Testing of Materials for Cement or Cementitious Blend Stabilisation

Size: px
Start display at page:

Download "Testing of Materials for Cement or Cementitious Blend Stabilisation"

Transcription

1 Technical Note 149 Testing of Materials for Cement or Cementitious Blend Stabilisation January 2016

2 Copyright State of Queensland (Department of Transport and Main Roads) 2016 Feedback: Please send your feedback regarding this document to: Technical Note, Transport and Main Roads, January 2016

3 1 Introduction The purpose of this technical note is to outline a mix design procedure which allows the optimum design cement or cementitious blend content for the modification or stabilisation of soils which are compatible with cement. This note provides guidelines, design criteria and test procedures for characterising the host soil and measuring the properties of the cement treated material. The three stages of this testing guideline are as follows: 1. sampling and characterisation of the host soil 2. mix design procedure 3. field control testing. In the remainder of this document the term cement can mean both cement and cementitious blends (that is, cement/flyash, cement/slag, cement/flyash/slag and so on). This process is also applicable to materials stabilised using slow setting additives such as lime/flyash and lime slag although these require a longer curing time before testing, usually 28 days. All test methods referenced in this document with the prefix Q are published by the Department of Transport and Main Roads #1 and those with a prefix AS are published by Standards Australia. Table 1 #2 Types of stabilisation Type of stabilisation/characteristic strength Modified 1.0 MPa < UCS* 2.0 MPa Bound Cat I 3.5 MPa < UCS* 4.5 MPa Bound Cat II 2.5 MPa < UCS* 3.5 MPa Anticipated performance attributes Flexible layer with improved shear strength, decreased permeability and significantly less tensile fatigue cracking. Bound pavement subject to tensile fatigue cracking and transverse shrinkage cracking. Bound pavement subject to tensile fatigue cracking and transverse shrinkage cracking. Generally cement is added to pavement materials to change its properties. This may be performed at a quarry to provide a plant-mixed material or in situ recycle an existing material. Generally the aim is to provide a modified material with a target unconfined compressive strength (UCS) of 1.5 MPa and to avoid making the material too stiff and susceptible to fatigue cracking. For more details refer to Section of the Pavement Rehabilitation Manual #5. 2 Sampling and characterisation The section under consideration must be sampled at regular intervals in order to identify material types and changes within any material. For more information refer to the departmental publications for Pavement Design #3,4 and Pavement Rehabilitation #5. It is important that each material type is sampled and tested at regular intervals in order to establish the range of material properties and to identify the presence of deleterious materials. Use of a soil classification system such as the unified soils classification system can assist in identifying the soil types #6. Technical Note, Transport and Main Roads, January

4 Host soil characterisation tests are as follows: Table 2 Test methods used to classify materials Property Test Method Title Particle Size Distribution (Grading) Atterberg limits (Liquid limit, plastic limit, plasticity index and linear shrinkage) Q103A Q103C Q104A or D Q105 Q106 Particle size distribution of soil - wet sieving Particle size distribution of soil hydrometer Liquid limit of soil Plastic limit and plasticity index of soil Linear shrinkage of soil Organic Content Q120B Organic content of soil - loss on ignition Sulfate content AS Determination of the sulfate content of a natural soil and the sulphate content of the groundwater Ferric oxide In-house FeO by classical method (grinding, digestion, titration) 2.1 Classification Initially, classification tests including particle size distribution and Atterberg limits should be undertaken #6. Depending on the variation in material properties as indicated by the particle size and Atterberg limit tests, either undertake further testing on samples representing material extremes, or where properties are similar, test the highest percentage passing the mm sieve. Generally materials that are not suitable for stabilisation are: poorly graded materials materials with a plasticity index (PI) > 10.0 where more than 25% passing the mm sieve materials where less than 25% passing the mm sieve may be suitable with a plasticity index higher (PI) than 10.0 Refer to Table 4.6 #5 of the Pavement Rehabilitation Manual for more details. 2.2 Deleterious materials This is usually not an issue for materials obtained from quarries or existing pavement materials originally obtained from quarries. In some situations is may be appropriate to test for deleterious materials where there may be a concern about the quality of the materials. These situations may include: Type 4 pavement materials Materials obtain from mine sites or adjacent to mine sites Materials that may contain sulphides or ironstone It may then be appropriate to test for deleterious materials. This includes the determination of sulfate, organic content and ferric oxide contents. Organic matter interferes with the hydration process as well as competing for available stabilising agent - water paste. Sulfates can also interfere with pozzolanic reactions due to the formation of very expansive hydrates which if formed after compaction, can result in heave. Ferric oxide also can also interfere with pozzolanic reactions; however there are no specific limits in the literature at this stage. Recent experience has indicated that contents in the range of Technical Note, Transport and Main Roads, January

