1 RIAI Practice e-bulletin (Issue No. 50) BUILDING CONTRACTS If your time to you Is worth savin' Then you better start swimmin' Or you'll sink like a stone For the times they are a-changin'. Bob Dylan 1. New Government Standard Conditions of Engagement for Construction Consultants For the last two years the Construction Industry Council (CIC), which comprises the RIAI, Engineers Ireland, ACEI and the CIF, have been in discussions with the Department of Finance on these proposals. There were some concessions made by the Department of Finance during the discussions mostly concerning Fee Bidding and Quality Price Ratio. The CIC did not agree to the Conditions of Engagement and it should be noted that they have been imposed by the Department of Finance and also that they will be implemented by all state agencies, including OPW, Departments of Health, Education, Defence and Local Authorities etc. The Government has introduced, from 1 January 2007 these new conditions of engagement for consultants (Architects, Landscape Architects, Engineers and Quantity Surveyors and others). This reform of public sector construction procurement in Ireland primarily involve risk transfer to contractors who are considered best able to manage and control identified risks, in a fixed price lump sum contract, and fixed price fee bidding for engagement of construction consultants. To view and download a copy of the Capital Works Management Framework Guidance Note on the Appointment of Consultants for Construction related Services previously called Guidance Notes 16 & 17. To view and download a copy of Government Standard Conditions of Engagement for Construction Consultants
2 Important Note: It is envisaged that the Conditions of Engagement will not be subject to any further textual change and will be used for appointment of consultants on or after 1 January 2007 in its present format described as Training Material. How will the Standard Conditions of Engagement for Construction Consultants apply? (For full text see Department of Finance Circular below) (a) To all new construction consultancy contracts awarded on or before 1 January (b) To all new construction consultancy contracts awarded before 1 January 2007 but after the issue of Department of Finance Circular 33/06, where contracting authorities want to use them following receipt of appropriate training. (c) To existing construction consultancy contracts awarded before the 1 January 2007 but only by agreement between the contracting authority and the construction consultant. (d) To the selection of the construction consultants made before the 1 January 2007 starting date in respect of construction consultancy awarded after 1 January Correspondence from the Minister of Finance to the CIC To view the correspondence between the Minister of Finance to the CIC, indicating what concessions were sought and where concessions have been made see the following: CIC Letter to B. Cowen 5 September 2006 B. Cowen Letter to CIC 12 October 2006 B. Cowen Letter to CIC 9 November 2006 Copyright It is the clear intention of the State to alter the accepted understanding of the intellectual ownership of copyright of the designer. The Minister of Finance has indicated that The issue of copyright is a matter for each Contracting Authority to decide on. The removal of the automatic right to transfer the copyright has been given as a concession. see Minister letter. The Contracting Authority will decide whether they implement their requirement take control of copyright of the design, by paying a fee. The RIAI advises copyright of the design should never be transferred to the client, unless a very substantial fee is agreed and paid. Government Policy and Types of Procurement Procedures for Consultants Government policy for construction related procurement is that fixed price lump-sum construction consultancy contracts are tendered on a competitive basis set out below:
3 Open Tendering: For this procedure a Request for Tenders is published at the same time as the advertisement / Contract Notice, is published. All tenders are evaluated and awarded first under qualification criteria and then under award criteria (including quality and price). Restricted Tendering: This is a two stage process: a Request for Expressions of Interest is published, and the resulting expressions of interest are subject to qualitative evaluation. A Request for Tenders is then issued to a number of qualifying suppliers; the tenders are evaluated and the contract awarded. Negotiated Tenders: Used as an exceptional procedure, in which the contracting authority negotiates the services required and the fees for those services with a number of competing service providers, called competitive negotiation procedure, or with one service provider, called non competitive negotiation procedure. Competitive Dialogue: This procedure is available for particularly complex contracts, where neither the open nor the restricted procedure will allow the award of the contract. It will rarely, if ever, be used for construction related services. Under most circumstances, the Restricted procurement procedure is to be used. 2. New Government Forms of Construction Contracts for Public Works These new contracts come into force on 19 February 2007 and they will replace the GDLA 82. While there are a number of building and engineering contracts proposed, the three building contracts affecting architects are: 1. Building Works Designed by the Employer 2. Building Works Designed by the Contractor 3. Minor Civil Engineering and Building Works Designed by Employer The final version of Contracts (1) to (3) will be available on 19 February 2007; until then a version described as training material is being assessed. Some minor changes may become evident and may need to be addressed. John O Reilly, FRIAI, Opinion and Observations on the Building Contracts John O Reilly, FRIAI, has prepared, for the RIAI, a paper on his opinion and observations on the contracts in a question and answer format.
