1 Saher Shawki INTRODUCTION Petroleum pipelines carrying oil, gas or petroleum products are not immune of corrosion although hydrocarbon fluids by itself are not corrosive. However, the presence of corrosive constituents such as water, salts CO 2, H 2 S or even abrasive material (sand) contribute largely for internal corrosion. Failure due to internal corrosion was recorded in petroleum pipelines for production and transportation. The failure cases are very diverse in nature due to a great number of reasons ranging from the design stage, including material selection, to basic requirements of operation, testing and maintenance (Bazzoni et al., 1989; Donham, 1987). In this paper detailed scheme of analysis is provided for two failure cases due to corrosion regarding pipeline material selection, structural engineering and operational management, referring to R&D and consulting experience. In some cases more than one reason contribute to the failure. The first case represents a typical case of core pipeline corrosion in deep well with fluids containing high levels of CO 2, water and sand. The second case was diagnosed as a result of wrong construction design of the above ground pipeline routing and negligence of treatment operation. CASE I: INTERNAL CORROSION of 3.5 CORE TUBES PIPELINE Service History An oil field faced significant corrosion problems occurred and appeared in The field is located in North Delta region, Egypt and started production in Two core petroleum pipelines of wells # 1 and # 4 with multi-phase flow (gas/condensate/water) suffered catastrophic pitting corrosion problems. Several samples of the corroded pipes from the two wells were subject of failure analysis (Fig 1). Pipeline and Fluid Details The following are the data of the pipe material and the fluid characteristics of the two wells (almost identical). Fluid composition gas/condensate/water Pressure (psi) start 4700 present 2150 CO 2 partial pressure start 37 present 19.5 (bar) Flow velocity (ft/sec) N/A Water content (%) ~ 45% Oil/ Condensate content ~ 55% (%) Sand content High Temperature ( o C) o C H 2 S partial pressure None ph value 6.5 Depth of inspected pipe 1240 (m) Pipe dimensions φ3. 5 ' t 8 mm Pipe material Carbon steel API grade L-80 Visual Examination of the Failed Pipes Figure 2 shows that the internal surfaces of the pipes were severely damaged. The damage is manifested Journal of Engineering and Technology 112
2 by a large number of deep pits; many of them are opened to the outer surface. Deep longitudinal grooving (with pitting) is also apparent. The surface is covered by carbonate/oxide iron deposits. Corrosion attack is clear on the tube internal surface as well as the jointing screws. Fig. 2: (a) Internal surface of the corroded tube showing grooving, deep ting and open pits. (b) Close-up of the internal corroded surfaces. Presumed Causes of Failure Corrosion of carbon steel pipes for multi-phase production (gas/condensate/water) is a major problem facing many hydrocarbon production wells all over the world. The most common material loss is caused by CO 2 partial pressure. The corrosion is influenced by a number of parameters such as: temperture, flow velocity, ph value, and water wetting and to a lesser exent: metal composition and microsturcture, H 2 S partial pressure, oxygen entry, and scaling index (for carbonate). It is well known that the CO 2 gas dissolves in water to form carbonic acid which lowers the ph value and reacts with iron forming iron carbonate which deposite on the pipewall (Waard and Milliams, 1975). The carbonate film is porous and can be removed mechanically by the stream velocity, exposing fresh iron surface to be attacked. The data shown in the above table are considered very hostile environment to be in contact with the internal surface of the pipes. It should be noted that corrosion in industrial system and particulary in such condition is never uniform. Locacalized corrosion by pitting or crater formation is most feared in practice and that what happened in the case under investigation. It is estimated in the present case that penetration (opened pits or total material loss) is as high as 3 8 mm/yr. Localized corrosion once started will accelerate by forming galvanic corrosion between severaly attacked and less attacked or protected areas. Deposits and scales of iron oxide or cabonate temperarely protect some areas of the surface. It is assumed that most of the corrosion damage and material loss occured in the first year of operation; when the CO 2 partial pressure was at its highiest level as shown above. Conclusions and Recommendations The fluid characterstics given for the wells are very aggressive specially CO 2 partial pressure, flow velocity, water content and sand. The failure of the core pipes is due to severe corrosion attack estimated to be 3 8 mm/yr, which nessitates replacement of the pipelines. Pipeline material is not suitable to combate the aggressive condition of the well fluid. It is only good for its mechanical Journal of Engineering and Technology 113
