1 Incorporating LID Stormwater Management Practices and Ecological Restoration on Redevelopment Properties Presented to LID Conference Philadelphia, Sept 2011 Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.

2 Considerations for Stormwater Management on Redevelopment Properties Site-specific issues and treatment options Design not one size fits all Extensive site investigations required to properly address site characteristics (drainage patterns, soils, contaminants, ground water, etc) Challenges related to stormwater treatment Limited infiltration opportunities (soils) Land cost high Physical lack of space Existing soil/groundwater contamination

3 Considerations for Ecological Restoration on Redevelopment Properties Site-specific issues and restoration options Design not one size fits all Extensive site investigations required to properly address site characteristics (drainage patterns, soils, contaminants, ground water, etc) Challenges related to restoring streams, wetlands, and other habitats Land cost high Physical lack of space Existing soil/groundwater contamination Funding for such projects

4 Approach: Integrated Stormwater Management Practices Master Planning Look for opportunities to implement run-off capture/treatment and re-use in planning stages Utilize a Tiered Approach if necessary/possible Utilizing more than one practice for additional treatment, particularly when infiltration into groundwater limited Landscaping as Infrastructure Carried over into the restoration/creation of ecologically sensitive areas: stream corridors, wetlands, riparian buffers, etc. Green Fingers Requires Planners, Engineers, and Environmental Scientists to work TOGETHER

5 Supports Ecological Restoration Efforts Meets Regulatory Requirements Current and Future Low Impact Development Stormwater Management Practices Considers Site Constraints Utilities, Roads, Buildings Improves Site Aesthetics Consider End User and Marketability

6 University of Delaware: Science and Technology Campus (STC) Previously a Chrysler Plant (~ ) Over 80% Impervious Adjacent University properties include College of Agriculture & Natural Resources Christina River Watershed, Newark, DE Piped perennial stream across property Brownfields site 50 Year Master Plan

7

8 STC Stormwater Considerations Existing Condition: Site predominately impervious Little known about existing infrastructure (underground utilities) Very low time of concentration during storm events Need to address existing and upcoming stormwater regulations as site Master Plan is developed Stream daylighting options need to incorporate stormwater practices Results of Brownfields investigation will influence location and design of practices

9 Silver Brook today..

10 Status of Evaluation of the Daylighting of Silver Brook Analyzed historical conditions and available data Appreciation for previous condition of Silver Brook and its significance in the landscape Conducted site visit to assess current conditions of stream on the STC; also visited the upstream and downstream portions of the drainage Met with Water Resources Agency/Stakeholders to discuss their knowledge of the watershed, relevant data they have available, and potential for funding sources for restoration Evaluate the pro & cons of daylighting or not daylighting the channel Coordinate efforts with the Brownfields investigation to aid in conceptual plans for stream and floodplain placement

11

12 Considerations for Daylighting Silver Brook Provide green-space within the STC Create visual barrier between E & W Create aquatic and terrestrial habitat Create floodplain providing various storm water treatment options Create area for recreation and greenway Improve water quality Provide location for various research opportunities for UD Faculty and students Cost of restoration, particularly with risk of contaminated soil treatment/removal Cost related to stream crossings (auto and pedestrian) 100yr floodplain - regulated

13 Considerations of not daylighting Silver Brook Stream would remain in culvert on property No constraints related to 100 yr floodplain boundary Property more accessible No greenspace onsite/connection to off-site parks Disappointment of local citizens Require all storm water treatment occur in other areas on property Potential issues with integrity of existing culvert

14 Expanding on Ecological Aspects Re-opening the piped channel restores a once free-flowing stream and vastly improves the ecological condition of the stream itself as well as the adjacent landscape Provides a sink for sediment, nutrients and other pollutants entering the drainage upstream of the STC. In support of UD Climate Action Plan and Sustainability goals Connects the green-space to the north (Prichard Park) and to the Christina River riparian area (Rittenhouse Park) to the south Improves the water quality of Silver Brook prior to its confluence with the Christina River ( trout fishery) - 303d listed river with TMDLs in place

15 University of Delaware School of Agriculture Science and Technology Campus University of Delaware Athletics

16 Dickey Park LID and Ecological Restoration in Redevelopment West Park Place Elementary Lewis Park White Chapel Park Phillips Park University of Delaware School of Agriculture Devon Park Science and Technology Campus University of Delaware Athletics Christina Creek Robscott Manor Rittenhouse Park