4 How will the New Forms of Construction Contracts for Public Works apply? It is intended that the new Forms of Construction Contracts for Public Works will apply as follows: (a) To all new public works projects about to begin the planning Stage on or after Monday 19 February (b) To all new public works projects where planning has commenced but where detailed tender documents have not been developed by Monday 19 February (c) For those public works projects where detailed development of tender documents has commenced, contracting authorities can elect to use the new Forms of Construction Contracts on or after Monday 19 February (d) Where a contracting authority, following appropriate training, wants to use the new forms of Construction Contracts on public works projects on a date earlier than Monday 19 February View and dowload the Department of Finance Circular 33/06: Construction Procurement Reform revision of arrangements for the procurement of public works projects and for the engagement and payment of construction consultants The Fundamental Important Changes are: 1. This is a completely new contract. 2. They will be fixed price lump sum contracts; with many of the contractual risks, which are traditionally borne by the Employer will now pass over to the Contractor. 3. The Contractor s ability to make claims will be restricted by the introduction of stringent procedural requirements compliance with which will be a pre- requisite to any successful claim. 4. Greater responsibility for contract management and administration will move from the Employer s Representative to the Contractor, e.g. Here is a selection of some of the changes: Risk defined in Tender Documents to ensure competitive pricing. Consent & Authorisation Risk: Under most standard contracts the Employer is obliged to obtain any necessary planning permission and other authorization or consent required by law. In the new forms of contract the position is reversed. Awarding the Contract The Award Criteria: is the Most Economically Advantageous Tender (MEAT). Fixed Price Risk: The new contracts have a fixed price period of thirty-six months including a six month lead in time. Risk Attaching to Legal Requirements: Under the new forms of contract, the Contractor is obliged to comply with all Legal Requirements. Employer is protected from claims for Loss of Profits or Damages
5 Delay & Disruption Risk: The contracts provide that certain events causing delay may be compensational and others may not. Risks: include Archaeology, Geology & Human Remains, Unforeseeable Ground Conditions and Unforeseeable Utilities Administrative Burden: The new contracts introduce new rigorous procedures relating to the provision of programmes, the provision of progress reports, the making of claims, the requesting of information and otherwise. Programmes: The Contractor must submit an extensively detailed programme. Claims: If the Contractor considers that he is entitled to an extension of time or to any additional sum, he is obliged to make his claim as soon as practicable and in any event within twenty working days after he becomes aware of it, or should have become aware of it. There are 21 Delay & Compensation Events Insurance Requirement: include existing building Final Account: The Contractor is obliged within two months after substantial completion of the works are certified, to furnish a final statement setting out all money that the Contractor considers to be due from the Employer arising out of the contract. Novation: One of the new forms of contract makes provision for the novation of contracts to the Contractor. Termination: The contract provides for voluntary termination by the Employer at any time. Consequence of Termination after reference to Conciliation 12 Grounds for Termination by Employer including Health & Safety 4 Grounds for Termination by Contractor Employer s Representative: It is envisaged that the Role of the Employer s Representative will normally be fulfilled by an Architect or Engineer The Employer s Representative: is the Employer s Agent not an impartial administrator of the contract, the role normally fulfilled by the Architect. The Employer s Representative: has the power to vary the contract may be limited to: 1) Maximum Value or 2) Maximum No. of Instructions. Contractor s Obligations: Notwithstanding the limits of the Employer s representative the Contractor is obliged to carry out all instructions and any payment will not be affected by an Employers Representative exceeding its authority. Payment for Compensation Events: they are subject to conditions Payment for Delay: are for compensation events only. Copyright of Contractor s Document: is transferred to the Employer Conciliation: either party may refer a dispute to Conciliation on 10 Working Days Notice 10 Working Days to agree Conciliator If dispute is not resolved: in 42 days Conciliator must make recommendation within a further 3 days Either party: may refer a dispute to Conciliation on 10 Working Days Notice If dispute is not resolved: in 42 days Conciliator must make recommendation within a further 3 days
6 Minor Civil Engineering and Building Works Designed by Employer: Applicable: to projects of less than 5.0 million. Provides: for cap on transfer of unforeseeable risk Bill of Quantities: should normally form part of the contract. No Prime Cost: (PC), Provisional Sums or Provisional Quantities No: Nominated Subcontractors To view and download a copy of latest known (possibly subject to variations) Government Standard Conditions of Engagement for Construction Consultants Public Works Contract for Building Works Designed by the Contractor Public Works Contract for Building Works Designed by the Employer Public Works Contract for Minor Civil Engineering and Building Works Designed by the Employer Words of Caution Practices and members should be aware that the new building contracts and the conditions of engagements are intended to be complimentary. If, previously, conditions of engagement have been offered and accepted prior to 1 January 2007; these new conditions should not be substituted by the state and accepted by the RIAI Practice or member for the earlier conditions of engagement. Interpretation of the New Building Contracts As these are new contracts, Members therefore should be cautious in interpretation or offer any guidance on the contracts. All queries for guidance or interpretation, where uncertainty exists, should be referred to the client. Rumbling from the Contracting Side The Construction Industry Federation is a social partner and was involved in the social partnership talks and negotiations with government last autumn. The CIF were confident that their position as social partners would influence the outcome of the discussions with the Department of Finance on the new contracts. This did not prove to be the case; in fact they received few concessions. It is the contractor view that these contracts could achieve their objective of bringing cost certainty to building contracts. They are devised to discourage Contractors from claiming for delays (even those caused by the Employer). Contractors will be at a major loss if they do not adequately price for the transfer of risk, the loss of claims ability and the extra layer of administrative personnel required. There are now rumblings from the contracting side that there ambiguities and contradictions within the contract documents and they will be exposed. Ambiguity and contradictions means the architect must be very much aware of his or her position as a designer to the employer or contractor, and their role and duties as decision maker, if such role exists.
