COMPREHENSIVE WATER LOSS CONTROL PROGRAM: NAGPUR (INDIA) Dinesh Rathi

Size: px
Start display at page:

Download "COMPREHENSIVE WATER LOSS CONTROL PROGRAM: NAGPUR (INDIA) Dinesh Rathi"

Transcription

1 ACHIEVING 24X7 WATER SUPPLIES THROUGH COMPREHENSIVE WATER LOSS CONTROL PROGRAM: NAGPUR (INDIA) Dinesh Rathi 1

2 Nagpur Water Supply Population 2.5 million in 217 sq km 530 mld of water supply ( 210 lpcd) 225 Thousand connections 2100 km of distribution network 31 water districts 41 service reservoirs 5 water treatment plants 2

3 Equitable Water Distribution-2005

4 4

5 5

6 NAGPUR WATER SUPPLY: Status before JNNURM Measurement Losses 125 mld Losses 20 mld 235 mld Commercial losses/ theft/metering error Losses In canal Raw water Purchase 625 mld TREATMENT 500 mld Distribution 480 mld Recovery 200 mld 140 mld SYSTEM EFFICIENCY : 32% Annual Loss (W/O Dep): Rs 56 crore With Depreciation : Rs 75 crore (appx) Physical losses Collection Losses 45mld

7 Water sector Challenges: NMC Water Losses and UFW Equitable distribution (Alternate day / 20 hrs/day) Accountability Water to Slums (inefficient i system) Water network coverage and inadequacy of network Water supply management during summer peak demand Old and inefficient assets Delay in capacity augmentation ti for future demand d from Limited water sources. Capital availability Low water tariff and Poor billing mechanism. Lack of professional approach.

8 Vicious circle Inadequate maintenance of existing assets Lack of operational expertise High UFW Strain on Water Resources Tariffs not rational Unsatisfied demand Poor cost recovery AUGMENTATIO N Strain on water resources Additional capital expenditure MISMATCH BETWEEN INCREASING NEEDS & DECREASING RESOURCES FUNDING BURDEN ON STATE FUNDING CONSTRAINTS THROUGH COMMERCIAL SOURCES BWSSB-NOV '96

9 WATER AUDIT FACTS WATER AUDIT IDENTIFIES HOW MUCH WATER IS LOST AND WHAT IS THE COST OF THAT LOSS. FACT-1 : NOT ALL WATER SUPPLIED BY NMC REACHES THE CUSTOMER FACT-2 : NOT ALL OF THE WATER THAT REACHES THE END USER IS PROPERLY MEASURED OR PAID FOR.

10 Pressure Reduction National norm is 8 12 m, actual m Minimum Night flow Supply hours are in night to individual id storage tank Metering errors 90% meters are non working Real losses Vs Apparent losses You can only guess Leak Detection Technology Kindly let me know the technology which detect leak at 5 m pressure at underground pp pipe IWA Methodology or AWWA M36???

11 Water Efficiency Supply Side Efficiency Demand Side Efficiency Water Audit Energy Audit Tl Telescopic Wt Water Tariff with cost recovery Billing & Collection Pumping Treatment Transport Storage Distribution Consumer Connection Metering Customer Management & Awareness Slum Policy for Water Supply

12 Reforms for Water Sector Ring fencing By formation of NESL Accounting Cost recovery By Rationalisation of Tariff Functional Financial Double entry Accrual based accounting User charges for cost recovery Meterisation

13 NEED FOR REFORMS IN WATER SECTOR Annual expenditure of Municipal Corporation on water supply : Rs 106 crores Total demand from consumers against water bills: Rs 70.7 crores(deficit ( of Rs 36.5 crores) Total recovery against water bill : Rs 50 crores(arrears of Rs crores) STATEMENT OF WATER BILLING DEMAND TO CONSUMER AND IT S RECOVERY YEAR DEMAND RECEIPT % RECOVERY (IN Rs. CRORES) (IN Rs. CRORES) WATER SUPPLY MLD 370 MLD 490 MLD Municipal Corporation Makes Payment to Irrigation Department for : 540 ml/day (annual avg.) Municipal Corporation Supplies Treated Water to City : 530 ml/day Municipal Corporation Billing to all consumers against water supply: 245 ml/day (annual avg.) Total Water Losses /UFW/ NRW are 291 ml/day i.e. 54 % of supply. OPEX is Rs 3.30/ 1000 WTP ANNUAL ENERGY BILL OF Rs. 28 CRORE /YEAR

14 JNNURM Projects Cost In Rs crore Completi on Outcome to Improve Supply Side Efficiency Leak Detection 3.30 March Flow Meters from source to ESR Reduction in BW UFW to 2% from 23% Water Audit Feb x7 for connection by Sep 09 Replacement of consumer meter Reduction in UFW < 25% in Pilot Energy Audit July 2009 Replacement of All Pumps installed prior to Year 2000 with minimum efficiency of 70% Reduction in system head by 12m for Pench-1 Centralized monitoring system Infrastructure for equitable dist. Expansio n of Network Dec Connectivity to 572 layouts Population over 2.0 lakhs will be covered in piped water network

15 JNNURM Projects Cost In Rs crore Compl etion Outcome to Improve Supply Side Efficiency Kanhan March New Plant of 240 mld and Up 2011 discarding the old plant of 120 gradation mld with Pumps Pench-4 Part-1 Pench-4 Part March March 2011 Replacement of Canal by 2300 mm pipe Additional Raw water of 115 mld from reduction in water losses in canal New WTP of 115 mld at Godhani Trunk main up to MBR Pench March Service Reservoirs 25 nos. Part Feeder Mains 35 Km Pench March Distribution system of 225 Km Part

16 Benefits of Sanctioned Projects Under JNNURM : Water Sector Cost In Rs crore Completi on Outcome to Improve Supply Side Efficiency Total JNNURM Phase (250 m USD) March Total Production Capacity 765 mld to meet demand up to 2021 Rehabilitation R h ti of old Pumps and WTP and reduction in energy cost by 20% 10% of Area will be converted in to 24x7 NIT Phase-1 : Water Supply coverage to 1.5 lakhs Population (EWS/LIG)

17 NAGPUR WATER SUPPLY: Status After Implementation of approved Projects under JNNURM Phase-1 Losses 5 mld 265 mld Commercial losses/ theft/metering error Raw water Transmission by Pipe TREATMENT 535 mld Distribution 530 mld Recovery 220 mld Benefits after partial Implementation System Efficiency : 41% from 32% Physical losses Collection Losses 45mld Reduced financial losses by tariff revision Increased water supply to distribution by 40 mld Need much more to improve technical & commercial efficiency in distribution system

