1 Planning Guidelines for Auto Parts Recyclers (Materials Recycling) April 2006
2 INTRODUCTION 1.1 The Hume Planning Scheme defines Materials Recycling as Land used to collect, dismantle, store recycle, or sell, used or scrap materials. 1.2 Council aims to achieve land used for either of the above uses to be suitably located and to have minimal impact on the surrounding environment. Appropriate siting not only involves the consideration of the zoning, site history, possible future impacts, surrounding land uses and ease of access, but must also address the possible environmental, social and economic impacts to the neighbourhood. 1.3 The guidelines aim to assist the responsible establishment and operation of land used for Auto Parts Recycling (Materials Recycling). 1.4 Applications should comply with the requirements of Council s guidelines in order to be considered favourably for such a use. However, irrespective of compliance with the requirements listed in these guidelines Council reserves the right to refuse any application that would cause a substantial detriment to the amenity of the neighbourhood. 1.5 In addition to the requirements outlined in these guidelines any proposal must also comply with the relevant policy as contained within the Hume Planning Scheme. 2. REQUIREMENTS FOR LAND USED FOR AUTO PARTS RECYCLING (MATERIALS RECYCLING) In submitting your planning permit application you should take into consideration the responsibilities in managing potential environmental risks associated with your auto dismantling yard. Hume City Council has identified a significant threat to water and ground contamination from auto parts recyclers. It is critical that contaminants such as oil and coolant do not enter the stormwater system or leach into the ground Applicants should comply with the requirements of Councils guidelines in order to be considered for such a use The key areas listed below are to be addressed in any proposal submitted to Council for assessment The key elements to be addressed are: 2.2 STORAGE AND STACKING Stacking of materials and goods must not exceed a height of 2.1 metres in height or 2 cars in height, and must not be visible from a public road or thoroughfare and must be stacked in a neat, safe and orderly manner The height of the fence should take into consideration the slope of the land to ensure that materials are not visible from the street.
3 2.3 SCREENING All areas required for storage on the site must be screened. The requirements are as follows: (a) (b) (c) (d) (e) (f) (g) (h) A screen fence of minimum 2.1 metres in height is required behind the 3 metre landscape setback along the front title boundary. The screen fence must be colorbond, treated pine timber or similar to the satisfaction of the Responsible Authority. Please note Council does not support the use of shade cloth. A screen fence is also required on side boundaries of the site at a minimum height of 2.1 metres where abutting vacant land or land containing a building with a car park and landscape setback, to screen the view of the site from the street and any neighbouring premises. If using the entire site and abutting vacant land, a screen fence would be required for the entire length of the side boundaries. Where the site abuts land with a building, the fence must be constructed 3 metres from the front title boundary to the point where the adjacent building commences. A screen fence would be required along the rear title boundary where abutting a reserve, residential property, vacant land or an exposed area of building. Access gates to the site must be colorbond, treated pine timber or similar to the satisfaction of the responsible Authority. Returns would be required between the fence and the gate where gates have been constructed 3 metres behind the property boundary. Gates must be kept closed at all times when no one is attending at the site. 2.4 LANDSCAPING A minimum 3 metre wide landscape setback is required along the front title boundary of the site A landscape plan generally in accordance with Councils landscaping guidelines should indicate proposed plant species, location, height and be submitted to and approved by Council. Trees and shrubs must be planted at mature heights. Shrubs must be planted at a minimum height of 300mm and trees must be planted at a minimum height of 1 metre Landscaped areas should be maintained on a regular basis. Maintenance includes the removal of weeds and the replacement of any dead plants A sprinkler system should be installed so that all landscaped areas are adequately maintained to the satisfaction of the Responsible Authority.
4 2.5 CAR PARKING Wherever practicable, car parking must be located at the site frontage to the rear of screen fencing Car spaces must be made available for staff and customer use and must not be used for any other purpose All vehicles associated with the operation must be parked within the site, and not on any nearby streets A car space must have at least 4.9 metres long and 2.6 metres wide, except where access is from the side when it must be at least 6.7 metres long and 2.3 metres wide At least 10%of the site area must be set aside for car spaces and access ways (but not driveways). The minimum width of the access lane depends on the angle of entry and must be as follows: Angle Width 45 degrees 3.5m 60 degrees 4.9m 90 degrees 6.4m Areas set aside for de-pollution and dismantling of vehicles should be drained and provided with an all-weather seal coat (bitumen and concrete). The areas must be constructed, drained and provided and maintained in a continuously useable condition to the satisfaction of the Responsible Authority The balance of the site may be paved with crushed rock or gravel of adequate thickness as necessary to prevent the formation of potholes and depressions according to the nature of the use, and the vehicles that will use the area. This area must be drained and maintained in a continuously useable condition to the satisfaction of the Responsible Authority Vehicle access to and from the subject land from any roadway or service lane must be by way of the vehicle crossing constructed in accordance with Council s Vehicle Crossing Specifications to suit the proposed driveway(s) and the vehicles that will use the crossing(s). The location, design and construction of the vehicle crossing(s) must be approved by the Responsible Authority. 2.6 SITE STRUCTURE The design, layout and provision of site structures must comply with all relevant Planning and Building regulations. 2.7 LOADING AND UNLOADING All loading and unloading of goods and materials must take place within the boundaries of the site.