7 The National Public Procurement Policy Unit (NPPPU) of the Department of Finance has now published these documents on their website: Policy Areas & Publications - Construction Procurement Reform. The documents can be accessed here. General Conclusion This is the latest information available to the RIAI and as soon as further information becomes available, Members will be informed. The RIAI are preparing a programme to assist Members in their understanding and administration of the consultant s conditions of engagement, both dealing as the client s representative and their role in dealing with the contractor at tender and during construction. There is a view that the larger contractors will survive these contractual changes, but it is the smaller to medium size contractors, who will not have the resources to accept and cope with the additional administrative burden of the contracts. It is feared that they will fall by the wayside. As the present now Will later be past The order is Rapidly fadin. And the first one now Will later be last For the times they are a-changin. Bob Dylan BUILDING ENERGY RATING The regulations were introduced on 22 December Despite publicity, implementation has not been delayed by representations from industry, rather because training, as envisaged, is not in place. One of the key reasons for this is that the software programme required for assessment is not yet available. The following is an extract from a communication received by the RIAI from Sustainable Energy Ireland on 10 January 'The European Communities (Energy Performance of Buildings) Regulations, 2006 (S.I. No. 666) were published by the Minister for the Environment, Heritage and Local Government on 22 December As you may be aware, under these regulations the transitional exemption period for the introduction of BER for new dwellings is shortened to 18 months compared with the 2 year period proposed in the Action Plan published last July. It now begins on 31 December 2006 rather than 30 June 2006 but runs as originally intended to 30 June 2008.Dwellings for which planning applications are submitted as and from 1 January 2007, require a BER when constructed or offered for sale.
8 The above arrangements will facilitate the final development and the putting in place of the administrative and quality assurance systems by SEI. Given the normal planning and construction timescales it is expected that demand for BERs will begin to grow from about mid 2007 and that the initial volume of work to be carried out by registered BER assessors will be minimal in the first half of A number of issues with the DEAP software were identified in the course of both beta testing and delivering first training courses. SEI is currently addressing the resulting requirements and it is now expected that a fully tested software package will be available by the end of March 2007, at which point training on the official DEAP software can commence. SEI will be registering BER assessors from Monday, 2 April Only assessors who have attended a validated BER training course using Version 2.1 of the DEAP software (due for release in March 2007) will be eligible for full registration as BER Assessors. SEI would strongly recommend that training providers conduct BER training on Version 2.1 of the DEAP software only, as BER assessors who train on earlier versions of DEAP will require refresher training on Version 2.1 once it is available.' For the last six months the RIAI and UCD ERG have been attempting to develop training for design and assessment with BER, but have not been able to make any progress because of changing deadlines and the non-availability of software. As above, SEI has confirmed that training cannot take place until the software is available. This is now projected for the end of March Only when the software is actually available can development of training begin. In light of this development the RIAI and UCD ERG cannot commence delivering training until April 2007, using DEAP Version 2.1, as recommended by Sustainable Energy Ireland. View and download the European Communities (Energy Performance of Buildings) Regulations 2006 Please note that the regulations do not apply to protected structures. There are two certificates: A design certificate A completion certificate Fee: 300 MISCELLANEOUS The Follies Trust seeks expressions of interest from professional consultants The Follies Trust is inviting submissions from interested professional consultants to provide a multi-disciplinary team to realise a scheme to conserve three major grave
9 monuments, situated in the Church of Ireland graveyard adjoining Knockbreda Parish Church in Belfast. The lead consultant must provide evidence of a working knowledge and experience of historic structures of architectural importance. The lead consultant must be a registered architect with RIBA or RIAI or an RICS chartered building surveyor. The team must include: A chartered structural engineer A chartered quantity surveyor A planning supervisor Members can be drawn from the resources of a single practice or be a consortium of independent professionals bound by a formal agreement for the duration of this commission. The appointment will be to develop the scheme from a sketch proposal through RIBA stages D to L inclusive. Terms of engagement will be RIBA CE/99 updated April Expressions of interest must arrive at: The Follies Trust 105 Somerset Studios Marcus Ward Street BELFAST BT7 1RP No later than 12 noon on Monday, 5 February In response, the Trust will provide a detailed written brief and a description of the selection procedures. Office Sharing in Dublin 2 Established practice in Dublin 2 can provide facilities and back-up for an architect who wants to set up practice, with a view to increasing the scope and sphere of work for both parties and a possible merger in the future. Contact in the first instance, Karina O'Neill - koneill@riai.ie 15 Jan 2007
CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR
CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR CIC/AppInsp The Construction Industry Council - Association of Consultant Approved Inspectors contract for the appointment of an approved inspector
More informationA Guide to Small Works. A brief explanation
A Guide to Small Works A brief explanation A Guide to House Extensions/Small Works - a brief explanation Small works are an ongoing, cherished part of DDC's activity and restricted only by distance. Here
More informationDIRECTORATE OF ESTATES & FACILITIES
DIRECTORATE OF ESTATES & FACILITIES PROCEDURE AND INFORMATION MANUAL EPM PM4 Client Representative (University Project Manager) for Capital Projects Scope of Services Document Originated: April 2006 By:
More informationCONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED
CONCODE Guide to contract strategies for construction projects in the NHS 1995 STATUS IN WALES ARCHIVED For queries on the status of this document contact info@whe.wales.nhs.uk or telephone 029 2031 5512
More informationBOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under
More informationGUIDANCE NOTE 1.5.2 Cost Control: Price Variation Clauses
GUIDANCE NOTE 1.5.2 Cost Control: Price Variation Clauses Office of Government Procurement Cost Control: Price Variation Clauses Document Reference GN 1.5.2 v1.0 22 January 2016 2016 Department of Public
More informationOPW HANDBOOK FOR THE CONSULTANTS DIRECT INVITATION LISTS (CDIL)
OPW HANDBOOK FOR THE CONSULTANTS DIRECT INVITATION LISTS (CDIL) FOR CONSULTANCY CONTRACTS WITH AN ESTIMATED VALUE OF LESS THAN 50,000 (EXCLUSIVE OF VAT) Table of Contents 1.0 Introduction...3 1.1 CDIL
More informationDated 29 February 2016. Flood Re Limited. Payments Dispute Process. Version 1.0
Dated 29 February 2016 Flood Re Limited Payments Dispute Process Version 1.0 1. General 1.1 The following provisions will apply to all disputes referred to and conducted under this Payments Dispute Resolution
More informationHow To Write New Government Construction Contracts
HUSSEY FRASER SOLICITORS 1. Objectives of new contracts 2. How objectives are to be achieved Risk Transfer Procedural / Information Burden 3. Termination Provisions 4. Collateral Warranties 5. Conclusion
More informationEMPLOYING QUINQUENNIAL ARCHITECTS/SURVEYORS AND OTHER
EMPLOYING QUINQUENNIAL ARCHITECTS/SURVEYORS AND OTHER 5 PROFESSIONAL ADVISORS GUIDANCE SHEET It is important for every church to have a good working relationship with its QI architect/surveyor as well
More informationUCD ARCHITECTURE- PROFESSIONAL DIPLOMA (ARCHITECTURE) COURSE INFORMATION 2011/12
UCD ARCHITECTURE- PROFESSIONAL DIPLOMA (ARCHITECTURE) COURSE INFORMATION 2011/12 PROGRAMME DESCRIPTOR UCD Course Code: PDARCH002 -Major T157 The Professional Diploma (Architecture) is the final professional
More informationAPPLICATIONS. UCD School of Architecture Professional Diploma (Architecture) 2014-15 PROGRAMME INFORMATION
UCD School of Architecture Professional Diploma (Architecture) 2014-1 PROGRAMME INFORMATION The Professional Diploma (Architecture) is the final professional examination for architectural graduates leading
More informationA guide to appointing an architect
A guide to appointing an architect and to being a good client Hurditch Architecture, 24 Botallack, St Just, Penzance, Cornwall, TR19 7EP Page 1 of 7 RIBA Chartered Architects Architects act 1997 In the
More informationASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES
ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES CAPITAL GRANTS PROGRAM / BUILDING GRANTS ASSISTANCE SCHEME Background Non government schools accepting the
More informationSouth Liverpool Homes. Invitation to Tender. Mobile Phone Contract
South Liverpool Homes Invitation to Tender Mobile Phone Contract Contents 1. Important notices... 3 1.1. Confidentiality... 3 1.2. Accuracy of information and liability of SLH... 3 1.3. Canvassing... 4
More informationCapital Works Management Framework Document No. GN 1.7. Standard Conditions of Engagement for Consultancy Services (Technical)
Capital Works Management Framework Document No. GN 1.7 Standard Conditions of Engagement for Consultancy Services (Technical) Guidance Note and Sample Schedules GN 1.7 090708 1 About This Document Background
More informationCapital Works Management Framework Guidance Note for Public Works Contracts
Capital Works Management Framework Guidance Note for Public Works Contracts Copyright 2006 Department of Finance 30 April 2007 Published in April 2007 by: The National Public Procurement Policy Unit of
More informationCheck. They re Chartered. Chartered Project Managers
Check. They re Chartered. Chartered Project Managers The Society of Chartered Surveyors Ireland is the leading organisation of its kind in Ireland for professionals working in the property, land and construction
More informationStandard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
Document A101 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the in the year (In words, indicate day, month and year.)
More informationProfessional Practice Commission: March 2013. Alternative Project Delivery Systems
Professional Practice Commission: March 2013 Alternative Project Delivery Systems UIA Accord Building project delivery systems. Definition Building project delivery systems are defined as the contractual
More information2011 No. 1824 TOWN AND COUNTRY PLANNING. The Town and Country Planning (Environmental Impact Assessment) Regulations 2011
STATUTORY INSTRUMENTS 2011 No. 1824 TOWN AND COUNTRY PLANNING The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 Made - - - - 19th July 2011 Laid before Parliament 26th July
More informationhttp://www.oireachtas.ie/viewdoc.asp?fn=/documents/bills28/acts/2007/a2107.pdf
UCD School of Architecture Professional Diploma (Architecture) 2012-13 PROGRAMME INFORMATION The Professional Diploma (Architecture) is the final professional examination for architectural graduates leading
More informationDavid Watkins RIBA Part 3 Course 2014. Cost Control and Management
David Watkins RIBA Part 3 Course 2014 Cost Cost Management Control and and Management_dhw_2014 Control_dhw_2014 For which of you, desiring to put up a tower, For which does of not you, first desiring give
More informationCHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS
CHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS 48-01.2-01. Definitions. In this chapter, unless the context otherwise requires: 1. "Agency construction management" means a public improvement delivery
More informationRef: S 9/21/05. 22 December 2011. To Heads of Departments / Offices
Ref: S 9/21/05 22 December 2011 To Heads of Departments / Offices Department of Public Expenditure & Reform Circular 15/2011: Mechanism to monitor compliance with employment law in outsourced operations
More informationPRACTICE NOTES FOR QUANTITY SURVEYORS
PRACTICE NOTES FOR QUANTITY SURVEYORS Preface Preface A Working Committee with representatives of the Hong Kong Institute of Surveyors, the Association of Consultant Quantity Surveyors and the Hong Kong
More informationProject manager services
Corporate Professional Local Project manager services For use with the RICS Standard form of consultant s appointment and RICS Short form of consultant s appointment The mark of property professionalism
More informationQuality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.