18 Strategy For Water Loss Control Water Audit ( ) Identification of the Water Losses (Technical & Commercial ) Leak Detection in Bulk water system (Supported by JNNURM) Installation of Flow Meters (Supported by JNNURM) Reduction in Raw water transmission losses (Supported by JNNURM) Pilot & DMA for Leak Detection ( ) Pilot of 24x7 water supply project to reduce UFW in Distribution System (Supported by JNNURM) DMA for leak detection plan to identify the causes (Supported by JNNURM) Full City Rehabilitation Plan ( ) Rehabilitation Plan Based on Water Audit and Pilot /DMA studies (Approved by JNNURM) O & M Strategy t for Sustainability ( ) 2035) Telescopic Tariff for conservation and cost recovery (Revised by General Body) PPP for Technical & Commercial Efficiency through 25 years O & M lease contract ( EOI received from 10 prospective bidders)

19 Pilot 24x7 Pilot Project Feature Connection including slum 10 slum areas Population Contract Study, Rehabilitate, Operate contract with Private operator. Penalty /bonus for targets in UFW, Quality, Customer services and Continuity of supply

20 Temporary Solution by Temporary Contract

21

22

23 House Service Connection

24

25 Near GPO

26 HSC a Major source of Leakages Breakdown of leakages 573, 37% HSC 983, 63% Pipes

27 Source of Losses (Physical + Commercial) House service connection : 63% of reported leak complaint Old conservancy lane / G I Pipes OldL Lead djoints /Valve leaks 70% of non working meters Illegal connections Poor quality of meters Absence of water accounting

28 Pilot 24x7 Project :Baseline for Private Operator KPI Baseline KPI Target KPI UFW level The NRW is assessed at 50% UFW below 30% for proportionate bonus Increase of volume Volume billed for FY = 21,7 Higher than baselines by billed compared to MLD on average. 10% for bonus FY This value shall be used for the costbenefit analysis of the rehabilitation plan. The baseline KPI for the assessment of bonus/penalties during O&M will be based on FY data. Continuity of 2to24hoursdepending on the area of 24/7 throughout the zone supply supply with minimum 2m pressure at customer tap Water Quality 63% of samples tested had a residual Residual chlorine higher chlorine level higher than 0,2 ppm than 0,2 ppm Time for handling customer complaints Not applicable Within 3 days

29 Rehabilitation Plan for Pilot 24x7 Replacement of 100% House service connection & Meters Replacement of old conservancy GI pipe Rehabilitation of Tertiary network Hydraulic modeling as per Master plan Installation of new billing system Customer Facility centre

30 Water Efficiency Targets Technical Efficiency : Ratio of Volume Billed & Volume Input Commercial Efficiency: i Collection of water charges vs Billed volume 30

31

32 32

33 Conversion in to 24 33

34 34

35 35

36 NRW -44% NRW -17% 36

37 37

38 Project Results Sr Description Before After-Sep09 Remark No ( ) ( ) 1 Number of legal Addition by connection slum + Survey 2 Water Supply in mld 43 mld mld 3 New meter installed Unmetered Connection 1800 slum 5 Volume billed % increase 6 Estimated UFW 44% 17% 7 Converted in 24x7 nil 4300 It provide a Important base for fixing up benchmark for full city 38

39 Improvement in Demand Side Efficiency : Water Tariff for Conservation and Sustainability Water Tariff for full cost recovery for sustainable water business. Subsidized Tariff to Urban poor and low domestic consumption 55 lpcd Tariff at cost for domestic consumption up to 135 lpcd Premium Tariff for domestic consumption beyond 135 lpcd and non domestic usage Indexation with raw water and energy charges. It enable to pass additional cost (70% of operating expenses) directly to consumer as surcharge. Tariffs are sufficient to meet Operating expenses. Earning will be better with operational efficiency and reduction in Non Revenue Water.

40 Catagory Old Tariff /1000 Ltrs New Tariff Tariff Revision Residential Rs 3 to 4 Rs. 8 to 15 for > 8 units per month as per telescopic consumption Remark Minimum charges Replaced by Monthly access charges (Rs 56 for 15mm) Semi Residential NA Rs 8 to 18 >8 units Min access charges are Rs 100 Institutional Rs 12 Rs. 15 to 20 Commercial-1 Rs 20 Rs. 25 to 100 Commercial-2 NA Rs 60 to 540 Mineral water + Cold drink Slum Rs 25 PM Rs. 30 to 80 PM Kaccha, Concrete, Multifloor Indexation NA Energy + Raw water Directly passing to consumer as surcharge Annual Revision i NA 5% to MC and 10% No need to approval to 25% to GB from GOM

41 41

42 42

43 43

44 44

45 45

46 46

47 47

48 48

49 49

50 PPP For Rehabilitation Program for Full City ( 90 m USD) Public Private Partnership Partnership Ownership : NMC Operation: Private Investment: Both NMC to decide Tariff NMC to decide Development Plan for City Pi Private Partner to Operate the system. Private Operator to earn profit through efficiency in Implementation and operations

51 Visible Project Benefits Water Supply Hours Water supply hours was increased from 4.30 hours to 24 hours Water Consumption: The water consumption was 440m3/day for a Bajiprabhu nagar with 4.30 hrs has increased to 24 hrs with 520m3/day and now reduced to 450 m3 of water consumption. With telescopic tariff and billing as per consumption will reduce. Pressure : Before conversion the average pressure at consumer water taps was 2-5 meters and now it reaches to m. It resulted in to energy saving for consumers as water reaches directly to overhead water tank. Quality: The continuous pressurized network has avoided the contamination The continuous pressurized network has avoided the contamination of water from leaking House service connections which were replaced under this project.

52 Visible ibl Project Benefits UFW: The average UFW was 69% in the zone was observed during base line study have been reduced to 33% in DMA of 144 regular connection and about of 150 slum dweller in Bajiprabhu nagar DMA. The UFW will reduce further after completion of slum connection rehabilitation. Commercial losses: Total billing volume was 137 m3/day has been increased to 338 m3/day (286 m3/day to regular consumer and 52 m3/day to slum consumer against nn billing to slum earlier). Lessons learnt: apart from technical lessons provided by demo zone a valuable feedback on consumer handling was learnt from this project will be used in full city 24x7 Water

53 NMC Strategy for Reforms in Water Sector Fixing of Benchmarking and Performance indicators through Water audit, Energy audit & Financial reforms. UFW/NRW reduction program with investment plan Assets Up gradation plan for better serviceability and efficiency Cost reduction program (Energy, Water & O & M Cost) Improvement in services to consumer special emphasis to urban poor Implementation ti of augmentation ti plans with inbuilt ilt efficiencies. i i Low cost Funds / Grant from Jn-NURM/ Tax free bonds/ PPP Performance based contract with 5 to 25 years of O & M with private participation i Rationalization of Water Tariff and Billing with Meterisation. Accountability of NMC towards consumer. Review of water supply master plan with inclusion of water reuse option.. Moving towards Continuous Water Supply in Nagpur

54 NMC Strategy Inadequate maintenance of existing assets Lack of operational expertise High UFW Strain on Water Resources Tariffs not rational MISMATCH BETWEEN INCREASING NEEDS & DECREASING RESOURCES Unsatisfied demand Poor cost recovery STRATEGY REFORMS IN WATER SECTOR INVESTMENT SUPPORT FROM JNNURM IMPLEMENTATION THROUGH PPP MODE FUNDING BURDEN ON NMC/STATE AUGMENTATION Strain on water resources Additional capital expenditure FUNDING CONSTRAINTS THROUGH COMMERCIAL SOURCES BWSSB-NOV '96

55 Implementation Options OPTION-1 : INVEST JNNURM MONEY KEEPING EXISTING MANAGEMENT PRACTICES AS IT IS WITH ASSUMPTION THAT ALL PROBLEMS ARE WITH PUMP AND PIPES. OPTION-2 : INVEST JNNURM FUND IN THE WATER SUPPLY SYSTEM AND IMPROVE THE MANAGEMENT & ACCOUNTABILITY.