5 2.7.2 An accessway should be provided on the site to enable forklift access to all vehicles stacked within the site A designated area is to be provided for the delivery and temporary storage of vehicles intended for recycling. Given the high potential for oil and coolant spills occurring in the vehicle receiving area, it is critical that the area is impervious and located where possible, away from stormwater drains. Proper spill kit provisions should also be located near the vehicle receiving area The dismantling or de-polluting of vehicles in this area is prohibited. 2.8 AMENITY To minimise adverse visual impact on the surrounding environment, the amenity at the site must be maintained. This would involve strategies and actions to address issues such as: (a) Litter Control (b) Noise Attenuation (c) Stormwater Management (d) Vermin Control (e) Dust Control 2.9 ENVIRONMENTAL CONSIDERATIONS In submitting your planning permit application you should take into consideration the responsibilities in managing potential environmental risks associated with your auto dismantling yard. Hume City Council has identified a very significant threat to water and ground contamination from auto parts recyclers. It is therefore critical that contaminants such as oil and coolant do not enter the stormwater system or leach into the ground Vehicle De-Pollution and Dismantling Area This area is principally where all dismantling of vehicle body parts and depolluting must occur. Given the likelihood of spills, it is important that any leaks are contained within an isolated area. A vehicle hoist is strongly recommended in making this process easier and safer. The basic requirements that are needed are: (a) The floor area should be impervious to prevent contamination to the ground. (b) The area is to be undercover. (c) Bunding of up to 400mm is to be placed around the area to prevent any liquids from escaping and entering the stormwater system or contaminating other areas. (d) Proper spill kit provisions are to be placed in this area Parts Washing This area should be used for hosing down of vehicle bodies and body parts.
6 (a) The area must have an impervious floor. (b) Bunding of 40mm placed around the entire wash bay as described above. (c) Area to be drained to an oil-water separator unit Wash bays should be placed inside the premises to contain overspray. Where this is not possible, roofing may be necessary. Contact must be made with the local water authority for specifications and to arrange a trade waste agreement Oil/water separator units should be maintained regularly as per the requirements of the local water authority. Maintenance should include regular cleaning of equipment. Connection of the separator units to the stormwater system is prohibited PARTS STORAGE AREA It is important to note that while parts are being stored they may still release contaminates into the ground and stormwater. It is therefore important that these parts be drained (de-polluted) of all liquids prior to storage in a designated area. Storage of parts (in particular the engine block and running gear) must be undercover, and preferably parts are to be racked off the ground Vehicle bodies not including the engine block and running gear should be stored outside and stacked to a maximum two vehicles in height. This area is to be on porous ground, preferably with a gravel surface WASTE STORAGE, RECYCLING AND DISPOSAL The storage of waste fluids (brake fluid, engine oil, radiator coolants etc) and batteries should be kept in a safe, designated area away from any potential collision with forklifts or other vehicles. The area should be undercover (i.e. roofed and walled) and is to have bunding that would secure liquid storage areas and contain potential spills from polluting the environment. The height of the bund should be sufficient to contain at least 25% of the volume of waste stored, as per EPA requirements Spill kit provisions are to be located in this area in the event of a spill Good segregation of chemicals and other waste products helps minimise waste. Areas for storage are to be indicted on the floor plan and provide the description of the type of waste. Waste material from vehicles should be classified under the following groups and handled accordingly; Hazard Re- Use Recycle Collected Disposed Environmental issue involved with these materials Potential be sold or reused on site. Product can be remanufactured or otherwise recycled. Product is to be collected by an authorised contractor. Product to be disposed in landfill or to a toxic waste dump Particular storage bins or containers should be clearly labelled for the use intended.
