1 I. INTRODUCTION A. Purpose Proper stormwater drainage is essential for adequate protection of the County s water resources and public health and safety. The potential environmental and economic impacts of uncontrolled stormwater drainage have led to a management and regulatory framework established by local, state, and federal government. The purpose of this element is to establish the County s policy directives for managing stormwater drainage. The characteristics of drainage patterns and associated limitations within Citrus County are incorporated into the drainage plan. B. Terms and Concepts 1. Drainage Systems Water flowing overland during and immediately following a storm event is called stormwater runoff. Under the effect of gravity, water flows towards sea level through depressions and channels or by sheetflow over flat terrain. The drainage system may consist of natural features, manmade features, or a combination of both. Natural drainage systems are defined by the topography of an area. The largest feature is the drainage basin or watershed. The boundary of a basin is referred to as the basin divide. The basin divide is a line where the natural land elevation directs runoff within the basin toward a common major drainage feature. A major drainage feature is referred to as a receiving body and smaller features are tributaries. Manmade drainage facilities features are designed to detain, store, or convey stormwater runoff. Swales, ditches, canals, and storm sewers are typical conveyance structures, which collect stormwater runoff and direct it toward downstream receiving facilities. Stormwater storage structures are classified as either detention or retention facilities. Detention facilities are designed to temporarily impound runoff and release it gradually to downstream portions of the drainage system through an outlet structure. Retention facilities are impoundments, which release stormwater by evaporation and percolation, with no direct discharge. 2. Drainage and Stormwater Management Stormwater runoff is highly variable and dependent upon the amount of rainfall during each storm event and conditions of the drainage basin. Since most storm events are relatively moderate, natural drainage features typically evolve to accommodate moderate quantities of runoff. Periodically, severe storm events 5-120

2 create runoff volumes exceeding these drainage features holding capacities, resulting in temporary high water levels. This periodic high water level (flood) is a naturally occurring event and has many beneficial effects in the cycle of the basin s ecosystem. Flooding or high water levels are generally not perceived as a problem until development occurs in floodprone areas. Historically, the typical strategy adopted in response to stormwater flooding of developed areas was to modify the drainage system to convey runoff away from developed sites more rapidly. This strategy with increasing urbanization results in proportionately faster runoff during storm events. In addition to controlling flood problems, this strategy for coping with stormwater runoff has detrimental effects on water quality. Soil eroding from development sites and materials such as oil, grease, pesticides, and fertilizers from urban and rural land uses are washed off by runoff, increasing the pollutant loading on receiving waters. The term stormwater management refers to comprehensive strategies for addressing stormwater quantity and quality issues. The combined goal of stormwater management strategies is to ensure that the volume, rate, timing, and pollutant load of runoff after development is similar to that which occurred prior to development. To accomplish this, a combination of structural and nonstructural techniques is utilized. Structural techniques emphasize detention and retention of stormwater to reduce runoff rates and provide settling and filtration of pollution. Nonstructural techniques emphasize preservation or simulation of natural drainage features to promote infiltration, filtering, and reducing the rate of runoff. The objective of stormwater management is to utilize the combination of techniques, which provides adequate pollution removal and flood protection in the most economical manner. C. Regulatory Framework The U.S. Environmental Protection Agency has published rules to implement the National Pollutant Discharge Elimination System (NPDES) as mandated under Section 402(p) of the Clean Water Act. The State of Florida submitted a request to the EPA for delegation of NPDES permitting. A main component of this permitting process will be submittal of a Stormwater Pollution Prevention Plan (SWPPP) to identify and mitigate both stormwater and non-stormwater flows. In Florida, the DEP is responsible for regulating stormwater throughout Florida. This regulatory role has been delegated by the DEP through a formal agreement to the Southwest Water Management District (SWFWMD). Within Citrus County, the SWFWMD is responsible for stormwater drainage

3 Sections 373 and 402, F.S., provide the SWFWMD specific authority to regulate stormwater drainage. Chapter 40D-4 and 40D-40, F.A.C., provide rules within SWFWMD for the management and storage of surface waters. Locally, stormwater management is regulated by the County. The Department of Public Works administers the requirements of the Stormwater Drainage Appendices of the LDC. II. INVENTORY A. Background The Southwest Florida Water Management District has identified watershed management as a major component for protection of water resources and the environment. State Water Policy defines a watershed management goal as an overall goal which provides the general strategies for the management of water resources within a watershed. The goal will be developed to be consistent with the Surface Water Improvement and Management (SWIM) program(s) and the NPDES program. The U.S. Geological Service has delineated watersheds at four levels of detail. Level One delineations show approximately 10 watersheds in the SWFWMD up to Level Four showing 1,000 watersheds. An interdisciplinary SWFWMD staff workgroup has chosen 23 delineated basins, comprised of watershed from Levels One and Two for development of preliminary watershed management goals. The District will prepare a comprehensive surface water approach that will encompass flood protection, water quality, natural systems management, and where appropriate, water supply considerations. The results of this initiative will be used for a variety of purposes including specific implementation strategies for each watershed in conjunction with federal, state, and local agencies. Intergovernmental coordination will then prioritize activities to provide maximum effective use of available funding. 1. Basins and Subbasins Citrus County is divided by a drainage divide, which forms the Coastal Rivers and Withlacoochee Basins. This drainage divide begins in the south central area of the County and gradually curves westward below the junction of the Withlacoochee River and the Gulf of Mexico (Figure 5-11). The Coastal Rivers Basin is drained by the Crystal, Homosassa, Halls, and Chassahowitzka Rivers. These river systems receive the majority of their volume from coastal springs and the seepage of groundwater, rather than surface runoff 5-122

