1 FY 16 - Project Management Office Technology Project Approval Process January 2015
2 Purpose of Project Management Office PMO Why do we have a PMO at Simmons? Strategic Ensure leadership (President s Operating Committee) has the opportunity to make informed decisions and effectively prioritize Ensure alignment with Simmons Strategy 2015 Ensure all projects are evaluated with the same criteria Financial Invest only in projects with quantifiable and strong return on investment Ensure the full cost of implementation and ongoing support is considered Operational Provide project management service and effective resource allocation Ensure compatibility with Simmons College IT Infrastructure and Systems Ensure external vendors and solutions are reliable and a good overall value compared with alternatives Project Management Office Technology January 2015 Page 2
3 What projects need to go through the PMO? Projects that have any of the following characteristics need to follow the PMO guidelines: Hardware or software purchase in excess of $5,000 or any technology purchase that would require agreeing to a contract (including online agreement to T&Cs) ANY Simmons data that is sent to a third party Requires more than 30 hours of Technology staff time to assist with project activities such as: requirements, development, testing, configuration, implementation or ongoing maintenance Requires integration/interfaces or other communication with existing systems or has anticipated future communication with Simmons systems (including single sign-on integration) Requires custom extracts from existing systems Project Management Office Technology January 2015 Page 3
4 Simmons PMO Tips for Proposals Scope of projects for PMO process are technology only PMO Team can help with proposals, in particular related to scoping the time involved with delivering the project Focus on the business issue you want to address, not the software solution. You should not select a vendor at this point just perform initial research to get a rough sense of what it will cost Proposals are being assessed for CONCEPT and $ ORDER OF MAGNITUDE Total cost of the project will be considered Process is tied to the budget cycle Do NOT submit the funding request in your department budget all PMO approved projects will be funded through a central budget Obtain Operating Team member sign off prior to submitting final version to PMO ( approval is fine) Any projects previously submitted may be updated and re-submitted in their original format (i.e. Word docs do NOT need to be cut and pasted into the new google form if they were already submitted) Project Management Office Technology January 2015 Page 4
5 Technology Project Approval Process Timeline for FY16 Submittals Timing January February 2 March April April Step PMO reviews Project Proposal Forms and provides feedback and assistance to requestors FINAL Project Proposals due to PMO PMO presents all FY16 project proposals to Operating Team. Based on final budget, PMO projects approved by Operating Team will be funded Notify requesters of funding decisions Project Management Office Technology January 2015 Page 5
6 Criteria for Evaluating Technology Projects Operating Team will use to evaluate projects: Strategic Considerations Enables a unique competitive advantage in the marketplace Supports a NEW revenue stream with projections for >$75,000 annual revenue and sustained profitability beginning in year 3 Risk of inaction would result in loss of market share >5% Financial Considerations Sustainable cost savings that yields ROI (>$20,000 annually or >5% of costs) Sustainable revenue enhancement that yields ROI (>$20,000 annually ) Significant balance sheet enhancement Operational Considerations Significant and systemic (i.e. impacts 3+ departments/stakeholders) efficiency improvements Project significantly and measurably improves customer (internal or external) experience. Downstream (stakeholder) impact is positive or of minimal disruption Enables significantly more informed and timely decision making Compliance Considerations Compliance and/or reputational cost of inaction is unacceptable Regulatory requirement Project Specific Considerations Problem that project addresses is clearly defined High probability of project implementation success (on time and with budget) and ongoing maintenance success Operational disruption of implementation is outweighed by the benefits of the outcome Other options for addressing the problem have been fully vetted and this approach is the best alternative Project Management Office Technology January 2015 Page 6