56 ASSET UTILIZATION

57 24x7 WATER SUPPLY : OBJECTIVES Water for all and 24 x 7 supplies with focus on safety, equity, and reliability. Continuous water supply at desired pressure. No Contamination of water Reduction in water losses Better Accountability Better Service to Consumer Sustainability of system

58 Why Continuous Water Supply Water Supply Hours Non Supply Hours

59 Investment for Rehabilitation Replacement of House connection Replacement of consumer meters Replacement of deteriorated pipes and fittings Rehabilitation tato of ESR/GSR. Rehabilitation of Pench-II WTP Rehabilitation of Misc component Implementation of Slum Policy

60 Private Participation in Water Sector :Exist in NMC All new assets created since 1999 is managed though service contract. Existing assets also managed thru service contract for Pumping station/ WTP O&M / Valve operations/ Billing distribution/ Annual maintenance contract for Zonal level Disadvantages It is only a labor contract replacing retired employees. No link with performance No accountability towards consumer Short term Contracts break up in small parts with no feasibility for private investment t Contractor motivated for providing short term solution

61 Institutional Arrangement NMC Bylaws Subsidies O&M Customer services Rehabilitation Operator Contract fees per cum Paid volume NESL Service Tariff NMC A/C Water & Sewage Fund Customers Assets Development Raw water Electricity 61

62 Strategy For Water Loss Control Water Audit ( ) Identification of the Water Losses (Technical & Commercial ) Leak Detection in Bulk water system (Supported by JNNURM) Installation of Flow Meters (Supported by JNNURM) Reduction in Raw water transmission losses (Supported by JNNURM) Pilot & DMA for Leak Detection ( ) Pilot of 24x7 water supply project to reduce UFW in Distribution System (Supported by JNNURM) DMA for leak detection plan to identify the causes (Supported by JNNURM) Full City Rehabilitation Plan ( ) Rehabilitation Plan Based on Water Audit and Pilot /DMA studies (Approved by JNNURM) O & M Strategy t for Sustainability ( ) 2035) Telescopic Tariff for conservation and cost recovery (Revised by General Body) PPP for Technical & Commercial Efficiency through 25 years O & M lease contract ( EOI received from 10 prospective bidders)

63 Thank you 63

64 Balancing service standards tariffs and subsidies NO Specify Service Level Yes Satisfied Estimate Cost Implement Set tariff and Subsidies Subsidies in the form of part of expenses (electricity and or RW charges) / sale of surplus bulk water to outside 64

65 Proposed Model Type of Contract Contracting Authority O & M Contract (Asset ownership and sovereign rigths remains with NMC) NMC / NESL Scope of Contract t Integrated t O & M of water supply facilities from raw water to customer meters including Water treatment Duration and possible extension Transmission of treated water and distribution to customers Full customer services including but not limited to: meter installation, reading, billing, revenue collection (and deposit in to NMC a/c) and customer complaints handling. Inclusion : O & M, repairs, replacement, efficiency Exclusions: Expansion, New Projects, Upgradations 25 years. Extension subject to approval from General Body. 65

66 Proposed Model Service Area Pipe network with in NMC limits. i Communities i out side NMC on request of NMC/NESL Integration of existing Progressive full take-over of O&M over the first few years service contracts of the contract after completion of existing contracts For Kanhan & Pench IV, Operator will take over the responsibility of NMC for O & M. Funding of the investments required Funding of the initial 5-year investments under the lease (Approx: 385 crores): 70% grant under JnNURM (if possible) 30% balance from financial institutions and/or private operator Capital investments under the contract Managed by the operator/nmc Remuneration of the operator Fees for each unit (m3) paid by consumer or NMC (free 66 supply, if any) through NESL

67 Services Standards, Tariff & Subsidies, Risks allocation (1/3) Services Standards Network Coverage : 100% coverage within two years for existing distribution area and expansion within NMC limits. Water Quality: Potable water as per CPHEEO norms. Continuity of Water Supply : 12 hours within 3 years 24 hrs within 5 years on a phased manner UFW Target: >25% Customer Complaints : To be attended within stipulated time. 67

68 Allocation of Responsibilities and Risks Business Operator : O&M, Management and partial Investments Responsibilities NMC : Allocation of Risks Decide the level of subsidy versus tariff Establish tariff structure Secure availability of raw water Pay energy bills to energy providers Manage existing JnNURM projects upto WTPs Repay old loans and liabilities Pay subsidies to NESL Operator : Operational and commercial risks Investments risks (partial) NMC : Risk of volatility on energy and raw water Unit Prices Changes in law Investments risks (partial) 68

69 Institutional, legal and contractual issues (1/3) NMC Act NESL set-up Role of the NESL When operator in place Option 1: Make necessary amendments required (if any) to facilitate long term lease agreement Option 2: Frame the agreement within NMC act to meet the desired objectives NMC opted for Option 2 and O & M contract was redrafted as per CNC act. Independent company to be 100% owned by NMC Chairman Mayor, MD Municipal Commissioner, CEO Ex Engr WWD Composition of Board of Director 6 each from officials and elected representative Call for external assistance whenever required (tariff rebasing, auditing, monitoring ) Monitor the key performance indicators Monitor the operator technical and financial performance, its legal and contractual obligations Approve the rebasing of tariff as per contract 69 Make the decision regarding new projects

70 Institutional, legal and contractual issues (2/3) Resolving disputes Procedures & time table shall be strictly regulated in the agreement. For minor dispute, the NESL may take up the decision. Tariff Adjustments Arbitration ti or Court of Law will be next step. Tariff to be determined by NMC Tariff revision on yearly y basis as per approved formulae No link of operator fees with slab and category of consumer. 70

71 Institutional, legal and contractual issues (3/3) Governing law Mechanism for compliance The operator must comply with all Indian laws, regulations, orders and directives that may affect the lease contract Penalties to be applied to the operator in the event of breach of its obligations. Performance bond in favor of NMC to cover the performance failures with respect to the operator obligations. 71

72 Human Resources issues Transfer of staff Subject to mutual consent of NMC staff and operator, NMC staff could be deputed to the operator for the first 120 days of the contract for mobilization period. NO change in employment Before the end of third 120 days, operator will offer regular employment to the selected staff of NMC within 90 days of Personnel integration period after one to one negotiations. Employees will have option to go back to NMC within 180 days of change consolidation period If they do not accept the offer, they will go back to NMC. During deputation of NMC staff to the operator, they will continue to hold their seniority and benefits as per their present employment terms with NMC. During the term of deputation to the operator, NMC staff will be paid by the operator and their salaries and benefits will not be inferior to their existing terms of employment with NMC. 72