4 from the surrounding watershed (Glace and Radcliffe, Inc., 1981). However, stormwater runoff is increasing due to urbanization of the lands within the respective watersheds. The Coastal River Basin consists of a large buffer area of saltwater marsh bordered by a land of freshwater swamp west of US-19. Traveling east from US- 19 the land elevations increase to a maximum at the eastern edge of the basin, which is located in the sand hills (Brooksville Ridge). Whereas the sand hill areas provide excellent infiltration and recharge for stormwater runoff, the areas bordering US-19 contain poorly drained soils that require appropriate stormwater management techniques to protect water quality. The Coastal Rivers Basin has been divided into 27 subbasins (Figure 5-11). The land area contained in each subbasin is shown in Table Since drainage basins do not conform to political boundaries, some of these subbasins consist of portions outside the County. Particular basins as noted were calculated to include only that portion which is in Citrus County. The Coastal River Basin contains the Crystal River/King s Bay area, which is a designated SWIM project. The County, in coordination with the City of Crystal River and SWFWMD, have implemented strategies developed under this program, as well as, utilized them in other areas within the Basin when applicable. The Withlacoochee River Basin covers the eastern half and northern edge of Citrus County (Figure 5-11). The Withlacoochee River, the major drainage feature of the Basin has its headwaters in the Green Swamp. The river meanders 157 miles northward to the Gulf of Mexico and forms the eastern and northern boundaries of Citrus County. This Basin is divided into 39 subbasins, which are listed in Table TABLE 5-12 COASTAL RIVERS BASIN Subbasin Area (acres) Subbasin Area (acres) C-1 40,967 C-15 1,690 C-2 13,594 C C-3 2,773 C-17 3,996 C-4 3,240 C C-5 3,140* C-19 6,575 C-6 1,631 C C-7 2,149 C-21 2,182 C-8 1,466 C-22 7,221 C C-23 5,781 C-10 1,051 C-24 6,465 C-11 1,153 C-25 1,785 C-12 10,626 C-26 88,760* C-13 13,407 C-27 1,377 C-14 1,690 Note: *Area of Basin within Citrus County Source: Glace and Radcliffe, Inc., 1981 Prepared by: Citrus County Community Development Division,

5 TABLE 5-13 WITHLACOOCHEE RIVER BASIN Subbasin Area (acres) Subbasin Area (acres) W-1 2,094 W-21 1,381 W-2 5,748 W-22 2,773 W-3 1,093 W-23 8,230 W-4 13,028* W W-5 1,387 W-25 4,885 W-6 3,636 W-26 1,965 W-7 10,257* W-27 6,511 W-8 1,644 W-28 1,230 W-9 2,747 W-29 2,571 W-10 1,230 W-30 3,453 W-11 2,213 W-31 3,398 W W-32 1,253 W-13 2,130 W-33 2,002 W-14 2,610 W-34 1,702 W-15 2,525 W-35 5,811* W-16 1,286 W-36 7,686 W-17 4,623 W-37 16,621 W-18 9,972 W-38 4,011 W-19 1,747 W-39 12,635 W-20 3,737 Note: *Area of Basin within Citrus County Source: Glace and Radcliffe, Inc., 1981 Prepared by: Citrus County Division of Planning, Environmental Factors There are many factors, which affect the surface water drainage of a basin or watershed. These factors include climate, topography, geology, hydrology, and soils. The following discussion summarizes these factors by characterizing drainage within Citrus County. A more detailed discussion is contained within the Conservation Element. The climate of Citrus County is typical of a low-lying subtropical area. The summers are warm and relatively humid, while winters are mild and relatively dry. Citrus County receives 55 inches of rainfall annually. More than one-half of the annual rainfall occurs during the months of June through September

6 5-125 Infrastructure Element

7 Topography of the County is characterized by low-lying, flat terrain, karst geology, a thin soil profile and extensive salt and freshwater wetlands along the coastal lowlands. The topography gradually rises in elevation and varies in landscape traveling eastward from the coast. Paralleling US-19 on the east is a nearly level sand terrace with elevation from 10 to 20 feet above mean sea level. East of this terrace a sand ridge is encountered where the land rises as high as 237 feet above mean sea level and 180 feet along the ridge crest. East of the sandhills the land elevations decrease towards Lake Tsala Apopka and the Withlacoochee River. Surficial geology of the County consists of sand with a scattered distribution of clays in the Central Ridge Area and karst geology along both the east and west portions of the County. Due to topographic and geologic features runoff is generally greater in the Coastal, Lakes, and River Areas of the County, rather than the Central Ridge. Stormwater in the Central Ridge permeates through the sand layers, whereas in the lake and coastal areas, stormwater permeability is inhibited by water table and soil characteristics. Soil associations within the County are categorized based on limitations to drainage. These soil groups with limitations on permeability should be considered during the review of proposed impacts to water quality relating to various stormwater management alternatives. Soil types have direct relationships with stormwater management parameters such as: permeability, erosion potential, infiltration, and filtration. These parameters control both the quantity and quality of water, which recharges the aquifer or becomes runoff. The hydrology of the County is characterized by the surface waters of the Withlacoochee River and the Tsala Apopka Plain, the Coastal Rivers, and the high recharge area of the Central Ridge. The hydrologic characteristics of the major surface water features demonstrate that the Withlacoochee River receives a significant portion of its flow outside of Citrus County (Green Swamp and related watersheds) and the coastal rivers are primarily fed by groundwater discharge. A significant portion of rainfall in the County percolates to the Floridan aquifer or a surficial aquifer, providing a regeneration of groundwater necessary for water consumption, protection against increased sinkhole activity, and the maintenance of hydrologic levels in wetlands, springs, and waterbodies. It is important to retain historical aquifer recharge rates in order to maintain aquifer levels. Runoff from storm events can cause significant detriment to water quality and the safety of the residents. Appropriate measures for controlling and treating runoff are necessary for protection of the public health, safety, and welfare