This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution
More informationICE Legal Notes Series
ICE Legal Notes Series Legal Notes Reviewing the work of another Engineer and replacing another Engineer Institution of Civil Engineers www.ice.org.uk Published by the Institution of Civil Engineers (ICE).
More informationExplaining an architect s services. General information on the usual tasks undertaken by an architect
Explaining an architect s services General information on the usual tasks undertaken by an architect June 2008 What an architect may do for you Introduction The root cause of disputes and complaints against
More informationPOSTGRADUATE CERTIFICATE IN PROFESSIONAL PRACTICE IN ARCHITECTURE
University of Cambridge: Programme Specifications Every effort has been made to ensure the accuracy of the information in this programme specification. Programme specifications are produced and then reviewed
More informationMDB Harmonised Particular Conditions
FIDIC Plant and Design-Build Contract MDB Harmonised Particular Conditions 1. Introduction There is a need for FIDIC to provide sample Particular Conditions that render the General Conditions of the 1st
More informationInfo sheet : Considering labour standards in the procurement process
Info sheet : Considering labour standards in the procurement process In line with the EU procurement rules and the Government s value for money principle, contracting authorities can take steps to consider
More informationStudent accommodation and affordable housing contributions
Section 106 Planning obligations speeding up negotiations Student accommodation and affordable housing contributions Government Response to consultation March 2015 Department for Communities and Local
More informationA Guide to Standard forms of Construction Contract Outlining Key Characteristics and Components
Produced for SCALA and the Local Government Task Force by Rob Tate Dip Arch. Dip TP. Dip Arb. FCIArb. RIBA 01582 516662 rob.tate@ntlworld.com You can contact the Local Government Task Force tel 020 7837
More informationSERVICES LEVEL AGREEMENT
Legal Sense (PTY) Ltd. is an Authorised Financial Services Provider FSP No: 26702 LEGAL PROTECTION FOR YOUR BUSINESS Criminal Civil Labour Contracts Debt Collection www.legalsense.co.za 0861 573 673 info@legalsense.co.za
More informationJoint Bidding Guide. 9. Opportunity Assessment. prepared for Leaders of Potential Consortia and Bid Managers
Joint Bidding Guide 9. Opportunity Assessment prepared for Leaders of Potential Consortia and Bid Managers Figure 1.1 The Joint Bidding Cycle Key Chapter for Both Sides 1. Introduction Chapter for Supply
More informationBUILDING INFORMATION MODEL (BIM) PROTOCOL
BUILDING INFORMATION MODEL (BIM) PROTOCOL 2013 Standard Protocol for use in projects using Building Information Models The CIC acknowledges the technical input and leadership provided by the BIM Task Group
More informationENGAGING A LANDSCAPE CONSULTANT GUIDANCE FOR CLIENTS ON FEES SEPTEMBER 2002
ENGAGING A LANDSCAPE CONSULTANT GUIDANCE FOR CLIENTS ON FEES SEPTEMBER 2002 The Landscape Institute 33 Great Portland Street London W1W 8QG Tel: +44 (0)20 7299 4500 Fax: +44 (0)20 7299 4501 Email: mail@llandscapeinstitute.org
More informationGuide to Procedure for Competitive Tendering March 2003
Guide to Procedure for Competitive Tendering March 2003 The Landscape Institute 33 Great Portland Street London W1W 8QG Tel: +44 (0)20 7299 4500 Fax: +44 (0)20 72994501 Email: mail@landscapeinstitute.org
More informationLAW OF MONGOLIA ON CONCESSIONS CHAPTER ONE. GENERAL PROVISIONS
LAW OF MONGOLIA 28 January 2010 State Palace, Ulaanbaatar city Article 1. Purpose of the law ON CONCESSIONS CHAPTER ONE. GENERAL PROVISIONS 1.1. The purpose of this law is to regulate matters related to
More informationChartered Architectural Technologists: Client information for domestic projects
Chartered Architectural Technologists: Client information for domestic projects 1 Contents Section 0. (Pg. 1) Section 1. (Pg. 2) Section 2. (Pg. 3) Section 3. (Pg. 5) Section 4. (Pg. 9) Section 5. (Pg.
More informationThe Client and the Architect
The Client and the Architect Giving the client more than they ever dreamt of within budget and on time? Design & Quality Quality, above all, is about care, people, passion, consistency, eyeball contact
More informationSourceIT User Notes. Specific Clauses. Licence and Support Contract Commercial off-the-shelf Software RELEASE VERSION 2.