5 10-13% have a deleterious effect on stabilised materials. As a guide advice should be sought if values greater than 2% are found. The following limits may be applied: Table 2.2 Deleterious materials limits Property Limit Sulfate Content (water soluble) < 0.3% Organic Content* < 1.0% Ferric Oxide * < 2.0% Note*: The limit shown is a guide; advice should be obtained before stabilising materials with ferric oxide contents greater than the limit or organic contents > 5.0%. 3 Mix design procedure This stage is to establish the optimum cement content for the host soil. Design test procedures are as follows: Table 3 Test methods used for design Property Test Method Title Unconfined Compressive Strength (UCS) Q115 Q135A Q135B Unconfined compressive strength of stabilised materials Addition of stabilising agents Curing of moulded specimens of stabilised materials Capillary rise Q125D Capillary rise of stabilised material Nominated working time limit Q136 Working time of stabilised materials Sulfate content of groundwater AS Determination of the sulfate content of a natural soil and the sulfate content of the groundwater 3.1 Cement and supplementary cementitious materials Cement, complying with the requirements of AS 3972: General purpose and blended cements, is to be used exclusively in laboratory testing. The cement should be sourced directly from suppliers. Bagged supplies from hardware stores/building suppliers should not be used as the age and condition of the cement is not known. Instructions for the storage and use of cement are included in Appendix 1. Supplementary cementitious materials (fly-ash, slag, silica fume and so on) should be sourced directly from suppliers. They should be kept dry in air tight containers. While they do not deteriorate with age they should be discarded after 12 months as the sample may no longer represent the materials currently supplied. 3.2 Lime Where slow setting additives are used, hydrated lime, complying with the requirements of AS Hydrated lime, is to be used exclusively in laboratory testing. The hydrated lime should be sourced directly from suppliers. Bagged supplies from hardware stores/building suppliers should not be used Technical Note, Transport and Main Roads, January

6 as the age and condition of the lime is not known. Instructions for the storage and use of lime are included in Appendix 1. A certificate with the available lime ( AL ) should be obtained from the supplier for the batch of lime. x As an alternative the lime may be sampled and forwarded to a laboratory to determine the AL. x The AL value should be forwarded along with other results of testing for the mix design procedure. If x a different source of lime is used for construction the quantity of lime ordered and spread rates on site may need to be adjusted for a lime that is more or less reactive than the lime used for the design procedure. The relationship between quicklime and hydrated lime content is: 0.76HrH Q= r Q ALI ALI where: Q r = application rate for quicklime (%) H r = application rate for hydrated lime (%) = available lime index of hydrated lime (%), used in laboratory mix design H ALI testing Q ALI = available lime index of quicklime (%), used in construction Quicklime is not to be used in the laboratory because of safety concerns, and the need to exercise very tight control over moisture during moulding. If quicklime is not fully hydrated before compaction, carbonation and localised expansion can occur. 3.3 Water Potable water (fit for human consumption) free from organics and with a sulfate content (AS ) less than 0.05% is the preferred mixing water. Where possible, the actual water source to be used in the field should also be used for the laboratory testing programme. While water high in soluble salts is suitable for mixing and curing, they can cause a build-up of salts which may migrate to the surface of the pavement. Excess concentration of salts can interface with the adhesion of seal coats. 3.4 UCS test analysis The UCS test is used to determine the optimum cement content. UCS tests (3 specimens) are to be undertaken at a range of cement contents (4) usually commencing with 0.5% cement. Suggested cement contents (%) for a target strength of 1.5 MPa are: 0.5, 1.0, 1.5 and 2.0 The strength of all compacted soil is greatly influenced by density. A 1% reduction in density rates can reduce the UCS by 5%. Small density variations can easily mask the effects of other variables such as cement content and curing conditions. Since compacted density has a direct influence on UCS, a strict control must be exercised on compaction moisture content. Suggested limits for achieved moisture content are: Achieved moisture content = target moisture content ± 0.3 percentile units Technical Note, Transport and Main Roads, January

7 The cement/soil mixture should be conditioned using short term conditioning, that is, where the cement/soil mixture is allowed to condition in an air-tight container for 45 minutes before further mixing and compaction. A standard curing regime comprising moist curing at 23 ± 2ºC for seven days has been adopted as detailed in Q135B. All specimens are to be tested using the standard UCS test, long term immersion testing is not usually undertaken for cement stabilised specimens. Plot the UCS data versus cement content and determine the cement content corresponding to the target strength (MPa). In Figure 1 the cement content corresponding with the target strength of 1.5 MPa would be the optimum cement content of 1.65%. Figure 3.4 Cement content v UCS UCS (MPa) Cement Content (%) 3.5 Working time The working time test is undertaken to determine the nominated working time limit for the stabilising agent and host soil. A moisture/density relationship (MDR) and UCS test are performed with the design cement content to establish a reference MDD and reference UCS. Further specimens are compacted with a delay between mixing and compaction which for cements will typically be 1, 2, 4, 6 and 8 hours. These delays reduce the achieved MDD and UCS due to the cement hydrating and reacting with the host soil, reducing the moisture content and increasing the friction between particles. These effects inhibit the reorientation of particles during compaction and therefore reduce the achieved MDD and the lower density also reduces the achieved UCS. The working time limit is defined as the delay time that produces a 3% reduction in achieved MDD (that is, 100% to 97%) or a 20% reduction in achieved UCS (that is, 100% to 80%), whichever is the shorter delay time. Technical Note, Transport and Main Roads, January

8 The determination of working time will need to be repeated before the project starts with samples of the actual materials and proportions (for example, host soil with 3% GB cement with 30% flyash) to be used in the project. Plot the maximum dry density (MDD) versus time delay and the UCS versus time delay for the cement content and determine the delay at 0.97 of 0 hour delay MDD (0.97 x = 2.134) and 0.80 of 0 hour delay UCS (0.80 x 1.5 = 1.2). In Figure 2 the delays corresponding 0.97 MDD and 0.80 UCS are 3 and 2 hours respectively. Therefore the nominated working time limit would be 2 hours. Figure 3.5 MDD/UCS v delay MDD/UCS Working time MDD (t/m3) MDD MDD WTL UCS WTL UCS Delay (hr) 4 Field control testing #1, 7 Field control testing is undertaken to ensure that particular design parameters, such as cement content, relative compaction and unconfined compressive strength are achieved. Table 4 Test methods used for field control Property Test Method Title Spread rate Q719 Field spread rate of solid stabilising agents - fabric mat Cement content Q134* Stabilising agent content - heat of neutralisation Mixing uniformity (cement content) Q134* Stabilising agent content - heat of neutralisation AS * Lime or cement content of stabilised pavement materials (EDTA method) Compacted density Q141A Compacted density of soils and crushed rock (nuclear gauge) Q141B Compacted density of soils and crushed rock (sand replacement) Technical Note, Transport and Main Roads, January