3 properties to withstand the operating pressure. It is recommended to use another grade of steel that contain chromuim content higher than 3% (compared to 0.23% of the failed steel). Some economic estimates suggest the use of stainless steel in replacement of carbon-steel. The final costs are rather the same when extending the life time of the pipeline by at least 5 folds (Celant et al., 1989; Dugstad et al., 1994). It is useless to use inhibitors to reduce corrosion, since high flow rate will wash out any inhibitor film formed adhering to the surface. CASE II: FAILURE OF CRUDE OIL SHIPPING PIPELINE Background Crude oil is transported from a field in Eastern Desert/ Egypt, through buried 10 pipeline (for~90 km) to a treatment plant for water and salt separation. The treated oil is then pumped through 18 bare pipeline extending 7 km above ground to join the main 10 pipeline (10 km) to the shipping station at the Red Sea. The 18 pipeline junction failed due to internal corrosion. Figure 3 shows a sketch of the pipeline network involving the failed section. Although this section is bare, no signs of surface corrosion were noted over 25 years in a clean desert atmosphere. Fig. 3: Sketch of the pipeline network (not to scale) Along the 7 km train, the pipes lie directly on the ground according to its natural topography of elevations and depressions (Fig. 4) without any pipelevel supports. Fig. 4: Sketch of 18 pipeline train showing some depressions. Frame showing some pipes not resting completely on the ground The pipeline data and operating history are as follows: Pipe material: grade API- X42 thickness 7.3 mm longitudinal seam welded Crude oil Characteristics: water content 5 %, Sulfur 4.5%, ph value 6-6.5, temperature 45 o C. Operation: pressure 14 bar. Journal of Engineering and Technology 114
4 plant was separate periods of during the last pipeline failure. History: The treated shutdown for two 9 and then 6 months two years before The Incident: Indication of a trouble was signaled by pressure drop and oil quantity shortage at the shipping station. The pipeline track was surveyed and spelled oil was found in one of the train depressions. One pipe was found ruptured open to a perfect longitudinal line extending to about 2 meters along the seam welding line, with slight bulging in the middle of the opening (Fig. 5). Huge amounts of crude oil were spilled due to the failure estimated by 10,000 barrels. The opening was in the position 6 O clock in contact with the ground. Field Inspection Ultrasonic wall thickness measurements indicated that all 12 O clock thickness measurements were mm; while 6 O clock thickness measurements (ground contact) were mm. Rusting of the outer surface of the pipe is very light due to dry desert atmosphere. Some corrosion scales was observed in places where the pipes are in contact with the ground, however loss of material is rather mild. The seam welding line is occasionally in direct contact or near ground. Diagnostic Investigation Visual examination of the failed pipe showed thick lip rupture. Large amounts of solid debris and waxes were found accumulated in all three removed pipes at 6 O clock position. Average wall thickness measurements in different locations on two of the removed pipes are shown in Fig. 6. Fig. 6: Wall thickness measuring point & position of cut piece for lab investigation Fig.5: Photos of opened pipe along the seam weld. Action taken by the petroleum company: About 500 barrels of the spilled oil were recovered by pumping out from the ditch in the sand around the failure location. Three pipes (each 12 m) were cut (failed pipe in the middle) and replaced by new ones to reoperate the line. For laboratory investigation: A piece (4 х 10 cm) was cut at one end of the failed pipe along the Journal of Engineering and Technology 115
5 rupture line. Figure 5 shows the inside surface after light cleaning with organic solvents. Severe pitting is clear. Loss of metal due to corrosion discloses lack of penetration of seam welding during pipe fabrication. The constituted a V groove with one edge more corroding than the other. In the root of the V groove a crack was found at higher magnification full of light brown oxide deposits (Fig. 7 c ). Fig.7: Cut piece showing (a) severe pitting corrosion (b) close-up of corrosion around seam welding groove. (c) Electron micrograph of the V groove with oxide deposits at the root. of stagnant conditions which lasted for 9 and 6 months respectively which provide ideal condition for pitting initiation. -Most important consideration for the failure is the weld imperfection. Unfortunately the seam line of the particular pipe was situated at 6 O clock position, i.e. the bottom of the pipe. This position is perfect for water gathering added to it a lower part of the infused weld groove. In terms of corrosion this creates crevice corrosion which deepens the attack and may lead to metal crating at the root of the V groove. - Hydrogen ions are generated by reaction of steel with a sour environment; the ions undulate at voids e.g. V groove and form hydrogen gas. Internal pressure and residual mechanical stresses can eventually cause hydrogen induced cracking (HCl) in the steel. -Pits are nucleation sites of stress corrosion cracking (SCC) in sour oil. Occurrence of