SourceIT User Notes Specific Clauses Licence and Support Contract Commercial off-the-shelf Software RELEASE VERSION 2.3 DECEMBER 2012 AGIMO is part of the Department of Finance and Deregulation SourceIT
More informationPROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT
PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT - INTRODUCTION 1.1. General. Kuwait Ports Authority (KPA) through the Ministry Of Finance (MOF) wishes
More informationAustralian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO
Australian National Audit Office Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Commonwealth of Australia 2002 ISBN 0 642 80678 0 10 December 2002 Dear Mr
More informationIn force as of 15 March 2005 based on decision by the President of NIB ARBITRATION REGULATIONS
In force as of 15 March 2005 based on decision by the President of NIB ARBITRATION REGULATIONS Contents I. SCOPE OF APPLICATION... 4 1 Purpose of these Regulations... 4 2 Applicability to different staff
More informationGUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities
GUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities Office of Government Procurement Building Control (Amendment) Regulations 2014 Procurement
More informationliquidators, it does not provide cover for fraud, dishonesty or misappropriation by the liquidator him or herself.
Consultation on the amount and terms of indemnity against losses and claims arising in respect of civil liability by liquidators 7 August 2015 Table of Contents 1) Introduction...1 2) Overview of Professional
More informationHow To Apply For Land Division In Australia
Development Act 1993 GUIDE FOR APPLICANTS Land Division Guide GUIDE FOR APPLICANTS Land Division Guide Planning SA Primary Industries and Resources SA 136 North Terrace Adelaide GPO Box 1815 South Australia
More information1999 No. 2083 CONSUMER PROTECTION. The Unfair Terms in Consumer Contracts Regulations 1999
STATUTORY INSTRUMENTS 1999 No. 2083 CONSUMER PROTECTION The Unfair Terms in Consumer Contracts Regulations 1999 Made - - - - 22nd July 1999 Laid before Parliament 22nd July 1999 Coming into force 1st October
More informationCharging for Pre-application Advice
Charging for Pre-application Advice Guidance Note - London Borough of Islington April 2016 1 Introduction The London Borough of Islington has a rich built heritage, a diverse community and high land values.
More informationNZS 3910:2013. Conditions of contract for building and civil engineering construction NZS 3910:2013. New Zealand Standard
New Zealand Standard Conditions of contract for building and civil engineering construction Superseding (in part) NZS 3910:2003 NZS 3910:2013 COMMITTEE REPRESENTATION This Standard was prepared under the
More informationINTERNSHIP TRAINING SCHEME
EAST AFRICA INSTITUTE OF ARCHITECTS INTERNSHIP TRAINING SCHEME (Rules & Guidelines) As Adopted by Council January 26 th 2013 Arusha Tanzania Fee: UGX.2500 KES.85 TZS.1,600 RWF. 650 Table of Contents. Section
More informationCLIENT / PROJECT MANAGER AGREEMENT
Authorship of this work is claimed by The Association of Construction Project Managers and any unauthorised reproduction constitutes an infringement in terms of the Copyright Act No 98 of 1978. CLIENT
More informationSUFFOLK COUNTY COUNCIL PROCUREMENT RULES. Version 2 Jan 2016. Page 1 of 19
SUFFOLK COUNTY COUNCIL PROCUREMENT RULES 2015 Version 2 Jan 2016. Page 1 of 19 TABLE OF CONTENTS 1. Introduction and Definitions... 3 2. Scope... 4 3. General Principles... 5 4. Responsibilities... 7 5.
More informationARTWORK COMMISSION AGREEMENT
ARTWORK COMMISSION AGREEMENT THIS AGREEMENT is made the day of in the year BETWEEN the Minister for Works of Level 6, 16 Parkland Road, Osborne Park, WA 6017 being the body corporate created under Section
More informationPROFESSIONAL PRACTICE
PROFESSIONAL PRACTICE Introduction Aim of the Course Professional Attachment Counselling The Professional Practice Examination Requirements of the Examination Professional Interview Assessment Detailed
More informationCode of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014
for Inspecting and Certifying Buildings and Works Building Control Regulations 2014 February, 2014 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1 1.3 Application
More informationBreed Communications Limited - limited company consultancy agreement 230113
Limited Company Consultancy Master Agreement DATED BETWEEN:- (1) Breed Communications Limited (Company Number 4809384) whose registered office is c/o Hilton Consulting, 119 The Hub, 300 Kensal Rise, London
More informationTLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za
TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za CONSTRUCTION MANAGEMENT - DEFINED Act of managing the construction process Contractual arrangement
More information2. Subject to any special rules applied by the College's funding bodies, the tendering procedures will be applicable to:
HARPER ADAMS UNIVERSITY COLLEGE Code of Tendering Practice Introduction 1. The following guidelines are to be used in the conduct of tendering and contracting of major services and supplies commissioned
More informationPREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS
THE GENERAL SECRETARIAT FOR RESEARCH AND TECHNOLOGY AS PROGRAMME OPERATOR OF THE GREEK-EEA RESEARCH PROGRAMME IMPLEMENTED UNDER THE GREEK FINANCIAL MECHANISM 2009-2014 PREANNOUNCES RESEARCH WITHIN PRIORITY
More informationThe FIDIC Suite of Contracts
Less well know FIDIC contracts are also available such as the Turquoise Book for Dredging and Reclamation Works published in January 2006 and the White Book model services agreement published in October
More information1/ 10 TED19_NRI 14/04/2016- ID:2016-000823 Standard form 2 - EN RI 282800 - DEL-DELIVERY OF THE WORKABLE (NI) PROGRAMME-2016-2021
1/ 10 TED19_NRI 14/04/2016- ID:2016-000823 Standard form 2 - EN CONTRACT NOTICE - ABOVE THRESHOLD SECTION I: CONTRACTING AUTHORITY I.1) NAME, ADDRESSES AND CONTACT POINT(S) Official name: Department for
More information2a. Membership of UKALA shall commence from the date advised in writing by UKALA and will last for a contract term of twelve calendar months.