9 Property Test Method Title Reference density Q142A Dry density-moisture relationship (standard compaction) Q144A Assignment of maximum dry density and optimum moisture content for soils and crushed rock Relative Compaction Q140A Relative compaction of soils and crushed rock Field UCS Q115 Unconfined compressive strength of compacted materials Nominated working time limit Q136 Working time for stabilised materials * These tests measure cement content. 4.1 Cement Content and Mixing Uniformity Insitu stabilisation For insitu stabilisation a simple mat test (Q719) is used to monitor stabilising agent content and distribution. One or more 1 m 2 mats are placed so as to catch the discharge from the spreader. While modern high performance equipment is capable of providing uniform mixing, the need arises from time to time to measure mixing efficiency. The cement content can be readily measured anywhere within the stabilised soil profile using one of two tests. The Heat of Neutralisation test (Q134) is a rapid low cost field test while the EDTA Titration method (Q117A) is a high cost, time consuming analytical test which is normally performed in a specialised laboratory. Samples of both the unstabilised material and the stabilising agent are required prior to performing either of these tests. 4.2 Cement content Plant-mixed stabilisation For plant mixed stabilisation the Heat of Neutralisation test (Q134) is a rapid low cost field test. Samples of both the unstabilised material and the stabilising agent are required prior to performing this test. 4.3 Compacted density and reference density insitu stabilisation The inherent variability of insitu stabilised materials usually means that a testing regime of one for one testing must be employed. Such testing involves taking a sample from each insitu density location and determining a reference density. The sand replacement test is the accepted test for measuring insitu density. A nuclear gauge technique can be used for cement modified/stabilised materials and has the potential to be a rapid, low cost alternative to sand replacement. Provided a wet density and moisture content bias is determined as detailed in the Nuclear Gauge Testing Manual #7.The reference density is measured using the traditional dry density - moisture relationship test. It is important that the reference density sample is taken and compacted before the allowable working time for cement has elapsed. Refer to Q140A for standard working times. An alternative is to determine a project/material specific nominated working time limit using Q136. The Hilf density ratio is not applicable for on-site compaction control. The Hilf method assumes the insitu density is determined at the same time the reference density is sampled and that both specimens are at the same moisture content. For insitu stabilisation the reference density is sampled from uncompacted material and then insitu density is determined later in the compacted material. The moisture content of the material can change significantly during the time between sampling and testing. Technical Note, Transport and Main Roads, January

10 4.4 Compacted density and reference density plant-mixed stabilisation The plant-mixed stabilised materials are usually more uniform which means that a testing regime using an assigned reference density may be employed. Such testing involves taking a sample from the quarry stockpile and adding the target additive content to the materials and determining a reference density. An initial value based on the average of six tests is used. This is then updated every 10,000 t using one new test and calculating a rolling average. The project may use an allowable working time as specified in Q140A or as an alternative determine a project/material specific nominated working time limit using Q136. A nuclear gauge technique can be used for cement modified/stabilised materials provided a wet density and moisture content bias is determined as detailed in the Nuclear Gauge Testing Manual #7. The sand replacement test may be used for measuring insitu density but it is more destructive to the finished pavement. 4.5 Field UCS The UCS test provides additional information on expected field performance relative to design. The field mixed material is moulded at field moisture content using either standard or modified compaction effort. Moulded specimens are then cured under standard conditions prior to testing. When sampling and making UCS specimens in the field it is assumed the insitu moisture content will be close to the optimum moisture content of the material. If not then the achieved dry density and dry density ratio will be likely to be well below the target. This will mean the UCS results for the samples will be lower than target due to the moisture and density being lower than the targets. Therefore care is required in interpreting these results. 4.6 Nominated working time limit As detailed in Sub-Section 3.5 this will need to be re-determined with samples of the project cement, supplementary cementitious materials, lime, water and host soil (that is, in situ and/or quarried). In future it may also be necessary to adjust this limit for the local temperature. 5 Future developments Since 2010 amendments to the Materials Testing Manual have allowed major changes in the testing of cement stabilised materials. Various methods have been published or amended to include the greater use of nuclear gauges in stabilised works, laboratory determination of allowable working times and testing of cores for unconfined compressive strength. There are some issues to be addressed in future amendments/edition of the Materials Testing Manual and departmental technical specifications, including: use of delay factors for compaction control accelerated curing of laboratory specimens effect of temperature on working time triple blend cements (that is, cement, fly-ash and lime). Some of these issues still require significant research to be performed. Technical Note, Transport and Main Roads, January

11 6 References 1. Materials Testing Manual, Queensland Department of Transport and Main Roads, Edition 4, Lime treatment of clay sub-grades, Queensland Department of Main Roads, Technical Note 39, December 2000, Jothi M Ramanujam 3. Guide to Pavement Technology Part 2: Pavement Structural Design, AustRoads, Pavement Design Supplement, Supplement to Part 2: Pavement Structural Design of AustRoads Guide to Pavement Technology, Queensland Department of Transport and Main Roads, November Pavement Rehabilitation Manual, Queensland Department of Transport and Main Roads, April Geotechnical Site Investigations, Standards Australia, AS , Appendix A Description and classification of soils and rocks for geotechnical purposes 7. Nuclear Gauge Testing Manual, Queensland Department of Transport and Main Roads, Edition 2, October 2003 Technical Note, Transport and Main Roads, January

