As Requested Review and Comment. SENT VIA: Attached Separate Cover Via:

Size: px
Start display at page:

Download "As Requested Review and Comment. SENT VIA: Attached Separate Cover Via:"

Transcription

1 o o 5995 Greenwood Plaza Blvd, Suite 100 Greenwood Village, CO Fax Nevada Mesa View Colorado Springs, CO Fax TRANSMITTAL No. 12J PROJECT: TMCA-Psychiatric Unit Renovation TO: L Nothhaft & Son Inc 2520 W 62nd Ct Denver CO DATE: RE: 03/05/ / Fire Suppression S ATTN: Harry Nothhaft Ph/Fax: WE ARE SENDING: Shop Drawings Letter Prints Change Order Plans Samples Specifications / Product Data Other: SUBMITTED FOR: Approval Your Use As Requested Review and Comment SENT VIA: Attached Separate Cover Via: JOB: 12J1993 ACTION TAKEN: Approved as Submitted Approved as Noted Returned After Loan Resubmit Submit Returned Returned for Corrections Due Date: 03/05/2012 NOTES: Nick: Please see attached comments from BOTH the engineer and architect of record. Comments from the engineer should be formally addressed and submitted as required. Item Package Code Rev. Copies Date Description Status Submittal Submittal Submittal Submittal Submittal A A A A B /05/ /05/ /05/ /05/ /05/2012 Fire Suppression (Common Work) - Fire Protection Systems Shop Drawings Water Based Fire Suppression Systems - Product Data: Piping Materials Water Based Fire Suppression Systems - Product Data: Pipe Hangers & Supports Water Based Fire Suppression Systems - Product Data: Sprinklers / Escutcheons / Guards Water Based Fire Suppression Systems - Shop Drawings Approved As Noted Approved As Noted Approved As Noted Approved As Noted Approved As Noted CC: Signed: Jennifer Lynn

2 S H O P D R A W I N G T R A N S M I T T A L To Date Project Number Jennifer Lynn 05 March 2012 SHA.HCA1102 GH Phipps Construction Companies Project 5995 Greenwood Plaza Blvd, Suite 100 Psychiatric Unit Renovation Greenwood Village, CO The Medical Center of Aurora North Campus Aurora, Colorado We transmit: herewith via fax pages with cover Copies Date Number Description Fire Suppression These items are transmitted as checked: reviewed furnish as corrected revise and resubmit rejected submit specific item This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the shop drawings during this review do not relieve contractor from compliance with the requirements of the plans and specifications. Approval of a specific item shall not include approval of an assembly of which the item is a component. Contractor is responsible for: dimensions to be confirmed and correlated at the jobsite; information that pertains solely to the fabrication processes or to the means, methods, techniques, sequences, and procedures of construction; coordination of his or her Work with a that of all other trades; and for performing all work in a safe and satisfactory manner. Item Remarks 1.01 Refer to CCRD comments contained herein Both Tyco Raven and Viking Mirage Pendants to have white finish/trims Provide tamper-resistant Tyco Raven Sprinkler Heads within the ceilings of all Patient Areas per Fire Protection General Note D/Sheet P2.1. Reference Detail 01/A1.1 for spaces designated as 'Patient Areas' Reference General Note 4 on Architectural Sheets A3.0 through A3.4. Sprinkler heads are required to be installed in the center of all tiles. File Copies HCA1102-ghphipps-shoptm doc Signed Christopher M. Malicki, AIA LEED AP BD+C S T E N G E L ~ H I L L A R C H I T E C T U R E 613 West Main Street Louisville, Kentucky voice fax stengelhill.com

3 S H O P D R A W I N G / S U B M I T T A L R E V I E W F O R M No Exceptions Taken Make Corrections Noted Revise and Resubmit Rejected Reviewed REVIEW IS SOLELY FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT. THIS REVIEW DOES NOT RELIEVE THE CONTRACTOR FROM TOTAL RESPONSIBILITY FOR QUANTITIES, ERRORS, OMISSIONS OR COMPLIANCE WITH THE INTENT OF THE CONTRACT DOCUMENTS. REVIEW AND APPROVAL BY CONTRACTOR IS REQUIRED BEFORE FABRICATION, SHIPMENT OR INSTALLATION. ANY ACTION SHOWN IS SUBJECT TO THE REQUIREMENTS OF THE PLANS AND SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR: DIMENSIONS WHICH SHALL BE CONFIRMED AND CORRELATED AT THE JOB SITE. ALL REVISED SUBMITTALS MUST BE RETURNED BY CONTRACTOR WITHIN 15 DAYS FROM RECEIPT OF THE ORIGINAL SUBMITTAL REVIEW. SUBMITTAL NUMBER/ REGISTER NUMBER: PROJECT NAME: The Medical Center of Aurora SUBMITTAL NAME: Fire Suppression CCRD PROJECT NO.: RELATED SPECIFICATION: Mechanical REVIEWER S NAME: Jeremy Fowler DATE RECEIVED: 3/1/2012 DATE REVIEWED: 3/5/2012 REMARKS: 1. Explain reasoning for three manufacturers for sprinkler pipe. 2. Confirm TYCO Raven sprinkler head to be model TY Coordinate sprinkler color and finish with architectural drawings. 4. Indicate all optional accessories and fittings to be used. 5. Coordinate all sprinkler head and pipe locations and installation with all other trades. END OF SUBMITTAL REVIEW

4 o o 5995 Greenwood Plaza Blvd, Suite 100 Greenwood Village, CO Fax Nevada Mesa View Colorado Springs, CO Fax TRANSMITTAL No. 12J PROJECT: TMCA-Psychiatric Unit Renovation TO: Stengel Hill Architects 613 W Main St Louisville KY DATE: RE: 03/01/ Fire Suppression ATTN: Chris Malicki Ph/Fax: WE ARE SENDING: Shop Drawings Letter Prints Change Order Plans Samples Specifications / Product Data Other: NOTES: SUBMITTED FOR: Approval Your Use As Requested Review and Comment SENT VIA: Attached Separate Cover Via: JOB: 12J1993 ACTION TAKEN: Approved as Submitted Approved as Noted Returned After Loan Resubmit Submit Returned Returned for Corrections Due Date: 03/15/2012 Item Package Code Rev. Copies Date Description Status Submittal Submittal Submittal Submittal Submittal A A A A B /01/ /01/ /01/ /01/ /01/2012 Fire Suppression (Common Work) - Fire Protection Systems Shop Drawings Water Based Fire Suppression Systems - Product Data: Piping Materials Water Based Fire Suppression Systems - Product Data: Pipe Hangers & Supports Water Based Fire Suppression Systems - Product Data: Sprinklers / Escutcheons / Guards Water Based Fire Suppression Systems - Shop Drawings Architect Review Architect Review Architect Review Architect Review Architect Review CC: Signed: Jennifer Lynn

5 Subcontractor Submittal Information Sheet 5995 Greenwood Plaza Blvd, Suite 100 Stengel Hill Architecture Greenwood Village, CO West Main Street Phone: Louisville KY Fax: Date: 02/29/12 TMCA Psychiatric Ward Renovations Job #12J1993 GH Phipps Submittal #: , Various Fire Suppression Subcontractor / Supplier: L. Nothhaft & Son Spec Section: & Spec Heading: Fire Suppression Paragraph # / Drawing: Various Submitted For: For Approval Resubmittal For Record Only Comments: Included: Product Data Shop Drawings Samples LEED Submittal Shops and product data were submitted to Aurora Life Safety on 02/29/12 for review, approval and permit. SUBMITTED GH Phipps Construction Companies GH Phipps has reviewed, approved, and herby submits the attached in accordance with the contract documents. Note to Subcontractor/Material Supplier: Subcontractor/Material Supplier remains responsible for the confirmation and correlation of dimensions at the jobsite; fabrication processes and construction techniques; coordination of the work with the work of other trades; and satisfactory performance of the work. By: Jennifer Lynn Project Engineer Date: 03/01/12

6 Submittal Stamp Sheet Project: TMCA - Phychiatric Unit Renovation Stengel-Hill Architecture Phipps Job #: 12J West Main Street Submittal #: , Louisville KY Gerald H. Phipps, Inc.: SUBMITTED GH Phipps Construction Companies Architect: GH Phipps has reviewed, approved, and herby submits the attached in accordance with the contract documents. Note to Subcontractor/Material Supplier: Subcontractor/Material Supplier remains responsible for the confirmation and correlation of dimensions at the jobsite; fabrication processes and construction techniques; coordination of the work with the work of other trades; and satisfactory performance of the work. Engineer: Other: NOTES: Shop drawings were submitted to Aurora Life Safety on 02/29/12 for review and permit. Signed: Jennifer V. Lynn, Project Engineer GH Phipps Representative

7 THE MEDICAL CENTER OF AURORA PSYCHIATRIC UNIT RENOVATION 700 POTOMAC ST. AURORA, CO FIRE PROTECTION EQUIPMENT SUBMITTALS PREPARED BY: L. NOTHHAFT & SON 2520 W. 62 ND COURT ADAMS COUNTY, CO JOB NUMBER

8

9 THE MEDICAL CENTER OF AURORA PSYCHIATRIC UNIT RENOVATION 700 POTOMAC ST. AURORA, CO INDEX ITEM MAKE MODEL PIPE STATEMENT OF SCHEDULE #40 & SCH. #10 COMPLIANCE SPRINKLER FINISH AS FOLLOWS: TYCO RAVEN PENDENT = CHROME VIKING MIRAGE PENDENT = WHITE ALLIED SCHEDULE #40 & SCH. #10 BULLMOOSE SCHEDULE #40 & SCH. #10 WHEATLAND SCHEDULE #40 & SCH. #10 SPRINKLERS TYCO TY3281 K=5.6 QUICK RESPONSE PENDENT VIKING VK462 K=5.6 QUICK RESPONSE PENDENT FITTINGS SMITH-COOPER DUCTILE IRON FITTINGS ANVIL CAST AND DUCTILE FITTINGS C-4 RIGID COUPLING E-1 90 GROOVED ELBOW K-1 GROOVED CAP ST-1 GROOVED SHORT PATTERN TEE MT-30 THREADED MECHANICAL TEE WELDMISER TEE-LET HANGERS AFCON ALL THREAD ROD - #650 RING HANGER #300 BEAM CLAMP - #100