pitting enhances the stress at the pit bottom and the root of the V groove. -The superimposed stress due to mechanical positioning of the pipe in the field and the added 14 bar pressure of the fluid contribute to the progress of the crack(azevedo,2007). Failure Analysis: -Severe internal pitting corrosion of the steel in the 6 o clock position after 25 years of service. This is a result of water separated from the crude sour oil (PH 6-6.5) gathered particularly in topographic depression at the failure site. Adds to this 2 periods When the thickness at the base of the crack / crevice reach 70% of specified minimum yield strength of the pipe internal, the metal rupture and the crack is opened with bulging shown in Fig 5. Moreover the crack will extend on both sides of the opening along the weld (seam) line. Opening will stop just due to the release of the fluid pressure. CONCLUSIONS AND RECOMMENDATIONS Failure occurred in one badly fabricated seam welded pipe. Internal pitting corrosion, due to sour Journal of Engineering and Technology 116
6 oil, during 25 years of service was a trigger of cracking in the infused weld grooves which ended to complete rupture of the pipe. Two other factors contributed to the failure; (a) positioning of the weld (seam) line at the bottom (6 o clock position where water can best accumulate, and (b) stagnant long shut down periods. We can t ignore the possible malfunction of the treatment plant with respect to water and salt content in the treated oil. In short, this section of the line is already damaged internally. Further rupture cases of the pipes were anticipated. To keep the extent of damage same as at the time of rupture and to avoid further deterioration, a number of actions was recommended to the oil company. As an immediate action: leveling of the pipes at the low laying areas should be carried out using concrete or sand bags as supports. For further action: any pipe having the seam weld line in the 6 Oclock position should be accurately inspected for the remaining wall thickness. Decision is up to the operators, to cut and remove the pipe if the thickness is critical or wait for complete rupture. Costs will govern the decision in either case. General Conclusions Internal corrosion of petroleum pipelines is very serious as far as its impact on the economy, environment and safety of operation. Cases displayed in this paper, although classical, confirmed that there is no one reason that contributes to a specific failure. Failure due to internal corrosion is so diverse and covers all stages of pipeline industry starting by material selection (represented by Case I), construction design and operation (for Case II) up to inspection and monitoring. A common factor that can be noted as most effective in several corrosion failure is the inadequate structural design of the pipelines including material selection. Economic consideration should not be confined to the cost constraints but should target safe operation as priority, and aim to extend the project life time of the pipeline to the designed period. REFERENCES Azevedo, C. R. F. (2007). Failure Analysis of a Crude Oil Pipeline, Engineering Failure Analysis, 14, pp Bazzoni, B. et al. (1989). "Criteria for Internal Corrosion Evaluation and Material Selection in Oil & Gas Industry ", Engineering Solutions for Corrosion in Oil and Gas Applications, NACE Conference, Milan, paper No. 12. Celant, M., Cheldi, T. and Condanni, D. (1989). "Controlling Corrosion in Deep Hot, Sour Wells for Oil Production" Engineering Solutions for Corrosion in Oil and Gas Applications, NACE Conference, Milan, paper No. 9. Donham, J.E. (1987). Corrosion in Petroleum Production Operations, Metals Handbook, 9th Ed. ASM International, vol. 13, Corrosion, p Waard, C.de and Milliams, D.E. (1975) "Carbonic Acid Corrosion of Steel", Corrosion 31, 5, pp Dugstad, A., Lunde, L. and Nesic, S. (1994) Control of Internal Corrosion in Multiphase Oil and Gas Pipelines, Proceedings of Conference, Prevention of Pipeline Corrosion, Houston, USA. Journal of Engineering and Technology 117
North American Stainless
North American Stainless Long Products Stainless Steel Grade Sheet 2205 UNS S2205 EN 1.4462 2304 UNS S2304 EN 1.4362 INTRODUCTION Types 2205 and 2304 are duplex stainless steel grades with a microstructure,
More informationRISK BASED INSPECTION (RBI)
1 RISK BASED INSPECTION (RBI) Roy Johnsen Professor, Institutt for produktutvikling og materialer (IPM), NTNU Roy.johnsen@ntnu.no Tlf: +47 93245101 2 CONTENT Introduction - Corrosion Management What is
More informationNorth American Stainless
North American Stainless Long Products Stainless Steel Grade Sheet AISI 316 UNS S31600 EN 1.4401 AISI 316L UNS S31630 EN 1.4404 INTRODUCTION NAS provides 316 and 316L SS, which are molybdenum-bearing austenitic
More informationWaterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
More informationCATHODIC PROTECTION SYSTEM DESIGN
CATHODIC PROTECTION SYSTEM DESIGN Presented By DENIS L ROSSI P.E. CORROSION ENGINEER New England C P Inc. Corrosion Fundamentals What is corrosion? It is defined as the degradation or deterioration of
More informationCrevice Corrosion on Stainless Steel Propeller Shafts
Crevice Corrosion on Stainless Steel Propeller Shafts A Quick Summary: What is it? How to Prevent it. How to Repair it. Stainless steel propeller shafts and running gear are subject to pitting & crevice
More informationCorrosion Inhibition of Dry and Pre-Action Fire Suppression Systems Using Nitrogen Gas
Corrosion Inhibition of Dry and Pre-Action Fire Suppression Systems Using Nitrogen Gas Josh Tihen Corrosion Product Manager Potter Electric Signal Company, LLC 1609 Park 370 Place St. Louis, MO 63042 (800)
More informationNorth American Stainless
North American Stainless Flat Product Stainless Steel Grade Sheet 316 (S31600)/EN 1.4401 316L (S31603)/ EN 1.4404 INTRODUCTION NAS provides 316 and 316L SS, which are molybdenum-bearing austenitic stainless
More informationGE Oil & Gas. Air Cooled Heat Exchangers. Robust and reliable for all loads and applications
GE Oil & Gas Air Cooled Heat Exchangers Robust and reliable for all loads and applications What it is Air cooled heat exchangers are commonly used in industrial applications where a reliable source of
More informationVapor Corrosion Inhibitors (VCIs) for Storage Tanks Corrosion Controlled Cost Controlled
Vapor Corrosion Inhibitors (VCIs) for Storage Tanks Corrosion Controlled Cost Controlled Presented by Kelly Baker, Zerust Oil & Gas Efim Lyublinski, Monique Posner, Terry Natale, Yefim Vaks, Ronnie Singh
More informationSteam System Best Practices Condensate System Piping
Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum
More informationPIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
More informationPROBLEM SOLVING FORUM
4 Dealing with Water Tank Blisters Amy Forsgren Swedish Corrosion Institute Stockholm, Sweden: Blistering of the paint system used in a steel water tank indicates that the steel surface was not cleaned
More informationNorth American Stainless
North American Stainless Flat Products Stainless Steel Grade Sheet 310S (S31008)/ EN 1.4845 Introduction: SS310 is a highly alloyed austenitic stainless steel designed for elevated-temperature service.
More informationA SHORT INTRODUCTION TO CORROSION AND ITS CONTROL
A SHORT INTRODUCTION TO CORROSION AND ITS CONTROL CORROSION OF METALS AND ITS PREVENTION WHAT IS CORROSION Corrosion is the deterioration of materials by chemical interaction with their environment. The
More informationAMEC 6007: Linear Velocity and Acceleration Learning Outcome. CHEM 6012: Oil and Gas Compositions and Sales Specifications Learning Outcome
s/objectives Level F ADMN 6044: Post Job Management It is important to know the proper procedures for closing out a job so that rigging and equipment is maintained for future use and personnel are adequately
More informationWhite rust on galvanized and galvanized pre-painted steel. Technical Information
Technical Information White rust on galvanised steel Prevention It is easier to prevent white rust than to cure it! Reasonable precautions to protect steel during both transport and storage can considerably
More informationBest Practice in Boiler Water Treatment
Best Practice in Boiler Water Treatment Boiler Water Treatment Part 2 Internal Treatment Objectives of Internal Water Treatment 1 To control the level of total dissolved solids (TDS) within the boiler
More informationNorth American Stainless
Introduction: North American Stainless Flat Products Stainless Steel Grade Sheet 309S (S30908)/ EN1.4833 SS309 is a highly alloyed austenitic stainless steel used for its excellent oxidation resistance,
More informationNorth American Stainless
North American Stainless Flat Products Stainless Steel Grade Sheet 304 (S30400)/ EN 1.4301 304L (S30403) / EN 1.4307 304H (S30409) Introduction: Types 304, 304L and 304H are the most versatile and widely
More informationwww.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 45 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 SCOPE 2 2.0 CONFLICTS
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationThe Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not
More information15823 N. Barkers Landing Houston, TX 77079 281/556 8774 david.hendrix@hghouston.com www.hghouston.com
D a v i d E. H e n d r i x, P. E. RESUME 15823 N. Barkers Landing Houston, TX 77079 281/556 8774 david.hendrix@hghouston.com www.hghouston.com Experience: 2013 1990 President, The Hendrix Group Inc., A
More informationThe Engineering Science of Oil Pipelines
The Engineering Science of Oil Pipelines From the Keystone XL pipeline project to spills and leaks in existing lines, pipelines are in the news. The SMCC has prepared this backgrounder on crude oil and
More informationCorrosion Resistant Alloys (CRAs) in the oil and gas industry selection guidelines update
Corrosion Resistant Alloys (CRAs) in the oil and gas industry Bruce D. Craig and Liane Smith Nickel Institute Technical Series N o 1 73 Corrosion Resistant Alloys (CRAs) in the oil and gas industry 3rd
More informationList of Frequently Utilized Storage Tank Standards and Practices
List of Frequently Utilized Storage Tank Standards and Practices Below is a list of frequently used storage tank standards and practices from organizations that are referenced in 25 PA Code, Chapter 245.