17 Dickey Park LID and Ecological Restoration in Redevelopment West Park Place Elementary Lewis Park White Chapel Park Phillips Park University of Delaware School of Agriculture Devon Park Science and Technology Campus 100 Floodplain University of Delaware Athletics Christina Creek Robscott Manor Rittenhouse Park

18 Master Plan Stormwater Management/Ecological Restoration Integration of innovative stormwater practices throughout the STC can offer multiple benefits Incorporate BMPs into landscaping rather than set aside valuable real estate for large scale (regional) approaches Naturally lends itself to creating these green corridors or fingers If soil contamination is an issue in a particular area, stormwater facilities can be installed to prevent mixing with groundwater Opportunity for incorporation of newly designed practices and monitoring for research and learning opportunities Needs to allow for PHASED DEVELOPMENT but with whole site plan in mind Sustainability Approach UD Path to Prominence

19

20

21

22

23

24

25

26

27 PRECEDENTS: STORMWATER STREETSCAPES

28

29

30

31

32

33 DNREC Stormwater Management Regulations City of Newark is the Delegated Agency for most UD projects DNREC is Delegated Agency for S&TC because it is in the Brownfield Program Current Regulations: Quantity: post-development peak cannot exceed pre-development peak for 2, 10 and 100 year frequency storm events Quality: 80% TSS removal as modeled by the Delaware Urban Runoff Management Model (DURMM) Impact on Redevelopment: no quantity management required if reducing impervious, quality management required for all runoff

34 Proposed Regulations (Draft, implemented 2011?) Quantity: Volume control for Resource Protection (1 yr), Conveyance (10 yr) and Flooding (100 yr) Events (promoting recharge and infiltration of 1 year storm) Quality: 80% TSS removal and Nitrogen and Phosphorus reductions consistent with receiving watershed s TMDL requirements (using updated DURMM model) Impact on Redevelopment: As currently drafted: Redeveloped areas shall employ runoff reduction practices to achieve a 20% reduction in the effective imperviousness based on the pre-developed condition.

35 Funding Considerations Grant funding opportunities include local, state, and federal Existing TMDL for Christina River this can open up avenues for funding through EPA 319 program City of Newark securing their NPDES permit (Phase II) and as a result will be required to create and implement a stormwater management plan; Potential for a utility (fee) in the future. Possible funding through cooperation with Research at UD and Water Resources Agency Willingness to utilize more progressive storm water BMPs and emphasize sustainability will aid in securing public funding Brownfields Remediation funding

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area

Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager crayburn@atlantaga.gov Stormwater

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management 40 slide sample of Presentation Please contact mhoalton@pacewater.com if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated

More information

MS4 Municipal Stormwater Compliance: Pollutant Removal through Floodplain Restoration / Reconnection Villanova Urban Stormwater Partnership

MS4 Municipal Stormwater Compliance: Pollutant Removal through Floodplain Restoration / Reconnection Villanova Urban Stormwater Partnership MS4 Municipal Stormwater Compliance: Pollutant Removal through Floodplain Restoration / Reconnection Villanova Urban Stormwater Partnership Pennsylvania Stormwater Symposium 2015 Today s Session Municipal

More information

Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets

Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets SUPPORTING INFORMATION ASSOCIATED WITH THE ALLOCATION PRIORITIES FOR CLEAN WATER FUND BOARD Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets 1 Agriculture AAFM On-Farm Implementation

More information

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE 12-O-1761 AN ORDINANCE TO AMEND VARIOUS SECTIONS OF CHAPTER 74, ARTICLE X OF THE CITY OF ATLANTA CODE OF ORDINANCES FOR THE PURPOSE OF PROMOTING GREEN

More information

Section 4 General Strategies and Tools

Section 4 General Strategies and Tools Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General

More information

Georgia Coastal Stormwater Supplement April 2009

Georgia Coastal Stormwater Supplement April 2009 9.0 Local Post-Construction Stormwater Management Programs 9.1 Overview Prior to the 1980s, stormwater management was synonymous with flood control. Postconstruction stormwater management systems consisted

More information

CWSRF Project Descriptions and Examples for Green Project Reserve

CWSRF Project Descriptions and Examples for Green Project Reserve CWSRF Project Descriptions and Examples for Green Project Reserve I. Water Efficiency a. Water efficiency is the use of improved technologies and practices to deliver equal or better services with less