10

11 FIRE PROTECTION SPRINKLER SYSTEM STATEMENT OF COMPLIANCE THE MEDICAL CENTER OF AURORA PSYCHIATRIC UNIT RENOVATION 700 POTOMAC ST. AURORA, CO NOTHHAFT JOB NUMBER This is to certify that the piping to be used on this project conforms to the 2010 edition of NFPA #13, chapter 6. All non-threaded piping shall be Schedule 10 lightwall conforming to ASTM A-135 or A- 795 or A53 with shop welded outlets, roll grooved ends and Victaulic grooved fittings. All threaded piping shall be Schedule 40 conforming to ASTM A-135 or A-795 or A53 with black standard weight cast iron or malleable or ductile iron screwed fittings. The TCRR valve of the pipe shall meet or exceed 1.0. We also certify that the fittings to be used on this project will be the following: 1. Black cast iron, malleable or ductile iron screwed standard weight. 2. Grooved fittings conforming to ASTM A-536. (See cut sheets.) 3. Welded fittings conforming to NFPA #13, 2010 Edition. (See cut sheets.) Pipe hangers shall be in accordance with the 2010 edition of NFPA #13 and are listed by Underwriters Laboratories. Hanger spacing will be in accordance with NFPA #13. Hanger rod diameters shall be in accordance with NFPA #13 as follows: 1" thru 4" pipe...3/8" All Thread Rod 5" thru 8" pipe...1/2" All thread Rod

12

13 Schedule-10/Schedule-40 M-COAT Submittal Data Sheet Fully Listed and FM Approved Sprinkler Pipe When you specify Schedule-10/Schedule-40 M-COAT sprinkler pipe from Allied Tube & Conduit, you get UL listed and FM approved products. Although these products do not require separate approvals, Schedule-10/Schedule-40 M-COAT gives you the extra quality assurance you demand. Our Sch-10 ( ) pipe and Sch-40 ( ) pipe have passed the same thorough lab testing as our other listed pipe products, and receive periodic mill inspections from both UL and FM agents to ensure consistent quality. Galvanized Pipe Schedule-10/Schedule-40 M-COAT product can be hot-dip galvanized to meet FM requirements. Superior Coating Our advanced formula mill coating offers a clean, durable surface that is also paintready for custom color applications without special preparation. The internal surface of all black Fire Sprinkler pipe up to in diameter shall be coated with Allied Tube & Conduit Antibacterial Formula M-COAT. American Made Able to meet Buy American requirements, and is available through distributors in the USA, Canada, Mexico and Latin America. Specifications & Approvals Schedule-10 M-COAT pipe is in compliance with ASTM A135, Type E Grade A, and NFPA 13. Schedule-40 M-COAT pipe is in compliance with ASTM A135/A795, Type E Grade A, and NFPA 13. Both pipe products have a working pressure rating of 300 psi maximum and also meet the stringent requirement for the following tests: Welded Outlets, Hydrostatic Pressure, Side Wall Rupture, Vibration Test. Sch-40 M-COAT Specifications NPS Nominal I.D. Wt. Wt. (H20 Filled) CRR In; mm In; mm Lbs/Ft; kg/m Lbs/Ft; kg/m ¼ ½ ½ Sch-10 M-COAT Specifications NPS Nominal I.D. Wt. Wt. (H20 Filled) CRR In; mm In; mm Lbs/Ft; kg/m Lbs/Ft; kg/m 1¼ ½ ½ Project: Sprinkler Contractor: Date: Engineer: Specification Reference: System Type: Locations: Comments: Customer Service (800) Fax: (800) S Lathrop Ave Norcom Rd N 27th Ave. 600 Dean Sievers Place Harvey, IL Philadelphia, PA Phoenix, AZ Morrisville, PA Atkore International, Inc. All Rights Reserved. STP-S5-4M-1111

14 Schedule 10 and Schedule 40 FM Approved and UL Listed Sprinkler Pipe Bull Moose Tube Company is a recognized producer of quality pipe products. Our Schedule 10 and Schedule 40 are FM Approved and UL Listed (for U.S. and Canada), even though these products do not require separate approvals and listings. Bull Moose Tube made the decision to have them approved and listed for your peace of mind. Our Sch. 10 and Sch. 40 have been through the same rigorous testing as our other fine pipe products. Bull Moose Tube s Sch. 10 and Sch. 40 pipes are made to ASTM A135 and ASTM A795. These products are typically supplied with our protective coating but can be supplied without the coating so they can be hot-dip galvanized to meet FM requirements for use in dry systems in accordance with the zinc coating specifications of ASTM A795 or ASTM A53. All Schedule 10 and Schedule 40 pipe has a pressure rating of 300 PSI. Schedule 10 Pipe Nominal Pipe Size (in) Nominal O.D. (in) Nominal I.D. (in) Weight/Ft Bundle Size lbs/ft / lbs/ft / lbs/ft lbs/ft / lbs/ft lbs/ft lbs/ft 19 Schedule 40 Pipe Nominal Pipe Size (in) Nominal O.D. (in) Nominal I.D. (in) Weight/Ft Bundle Size lbs/ft / lbs/ft / lbs/ft lbs/ft / lbs/ft lbs/ft lbs/ft 19 PIPE PREPARATION For proper operation, all pipe surfaces should be cleaned prior to installation. In order to provide a leak-tight seat for the gasket, pipe surfaces should be free from indentations and projections from the end of the pipe to the groove. All loose paint, scale, dirt, chips, grease, and rust must be removed prior to installation. Failure to take these important steps may result in improper coupling assembly, causing leakage. Also, check the manufacturer s instructions for the specific fitting used. A company 1819 Clarkson Road Chesterfield, MO (800) FAX: (636) sales@bullmoosetube.com For additional information, contact your salesperson today at (800) or (636) in the USA, or from Canada call (800) All information contained herein is accurate as known at the time of publication. Bull Moose Tube reserves the right to change product specifications without notice and without incurring obligation. 12/09

15 STEEL FIRE SPRINKLER PIPE Schedule 10 and Schedule 40 S U B M I T T A L D A T A S H E E T High Quality, High Performance, Long-Lasting Wheatland s Schedule 10 and Schedule 40 steel fire sprinkler pipe have set the industry s standards for years. Both products are subjected to the toughest possible testing to assure the highest possible quality and reliable, long-lasting performance. Each is coated with Wheatland s proprietary mill coating to assure a clean, corrosion-resistant surface that outperforms and outlasts standard lacquer coatings. The coating also allows the pipe to be easily painted, without special preparation. You can order Schedule 10 or Schedule 40 in black, or with hotdip galvanizing, to meet FM requirements for dry systems to meet the zinc coating specifications of ASTM A795 or A53. Both Schedule 10 and 40 are UL, C-UL and FM listed and meet NFPA 13 standards. We coat all of our black products up to 6 with our patented MIC Shield coating, which helps protect against the onset of microbial corrosion (MIC). Our MIC Shield was the first factory applied coating to be approved by FM as compatible with hybrid sprinkler systems that include CPVC plastic pipe in mixed use occupancies. MIC Shield is also chemically compatible with Flow Guard Gold, Blaze Master and Corizan CPVC. Why Wheatland? Experience: We ve manufactured fire sprinkler pipe since 1931 We produce the most complete line of products in the industry We offer a number of proprietary products and unique benefits We provide a complete line of coatings: - in-house, hot dip galvanizing - black sprinkler pipe - MIC shield, the first FM global approved factory applied, anti-microbial coating for use with CPVC plastic pipe systems - proprietary mill coatings that provide corrosion resistant properties - proprietary mill coatings that extend shelf life Schedule 10 and 40 Meet or Exceed These Standards UL, C-UL and FM Listed FM Approved ASTM A135,, Type E, Grade A (Schedule 10) ASTM A795, Type E, Grade A (Schedule 40) Green: The steel used to produce Wheatland s sprinkler pipe contains recycled steel and is virtually totally recyclable. Seismic/Sway Bracing: Wheatland sprinkler pipe data tables are available for determining the forces for piping used as a sway brace component or in Seismic applications. Technical Data Chart PRODUCT NPS NOM I.D Schedule 10 WT/FT WT/FT H 2 O FILLED PCS/ LIFT WT/LIFT 21' WT/LIFT 24' WT/LIFT 25' 1 1/4" ,315 2,645 2, /2" ,673 3,055 3,183 2" ,051 2,344 2, /2" ,226 2,544 2,651 3" ,730 1,977 2,060 4" ,242 2,562 2,669 5" ,124 2,427 2,529 6" ,953 2,232 2,325 8" Schedule 40 1" ,471 2,824 2, /4" ,437 2,785 2, /2" ,513 2,872 2,992 2" ,303 2,632 2,742 Project: Contractor: Date: Engineer: Specification Reference: System Type: Locations: Comments: 700 South Dock Street, Sharon, PA Ph: Fax: info@wheatland.com Made in U.S.A. Rev. 6/16/11

16 Technical Services RAVEN 5.6K Institutional Sprinklers Pendent and Horizontal Sidewall Quick Response, Standard and Extended Coverage General Description TYCO RAVEN 5.6K Institutional Pendent and Horizontal Sidewall Sprinklers are quick response spray sprinklers designed for use in areas such as correctional, detention, and mental health care facilities as well as other commercial buildings. Both the pendent and horizontal sidewall styles are available for standard or extended coverage applications. The assembly is designed with tamper-resistant features. This protected, unobtrusive design helps reduce the opportunity for individuals to injure themselves or others with sprinkler components. The flush design is aesthetically appealing by concealing all operating parts. NOTICE RAVEN Institutional Sprinklers described herein must be installed and maintained in compliance with this document and with the applicable standards of the National Fire Protection Association, in addition to the standards of any Authorities Having Jurisdiction. Failure to do so may impair the performance of these devices. Tyco Fire Protection Products specifically disclaims any liability for damages or injury (including death) arising out of or caused by manipulation, dismantling, or misuse of RAVEN Institutional Sprinklers or the use or attempted use of the RAVEN Institutional Sprinklers or IMPORTANT Always refer to Technical Data Sheet TFP700 for the INSTALLER WARNING that provides cautions with respect to handling and installation of sprinkler systems and components. Improper handling and installation can permanently damage a sprinkler system or its components and cause the sprinkler to fail to operate in a fire situation or cause it to operate prematurely. any component thereof as an instrument unrelated to its intended function as a fire protection device. Owners are responsible for maintaining their fire protection system and devices in proper operating condition. The installing contractor or manufacturer should be contacted with any questions. Sprinkler Identification Numbers (SINs) SIN DOT COLOR* Technical Data Approvals UL and C-UL Listed APPLICATION TY3281 Black Pendent Standard Coverage TY3282 Green Pendent Extended Coverage TY3381 Red HSW Standard Coverage TY3382 Purple HSW Extended Coverage * Refer to Figures 1 through 4 for SIN Color Dot location. Maximum Working Pressure 175 psi (12,1 bar) Inlet Thread Connection 1/2 inch NPT Discharge Coefficient K=5.6 GPM/psi 1/2 (80,6 LPM/bar 1/2 ) Temperature Rating 165 F (74 C) Finish Sprinkler: Chrome or White Escutcheon: Chrome or White Physical Characteristics Body... Brass Deflector Assembly Bronze Sealing Assembly...Beryllium Nickel with TEFLON Link Assembly Copper Page 1 of 10 JANUARY 2012 TFP651