More informationProfiles for floors of same height Cerfix Projoint
PROFILPAS S.P.A. VIA EINSTEIN, 38 35010 CADONEGHE (PADOVA) ITALY TEL. +39 (0)49 8878411 +39 (0)49 8878412 FAX. +39 (0)49-706692 EMAIL: INFO@PROFILPAS.COM s for floors of same height Cerfix Projoint Application
More informationLiquid Applied Internal Flow Coatings for Oil Transmission Lines
Liquid Applied Internal Flow Coatings for Oil Transmission Lines M R McDonnell E Wood Limited United Kingdom This paper will examine more closely the benefits to the Industry by lining Oil Pipelines. Introduction
More informationCURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS
A DB RILEY TECHNICAL PUBLICATION CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS by James P. King, Design Manager DB Riley, Inc. Presented at the 1998 ASME
More informationThe soot and scale problems
Dr. Albrecht Kaupp Page 1 The soot and scale problems Issue Soot and scale do not only increase energy consumption but are as well a major cause of tube failure. Learning Objectives Understanding the implications
More informationAUTOCLAVE CORROSION INHIBITOR EVALUATION
AUTOCLAVE CORROSION INHIBITOR EVALUATION Cormetrics Job #: 12-123 Prepared for: ABC Company Lab: Bay 4-2280 39 th Avenue NE, Calgary, AB. T2E 6P7 Phone: 258-2853 Fax: 291-1423 ABC Company Page 1 of 9 1.
More informationSPECIFICATION Aluminum Module Frames. Allowed anodization before fabrication for clear frames.
SPECIFICATION Allowed anodization before fabrication for clear frames. Page 2 of 9 1. SCOPE 1.1. This document provides general requirements for aluminum frames used in the assembly of photovoltaic modules.
More informationINDIAN STANDARDS (BIS) ON WELDING
** IS 82:957 Glossary of terms relating to welding and cutting of Sep 2008 metals 2 IS 83:986 Scheme of symbols for welding (revised) Sep 2008 3 IS 84:2004 Covered electrodes for manual metal arc welding
More informationNON-DESTRUCTIVE TESTING OF PIPELINES. L. Annila. Abstract
NON-DESTRUCTIVE TESTING OF PIPELINES L. Annila Abstract This paper shall present different, contemporarily available non-destructive testing (NDT) methods of pipelines and compare them to each other from
More informationGENERAL PROPERTIES //////////////////////////////////////////////////////
ALLOY 625 DATA SHEET //// Alloy 625 (UNS designation N06625) is a nickel-chromium-molybdenum alloy possessing excellent resistance to oxidation and corrosion over a broad range of corrosive conditions,
More informationBiocorrosion Risk Assessment
Biocorrosion Risk Assessment Andrew M.Pritchard European Summer School on Biologically Influenced Corrosion, University of Portsmouth 7-13 July 2002 Contents T Management and assessment of risks T A definition
More informationAvoiding Burning Through: Control the Inside Surface Temperature, Not the Pressure
Originally published in the Canadian Welding Association Journal, Spring 2013, pp 30 39 Welding on In service Pipelines: Dispelling Popular Myths and Misconceptions Bill Amend Sr. Principal Engineer, Welding
More informationAtomic Structure. Atoms consist of: Nucleus: Electrons Atom is electrically balanced equal electrons and protons. Protons Neutrons
Basics of Corrosion Performance Metals Sacrificial anode manufacturer Specialize in aluminum alloy anodes All products made in the USA (Berks county, PA) ISO9001/2001 Certified Quality System Also traditional
More informationNAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
More informationOil and Gas Pipeline Design, Maintenance and Repair
Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University aelsayed@mail.eng.cu.edu.eg
More informationCathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants
Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants PG&E Office San Francisco January 18, 2007 Craig K. Meier Corrosion Control Incorporated Corrosion process for tanks
More informationSpecific Volume of Liquid (Column 7). The volume per unit of mass in cubic feet per pound.