More information

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST APPENDIX A: STORMWATER MANAGEMENT CHECKLIST The first thing that applicants and designers must do before beginning a project is to make sure they are familiar with the 11 minimum standards listed in Manual

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT Contacts: Barry Chilibeck (666-3765) or Megan Sterling (666-2322) Revision 4

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

Greater Los Angeles County Region

Greater Los Angeles County Region Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this

More information

Protecting Floodplain. While Reducing Flood Losses

Protecting Floodplain. While Reducing Flood Losses Protecting Floodplain Natural and Beneficial i Functions While Reducing Flood Losses Jon Kusler Association of State Wetland Managers 518 872 1804; jon.kusler@aswm.org Report available at: http://aswm.org/pdf_lib/nbf.pdf

More information

Green Spaces to Improve Waterways and Communities

Green Spaces to Improve Waterways and Communities Green Spaces to Improve Waterways and Communities Thomas M. Evans, ASLA LEED AP Green Infrastructure Design Services Director Cleveland, Ohio Northern Michigan Green Infrastructure Conference June 4, 2015

More information

Environment Virginia Conference April 6, 2011. Integrating Stormwater, Urban Design, and Growth Policies

Environment Virginia Conference April 6, 2011. Integrating Stormwater, Urban Design, and Growth Policies Environment Virginia Conference April 6, 2011 Integrating Stormwater, Urban Design, and Growth Policies Integrating Stormwater, Urban Design, and Growth Policies Sara Hollberg, AICP, Valley Conservation

More information

Summary: Introduction

Summary: Introduction Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with

More information

Low Impact Development

Low Impact Development Low Impact Development for Linear Transportation Projects Disclaimer This project was developed through an Assistance Agreement under the U.S. EPA Office of Water 104 b(3) Program. It is intended for use

More information

Re-plumbing the Chesapeake Watershed: Improving roadside ditch management to meet TMDL Goals

Re-plumbing the Chesapeake Watershed: Improving roadside ditch management to meet TMDL Goals Dr. Kathy Boomer, The Nature Conservancy Dr. Rebecca Schneider, Cornell, NY Re-plumbing the Chesapeake Watershed: Improving roadside ditch management to meet TMDL Goals Workshop Findings and Recommendations

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

Flood Damage Prevention in Delaware County, NY

Flood Damage Prevention in Delaware County, NY Flood Damage Prevention in Delaware County, NY Susquehanna Basin 2 Villages, 8 Hamlets Schoharie Basin 1 Hamlet Cannonsville Basin 4 Villages, 6 Hamlets Pepacton Basin 2 Villages, 6 Hamlets Upper Delaware

More information

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer Novatech 2010, the 7th international conference on sustainable techniques and strategies in urban

More information

CHAPTER II SURFACE WATER MANAGEMENT ELEMENT

CHAPTER II SURFACE WATER MANAGEMENT ELEMENT CHAPTER II TABLE OF CONTENTS Objective 1-Master Stormwater Management Plan Implementation... 1 Objective 2- Meeting Future Needs... 5 Objective 3- Concurrency Management... 6 Objective 4- Natural Drainage

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network

Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs Tom Schueler Chesapeake Stormwater Network Recent Expert Panels 1. Stormwater Retrofit Practices 2. New State Performance Standards

More information

7.0 Stream Restoration

7.0 Stream Restoration 7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Wetland study slide Water Quality NRE goals in watershed plans Protect habitat that remains.

More information

~Pennsylvania Campaign for Clean Water~ Stormwater Workgroup

~Pennsylvania Campaign for Clean Water~ Stormwater Workgroup c/o Liz Deardorff, co-chair 1845 Market Street, Suite 206 Camp Hill, PA 17011 LDeardorff@AmericanRivers.org April 30, 2015 Sally Claggett Chesapeake Bay Program U.S. Environmental Protection Agency 410

More information

6 Use of Low Impact Development Techniques in an Urbanized Watershed Infill and Retrofit Applications

6 Use of Low Impact Development Techniques in an Urbanized Watershed Infill and Retrofit Applications 6 Use of Low Impact Development Techniques in an Urbanized Watershed Infill and Retrofit Applications David Pohl, Ph.D., P.E. Weston Solutions, Inc. Presentation Outline Storm Water Regulatory Overview