12 Appendix 1 Storage of cement in the laboratory Importance of proper storage Cement will react with products in the atmosphere and degenerate with age. With proper handling, the degeneration can be held to a minimum. It is important to keep all cement dry and in airtight containers. Storage 1. It is best to obtain no more than a one - two month supply of cement at a time. 2. Upon receipt, the total supply should be transferred from bags into airtight stock containers, Ergotainers are recommended. The date received should be marked on each container. 3. It is helpful to tap the full containers on the ground to achieve some degree of cement settling. This compaction will help limit atmospheric exposure of the cement below the surface. 4. A smaller lab container is needed to hold the cement used in day-to-day testing. 5. The lab container must also be airtight and should hold a one - two week supply. The use of a lab container avoids exposing the cement supply to the atmosphere and limits the number of times a stock container must be opened. The stock container only needs to be opened a couple of times a month rather than daily. 6. Cement in the stock container should be discarded 12 weeks after it is received. Use/sampling 1. Each time cement is transferred from the stock container to a lab container the top mm of cement in the stock container should be discarded. When cement is added to the lab container the date should be marked on the container. 2. Before each testing job, the top mm of cement should be discarded from the lab container. 3. Prior to transferring cement from the stock container to the lab container, all cement remaining in the lab container should be discarded. 4. No container should be left open when not being used. If the lab container is to be unused for more than 10 minutes, close it tight. 5. Cement in the lab container should be discarded if it has been in the lab container for more than 14 days. 6. If care is taken to follow these storage methods, and stock is rotated often, the cement quality should remain at acceptable levels. Technical Note, Transport and Main Roads, January

13

PROPERTIES AND MIX DESIGNATIONS 5-694.200

PROPERTIES AND MIX DESIGNATIONS 5-694.200 September 1, 2003 CONCRETE MANUAL 5-694.200 5-694.210 PROPERTIES OF CONCRETE PROPERTIES AND MIX DESIGNATIONS 5-694.200 Inspectors should familiarize themselves with the most important properties of concrete:

More information

SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E

SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E Test Procedure for SOIL-LIME TESTING TxDOT Designation: Tex-121-E Effective Date: August 2002 1. SCOPE 1.1 This method consists of three parts. 1.1.1 Part I determines the unconfined compressive strength

More information

Stabilization of Soil with Self-Cementing Coal Ashes

Stabilization of Soil with Self-Cementing Coal Ashes 2005 World of Coal Ash (WOCA), April 11-15, 2005, Lexington, Kentucky, USA http://www.flyash.info Stabilization of Soil with Self-Cementing Coal Ashes Scott M. Mackiewicz, 1 E. Glen Ferguson, 2 1 & 2 Kleinfelder,

More information

CONSTRUCTION MATERIAL TESTING WWW.AU.SGS.COM/INDUSTRIAL

CONSTRUCTION MATERIAL TESTING WWW.AU.SGS.COM/INDUSTRIAL CONSTRUCTION MATERIAL TESTING WWW.AU.SGS.COM/INDUSTRIAL Introduction For over 20 years, we have offered a full range of materials testing to suit the requirements of local, national and international civil

More information

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction California Groundwater Association An NGWA Affiliate State PO Box 14369 Santa Rosa CA 95402 707-578-4408 fax: 707-546-4906 email: cga@groundh2o.org website: www.groundh2o.org CGA Standard Practices Series

More information

Example Specification for Concrete using Current Building Code Requirements

Example Specification for Concrete using Current Building Code Requirements Example Specification for Concrete using Current Building Code Requirements DISCLAIMER: This specification is an example that accompanies a seminar titled The P2P Initiative: Performance-based Specs for

More information

1.5 Concrete (Part I)

1.5 Concrete (Part I) 1.5 Concrete (Part I) This section covers the following topics. Constituents of Concrete Properties of Hardened Concrete (Part I) 1.5.1 Constituents of Concrete Introduction Concrete is a composite material

More information

Construction Materials Testing. Classes of Test

Construction Materials Testing. Classes of Test Construction Materials Testing Classes of Test February 2014 Copyright National Association of Testing Authorities, Australia 2014 This publication is protected by copyright under the Commonwealth of Australia

More information

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS 304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.

More information

EVALUATION OF STRUCTURAL PROPERTIES OF LIME STABILIZED SOILS AND AGGREGATES VOLUME 3: MIXTURE DESIGN AND TESTING PROCEDURE FOR LIME STABILIZED SOILS

EVALUATION OF STRUCTURAL PROPERTIES OF LIME STABILIZED SOILS AND AGGREGATES VOLUME 3: MIXTURE DESIGN AND TESTING PROCEDURE FOR LIME STABILIZED SOILS EVALUATION OF STRUCTURAL PROPERTIES OF LIME STABILIZED SOILS AND AGGREGATES VOLUME 3: MIXTURE DESIGN AND TESTING PROCEDURE FOR LIME STABILIZED SOILS PREPARED FOR THE NATIONAL LIME ASSOCIATION by Dallas

More information

SECTION 3.3 - PAVEMENT DESIGN

SECTION 3.3 - PAVEMENT DESIGN SECTION 3.3-3.3.1 GENERAL 3.3.2 SUBSURFACE DRAINAGE 3.3.3 DETERMINATION OF DESIGN TRAFFIC 3.3.4 SUBGRADE EVALUATION 3.3.5 PAVEMENT THICKNESS 3.3.5.1 GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING 3.3.5.2