7 How to initiate a project request If you would like to initiate project that involves technology, please follow these steps: Fill out the Technology Project Proposal Form If you previously submitted a proposal that was not funded and would like to re-propose the same project, you are welcome to update your materials from last year and send them via to Deborah Wahlen (you do not need to re-enter the content in the new form) Submit the Proposal Form by February 2, You are encouraged to submit the form earlier to obtain feedback before your final proposal submission. Technology will present all proposed projects to the Operating Committee for consideration in March 2015 Project approvals will be announced once the final expense budget has been approved by the Board For questions or help with the process please contact Deborah Wahlen. Project Management Office Technology January 2015 Page 7
8 Who is the PMO? Deborah Wahlen, Director, Project Management Office Nephellie Dobie, Director, Project Management & Business Analysis Emily Chaves, Sr. Business Analyst Jane Showalter, Sr. Business Analyst Project Management Office Technology January 2015 Page 8
FY 17 Budget Cycle Capital Initiative Proposal Process. December 2015
FY 17 Budget Cycle Capital Initiative Proposal Process December 2015 Capital Initiatives - Overview What is a Simmons Capital Initiative? Any expenditure in excess of $5,000 with a useful life of 3 years
More informationMissouri Department of Natural Resources Administrative Policies and Procedures
Administrative Policies and Information management is critical to successful operations within the Department of. All Information Technology (IT) projects will be conducted in alignment with the departmental
More informationAttachment 1. PGW IS expects to use the Demand Management and Project Prioritization tools and methodologies to:
Attachment 1 1. Introduction 1.1 Overview Philadelphia Gas Works (PGW) has used Microsoft Project and Project Server to manage Information Services (IS) Projects since 2006. In 2014, PGW upgraded its Project
More informationObjectives. Project Management Overview. Successful Project Fundamentals. Additional Training Resources
Project Management for Small Business Moderator: Maria Mancha Frontline Systems, Inc. Objectives Project Management Overview Successful Project Fundamentals Additional Training Resources Project Management
More informationWhy are PMO s are Needed on Large Projects?
Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects
More informationISO 20000-1:2005 Requirements Summary
Contents 3. Requirements for a Management System... 3 3.1 Management Responsibility... 3 3.2 Documentation Requirements... 3 3.3 Competence, Awareness, and Training... 4 4. Planning and Implementing Service
More informationFINAL REPORT - CONTRACT PROCUREMENT WORK GROUP RFP AND PROCUREMENT PROCESSES WORK GROUP RECOMMENDATIONS - AS APPROVED BY CABINET 8/21/13
FINAL REPORT - CONTRACT PROCUREMENT WORK GROUP RFP AND PROCUREMENT PROCESSES WORK GROUP RECOMMENDATIONS - AS APPROVED BY CABINET 8/21/13 Section I.F - Applicability: Page 4 references applicability to
More informationWhite Paper. Making the case for PPM
Introduction There are many reasons why organizations decide to implement project portfolio management solutions, but typically it is to help senior management confidently and consistently answer questions
More informationQ uick Guide to Disaster Recovery Planning An ITtoolkit.com White Paper
This quick reference guide provides an introductory overview of the key principles and issues involved in IT related disaster recovery planning, including needs evaluation, goals, objectives and related
More informationQuestions CASE 167583 Business Marketing and Advertising RFP
Questions CASE 167583 Business Marketing and Advertising RFP Q1 R1 Q2 R2 Q3 R3 Q4 R4 Can we have review only access to Google Analytics for michiganbusiness.org, puremichiganbusinessconnect.org and werunonbrainpower.org
More informationTaxSlayer Frequently Asked Questions (FAQs)
TaxSlayer Frequently Asked Questions (FAQs) Background: The VITA/TCE software contract has been awarded to TaxSlayer, LLC. TaxSlayer will be the new software provider for the VITA/TCE Programs beginning
More informationNEEDS BASED PLANNING FOR IT DISASTER RECOVERY
The Define/Align/Approve Reference Series NEEDS BASED PLANNING FOR IT DISASTER RECOVERY Disaster recovery planning is essential it s also expensive. That s why every step taken and dollar spent must be