8 3. Development Pressures Land development impacts the natural drainage patterns and function of land areas. Development or urbanization increases the amount of impervious surfaces, thus, increases the amount and rate of stormwater runoff. Rainfall, which contacts impervious surfaces, washes oil, grease, sediments, residuals, and other pollutants into the receiving bodies. Runoff also transports sediments, fertilizers, pesticides, herbicides, and increases the leachate from agricultural, landscaped, residential, and other similar land areas. Stormwater runoff conveys many pollutants including suspended solids, heavy metals, nitrogen, phosphorus, pesticides, herbicides, fertilizers, and organic materials. These pollutants have degrading effects on water quality. The addition of pollutants of this nature reduces dissolved oxygen concentrations, increase eutrophication, increase public health risks, increase siltation, and reduce aesthetic values. Increasing volumes and runoff rates from an urbanizing landscape can lead to the flooding of low-lying areas and areas, which previously had no flooding problems. As development continues, runoff rates and volumes increase. B. Stormwater Drainage Plans and Studies 1. Citrus County: Stormwater Drainage Study Glace and Radcliffe, Inc., completed a stormwater drainage study in July 1981 for Citrus County. This study delineates subbasin boundaries, identified existing control structures, identified wetland and recharge areas, and recommended stormwater management practices. Conclusions from the stormwater drainage study are listed below: Citrus County has many well-defined drainage basins and adequately sized drainage structures. The growth and urbanization, which is occurring in Citrus County, could have deleterious effects on water quality. As growth continues, the County will become more urbanized and the rate of delivery of stormwater in the respective basins and subbasins will increase. The County should take action to protect area water quality and preserve its vital natural resources. The County should implement regulations as required to enhance stormwater management contribution to life and environmental quality. The County should be cognizant that the implementation of both structural and nonstructural alternatives for stormwater management may be 5-127

9 required in the future and that the appropriation of funds to accomplish these stormwater objectives will be necessary. Specific recommendations from the stormwater drainage study are: The County Commission accepted this report as the basis for making future decisions on stormwater management practices and implementing future improvements to the County s primary drainage system. The County proceed with the adoption of stormwater management regulations. The County perform site specific, stormwater management evaluations using this study as a database. The County administer proper land use and water conservation regulations and prohibit development in these flood prone areas where it would be detrimental and not in the best interest of Citrus County. 2. Five Year Plan: Drainage Improvements The Drainage Improvements Plan prepared by the Department of Technical Services in October 1986 provided a prioritized list of improvements through the year These improvements were estimated to cost approximately $582,000 to the year Additional projects are added each year as older projects are completed. A current listing of projects is contained within the Capital Improvements Element. Each project within the drainage improvement plan was evaluated based on seven factors, which include: Residential Units Affected Commercial Units Affected County Roads Affected Frequency of Flooding Length of Time-Standing Water Average Daily Traffic/Affected Roadways Flooding Area (acreage) These factors were inventoried and a score was calculated. The point score was then divided by the estimated cost to rank the project in priority order. These improvements were generally site specific in areas experiencing flooding conditions during various storm events. The Department of Technical Services was responsible for the planning and design of such improvements and the Department of Public Works was responsible for the construction and maintenance of the facilities. In many cases the improvements were remedial and may be of emergency nature. Since the improvements are not the portion of a comprehensive drainage plan for the subdivision or a portion of a stormwater 5-128

10 master plan for a subbasin, the pollutant and filtering functions were not always met. 3. Beverly Hills Stormwater Study and Plan This study was prepared for Citrus County in December The Beverly Hills Development was platted prior to stormwater drainage design requirements in the County. Numerous drainage problems occurred within the subdivision. The County authorized the preparation of this study to develop an overall stormwater master plan for Beverly Hills, Units One through Five. The initial design was intended to comprehensively address and effectively manage stormwater drainage. Based on this study, the County has addressed problem drainage areas in many areas of Beverly Hills. This program is ongoing. 4. Highlands Stormwater Study The Highlands Stormwater Study was commissioned by the County to address drainage problems within a portion of the Inverness Highlands Subdivision. This study covers a land area of approximately 1,110 acres. The study identified drainage patterns and problems. Strategically located properties were acquired through an assessment program and some drainage facilities have been constructed. This project is ongoing and is revisited periodically as development and infill occur. III. NEEDS ASSESSMENT A. Stormwater Drainage Regulation 1. Citrus County Citrus County s stormwater drainage regulations are embodied in the Citrus County Land Development Code and Appendices C.O These regulations contain level of service standards for drainage facilities and specific design standards. The Department of Public Works is responsible for enforcement of this ordinance. Their main role in administering these ordinances lies within the subdivision (plat) review procedures. The construction of a single family residence is conditionally exempt from requirements of this ordinance. The conditional exemption does not include requirements of Section 3, Subsections (4) and (5), which state: 5-129

