B. Boundary Description III. Goals and Objectives IV. Redevelopment Activities
More informationEligibility and Application Guidelines for the Low Interest Loan Program for the Downtown Historic District (DHD)
Eligibility and Application Guidelines for the Low Interest Loan Program for the Downtown Historic District (DHD) GOAL: To attract new businesses and investors, to provide private property owners access
More informationMotorcycle & Pedestrian Master Plans in Indianapolis, Indiana
PROJECT PURPOSE The Warsaw + Winona Lake Bicycle and Pedestrian Master Plan establishes a comprehensive framework for a connected bicycle and pedestrian system that will be used for both recreation and
More informationDOWNTOWN AND NEIGHBORHOODS
DEVELOPMENT DOWNTOWN AND NEIGHBORHOODS There is no doubt that our Downtown is the heart of Litchfield County. It is vital that we begin to restore and renew the vibrancy of Torrington s center. The City
More informationBMLPA INNOVATIVE BUSINESS AND DEVELOPMENT FINANCING
INNOVATIVE BUSINESS AND DEVELOPMENT FINANCING STATE AND FEDERAL NEW MARKETS TAX CREDITS Introduction Important Highlights Economic Boost to Qualified Projects of more than twenty percent (20%) of Project
More informationBusiness and Industry Guaranteed Loan
Business and Industry Guaranteed Loan The B & I Guaranteed Program is Lender- Driven: The USDA guarantees the loan rather than lending directly. A commercial lender requests the B & I Guarantee, and if
More informationRapid City Downtown Area Master Plan. Draft Plan Concepts April 2016
Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled
More informationCITY OF FLORENCE NEIGHBORHOOD REVITALIZATION STRATEGY SECOND PUBLIC MEETING
CITY OF FLORENCE NEIGHBORHOOD REVITALIZATION STRATEGY SECOND PUBLIC MEETING Prepared for: City of Florence July 7th, 2014 AGENDA Review Feedback from First Community Meeting Present Catalytic Project Areas
More informationGEORGIA COLLEGE & STATE UNIVERSITY
MASTER PLAN GEORGIA COLLEGE & STATE UNIVERSITY 1 EXECUTIVE SUMMARY Prepared by Sasaki Associates, Inc. Georgia College & State University Campus Master Plan with Lord, Aeck & Sargent The Jaeger Company
More informationTOWN OF WINDSOR TOWN BOARD RESOLUTION 2014-70
TOWN OF WINDSOR TOWN BOARD RESOLUTION 2014-70 RESOLUTION ADOPTING TAX INCREMENTAL FINANCING POLICY AND APPLICATION FOR TAX INCREMENTAL DISTRICT NO.1 (TID No.1) WHEREAS, earlier this year, the Town of Windsor
More informationAlamo Colleges Public Private Partnership Projects. John Strybos Associate Vice Chancellor of Facilities Operation and Construction Management
Alamo Colleges Public Private Partnership Projects 6/13/2013 John Strybos Associate Vice Chancellor of Facilities Operation and Construction Management The Achieving the Dream Leader College designation
More informationFacility Financing Overview Financing Challenges for New Charter Schools Securing a facility, obtaining start-up funding, acquiring the expertise necessary to run a charter school and student enrollment
More informationREQUEST FOR QUALIFICATIONS. On-Call Conceptual Architectural and Engineering Design Services
Hemisfair Park Area Redevelopment Corporation June 26, 2015 Rendering of the Hemisfair Civic Park Schematic Design REQUEST FOR QUALIFICATIONS On-Call Conceptual Architectural and Engineering Design Services
More informationCITY OF WATERVILLE DOWNTOWN FORGIVABLE LOAN PROGRAM
CITY OF WATERVILLE DOWNTOWN FORGIVABLE LOAN PROGRAM I. PROGRAM SUMMARY The City of Waterville has established a Downtown Forgivable Loan Program to provide financial assistance to business and property
More information911 UNIVERSITY DRIVE STATE COLLEGE, PA
911 UNIVERSITY DRIVE STATE COLLEGE, PA HIGH PROFILE OFFICE CENTER FOR SALE OR LEASE Excellent property and location 10,750 (+/-) S.F. Can divide into 2,000 SF+ Office Spaces Convenient access to downtown,
More informationSunTrust Your SBA Lending Partner
SunTrust Your SBA Lending Partner Presented by: Eric Hicklin All credit subject to SBA and SunTrust criteria. 2009 SunTrust Banks, Inc. SunTrust is a federally registered service mark of SunTrust Banks,
More information2014 CEDA APPLICATION FORM
2014 CEDA APPLICATION FORM All Applications Must Be Received By August 15, 2014 The 2014 TEDC Community Economic Development Awards (CEDA) will be presented during TEDC's Annual Conference Award s Luncheon
More informationCampo Felice. Riverfront Senior Living. Fort Myers, Florida
Campo Felice Riverfront Senior Living Fort Myers, Florida INVESTMENT OVERVIEW PROJECT: LOCATION: LENDER: BORROWER: DEVELOPER: EB-5 CAPITAL: INVESTMENT STRUCTURE: EXIT STRATEGY: INVESTMENT AMOUNT: JOB CREATION:
More informationCITY OF BUFFALO 2007 FEDERAL AGENDA BYRON W. BROWN MAYOR
CITY OF BUFFALO 2007 FEDERAL AGENDA BYRON W. BROWN MAYOR INTRODUCTION Mayor Byron W. Brown has established clear federal legislative priorities that support his goal of reviving the City of Buffalo s economy.