More information

Post Construction Stormwater Management Checklist Program

Post Construction Stormwater Management Checklist Program Post Construction Stormwater Management Checklist Program Anahid Damerau, CPESC, CPSWQ Christopher Smith, P.E. Department of Environmental Protection Stormwater Section Watershed Management Program The

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Fundamentals. Management. of Urban Runoff. Technical and Institutional Issues. 2 nd Edition 2007

Fundamentals. Management. of Urban Runoff. Technical and Institutional Issues. 2 nd Edition 2007 Fundamentals of Urban Runoff Management Technical and Institutional Issues 2 nd Edition 2007 Earl Shaver Richard Horner Joseph Skupien Chris May Graeme Ridley Fundamentals of Urban Runoff Management: Technical

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Stormwater Credit Open House Q&A

Stormwater Credit Open House Q&A Stormwater Credit Open House Q&A Stormwater Charge Project GENERAL INFORMATION AND APPLICATION PROCESS FOR STORMWATER CREDITS Question: What is the response time for an application - 30 business days or

More information

Integrated Restoration Prioritization

Integrated Restoration Prioritization Integrated Restoration Prioritization Habitat Restoration and Environmental Monitoring Projects Section Restoration Services Division Definition Restoration Prioritization is a process of combining various

More information

ATTACHMENT 7. CWSRF Project Descriptions and Examples for Green Project Reserve

ATTACHMENT 7. CWSRF Project Descriptions and Examples for Green Project Reserve Attachments 7 and 8 are from the American Recovery and Reinvestment Act Guidance, produced March 2, 2009 by the U.S. EPA Office of Water. Attachments 7 and 8 specifically address the 20% Green Project

More information

Official OPP Overall Penn State Stormwater Program Latest Revision/Review: 5/28/2015

Official OPP Overall Penn State Stormwater Program Latest Revision/Review: 5/28/2015 Official OPP Latest Revision/Review: 5/28/2015 Link to Penn State s Stormwater homepage: http://www.opp.psu.edu/services/stormwater ARTICLE 1 - GENERAL 1.1 Intent Since the passage of the Clean Water Act,

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

Wetlands and Climate Change: Considerations for Wetland Program Managers

Wetlands and Climate Change: Considerations for Wetland Program Managers Wetlands and Climate Change: Considerations for Wetland Program Managers Association of State Wetland Managers July 2015 1 Wetlands and Climate Change: Considerations for Wetland Program Managers Association

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning

More information

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL FOREWORD This document contains the basis for NOAA and EPA s decision to fully approve Massachusetts Coastal Nonpoint

More information

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent

More information

The Eight Tools of Watershed Protection. Tom Schueler Center for Watershed Protection EPA Webcast

The Eight Tools of Watershed Protection. Tom Schueler Center for Watershed Protection EPA Webcast The Eight Tools of Watershed Protection Tom Schueler Center for Watershed Protection EPA Webcast 1 About the Center for Watershed Protection Non-profit 501(c)3, non-advocacy organization Work with watershed

More information

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN May 2010 Prepared by for the Execubve Summary The Chehalis Basin experienced catastrophic flooding in 2007 and 2009. In response, the

More information

Joel Tillery, P.E., CH2M HILL. SESWA 2010 Annual Conference October 7, 2010

Joel Tillery, P.E., CH2M HILL. SESWA 2010 Annual Conference October 7, 2010 Joel Tillery, P.E., CH2M HILL SESWA 2010 Annual Conference October 7, 2010 The need for water quality improvement is a reason to play the game. Local governments dealt a variety of federal, state, and

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS

Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS Triple Bottom Line Analysis for Green Infrastructure A Case Study Imagine 1 25 June the 2013 result Learning Objectives Explain Green Infrastructure (GI) as a strategy for stormwater management Describe

More information

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161 Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.