17 TFP651 Page 2 of 10 Design Criteria General Criteria Only Escutcheons shown in Figures 5 and 6 can be utilized with TYCO RAVEN Institutional Sprinklers. A maximum of two Spacers can be used to adjust the Escutcheons. NOTICE Use of more than two Spacers may result in disabling the tamper-resistant design of TYCO RAVEN Institutional Sprinklers and the principle functions of helping to avoid false sprinkler operations and to avoid opportunity for individuals to injure themselves or others with components of the sprinkler. Integrity of the tamper-resistant design of RAVEN Escutcheons is dependent on the piping installation design. When installed properly, the Escutcheon is held fast (that is, tight with no movement or gap) to the mounting surface (ceiling or wall, as applicable) by tightening the sprinkler assembly into the sprinkler fitting. A proper installation requires all of the following: The sprinkler fitting must be properly located with respect to distance from the face of the sprinkler fitting to the face of the mounting surface (Figures 5 and 6); The sprinkler fitting must be rigidly secured and immobile; and, The centerline of the sprinkler fitting must be perpendicular to the mounting surface to assure that the escutcheon sits squarely against the mounting surface around the entire perimeter of the Institutional Escutcheon. Figure 7 illustrates a technique to adjust the location of the sprinkler fitting to help assure immobility of the sprinkler fitting and to help maintain perpendicularity of the sprinkler fitting to the mounting surface. While Figure 7 illustrates a horizontal installation, it can be applied to pendent installations. When applied, the technique shown in Figure 7 allows the sprinkler/supply pipe to be pulled back into the mounting surface from behind the wall or above the ceiling before tightening the retaining flange set screw, which will help overcome problems with assuring that the escutcheon is held fast to the mounting surface (that is, tight with no movement or gap). Also, this installation technique allows for easy removal of the sprinkler/supply pipe for installations where access is behind the wall or above the ceiling. Standard Coverage Criteria RAVEN Standard Coverage, Institutional Pendent and Horizontal Sidewall Sprinklers (TY3281 and TY3381) are intended for use with fire protection systems designed in accordance with the standard installation rules recognized by the applicable Listing or Approval agency (for example, UL Listing is based on NFPA 13 requirements). RAVEN Horizontal Sidewall Sprinklers (TY3381) must be installed with a deflector-to-ceiling distance of 4 to 12 inches (100 to 300 mm). To meet this requirement, the centerline of the sprinkler waterway must be located 4-7/16 to 12-7/16 inches (112,7 to 315,9 mm) below the ceiling (Figure 7). 5.6K Extended Coverage Pendent (TY3282) Response Rating Coverage Area ft. x ft. (m x m) Minimum Flow (1) GPM (LPM) Minimum Pressure (2) psi (bar) Deflector-To-Ceiling Distance in. (mm) Sprinkler Temperature Rating F ( C) Minimum Spacing ft. (m) Quick 16 x 16 (4,9 x 4,9) 26 (98) 21.6 (1,49) Flush Mounted 165 (74) 8 (2,4) 5.6K Extended Coverage Horizontal Sidewall (TY3382) Response Rating Coverage Area ft. x ft. (m x m) Minimum Flow (1) GPM (LPM) Minimum Pressure (2) psi (bar) Deflector-To-Ceiling Distance (3) in. (mm) Sprinkler Temperature Rating F ( C) Lateral Minimum Spacing (4) ft. (m) Quick 16 x 16 (4,9 x 4,9) 26 (98) 21.6 (1,49) 4 to 12 (100 to 300) 165 (74) 8 (2,4) NOTES 1. Requirement is based on minimum flow in GPM (LPM) from each sprinkler. 2. Indicated residual pressures are based on the nominal K-factor. 3. Centerline of the sprinkler waterway is located 7/16 inch (11,1 mm) below the deflector (Figure 7). 4. Minimum spacing is for lateral distance between sprinklers located along a single wall. Otherwise adjacent sprinklers (that is, sidewall sprinklers on an adjacent wall, on an opposite wall, or pendent sprinklers) must be located outside of the maximum listed protection area of the extended coverage sidewall sprinkler being utilized. TABLE A RAVEN INSTITUTIONAL SPRINKLERS UL AND C-UL LISTING EXTENDED COVERAGE AND FLOW RATE CRITERIA

18 TFP651 Page 3 of 10 Extended Coverage Criteria RAVEN Extended Coverage, Institutional Pendent and Horizontal Sidewall Sprinklers (TY3282 and TY3382) must be installed in accordance with the flow rate criteria provided in Table A. They must be installed and utilized in light hazard occupancies under smooth, flat, horizontal ceilings as outlined in the applicable installation standard recognized by the Listing or Approval agency (for example, UL Listing is based on NFPA 13 requirements). RAVEN Extended Coverage, Horizontal Sidewall Sprinklers (TY3382) must be installed with a deflector-to-ceiling distance of 4 to 12 inches (100 to 300 mm). To meet this requirement, the centerline of the sprinkler waterway must be located 4-7/16 to 12-7/16 inches (112,7 to 315,9 mm) below the ceiling (Figure 7). Operation In standby condition, the unique assembly of RAVEN Institutional Pendent and Horizontal Sidewall Sprinklers is designed with tamper-resistant features to help prohibit a false activation and help reduce the opportunity for individuals to injure themselves or others with components of a fire sprinkler. RAVEN Institutional Sprinklers are specifically designed to minimize components, as well as holes or shapes, that could provide a point for securing an external non-sprinkler associated object. Also, when properly installed, the escutcheon is held fast to the ceiling or wall to deter its removal. The shape of the sprinkler and escutcheon cannot be grasped easily, which further deters tampering. The sprinkler is designed to operate if the link assembly is manually removed. This feature reduces the possibility of the sprinkler being placed in an inoperable condition as a result of tampering. For information on the break-away load of RAVEN Institutional Sprinklers, contact Technical Services. A link assembly covers the sealing assembly. The link is soldered with an eutectic solder that melts when exposed to heat. When the link reaches its rated temperature, the link separates and releases the sealing assembly, allowing the deflector assembly to extend from the body and water to flow. 1/2" NPT 1-13/16" (46 mm) 7/16" (11 mm) NOMINAL MAKE-IN SPRINKLER BODY ESCUTCHEON PLATE MOUNTING SURFACE LINK ASSEMBLY SIN COLOR DOT LOCATION (VISIBLE BEFORE AND AFTER COMPLETED INSTALLATION) SIDE VIEW SPRINKLER WRENCHING NOTCHES 5/8" * (16 mm) DEFLECTOR ASSEMBLY IN OPERATED POSITION OPERATED SIDE VIEW ESCUTCHEON PLATE (SELECT PER FIGURE 5) 1-3/8" DIA. (35 mm) INNER LINK OUTER LINK ** * DIMENSION WITHOUT MAXIMUM OF 2 ADJUSTMENT SPACER RINGS; EACH SPACER PROVIDES ADDITIONAL 5/64" (2 mm) OF ADJUSTMENT. ** ORIENTATION OF INNER LINK TO OVERALL SPRINKLER ASSEMBLY, INCLUDING SPRINKLER WRENCHING NOTCHES, MAY VARY. BOTTOM VIEW FIGURE 1 RAVEN INSTITUTIONAL PENDENT SPRINKLERS NOMINAL INSTALLATION DIMENSIONS

19 TFP651 Page 4 of /8" (54 mm) 7/16" (11 mm) NOMINAL MAKE-IN SIN COLOR DOT LOCATION (VISIBLE BEFORE AND AFTER COMPLETED INSTALLATION) 1-3/8" DIA. (35 mm) ENCLOSED DEFLECTOR LINK ASSEMBLY OUTER LINK INNER * LINK 1/2" NPT SIDE VIEW ESCUTCHEON PLATE MOUNTING SURFACE SPRINKLER WRENCHING NOTCHES 3/4" ** (19 mm) SPRINKLER BODY 7/16" (11 mm) FRONT VIEW * ORIENTATION OF INNER LINK TO OVERALL SPRINKLER ASSEMBLY, INCLUDING SPRINKLER WRENCHING NOTCHES AND TOP OF DEFLECTOR, MAY VARY. DO NOT USE INNER LINK TO DETERMINE TOP OF SPRINKLER DEFLECTOR ORIENTATION; REFER TO FIGURE 4. ** DIMENSION WITHOUT MAXIMUM OF 2 ADJUSTMENT SPACER RINGS; EACH SPACER PROVIDES ADDITIONAL 5/64" (2 mm) OF ADJUSTMENT. CENTERLINE OF SPRINKLER WATERWAY DEFLECTOR ASSEMBLY IN OPERATED POSITION ESCUTCHEON PLATE (SELECT PER FIGURE 6) OPERATED SIDE VIEW FIGURE 2 RAVEN INSTITUTIONAL HORIZONTAL SIDEWALL SPRINKLERS NOMINAL INSTALLATION DIMENSIONS

20 TFP651 Page 5 of 10 SPRINKLER FITTING LOCATED AT PROPER DEPTH FROM AND PERPENDICULAR TO MOUNTING SURFACE MOUNTING SURFACE SIN COLOR DOT NOMINAL DIA. 1/32" (0,7 mm) (NOTE 1) CLEARANCE HOLE RAVEN ESCUTCHEON PLATE LINK ASSEMBLY ADJUSTMENT SPACER RING (AS NECESSARY MAXIMUM 2) RAVEN PENDENT SPRINKLER W-TYPE 25 WRENCH SPRINKLER PROTECTIVE CAP REMOVED ONLY AT INSTALLATION (TO REMOVE, PULL CAP STRAIGHT WITHOUT BENDING IT) NOTE: 1. SIN (SPRINKLER IDENTIFICATION NUMBER) COLOR DOT INDICATES: COLOR SIN APPLICATION BLACK GREEN TY3281 TY3282 LINK ASSEMBLY PENDENT STANDARD COVERAGE PENDENT EXTENDED COVERAGE DISREGARD FOR PENDENT APPLICATION SPRINKLER BOTTOM VIEW WRENCH PRONGS UNIQUELY SPACED TO ALIGN WITH SPRINKLER WRENCHING NOTCHES WRENCH BOTTOM VIEW ACCEPTS 1/2" DRIVE FIGURE 3 RAVEN INSTITUTIONAL PENDENT SPRINKLER INSTALLATION WITH W-TYPE 25 SPRINKLER WRENCH