11 (4) Special Cases Single family dwellings, including duplexes, shall be constructed in such a manner as to prevent flooding from stormwater entering the site from adjacent properties, including roadways. Residential sites within a Master Drainage Area shall provide approved drainage methods, as to prevent direct runoff onto adjacent properties. All other residential sites shall be graded in such a manner as to provide on-site retention of the first one (1) inch of stormwater runoff for the developed area of the lot and to prevent direct runoff onto adjacent properties. (5) All Systems (including Special Cases) Whenever stormwater runoff is designed to enter any body of water, including roadside ditches and swales, special engineering features designed to remove, oils, suspended soils, and other objectionable materials shall be required. To the maximum extent possible, designs shall include methods to retain stormwater in natural recharge areas. The Department of Public Works is responsible for planning engineering and for the construction and maintenance of drainage facilities for the County operated facilities. The Land Development Code contains requirements that drainage facilities and conveyance systems be constructed to meet specific storm duration events. These specific standards are located in Appendix A and B of the Land Development Code. A summary of requirements for stormwater management include: Calculations for runoff shall consider the entire contributory watershed including area outside of the subdivision Natural collection facilities which direct runoff from the subdivision on to adjacent properties must be perpetuated to the extent of protecting the upland owners interest; however, such facilities must not be incorporated into the drainage design for the subdivision The collection of stormwater runoff shall be by positive gravity means without the use of siphons, pumps, or similar devices Calculations shall be based on commonly accepted engineering procedures such as S.C.S, TR-55 or the rational method (Q=CIA). All developers must retain or detain only the additional runoff caused by their development If, prior to development, stormwater flows either from or through the site under review to an adjacent property, that predevelopment peak runoff 5-130

12 rate shall be calculated and, with either detention or retention facilities incorporated in the drainage design, post development drainage shall be performed which demonstrate that the peak runoff rates onto adjacent properties will not be increased during a 25-year, 24-hour storm event (open basin) or a 100-year, 24-hour storm event (closed basin) It shall also be demonstrated that for the same design storm, there will be no increase in backwater onto an upstream property and that any increase in volume of runoff will have been detained and released at a time which will not cause any increased flooding downstream It shall be demonstrated that the design of all site drainage facilities shall not cause flooding of public streets or buildings during a 25-year, 24-hour storm event (open drainage system). 3-year, 24-hour storm event for closed drainage system (curb and gutter) Culverts within an open drainage system shall be designed to discharge a 10-year frequency storm without static head at the entrance and a 25-year frequency storm utilizing available head at the entrance 2. Southwest Florida Water Management District (SWFWMD) The SWFWMD surface water management rules (Chapter 40D-4 and 40D-40, F.A.C.) provide regulations for the construction and operation of any new surface water management system or the alteration of any surface water management system. Exemptions from the surface water management rules included specified agricultural and mining lands, permitted development prior to October 1, 1984, and the construction of single-family residences (refer to Chapters 40D-4 and 40D-40 for specific list of exemptions). B. Capacity and Performance of Facilities The capacity and performance of drainage facilities refers to the capacity of conveyance channels, and the relation to water quantity and quality, respectively. A comprehensive study of drainage facilities was conducted in the Stormwater Drainage Study, (Glace and Radcliffe, Inc., 1981). This study stated that Citrus County has many well defined drainage basins and adequately sized drainage structures. Areas of the County without stormwater drainage facilities or adequately designed facilities are numerous. These areas have a mixture of drainage problems relating to lack of facilities, soils with low infiltration rates, and poor subdivision designs. These areas are found in the Coastal, Lakes, and River and Central Ridge Areas of the County. Existing drainage facilities have not been analyzed for either capacity or performance. In many cases, the post-development peak has not been reached and facilities appear to be designed and constructed over capacity, due to the lack of standing water

13 IV. DRAINGE PLAN A. Level of Service The County s regulations shall utilize the 25-year, 24-hour storm event (open basin) and a 100-year, 24-hour storm event (closed basin) for the construction of drainage facilities and require the water quality treatment of the first one-half inch of runoff. This storm event is utilized as a level of service for predevelopment and postdevelopment stormwater requirements. The SWFWMD was delegated responsibility to regulate stormwater from the DEP in accordance with Chapter 62-25, F.A.C. The SWFWMD utilizes the 100-year, 24-hour storm event in their stormwater design requirements. The County also uses the 100-year, 24-hour storm event and the retention of the first one-half inch of runoff for the drainage level of service for all new subdivisions or planned developments. The SWFWMD requires retention of the first one-half inch up to one and a half inches of runoff depending on the basin type, location, and physical characteristics of the development. Existing regulations and programs, which govern land use and development of natural drainage features, are contained within the LDC. They include regulations that address the protection of natural drainage inclusion of protective measures for natural drainage features. The level of service for drainage plans and facilities for all new subdivision or planned development is as follows: 1. For open basins - the retention of the first one-half inch of runoff or a volume of 50 percent more for discharge into Outstanding Florida Waters (OFW) (water quality/pollution) and the 25-year, 24-hour storm event (water quantity/flooding); 2. For closed basins - the retention of the first one-half inch of runoff or a volume of 50 percent more for discharge into (OFW) (water quality/pollution) and the 100-year, 24-hour storm event (water quantity/flooding). The County regulations require that the first one-half inch of runoff is retained on-site for single-family residences (except when a Master Drainage Plan is in place). The County s adopted level of service has been adjusted to match the SWFWMD water quality and water quantity criteria