More information

Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH

Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH Project Background In November of 2013 the Green Infrastructure for Sustainable Coastal Communities (GISCC) project

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 15.1 STORM DRAINAGE 15.1

MOUNTAIN HOUSE SPECIFIC PLAN I 15.1 STORM DRAINAGE 15.1 CHAPTER FIFTEEN: STORM DRAINAGE AND FLOOD PROTECTION 15.1 STORM DRAINAGE 15.1 15.1.1 Introduction 15.1 15.1.2 Analysis and Design Criteria 15.1 15.1.3 Off-Site Drainage 15.1 15.1.4 Primary Storm Drain

More information

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding New York State Water Resources Institute Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding Emily Vail Hudson River Estuary Program NYS Department of Environmental Conservation

More information

7 Glossary and Acronyms

7 Glossary and Acronyms 7 Glossary and Acronyms Glossary A Armor-in-Place: Restoration technique intended to help stream banks withstand high flows from altered hydrology. Armor can consist of hard elements such as concrete,

More information

STORMWATER AND URBAN DESIGN

STORMWATER AND URBAN DESIGN STORMWATER AND URBAN DESIGN Atlanta BeltLine Fall 2012 DESIGN + RESEARCH Urban Design Strategies for Four Sites on the Atlanta BeltLine Maddox Park, Boone Blvd and Proctor Creek Ansley Mall and the Clear

More information

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies SECTION A: Climate Change 1. Ensure that climate change impacts are addressed in long range plans and in the review

More information

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Eric Loucks, P.E., D.WRE Kumar Gali, P.E. June 4, 2015 Outline MMSD Service Area Problem and Challenges Solution

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Urban Stream Restoration Implementation Auburn, AL March 13-14

Urban Stream Restoration Implementation Auburn, AL March 13-14 Urban Stream Restoration Implementation Auburn, AL March 13-14 Thank you sponsors and partners: City of Auburn, Alabama Department of Transportation, Alabama Department of Environmental Management, Auburn

More information

SECTION 9J-5.011 STORMWATER MANAGEMENT ELEMENT

SECTION 9J-5.011 STORMWATER MANAGEMENT ELEMENT SECTION 9J-5.011 STORMWATER MANAGEMENT ELEMENT CONTENTS PAGE I. INTRODUCTION... 1 II. DATA... 14 A. Regulatory Framework... 14 B. Existing Conditions... 16 III ANALYSIS... 28 A. Level of Service... 28

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Introductions Brett Long, PE Project Permitting & Construction Oversight Chris Streb, PE Project Designer & Construction Oversight Assistance WHO WE ARE

More information

Fairlington Community Center

Fairlington Community Center Williamsburg Boulevard Green Street Project June 13, 2012 Williamsburg Middle School Relevant Outreach November 12, 2008: Introduction to Little Pimmit Run Watershed Retrofits Workshop, Yorktown High School

More information

Door County. Zoning. Does the ordinance include shoreland-wetland district requirements that exceed State minimum standards? Yes. See responses below.

Door County. Zoning. Does the ordinance include shoreland-wetland district requirements that exceed State minimum standards? Yes. See responses below. Door County Zoning Introduction Door County has a comprehensive Zoning Ordinance that contains wetland conservation provisions. Shoreland-Wetland zoning provisions are enforced in all unincorporated areas

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

Backyard Buffers. Protecting Habitat and Water Quality

Backyard Buffers. Protecting Habitat and Water Quality Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities

Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities Presented by: Interlocking Concrete Pavement Institute The Low Impact Development Center,

More information

Backyard Buffers that Work for People and Nature by Restoring Ecological Function

Backyard Buffers that Work for People and Nature by Restoring Ecological Function Backyard Buffers that Work for People and Nature by Restoring Ecological Function What is a Wetland Buffer? A wetland buffer is a simple land management practice that is employed by municipalities to protect

More information

BALTIMORE COUNTY. Phase II Watershed Implementation Plan

BALTIMORE COUNTY. Phase II Watershed Implementation Plan BALTIMORE COUNTY Phase II Watershed Implementation Plan July 2, 2012 Vincent J. Gardina, Director Department of Environmental Protection and Sustainability CHAPTER 1 OVERVIEW OF THE BALTIMORE COUNTY PHASE

More information

Low Impact Development (LID) is an innovative approach to stormwater

Low Impact Development (LID) is an innovative approach to stormwater CHAPTER 2 The Benefits of Low Impact Development Low Impact Development (LID) is an innovative approach to stormwater management that is based upon the principle of managing rainfall at the source. The

More information

Baltimore County Stream Restoration Improves Quality of Life

Baltimore County Stream Restoration Improves Quality of Life Baltimore County Stream Restoration Improves Quality of Life Baltimore County, Maryland, faces a challenge common to most areas experiencing urban growth: how to keep its waterways stable and healthy for

More information

Sustainability Brief: Water Quality and Watershed Integrity

Sustainability Brief: Water Quality and Watershed Integrity Sustainability Brief: and Watershed Integrity New Jersey depends on water resources for the health of our people, the strength of our economy, and the vitality of our ecosystems. The quality of our water