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN Research & Development Division RD/GN/012 August 1990 HIGHWAYS DEPARTMENT GUIDANCE NOTES (RD/GN/012) SOIL TEST FOR PAVEMENT DESIGN Prepared

More information

Engineering Road Note 9 May 2012

Engineering Road Note 9 May 2012 Engineering Road Note 9 May 2012 PROCEDURE FOR THE DESIGN OF ROAD PAVEMENTS 1. INTRODUCTION This Note outlines the procedure to be used for the design of road pavements under the control of the Commissioner

More information

Shotcrete Quality Control and Testing for an Underground Mine in Canada

Shotcrete Quality Control and Testing for an Underground Mine in Canada Shotcrete Quality Control and Testing for an Underground Mine in Canada By Dudley R. (Rusty) Morgan and Mazin Ezzet AMEC Earth & Environmental, a division of AMEC Americas Limited SHOTCRETE FOR AFRICA

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement Lafarge in North America The Lafarge Group is the world leader

More information

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. September 1, 2003 CONCRETE MANUAL 5-694.300 MIX DESIGN 5-694.300 NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. 5-694.301

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

Geotechnical Properties of Fly Ash and Soil Mixtures for Use in Highway Embankments

Geotechnical Properties of Fly Ash and Soil Mixtures for Use in Highway Embankments World of Coal Ash (WOCA) Conference - May 9-12, 2011, in Denver, CO, USA http://www.flyash.info/ Geotechnical Properties of Fly Ash and Soil Mixtures for Use in Highway Embankments Fabio Santos 1, Lin

More information

THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION

THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION 1. SCOPE The maximum dry density and optimum moisture content, as defined below,

More information

AGREGADOS RECICLADOS MITOS Y REALIDADES

AGREGADOS RECICLADOS MITOS Y REALIDADES The Production and Use of Recycled Concrete in the USA Thomas Van Dam, Ph.D., P.E., FACI Principal Engineer CTL Group Introduction In the United States, concrete is the most commonly used recycled material

More information

Chapter Two Types of Cement The properties of cement during hydration vary according to:

Chapter Two Types of Cement The properties of cement during hydration vary according to: Chapter Two Types of Cement The properties of cement during hydration vary according to: Chemical composition Degree of fineness It is possible to manufacture different types of cement by changing the

More information

Cementitious Stabilization

Cementitious Stabilization A2J01: Committee on Cementitious Stabilization Chairman: Roger K. Seals, Louisiana State University Cementitious Stabilization DALLAS N. LITTLE, Texas A&M University ERIC H. MALES, National Lime Association

More information

SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS

SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS TNZ B/02:2005 SPECIFICATION FOR CONSTRUCTION OF UNBOUND 1. SCOPE This specification shall apply to the construction of unbound granular pavement layers. The term pavement layer shall apply to any layer

More information

Optimum Curing Cycles for Precast Concrete

Optimum Curing Cycles for Precast Concrete Optimum Curing Cycles for Precast Concrete Dr Norwood Harrison, Technical Support Manager, Humes Mr Tom Howie, Manager Engineered Structures, Humes Prepared for the Concrete Pipe Association of Australasia,

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

Manufacturing Quality Concrete Products

Manufacturing Quality Concrete Products CEMEX USA - Technical Bulletin 8.0 Manufacturing Quality Concrete Products Establishing or Upgrading a Quality Program Overview The following guidelines were developed for MCP (manufactured concrete products)

More information

5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN 5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN NOTE: This document is generally written in the imperative mood. The subject, "the Contractor" is implied. Also implied in this language are "shall",

More information

Section 300 Base Courses

Section 300 Base Courses Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA

More information

Chapter 8 Design of Concrete Mixes

Chapter 8 Design of Concrete Mixes Chapter 8 Design of Concrete Mixes 1 The basic procedure for mix design is applicable to concrete for most purposes including pavements. Concrete mixes should meet; Workability (slump/vebe) Compressive

More information

Use of Marginal Materials & Fly ash in Road Works

Use of Marginal Materials & Fly ash in Road Works Use of Marginal Materials & Fly ash in Road Works U.K.Guru Vittal Sr. Principal Scientist Central Road Research Institute New Delhi 110 025 vittal.crri@gmail.com Introduction Issue Development Vs. Environment

More information

Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers

Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers International Journal of Materials Engineering 12, 2(1): 7-11 DOI: 1.923/j.ijme.11.2 Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers Venu Malagavelli *, Neelakanteswara

More information

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form (NETTCP) Course Registration Form Interim Certification (Cost $300 members / $425 non-members) HMA Plant Technician* HMA Paving Inspector* Soils & Aggregate Inspector* Soils & Aggregate Lab Technician*

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA October 21, 2011 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

Recycled Concrete Pavement and Other Recycled Materials in Concrete Pavements

Recycled Concrete Pavement and Other Recycled Materials in Concrete Pavements Recycled Concrete Pavement and Other Recycled Materials in Concrete Pavements Infrastructure Applications Utilizing Recycled Materials in South Carolina What/Who is NRMCA? National Ready-Mixed Concrete

More information

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

GRADATION OF AGGREGATE FOR CONCRETE BLOCK GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published

More information

The Effects of Various Lime Products for Soil Drying

The Effects of Various Lime Products for Soil Drying Technical Report The Effects of Various Lime Products for Soil Drying Lawrence W. Cole, P.E. Technical Marketing Manager Construction Timothy Shevlin Technical Specialist Construction Steve Tutokey Senior

More information

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document NRMCA Quality Certification Ready Mixed Concrete Quality Management System Certification Criteria Document Version 1 February 2014 NRMCA Quality Certification Ready Mixed Concrete Quality Management System

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials

More information

Quality Assurance Program. June 2005 2005 by Texas Department of Transportation (512) 416-2055 all rights reserved

Quality Assurance Program. June 2005 2005 by Texas Department of Transportation (512) 416-2055 all rights reserved Quality Assurance Program June 2005 2005 by Texas Department of Transportation (512) 416-2055 all rights reserved Quality Assurance Program June 2005 Manual Notices Manual Notice 2005-1To: Users of the

More information

These recommendations generally follow the Construction Specifications Institute (CSI) Master Format.