Steam Tables What They Are How to Use Them The heat quantities and temperature/ pressure relationships referred to in this Handbook are taken from the Properties of Saturated Steam table. Definitions of
More informationTroubleshooting Your RO
Troubleshooting Your RO Summary: There can be many reasons why a RO system suffers a loss in performance, and is unable to produce the proper quantity and/or quality of permeate water. Similar to a doctor
More informationBRAZED PLATE INSTALLATION MANUAL
www.brazedplate.com BRAZED PLATE INSTALLATION MANUAL S.E.C. Heat Exchangers P.E.I. CANADA C0A 1A0 tel; 902-659-2424 fax; 902-659-2800 Table of Contents Description...2 Mounting position...3 Piping connections......3
More informationHoneywell Corrosion Solutions
Honeywell Corrosion Solutions Honeywell offers technology, services and software to provide comprehensive solutions to help industry detect and solve corrosion problems that can hinder their abilities
More informationPBX Series Quick Fit Connector Bimetallic Steam Traps
6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationCHALLENGES IN A DILUTION STEAM GENERATOR SYSTEM
CHALLENGES IN A DILUTION STEAM GENERATOR SYSTEM Lee Siang Hua Titan Petrochemicals (M) Sdn Bhd Cheah Phaik Sim Titan Petrochemicals (M) sdn Bhd piximmink@yahhoo.com Karl Kolmetz Westlake Group, Lake Charles,
More informationDissimilar Metal Corrosion
PDHonline Course S118 (1 PDH) Dissimilar Metal Corrosion Instructor: D. Matthew Stuart, P.E., S.E., F.ASCE, F.SEI, SECB, MgtEng 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658
More informationComparison of the Corrosion Protection Effectiveness of Vapor Corrosion Inhibitor and Nitrogen Blanketing System
Comparison of the Corrosion Protection Effectiveness of Vapor Corrosion Inhibitor and Nitrogen Blanketing System Behzad Bavarian 1, Jia Zhang 1, Lisa Reiner 1 and Boris Miksic, FNACE 2 Dept. of Manufacturing
More informationPressure Vessel Assessment Report
Project Information Client: Total Energy Location: Blackwell OK Date: 7/23/2013 Contact: Integrity Mgmt. Advisor: Chuck Easterbrooks - API 510 #2212 Cc: API / UT Inspector: Robert Van Pelt-API 510# 40899
More informationNorth American Stainless
North American Stainless Flat Products Stainless Steel Grade Sheet 430 (S43000)/ EN 1.4016 Introduction: SS430 is a low-carbon plain chromium, ferritic stainless steel without any stabilization of carbon
More informationSSPC-SP 6/NACE NO. 3
Joint Surface Preparation Standard SSPC-SP 6/NACE NO. 3 Commercial Blast Cleaning This SSPC: The Society for Protective Coatings and NACE International standard represents a consensus of those individual
More informationPort of Rotterdam. More than 50 kilometres!
Port of Rotterdam More than 50 kilometres! 3 Development of the port 2008-2030 1960-1970 1906-1922 1929 1949 1400-1800 1800-1900 1970 2008 1948-1957 1934-1946 4 Salinity in the port 5 Port in figures Total
More informationCorrosion Protection Provided by Mortar Lining in Large Diameter Water Pipelines After Many Years of Service. Sylvia C. Hall, P.E., M.
100 Corrosion Protection Provided by Mortar Lining in Large Diameter Water Pipelines After Many Years of Service Sylvia C. Hall, P.E., M.ASCE 1 Abstract More than 95% of large diameter steel (AWWA C200/C205),
More informationWorld Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014
World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014 From Safe by Accident? by Judy Agnew & Aubrey Daniels Despite decades of reduction in safety related deaths and injuries on the job,
More informationBODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION
BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION 2015 (Replaces July 2013) API Authorized Piping Inspectors must have a broad knowledge base relating to maintenance, inspection,
More informationCATHODIC PROTECTION OF REINFORCED CONCRETE STRUCTURES
CATHODIC PROTECTION OF REINFORCED CONCRETE STRUCTURES AN OVERVIEW CLEARLY THE BEST PROTECTION FOR YOUR INVESTMENT Introduction Cathodic protection is applied to reinforced concrete structures to either
More informationE. INTERNAL PACKAGING
ANTI-CRRSIN MEASURES E. INTERNAL PACKAGING 1. ANTI-CRRSIN MEASURES During transport, handling and storage especially during overseas shipping more intensive stresses occur, which are often not sufficiently
More informationGE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications
GE Oil & Gas Air cooled heat exchangers Robust and reliable for all loads and applications What it is Air cooled heat exchangers are commonly used in industrial applications where a reliable source of
More informationFlow Assurance & Operability
Flow Assurance & Operability Erosion due to sand production Date Business Name Overview 1. What causes erosion? 2. Sand production and transport 3. Sand management 4. Instrumentation / monitoring of sand
More informationGENERAL RUBBER LINING PRINCIPLES
GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface
More information60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING
60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed
More informationALLOY C276 DATA SHEET
ALLOY C276 DATA SHEET //// Alloy C276 (UNS designation N10276) is a nickel-molybdenum-chromium-iron-tungsten alloy known for its corrosion resistance in a wide range of aggressive media. It is one of the
More informationOptimize Pipeline Hydraulics with Multiphase Flow Modeling
Optimize Pipeline Hydraulics with Multiphase Flow Modeling Below are questions asked by attendees during the webinar on February 22, 2012, followed by answers provided by our presenters. Will you also
More informationEVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES
EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES Prepared for AIR LOGISTICS, INC. Azusa, California September 2005 Revision 1 STRESS ENGINEERING SERVICES, INC. Houston, Texas
More informationExternal Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902
External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water
More informationTECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT
TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT I / 7 Natural Gas Transport. General principle The most efficient and effective method of natural gas distribution from the place of production to the
More informationPaper No. 4071 APPLICATION OF EQCM TO THE STUDY OF CO2 CORROSION
Paper No. 471 APPLICATION OF EQCM TO THE STUDY OF CO2 CORROSION Yang Yang, Bruce Brown and Srdjan Nešić Institute for Corrosion and Multiphase Technology, Department of Chemical and Biomolecular Engineering
More informationThe Owners Coated Coil, Cleaning and Maintenance Service Manual.
The Owners Coated Coil, Cleaning and Maintenance Service Manual. Revision: July, 2011 Section INDEX Pages Forward 1 2 Importance of Proper & Timely Coil Cleaning 3 Coil Cleaner Characteristics 4 Selecting
More informationThe National Board of Boiler and Pressure Vessel Inspectors 1055 Crupper Avenue Columbus, Ohio 43229 614.888.8320
TheNationalBoardofBoilerandPressureVesselInspectors 1055CrupperAvenue Columbus,Ohio43229 614.888.8320 NB-410, Revision 3 Sept, 2015 1 1.0 GENERAL The purpose of this document is to provide basic guidelines
More informationOIL & GAS PRODUCTION AUDITING
OIL & GAS PRODUCTION AUDITING Wayne C. Dussel Offshore Measurement Supervisor El Paso Production GOM Basic Measurement Audit Steps I. Select location (s) to be reviewed. II. Review contracts, commingling
More informationCSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach
CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach Greg Orloff, MBA Government Relations Officer North America and Europe CSA Group Z662 Technical Committee (TC) Over 250
More informationJune 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
More informationMeasuring the Condition of Prestressed Concrete Cylinder Pipe
Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder
More informationVacuum. How It Relates to Refrigeration And Air Conditioning Service
Vacuum How It Relates to Refrigeration And Air Conditioning Service Moisture In A Refrigeration System Visible Moisture Water Droplets Uncommon, but it can occur Invisible Moisture Water Vapor Found in
More informationTube Damage Mechanism and Analysis in Feed Water Heaters
Tube Damage Mechanism and Analysis in Feed Water Heaters Asst. prof. Dr. Rafaa Abbas Al-Baldawi College of Engineering Al-Mustansirya University rafa_a70@yahoo.com Dr. Mohammed Najm Abdullah College of
More informationREPORT OF A COATING FAILURE ON A 16-INCH OIL PIPELINE UNDER WET CO2 SERVICE
REPORT OF A COATING FAILURE ON A 16-INCH OIL PIPELINE UNDER WET CO2 SERVICE Klaus E. Kueter InterCorr International, Inc. 14503 Bammel-N. Houston, Suite 300 Houston, TX 77014 David E. Hendrix The Hendrix
More informationTITANIUM FABRICATION CORP.