21 TFP651 Page 6 of 10 SPRINKLER FITTING LOCATED AT PROPER DEPTH FROM AND PERPENDICULAR TO MOUNTING SURFACE RAVEN HORIZONTAL SIDEWALL SPRINKLER SPRINKLER PROTECTIVE CAP REMOVED ONLY AT INSTALLATION (TO REMOVE, PULL CAP STRAIGHT WITHOUT BENDING IT) SIN COLOR DOT NOMINAL DIA. 1/32" (0,7 mm) (NOTES 1 AND 2) CLEARANCE HOLE MOUNTING SURFACE RAVEN ESCUTCHEON PLATE ADJUSTMENT SPACER RING (AS NECESSARY MAXIMUM 2) LINK ASSEMBLY TOP OF ENCLOSED DEFLECTOR SIN COLOR DOT SPRINKLER FRONT VIEW A LEVEL APPLIED HERE ENSURES SPRINKLER INSTALLATION WITH DEFLECTOR PARALLEL TO FLOOR. WRENCH EMBOSSED WITH "UP" INDICATES PROPER ORIENTATION OF SPRINKLER WITH SIN COLOR DOT FACING UP. LINK ASSEMBLY ACCEPTS 1/2" DRIVE WRENCH PRONGS UNIQUELY SPACED TO ALIGN WITH SPRINKLER WRENCHING NOTCHES WRENCH FRONT VIEW W-TYPE 25 WRENCH NOTES: 1. SIN (SPRINKLER IDENTIFICATION NUMBER) COLOR DOT INDICATES: 2. COLOR SIN APPLICATION RED PURPLE TY3381 TY3382 HSW STANDARD COVERAGE HSW EXTENDED COVERAGE FOR HSW SPRINKLERS, SIN COLOR DOT ALSO HELPS VERIFY DEFLECTOR IS IN PROPER ORIENTATION. USING SPRINKLER WRENCH, POSITION SPRINKLER SO SIN COLOR DOT FACES UP (SEE "WRENCH FRONT VIEW"). FIGURE 4 RAVEN INSTITUTIONAL HORIZONTAL SIDEWALL SPRINKLER INSTALLATION WITH W-TYPE 25 SPRINKLER WRENCH

22 TFP651 Page 7 of 10 STYLE F DIAMETER DETERMINED BY CLEARANCE FOR SPRINKLER FITTING STYLE F 3/8" (9,5 mm) 1" (25,4 mm) DIAMETER DETERMINED BY CLEARANCE FOR SPRINKLER FITTING 3" DIA. (76,2 mm) 7/16" (11,1 mm) 3" DIA. (76,2 mm) 3/8" (9,5 mm) 1-5/16" (33,3 mm) 7/16" (11,1 mm) STYLE G DIAMETER DETERMINED BY CLEARANCE FOR SPRINKLER FITTING STYLE G 3/8" (9,5 mm) 1" (25,4 mm) DIAMETER DETERMINED BY CLEARANCE FOR SPRINKLER FITTING 4" DIA. (101,6 mm) 7/16" (11,1 mm) 4" DIA. (101,6 mm) 3/8" (9,5 mm) 1-5/16" (33,3 mm) 7/16" (11,1 mm) FIGURE 5 RAVEN INSTITUTIONAL PENDENT SPRINKLERS ESCUTCHEON OPTIONS FIGURE 6 RAVEN INSTITUTIONAL HSW SPRINKLERS ESCUTCHEON OPTIONS

23 TFP651 Page 8 of 10 Installation TYCO RAVEN Institutional Sprinklers must be installed in accordance with the following instructions. NOTICE Refer to Design Criteria for important information regarding the piping installation design and its effect on maintaining the integrity of the tamper-resistant design of the Institutional Escutcheons. Obtain a 1/2 inch NPT sprinkler joint by applying a minimum-to-maximum torque of 7 to 14 ft.-lbs. (9,5 to 19,0 Nm). Higher levels of torque may damage the sprinkler with consequent leakage or impairment of the sprinkler. Rather than over-torquing to meet proper orientation for the horizontal sidewall sprinkler, stop tightening earlier. Do not attempt to compensate for improper location of the sprinkler fitting by under or over-tightening the sprinkler. After installation is complete, ensure the RAVEN Escutcheon is held fast (that is, tight with no movement or gap) to the mounting surface and that the Escutcheon sits squarely against the mounting surface around the entire perimeter of the Escutcheon. The following tools are recommended for proper installation of RAVEN Institutional Sprinklers: TEFLON tape TYCO W-Type 25 Installation Wrench 1/2-inch drive ratchet wrench Torque wrenches 3-inch maximum length ratchet extension (optional) Level Step 1. Install RAVEN Pendent Sprinklers with the centerline of the waterway perpendicular to the ceiling. Install RAVEN Horizontal Sidewall sprinklers with the centerline of their waterway parallel with the ceiling and perpendicular to the back wall. Step 2. Inspect the sprinkler for any visible signs of damage that could have occurred during shipping or handling. Apply a non-hardening pipe-thread sealant such as TEFLON tape to the NPT thread of the sprinkler. Applying between 2 and 4 full wraps of tape is recommended. Carefully remove the orange protective cap from the sprinkler by pulling it straight out without bending it. Verify that the sprinkler identification number (SIN) and temperature rating located on the side of the sprinkler match installation requirements. Step 2 Step 3. Align the TYCO W-Type 25 Installation Wrench with the sprinkler. The flat surface should be in line with the small colored dot on the sprinkler. Step 4. Ensure that the TYCO W-Type 25 Installation Wrench is fully engaged onto the sprinkler. Fully insert all three Wrench Prongs into the slots on the sprinkler body. Step 4 Step 5. With the Wrench on the sprinkler, place the escutcheon over the threaded end of the sprinkler. Step 5 Step 6. Ensure that the ceiling/wall is smooth for the escutcheon to sit against and that the distance from the ceiling/wall surface to the sprinkler fitting is appropriate. As shown in Figures 5 and 6, the face of sprinkler fitting to face of mounting surface dimensions are 1 inch for pendent sprinklers and 1-5/16 inches for horizontal sidewall sprinklers. Step 6 Note: The sprinkler has intentionally been designed to be difficult to grasp by hand. Therefore, the use of the W-Type 25 Installation Wrench for hand-tightening assists in threading the sprinkler. Also use of the W-Type 25 Installation Wrench helps avoid damage to the Sprinkler during installation. Step 7. With the Escutcheon in place and with pipe-thread sealant applied to the pipe threads, hand-tighten the sprinkler into the sprinkler fitting using the TYCO W-Type 25 Installation Wrench with the Wrench Prongs fully engaged with the Sprinkler Wrenching Notches. The Wrench Prongs are designed to engage the wrenching notches in the sprinkler body. The Wrench Prongs are also uniquely spaced to align with the sprinkler wrenching notches in one position. Step 7 Step 8. Wrench-tighten the Sprinkler using only the TYCO W-Type 25 Installation Wrench (Figure 3). Insert a 1/2 inch drive ratchet wrench (with or without the extension) into the TYCO W-Type 25 Installation Wrench. Ensure the ratchet wrench remains parallel to the ceiling/wall. A ratchet extension can help to keep the wrench in line with the sprinkler. Torque for the RAVEN Institutional Sprinkler is 7 to 14 ft.-lbs. Step 8 Note: To help prevent slippage of the wrench and while using a 1/2-inch drive ratchet wrench, place one hand over the TYCO W-Type 25 Installation Wrench while tightening with the other hand.

24 TFP651 Page 9 of 10 A recommended technique to determine if the torque range is achieved involves the use of two different torque settings. Install first with a 7 ft.-lbs. torque value, followed by adjusting with a maximum 14 ft.-lbs. value. Step 9. For horizontal sidewall sprinklers, a Level should be placed on top of the flat surface of the TYCO W-Type 25 Installation Wrench to orient the sprinkler correctly. Step 9 Step 10. After installation is complete, ensure that the RAVEN Escutcheon is held fast against the mounting surface and sits squarely against the ceiling around its entire perimeter. Step 10 When using the technique in Figure 7, the Escutcheon can be pulled flat against the mounting surface by pulling up on the sprinkler/supply pipe from behind the wall or above the ceiling and then tightening the Wall Set Screws and Pipe Set Screws of the Retaining Flange. Do not over-tighten the Wall Set Screws as over-tightening these screws may damage the sprinkler. To verify correct sprinkler application, refer to the Notes in Figures 3 and 4 on SIN color dot indicators. For horizontal sidewall sprinklers, the SIN Color Dot also helps verify deflector orientation. In proper installations of RAVEN Horizontal Sidewall Sprinklers, SIN Color Dots face up. NOTICE If the Escutcheon is NOT held fast (tight with no movement or gap) to the mounting surface and as an option to relocating the sprinkler fitting (increasing the face of sprinkler fitting to face of mounting surface distance), up to two Adjustment Spacer Rings as shown in Figure 3 may be utilized. Each Adjustment Spacer Ring can account for inches of gap between the Escutcheon and mounting surface. Therefore, if the gap is greater than inches, the sprinkler fitting will need to be relocated to assure proper installation of both the sprinkler and escutcheon. Care and Maintenance TYCO RAVEN Institutional Sprinklers must be maintained and serviced in accordance with the following instructions. NOTICE Service inspections should be made on a regular basis to detect possible damage or alterations to the sprinkler and escutcheon. Inspections should include making certain that the Institutional Escutcheon is held fast to the mounting surface. Damaged or altered sprinklers are to be replaced immediately to avoid personal injury and to prevent use for causing personal injury, as well as to maintain the sprinkler system in an operative condition. Before closing a fire protection system main control valve for maintenance work on the fire protection system that it controls, obtain permission to shut down the affected fire protection system from the proper authorities and notify all personnel who may be affected by this action. Exercise care to avoid damage to the sprinklers before, during, and after installation. Never paint, plate, coat, or otherwise alter sprinklers after they leave the factory; otherwise, the performance may be impaired. 1" X 1/2" M.I. CLASS 150 SPRINKLER FITTING 1" STEEL PIPE PIPE SET SCREW 2" SCH. 40 STEEL PIPE SLEEVE (LENGTH TO SUIT WALL THICKNESS) OR 2" (50 mm) I.D. CORED HOLE WALL SET SCREW FINISHED CEILING 4-7/16" (112,7 mm) TO 12-7/16" (315,9 mm) * CENTERLINE OF SPRINKLER WATERWAY MODEL 1780 RETAINING FLANGE 5/8" (15,9 mm) MODEL 1781 CENTERING GROMMET WALL THICKNESS RAVEN HSW SPRINKLER * RESULTS IN OPERATED DEFLECTOR-TO-CEILING DISTANCE OF 4"-12" (101,6 mm TO 304,8 mm) FIGURE 7 OPTIONAL INSTALLATION TECHNIQUE FOR USING MODEL 1780 RETAINING FLANGE AND MODEL 1781 CENTERING GROMMET (Horizontal Installation Shown May be Applied to Pendent Installation)