These recommendations generally follow the Construction Specifications Institute (CSI) Master Format. TECHNICAL BULLETIN Suggested Specification for White Concrete Floors Specifier Notes: 1. The Architect or Engineer should review the contents and adopt the suggested language as appropriate, ensuring it

More information

EFFECT OF NANO-SILICA ON CONCRETE CONTAINING METAKAOLIN

EFFECT OF NANO-SILICA ON CONCRETE CONTAINING METAKAOLIN International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 1, Jan-Feb 2016, pp. 104-112, Article ID: IJCIET_07_01_009 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=1

More information

STABILIZATION OF BLACK COTTON SOIL WITH SAND AND CEMENT AS A SUBGRADE PAVEMENT

STABILIZATION OF BLACK COTTON SOIL WITH SAND AND CEMENT AS A SUBGRADE PAVEMENT International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 2, March-April 216, pp. 341 351, Article ID: IJCIET_7_2_3 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=2

More information

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the

More information

To go into depth on fly ash would be beyond the scope of this paper. Nevertheless, believe us ASH IS CASH.

To go into depth on fly ash would be beyond the scope of this paper. Nevertheless, believe us ASH IS CASH. COAL (FLY) ASH To go into depth on fly ash would be beyond the scope of this paper. Nevertheless, believe us ASH IS CASH. During the course of the research on my blended cement, I realized that the research

More information

Quality Assurance Concepts. Outline

Quality Assurance Concepts. Outline Quality Assurance Concepts Peter C. Taylor Outline What is quality? Who cares? How do we get it? What is the important stuff? 1 Defining Quality Simple Definition (Philip Crosby) Quality: Conformance to

More information

Lab 1 Concrete Proportioning, Mixing, and Testing

Lab 1 Concrete Proportioning, Mixing, and Testing Lab 1 Concrete Proportioning, Mixing, and Testing Supplemental Lab manual Objectives Concepts Background Experimental Procedure Report Requirements Discussion Prepared By Mutlu Ozer Objectives Students

More information

MASONRY INFORMATION. Selecting and Specifying Mortar and Grout for Unit Masonry. Introduction. Desirable Mortar Properties. Selection of Mortar

MASONRY INFORMATION. Selecting and Specifying Mortar and Grout for Unit Masonry. Introduction. Desirable Mortar Properties. Selection of Mortar Portland Cement Association MASONRY INFORMATION Selecting and Specifying Mortar and Grout for Unit Masonry Introduction Masonry mortar and masonry grout are key materials in unit masonry construction.

More information

In-situ Density Determination by Sand Replacement Method

In-situ Density Determination by Sand Replacement Method University of Texas at Arlington Geotechnical Engineering Laboratory Test Procedure In-situ Density Determination by Sand Replacement Method Lecture Note 7 (Thursday 03-04-04) 1 Definitions, Objectives

More information

PAVEMENT REHABILITATION using BITUMEN STABILISATION STATE OF THE ART

PAVEMENT REHABILITATION using BITUMEN STABILISATION STATE OF THE ART PAVEMENT REHABILITATION using BITUMEN STABILISATION STATE OF THE ART 23 rd Road Pavement Forum Fern Hill Hotel, Tweedie, KZN Wednesday 9 th May 2012 Dave Collings UCD Technology LOUDON INTERNATIONAL THE

More information

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf

More information

SERIES 800 ROAD PAVEMENTS - (11/04) UNBOUND, CEMENT AND OTHER HYDRAULICALLY BOUND MIXTURES

SERIES 800 ROAD PAVEMENTS - (11/04) UNBOUND, CEMENT AND OTHER HYDRAULICALLY BOUND MIXTURES MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 1 SPECIFICATION FOR HIGHWAY WORKS SERIES 800 ROAD PAVEMENTS - (11/04) UNBOUND, CEMENT AND OTHER HYDRAULICALLY BOUND MIXTURES Contents Clause Title

More information

Chapter 2 Basis of design and materials

Chapter 2 Basis of design and materials Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural

More information

LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES

LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES Test Procedure for LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES TxDOT Designation: Tex-142-E Effective Date: August 1999 1. SCOPE 1.1 This method is a system for classifying disturbed and

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes

Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes Naue GmbH&Co.KG Quality Control and Quality Assurance Manual For Geomembranes July 2004 V.O TABLE OF CONTENTS 1. Introduction 2. Quality Assurance and Control 2.1 General 2.2 Quality management acc. to

More information

SOIL STABILIZATION WITH FLYASH AND RICE HUSK ASH

SOIL STABILIZATION WITH FLYASH AND RICE HUSK ASH SOIL STABILIZATION WITH FLYASH AND RICE HUSK ASH Dr. ROBERT M. BROOKS Associate Professor, Department of Civil and Environmental Engineering, Temple University, Philadelphia 19122. ABSTRACT The objective

More information

Cementitious Materials Update The effect of ggbs, fly ash, silica fume. concrete.