More informationProject Financing Tools
OVERVIEW The City of Ramsey has a number of financial tools available for economic development projects. In general, tools include gap financing loans, SBA loans/loan guarantees and project based local
More informationOakland 2025 Master Plan A vision for sustainable living and mobility
Oakland 2025 Master Plan A vision for sustainable living and mobility IMPLEMENTATION CHART Making Oakland 2025 Happen The Oakland 2025 Master Plan is grounded in market research and benchmarks that are
More informationCARMEL, IN RETAIL OFFICE OUTLOTS. Retail, Office Space & Land Available
CARMEL, IN RETAIL OFFICE OUTLOTS Retail, Office Space & Land Available PROVIDENCE AT OLD MERIDIAN Providence at Old Meridian is a 23-acre mixed-use Traditional Neighborhood Development consisting of residential
More informationDenver Union Station. Regional Transportation District Denver, Colorado
Denver Union Station Regional Transportation District Denver, Colorado Regional Transportation District Created in 1969 Eight-county service area Service area: 2,340 sq. miles 2.8 million population 15
More informationCollege Park North Retail Development The Woodlands, Texas
SUBJECT PROPERTY FEATURES LOCATION FEATURES ±21,520 SF of prime retail space available Pad site opportunities available for ground lease Adjacent to numerous big box retailers, including Burlington Coat
More informationDallas Convention Center Debt Restructure Feasibility Study Vendor Selection
Dallas Convention Center Debt Restructure Feasibility Study Vendor Selection Briefing to the Economic Development Committee February 4, 2008 1 Purpose To provide an update on the results of the procurement
More informationP3 STRUCTURE CONSIDERATIONS. List of Contributors: James D. Piers Paul C. Wilson David M. Doubilet Donald M. Dalik
P3 STRUCTURE CONSIDERATIONS List of Contributors: James D. Piers Paul C. Wilson David M. Doubilet Donald M. Dalik Program Agreement Parties Usually multi-party arrangements require agreements among and
More informationKATHIE CANNING EXECUTIVE DIRECTOR
OVEMBER 20, 2013 DISTRICT NOVEMBER ADVISORY BOARD MEETING KATHIE CANNING EXECUTIVE DIRECTOR AGENDA INTRODUCTION/OVERVIEW 2014 PROJECTIONS COMPETITIVE OVERVIEW 2013 CLIENT ADVISORY BOARD CAPITAL IMPROVEMENT
More informationG. Syracuse RESTORE III The Connective Corridor: Building Upwards (W828) June 24, 2010. General Project Plan
General Project Plan Grantee: City of Syracuse (the City or Syracuse ) Beneficiary Company: 215 West Fayette Street Associates, LLC ESD Investment: Project Locations: A grant of up to $1,300,000, pending
More informationVillage of Cambridge. Tax Incremental Financing Policy & Application
Village of Cambridge Tax Incremental Financing Policy & Application Village of Cambridge, Wisconsin 200 Spring Street Cambridge, WI 53563 www.cambridge.wi.us (608) 423-3712 Table of Contents Table of Contents...1
More informationQ&A for Small Business Owners
Q&A for Small Business Owners What did the Obama Administration announce today? The Treasury Department will commit up to $15 billion to help unlock the secondary markets for small business loans. By purchasing
More informationproperty introduction
THE PINNACLE IN DOWNTOWN SARASOTA OFFICE SPACE property introduction Built in 1970 as part of the Ellis Group of banks, downtown Sarasota s Ellis Building has always had a healthy and stable mix of business
More informationGREEN BUSINESS LOAN PROGRAM Application & Information
East Providence Special Waterfront Development District Small Business Administration GREEN BUSINESS LOAN PROGRAM Application & Information WATERFRONT DISTRICT/SBA GREEN LOAN PROGRAM Waterfront District
More information2015 2016 UNION GAP STRATEGIC PLAN
2015 2016 UNION GAP STRATEGIC PLAN On September 9, 2002, the City Council by Resolution No. 452 adopted the city s mission statement, vision statement and 5-year goals. The city s mission statement provides:
More informationThe District will consider proposals from organizations and special events that meet the following eligibility criteria:
Grant Criteria The Durango BID aims to promote broad participation in the arts and special events, encourage resource-sharing and collaboration, and provide equitable access within the City of Durango
More informationNYCIDA PROJECT COST/BENEFIT ANALYSIS January 8, 2015
NYCIDA PROJECT COST/BENEFIT ANALYSIS January 8, 2015 APPLICANT 5 Bay Street LLC 30-56 Whitestone Expressway Suite 300 Whitestone, NY 11354 PROJECT LOCATION 5 Bay Street Staten Island, NY 10301 A. Project
More informationCITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT
CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT MEETING DATE: SEPTEMBER 8, 2015 ITEM NUMBER: 1 SUBJECT: PROPOSED GENERAL PLAN LAND USE ALTERNATIVE FOR THE YEAR 2015-2025 GENERAL PLAN
More informationFinancing Energy-Saving Improvements. Through The Florida Green Energy Works PACE Financing Program
Financing Energy-Saving Improvements Through The Florida Green Energy Works PACE Financing Program Who we are - Towns: - Lantana & Mangonia Park - Chambers: - Greater Boynton Beach Chamber of Commerce
More informationNine Story, LEED Certified Class A Office Building ONE SUMMERLIN. 1980 Festival Plaza Drive, Las Vegas, Nevada 89135
Nine Story, LEED Certified Class A Office Building ONE SUMMERLIN 1980 Festival Plaza Drive, Las Vegas, Nevada 89135 PROPERTY HIGHLIGHTS LEED Certified Silver, core and shell. Green building initiatives
More informationUnderstanding Value Capture as a Transportation Finance Strategy in Massachusetts. March 15, 2013
Understanding Value Capture as a Transportation Finance Strategy in Massachusetts March 15, 2013 Background The Massachusetts Legislature will soon explore options to increase transportation revenue. One
More informationLynnwood Place. FOR LEASE 184th Street SW & 33rd Avenue, Lynnwood. Exciting New Mixed-Use Development
FOR LEASE 184th Street SW & 33rd Avenue, Lynnwood Entrance to the project from 184th St SW directly across from Alderwood Mall Exciting New Mixed-Use Development Retail, restaurant, entertainment, and
More informationEAST HARLEM COMMERCIAL RFP PROPOSAL Q&A
EAST HARLEM COMMERCIAL RFP PROPOSAL Q&A Q: Are proposals for sale or ground lease of the land? A: Proposals should be for a ground lease of the land. Q: What lease term should we propose? A: You may submit
More informationCOMMUNITY DEVELOPMENT PROGRAM. Development Services Department
Community Development Program includes the services and activities of two City departments: and Public Works Department. Programs: Administration Community Development Community Development Block Grants
More informationNear West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD
Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD Boundaries The Near West Side Comprehensive Plan covers a broad area immediately west of Milwaukee s downtown.
More informationCity of Albuquerque. Request for Proposals Design-Build. Solicitation Number: RFP 01-2012. 205 Silver Avenue NW Albuquerque, NM 87102
City of Albuquerque Request for Proposals Design-Build Solicitation Number: RFP 01-2012 205 Silver Avenue NW Albuquerque, NM 87102 Issuance Date: July 6, 2012 Due Date: November 2, 2012, 4:00 p.m. (MST)
More information3600 86th Street Urbandale, IA 50322 515.278.3900 Urbandale.org CITY OF URBANDALE REVOLVING LOAN FUND (RLF) APPLICATION
360086thStreet Urbandale,IA 50322 515.278.3900 Urbandale.org CITY OF URBANDALE REVOLVING LOAN FUND (RLF) APPLICATION PROJECT IDENTIFICATION Company Name Project Name Contact Person Telephone Number Email
More informationCategory: Creative Financing Project: Progression Place - " An Anchor for the Community" Project Location: 1805 7th St, NW Washington DC, 20001
Category: Creative Financing Project: Progression Place - " An Anchor for the Community" Project Location: 1805 7th St, NW Washington DC, 20001 Status: Operational Cost: $157,654,244 Description: The Four
More informationRural Development. Interagency Lender Training September 2014
Rural Development Interagency Lender Training September 2014 Business and Industry Guaranteed Loan The B & I Guaranteed Program is Lender- Driven: The USDA guarantees the loan rather than lending directly.
More information