7 The disposal of waste liquids and solids should be undertaken by approved authorised waste collectors when applicable As part of good and responsible site management a contingency plan should be implemented if and when chemical or fluid contaminations occur. A safety management plan should be implemented and the provisions for spill storage kits should be kept available Spill storage kits should contain the following: absorbent material container for waste absorbent shovel, broom, dust pan and gloves catch trays for spills.
8 2.14 STANDARD CONDITIONS OF PERMIT: The following permit conditions would be likely imposed on any approval Council may give. Please note that Councils consent to the proposal is based on these conditions being met CONDITIONS 1. Before the use and or development permitted by this permit commences, plans to the satisfaction of the Responsible Authority must be submitted to and approved by the Responsible Authority. When approved the plans will be endorsed and will then form part of this permit. The plans must be drawn to scale and be generally in accordance with the Hume City Council Planning Guidelines for Auto Parts Recyclers. 2. The layout of the site and/or the size of the proposed or existing buildings and works and/or the internal layout and use of the buildings as shown on the endorsed plan/s shall not be altered or modified except with the written consent of the Responsible Authority. 3. The use of the land or of any of the buildings on the subject land shall not be altered or changed to some other use except with the written consent of the Responsible Authority. 4. The use or development permitted by this permit must not, in the opinion of the Responsible Authority, adversely affect the amenity of the locality by reason of the processes carried on; the transportation of materials, goods (or commodities) to and from the subject land; the appearance of any buildings, works or materials; the emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil; the presence of vermin, or otherwise. 5. The subject land must be maintained in an orderly and neat manner at all times and its appearance must not, in the opinion of the Responsible Authority, adversely affect the amenity of the locality. 6. Vehicles intended for wrecking, vehicle parts, goods, equipment, packing material or machinery must not be stored or left exposed outside a building so as to be visible from any public road or thoroughfare. 7. Prior to the commencement of the use a landscape plan must be submitted in accordance with Councils guidelines showing the plant species, location, height and spread must be submitted to and approved by Council. 8. Landscaped areas must be maintained on a regular basis to the satisfaction of the Responsible Authority. Maintenance should include but not be limited to the removal of weeds and the replacement of any dead plants. 9. Prior to the commencement of the use a sprinkler system must be installed so that all landscaped areas are adequately maintained to the satisfaction of the Responsible Authority. 10. Prior to the commencement of the use a screen fence a minimum 2.1 metres height is required behind the 3 metre landscape setback along the front title
9 boundary. The screen fence must be colorbond, treated pine timber or similar to the satisfaction of the Responsible Authority. 11. The access gates must be closed at all times whilst no one is attending the property. 12. The following conditions relate to the vehicle receiving area; a) A separate Vehicle Receiving Area is to be identified and used specifically for the receiving and temporary storage of vehicles, prior to dismantling. b) All unloading and loading of vehicles must at all times be carried out within the receiving area shown on the endorsed plan. c) This area must be available for such use and shall not be used for any other purpose other than receiving and temporary vehicle storage. d) This area must be impervious and sealed with an all-weather seal coat. e) Proper provisions must be made to ensure any spills, including oil and coolant, are cleaned immediately from vehicles being delivered and not allowed to enter the stormwater. Proper provisions include spill kits and drip trays being located in this area. 13. The following conditions relate to the vehicle de-pollution and dismantling area; a) This area is to be used for dismantling of vehicle body parts and depolluting (draining of oils, radiator fluid etc). b) This area must be available for such use and shall not be used for any other purpose other than for de-polluting and dismantling of vehicles. c) This area must be impervious and sealed with an all-weather seal coat. d) This area is to be indoors and/or undercover. e) Bunding is to be placed around this area to a minimum height of 400mm and form a smooth curved mound. f) Proper provisions must be made to ensure any spills, including oil and coolant, are cleaned immediately from vehicles being de-polluted and dismantled. Proper provisions include spill kits and drip trays being located in this area. 14. The following conditions relate to the parts washing area; a) Washing down of vehicles and vehicle parts are to be done within the wash bay area only. b) The wash bay area must have an impervious floor with bunding placed around the entire wash bay area. c) Bunding is to be of a size, height and width to provide a continual barrier so that all waste/spill is contained within the boundaries of the site. d) No over spray is to leave the site from the wash bay area. e) The wash bay area must be drained to an oil water separator unit or a unit approved by the relevant water authority. f) A trade waste agreement must be arranged with the relevant water authority to permit the discharge of waste water into the sewer system. g) The oil-water separator unit/or other approved facility is to be maintained and cleaned regularly as per the requirements of the water authority. 15. The following conditions relate to the parts storage area; a) A separate Parts Storage Area is to be identified and used specifically for the permanent storage of vehicle bodies and parts.