Cementitious Materials Update The effect of ggbs, fly ash, silica fume. concrete. Cementitious Materials Update The effect of ggbs, fly ash, silica fume and limestone on the properties of concrete. Richard Barnes Concrete Society Technical Report: Cementitious Materials - The effect

More information

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)

More information

INTRODUCTION TO CONCRETE PAVEMENTS

INTRODUCTION TO CONCRETE PAVEMENTS INTRODUCTION TO CONCRETE PAVEMENTS Abstract Arvo Tinni Tinni Management Consulting February 2013 This paper describes the experiences and design methodologies for concrete pavements in Australia. It is

More information

Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia

Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia Roller-Compacted Concrete Pavement: Design and Construction Pavement Thickness esign and RCC-Pave Software Gregory E. Halsted, P.E. Pavements Engineer Portland Cement Association October 24, 2006 Atlanta,

More information

SOUTH AFRICAN PAVEMENT ENGINEERING MANUAL. Chapter 3. Materials Testing

SOUTH AFRICAN PAVEMENT ENGINEERING MANUAL. Chapter 3. Materials Testing SOUTH AFRICAN PAVEMENT ENGINEERING MANUAL Chapter 3 Materials Testing AN INITIATIVE OF THE SOUTH AFRICAN NATIONAL ROADS AGENCY LTD Date of Issue: November 2011 Revision 1.0 2009 South African National

More information

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests Product Data Sheet Edition 05/12/2014 Identification no: 020204030010000044 Sikadur -41 CF Rapid 3-part thixotropic epoxy patching mortar Construction Product Description Uses Characteristics / Advantages

More information

Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete

Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete Ming-Gin Lee 1,a, Yi-Shuo Huang 1,b 1 Department of Construction Engineering, Chaoyang University of Technology,Taichung

More information

SULPHATE ATTACK AND CHLORIDE ION PENETRATION: THEIR ROLE IN CONCRETE DURABILITY

SULPHATE ATTACK AND CHLORIDE ION PENETRATION: THEIR ROLE IN CONCRETE DURABILITY SULPHATE ATTACK AND CHLORIDE ION PENETRATION: THEIR ROLE IN CONCRETE DURABILITY Concrete durability continues to be a subject of controversy among design professionals, specifiers, Government instrumentalities,

More information

NRC INSPECTION MANUAL

NRC INSPECTION MANUAL NRC INSPECTION MANUAL INSPECTION PROCEDURE 88001 LLUR ON-SITE CONSTRUCTION PROGRAM APPLICABILITY: 2600, 2801 88001-01 INSPECTION OBJECTIVES 01.01 To determine by direct observation if on-site construction

More information

FACT SHEET: HYDRATED LIME FOR MASONRY PURPOSES

FACT SHEET: HYDRATED LIME FOR MASONRY PURPOSES FACT SHEET: HYDRATED LIME FOR MASONRY PURPOSES Hydrated Masons Lime Characteristics Type S (Special) hydrated lime is a fine, white, high purity product which has been specially hydrated for convenient,

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

STUDY OF STRENGTH OF CONCRETE WITH PALM OIL FUEL ASH AS CEMENT REPLACEMENT

STUDY OF STRENGTH OF CONCRETE WITH PALM OIL FUEL ASH AS CEMENT REPLACEMENT International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 3, May June 2016, pp. 337 341, Article ID: IJCIET_07_03_033 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=3

More information

Schedule of Accreditation Issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation Issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Issued by 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Materials Testing Division Northdown House Ashford Road Kent ME17 1QW Contact: Ben Roper Tel: +44 (0)1622 858545 Fax: +44 (0)1622

More information

ENGINEERED QUARTZ STONE

ENGINEERED QUARTZ STONE ENGINEERED 2 QUARTZ STONE 18 GOOD INDUSTRY PRACTICES 2 ENGINEERED QUARTZ STONE Natural stones, especially granite, have been used for flooring and countertop material in high-end homes for its beauty and

More information

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Construction Specification for Concrete Curb and Concrete Curb and Gutter Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 April 2015 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03

More information

Strength of Concrete

Strength of Concrete Strength of Concrete In concrete design and quality control, strength is the property generally specified. This is because, compared to most other properties, testing strength is relatively easy. Furthermore,

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall

More information

HYDRAULIC STRUCTURES, EQUIPMENT AND WATER DATA ACQUISITION SYSTEMS Vol. IV - Testing of Materials and Soils - F. Druyts

HYDRAULIC STRUCTURES, EQUIPMENT AND WATER DATA ACQUISITION SYSTEMS Vol. IV - Testing of Materials and Soils - F. Druyts TESTING OF MATERIALS AND SOILS F. Druyts Pr. Eng., Department of Water Affairs and Forestry, Pretoria, South Africa Keywords: Materials testing, soil mechanics/properties, construction materials, earth

More information

Sustainable Concrete: The Role of Performance-based Specifications

Sustainable Concrete: The Role of Performance-based Specifications Sustainable Concrete: The Role of Performance-based Specifications Lionel Lemay 1, Colin Lobo 2 and Karthik Obla 3 1 National Ready Mixed Concrete Association, 1244 Crane Blvd., Libertyville, IL, 60048;

More information

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance Abstract Testing and appraisal of polymer effect as an additive on asphalt mixture performance Hamid Sabbagh mollahosseini*,golazin Yadollahi**, Ershad Amoosoltani*** *, ***Executive of Engineering and

More information

MARTIN TESTING LABORATORIES (MTL) PAINTS AND COATINGS TESTING CAPABILITIES

MARTIN TESTING LABORATORIES (MTL) PAINTS AND COATINGS TESTING CAPABILITIES Liquid Coating Properties Composition VOC Content, ASTM D2369 Water Content, ASTM D4017 Physical Properties Calculating Physical Constants of Coatings, ASTM D5201 Density, ASTM D1475 Flash Point, ASTM