More informationBusiness Risk Management - Top 10 Questions to Ask
How to Ace IT Governance Without Tech Expertise 50 POWERFUL QUESTIONS READY TO ASK AT YOUR NEXT BOARD MEETING Corporate Director and Creator of THE BOARDROOM BLUEPRINT TM OVERVIEW 50 POWERFUL I.T. QUESTIONS
More informationPROJECT MANAGEMENT PLAN <PROJECT NAME>
PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
More informationState of Oregon. State of Oregon 1
State of Oregon State of Oregon 1 Table of Contents 1. Introduction...1 2. Information Asset Management...2 3. Communication Operations...7 3.3 Workstation Management... 7 3.9 Log management... 11 4. Information
More informationBUSINESS SERVICES INTEGRATION AGREEMENT
BUSINESS SERVICES INTEGRATION AGREEMENT Integration Agreement for use of Business Services Between General Services Administration Federal Procurement Data System Next Generation And 1 1. Introduction
More informationThe PNC Financial Services Group, Inc. Business Continuity Program
The PNC Financial Services Group, Inc. Business Continuity Program 1 Content Overview A. Introduction Page 3 B. Governance Model Page 4 C. Program Components Page 4 Business Impact Analysis (BIA) Page
More informationSoftware as a Medical Device. A Provider View from Canada
Software as a Medical Device A Provider View from Canada Current Situation in Canada Medical Device ruling August 2009 Revised Notice in May 2010, providing dates for compliance (Sept. 2011 for Class 2)
More informationINFORMATION TECHNOLOGY SERVICES IT CHANGE MANAGEMENT POLICY & PROCESS
INFORMATION TECHNOLOGY SERVICES IT CHANGE MANAGEMENT POLICY & PROCESS Revised: 12/5/2011 Table of Contents Overview... 3 Roles and Responsibilities... 4 Management Process Definition... 6 Management Process
More informationCustomer Relationship Team reporting to Product Manager
Position Description Employee: Position title: Location: Grade: Organisation: Head Office: 60-68 Moorabool Street, Geelong. Technical Specialist Customer Relationship Team reporting to Product Manager
More informationXavier University: IT Portfolio Management and the Project Request Process
A guideline and process document to establish the governance framework for technology related project requests laying the groundwork for strategic portfolio management Xavier University: IT Portfolio Management
More informationProductivity Apex Inc. Incorporating GPS Technology to Enhance One call Center Processes in New Jersey
Productivity Apex Inc Incorporating GPS Technology to Enhance One call Center Processes in New Jersey Final Report May Latest update on the Project Performance since last quarterly report: The last two
More informationRO-Why: The business value of a modern intranet
RO-Why: The business value of a modern intranet 1 Introduction In the simplest terms, companies don t build products, do deals, or make service calls people do. But most companies struggle with isolated
More informationTips To Select and Implement CRM To Improve Your Bottom Line
Tips To Select and Implement CRM To Improve Your Bottom Line January 7, 2010 Eric Kimberling, President Panorama Consulting Group www.panorama-consulting.com 303-256-6253 About Panorama Consulting Niche
More informationSchenectady City School. Request for Proposal for Website Design and Content Management System RFP #0620 16
Schenectady City School District Request for Proposal for Website Design and Content Management System RFP #0620 16 Proposals to be received: Time: 9am Date: June 20, 2016 Place: Schenectady City School
More informationThe App Store Model Comes to The Enterprise
The App Store Model Comes to The Enterprise Reference Code: CYIT0155 Publication Date: May 2011 Author: Tony Baer SUMMARY Catalyst Consumerization of IT is setting end users and enterprise IT on a collision
More informationHR Strategic Design Initiative. Project Status. June 2015
HR Strategic Design Initiative Project Status June 2015 Embarked upon the HR Strategic Design Initiative Objectives Develop a thorough and fact-based understanding of the University s HR requirements Design
More informationBridging Development and Operations: The Secret of Streamlining Release Management
Bridging Development and Operations: The Secret of Streamlining Release Management Mark Levy, Product Manager Serena Software SERENA SOFTWARE INC. Release Management Goal Deploy application changes into
More information2. Please describe the project s alignment with the Common System Principles (Appendix 1).