UKALA: letting agents thrive The UK Association of Letting Agents The UK Association of Letting Agents 22-26 Albert Embankment To promote and protect the interest s London SE1 7TJ of letting and management
More informationA Guide to... Home Renovation Incentive (HRI)
A Guide to... Home Renovation Incentive (HRI) About this guide This guide will tell you what you need to know if you are organising to have construction work done on your house and would like to avail
More informationCAPITAL WORKS GUIDANCE DOCUMENT
COMMUNITY BUILDINGS TRANSFER PROGRAMME CAPITAL WORKS GUIDANCE DOCUMENT This document has been prepared to assist and advise management groups of community buildings who are involved in Durham County Council
More informationRevised Code of Practice on Workforce Matters
Revised Code of Practice on Workforce Matters Procurement Advice Note (PAN) for the Public Sector in Wales Page 1 of 29 Contents Section No. Section Name Page No. 1. Introduction 3 (i) Points to Note (ii)
More informationTo be used in conjunction with the Invitation to Tender for Consultancy template.
GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small
More information香 港 特 別 行 政 區 政 府. The Government of the Hong Kong Special Administrative Region. Development Bureau Technical Circular (Works) No.
香 港 特 別 行 政 區 政 府 The Government of the Hong Kong Special Administrative Region 政 府 總 部 發 展 局 工 務 科 香 港 添 馬 添 美 道 2 號 政 府 總 部 西 翼 1 8 樓 Works Branch Development Bureau Government Secretariat 18/F, West
More informationMembers, Council of Presidents. Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid
July, 2003 MEMORANDUM UCF-05.01-07/03 TO: Members, Council of Presidents FROM: SUBJECT: Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid AUTHORITY: Sections 240.209(3)(p),
More information2006 No. 246 TERMS AND CONDITIONS OF EMPLOYMENT. The Transfer of Undertakings (Protection of Employment) Regulations 2006
STATUTORY INSTRUMENTS 2006 No. 246 TERMS AND CONDITIONS OF EMPLOYMENT The Transfer of Undertakings (Protection of Employment) Regulations 2006 Made - - - - 6th February 2006 Laid before Parliament 7th
More informationGovernment of India Ministry of Communications &IT Department of Telecommunication
Government of India Ministry of Communications &IT Department of Telecommunication To, (As per by email) Subject: Invitation of Expression of Interest (EOI) for Implementation of ISO 9001:20008 project
More informationSUMMER WORKS SCHEME (SWS) 2014
Circular 0059/2013 To: The Managerial Authorities of Recognised Primary, Secondary, Community and Comprehensive Schools and The Chief Executive Officers of Education and Training Boards SUMMER WORKS SCHEME
More informationImpartiality must be maintained in selecting suppliers to fulfil Council s requirements.
Title: Type: Council Adopted: 17 December 2014 File No: SF/491 TRIM Reference: 14/35410 Attachments: Guidelines (TRIM: 14/38862) 1. Purpose The purpose of this policy is to provide principles, processes
More informationNon-binding Calculation Recommendation
Non-binding Calculation Recommendation Performance Profile for Interior Design 0/12 Non-binding Calculation Recommendation CONTENTS Page 1. Scope... 2 2. Principles of the processing time. 2 3. Processing
More informationValue for Money Unit Local Government Audit Service
Value for Money Unit Local Government Audit Service Report on Spot Checks of Capital Projects funded by the Department of the Environment, Heritage and Local Government and undertaken by Local Authorities
More informationProject Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services
Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services January 2010 Contents Project Management Page Local Decontamination Units (LDUs) Construction Project Management...3
More informationPROFESSIONAL PRACTICE EXAM MARCH 2009 PAPER 1: THE ARCHITECTURAL PROFESSIONAL AS A PRACTITIONER AND ARCHITECTURAL SERVICE TO THE CLIENT
PROFESSIONAL PRACTICE EXAM MARCH 2009 Instructions to Candidates: 1 All questions are to be answered Where a question is in sections, each answer is to be clearly separated strictly in accordance with
More informationContents. Part 1: Introduction. Part 2: Instructions to Tenderers. Part 3: Qualification and Award Criteria
Request for Tenders for the Provision of Assisting The Health Insurance Authority in Preparing a Consumer Information Campaign in Respect of Lifetime Community Rating 02 October 2014 Contents Part 1: Introduction
More informationBest Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education
EMAIL contact@fosterinfrastructure.com WEB www.fosterinfrastructure.com Best Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education
More informationINSOLVENCY GUIDANCE NOTE STATEMENT OF INSOLVENCY PRACTICE 9 (NI): REMUNERATION OF INSOLVENCY OFFICE HOLDERS NORTHERN IRELAND
INSOLVENCY GUIDANCE NOTE STATEMENT OF INSOLVENCY PRACTICE 9 (NI): REMUNERATION OF INSOLVENCY OFFICE HOLDERS NORTHERN IRELAND Contents Paragraph s Introduction 1-8 The Statutory provisions 9 Administration
More informationAn organization which employs, or is about to employ, any of the above, has a financial or other interest in the firm selected for award.