14 B. Natural Features and Drainage Natural features and drainage are important to preserve. These features include high recharge areas and natural drainage patterns. Protection of these functions and resources is beneficial in multiple areas: 1) filtering and recharging our potable water supply aquifers, 2) reducing the potential of increased sinkhole activity, 3) maintenance of flows to streams and springs, 4) providing natural filtering prior to discharge into surface waters, and 5) reducing the costs of developing drainage systems in areas where natural features are utilized in conjunction with manmade drainage facilities. Development standards in areas of high recharge are necessary to preserve the functions of such lands. Drainage facilities in recharge areas shall utilize facilities which maintain the volume of historical recharge and provide adequate filtering and water quality treatment to prevent nutrients and contaminants from entering the potable aquifer. In all cases, no drainage is allowed to discharge into sinkholes or direct openings to aquifers providing potable water (refer to the Conservation Element for groundwater protection measures). Where the likelihood of sinkholes exists, all proposed drainage retention and water quality treatment areas should be inspected through geotechnical testing for the presence of cavities and voids beneath the proposed location. Natural drainage patterns are important to preserve, as they are the lands existing drainage facilities. If development of the watershed does not include a comprehensive analysis of such drainage, the result is a basin, which will have potentially expensive and hazardous conditions. C. Stormwater Drainage Plans Currently, there are limited (Homosassa Southfork) stormwater drainage plans for establishing a unified effort to adequately facilitate stormwater drainage, although the County currently is entering into a Memorandum of Understanding (MOU) with the SWFWMD. The MOU will provide for detailed aerial photography and mapping, watershed analysis, watershed development impact modeling, and identification of needed projects, among other things. Many efforts and expenditures are being made to correct drainage problems throughout the County. The development of master drainage plans for subbasins or small groups of subbasins can establish the desired goal for meeting stormwater needs within affected subbasins. These plans can coordinate the individual improvements within a subbasin to meet the overall stormwater drainage needs and requirements

15 D. Regional Stormwater Drainage Plans A regional stormwater drainage plan is proposed for the County Road 491 Corridor Planning Study described in the Future Land Use Element. Currently, stormwater management facilities within the CR-491 Corridor are provided individually by each development, whether it is through a single site or as part of an overall master planned development or commercial/medical subdivision. These systems, especially the stormwater ponds, typically require a large amount of land to assure that the requirements for collecting and treating the stormwater from any rain event are met. These systems can also be costly to design, permit and construct. Citrus County has a number of commercial sites that have already been developed utilizing the concept of regional drainage. For many of these a regional drainage retention pond accepts the stormwater for all of the projects parcels, especially the out parcels, allowing them to be developed along the valuable highway frontage without the need for their own onsite drainage pond. In addition, regional stormwater management system can be utilized for roadway projects with an adjacent commercial developments. The development of regional stormwater ponds benefits both the County and the development community by reducing the amount of land area required for a stormwater system and releasing a larger portion back to the overall project area for future development A

16 V. GOALS, OBJECTIVES, AND POLICIES Goal #9 - To develop a comprehensive stormwater drainage program including design requirements, unified drainage plans, and protection of natural drainage features and functions. Level of Service Objective 9.1 Policy The Land Development Code shall contain requirements for stormwater facility design and Level of Service. The level of service for drainage plans and facilities for all new nonresidential development, subdivision or planned development is as follows: 1. For open basins - the retention of the first one-half inch of runoff or a volume of 50 percent more for discharge into OFW (water quality/pollution) and the 25-year, 24-hour storm event (water quantity/flooding); Stormwater discharges from any site shall conform to the water quality standards used by SWFWMD, DEP and the rules and regulations adopted or implemented by the Citrus County Board of County Commissioners. 2. For closed basins - the retention of the first one-half inch of runoff or a volume of 50 percent more for discharge into OFW (water quality/pollution) and the 100-year, 24-hour storm event (water quantity/flooding). No stormwater runoff shall be allowed to drain directly through any sinkhole or other karst feature. Stormwater discharges from any site shall conform to the water quality standards used by SWFWMD, DEP and the rules and regulations adopted or implemented by the Citrus County Board of County Commissioners. 3. For all spring and spring run basins all stormwater discharges from any site shall conform to water quality standards used by SWFWMD, DEP and the rules and regulations adopted or implemented by the Citrus County Board of County Commissioners. If and when an interlocal agreement is enacted, the agreement will supersede this policy. Policy The County shall ameliorate the future discharge of inadequately treated stormwater runoff into waters and wetlands of the state by requiring the following: 5-134

17 a. Redevelopment projects shall include water quality treatment to the greatest degree possible to not exceed that required for new development. b. All other projects shall ensure that water quality treatment for the first one-half inch of runoff be retained on-site, or in the case of runoff entering any body of water designated an Outstanding Florida Water (OFW), a volume of 50 percent more shall be required. Stormwater discharge shall conform to the standards used by SWFWMD, DEP and the rules and regulations adopted or implemented by the Citrus County Board of County Commissioners. Policy Policy Policy Policy The County shall coordinate with the SWFWMD and FDEP to create a single permitting procedure for addressing stormwater/drainage requirements of new developments. All stormwater management and drainage systems proposed to be constructed in karst sensitive areas, areas with known sinkholes, and areas with shallow depth to limestone bedrock, shall be evaluated for the presence of sinkholes through appropriate geotechnical testing. All proposed Drainage Retention Areas (DRAs) shall be tested for the presence of cavities and voids beneath them. DRAs and other stormwater storage and treatment facilities, but not conveyance facilities, shall not be located over unfilled voids. If there is an existing or historic sinkhole on the proposed development, or indication that a sinkhole may develop in the future, then a detailed geological/geotechnical investigation shall be required. This investigation must be conducted by a certified geologist or professional engineer experienced in hydrogeology and a report submitted to the County for consideration. The geologic investigation shall be comprehensive enough that recommendations for site planning, engineering design and construction techniques may be made. The County shall approve or deny development proposals based upon the scale of the development and the hazards revealed within the investigation. No stormwater structure or facility, other than stormwater swales, shall be located over or adjacent to an existing sinkhole unless it is determined by a certified geologist or professional engineer experienced in hydrogeology that the area is safe and that there is no subsurface connection that may cause contamination or damage to the groundwater