73 Selection of operator (1/2) Operator selection Quality Cost Based Selection with: - International pre-qualification process. - Competitive tender among pre-qualified bidders Technical proposal in two stage The technical proposal should include: - Methodology to improve efficiency to upgrade the system to 24x7 - Proposed organization structure & human resources plan - Customer services - Capital investment management - Operation & Maintenance plans Financial proposal after approved second stage technical proposal 73

74 Selection of operator (2/2) Operator selection The Financial Proposal shall include for each bidder: - The fees on paid volume No link with water rate tariff slab and type of consumer In absence of reliable consumer record and billing system (Avg billing) NESL shall assure the minimum pay of 250 mld for first five years. Sovereign Power will remain as function and responsibility of NMC Disconnection of defaulters. Deposit of revenue receipt ( water charges) in to a NMC acct. Tariff decisions Ownership of Municipal Assets Development and Up gradation of facilities. 74

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE Arabian Sea Mumbai KARNATAKA Delhi Chennai Nepal Calcutta Bay of Bengal PRESENTATION Improving the performance of Public Water Utilities A case study of Bangalore By N.C. MUNIYAPPA, Chairman, BWSSB LOCATION

More information

KARNATAKA URBAN WATER SUPPLY & DRAINAGE BOARD BANGALORE WATER SUPPLY MANAGEMENT - A CASE STUDY OF HUBLI-DHARWAD

KARNATAKA URBAN WATER SUPPLY & DRAINAGE BOARD BANGALORE WATER SUPPLY MANAGEMENT - A CASE STUDY OF HUBLI-DHARWAD KARNATAKA URBAN WATER SUPPLY & DRAINAGE BOARD BANGALORE WATER SUPPLY MANAGEMENT - A CASE STUDY OF HUBLI-DHARWAD By K.P. Jayaramu, Executive Engineer, Karnataka Water Board, Jn NURM City Division, Mysore

More information

CITY OF TORONTO WATER LOSS STUDY & PRESSURE MANAGEMENT PILOT

CITY OF TORONTO WATER LOSS STUDY & PRESSURE MANAGEMENT PILOT CITY OF TORONTO WATER LOSS STUDY & PRESSURE MANAGEMENT PILOT Alain M. Lalonde, P.Eng. Principal, Veritec Consulting Inc.* Candice Au, P.Eng. Engineer, Toronto Water, City of Toronto Paul Fanner, C.Eng.

More information

Gharbeya Water and Wastewater Company - Background

Gharbeya Water and Wastewater Company - Background Gharbeya Water and Wastewater Company - Background The Gharbeya company is located in the Delta Population: 4,170,000 Water coverage: 90% Water accounts: 730,000 Wastewater coverage: 35% Wastewater accounts:

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )

More information

SWAN. The Value of Online Water Network Monitoring SUMMARY

SWAN. The Value of Online Water Network Monitoring SUMMARY SWAN S m a r t W a t e r N e t w o r k s F o r u m The Value of Online Water Network Monitoring SUMMARY Online water monitoring is the use of data transmitted from network elements, meters and sensors

More information

Township of Terrace Bay Drinking Water System Financial Plan

Township of Terrace Bay Drinking Water System Financial Plan Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance

More information

Why Smart Water Networks Boost Efficiency

Why Smart Water Networks Boost Efficiency Why Smart Water Networks Boost Efficiency by Jeff M. Miller and Mark Leinmiller Executive summary The Smart Water Network (SWAN) is the water utility industry s equivalent to the energy industry s Smart

More information

Aspects of Energy Efficiency in Water Supply systems

Aspects of Energy Efficiency in Water Supply systems Aspects of Energy Efficiency in Water Supply systems Mordecai Feldman Miya, Tel Aviv, Israel, mordecai.feldman@miya-water.com Keywords: water supply, energy, operation, scheduling, Water loss Abstract

More information

A GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN

A GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN A GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN Florida Department of Economic Opportunity Division of Community Development Bureau of Community Planning September 2007. Revised July

More information

Water Mains Rehabilitation Framework (NI) Northern Ireland Water

Water Mains Rehabilitation Framework (NI) Northern Ireland Water PROJECT: CLIENT: MAIN CONTRACTOR: Water Mains Rehabilitation Framework (NI) Northern Ireland Water Farrans Background Northern Ireland Water manages a water mains infrastructure that supplies 625 million

More information

Water Utility Financial Plan and Rates Study

Water Utility Financial Plan and Rates Study FINAL March 2015 Prepared for City of Fresno, California Water Utility Financial Plan and Rates Study Submitted by F I N A L Water Utility Financial Plan and Rates Study Prepared for City of Fresno, California

More information

Turning Around Public Water Utilities in Financial Stress

Turning Around Public Water Utilities in Financial Stress Turning Around Public Water Utilities in Financial Stress Experience from East Asia by Aldo Baietti Water Week 2005 1 Financial Restructuring Differences Between Public Utilities and Private Enterprises

More information

Type of Contract: Management contract (with design/build responsibilities)

Type of Contract: Management contract (with design/build responsibilities) Parties to the Contract: The Client : Municipality of Podgorica The Contractor Performance Objectives: Operate & maintain water system Manage customer billing & collection Implement 5-year system optimization

More information

7.1 Conservation Programs for Industrial, Commercial, and Institutional Accounts

7.1 Conservation Programs for Industrial, Commercial, and Institutional Accounts Industrial, Commercial, and Institutional Accounts Applicability This BMP is intended for all Municipal Water User Groups ( utility ) which serve industrial, commercial, and institutional ( ICI ) customers.

More information

Community Unit School District 220 4:40 Page 1 of 5

Community Unit School District 220 4:40 Page 1 of 5 Page 1 of 5 DEBT MANAGEMENT The policies set forth in this Debt Management Policy (the Policy ) have been developed to provide guidelines relative to the issuance, sale, statutory compliance, and investment

More information

WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT.

WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. ABSTRACT Steve Shoaf, City Of Asheville Nicholas Dierkes, Brown and Caldwell Understanding how well our Utilities

More information

Water Supply Authority. Regulatory Accounting Guidelines

Water Supply Authority. Regulatory Accounting Guidelines Water Supply Authority Regulatory Accounting Guidelines Edition 2 February 2004 Regulatory Accounting Guidelines Edition 2 February 2004 Contents 1 General... 1 1.1 Background and introduction... 1 1.2

More information

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH Dr. Petros Kolovopoulos (Hydro-Comp Enterprises Ltd, Cyprus), Dr Dinos Constantinides (Hydro-Comp Enterprises Ltd, Cyprus) Key words: Asset Management,

More information

Press Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL

Press Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL Press Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL The revised tariff rates for supply of electricity in the State of Punjab during the year 2014-15 have been determined and the Tariff Orders

More information

Performance Based Service Contracts for Reducing Non Revenue Water

Performance Based Service Contracts for Reducing Non Revenue Water Performance Based Service Contracts for Reducing Non Revenue Water Roland Liemberger Regional Director, Asia I like to thank for all the support during the last four years Scale of the Problem: Global

More information

Chapter 52. Operation of Public Utilities. Article 7. Water and Wastewater Utilities.