TITANIUM FABRICATION CORP. Titanium, Zirconium, and Tantalum Clad Construction General Considerations In many applications, particularly for large pressure vessels designed for high temperature and pressure,
More informationGuidelines for Selecting and Maintaining Glycol Based Heat Transfer Fluids
Guidelines for Selecting and Maintaining Based Heat Transfer Fluids David Berry Engineering Manager, Chem-Aqua Canada Allan Browning Technical Marketing Manager, Chem-Aqua, Inc. Based Heat Transfer Fluids
More informationAPPENDIX CC NUCLEAR WASTE STORAGE
APPENDIX CC NUCLEAR WASTE STORAGE APPENDIX CC NUCLEAR WASTE STORAGE MICHIEL P.H. BRONGERS 1 SUMMARY Nuclear wastes are generated from spent nuclear fuel, dismantled weapons, and products such as radio
More informationBHS CANDLE FILTER APPLICATIONS FOR CLARIFICATION / RECOVERY OF SOLIDS FROM CHEMICAL SLURRIES
FOR CLARIFICATION / RECOVERY OF SOLIDS FROM CHEMICAL SLURRIES TABLE OF CONTENTS 1. FINE CATALYST RECOVERY AT A REFINERY Pages 2 4 2. FINE SOLIDS REMOVAL & CLARIFICATION OF A SPECIALIZED ACIDIC SOLVENT
More informationField Data Collection, Evaluation and Use for Corrosivity Prediction and Validation of Models
Field Data Collection, Evaluation and Use for Corrosivity Prediction and Validation of Models Part II: Evaluation of Field Data and Comparison of Prediction Models Rolf Nyborg Institute for Energy Technology
More informationWeld Cracking. An Excerpt from The Fabricators' and Erectors' Guide to Welded Steel Construction. The James F. Lincoln Arc Welding Foundation
Weld Cracking An Excerpt from The Fabricators' and Erectors' Guide to Welded Steel Construction The James F. Lincoln Arc Welding Foundation Weld Cracking Several types of discontinuities may occur in welds
More informationBODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)
BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013) API Authorized Aboveground Storage Tank Inspectors
More informationstainless steel for coastal and salt corrosion DESIGNER HANDBOOK TABLE OF CONTENTS: INTRODUCTION CASE STUDY ONE: STREET LEVEL APPLICATIONS
DESIGNER HANDBOOK stainless steel for coastal and salt corrosion TABLE OF CONTENTS: INTRODUCTION CASE STUDY ONE: STREET LEVEL APPLICATIONS CASE STUDY TWO: EXTERIOR WALL PANELS AND WINDOW FRAMES CASE STUDY
More informationBPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap
1263050/6 IM-P126-07 ST Issue 6 BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation
More informationENERGY CARRIERS AND CONVERSION SYSTEMS Vol. II - Transportation of Hydrogen by Pipeline - Kunihiro Takahashi TRANSPORTATION OF HYDROGEN BY PIPELINE
TRANSPORTATION OF HYDROGEN BY PIPELINE Kunihiro Takahashi Director, Center for Supply Control and Disaster Management, Tokyo Gas Co. Ltd., Tokyo, Japan Keywords: pipeline transportation of gaseous hydrogen,
More informationChapter 5 - Aircraft Welding
Chapter 5 - Aircraft Welding Chapter 5 Section A Study Aid Questions Fill in the Blanks 1. There are 3 types of welding:, and, welding. 2. The oxy acetylene flame, with a temperature of Fahrenheit is produced
More informationIntroducing an All New Line of Cleaning Chemicals
www.alltemp.ca Introducing an All New Line of Cleaning Chemicals Coil Cleaners & Brighteners Metal Cleaning Detergents Ice Machine Cleaners Scale Removers Electronic Cell Cleaner Degreasing Solvent Leak
More informationV-Cone, An Alternative to Orifice Meter in Wet Gas Applications
V-Cone, An Alternative to Orifice Meter in Wet Gas Applications Stephen A. Ifft McCrometer Inc. Hemet, California, USA Abstract This paper will discuss the use of the V-Cone differential pressure flowmeter
More informationSpecification for Rotary Drill Stem Elements
Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004
More informationDavid O. Ahrens, Commercial Marine Manager Caterpillar Engine Products Division
Caterpillar Inc. Cat Marine Power Diesel fuel feature story 187-P-2-004-98 Special to Seaway Review HEADLINE: BYLINE: Fuel for Thought David O. Ahrens, Commercial Marine Manager Caterpillar Engine Products
More informationHeat Exchanger Thin Film Foul Release Applications Corrosion Resistant Protective Coatings Grit Blast Surface Prep of Tubular Equipment
Heat Exchanger Thin Film Foul Release Applications Corrosion Resistant Protective Coatings Grit Blast Surface Prep of Tubular Equipment Non-Destructive Examination Heat Exchanger Mechanical Repair Services
More information[]n. Craving energy. Oil and gas formation. Oil and gas formation. Resources: Fossil Fuels. Supplying our energy needs: Source of energy in the US
Craving energy Supplying our energy needs: Source of energy in the US Resources: Fossil Fuels Energy consumption in the US Reading: Ch 13 Oil and gas formation Oil and gas formation 1. Need accumulation
More informationPIPELINE INTEGRITY SOFTWARE By Valery V. Kotov, Weatherford P&SS, Lukhovitsy, Russia
PIPELINE INTEGRITY SOFTWARE By Valery V. Kotov, Weatherford P&SS, Lukhovitsy, Russia ABSTRACT It is now commonly accepted that In-Line Inspection is one of the most reliable methods of ensuring pipeline
More informationPaper to be published in 2004
Paper to be published in 2004 RECENT ACTIVITIES ON HIGH TEMPERARTURE HYDROGEN ATTACK Koji Kawano, PhD. Senior Engineering Coordinator Idemitsu Engineering Company, Ltd. Chiba, Japan ABSTRACT Existing C-0.5Mo
More information