Project Name Project Summary Please provide the project charter with this request. Please note any changes to the scope or schedule, or budget in this section and any other information you feel necessary.
More informationAudit Capabilities: Beyond the Checklist. Niall Haddow, Business Leader Philip Young, Sr. IT Auditor Professional Strategies - Session S32
Audit Capabilities: Beyond the Checklist Niall Haddow, Business Leader Philip Young, Sr. IT Auditor Professional Strategies - Session S32 Agenda Beyond the Checklist Visa Overview Visa Internal Audit Overview
More informationFrank P.Saladis PMP, PMI Fellow
Frank P.Saladis PMP, PMI Fellow Success factors for Project Portfolio Management The Purpose of Portfolio Management Organizational Assessment Planning a Portfolio Management Strategy The Portfolio Management
More informationFIS Support Portal. support.fis.pitt.edu. 1 P age
FIS Support Portal support.fis.pitt.edu 1 P age TABLE OF CONTENTS Overview... 2 New Features... 2 Using and Navigating the Portal... 3 1: My Tickets and Requests... 4 2: Submit a Ticket... 5 3: Request
More informationMarketing Project Management 101
Marketing Project Management 101 How marketing teams can tame project chaos 2016 Workfront. All rights reserved. Hala Saleh Founder, 27Sprints, LLC @halasaleh1 Heather Hurst Director of Corporate Marketing,
More informationArctic Economic Council
Working Group: Traditional Knowledge, Stewardship and Small/Medium Business Development Arctic Economic Council WORKING GROUP SCOPE The Arctic Economic Council aims to facilitate business activities and
More informationAll of these circumstances indicate that the world of tomorrow is as different as today s water utility business is from that of yesteryear.
EXECUTIVE SUMMARY PROJECT OVERVIEW Why Should We Invest in Strategic Planning? Strategic planning is a set of intentions expressed as a plan. The plan turns the intentions into reality by focusing on the
More informationOverview of Performance Management
Overview of Performance Management Individual Performance Plan Performance Review & Evaluation 1 Performance Management: Why Me? Why Now? 2 Purpose To Provide an Overview of: The Who, What, and Why of
More informationApplication Overhaul. Key Initiative Overview
Scott D. Nelson Research Managing Vice President This overview provides a high-level description of the Application Overhaul Key Initiative. IT leaders can use this guide to understand how to develop an
More informationRequest for Proposal. Institutional Cost Driver Analysis
Request for Proposal Institutional Cost Driver Analysis Date Issued: February 25, 2014 1560 Broadway, Suite 1600Denver, Colorado 80202(303) 866-2723 LT. GOV. JOSEPH A. GARCIA, EXECUTIVE DIRECTOR 1 1. Overview
More information10 Reasons Why Project Managers Need Project Portfolio Management (PPM)
10 Reasons Why Project Managers Need Project Portfolio Management (PPM) Introduction Many project managers might think they are doing just fine with spreadsheets or basic project management software and
More informationLeadingAge Maryland. QAPI: Quality Assurance Performance Improvement
LeadingAge Maryland QAPI: Quality Assurance Performance Improvement NOT ALL CHANGE IS IMPROVEMENT, BUT ALL IMPROVEMENT IS CHANGE Donald Berwick, MD Former CMS Administrator 2 WHAT IS QAPI? Mandated as
More informationThe ITIL v.3. Foundation Examination
The ITIL v.3. Foundation Examination ITIL v. 3 Foundation Examination: Sample Paper 3, version 3.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions.
More information2015-233-B. Request for Information (RFI) for Contract Management and Project Management Software Solutions
2015-233-B Request for Information (RFI) for Contract Management and Project Management Software Solutions SECTION 1 GENERAL INFORMATION 1.1 INTRODUCTION The Purchasing Department for the City of Plano,
More informationD R A F T - F O R C O M M E N T
Business Impact Analysis Agency Name: State Board of Orthotics, Prosthetics, and Pedorthics (OPP) Regulation/Package Title: FYR - FY17 - Online Processing Rule Number(s): 4779-5-03; 4779-6-01; 4779-8-01;
More information8.4 REMOTE OFFICE INTERNET AND DATA SERVICES CONTRACT MANAGEMENT OFFICE RANDALL THAIN, PROJECT MANAGER
8.4 REMOTE OFFICE INTERNET AND DATA SERVICES CONTRACT LOCATION/ADDRESS: EXECUTIVE MANAGER: PREPARED BY: TRIM FILE NO: 48/11/29 ATTACHMENTS: WHOLE OF MUNICIPALITY JOHN GABB ENTERPRISE PORTFOLIO MANAGEMENT
More informationVirginia Commonwealth University School of Medicine Information Security Standard
Virginia Commonwealth University School of Medicine Information Security Standard Title: Scope: Business Continuity Management Standard for IT Systems This standard is applicable to all VCU School of Medicine
More informationImproved use of technology & automation Develop a comprehensive data base system to track & report progress on submissions
Improved use of technology & automation Develop a comprehensive data base system to track & report progress on submissions Web based status reporting Development of electronic permitting system The database
More informationMedicare Program; Pre-Claim Review Demonstration for Home Health Services. AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS.
This document is scheduled to be published in the Federal Register on 06/10/2016 and available online at http://federalregister.gov/a/2016-13755, and on FDsys.gov CMS-6069-N DEPARTMENT OF HEALTH AND HUMAN
More informationCDMG 3607 Digital Asset Management INSTRUCTIONAL OBJECTIVES
New York City College of Technology The City University of New York Department of Communication Design CDMG 3607 Digital Asset Management Course Description This course focuses on the terminology, techniques,
More informationChange Management: Adopt and Implement Grant Management Software
Change Management: Adopt and Implement Grant Management Software StreamLink Software, 2014 Introduction The decision to purchase grant management software is a big one. If your organization recently took
More informationI. Creating a Project Request in TeamDynamix: Defining
I. Creating a Project Request in TeamDynamix: Defining Project Request Site: https://projects.xavier.edu/tdclient/login.aspx This section will describe the details to create a project request. A project
More informationService Procurement process improvement in SAP. Copyright 2008, Advanced Contractor Cost Management Inc. All Rights Reserved 1
Service Procurement process improvement in SAP 1 Objectives Assist the Client in managing an expanding contracted work force using a proven methodology. Provide a SAP based, web enabled software solution,
More informationAny successful software implementation is dependent upon
Best Practices for Selecting Governance Risk and Compliance Software By Shannan Layette, Pete McAteer and Buddy Doyle Any successful software implementation is dependent upon selecting the right vendor
More informationEnterprise Resource Planning
Enterprise Resource Planning Organizational Readiness & Risk Assessment Workbook Prepared for: Copyright S.S. Inc. 1986 2009 Table of Contents OVERVIEW... 2 SECTION A: EXECUTIVE MANAGEMENT S GOALS & COMMITMENT...
More informationBRMS Integrated with ACCESS Florida Conceptual Illustration. Page 2 of 8
State of Florida Agency for Health Care Administration (ACHA) Modernization Using a Business Rules Management System (BRMS) Introduction December 16, 2012 The State of Florida has determined that further
More informationThe 2015 Manufacturing ERP Report
The 2015 Manufacturing ERP Report. All rights reserved. No unauthorized reproduction without the author s written consent. All references to this publication must cite Panorama Consulting Solutions as
More informationVENDOR SELECTION: WHERE TO BEGIN?
VENDOR SELECTION: WHERE TO BEGIN? INTRODUCTION Selecting the right software for your organization, regardless if it s a best-of breed HR or Sales application or a full-fledged ERP system, can be a daunting
More informationRequest for Proposal: Network Switches
Request for Proposal: Network Switches January 16, 2015 Friend Public Schools 501 Main Street Friend, NE 68359 Erate Identifier: Category Two RFP Network Switches 1 Table of Contents Overview...3 1.1 Project
More informationCDMRP ereceipt System User Guide
CDMRP ereceipt System User Guide Congressionally Directed Medical Research Programs (CDMRP) Last Updated: January 2011 Table of Contents Overview... 3 Purpose... 3 Help Desk Contact Information... 3 System
More informationA Changing Commission: How it affects you - Issue 1
A Changing Commission: How it affects you - Issue 1 Contents Overview... 3 Change Programme... 4 Introduction... 4 Reviewing how we regulate and engage... 4 What are the key changes... 5 What does it mean
More informationTips for Good Agile Requirements
Whitepaper 9 Tips for Good Agile Requirements Organizations are finding that they need better ways to develop the applications that are critical to the enterprise. The existing old-fashioned methods are
More information2014 Wide Area Networking State-of-the Market Report
2014 Wide Area Networking State-of-the Market Report By Jim Metzler, Ashton Metzler & Associates Distinguished Research Fellow and Co-Founder, Webtorials Editorial/Analyst Division Executive Summary The
More informationWriting - The Four Different Types of faxes
Protocol & Procedures for Online Marketing To: Faculty, Staff and Students From: The Office of Public Information Frear Hook, Webmaster: x3460, frear.hook@maine.edu Rachel McFadden, Web & Social Media
More informationestb/ebond Frequently Asked Questions
estb/ebond Frequently Asked Questions The purpose of this FAQ document is to provide the Trade community with answers to questions related to the ebond process that will be available on January 3, 2015.
More informationIndustrial Cyber Security Risk Manager. Proactively Monitor, Measure and Manage Industrial Cyber Security Risk
Industrial Cyber Security Risk Manager Proactively Monitor, Measure and Manage Industrial Cyber Security Risk Industrial Attacks Continue to Increase in Frequency & Sophistication Today, industrial organizations
More informationDelivering Excellence in Insurance Claims Handling
Delivering Excellence in Insurance Claims Handling Guide to Best Practice Delivering Excellence in Insurance Claims Handling Contents Page 1. Introduction 1 2. Executive Summary 2 3. Components of Best
More informationCITY OF MILTON REQUEST FOR PROPOSAL #09-001-ITS
CITY OF MILTON REQUEST FOR PROPOSAL #09-001-ITS to provide INFORMATION TECHNOLOGY SUPPORT SERVICES Issued: November 2, 2009 Submit completed application to: City of Milton 1000 Laurel Street Milton, WA
More informationInsurance Brokers - from initial registration to ongoing submittal, retrieval, and editing of new or existing certificates of insurance.
Welcome to Track4LA 2.1 Our insurance and bonds compliance system has been designed to make the experience around submitting and retrieving insurance information quick and easy. For those brokers who have
More informationWest Virginia Hospital Inpatient Data System. Data Collection Policies and Procedures. February 7, 2011 Version 2.0
West Virginia Hospital Inpatient Data System Data Collection Policies and Procedures February 7, 2011 Version 2.0 West Virginia Hospital Inpatient Data System Data Collection Policies and Procedures Guide
More informationGetting Started with the Content Management System (CMS)
Getting Started with the Content Management System (CMS) 1.0 Step-by-Step Guide to Migrating to the CMS Step 1: Kick-off Meeting CMS Project Team, Department Web Working Group; i.e. Director/Department
More informationSeven Critical Steps to a Successful CRM Solution
Western Territory 515 South Figueroa Street, Suite 1050 Los Angeles, California 90071 19000 Mac Arthur Boulevard, 5 th floor Irvine, California 92612 888-SEI-SEI3 www.sei-it.com SEVEN CRITICAL STEPS TO
More informationDIRECTIVE NUMBER: 141.03.04.001 v2.0. SUBJECT: Correctional Integration Systems Change Management Plan
DEPARTMENT OF CORRECTION SUPPORT Management Services DIRECTIVE NUMBER: SUBJECT: Correctional Integration Systems Change PAGE NUMBER: 1 of 10 Adopted: 12-15-03 01.00.00. POLICY OF THE DEPARTMENT It is the
More informationRequest for Proposal: Network Switches
Request for Proposal: Network Switches December 21, 2015 Falls City Public Schools 1415 Morton Street Falls City, NE 68355 Erate Identifier: Cat2.2016Networkswitches 1 Table of Contents Overview...3 1.1
More informationI D C M a r k e t S c a p e : W o r l d w i d e F i n a n c i a l S e r v i c e s C o n s u l t i n g 2 0 1 2 V e n d o r A n a l y s i s
Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015 www.idc.com C O M P E T I T I V E A N A L Y S I S I D C M a r k e t S c a p e : W o r l d w i d e F i n a n c
More informationAuditing in the New Millennium:
: Information Technology Controls and Network Vulnerability Assessments Ernie Barany, CPA, CPT, CEH Principal Auditor Dan Altobelli, CPA, CISA, CEH Principal Auditor 1 When you think of IT auditing, is
More informationSCOPE OF WORK. Project Ready to Learn
SCOPE OF WORK Project Ready to Learn This proposed Scope of Work (Scope) describes the tasks to be performed by the Contracted Project Coordinator (Contractor) in assisting the Project Ready to Learn Coalition
More informationRisk management and the transition of projects to business as usual
Advisory Risk management and the transition of projects to business as usual Financial Services kpmg.com 2 Risk Management and the Transition of Projects to Business as Usual Introduction Today s banks,
More informationCONNECTICUT HOUSING FINANCE AUTHORITY REQUEST FOR PROPOSAL FOR Development of Strategic Information Technology Plan
Overview The Connecticut Housing Finance Authority (CHFA) was created in 1969 as a public instrumentality by the State Legislature. As a quasi-public agency and political subdivision of the State of Connecticut,
More informationSocial Media -Benefits and Risk. Western Carolinas IIA Chapter Meeting October 25, 2012
Social Media -Benefits and Risk Western Carolinas IIA Chapter Meeting October 25, 2012 Matt Thompson Managing Director, Advisory Services Grant Thornton LLP Introductions Matt Thompson Managing Director
More informationCM00 Change Management High Level
CM00 Change Management High Level CM01 Create Change CM09 Assess and Execute Emergency / CM03 Approve Change CM05 Implement Change CM02 Assess And Schedule Change CM07 Review Change CM04 Communicate Scheduled
More informationInformation Technology Governance Overview and Charter
Information Technology Governance Overview and Charter Prepared by: Project #: Date submitted Document version: IT Governance Charter v03.05.2012 1.0 48.0 - Page 1 of 34 Document History Version Date Author
More informationII. TOPIC DESCRIPTION
Special Notice N00014-16-R-SN02 Special Program Announcement for 2016 Office of Naval Research Research Opportunity: Undersea Technologies for Autonomous Detection and Communications I. INTRODUCTION This
More informationRFP Attachment C Classifications
RFP 1. Applications IT Architect Analyzes and designs the architecture for software applications and enhancements, including the appropriate application of frameworks and design patterns and the interrelationships
More informationStatement of Procurement Conduct
Statement of Procurement Conduct December 2014 Copyright of Western Power Any use of this material except in accordance with a written agreement with Western Power is prohibited. Introduction Western Power
More informationGIS ANALYST I GIS ANALYST II
GIS ANALYST I GIS ANALYST II Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended to reflect all duties
More informationSTAFF AUGMENTATION REQUEST FOR QUOTE - REPOST
STAFF AUGMENTATION RFQ - REPOST STAFF AUGMENTATION REQUEST FOR QUOTE - REPOST STAFF AUGMENTATION RFQ COVER SHEET Doc ID: Project Name: Other Information: Open To: EDUR2011015R MS SharePoint 2010 Application
More informationRisk Management Primer
Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders
More informationRequest for Proposal: Network Switches
Request for Proposal: Network Switches January 16, 2015 Heartland Community School District 1501 Front Street Henderson, NE 68371 Erate Identifier: Category Two RFP Network Switches 1 Table of Contents
More informationIntroduction. Software Development and Change Management Recommendations
Introduction This document was created by a joint working group of the Futures Industry Association ( FIA ) Principal Traders Group and the FIA European Principal Traders Association (collectively FIA
More informationRole Reporting Information. Role Family Analyst (Why the family exists and how it adds value to EnergyAustralia)
Role Reporting Information Role Title Business Analyst Position Number Role Reports Directly To Practice Leader EnergyAustralia Group Executive Manager Chief Information Officer Date 10/08/2015 Role Family
More informationDeveloping a Role s Key Accountabilities: Laying a Foundation for Performance, Satisfaction and Results
Developing a Role s Key Accountabilities: Laying a Foundation for Performance, Satisfaction and Results Different managers have different methods of communicating expectations and delivering employee performance
More informationENTERPRISE CHANGE MANAGEMENT PROCESS
University of California San Francisco ENTERPRISE CHANGE MANAGEMENT PROCESS VERSION 2.00, REV. 6/20/2013 Table of Contents 1 About this Process Document... 6 1.1 Intended Audience... 6 1.2 Assumptions...
More informationReturn on Investment in Business Intelligence in Small and Mid-Sized Businesses
Return on Investment in Business Intelligence in Small and Mid-Sized Businesses ZELJKO PANIAN The Graduate School for Economics and Business University of Zagreb J.F. Kennedy Sq. 6 CROATIA zpanian@efzg.hr
More informationNORTH IDAHO COLLEGE REQUEST FOR PROPOSALS FOR PURCHASING CARD SERVICES. November 12, 2014
NORTH IDAHO COLLEGE REQUEST FOR PROPOSALS FOR PURCHASING CARD SERVICES November 12, 2014 REQUEST FOR PROPOSALS Purchasing Card Services RFP 15-03 Release Date: November 12, 2014 Last Day for Questions:
More informationChange Management Trends in Governance Structures
Change Management Trends in Governance Structures Cheryl Yaeger BenchMark Consulting International OVERVIEW Financial institutions are operating in a very dynamic marketplace today; this requires the ability
More informationAppendix 3: Project Management Substation Guidelines (General Process Flow Template)
365 Appendix 3: Project Management Substation Guidelines (General Process Flow Template) Checkpoint Methodology The schedule is issued prior to the go decision. It covers the duration of the project. It
More informationVendor Focus for IBM Global Services: Consulting Services for Cloud Computing
Research Publication Date: 22 February 2010 ID Number: G00174046 Vendor Focus for IBM Global Services: Consulting Services for Cloud Computing Susan Tan Amid the hype and buzz of cloud computing are very
More informationAligning CFO and CIO Priorities
whitepaper economics Aligning and Priorities Forward-thinking organizations are viewing computing as an investment in business transformation, not just a way to cut costs for IT. Thanks to the, s and s
More informationSuccess strategies for avoiding common pitfalls of health care CRM implementation
Success strategies for avoiding common pitfalls of health care CRM implementation Health plan leaders need a customer relationship management (CRM) system to help them manage the multitude of challenges
More informationAARP Medicare Supplement Program. Information Guide. Alabama Launch. 1 For internal use only
AARP Medicare Supplement Program Information Guide Alabama Launch 1 Table of Contents How to enroll with Healthy Contributions...3-5 AARP Medicare Supplement Program at a glance.....6 Fitness Incentive
More informationRequest for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018
Request for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018 for City of Pitt Meadows Table of Contents Table of Contents... 2 General Information...
More information