10 b) All parts must be de-polluted prior to storage in this area. c) This area must be available for such use and shall not be used for any other purpose other than for storage. d) An outside storage area is to be used for vehicle body parts at a maximum stack of 2 vehicles in height. e) Oily parts including the engine block and running gear, batteries and waste liquids must not be stored in this outside area. f) A storage area, that is indoors and undercover, is to be provided for the storage of the engine block and running gear. 16. The following conditions relate to the waste storage, recycling and disposal area; a) All liquid waste, including engine oil, transmission fluid and radiator coolant, must be collected and stored in a dedicated area that is indoors and undercover. b) This area must be available for such use and shall not be used for any other purpose other than for storing liquid wastes. c) This area must be impervious and sealed with an all-weather seal coat. d) Bunding should be placed around this area to contain at least 25% of the volume of waste stored as per EPA requirements. e) The disposal of waste liquids are to be undertaken by approved authorised waste collectors. f) The occupier is required to keep a complete written record of waste disposal undertaken by the approved waste collector. g) Spill kit provisions must be maintained near this area. 17. Prior to the commencement of the use a spill kit must be provided on the site that includes absorbent material, container for waste absorbent, shovel, broom, dust pan, gloves and catch trays for spills to the satisfaction of the Responsible Authority. 18. No cleaning detergents, degreasers are to be discharged into the storm water system. This water can be placed into the oil-water interceptor unit or discharged to the sewer system. 19. No contaminated water containing oil, grease, radiator fluid, washing detergent or sediment is to be discharged into stormwater drains or allowed to be discharged beyond the boundaries of the subject land onto other land or any street or road directly or indirectly into any watercourse. 20. No stack of material stored externally is to exceed 2.1 metres, or 2 cars in height to the satisfaction of the Responsible Authority. 21. Stormwater drains are not to be used for any other purpose than for stormwater. 22. The subject land must not be used for the storage of dangerous, or hazardous or explosive goods, materials or substances. 23. Outdoor lighting must be designed, baffled and located to the satisfaction of the Responsible Authority so that no direct light is emitted outside the boundaries of the subject land.
11 24. Areas set aside for the parking and movement of vehicles as shown on the endorsed plan(s) must be made available for such use and must not be used for any other purposes. 25. The boundaries of all car spaces, access and egress lanes and the direction in which vehicles should proceed along the access lanes must at all times be clearly indicated on the ground to the satisfaction of the Responsible Authority. 26. Prior to the commencement of the use the areas set aside for de-pollution and dismantling must be properly formed and drained and provided with an allweather seal coat (concrete or bitumen) to the satisfaction of the Responsible Authority. 27. Prior to the commencement of the use the balance of the site may be paved with crushed rock or gravel of a minimum thickness of 700mm as necessary to prevent the formation of potholes and depressions according to the nature of the use, and the vehicles that will use the area. This area must be drained and maintained in a continuously useable condition to the satisfaction of the Responsible Authority. 28. Stormwater from all paved areas must be drained to the underground stormwater system. 29. Prior to the commencement of the use the drainage plans must be submitted to Council for approval. 30. No polluted and/or sediment laden run-off is to be discharged directly or indirectly into Council s drains or watercourses during or after development to the satisfaction of the Responsible Authority. 31. The loading and unloading of goods from vehicles and the delivery of goods must at all times be carried out within the boundaries of the subject land. 32. All staff vehicles including vehicles associated with the operation of the use must be parked within the site and not on the street. 33. Vehicle access to and from the subject land must be by way of a vehicle crossing constructed in accordance with Council s Vehicle Crossing specifications to suit the proposed driveway(s) and the vehicles that will use the crossing(s). The location, design and construction of the vehicle crossing(s) must be approved by the Responsible Authority. 34. Any services within the road reserve that require relocation must be approved by the relevant service authority and any such relocation must be made at the owner s or developer s cost. 35. Oil or wastewater must not be discharged beyond the boundaries of the premises. 36. This permit will expire if one of the following circumstances applies: The development and use is/are not commenced within two years of the date of this permit. The development is not completed within two years of the date of commencement.
12 The Responsible authority may extend these times if a request is made in writing before the permit expires or within three months afterwards. Note: If the application is a result of enforced action, the commencement and completion times may be reduced to 2 months each. These guidelines are intended as a guide for permit applicants only and may vary depending on the extent of the proposed use/development. This list of information provided is not exhaustive and is compiled without the benefit of a site inspection or referrals which might reveal other material constraints and/or considerations. Additional requirements may be incurred. Council reserves the right to request additional information pursuant to Section 54(1) of the Planning and Environment Act (1987) on any proposal submitted for consideration.
Waste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
More informationDevelopment proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
More informationEnvironmental Management Plan
Environmental Management Plan This environmental management plan outlines Red Bus Services objectives and strategies for protecting the environment. This plan sets out how Red Bus Services intends to comply
More informationSpill Prevention, Control & Cleanup SC-11
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Spills and leaks, if not properly controlled, can adversely impact the storm drain system and receiving waters. Due to
More informationChapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
More informationUDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,
More informationGood Housekeeping BMP
E.1. Good Housekeeping BMP Sweep or vacuum shops floor frequently. Use mopping as an alternative to hosing down work areas. Spot clean any spilled oil or fluids using absorbents or rags. Use dry cleanup
More informationPOLLUTION PREVENTION FACT SHEET: AUTOMOBILE MAINTENANCE
POLLUTION PREVENTION FACT SHEET: AUTOMOBILE MAINTENANCE Description This pollution prevention measure involves creating a program of targeted outreach and training for businesses involved in automobile
More informationSTARTING A NEW FOOD BUSINESS? GUIDELINES FOR OPENING A CLASS 3 FOOD BUSINESS
STARTING A NEW FOOD BUSINESS? GUIDELINES FOR OPENING A CLASS 3 FOOD BUSINESS Updated: July 2010 Contents Procedure for opening a new Food Business... 2 Basic Records... 3 Summary - Construction and Fitout
More informationTemporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationGood Housekeeping Practices for DPW/Fleet Maintenance Facilities
Good Housekeeping Practices for DPW/Fleet Maintenance Facilities Kevin P. Walker C&S Engineers, Inc. Best Management Practices Best Management Practices (BMPs) are measures and/or controls used to prevent
More informationMAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN
MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident
More informationUNIVERSITY OF WISCONSIN MADISON
UNIVERSITY OF WISCONSIN MADISON Contractor Spill Contingency Plan (while working on campus) Departments of: Environment, Health & Safety Physical Plant Table of Contents Spill Contingency Plan Most Common
More informationVEHICLE CROSSOVER INFORMATION PACK
VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)
More informationHome Office, Home Occupation and Home Business
, Home Occupation and Home Business Introduction This fact sheet provides summary information on requirements for, Home Occupation and Home Business proposals. It is not a definitive document but provides
More informationSCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
More informationManaging Floor Drains and Flammable Traps
Managing Floor Drains and Flammable Traps Contents: Problem... 1 Solution... 2 Maintenance... 2 Waste Management Options... 2 For More Information... 4 BMP Chart... 5 This fact sheet discusses recommended
More informationARTICLE 13 B-3 BUSINESS DISTRICT
ARTICLE 13 B-3 BUSINESS DISTRICT PREAMBLE This district has been established to provide for commercial and recreational activities which primarily are conducted within an enclosed building SECTION 1301
More informationImproper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
More informationFOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN 37618 423-538-7144
FOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN 37618 423-538-7144 This document may be printed and used for reference by
More informationIngredion ANZ Pty Ltd
Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)
More informationFlorida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
More informationSuffolk County Department of Health Services. Division of Environmental Quality
Suffolk County Department of Health Services Division of Environmental Quality Guidelines For the Construction of Storage Areas for Portable Containers ~~~~ Clare B. Bradley, M.D., M.P.H. Suffolk County
More informationConcrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationHow Your Vehicle Service Facility Can Prevent Stormwater Pollution
TIPS FOR A CLEANER BAY How Your Vehicle Service Facility Can Prevent Stormwater Pollution alameda county YOU CAN PREVENT WATER POLLUTION! Storm drains flow directly into creeks and the Bay without any
More informationHYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003
Page: 1 of 6 PROCEDURE SIG-ENV-PR003 Revision Approved Date Description 1 AV 01/04/99 New EP 2 AV 07/06/00 Revision of EP 3 AV 04/04/03 Revision of EP 4 Stuart Roseby DRAFT 5 Stuart Roseby 25/07/2005 Approved
More informationPolicy document on the provision of waste & recycling collection and storage facilities. Includes both domestic and commercial premises
Policy document on the provision of waste & recycling collection and storage facilities Includes both domestic and commercial premises Introduction This document is intended to help relevant parties who
More informationEnvironmental Site Inspection Checklist
Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated
More informationENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
More informationBUSINESS INSPECTION PROGRAM
RESOURCES FOR ENVIRONMENTAL HELP BUSINESS INSPECTION PROGRAM How can I help keep our waters clean and healthy? Educate your staff about common surface water pollution sources (spills, leaky containers
More informationFLAMMABLE LIQUIDS COMPLIANCE NOTE
Issued by: Heather Rice Page: 1 of 7 COMPLIANCE NOTE INTRODUCTION This document provides additional guidance to support the Arrangement on Flammable Liquids (Ref No. CYC/HS/A27) CONTENTS Section Topic
More informationOutdoor Storage of Raw Materials SC-33
Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.