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

CONSULTANCY & MATERIAL TESTING FACILITY

CONSULTANCY & MATERIAL TESTING FACILITY CONSULTANCY & MATERIAL TESTING FACILITY (CIVIL ENGINEERING DEPARTMENT) JAYPEE UNIVERSITY OF ENGINEERING & TECHNOLOGY A.B. ROAD, P.B. NO-1, RAGHOGARH, DIST: GUNA (M.P.) - 473226 Phone: 07544-267051, 267310-314,

More information

Determination of Thermal Conductivity of Coarse and Fine Sand Soils

Determination of Thermal Conductivity of Coarse and Fine Sand Soils Proceedings World Geothermal Congress Bali, Indonesia, - April Determination of Thermal Conductivity of Coarse and Fine Sand Soils Indra Noer Hamdhan 1 and Barry G. Clarke 2 1 Bandung National of Institute

More information

Soils and Aggregates Division

Soils and Aggregates Division Dan Sajedi, Division Chief 443-572-5162 George Hall, Assistant Division Chief Field Operations 443-572-5271 Eric Frempong, Assistant Division Chief Laboratory 443-572-5055 Aggregate Materials, Controlled

More information

UMPQUA Testing Service

UMPQUA Testing Service , LLC Materials Testing and Quality Control Services June 2016 Price List & General Terms and Conditions Page 1 of 7 , LLC Labor Rates Hourly Rates Concrete Technicians: (ODOT/ACI Certified QCT & CSTT):

More information

Material and methods. Värmeforsk report 1212 2012 Niklas Hansson DIANAS utilization of waste inciniration bottom ash in bound construction materials

Material and methods. Värmeforsk report 1212 2012 Niklas Hansson DIANAS utilization of waste inciniration bottom ash in bound construction materials Värmeforsk report 1212 2012 Niklas Hansson DIANAS utilization of waste inciniration bottom ash in bound construction materials Executive Summary Introduction In an international perspective waste incineration

More information

EDUCATIONAL GUIDE TO PROPERTIES OF MASONRY MORTAR

EDUCATIONAL GUIDE TO PROPERTIES OF MASONRY MORTAR EDUCATIONAL GUIDE TO PROPERTIES OF MASONRY MORTAR Contents Page Introduction 3 Specifying mortar 3 Properties of plastic mortar 4 Properties of hardened mortar 8 Glossary of terms 13 Bibliography 14 Self-assessment

More information

A.17. OXIDIZING PROPERTIES (SOLIDS)

A.17. OXIDIZING PROPERTIES (SOLIDS) A.17. OXIDIZING PROPERTIES (SOLIDS) 1. METHOD 1.1. INTRODUCTION It is useful to have preliminary information on any potentially explosive properties of the substance before performing this test. This test

More information

Trench Rescue by Buddy Martinette

Trench Rescue by Buddy Martinette Trench Rescue by Buddy Martinette SOIL TYPE AND TESTING It is imperative that rescue personnel understand soil types and testing procedures if the want to be competent at trench rescue operations. Determining

More information

EFFECT OF DIESEL CONTAMINATION ON GEOTECHNICAL PROPERTIES OF CLAY NEAR BPCL

EFFECT OF DIESEL CONTAMINATION ON GEOTECHNICAL PROPERTIES OF CLAY NEAR BPCL International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 2, March-April 216, pp. 152 158, Article ID: IJCIET_7_2_12 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=2

More information

A COMPREHENSIVE STUDY ON PARTIAL REPLACEMENT OF CEMENT WITH SUGARCANE BAGASSE ASH, RICE HUSK ASH & STONE DUST

A COMPREHENSIVE STUDY ON PARTIAL REPLACEMENT OF CEMENT WITH SUGARCANE BAGASSE ASH, RICE HUSK ASH & STONE DUST International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 3, May June 2016, pp. 163 172, Article ID: IJCIET_07_03_016 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=3

More information

EXPERIMENTAL INVESTIGATION ON BEHAVIOUR OF NANO CONCRETE

EXPERIMENTAL INVESTIGATION ON BEHAVIOUR OF NANO CONCRETE International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 2, March-April 2016, pp. 315 320, Article ID: IJCIET_07_02_027 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=2

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

New Refractory Technology Provides Advantages in Monolithic Refractories

New Refractory Technology Provides Advantages in Monolithic Refractories New Refractory Technology Provides Advantages in Monolithic Refractories There have been a number of different refractory binder systems introduced and utilized over the last 100 years. The most long-standing

More information

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without

More information

WORK2001: FIRST INTERNATIONAL CONFERENCE ON EMPLOYMENT CREATION IN DEVELOPMENT 2-5 APRIL 2001

WORK2001: FIRST INTERNATIONAL CONFERENCE ON EMPLOYMENT CREATION IN DEVELOPMENT 2-5 APRIL 2001 WORK2001: FIRST INTERNATIONAL CONFERENCE ON EMPLOYMENT CREATION IN DEVELOPMENT 2-5 APRIL 2001 UNIVERSITY OF THE WITWATERSRAND, SOUTH AFRICA PRELIMINARY DEVELOPMENT OF SLAG AS A STABILISED MATERIAL FOR

More information

Moisture and Resilient Floor Covering

Moisture and Resilient Floor Covering Moisture and Resilient Floor Covering Moisture related failures of resilient floor coverings installed over concrete have focused unfairly over the years on the premise that the flooring product itself

More information