18 Objective 9.2 Policy Citrus County will establish a program to ensure that drainage facilities meet existing and projected demand throughout the planning period, maximize the use of existing facilities, and discourage urban sprawl by using drainage levels of service and requiring development to retain stormwater on site and connect to existing drainage facilities. All development is required to connect to existing facilities, meet drainage levels of service, and retain stormwater on site. Natural Features and Drainage High Recharge Objective 9.3 Policy Policy Policy Policy The development of drainage facilities in areas of high recharge shall incorporate pollutant and filter functions into site drainage plans. Basins, swales, and culverts shall be designed to protect groundwater and surface water quality and quantity in all new developments. The Land Development Code shall contain minimum standards for recharge of stormwater in areas of high recharge. Postdevelopment recharge volumes and water quality shall equal or improve historical pre-development conditions as provided by the standards used by the SWFWMD, DEP and the rules and regulations adopted or implemented by the Citrus County Board of County Commissioners. The County is exempt from pollutant and filtering functions in cases of emergency actions. The County will adopt and require stormwater Best Management Practices (BMPs) for all stormwater management systems located in all areas of the County. Natural Drainage Objective 9.4 Policy Natural drainage features shall be protected and included in Master Stormwater Drainage Plans. Natural drainage features shall be analyzed in all development plans and measures to protect the natural drainage features will be incorporated into the County Land Development Code

19 Policy A public or private stormwater utility, MSTU or other applicable mechanism shall be adopted by 2007 to provide the financial basis for stormwater master planning and retrofitting projects. Stormwater Drainage Plans Objective 9.5 Policy The County shall implement stormwater master plans, emphasizing facility capacity of drainage systems as the basis for a watershed based approach to stormwater management. The County shall utilize the report to Plan Oversight Committee from the Stormwater Level of Service Convention Committee in development of the master plans. The County will coordinate and work with the SWFWMD to develop comprehensive watershed master plans through the mechanism of a Memorandum of Understanding (MOU). The MOU will assist with the development and implementation of a variety of flood prevention and control projects, water quality projects, detailed flood plain analysis, and watershed modeling. Existing Deficiencies and Coordination Objective 9.6 Policy Policy Policy The County shall correct existing drainage deficiencies identified in the Five-year Drainage Improvements Plan, prevent future discharge of inadequately treated runoff, and implement a program to identify, prioritize, and correct drainage deficiencies. The program to identify, prioritize, and correct drainage deficiencies shall be coordinated with the preparation of Master Stormwater Drainage Plans and shall include measures to correct system capacity, pollution loading, and recharge functions of drainage systems. The program to implement the correction of existing facilities shall follow the schedule in the Capital Improvements Element. Proposed capital improvement projects will be evaluated and ranked according to the following level guidelines: Level One - whether the project is needed to protect public health and safety, to fulfill the County s legal commitment to provide facilities and services, to preserve or achieve full use of existing facilities, or if permitted capacity has been reached. Level Two - whether the project increases efficiency of use of existing facilitates, prevents or reduces future improvement costs, 5-137

20 provides service to developed areas lacking full service, or promotes infill development. Level Three - where the project represents a logical extension of facilities and services within a designated service area. Policy The County will continue a program to coordinate the expansion or extension of drainage facilities with other local governments to meet future needs. Regional Stormwater Drainage Facilities Objective 9.7 The County shall develop a Regional Stormwater Drainage Plan to serve and implement the strategies of the CR-491 Corridor Overlay Plan (refer to Chapter 10, Future Land Use Goal 17C)

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Receiving Water Body:

Receiving Water Body: 62-330 ENVIRONMENTAL RESOURCE PERMIT INDIVIDUAL - TECHNICAL STAFF REPORT 04-Nov-2015 APPLICATION #: IND-059-16968-1 Applicant: Eddie Dixon Holmes District School Board 701 E Pennsylvania Ave Bonifay, FL

More information

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management 40 slide sample of Presentation Please contact mhoalton@pacewater.com if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated

More information

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

Low Impact Development Checklist

Low Impact Development Checklist New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Drainage Analysis for the McKownville Area

Drainage Analysis for the McKownville Area Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland

More information

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS 62-624.100 Policy and Purpose. 62-624.200 Definitions. 62-624.300 General Provisions. 62-624.310 General Conditions, Individual Permits. 62-624.400

More information

Computing Stormwater Runoff Rates and Volumes

Computing Stormwater Runoff Rates and Volumes New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE 12-O-1761 AN ORDINANCE TO AMEND VARIOUS SECTIONS OF CHAPTER 74, ARTICLE X OF THE CITY OF ATLANTA CODE OF ORDINANCES FOR THE PURPOSE OF PROMOTING GREEN

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended

More information

Shooks Run Drainage Study Basic Terminology

Shooks Run Drainage Study Basic Terminology Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs

More information

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II DESIGN REQUIREMENTS FOR STORMWATER TREATMENT AND MANAGEMENT SYSTEMS WATER QUALITY AND WATER QUANTITY

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Conveyance means a mechanism for transporting water from one point to another, including pipes, ditches, and channels.