25 TFP651 Page 10 of 10 Replace sprinklers that: were damaged by dropping, striking, wrench twisting, wrench slippage, or the like. were modified or over-heated. are leaking or exhibiting visible signs of corrosion. Frequent visual inspections are recommended to be initially performed for sprinklers installed in potentially corrosive atmospheres to verify the integrity of the materials of construction as they may be affected by the corrosive conditions present for a given installation. Thereafter, annual inspections per NFPA 25 are required. Owners are responsible for the inspection, testing, and maintenance of their fire protection system and devices in compliance with this document, as well as with the applicable standards of the National Fire Protection Association (for example, NFPA 25), in addition to the standards of any other Authorities Having Jurisdiction. Contact the installing contractor or sprinkler manufacturer regarding any questions. Sprinklers are recommended to be inspected, tested, and maintained by a qualified Inspection Service in accordance with local requirements and/or national codes. Disclaimer for RAVEN Institutional Sprinklers Tyco Fire Protection Products specifically disclaims any liability for damages or injury (including death) arising out of or caused by manipulation, dismantling, or misuse of RAVEN Institutional Sprinklers or the use or attempted use of the RAVEN Institutional Sprinklers or any component thereof as an instrument unrelated to its intended function as a fire protection device. Limited Warranty Products manufactured by Tyco Fire Protection Products (TFPP) are warranted solely to the original Buyer for ten (10) years against defects in material and workmanship when paid for and properly installed and maintained under normal use and service. This warranty will expire ten (10) years from date of shipment by TFPP. No warranty is given for products or components manufactured by companies not affiliated by ownership with TFPP or for products and components which have been subject to misuse, improper installation, corrosion, or which have not been installed, maintained, modified or repaired in accordance with applicable Standards of the National Fire Protection Association, and/or the standards of any other Authorities Having Jurisdiction. Materials found by TFPP to be defective shall be either repaired or replaced, at TFPP s sole option. TFPP neither assumes, nor authorizes any person to assume for it, any other obligation in connection with the sale of products or parts of products. TFPP shall not be responsible for sprinkler system design errors or inaccurate or incomplete information supplied by Buyer or Buyer s representatives. In no event shall TFPP be liable, in contract, tort, strict liability or under any other legal theory, for incidental, indirect, special or consequential damages, including but not limited to labor charges, regardless of whether TFPP was informed about the possibility of such damages, and in no event shall TFPP s liability exceed an amount equal to the sales price. The foregoing warranty is made in lieu of any and all other warranties, express or implied, including warranties of merchantability and fitness for a particular purpose. This limited warranty sets forth the exclusive remedy for claims based on failure of or defect in products, materials or components, whether the claim is made in contract, tort, strict liability or any other legal theory. This warranty will apply to the full extent permitted by law. The invalidity, in whole or part, of any portion of this warranty will not affect the remainder. Ordering Procedure Contact your local distributor for availability. When placing an order, indicate the full product description and Part Number (P/N). Sprinkler Assemblies Specify: RAVEN (standard or extended coverage), 165 F (74 C), Institutional (pendent or horizontal sidewall) Sprinkler with (finish) and P/N (below). Standard Coverage Pendent (TY3281) Chrome... P/N White Color... P/N Standard Coverage HSW (TY3381) Chrome... P/N White Color... P/N Extended Coverage Pendent (TY3282) Chrome... P/N White Color... P/N Extended Coverage HSW (TY3382) Chrome...P/N White Color...P/N Separately Ordered Escutcheons Style F (3 Diameter) Chrome... P/N White Color... P/N Separately Ordered Escutcheons Style G (4 Diameter) Chrome... P/N White Color... P/N Separately Ordered Sprinkler Wrench Specify W-Type 25 Installation Wrench, P/N Separately Ordered Adjustment Spacer Ring Specify Adjustment Spacer Ring for use with RAVEN Institutional Sprinklers, P/N Separately Ordered Parts for Installation in Concrete Specify Model 1781 Centering Grommet for installation in concrete, P/N Specify Model 1780 Retaining Flange with Set Screws for installation in concrete, P/N Copyright 2009, 2012 Tyco Fire Protection Products. All rights reserved. TEFLON is trademark of The DuPont Corporation.

26 April 8, 2011 Sprinkler 54a TECHNICAL DATA mirage standard and Qr concealed pendent sprinkler vk462 and hp sprinkler vk463 (K5.6) The Viking Corporation, 210 N Industrial Park Drive, Hastings MI Telephone: Technical Services: Fax: techsvcs@vikingcorp.com 1. DESCRIPTION Viking Mirage Standard and Quick Response Concealed Pendent Sprinkler VK462 and HP Sprinkler VK463 are thermosensitive glass-bulb spray sprinklers designed for installation on concealed pipe systems where the appearance of a smooth ceiling is desired. The sprinkler is pre-assembled with a threaded adapter for installation with a low-profile cover assembly that provides up to ½ (12.7 mm) of vertical adjustment. The twopiece design allows installation and testing of the sprinkler prior to installation of the cover plate. The push-on, thread-off design of the concealed cover plate assembly allows easy installation of the cover plate after the system has been tested and the ceiling finish has been applied. The cover assembly can be removed and reinstalled, allowing temporary removal of ceiling panels without taking the sprinkler system out of service or removing the sprinkler. 2. LISTINGS AND APPROVALS culus Listed: Category VNIV FM Approval: Class 2015 NYC Approved: MEA E, Volume 32 VdS Approved: Certificate G LPCB Approved: Ref. No. 096e/12 CE Certified: Standard EN , EC-certificate of conformity 0832-CPD-2032 Refer to Approval Chart 1 and Design Criteria on page 54c for culus Listing requirements, and refer to Approval Chart 2 and Design Criteria on page 54d for FM Approval requirements that must be followed. 3. technical data Specifications: Available since Minimum Operating Pressure: 7 psi (0.5 bar)* Maximum Working Pressure: Sprinkler VK463 is rated for use with water working pressures ranging from the minimum 7 psi (0.5 bar) up to 250 psi (17.2 bar) for high-pressure systems. High-pressure (HP) sprinklers can be identified by locating 250 stamped on the deflector. Sprinkler VK462 is rated to a maximum 175 psi (12 bar) wwp. Factory tested hydrostatically to 500 psi (34.5 bar) Thread size: 1/2 (15 mm) NPT Nominal K-Factor: 5.6 U.S. (80.6 metric ) Glass-bulb fluid temperature rated to -65 F (-55 C) Patents Pending *culus Listing, FM Approval, and NFPA 13 installs require a minimum of 7 psi (0.5 bar). The minimum operating pressure for LPCB and CE Approvals ONLY is 5 psi (0.35 bar). Metric K-factor measurement shown is when pressure is measured in Bar. When pressure is measured in kpa, divide the metric K-factor shown by Material Standards: Sprinkler Body: Brass UNS-C84400 Deflector: Copper UNS-C19500 for Sprinkler VK462 Viking Technical Data may be found on Phosphor Bronze UNS-C51000 for Sprinkler VK463 The Viking Corporation s Web site at Deflector Pins: Stainless Steel Alloy Bulb: Glass, nominal 3 mm diameter The Web site may include a more recent Pip Cap and Insert Assembly: Copper UNS-C11000 and Stainless Steel edition of this Technical Data Page. UNS-S30400 Button: Brass UNS-C36000 Screws: 18-8 Stainless Steel Belleville Spring Sealing Assembly: Nickel Alloy, coated on both sides with Teflon Tape Yoke: Phosphor Bronze UNS-C51000 Cover Adapter: Cold Rolled Steel UNS-G10080, Finish: Clear Chromate over Zinc Plating Form No. F_ Replaces page 54a-f, dated February 25, (Revised LPCB Approval. Removed UL listing from 165 F Cover Obsoleted sprinkler )

27 Sprinkler 54b April 8, 2011 TECHNICAL DATA mirage standard and Qr concealed pendent sprinkler vk462 and hp sprinkler vk463 (K5.6) The Viking Corporation, 210 N Industrial Park Drive, Hastings MI Telephone: Technical Services: Fax: techsvcs@vikingcorp.com Cover Assembly Materials: Cover: Copper UNS-C11000 Base: Brass UNS-C26000 or UNS-C26800 Springs: Nickel Alloy Solder: Eutectic Ordering Information: (Also refer to the current Viking price list.) Viking Mirage Standard and Quick Response Concealed Pendent Sprinklers and Cover Plate Assemblies must be ordered separately: Sprinkler: Base Part No A or HP Base Part No A Specify sprinkler temperature rating by adding the appropriate suffix for the temperature rating to the base part number: Temperature Suffix ( F/ C): 155 /68 = B, 175 /79 = D, 200 /93 = E For example, sprinkler VK463 with a 155 F/68 C temperature rating = 13667AB. Cover Plate Assembly: Base Part No (2-3/4 diameter), Base Part No (3-5/16 diameter), or Base Part No (square cover plate, 3-5/16 diameter) Specify finish and temperature rating of the cover plate assembly by adding the appropriate suffixes for the finish and the cover temperature rating to the base part number: Finish Suffix: Polished Chrome = F, Brushed Chrome = F-/B, Bright Brass = B, Antique Brass = B-/A, Brushed Brass = B-/B, Brushed Copper = E-/B, Painted White = M-/W, Painted Ivory = M-/I, Painted Black = M-/B Temperature Suffix ( F/ C): 135 /57 UL (139 /59 FM and LPCB) = A, 165 /74 = C For example, cover with a Polished Chrome finish and a 165 F/74 C temperature rating = 13504FC. Note: Square cover plate culus Listing is for the 135 F (57 C) temperature rated cover plate only. Refer to the Approval Chart. Available Finishes And Temperature Ratings: Refer to Table 1. Accessories: (Also refer to the Sprinkler Accessories section of the Viking data book.) Sprinkler Wrenches**: A. Heavy Duty Wrench Part No W/B (available since 2006), or B. Head Cabinet Wrench Part No *** (available since 2006) C. Optional Concealed Cover Plate Installer Tool Part No for cover 13504, or Part No for the large diameter cover (available since 2007) **Requires a ½ ratchet (not available from Viking). ***Optional for removal of the protective cap. Ideal for sprinkler cabinets. Sprinkler Cabinet: Part No A (available since 1971) 4. Installation Refer to appropriate NFPA Installation Standards. 5. Operation During fire conditions, when the temperature around the sprinkler approaches its operating temperature, the cover plate detaches. Continued heating of the exposed sprinkler causes the heat-sensitive liquid in the glass bulb to expand and the bulb to shatter, releasing the yoke, pip-cap and sealing spring assembly. Water flowing through the sprinkler orifice strikes the sprinkler deflector, forming a uniform spray pattern to extinguish or control the fire. 6. inspections, tests and maintenance Refer to NFPA 25 for Inspection, Testing and Maintenance requirements. 7. availability Viking Sprinklers VK462 and VK463 are available through a network of domestic and international distributors. See The Viking Corporation web site for the closest distributor or contact The Viking Corporation. 8. Guarantee For details of warranty, refer to Viking s current list price schedule or contact Viking directly.