More informationPollution Incident Response Plan
Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution
More informationVEHICLE SERVICE FACILITIES. Best Management Practices
VEHICLE SERVICE FACILITIES Best Management Practices Chapter 1 of the Best Management Practices Manual for the City s Storm Water Management Program Public Works Department 809 Center Street, Santa Cruz,
More informationANNEX 2 Emergency / Pollution Incident Response Plan
ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...
More informationHousehold waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
More informationStormwater BMPs: Secondary Containment and Spill Control. September 2012
Stormwater BMPs: Secondary Containment and Spill Control September 2012 Secondary Containment Secondary Containment Helps to minimize the potential for pollution by: Keeping spills in a confined area Preventing
More informationAURV471482A Plan and manage compliance with environmental regulations in the body repair industry
AURV471482A Plan and manage compliance with environmental regulations in the body repair industry Release: 1 AURV471482A Plan and manage compliance with environmental regulations in the body repair industry
More informationWASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE
SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.
More informationBEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ
BEST MANAGEMENT PRACTICES (BMPs)... What are They? CLEAN STREETS MEAN CLEAN STREAMS Inexpensive to implement and easy to use, BMPs help you to do your share to protect the environment. The term Best Management
More informationManchester City Council Item 6 Planning and Highways Committee 8 May 2014
Application Number 104843/FO/2014/N1 Date of Appln 28th Feb 2014 Committee Date 8th May 2014 Ward Moston Ward Proposal Location Applicant Agent Change of use of ground floor to a hot food takeaway (Fish
More informationPollution Incident Response Management Plan
Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes
More informationChemical Storage and Spill Response Guidelines
Chemical Storage and Spill Response Guidelines 9TP-SD-066/3.0 Supporting Document Applicable to Transport Projects Delivery Office Quality Management System Status: Approved Version: 3.0 Branch: Business
More informationpart 9 waste management
part 9 waste management 30m Hammerhead T-form 22m 21m Hammerhead Y-form 30m 18m Forward Side-Turn 25m 15m Reverse Side-Turn 30m Above: Recommended turning circles for waste collection vehicles 9 WASTE
More informationDevelopment Variance Permit Application Package
When do I need a Development Variance Permit? Development Variance Permit Application Package If my proposed development does not meet the standards set out in the Zoning Regulation Bylaw on matters that
More informationBEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008
BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 JBA Prepared by : John Barnett and Associates / SLR Consulting 7 Dundrum Business Park
More informationPollution Incident Response Management Plan (PIRMP)
Pollution Incident Response Management Plan (PIRMP) For NSW Ports For Construction of Berth 103 Stage 2 Extension WATERWAY CONSTRUCTIONS PTY LTD ABN 74 061 311 395 Po Box 290, Annandale NSW 2038 TELEPHONE:
More informationWorkplace Health, Safety & Welfare
Relevant Legislation Workplace (Health, Safety and Welfare) Regulations 1992 Construction (Design & Management) Regulations 2015 Provision & Use of Work Equipment Regulations 1998 (PUWER) Lifting Operations
More informationLaws Requiring Pollution Prevention Practices
Laws Requiring Pollution Prevention Practices Stormwater/urban runoff is being addressed as a result of the 1987 amendments to the Federal Clean Water Act [Section 402(p)], which established requirements
More informationHow Your Business Can Prevent Stormwater Pollution
Tips for a Cleaner Bay How Your Business Can Prevent Stormwater Pollution alameda county You Can Prevent Water Pollution! Storm drains flow directly into creeks and the Bay without any treatment. Because
More informationEnvironmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
More informationCivil Engineering Sector Labour-Management Health and Safety Committee
PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION
More informationDIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012
DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines
More informationCritical Regulations SUMMARY OF. Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.
SUMMARY OF Critical Regulations Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.26 Spill Prevention, Control, and Countermeasures Rule (SPCC) 40
More informationOutdoor Liquid Container Storage
Outdoor Liquid Container Storage SC-31 Objectives Cover Contain Educate Reduce/Minimize Description Accidental releases of materials from above ground liquid storage tanks, drums, and dumpsters present
More informationSILICON VALLEY CLEAN WATER. May 2015
SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial
More informationGeneral environmental duty. Code of practice for the concrete batching industry
General environmental duty Code of practice for the concrete batching industry Table of contents 1. Introduction... 3 2. Objective of the code... 3 3. Scope of the code... 3 4. Commencement date... 3 5.
More informationSCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose
SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance
More informationImproper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.
WQ-3 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design and Operation Standards Section 1. Introduction According to the EPA, the majority of water pollution
More informationCleaning. Wash vehicles over an indoor drain leading to an oil/water separator that flows to the sanitary sewer system.
Underground Oil/Water Separator Cleaning Wash water from cleaning often contains solvents, detergents, and metals. Wash water should never be discharged to a street, gutter, or storm drain. Contact your
More informationLIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
More informationPLANNING & ENVIRONMENT COMMITTEE 8 JULY 2009 REGULATION OF CHARITY CAR WASHING ON ROADWAYS RECOMMENDATION:
341 PLANNING & ENVIRONMENT COMMITTEE 8 JULY 2009 19 REGULATION OF CHARITY CAR WASHING ON ROADWAYS Jacinta Oliver: 18/46/2-104: #2017806 RECOMMENDATION: That Council promote healthy waterways and water
More informationRequired BMPs for All Commercial Properties
REQUIREMENTS ACTIVITY SHEET A- Required BMPs for All Commercial Properties MINIMUM REQUIREMENTS The following BMPs are required if you own or occupy commercial, industrial, agricultural, public, or multifamily
More informationSPILL CONTAINMENT AND CONTROL PLAN
SPILL CONTAINMENT AND CONTROL PLAN PUD NO. 1 TREATMENT PLANT 1257 GLASS ROAD PORT ANGELES, WASHINGTON PUD No. 1 Treatment Plant 2431 East Highway 101 P.O. Box 1090 Port Angeles, WA 98362 Facility Description:
More informationPollution & Noise from Demolition & Construction Sites
CONTROL OF Pollution & Noise from Demolition & Construction Sites N oi se Co ns tru ct io n MAY 2008 THE LONDON BOROUGH 3 CONTENTS Part 1 Introduction Page 1. Background 4 2. Purpose of the code 5 3.
More informationMinister s Guideline MG-12 Siting and Design of Single Dwellings
Minister s Guideline MG-12 Siting and Design of Single Dwellings This replaces previous Minister s Guideline MG/12 issued June 2005 Pursuant to section 188 A of the Building Act 1993 (the Act) I hereby
More informationDRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer
Only RAIN down the Storm Drain... DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer This publication applies to you if: You generate wastewater outdoors, and The wastewater
More informationSPILL RESPONSE PLAN. What is the Issue? Regulatory Requirements. General Information
An equal opportunity university SPILL RESPONSE PLAN What is the Issue? Accidental spills of petroleum products, common household cleaning products, hazardous materials or hazardous waste, can have negative
More informationTHE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission
Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:
More informationAPPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
More informationCHAPTER 15 MUNICIPAL SEPARATE STORM SEWER SYSTEM PROGRAM REQUIREMENTS
CHAPTER 15 MUNICIPAL SEPARATE STORM SEWER SYSTEM PROGRAM REQUIREMENTS 15.1 INTRODUCTION In accordance with Section 402 (p) of the Clean Water Act, the National Pollutant Discharge Elimination System (NPDES)
More informationCITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
More informationPLANNING POLICY 3.3.5
PLANNING POLICY 3.3.5 CHILD CARE PREMISES 1. Introduction A Child Care Premises is used to provide a child care service within the meaning of the Child Care Services Act 2007, but does not include a Family
More informationALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.
More informationBest Management Practices
for The City of Paso Robles is required to implement a Phase II Municipal Water Program in order to reduce or eliminate the pollutants that enter our waterways from both storm water and non-storm water
More informationSANDRIDGE. Application in the FBURA.
6.6 578 PLUMMER STREET, PORT MELBOURNE LOCATION/ADDRESS: RESPONSIBLE MANAGER: AUTHOR: TRIM FILE NO.: P0256/2015 ATTACHMENTS: WARD: TRIGGER FOR DETERMINATION BY COMMITTEE: 578 PLUMMER STREET, PORT MELBOURNE
More informationWITHOUT PREJUDICE. City of Port Phillip Planning Permit Application No. P0039/2015
WITHOUT PREJUDICE City of Port Phillip Planning Permit Application No. P0039/2015 VCAT Reference: P0822/2015 Draft Conditions Proposed by the City of Port Phillip for VCAT Application for Review P0822/2015
More informationPrevent Blockages in the Sanitary Sewer System
FATS, OILS & GREASE - BMPs The following Best Management Practices (BMPs) tables are listed below: Prevent blockages in the Sanitary Sewer System Properly Maintain Grease Traps and Interceptors to Prevent
More informationAnnual Storm Water Pollution Prevention Plan and Spill Prevention, Control and Countermeasures Plan Compliance Inspection
Annual Storm Water Pollution Prevention Plan and Spill Prevention, Control and Countermeasures Plan Compliance Inspection September 22, 2014 Prepared By: Facilities Management Environmental Resources University
More informationAustin Used Cooking Oil Initiative Voluntary Compliance Standards
Austin Used Cooking Oil Initiative Voluntary Compliance Standards The City of Austin invites Used Cooking Oil Generators - including brick-and-mortar restaurants, mobile food vendors and other food service
More informationPesticide Spills. Chapter 26. In This Chapter. Keywords. Accidents. Pesticides Act and Environmental Protection Act
Chapter 26 Pesticide Spills In This Chapter Keywords Accidents After learning the information in this chapter, you will be able to: 1. Define a spill. 2. Describe when a spill must be reported to the Spills
More informationGENERAL PERMIT WMGM043
A. Description: The approval herein granted is for the acceptance, transfer, and processing prior to beneficial use of construction and demolition waste materials as follows: a. Processing by sorting,
More informationSustainable Resource Management Ltd
6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects
More informationConstruction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
More informationCity of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
More informationHINTS AND TIPS FOR IMPROVING RESOURCE EFFICIENCY IN YOUR BUSINESS
HINTS AND TIPS FOR IMPROVING RESOURCE EFFICIENCY IN YOUR BUSINESS Publication 1255 October 2008 EPA Victoria has assembled a range of hints and tips aimed at assisting you to improve the resource efficiency
More informationPLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
More informationFat-Free Sewers. How to Prevent Fats, Oils, and Greases from Damaging Your Home and the Environment
Fat-Free Sewers How to Prevent Fats, Oils, and Greases from Damaging Your Home and the Environment Fats, Oils, and Grease What is FOG? Residual fats, oils, and grease (FOG) are by-products that food service
More informationStorm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
More informationPlanning Technical Advice Note: Waste bin storage and access requirements for new and change of use developments
City Development Planning Technical Advice Note: Waste bin storage and access requirements for new and change of use developments November 2014 1. Introduction There are a number of issues associated with
More informationBest Environmental Management Practices
Save money and prevent costly utility increases by protecting our environment and our Publicly Owned Treatment Works. Read this pamphlet to find out how. Vehicle Service Facility Best Environmental Management
More informationVersion Decision Number Adoption Date History 1 20\2501 23/02/10 Adopted 2 3 4
Title: Waste Management Policy No: 054 Adopted By: Council Next Review Date: 23/02/2014 Responsibility: General Manager Infrastructure Document Number: 2118629 Version Decision Number Adoption Date History
More informationConstruction Management Plan Template
Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name
More informationSusceptibility of Your Drinking Water Source to Contamination
Susceptibility of Your Drinking Water Source to Contamination The aquifer that supplies drinking water to ICASI Culinary School has a moderate susceptibility because of the following reasons: < Available
More information3.0 Table of Development Note: This table must be read in conjunction with the explanation provided in Part 5, Division 1, Chapter 2 Using Domains.
Part 5 Division 2 Chapter 2 Domains Domains Park Living 1.0 Intent The purpose of this domain is to provide a variety of opportunities for low density residential activity within areas of semi-rural landscapes,
More informationPPG13. pollution prevention guidelines. Vehicle washing and cleaning: PPG13. This document is out of date was withdrawn 14/12/2015. 1.
PPG13 July 2007 Environment Alliance - working together pollution prevention guidelines Vehicle washing and cleaning: PPG13 These guidelines are jointly produced by the Environment Agency for England and
More informationCITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is
~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions
More informationBIOSECURITY PROCEDURES IN POULTRY PRODUCTION
1 Annex VII CHAPTER 6.4. BIOSECURITY PROCEDURES IN POULTRY PRODUCTION Article 6.4.1. Introduction This chapter provides recommended biosecurity procedures in poultry production and is not specifically
More informationBe a part of the Team! Keep the Bay CLEAN!
Be a part of the Team! Keep the Bay CLEAN! Water Quality Protection Guidelines for Food Handling Facilities Regional Water Quality Control Plant Operated by the City of Palo Alto for the communities of
More information