Conveyance means a mechanism for transporting water from one point to another, including pipes, ditches, and channels. Glossary of Common Stormwater Terms Baffle means a device to check, deflect, or regulate flow. Beneficial Uses means uses of waters of the states which include but are not limited to - use for domestic,

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Official OPP Overall Penn State Stormwater Program Latest Revision/Review: 5/28/2015

Official OPP Overall Penn State Stormwater Program Latest Revision/Review: 5/28/2015 Official OPP Latest Revision/Review: 5/28/2015 Link to Penn State s Stormwater homepage: http://www.opp.psu.edu/services/stormwater ARTICLE 1 - GENERAL 1.1 Intent Since the passage of the Clean Water Act,

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Chapter 5.0. Stormwater Credits for Innovative Site Planning Chapter 5.0 Stormwater Credits for Innovative Site Planning Chapter 5. Stormwater Credits...Introduction 5.0 Stormwater Credits In Maryland, there are many programs at both the State and local level that

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

SECTION 9J-5.011 STORMWATER MANAGEMENT ELEMENT

SECTION 9J-5.011 STORMWATER MANAGEMENT ELEMENT SECTION 9J-5.011 STORMWATER MANAGEMENT ELEMENT CONTENTS PAGE I. INTRODUCTION... 1 II. DATA... 14 A. Regulatory Framework... 14 B. Existing Conditions... 16 III ANALYSIS... 28 A. Level of Service... 28

More information

SPA Annual Report for 2002 September, 2003 Montgomery County Department of Environmental Protection Page 125. Evaluation and Recommendations

SPA Annual Report for 2002 September, 2003 Montgomery County Department of Environmental Protection Page 125. Evaluation and Recommendations Montgomery County Department of Environmental Protection Page 125 Evaluation and Recommendations Monitoring efforts in the Special Protection Areas continue to provide the kind of information needed to

More information

Southwest Florida Water Management District. Environmental Resource Permit Applications within the Southwest Florida Water Management District

Southwest Florida Water Management District. Environmental Resource Permit Applications within the Southwest Florida Water Management District Southwest Florida Water Management District PART B PART B Basis of Review Environmental Resource Permit Applications within the Southwest Florida Water Management District MANAGEMENT AND STORAGE OF SURFACE

More information

APPROVAL AMENDMENT HISTORY

APPROVAL AMENDMENT HISTORY Prepared by: Aurecon South Africa (Pty) Ltd STORMWATER MANAGEMENT PLAN TOKAI ESTATE (DRAFT 1) Submission date: 11 January 2013 Contact Person: Francois du Toit T: +27 21 526 6950 F: +27 21 526 9500 E:

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

Stormwater Design Guidelines Frequently Asked Questions:

Stormwater Design Guidelines Frequently Asked Questions: 525 Golden Gate, 11th Floor San Francisco, CA 94102 T 415.551.4694 F 415.934.5728 TTY 415.554.3488 Stormwater Design Guidelines Frequently Asked Questions: A. GENERAL INQUIRIES... 2 1. What projects are

More information

Development of Conservation and Restoration Targets for Sustainable Water Resource Management Mike Britt, Natural Resources Division Director

Development of Conservation and Restoration Targets for Sustainable Water Resource Management Mike Britt, Natural Resources Division Director Development of Conservation and Restoration Targets for Sustainable Water Resource Management Mike Britt, Natural Resources Division Director September 2012 FINAL Table of contents Section Pages 1. Introduction

More information

QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL

QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL Key Background Congress enacted the modern Clean Water Act in 1972 to address pollution entering the nation s waters to complement statutes such as the

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

Post Construction Stormwater Management Checklist Program

Post Construction Stormwater Management Checklist Program Post Construction Stormwater Management Checklist Program Anahid Damerau, CPESC, CPSWQ Christopher Smith, P.E. Department of Environmental Protection Stormwater Section Watershed Management Program The

More information

Georgia Coastal Stormwater Supplement April 2009

Georgia Coastal Stormwater Supplement April 2009 9.0 Local Post-Construction Stormwater Management Programs 9.1 Overview Prior to the 1980s, stormwater management was synonymous with flood control. Postconstruction stormwater management systems consisted

More information

Appendix G: Model Stormwater Ordinance and Performance Standards

Appendix G: Model Stormwater Ordinance and Performance Standards Appendix G: Model Stormwater Ordinance and Performance Standards 1. Rein in the Runoff Model Low Impact Development Stormwater Ordinance for the Communities in the Spring Lake Watershed 2. Rein in the

More information

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST APPENDIX A: STORMWATER MANAGEMENT CHECKLIST The first thing that applicants and designers must do before beginning a project is to make sure they are familiar with the 11 minimum standards listed in Manual

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

City of Valdosta Land Development Regulations. Table of Contents

City of Valdosta Land Development Regulations. Table of Contents TITLE 1 ADMINISTRATION Chapter 102 General Provisions 102-1 Title 102-2 Purpose 102-3 Authority 102-4 Jurisdiction 102-5 Application of Ordinance 102-6 Relationship to Existing Ordinances 102-7 Powers

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH

Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH Project Background In November of 2013 the Green Infrastructure for Sustainable Coastal Communities (GISCC) project

More information

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT Contacts: Barry Chilibeck (666-3765) or Megan Sterling (666-2322) Revision 4

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

ORDINANCE NO. 89-04-09 AN ORDINANCE TO ESTABLISH REGULATIONS AND STANDARDS FOR STORM DRAINAGE FACILITIES

ORDINANCE NO. 89-04-09 AN ORDINANCE TO ESTABLISH REGULATIONS AND STANDARDS FOR STORM DRAINAGE FACILITIES Bill No. 86-13 ORDINANCE NO. 89-04-09 AN ORDINANCE TO ESTABLISH REGULATIONS AND STANDARDS FOR STORM DRAINAGE FACILITIES The Berkeley County Council hereby adopts the following provisions: 1) Definitions

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Anne Arundel County s Watershed Protection and Restoration Program STORMWATER REMEDIATION FEE CREDIT POLICY AND GUIDANCE (Multi-Family,

Anne Arundel County s Watershed Protection and Restoration Program STORMWATER REMEDIATION FEE CREDIT POLICY AND GUIDANCE (Multi-Family, s Watershed Protection and Restoration Program STORMWATER REMEDIATION FEE CREDIT POLICY AND GUIDANCE (Multi-Family, Non-Residential and/or Residential Properties with an Inspection and Maintenance Agreement

More information

ORDINANCE NO. 2013 -

ORDINANCE NO. 2013 - ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION

More information

A. General Information

A. General Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Massachusetts Department of Environmental Protection WPA Form 3 Notice of Intent

More information

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL FOREWORD This document contains the basis for NOAA and EPA s decision to fully approve Massachusetts Coastal Nonpoint

More information

Low Impact Development

Low Impact Development Low Impact Development for Linear Transportation Projects Disclaimer This project was developed through an Assistance Agreement under the U.S. EPA Office of Water 104 b(3) Program. It is intended for use

More information

Homeowner s Guide to Drainage

Homeowner s Guide to Drainage Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage

More information

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS June 27, 2011 Chapter 9 Storm Drainage Design and Stormwater Quality Regulations Table of Contents CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS Table of Contents Chapter 9 Storm Drainage

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

FY 2015-16 Springs Funding Projects

FY 2015-16 Springs Funding Projects FY 2015-16 Springs Funding Projects Spring Homosassa Springs Project Name and Description Garcia Point Septic Project: Through the connection of 88 residential septic systems to Citrus County s central

More information

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

APPLICATION PROCESS FOR LAND DISTURBING PERMIT PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing

More information

ORDINANCE. BE IT ORDAINED by the Board of Commissioners of Bibb County, Georgia, and it is hereby ordained by authority of the same as follows:

ORDINANCE. BE IT ORDAINED by the Board of Commissioners of Bibb County, Georgia, and it is hereby ordained by authority of the same as follows: ORDINANCE AN ORDINANCE OF THE BOARD OF COMMISSIONERS OF BIBB COUNTY, GEORGIA TO AMEND THE BIBB COUNTY CODE OF ORDINANCES BY DELETING CHAPTER 15.5 STORMWATER MANAGEMENT IN ENTIRETY AND REPLACING IT WITH

More information

Scheduling Maintenance for Infiltration Basins and Trenches

Scheduling Maintenance for Infiltration Basins and Trenches Visual Inspection for Infiltration Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT

RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT CHAPTER 14 RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT Grace Johns and Lisa A. McDonald Economic analysis methods have been used in Florida to identify positive

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer Background San Antonio, the seventh largest city in the United States, covers approximately 515 square miles of Bexar County in south central Texas.

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12 CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc. Incorporating LID Stormwater Management Practices and Ecological Restoration on Redevelopment Properties Presented to LID Conference Philadelphia, Sept 2011 Presented by Dani Wise Johnson Vanasse Hangen

More information

REGULATORY GUIDANCE LETTER

REGULATORY GUIDANCE LETTER REGULATORY GUIDANCE LETTER. 07-02 Date: July 4, 2007 SUBJECT: Exemptions for Construction or Maintenance of Irrigation Ditches and Maintenance of Drainage Ditches Under Section 404 of Clean Water Act 1.

More information

7.0 Stream Restoration

7.0 Stream Restoration 7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

DRAINAGE SERVICE CHARGES

DRAINAGE SERVICE CHARGES DRAINAGE SERVICE CHARGES Louisville and Jefferson County Metropolitan Sewer District 700 West Liberty Street Louisville, Kentucky 40203-1913 EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2013 A

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

Stormwater Drainage Design for Parking Lots

Stormwater Drainage Design for Parking Lots PDHonline Course C201 (4 PDH) Stormwater Drainage Design for Parking Lots 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org www.pdhcenter.com

More information

Mission Canyon Residential Design Guidelines Workshop. Table Focus: Environmental Issues and Concerns

Mission Canyon Residential Design Guidelines Workshop. Table Focus: Environmental Issues and Concerns Mission Canyon Residential Design Guidelines Workshop Table Focus: Environmental Issues and Concerns Grading How is Grading Regulated in Santa Barbara County? The technical aspects of grading are regulated

More information

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL March 2008 A note to recipients of the Charlotte-Mecklenburg Storm Water Services Credit Application Manual: This is the second

More information

CHAPTER 28.1 -- STORM WATER MANAGEMENT DIVISION 1

CHAPTER 28.1 -- STORM WATER MANAGEMENT DIVISION 1 CHAPTER 28.1 -- STORM WATER MANAGEMENT DIVISION 1 Section 28.1-1. Purpose and Policy: GENERAL PROVISIONS a) This chapter sets forth uniform requirements for storm water management systems within the and