Quick response concealed horizontal sidewall sprinkler

Quick response concealed horizontal sidewall sprinkler January 1, 2011 Sprinkler 63a 1. DESCRIPTION Viking Quick Response Concealed Horizontal Sidewall Sprinkler VK408 is a small solder link and lever spray sprinkler designed for installation on concealed

More information

Series TY-FRB 5.6 and 8.0 K-factor Extended Coverage Horizontal Sidewall Sprinklers Quick and Standard Response (Light Hazard) General Description

Series TY-FRB 5.6 and 8.0 K-factor Extended Coverage Horizontal Sidewall Sprinklers Quick and Standard Response (Light Hazard) General Description Worldwide Contacts www.tyco-fire.com Series TY-FRB 5.6 and 8.0 K-factor Extended Coverage Horizontal Sidewall s Quick and Standard Response (Light Hazard) General Description TYCO Series TY-FRB 5.6 and

More information

Model SW-20 and SW-24 11.2 K-factor Extended Coverage Ordinary Hazard Horizontal Sidewall Sprinklers (Standard Response) General Description

Model SW-20 and SW-24 11.2 K-factor Extended Coverage Ordinary Hazard Horizontal Sidewall Sprinklers (Standard Response) General Description Worldwide Contacts www.tyco-fire.com Model SW-20 and SW-24 11.2 K-factor Extended Ordinary Hazard Horizontal Sidewall s (Standard ) General Description 11.2 K-factor, Extended Ordinary s, Standard are

More information

Sprinkler Identification Number. Page 1 of 6 MARCH 2014 TFP288. Worldwide Contacts. www.tyco-fire.com

Sprinkler Identification Number. Page 1 of 6 MARCH 2014 TFP288. Worldwide Contacts. www.tyco-fire.com Worldwide Contacts www.tyco-fire.com Model EC-HS 80 K-factor, Quick Response Extended Coverage Horizontal Sidewall Sprinklers Installations per VdS CEA 400, Annex E, LH/OH General Description The Model

More information

Series TY-FRB 2.8, 4.2, 5.6, and 8.0 K-Factor Upright, Pendent, and Recessed Pendent Sprinklers Quick Response, Standard Coverage General Description

Series TY-FRB 2.8, 4.2, 5.6, and 8.0 K-Factor Upright, Pendent, and Recessed Pendent Sprinklers Quick Response, Standard Coverage General Description Worldwide Contacts www.tyco-fire.com Series 2.8,.2,.6, 8.0 K-Factor Upright, Pendent, Recessed Pendent Sprinklers Quick Response, Stard Coverage General Description The TYCO Series, 2.8,.2,.6, 8.0 K-factor,

More information

Sprinkler Identification Numbers

Sprinkler Identification Numbers Worldwide Contacts www.tyco-fire.com Series TY-FRB 5.6 K-factor Horizontal Quick Response, Standard Coverage General Description described in this data sheet are quick response -standard coverage, decorative

More information

Model/Sprinkler Identification Numbers

Model/Sprinkler Identification Numbers Technical Services: Tel: (800) 381-9312 / Fax: (800) 791-5500 Series TY-L 5.6 and 8.0 K-factor Upright, Pendent, and Recessed Pendent Sprinklers Standard Response, Standard Coverage General Description

More information

Series TY-FRL 5.6 and 8.0 K-factor Extended Coverage Horizontal Sidewall Sprinklers Quick & Standard Response (Light Hazard) General Description

Series TY-FRL 5.6 and 8.0 K-factor Extended Coverage Horizontal Sidewall Sprinklers Quick & Standard Response (Light Hazard) General Description Technical Services: Tel: (800) 381-9312 / Fax: (800) 791-5500 Series TY-FRL 5.6 and 8.0 K-factor Extended Horizontal Sidewall s Quick & Standard (Light Hazard) General Description The Series TY-FRL, 5.6,

More information

Series DS-1 Dry-Type Sprinklers 5.6K Horizontal Sidewall Standard and Quick Response, Extended Coverage General Description

Series DS-1 Dry-Type Sprinklers 5.6K Horizontal Sidewall Standard and Quick Response, Extended Coverage General Description Worldwide Contacts www.tyco-fire.com Series DS-1 Dry-Type Sprinklers 5.6K Horizontal Sidewall Standard and Quick Response, Extended Coverage General Description TYCO Series DS-1 Dry-Type Sprinklers, 5.6

More information

Series ELO-231B 11.2 K-factor Upright and Pendent Sprinklers. Standard Response, Standard Coverage, General Description

Series ELO-231B 11.2 K-factor Upright and Pendent Sprinklers. Standard Response, Standard Coverage, General Description Technical Services: Tel: (800) 381-9312 / Fax: (800) 791-5500 Series ELO-231B 11.2 K-factor Upright and Pendent Sprinklers Standard Response, Standard Coverage General Description IMPORTANT Always refer

More information

Model WS Specific Application Window Sprinklers Horizontal and Pendent Vertical Sidewall 5.6 K-factor General Description

Model WS Specific Application Window Sprinklers Horizontal and Pendent Vertical Sidewall 5.6 K-factor General Description Worldwide Contacts www.tyco-fire.com Model WS Specific Application Window Sprinklers Horizontal and Pendent Vertical Sidewall 5.6 K-factor General Description The TYCO Model WS Specific Application Window

More information

Sprinkler Identification Numbers (SINs) Technical Data

Sprinkler Identification Numbers (SINs) Technical Data Worldwide Contacts www.tyco-fire.com Series DS-1 5.6 K-factor, Dry-type Sprinklers Pendent, Upright, and Horizontal Sidewall Standard Response, Standard Coverage General Description TYCO Series DS-1 5.6K

More information

Type EA-1 PROTECTOSPRAY Directional Spray Nozzles, Automatic, Medium Velocity General Description

Type EA-1 PROTECTOSPRAY Directional Spray Nozzles, Automatic, Medium Velocity General Description Worldwide Contacts www.tyco-fire.com Type EA-1 PROTECTOSPRAY Directional Spray Nozzles, Automatic, Medium Velocity General Description The TYCO Type EA-1 PROTECTO- SPRAY Directional Spray Nozzles are automatic

More information

TECHNICAL DATA 2. LISTINGS AND APPROVALS. Spray Nozzle 11. December 20, 2013

TECHNICAL DATA 2. LISTINGS AND APPROVALS. Spray Nozzle 11. December 20, 2013 Spray Nozzle 11 1. DESCRIPTION Viking Model C-1 Window Sprinklers are non-automatic, open, outside intended for protection of windows, walls, and roofs against exposure fires. The directional discharge

More information

ESFR DRY PENDENT SPRINKLER VK502 (K14.0) TECHNICAL DATA

ESFR DRY PENDENT SPRINKLER VK502 (K14.0) TECHNICAL DATA December 19, 2013 Sprinkler 122j 1. DESCRIPTION Viking Early Suppression Fast Response (ESFR) Dry Pendent Sprinkler VK502 is a fast response fusible element type sprinkler designed for use in storage areas

More information

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description Worldwide Contacts www.tyco-fire.com Model F thru F3 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description The Mulsifyre Nozzles are open (nonautomatic) nozzles and they are designed

More information

Type D3 PROTECTOSPRAY Directional Spray Nozzles, Open, Medium Velocity General Description

Type D3 PROTECTOSPRAY Directional Spray Nozzles, Open, Medium Velocity General Description Worldwide Contacts www.tyco-fire.com Type D3 PROTECTOSPRAY Directional Spray Nozzles, Open, Medium Velocity General Description The TYCO Type D3 PROTECTO- SPRAY Nozzles are open (non-automatic) directional

More information

Model KFR56 Series Quick Response Standard Spray

Model KFR56 Series Quick Response Standard Spray Bulletin 036 Model KFR56 Series Quick Response Standard Spray Bulletin 036 Model KFR56 Sprinkler Types Standard Upright Standard Pendent Horizontal Sidewall Model KFR56 Sprinkler Types Pendent F1/F2/FP

More information

esfr pendent sprinkler vk510 (k25.2)

esfr pendent sprinkler vk510 (k25.2) January 17, 2014 Sprinkler 124a 1. DESCRIPTION Viking Early Suppression Fast Response (ESFR) Pendent Sprinkler VK510 incorporates the capability to suppress specific high-challenge fires. The addition

More information

Technical Data. Installation

Technical Data. Installation Technical Services: Tel: (800) 81-91 / Fax: (800) 791-5500 Model 51 (1) Riser Manifold 1-1/ thru 6 Inch (DN40 thru DN150) For NFPA 1 Sprinkler Systems General Description The Figure 51 (1) Riser Manifolds

More information

Steel Fire Sprinkler Pipe

Steel Fire Sprinkler Pipe Steel Fire Sprinkler Pipe Wheatland Tube Fire Sprinkler Products Wheatland Tube began producing steel fire sprinkler pipe in 1931, and today offers the most complete line of products in the industry. Engineers

More information

Model F1FR Series Quick Response Glass Bulb Sprinklers

Model F1FR Series Quick Response Glass Bulb Sprinklers Model F1FR56 Sprinkler Types Standard Spray Standard Spray Conventional / Vertical Sidewall Model F1FR56 Recessed Sprinkler Types Standard Spray Model F1FR56 Concealed Sprinkler Types Standard Spray Model

More information

Viking Residential Sprinkler Installation Guide

Viking Residential Sprinkler Installation Guide Viking Residential Sprinkler Installation Guide January, 2009 Trusted Above AllT M www.flowbusiness.cl Sprinkler RES1 January 9, 2009 1. DESCRIPTION Viking residential automatic sprinklers are equipped

More information

RAPID RESPONSE Model RSV-1 Residential Shut-Off Valve, 1 Inch and 2 Inch (DN25 and DN50) for Dual-Purpose Residential Water Supply General Description

RAPID RESPONSE Model RSV-1 Residential Shut-Off Valve, 1 Inch and 2 Inch (DN25 and DN50) for Dual-Purpose Residential Water Supply General Description Worldwide Contacts www.tyco-fire.com RAPID RESPONSE Model RSV-1 Residential Shut-Off Valve, 1 Inch and 2 Inch (DN25 and DN50) for Dual-Purpose Residential Water Supply General Description The TYCO RAPID

More information

Series MJC Multiple Jet Controls DN20, DN25, DN40, and DN50, 12 bar BSPT Inlet & Outlets Threads General Description.