85.36 Procurement (a) States. When procuring property and services under a grant, a State will follow the same policies and procedures it uses for procurements from its non-federal funds. The State will
More informationMotor Vehicle Insurance. and. Repair Industry. Code of Conduct
. Motor Vehicle Insurance and Repair Industry Code of Conduct Revised March 2011 MOTOR VEHICLE INSURANCE AND REPAIR INDUSTRY CODE OF CONDUCT 1 TABLE OF CONTENTS PREAMBLE... 3 1. PRINCIPLES OF THE CODE...
More informationDeveloping a Project
Developing a Project From Concept to Completion www.ecb.co.uk Sources of Grant Aid and Funding for Cricket Clubs 1 Contents Developing a Project From Concept to Completion Section Page Introduction 1 1
More informationBuilding Work Contractors Act 1995
Version: 21.11.2015 South Australia Building Work Contractors Act 1995 An Act to regulate building work contractors and the supervision of building work; and for other purposes. Contents Part 1 Preliminary
More informationEurope Social Innovation Competition 2013 Prize Unlocking potential, creating new work --- Terms and Conditions
EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Brussels, 28 September 2012 Europe Social Innovation Competition 2013 Prize Unlocking potential, creating new work --- Terms and Conditions
More informationREQUEST FOR QUOTATION/ PURCHASE ORDER
REQUEST FOR QUOTATION/ PURCHASE ORDER Conditions of Contract- Services These Conditions may be varied only by the written agreement of the Council. No terms or conditions put forward at any time by the
More informationExpression of Interest Document for Coaching for IIT - JEE during 2015-16. Free Training Scheme for the Candidates Belonging To Scheduled Tribe
TAMIL NADU ADI DRAVIDAR HOUSING AND DEVELOPMENTCORPORATION LIMITED (TAHDCO) No.31, 2 nd LANE, CENOTAPH ROAD, TEYNAMPET, CHENNAI 600 018. Expression of Interest Document for Coaching for IIT - JEE during
More informationPROFESSIONAL PRACTICE EXAM 27 MARCH 2014
PROFESSIONAL PRACTICE EXAM 27 MARCH 2014 PAPER 1: This is closed book paper. Answer all questions Total marks for this paper - 100 marks Time allowed for Paper 1-3 hours Pass mark for the examination -
More informationAIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder
AIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder AGREEMENT made as of the day of in the year of (In words, indicate day, month and year) BETWEEN the Owner: (Name,
More informationSmart Meters Programme Schedule 9.1. (TUPE) (CSP South version)
Smart Meters Programme Schedule 9.1 (TUPE) (CSP South version) Schedule 9.1 (TUPE) (CSP South version) Amendment History Version Date Status v.1 Signature Date Execution copy SCHEDULE 9.1 TUPE 1. PURPOSE
More informationPublic Lecture at Engineers Ireland. How the Public Works Contracts might be used in the Private Sector
Public Lecture at Engineers Ireland on How the Public Works Contracts might be used in the Private Sector by Ciaran Fahy Anthony Hussey 4 July 2013 1. INTRODUCTION In May 2004 the government decided as
More informationPERSONAL ALERT SYSTEMS REBATE SCHEME PROVIDER PANER DEED
DATED DAY OF 2015 PERSONAL ALERT SYSTEMS REBATE SCHEME PROVIDER PANER DEED between MINISTER FOR COMMUNITIES AND SOCIAL INCLUSION - and - [INSERT PARTY NAME] ACN [INSERT] Page 1 of 1 TABLE OF CONTENTS BACKGROUND...
More informationThe New Standard Construction Contracts: NZS3910, 3916 and 3917
The New Standard Construction Contracts: NZS3910, 3916 and 3917 Brian Clayton, Partner FEBRUARY 2014 3258689.3 Chapman Tripp Introduction Standards New Zealand has recently completed the first review of
More informationA Guide to the Design Build Process
A Guide to the Design Build Process Essential reading for anyone considering or undertaking building work We are an affiliation of Chartered Architects and Chartered Building Surveyors who together provide
More informationUK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT NOTICE. Services
1/6 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:273114-2011:text:en:html UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT
More informationSelf Build: A Guide to Building your Own Home. Are you, or a member of your family, disabled and thinking about building a home?
Self Build: A Guide to Building your Own Home Are you, or a member of your family, disabled and thinking about building a home? Introduction As a disabled person or a family with a disabled family member,
More informationGuidance on Framework Agreements
1. Introduction Guidance on Framework Agreements The purpose of this document is to provide guidance to public purchasers on the operation of framework agreements as provided for under current public procurement