Chapter 52. Operation of Public Utilities. Article 7. Water and Wastewater Utilities. Chapter 52. Operation of Public Utilities. Article 7. Water and Wastewater Utilities. 700. Exempt water or wastewater utilities 710. Certificate of public convenience and necessity 715. Public convenience

More information

Real-time Monitoring Platform to Improve the Drinking Water Network Efficiency

Real-time Monitoring Platform to Improve the Drinking Water Network Efficiency Real-time Monitoring Platform to Improve the Drinking Water Network Efficiency SUMMARY Recent advances in real-time water sensing technology have enabled new opportunities for improved assessment and management

More information

Austin Water Utility Joint Committee on AWU s Financial Plan

Austin Water Utility Joint Committee on AWU s Financial Plan Austin Water Utility Joint Committee on AWU s Financial Plan May 7, 2014 1 New Forecast Options Requested by Large Volume Representative Dan Wilcox 4/23/2014 2 Forecast Option #9 Assumptions Spread the

More information

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2006-07 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars

More information

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By ABSTRACT Migdalia Hernandez, City of Sanford P.O. Box

More information

Table of GRI indicators

Table of GRI indicators 2013 Sustainability Report > Table of GRI indicators Table of GRI indicators The following table of GRI-G3.1 indicators includes a brief description of each, reference to the page in the 2013 Sustainability

More information

PROGRAM IMPLEMENTATION SCHEDULE

PROGRAM IMPLEMENTATION SCHEDULE Water Sector Improvement Program (RRP PAL 44031) A. Program Description PROGRAM IMPLEMENTATION SCHEDULE 1. The Program will support reform of the water and sanitation sector, focusing on improving policy

More information

ENERGY COST SAVINGS IN MUNICIPAL WATER PUMPING SYSTEMS-NEED FOR WEB INTERACTIVE TOOL

ENERGY COST SAVINGS IN MUNICIPAL WATER PUMPING SYSTEMS-NEED FOR WEB INTERACTIVE TOOL International Journal of Science, Environment and Technology, Vol. 2, No 5, 2013, 920 929 ISSN 2278-3687 (O) ENERGY COST SAVINGS IN MUNICIPAL WATER PUMPING SYSTEMS-NEED FOR WEB INTERACTIVE TOOL 1 G. RudraNarsimha

More information

How To Improve Water Week

How To Improve Water Week Water Week - Session 24 Building is Easy, Maintaining is Not - 2 NRW Reduction in Developing Countries: The World Bank's Perspective Jan G. Janssens Energy and Water Department The World Bank Washington

More information

The Law of the City of Moscow. No. 30 dated the 30 th of June 2010. On the Chamber of Control and Accounts of Moscow

The Law of the City of Moscow. No. 30 dated the 30 th of June 2010. On the Chamber of Control and Accounts of Moscow The Law of the City of Moscow No. 30 dated the 30 th of June 2010 On the Chamber of Control and Accounts of Moscow In accordance with the federal legislation and the Moscow City Charter, this Law shall

More information

SAMPLE INSURANCE BROKER SERVICE AGREEMENT

SAMPLE INSURANCE BROKER SERVICE AGREEMENT SAMPLE INSURANCE BROKER SERVICE AGREEMENT (For Use By Insurance Brokers in Preparing Service Agreements for Clients Whose 401(k) Plans Are Funded by John Hancock Group Annuity Contracts or, With Respect

More information

SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES

SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES Table of Contents 1st. INTRODUCTION... 3 2nd. ELECTRICITY SECTOR BACKGROUND. 4 3rd. SCOPE OF WORK. 6 PHASE :

More information

Law of Mongolia on Concessions

Law of Mongolia on Concessions Economic Policy Reform and Competitiveness Project April 2005 Ulaanbaatar, Mongolia This publication was produced for review by the United States Agency for International Development The views expressed

More information

TARIFF AND GOVERNANCE ASSESSMENT

TARIFF AND GOVERNANCE ASSESSMENT Power System Expansion and Efficiency Improvement Investment Program (RRP BAN 42378) A. Tariff Assessment 1. Introduction TARIFF AND GOVERNANCE ASSESSMENT 1. Electricity tariffs in Bangladesh are unbundled

More information

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION Sheet 1 Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services from the Distribution Company, with the exception of

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

Town of Silver Plume Drawer F Silver Plume, CO 80476

Town of Silver Plume Drawer F Silver Plume, CO 80476 Town of Silver Plume Drawer F Silver Plume, CO 80476 RESOLUTION 2013-5 RESOLUTION TO SET WATER AND SEWER RATES FOR CALENDAR YEAR 2014 A RESOLUTION ESTABLISHING RATES FOR WATER AND SEWER SERVICE FOR USERS

More information

AMRITSAR CITY DEVELOPMENT PLAN. Appraisal Report (Summary)

AMRITSAR CITY DEVELOPMENT PLAN. Appraisal Report (Summary) AMRITSAR CITY DEVELOPMENT PLAN Appraisal Report (Summary) General: The City Development Plan for Amritsar has been prepared very well. The revised report is comprehensive and has incorporated relevant

More information

ANALYZING BANK PERFORMANCE

ANALYZING BANK PERFORMANCE ANALYZING BANK PERFORMANCE The Balance Sheet PNC Bank vs Community National Bank Asset selection - liquidity loans vs investments types of loans Sources of funds - equity vs liabilities checkable deposits

More information

SWAN. The Value of Online Water Network Monitoring SUMMARY

SWAN. The Value of Online Water Network Monitoring SUMMARY SWAN S m a r t W a t e r N e t w o r k s F o r u m The Value of Online Water Network Monitoring SUMMARY Online water monitoring is the use of data transmitted from network elements, meters and sensors

More information

FINANCIAL ANALYSIS. A. Introduction and Methodology

FINANCIAL ANALYSIS. A. Introduction and Methodology Coastal Towns Environmental Infrastructure Project (RRP BAN 44212) FINANCIAL ANALYSIS A. Introduction and Methodology 1. The Coastal Towns Environmental Infrastructure project finances basic urban service

More information

62-110. Certificate of convenience and necessity.

62-110. Certificate of convenience and necessity. Article 6. The Utility Franchise. 62-110. Certificate of convenience and necessity. (a) Except as provided for bus companies in Article 12 of this Chapter, no public utility shall hereafter begin the construction

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long

More information

Murcia. Capital and most populous city of the Region de Murcia. Seventh largest city in Spain.

Murcia. Capital and most populous city of the Region de Murcia. Seventh largest city in Spain. SMART WATER Murcia. Capital and most populous city of the Region de Murcia. Seventh largest city in Spain. Population of the city: 450.000 inhabitants. (about one third of the total population of the Region).

More information

360 CMR: MASSACHUSETTS WATER RESOURCES AUTHORITY 360 CMR 12.00: LEAK DETECTION REGULATIONS

360 CMR: MASSACHUSETTS WATER RESOURCES AUTHORITY 360 CMR 12.00: LEAK DETECTION REGULATIONS 360 CMR 12.00: LEAK DETECTION REGULATIONS Section 12.01: Preamble 12.02: Effective Date 12.03: Definitions 12.04: Applicability of Leak Detection and Repair Program 12.05: Minimum Frequency 12.06: Methods

More information

The condominium form of ownership in the United

The condominium form of ownership in the United A Lender s Primer: Major Repair Loans for Condominiums and Other Common Ownership Communities By Richard A. Rosner The condominium form of ownership in the United States is the product of enabling legislation

More information

AMENDMENT TO LONG TERM COUNCIL COMMUNITY PLAN

AMENDMENT TO LONG TERM COUNCIL COMMUNITY PLAN 2011 AMENDMENT TO LONG TERM COUNCIL COMMUNITY PLAN This document contains the 2011 amendment to the Revenue and Financing Policy of the 2009 Long Term Council Community Plan. This amendment was adopted

More information

UPDATED DRAFT DEBT AND CREDIT CONTROL POLICY

UPDATED DRAFT DEBT AND CREDIT CONTROL POLICY UPDATED DRAFT NALEDI LOCAL MUNICIPALITY Council resolves to adopt the following proposal as the Debt and Credit Control Policy of the Naledi Local Municipality Policy effective date: [30 May 2012] Approved

More information

California Department of Public Health Drinking Water Program. TMF Assessment Form. ASSESSMENT TYPE: Funding Project New System Change of Ownership

California Department of Public Health Drinking Water Program. TMF Assessment Form. ASSESSMENT TYPE: Funding Project New System Change of Ownership California Department of Public Health Drinking Water Program TMF Assessment Form ASSESSMENT TYPE: Funding Project New System Change of Ownership WATER SYSTEM CLASSIFICATION: Community Water System Nontransient

More information

MORUWASA S STRATEGIC PLAN MATRIX FOR 2007/2008 2021/2022. Strategy Activity Responsibility Time Frame Performance

MORUWASA S STRATEGIC PLAN MATRIX FOR 2007/2008 2021/2022. Strategy Activity Responsibility Time Frame Performance KRA 1: ORGANIZATION STRUCTURE, POLICIES, REGULATIONS AND PRACTICES Objective 1: Ensuring good governance and sound manag Operational OT 1: targets The organization structure of MORUWASA reviewed after

More information

MILLENNIUM CHALLENCE CORl'ORA110N

MILLENNIUM CHALLENCE CORl'ORA110N * MILLENNIUM CHALLENCE CORl'ORA110N UN ITED STATES OF A~1ERICA CONGRESSIONAL NOTIFICATION TRANSMITTAL SHEET We wish to inform you that the Millen11ium Challenge Corporation plans to negotiate a Millermium

More information

Water Charges Plan Decision Paper (Executive Summary)

Water Charges Plan Decision Paper (Executive Summary) Water Charges Plan Decision Paper (Executive Summary) DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: QUERIES TO: Decision Paper CER/14/746 30 September 2014 waterchargesplan@cer.ie The Commission for Energy

More information

WATER AND WASTEWATER UTILITY RATE STUDY CITY OF

WATER AND WASTEWATER UTILITY RATE STUDY CITY OF WATER AND WASTEWATER UTILITY RATE STUDY CITY OF MAY 2013 WATER AND WASTEWATER UTILITY RATE STUDY FOR CITY OF YREKA 701 4 TH STREET YREKA, CA 96097 JOB NO. 69.39 MAY 2013 PREPARED BY: TABLE OF CONTENTS

More information

Vienna, 07th May 2015

Vienna, 07th May 2015 Local Government s Asset Management Tools and Trainings for facilitating more transparent and accountable role UTVSI Presented by: Dr. P. Kolovopoulos Vienna, 07th May 2015 Utility External Pressures &

More information

Policy measures for the prevention and minimization of hazardous wastes

Policy measures for the prevention and minimization of hazardous wastes WASTE AND WASTE MANAGEMENT PROGRESS AND ACHEIVEMENTS Policy measures for the prevention and minimization of hazardous wastes 1. At the international level, Mongolia joined The Basel Convention on the Control

More information

REVISED CONSUMPTIVE TARIFFS, RATES AND BASIC CHARGES FOR ELECTRICITY SERVICES, WATER AND SANITATION SERVICES AND SOLID WASTE MANAGEMENT SERVICES

REVISED CONSUMPTIVE TARIFFS, RATES AND BASIC CHARGES FOR ELECTRICITY SERVICES, WATER AND SANITATION SERVICES AND SOLID WASTE MANAGEMENT SERVICES ANNEXURE 4 REVISED CONSUMPTIVE TARIFFS, RATES AND BASIC CHARGES FOR ELECTRICITY SERVICES, WATER AND SANITATION SERVICES AND SOLID WASTE MANAGEMENT SERVICES 1. ELECTRICITY 1.1 General The proposed revisions

More information

Essential Water. Customer Charter

Essential Water. Customer Charter Essential Water Customer Charter Who is Essential Water? Essential Water is a division of Essential Energy and provides water supply services to over 20,000 people in Broken Hill, Menindee, Sunset Strip

More information

First Fix Leak Repair Scheme

First Fix Leak Repair Scheme Irish Water First Fix Leak Repair Scheme For Domestic Water Customers CER Consultation Public Submissions: Irish Water Response Submission to the CER Reg_PP_IW_FFLRS_003 31/07/15 1 Introduction This document

More information

ATTACHMENT 1 DRINKING WATER STATE REVOLVING LOAN FUND INTENDED USE PLAN (IUP) RANKING FRAMEWORK. for PENNVEST DRINKING WATER PROJECTS

ATTACHMENT 1 DRINKING WATER STATE REVOLVING LOAN FUND INTENDED USE PLAN (IUP) RANKING FRAMEWORK. for PENNVEST DRINKING WATER PROJECTS ATTACHMENT 1 DRINKING WATER STATE REVOLVING LOAN FUND INTENDED USE PLAN (IUP) RANKING FRAMEWORK for PENNVEST DRINKING WATER PROJECTS April, 2014 Prepared by Bureau of Point and Non-Point Source Management

More information

GLOBALG.A.P. Risk-Assessment on Social Practice (GRASP)

GLOBALG.A.P. Risk-Assessment on Social Practice (GRASP) GLOBALG.A.P. Risk-Assessment on Social Practice (GRASP) GRASP Module Interpretation for Czech Republic V 1.3 Valid from: 01.07.2015 Mandatory from: 01.10.2015 English Version Developed by Czech Society

More information

SUEZ ENVIRONNEMENT GROUP WATER SECTOR:

SUEZ ENVIRONNEMENT GROUP WATER SECTOR: Workshop on PPP Amman, June 6 & 7, 2010 J. Ouechec SUEZ ENVIRONNEMENT GROUP WATER SECTOR: PPP references & lessons learnt in Near & Middle East region Tripoli Lebanon Management Contract Case Funds: Agence

More information

Administrative Regulations POLICY STATUS: POLICY NUMBER: POLICY ADDRESS:

Administrative Regulations POLICY STATUS: POLICY NUMBER: POLICY ADDRESS: CATEGORY: POLICY STATUS: Administrative Regulations POLICY TITLE: POLICY NUMBER: POLICY ADDRESS: POLICY PURPOSE: APPLIES TO: SUB-SECTIONS: POLICY STATEMENT Debt Policy In support of its mission, the University

More information

Project Cost & Schedule Monitoring Process Using MS Excel & MS Project

Project Cost & Schedule Monitoring Process Using MS Excel & MS Project Project Cost & Schedule Monitoring Process Using MS Excel & MS Project Presented by: Rajesh Jujare About Us Solutions is founded with objectives a. To share its expertise and experiences to overcome the

More information

CEMENT BUSINESS. Sub: Domestic Travel Policy for Management Cadre employees at Job Band 10 & below and Staff Cadre employees of Cement Business

CEMENT BUSINESS. Sub: Domestic Travel Policy for Management Cadre employees at Job Band 10 & below and Staff Cadre employees of Cement Business September 24, 2009 To: All HR Heads Sub: Domestic Travel Policy for Management Cadre employees at Job Band 10 & below and Staff Cadre employees of Cement Business Dear All, Attached is revised Domestic

More information

November 9, 2011 James Petrick, CFO

November 9, 2011 James Petrick, CFO Civil Service Pension Reform in the United States November 9, 2011 James Petrick, CFO Federal Retirement Thrift Investment Board Part I. Antecedents Reasons for Federal Pension Reform Cost of old system

More information

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) The Status of the Wind Power Market in Egypt Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) Berlin, June 11 th, 2013 1 Contents Key Challenges for

More information

Peoria County General Fund

Peoria County General Fund Peoria County General Fund Financial Data through December 31, 201 (As of March 17, 2016) 201 Revenues 201 Expenditures Year to Date Budget 4,044,999 Year to Date Budget 4,024,494 Year to Date Actual 44,068,112

More information

Designing an Effective Leakage Reduction and Management Program

Designing an Effective Leakage Reduction and Management Program The Water and Sanitation Program is an international partnership for improving water and sanitation sector policies, practices, and capacities to serve poor people April 2008 Field Note Performance Improvement

More information

BASIC CONCEPTS AND FORMULAE

BASIC CONCEPTS AND FORMULAE 7 Contract Costing BASIC CONCEPTS AND FORMULAE Basic Concepts 1. Contract costing:- Contract or terminal costing, as it is termed, is one form of application of the principles of job costing. In fact a

More information

Drinking Water Asset Management Grant 2016

Drinking Water Asset Management Grant 2016 Drinking Water Asset Management Grant 2016 Asset Management Grant 2016 1 Table of Contents Grant Overview... Page 3 Grant Time Line... Page 4 Eligibility Requirements and Award Information... Page 4 Grant

More information

DISCLOSURE ON CAPITAL ADEQUACY & MARKET DISCIPLINE (CAMD)

DISCLOSURE ON CAPITAL ADEQUACY & MARKET DISCIPLINE (CAMD) DISCLOSURE ON CAPITAL ADEQUACY & MARKET DISCIPLINE (CAMD) A) Scope of Application : (a) This guidelines applies to Delta Brac Housing Finance Corporation Ltd. (b) (c) DBH has no subsidiary companies. Not

More information

Selfhelpgroups - Default Management and Recoveries: A Study among the Scheduled Caste Women in Andhra Pradesh and Telangana

Selfhelpgroups - Default Management and Recoveries: A Study among the Scheduled Caste Women in Andhra Pradesh and Telangana International Journal of Humanities and Social Science Invention ISSN (Online): 2319 7722, ISSN (Print): 2319 7714 Volume 3 Issue 8 ǁ August. 2014 ǁ PP.58-62 Selfhelpgroups - Default Management and Recoveries:

More information

Homeowner Handbook. 88 King Street Burlington, Vermont 05401 802-862-6244

Homeowner Handbook. 88 King Street Burlington, Vermont 05401 802-862-6244 Homeowner Handbook 88 King Street Burlington, Vermont 05401 802-862-6244 January 2012 Table of Contents Review of the Ground Lease Page 2 Review of the Housing Subsidy Covenant Page 3 Lease and Membership

More information

Prequalification for Empanelment of Contractors for Supplying and Installation of Modular Furniture

Prequalification for Empanelment of Contractors for Supplying and Installation of Modular Furniture Prequalification for Empanelment of Contractors for Supplying and Installation of Modular Furniture IDBI Bank Ltd. proposes to carryout Modular Furniture Works for its new bank branches and offices, Renovation

More information

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes

More information

Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS 2016-18

Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS 2016-18 Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS 2016-18 Page 2 of 8 1. INTRODUCTION Capital Region Water (CRW) is requesting proposals

More information

PROJECT PROFILE MANUFACTURING AND SALES OF DOMESTIC LIGHTS WITH LED TECHNOLOGY. Prepared by. United Electrical Industries Ltd, Pallimukku, Kollam

PROJECT PROFILE MANUFACTURING AND SALES OF DOMESTIC LIGHTS WITH LED TECHNOLOGY. Prepared by. United Electrical Industries Ltd, Pallimukku, Kollam PROJECT PROFILE ON MANUFACTURING AND SALES OF DOMESTIC LIGHTS WITH LED TECHNOLOGY Prepared by United Electrical Industries Ltd, Pallimukku, Kollam (PSU-Industries Department) Company Profile Name of Company

More information

Addendum. This addendum set out changes to be made in the Statement of Additional Information (SAI) of Tata Mutual Fund.

Addendum. This addendum set out changes to be made in the Statement of Additional Information (SAI) of Tata Mutual Fund. Addendum This addendum set out changes to be made in the Statement of Additional Information (SAI) of Tata Mutual Fund. Date of Enactment of Finance Bill 2015: 14th May 2015 Section VI. TAX & LEGAL & GENERAL

More information

PRESS NOTE REVISION OF ELECTRICITY TARIFF FOR 2016-17

PRESS NOTE REVISION OF ELECTRICITY TARIFF FOR 2016-17 KARNATAKA ELECTRICITY REGULATORY COMMISSION 6th & 7th Floor, Mahalakshmi Chambers, No. 9/2, M.G. Road, Bangalore-560001 PRESS NOTE REVISION OF ELECTRICITY TARIFF FOR 2016-17 The Karnataka Electricity Regulatory

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Water December 2013 Utilities Team Engineering Services Western Bay of Plenty District Council Water Asset Management Plan Adopted by Council on. 2013 Edition Task Title Name Signature

More information

Risk and Audit Committee Terms of Reference. 16 June 2016

Risk and Audit Committee Terms of Reference. 16 June 2016 Risk and Audit Committee Terms of Reference 16 June 2016 Risk and Audit Committee Terms of Reference BHP Billiton Limited and BHP Billiton Plc Approved by the Boards of BHP Billiton Limited and BHP Billiton

More information

REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND

REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND Harford County, Maryland APRIL 2016 Black & Veatch Holding Company 2011. All rights reserved. Harford County Report on

More information

Leak Detection and Abatement in the Water Utility of Iasi

Leak Detection and Abatement in the Water Utility of Iasi Leak Detection and Abatement in the Water Utility of Iasi Transferable Solution Project Summary Project Activities Project Benefits Lessons Learned Contact Information Project Title: Leak Detection and

More information

LAKE VICTORIA WATER & SANITATION INITIATIVE FAST TRACK CAPACITY BUILDING PROGRAMME WATER AUDIT MANUAL

LAKE VICTORIA WATER & SANITATION INITIATIVE FAST TRACK CAPACITY BUILDING PROGRAMME WATER AUDIT MANUAL LAKE VICTORIA WATER & SANITATION INITIATIVE FAST TRACK CAPACITY BUILDING PROGRAMME WATER AUDIT MANUAL Prepared by: NWSC- External Services, Uganda July 2008 Preamble This manual is specifically meant to

More information

Early Learning and Child Care Initiative

Early Learning and Child Care Initiative Early Learning and Child Care Initiative Child Care Centre Expansion Loan Table of Contents Background...2 Overview...3 Loan Description...3 Eligibility Criteria - Centres...4 Eligible Expansion Costs...4

More information

Water Loss Auditing and Water Leak Detection: How Much is Being Lost and Where Does it Go? PNWS-AWWA Annual Conference Michael W. Grimm, P.E.

Water Loss Auditing and Water Leak Detection: How Much is Being Lost and Where Does it Go? PNWS-AWWA Annual Conference Michael W. Grimm, P.E. Water Loss Auditing and Water Leak Detection: How Much is Being Lost and Where Does it Go? PNWS-AWWA Annual Conference Michael W. Grimm, P.E. April 29, 2015 1 2 What Will Be Covered Determining the magnitude

More information

Mega Manila: Partnership in Action

Mega Manila: Partnership in Action Domestic WastewaterManagement in Mega Manila: Partnership in Action Leonor C. Cleofas Deputy Administrator Metropolitan Waterworks and Sewerage System Securing the Future Today The MWSS Privatization On

More information

Original SHEET NO. TOC. Arizona American Water Company SHEET NO.. (Name of Company).Anthem Water District. (Name of Service Area) Table of Contents

Original SHEET NO. TOC. Arizona American Water Company SHEET NO.. (Name of Company).Anthem Water District. (Name of Service Area) Table of Contents Original SHEET NO. TOC. Table of Contents G-1 General Water Service 1 - Original IR 1 Irrigation 2 - Original PI 1 Public Interruptible 3 - Original FP 1 Private Fire Protection 4 - Original MISC-1 Miscellaneous

More information

Financial Statements and Independent Auditor s Report. DDC Foothills Home (A Colorado Nonprofit Corporation) FHA Project No. 101 HD023 NP PD DD

Financial Statements and Independent Auditor s Report. DDC Foothills Home (A Colorado Nonprofit Corporation) FHA Project No. 101 HD023 NP PD DD Financial Statements and Independent Auditor s Report DDC Foothills Home June 30, 2014 TABLE OF CONTENTS INDEPENDENT AUDITOR S REPORT 4 FINANCIAL STATEMENTS STATEMENT OF FINANCIAL POSITION 6 STATEMENT

More information

CONNEXUS ENERGY. Financial statements as of and for the Years Ended December 31, 2010 and 2009, and Independent Auditors Report.

CONNEXUS ENERGY. Financial statements as of and for the Years Ended December 31, 2010 and 2009, and Independent Auditors Report. CONNEXUS ENERGY Financial statements as of and for the Years Ended December 31, 2010 and 2009, and Independent Auditors Report. INDEPENDENT AUDITORS REPORT To the Board of Directors of Connexus Energy

More information

AADC Water Network Management and Leakage Control Synopsis

AADC Water Network Management and Leakage Control Synopsis AADC Water Network Management and Leakage Control Synopsis 1 Al Ain Distribution Company. Formed (from the Water and Electricity Department) in 1999 as a wholly owned subsidiary of the Abu Dhabi Water

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2015 HOUSE BILL 1080 RATIFIED BILL AN ACT TO ESTABLISH THE ACHIEVEMENT SCHOOL DISTRICT.

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2015 HOUSE BILL 1080 RATIFIED BILL AN ACT TO ESTABLISH THE ACHIEVEMENT SCHOOL DISTRICT. GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2015 HOUSE BILL 1080 RATIFIED BILL AN ACT TO ESTABLISH THE ACHIEVEMENT SCHOOL DISTRICT. The General Assembly of North Carolina enacts: SECTION 1. Subchapter III

More information

The Oil & Gas Fiscal Regime in Mexico. Energy and Natural Resources Group Tax and Legal

The Oil & Gas Fiscal Regime in Mexico. Energy and Natural Resources Group Tax and Legal The Oil & Gas Fiscal Regime in Mexico Energy and Natural Resources Group Tax and Legal The Oil & Gas Fiscal Regime in Mexico Following the constitutional amendments of December 2013 and the so-called secondary

More information

Aquatera 2015/16 Business Plan Highlights

Aquatera 2015/16 Business Plan Highlights Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality

More information

Key Performance Indicators for Queensland Urban Water Service Providers. Definitions Guide (version 1.2)

Key Performance Indicators for Queensland Urban Water Service Providers. Definitions Guide (version 1.2) Key Performance Indicators for Queensland Urban Water Service Providers Definitions Guide (version 1.2) This publication has been compiled Water Supply Policy and Economics, Department of Energy and Water

More information

Karnataka. Urban Governance & Innovation in Bangalore

Karnataka. Urban Governance & Innovation in Bangalore Urban Governance & Innovation in Bangalore Subhash Chandra Special Commissioner Bangalore City Corporation Bangalore, Karnataka, INDIA Karnataka Eighth largest state in India Population of 52.73 million

More information

Review relating to Statutory Corporation

Review relating to Statutory Corporation Review relating to Statutory Corporation 6.2 Computerised energy billing system of Ranchi Electric Supply Circle of Jharkhand State Electricity Board Highlights Jharkhand State Electricity Board (JSEB)

More information

PROJECT CRITERIA: ECONOMIC VIABILITY AND PROJECT ALTERNATIVES

PROJECT CRITERIA: ECONOMIC VIABILITY AND PROJECT ALTERNATIVES SESSION 1.2 PROJECT CRITERIA: ECONOMIC VIABILITY AND PROJECT ALTERNATIVES Introductory Course on Economic Analysis of Investment Projects Economics and Research Department (ERD) Discounted Cash Flow: Measures

More information

1. Common areas means the entire project excepting all units therein granted or reserved.

1. Common areas means the entire project excepting all units therein granted or reserved. NEVADA NRS 117.010 Definitions. As used in this chapter: 1. Common areas means the entire project excepting all units therein granted or reserved. 2. Condominium means an estate in real property consisting

More information