Series MJC Multiple Jet Controls DN20, DN25, DN40, and DN50, 12 bar BSPT Inlet & Outlets Threads General Description. Worldwide Contacts www.tyco-fire.com Series Multiple Jet Controls DN20, DN25, DN40, and DN50, 2 bar BSPT Inlet & Outlets Threads General Description The TYCO Series Multiple Jet Controls are control valves

More information

HIGH VELOCITY WATER SPRAY NOZZLE

HIGH VELOCITY WATER SPRAY NOZZLE HIGH VELOCITY WATER SPRAY NOZZLE MODELS HV-AS & HV-BS HD FIRE PROTECT TECHNICAL DATA MODEL HV-AS & HV-BS MAXIMUM WORKING 12 Bar (175 PSI) PRESSURE EFFECTIVE 3.5 Bar to 10.5 Bar WORKING PRESSURE (50-150

More information

Sprinkler Guards Model C Model D

Sprinkler Guards Model C Model D Bulletin 208 Rev. M Sprinkler Guards Model C Model D Bulletin 208 Rev. M Model C Sprinkler Guards Model C Series sprinkler guards are designed to be assembled onto installed sprinklers. They are constructed

More information

Engineering Specifications

Engineering Specifications PUREFLOW PEX PRODUCTS PART 1 GENERAL 1.1 SUMMARY 1.1.1 This specification covers Branch & Main, Parallel Water Distribution Systems (MANABLOC), Cross-linked Polyethylene tubing and fittings using PEX Press

More information

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series INSTR3010 0406 Installation and Operating Instructions Installation Instructions for SS EPE-316L Series Congratulations on your purchase of this Aqua-Pure high flow, single housing filtration system. This

More information

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code Part 1 - GENERAL 1.1 DESCRIPTION OF WORK A. Design and installation of an engineered Kidde ECS Advanced Delivery Systems (ADS), clean agent/waterless fire suppression system employing DuPont FM-200 agent,

More information

IDENTIFICATION BROCHURE FOR Central RESIDENTIAL WET SPRINKLERS

IDENTIFICATION BROCHURE FOR Central RESIDENTIAL WET SPRINKLERS IDENTIFICATION BROCHURE FOR Central RESIDENTIAL WET SPRINKLERS 1 INTRODUCTION TO THE VOLUNTARY REPLACEMENT PROGRAM This brochure provides information that will assist you in identifying whether the sprinklers

More information

Model F156 Sprinkler Types. Model F156 Recessed Sprinkler Types. Model F142, F1XLH & F128 Sprinkler Types

Model F156 Sprinkler Types. Model F156 Recessed Sprinkler Types. Model F142, F1XLH & F128 Sprinkler Types Bulletin 013 Rev. M Models F1 Series Standard Response s Bulletin 013 Rev. M Model F156 Types Standard Upright Standard Pendent Conventional Vertical Sidewall Model F156 Recessed Types Pendent/F1/F2/FP

More information

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED. CAST IRON THE BASICS 1. DO NOT LIFT ON YOUR OWN. 2. ONLY LIFT THE RADIATOR VERTICALLY. 3. DO NOT LIFT MORE THAN 8/10 SECTIONS AT ANY ONE TIME. 4. POSITION THE RADIATOR BEFORE FINAL ASSEMBLY. 5. THIS PRODUCT

More information

4077 AIRPARK DRIVE STANDISH, MICHIGAN 48658 PHONE 989-846-4583 800-248-0278 FAX

4077 AIRPARK DRIVE STANDISH, MICHIGAN 48658 PHONE 989-846-4583 800-248-0278 FAX Butterfly Valves 4077 AIRPARK DRIVE STANDISH, MICHIGAN 48658 PHONE 989-846-4583 800-248-0278 FAX 989-846-9231 www.globesprinkler.com MAY 2013 L-1 BULLETIN BUTTERFLY REV. #5 GLOBE BUTTERFLY VALVE INSTALLATION

More information

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER 1.800.591.9360 TECHNICAL ASSISTANCE FAX: 1.626.855.4894

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER 1.800.591.9360 TECHNICAL ASSISTANCE FAX: 1.626.855.4894 ACORN SAFETY P.O. BOX 3527 CITY OF INDUSTRY, CA 9744-0527 UNITED STATES OF AMERICA WWW.ACORNSAFETY.COM INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS FREEZE RESISTANT WALL MOUNTED EMERGENCY EYEWASH

More information

LIST PRICE BOOK MALLEABLE CAST IRON PRESS FITTINGS FOR SCH. 10 40 BLACK & GALVANIZED STEEL PIPE

LIST PRICE BOOK MALLEABLE CAST IRON PRESS FITTINGS FOR SCH. 10 40 BLACK & GALVANIZED STEEL PIPE FASTLOCK fittings are not currently approved for use with gas or fire protection applications. FITTINGS FOR STEEL PIPE LIST PRICE BOOK MALLEABLE CAST IRON FITTINGS FOR SCH. 10 40 BLACK & GALVANIZED STEEL

More information

Installation Instructions

Installation Instructions PUSH Installation Instructions A DA C O M PLIA NT shown with optional Bradley 90-75 faucet Front-Mounted Barrier Free Rectangular Bowl Stainless Steel Lav Table of Contents Pre-Installation Information...........2

More information

Extended Coverage Sprinklers

Extended Coverage Sprinklers Extended Coverage Sprinklers Welcome ASPE Wally Barker Sprinkler Systems 101 MATERIALS OF CONSTRUCTION The components that make up a sprinkler head are: Frame or casting Deflector Fusible element or frangible

More information

TECHNICAL DATA. Dry 122a. November 12, 2013

TECHNICAL DATA. Dry 122a. November 12, 2013 Dry 122a 1. PRODUCT DESCRIPTION The Viking is a quick-opening device. When installed with the required external Anti-flood Device, the assembly is designed to increase the operating speed of Viking Model

More information

IDENTIFICATION BROCHURE FOR Central COMMERCIAL WET SPRINKLERS

IDENTIFICATION BROCHURE FOR Central COMMERCIAL WET SPRINKLERS IDENTIFICATION BROCHURE FOR Central COMMERCIAL WET SPRINKLERS 1 INTRODUCTION TO THE VOLUNTARY REPLACEMENT PROGRAM This brochure provides information that will assist you in identifying whether the sprinklers

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

Stainless Steel Single and Dual Circulation Kits

Stainless Steel Single and Dual Circulation Kits Instruction Sheet P/N 160780 01 Stainless Steel Single and Dual Circulation Kits Introduction The single and dual high-pressure circulation kits allow you to vary and control the circulation rate of coating

More information

TWO-WAY DIVERTER WITH THREE-WAY HAND SHOWER

TWO-WAY DIVERTER WITH THREE-WAY HAND SHOWER TWO-WAY DIVERTER WITH THREE-WAY HAND SHOWER 1. BEFORE YOU BEGIN A. HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials, and

More information

SECTION 15140 - PIPE HANGERS AND SUPPORTS

SECTION 15140 - PIPE HANGERS AND SUPPORTS Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING

60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING 60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed

More information

Select Radiators Installation Guide

Select Radiators Installation Guide Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall

More information

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab GOOSENECK MOUNTING KIT Equipment Required: Fastener Kit: F Wrenches: 3/4, 7/8, 15/16 Drill Bits: 1/4 Other Tools: Drill WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers

More information

Float and Thermostatic Traps Series H, C and X

Float and Thermostatic Traps Series H, C and X Hoffman Specialty Installation & Maintenance Instructions HS-(E) and Thermostatic Traps Series H, C and X Series C & NPT Series C NPT Series X NPT Series C NPT Series H Ratings Maximum Max. Operating NPT

More information

TITAN 13 x 2 ½ BRAKES

TITAN 13 x 2 ½ BRAKES INSTALLATION INSTRUCTION AND SERVICE MANUAL Actuator/Trailer Dealer - Please provide these instructions to the consumer. Consumer - Read and follow these instructions. Keep them with the trailer for future

More information

08.08 Vic-Check Valves

08.08 Vic-Check Valves The check valves are a product of computer-assisted innovative engineering with quality features including a new hydrodynamically efficient profile. The Vic-Check valve utilizes a spring-assisted, single-disc

More information

USE &CARE GUIDE. Remote Faucet Pump System. See Important Safeguards on page 2

USE &CARE GUIDE. Remote Faucet Pump System. See Important Safeguards on page 2 Remote Faucet Pump System USE &CARE GUIDE See Important Safeguards on page 2 An exclamation point within an equilateral triangle is intended to alert user to the presence of important operating and maintenance

More information

COMPLIANCE WITH LAWS, CODES, AND STANDARDS

COMPLIANCE WITH LAWS, CODES, AND STANDARDS All products furnished by Jinan Meide Casting Co. Ltd, shall be in accordance with the following terms and conditions unless otherwise agreed to in writing: ACCEPTANCE AND COMPLETE AGREEMENT Buyer s order

More information

Price Book - Section 20 Miscellaneous

Price Book - Section 20 Miscellaneous Effective Date Price Book - Central - 4" Dry Pipe Valve Model AF or AG (2002) (each) Valve Cover 40002000 $564.50 Cover Bolts (Purchase 6 Units Each) 60003000 $15.50 Cover Gasket 40004000 $139.00 Clapper

More information

81000 Series Aluminum Gate Valve Installation and Repair Manual

81000 Series Aluminum Gate Valve Installation and Repair Manual High Vacuum Valves Leader in Quality and Value 81000 Series Aluminum Gate Valve Installation and Repair Manual Dear Customer, Thank you for choosing HVA as your vacuum valve supplier. Your valve will give

More information

CLEAR-DIVISIONS CENTERFOLD

CLEAR-DIVISIONS CENTERFOLD CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in

More information

RESIDENTIAL SPRINKLER INSTALLATION GUIDE

RESIDENTIAL SPRINKLER INSTALLATION GUIDE RESIDENTIAL SPRINKLER INSTALLATION GUIDE 4077 AIR PARK DRIVE STANDISH, MICHIGAN 48658 PHONE 989-846-4583 800-248-0278 FAX 989-846-9231 www.globesprinkler.com A-15 GLOBE RESIDENTIAL SPRINKLER GUIDE DESCR.,

More information

Retractable Screen. Replacement Screen Instructions

Retractable Screen. Replacement Screen Instructions Retractable Screen Patent Pending Replacement Screen Instructions For RTS, RET, & RTM Products ATTENTION! Retractable screens are not intended to provide security or provide for the retention of objects,

More information

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR Installation and Operation Manual 1 ENGLISH Safety Instructions 2 Features 2-3 Specifications 3 Installation 4-5 Wiring Diagrams 6-7 Warranty 8

More information

Installation Instructions

Installation Instructions Installation Instructions E19-120 (Plastic showerhead) E19-120A (Stainless steel showerhead) E19-120SS (All Stainless Steel) Drench Shower - Horizontal Supply Table of Contents Pre-Installation Information..........................2.............................3

More information

OAK WORKBENCH WITH 2 DRAWERS

OAK WORKBENCH WITH 2 DRAWERS OAK WORKBENCH WITH 2 DRAWERS Model 93991 ASSEMBLY Instructions Visit our website at: http://www.harborfreight.com Read this material before using this product. Failure to do so can result in serious injury.

More information

Installation Instructions: (Part # SB76880) XRC Armor Front Fender Kit

Installation Instructions: (Part # SB76880) XRC Armor Front Fender Kit WARNING: Check with Local and State laws before installing this accessory! NOTE: Carefully read entire instructions thoroughly before attempting to install this part. Parts Included: Qty Parts Included:

More information

Pre-Fab Easy Installation For Models: 006-CT-USK, 008-CT-USK Installation and Operating Instructions for Existing Homes with Standard Piping

Pre-Fab Easy Installation For Models: 006-CT-USK, 008-CT-USK Installation and Operating Instructions for Existing Homes with Standard Piping Instruction Sheet 102-140 Pre-Fab Easy Installation For Models: 006-CT-USK, 008-CT-USK Installation and Operating Instructions for Existing Homes with Standard Piping Plant I.D. 001-1024 EFFECTIVE: November

More information

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank This specification describes requirements for a Diesel Fuel Day Tank System consisting of one or more fuel tanks, an Electronic

More information

1-1/2 Inch (DN40) 9 lbs. (4,1 Kg) 8 lbs. (3,6 Kg) Flange Groove* N/A N/A. Flange Flange N/A N/A

1-1/2 Inch (DN40) 9 lbs. (4,1 Kg) 8 lbs. (3,6 Kg) Flange Groove* N/A N/A. Flange Flange N/A N/A Worldwide Contacts www.tyco-fire.com DV-5 Deluge Valve Diaphragm Style General Description The TYCO 1-1/2 thru inch (DN40 thru DN200), DV-5 Deluge Valves are diaphragm type valves designed for vertical

More information

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Equipment

More information

Installation Instructions / Warranty

Installation Instructions / Warranty Installation Instructions / Warranty Vertical Spray Bidet Fitting Rough 1322X181 Citterio 39224xx0 Citterio 39225xx0 Starck 10220xx0 Steel 35220800 Uno 38220xx0 Terrano 37224xx0 Terrano 37225xx0 Carlton

More information

James M. Pleasants Company

James M. Pleasants Company James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:

More information

Viking Residential Sprinkler Installation Guide

Viking Residential Sprinkler Installation Guide Viking Residential Sprinkler Installation Guide Trusted bove ll TM www.vikinggroupinc.com Sprinkler RES1 1. DESCRIPTION Viking residential automatic s are equipped with a fast response heat-sensitive operating

More information

FOAM CHAMBER MODEL - FC

FOAM CHAMBER MODEL - FC FOAM CHAMBER MODEL - FC TECHNICAL DATA : MODEL SIZE WORKING PRESSURE FC 50, 65, 80, 100 &150 NB inlet Minimum 2.8 Kg. / sq. cm. (40 PSI) Maximum 7 Kg. / sq.cm. (100 PSI) FLANGE CONNECTION ANSI B16.5 Class

More information

Installation and Maintenance Instructions

Installation and Maintenance Instructions Installation and Maintenance Instructions Limited One Year Warranty T&S warrants to the original purchaser (other than for purposes of resale) that such product is free from defects in material and workmanship

More information

Installation Manual DIAPHRAGM WELL TANK

Installation Manual DIAPHRAGM WELL TANK Installation Manual DIAPHRAGM WELL TANK IN-LINE SERIES: 2-5 & 7 GALLON VERTICAL SERIES: 14-20-25-32-36-52-65-86-96-119 GALLON HORIZONTAL SERIES: 7-14 & 20 GALLON NO LEAD NO LEAD: The weighted average of

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 16303

INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 16303 WATER MIST HAND PORTABLE FIRE EXTINGUISHERS Model B270 ¾ Gallon Model B272 2 ½ Gallon INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 6303 All fire extinguishers should be installed, inspected

More information

CLEAR-DIVISIONS VARIOFOLD

CLEAR-DIVISIONS VARIOFOLD CLEAR-DIVISIONS VARIOFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOFOLD moveable The yellow highlighted areas in the

More information

INSTALLATION INSTRUCTIONS. SharkBite. Connection System. The SharkBite System

INSTALLATION INSTRUCTIONS. SharkBite. Connection System. The SharkBite System INSTALLATION INSTRUCTIONS SharkBite Connection System The SharkBite System The SharkBite connection system uses an advanced push-fit design that works in two stages. When the tube is inserted into the

More information

Installation Instructions 6028.801

Installation Instructions 6028.801 DAZZLE Installation Instructions 08.80 Spread Lavatory Faucet with Speed Connect Drain* Congratulations on purchasing your American Standard faucet with Speed Connect drain, a feature found only on American

More information

Ceiling Mount Air Handler Manual

Ceiling Mount Air Handler Manual www.surna.com 303.993.5271 Ceiling Mount Air Handler Manual Models: CMAH12, CMAH18, CMAH24, CMAH30, CMAH36, CMAH48, CMAH60 Revised: September 2014 Table of Contents Warranty Information 4 Limited Warranty

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Submersion/Insertion Toroidal Sensor

Submersion/Insertion Toroidal Sensor Instruction Sheet PN 51A-228/rev.P December 2010 Model 228 Submersion/Insertion Toroidal Sensor For additional information, please visit our website at www.emersonprocess.com/raihome/liquid/. CAUTION SENSOR/PROCESS

More information

Powers Controls Free Energy Band TH 193 HC Heating/Cooling Room Thermostat

Powers Controls Free Energy Band TH 193 HC Heating/Cooling Room Thermostat Document No. 155-068P25 TH 193-4 Powers Controls Free Energy Band TH 193 HC Heating/Cooling Room Thermostat 50 60 70 80 70 TH0356R1 60 80 POWERS Description The TH 193 HC thermostats are proportional dual

More information

Your safety and the safety of others are very important.

Your safety and the safety of others are very important. NATURAL GAS TO PROPANE CONVERSION KIT 090 INSTALLATION INSTRUCTIONS FOR ALTITUDES 0 -,00 FT. ONLY PROPANE CONVERSION KIT SAFETY... INSTALLATION REQUIREMENTS... Tools and Parts... LP Gas Requirements...

More information

London Farm Kitchen Sinks

London Farm Kitchen Sinks INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE London Farm Kitchen Sinks 24" Sink model number 35120 30" Sink model number 35130 36" Sink model number 35140 Certified to comply with ANSI A112.19.3.M CAN/C.S.A

More information

TD01211 PIN: NX010 201007.2 nd Edition. Water Motor Alarm MODEL: NX010 TECHNICAL DATA

TD01211 PIN: NX010 201007.2 nd Edition. Water Motor Alarm MODEL: NX010 TECHNICAL DATA Water Motor Alarm MODEL: NX010 GENERAL DESCRIPTION TECHNICAL SPECIFICATIONS Model NX010 Working Water Pressure Range 5 to 175 psig 0.035 to 1.2 MPa (0.35 to 12 bar) Shipping Weight 11 lbs 5 kg Alarm Line

More information

Model RV-1 Pressure Relief Valve 2 to 8 Inch (DN50 to DN200), 250 psi (17,2 bar) Pilot-Operated, Globe and Angle Body Styles General Description

Model RV-1 Pressure Relief Valve 2 to 8 Inch (DN50 to DN200), 250 psi (17,2 bar) Pilot-Operated, Globe and Angle Body Styles General Description Technical Services 00-3-932 +-0-7-220 www.tyco-fire.com Model RV- Pressure Relief Valve 2 to Inch (DN50 to DN200), 250 psi (7,2 bar) Pilot-Operated, Globe and Angle Body Styles General Description The

More information

By SP Partners, LLC. www.rainbowatticstair.com INSTALLATION GUIDE. Prestige

By SP Partners, LLC. www.rainbowatticstair.com INSTALLATION GUIDE. Prestige By SP Partners, LLC www.rainbowatticstair.com INSTALLATION GUIDE Prestige IMPORTANT READ THIS FIRST Inspect stair for any damage prior to installation. Stair is NOT to be installed while home is under

More information

Installation Instructions / Warranty

Installation Instructions / Warranty Installation Instructions / Warranty Axor Citterio 39384XX1 39387XX1 Axor Citterio 39385XX1 39386X1 Axor Massaud 18743001 18747001 Axor Starck X 10385XX1 10386XX1 Axor Starck 10375XX1 10379XX1 Axor Terrano

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

FOAM CHAMBER MODEL - FCA & FCA-S HD FIRE PROTECT PVT. LTD. TECHNICAL DATA FEATURES APPLICATION. Carbon Steel Construction FCA-65, FCA-80 & FCA-100

FOAM CHAMBER MODEL - FCA & FCA-S HD FIRE PROTECT PVT. LTD. TECHNICAL DATA FEATURES APPLICATION. Carbon Steel Construction FCA-65, FCA-80 & FCA-100 MODEL - FCA & FCA-S HD FIRE PROTECT TECHNICAL DATA MODELS FCA-65, FCA-80 & FCA-100 Carbon Steel Construction FCA-S 65, FCA-S 80 & FCA-S 100 Stainless Steel Construction INLET SIZE 65, 80, 100 NB WORKING

More information

ASME Packaged Indirect Fired Water Heater

ASME Packaged Indirect Fired Water Heater Utilizes Or HTHW To Heat Domestic Water, Semi-Instantaneous or Storage Type Model BW Features Reliable Only high grade materials used in construction to ensure long operating life Hydrastone cement lining

More information

Installation Instructions / Warranty

Installation Instructions / Warranty Installation Instructions / Warranty Uno 38475XX1 38379XX1 Steel 35375801 35379801 Massaud 18743001 18747001 Starck X 10385XX1 10386XX1 Starck 10375XX1 10379XX1 Citterio M 34715XX1 34716XX1 Citterio 39384XX1

More information

HotLok Pass Through Blanking Panel

HotLok Pass Through Blanking Panel HotLok Pass Through Blanking Panel Part Numbers 1U - 10112 2U - 10113 Table of Contents Tools Required for Installation Page 2 Dimensions and Rack Requirements Page 2 Installation Procedures Page 3 Removal

More information

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE

More information

cbperformance.com Please read this entire brochure prior to installing your CB Performance Products MAGNASPARK II distributor.

cbperformance.com Please read this entire brochure prior to installing your CB Performance Products MAGNASPARK II distributor. - Easy -wire installation with no external spark box necessary, but can be used with one. - Precision CNC machining and hand assembled construction. This is a premium product. - Accurate super hot spark

More information

MODEL G300 BRAKE BLEEDER

MODEL G300 BRAKE BLEEDER MODEL G300 BRAKE BLEEDER Installation, Operation & Repair Parts Information Branick Industries, Inc. 4245 Main Avenue P.O. Box 1937 Fargo, North Dakota 58103 REV060616 P/N: 81-0035G 1 THIS PAGE INTENTIONALLY

More information

THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494

THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494 THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494 1. BEFORE YOU BEGIN IMPORTANT INSTRUCTIONS READ AND SAVE FOR THE CONSUMER WARNING: Risk of scalding or other severe injury. Before completing installation,

More information

MBA-MM-1040/10/13/1665 MULTI MEDIA FILTERS

MBA-MM-1040/10/13/1665 MULTI MEDIA FILTERS MASTER Water Conditioning Corp. www.masterwater.com Installation and Operation Manual MBA-MM-1040/10/13/1665 MULTI MEDIA FILTERS with the 263/742 Logix Control Valve June 2010 Table of Contents Page No.

More information

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00 211100_flexheadin_01_MS_0409 5/22/09 PTC 56 Lowland Street Holliston, MA 01746 Phone: (800) 829-6975 Phone: (508) 893-9596 Fax: (508) 893-6020 E-mail: sales1@flexhead.com www.flexhead.com This MANU-SPEC

More information