More information

Floodplain Restoration and Storm Water Management: Guidance and Case Study

Floodplain Restoration and Storm Water Management: Guidance and Case Study Floodplain Restoration and Storm Water Management: Guidance and Case Study Prepared by: Chagrin River Watershed Partners, Inc. P.O. Box 229 Willoughby, Ohio 44094 (440) 975-3870 (440) 975-3865 (fax) www.crwp.org

More information

Shooks Run Drainage Study Basic Terminology

Shooks Run Drainage Study Basic Terminology Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs

More information

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007 Use of Green Roofs to Meet New Development Runoff Requirements Greg Davis Nov. 8, 2007 Why green roof? Absorption of precipitation Increased insulation Reduced urban heat island effect Pollutant removal

More information

Massachusetts DEP Stormwater Management Regulations 2008 Changes Client Update Seminar June 18, 2008

Massachusetts DEP Stormwater Management Regulations 2008 Changes Client Update Seminar June 18, 2008 Massachusetts DEP Stormwater Management Regulations 2008 Changes Client Update Seminar June 18, 2008 Bethany Eisenberg Director of Stormwater Services, VHB Watertown, MA 617-924-1770 beisenberg@vhb.com

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study TITLE: [Name of municipality] Storm Water Abatement Feasibility Study PROBLEM/NEED: [Name of watershed] is an area of [##] acres, surrounding [name of waterbody]. [Name of waterbody] has been assessed

More information

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association

More information

Please click on the tutorial most fitting of your expertise in order to learn about the features of the visualization tool.

Please click on the tutorial most fitting of your expertise in order to learn about the features of the visualization tool. Introduction Welcome to the Indian Creek Conservation Reserve Program (CRP) visualization tool. This tool was developed by the University of Iowa - Institute for Hydroscience and Research (IIHR) as part

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

NOAA/EPA DECISIONS ON CONDITIONS FOR THE NEW JERSEY COASTAL NONPOINT PROGRAM

NOAA/EPA DECISIONS ON CONDITIONS FOR THE NEW JERSEY COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS FOR THE NEW JERSEY COASTAL NONPOINT PROGRAM FOREWORD This document contains the basis for the decision by NOAA and EPA (Federal Agencies) to fully approve New Jersey s

More information

Draft Photo Documentation Update for Proposition 13 Grant Agreement No. San Diego Region McClellan-Palomar Airport Water Quality Treatment Facility

Draft Photo Documentation Update for Proposition 13 Grant Agreement No. San Diego Region McClellan-Palomar Airport Water Quality Treatment Facility Draft Photo Documentation Update for Proposition 13 Grant Agreement No. San Diego Region McClellan-Palomar Airport Water Quality Treatment Facility Prepared For: County of San Diego DPW 555 South Overland

More information

Advice for the provision of surface water drainage systems for new developments

Advice for the provision of surface water drainage systems for new developments www.centralbedfordshire.gov.uk 1 Advice for the provision of surface water drainage systems for new developments Central Bedfordshire Council, April 2015 This guidance note if for anyone wishing to submit

More information

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.

More information

The International Stormwater BMP Database Part 1: Summary of Database

The International Stormwater BMP Database Part 1: Summary of Database Land Development Brief: February 2013 The Pennsylvania Housing Research Center The International Stormwater BMP Database Part 1: Summary of Database Katherine L. Blansett, Ph.D., P.E. INTRODUCTION This

More information

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: obropta@envsci.rutgers.edu

More information

DNREC comments on Town of Cheswold Comp Plan

DNREC comments on Town of Cheswold Comp Plan DNREC comments on Town of Cheswold Comp Plan There are sensitive wetlands, forested areas, rare wildlife and plant species, and unique natural vegetative communities that occur within current Town boundaries

More information

Making San Francisco A Water Sensitive City Urban Watershed Management Program October 25, 2011

Making San Francisco A Water Sensitive City Urban Watershed Management Program October 25, 2011 Making San Francisco A Water Sensitive City Urban Watershed Management Program October 25, 2011 Outline San Francisco Context Drivers of Change Emerging Paradigm LID Program Goals Mechanisms for Change

More information

NAPA COUNTY WATERSHED SYMPOSIUM

NAPA COUNTY WATERSHED SYMPOSIUM Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath