PROPOSED AMENDMENTS TO PART 23: OIL AND GAS TO THE OCCUPATIONAL HEALTH AND SAFETY REGULATION

Size: px
Start display at page:

Download "PROPOSED AMENDMENTS TO PART 23: OIL AND GAS TO THE OCCUPATIONAL HEALTH AND SAFETY REGULATION"

Transcription

1 Online APPENDIX Feedback 1 PART 23: OIL AND GAS Definitions 23.1 In this Part: flow piping system means a temporary or portable system of piping and other component parts, including valves and fittings, that is (a) located above ground, and (b) for use to convey to or from a well head a liquid under pressure, or a gas under pressure, during drill stem testing, swabbing, cementing, well servicing or well stimulation; Pumps (1) A positive displacement pump and attachments must have valves, pipes and fittings capable of withstanding the pump's maximum working pressure. (2) A quick closing type valve must not be used on the discharge line of a positive displacement pump. (3) A positive displacement pump must be protected against freezing. (4) Except for a pumping wellhead well head, a pressure relief device must be installed on the discharge side of a positive displacement pump, but a valve must not be installed between them. (5) For a wellhead well head utilizing a down-hole positive displacement pump, the employer must implement measures to prevent the pump from causing pressures that exceed the pressure rating of the system. Liquefied gas used for purging or gauging operations or well stimulation The employer must ensure that workers are protected from hazards that may be caused by the release of liquefied gas being used for purging or gauging operations or well stimulation. Flow piping (1) Flow piping systems must be anchored during well testing or stimulation unless there is an effective quality assurance program to ensure integrity of the piping system. (2) The quality assurance program must include routine inspections, nondestructive testing, pressure testing, identification of piping components, and piping specifications that meet the service application. (3) If swivel joints or hoses are used in well stimulation and similar operations, the piping system must be secured at the well head and supply vehicle or pumping unit end with wire rope safety lines not less than 11 mm ( 7 /16 in) in diameter, or chains of equal strength. (4) Flowback lines must be anchored and restrained. Page 1

2 (5) If a system of piping and swivel joints with a pressure greater than kpa (300 psi) is used in well stimulation and similar operations (a) the operation must be conducted by remote control, (b) unauthorized workers must not enter the area between the point of discharge and the well head, and (c) before starting operations, warning signs must be posted in the area stating "DANGER, NO UNAUTHORIZED WORKERS ALLOWED IN THIS AREA" or other similar language. (6) Subsections (3) and (5) do not apply to well testing. (7) In a flow piping system exceeding kpa (500 psi), (a) connections must be welded, flanged or hammer unions, and (b) if there is only a threaded connection available at the well head, special precautions must be taken. (8) A piping system must be completely depressurized before leaking connections or fittings are corrected. (9) Hammering on a pressurized system is not permitted. (10) Repealed. [B.C. Reg. 312/2003.] (11) If liquid carbon dioxide or other liquified gas is used for well stimulation, the valve controls of the supply unit must be on the side opposite to the pipe supplying the liquified gas. Flow piping systems integrity assurance program (1) The employer must develop and implement a program for the purpose of ensuring the integrity of the flow piping systems at the worksite. (2) In fulfilling the requirements of subsection (1), the employer must take into consideration the conditions under which the flow piping systems may operate, including, without limitation, corrosion factors and fluctuating temperatures and pressures, and must include provision for the following elements: (a) routine inspections, non-destructive testing and pressure testing of piping and other component parts of the flow piping systems, including setting out in writing, for each type of part to be inspected or tested, (i) the inspection or testing procedure, (ii) the frequency of inspection or testing and how the frequency is to be determined, Page 2

3 (iii) the criteria for rejection of a part and its removal from service, and (iv) the method of determining how frequently a part is to be replaced, including the basis for replacement; (b) preparing, updating and making readily available at the worksite an up-to-date document, relating to the inspections and testing referred to in paragraph (a), that identifies each part that has been inspected or tested, and sets out, for that part, (i) the inspection or testing procedure followed, (ii) the results of the inspection or testing, and (iii) if a part has been rejected, the rejection criteria applied; (c) periodic reviews and updates of the program; (d) a system of preparing and retaining records in relation to each element of the program. (3) The employer must assign to a qualified person responsibility for administration of the program referred to in subsection (1). Flow piping systems selection, installation, operation and inspection The employer must ensure that (a) the flow piping systems at the worksite are (i) selected based on the manufacturer s specifications, having regard to the systems anticipated operation, and (ii) installed, operated and inspected in accordance with the manufacturer s instructions and specifications, and (b) copies of all of the manufacturer s instructions and specifications in relation to the flow piping systems are readily available at the worksite. Flow piping systems restraint systems (1) The employer must ensure that each flow piping system at the worksite is restrained by an engineered restraint system that is designed and manufactured (a) to be used for the purpose of safely restraining the flow piping system, and (b) to withstand the forces that may be encountered if the flow piping system fails. Page 3

4 (2) If a restraint system has been manufactured by a commercial manufacturer, the employer must ensure that the restraint system is installed and anchored in accordance with the instructions and specifications of that manufacturer. (3) If a restraint system has been manufactured by the employer or another persons who is not a commercial manufacturer, the employer must ensure that (a) engineering documentation has been prepared demonstrating that the restraint system has been designed and manufactured as described in subsection (1), (b) the restraint system is installed and anchored in accordance with the engineering documentation, and (c) a copy of the engineering documentation is readily available at the worksite. (4) In addition to meeting the requirements of subsection (2) or (3) (b), the employer must ensure that each restraint system is anchored at both the well head and the supply vehicle or pumping unit, but a restraint system need not be anchored to the well head or to the supply vehicle or pumping unit. (5) The employer must ensure that temporary ground anchors that are part of a restraint system are pull tested before initial use and, if they continue to be used, that they are tested annually and whenever they may have been affected by seasonal changes. Flow piping systems other requirements (1) If the pressure of a flow piping system may exceed kpa (435 psi), the employer must ensure that all of the flow piping system connections are welded or flanged or are hammer unions. (2) The employer must ensure that a flow piping system is completely depressurized before a leak in a connection or fitting in the flow piping system is corrected. (3) The employer must ensure that a person does not hammer on a pressurized flow piping system. (4) If workers are using liquefied gas for well stimulation, the employer must ensure that the unit that supplies the liquefied gas and the unit that pumps the liquefied gas are positioned so that the valve controls of each unit are on the opposite side of that unit from the piping that supplies the liquefied gas to the well. Pressure testing requirements (1) Before commencing a service operation, piping, pumps, valves and fittings to be used in the operation must be hydraulically tested to a pressure not less than 10% above the maximum anticipated operating pressure as determined by the well owner. Page 4

5 (2) Before commencing well testing or flowback operation, flow line piping, valves and fittings from the well head to the first pressure control choke must be hydraulically pressure tested to a pressure not less than 10% above the maximum anticipated shut-in pressure as determined by the well owner. (3) When nitrogen is being used in well stimulation, the piping system may be pressure tested with nitrogen provided that the nitrogen treating line is connected to the main line as close to the well as practicable. (4) Documentation of the testing must be available on the worksite for inspection by an officer. (5) Air must be purged from the piping system before pressurizing low flash point hydrocarbons. Pressure testing requirements (1) The employer must ensure that, before a well service operation commences, piping, pumps, valves and fittings that are to be used in the operation have been (a) hydraulically pressure tested, or (b) if hydraulic pressure testing is not practicable, pressure tested with an inert gas, to the pressure determined under subsection (2). (2) The pressure to which piping, a pump, a valve or a fitting is to be tested under subsection (1) is (a) the test pressure recommended by the manufacturer of the piping, pump, valve or fitting, or (b) if the manufacturer has not recommended a test pressure, to a pressure that is at least 10% above the maximum operating pressure anticipated by the well owner, except that the test pressure must not exceed the maximum pressure rating of that piping, pump, valve or fitting. (3) The employer must ensure that, before a well testing or flowback operation commences, the flow piping system from the well head to the first pressure control choke has been (a) hydraulically pressure tested, or (b) if hydraulic pressure testing is not practicable, pressure tested with an inert gas, to the test pressure recommended by the manufacturer of the flow piping system or, if the manufacturer has not recommended a test pressure, to a pressure that is at least 10% above the maximum shut-in pressure anticipated by the well owner. (4) The employer must ensure that documentation of the results of the testing required under subsections (1) and (3) is readily available at the worksite. Page 5

6 (5) The employer must ensure that if (a) nitrogen is being used in well stimulation, and (b) the flow piping system that supplies the nitrogen to the well is pressure tested with nitrogen, the nitrogen treating line is connected to the main line as close as practicable to the well. (6) The employer must ensure that, before a flow piping system is pressurized with low flash point hydrocarbons, the air has been purged from the flow piping system. EXPLANATORY NOTES TO THE PROPOSED AMENDMENTS: In recent years, due to advancing technologies, the operating pressures of flow piping systems are far greater than the pressures when the current requirements were developed under the Occupational Health and Safety Regulation ( OHSR ). Serious injuries can occur to workers when flow piping systems fail and the component parts are not restrained properly. Current section 23.69(3) of the OHSR requires the use of 11 mm (7/16 inch) wire rope restraint lines for swivel joints or hoses used in well stimulation or similar operations. The restraints must be secured at the well head and at the supply unit or pumping unit head. These requirements do not allow for other types of restraints to be used that may provide equal or greater protection. WorkSafeBC has received variance requests over the last few years to allow other restraint systems, such as synthetic restraint lines to be used in place of the wire rope restraints. This illustrates that the wire rope restraints may not be as protective as some other types of restraints. The purpose of the proposed amendments to section is to ensure that flow piping systems are safe under the conditions being operated and for them to be properly restrained. Page 6

7 Proposed new definition of flow piping system: A definition of flow piping system is proposed to provide clarity to stakeholders about the type of piping being discussed in this section. The proposed flow piping system requirements apply to temporary or portable above ground piping systems used to convey liquid or gas under pressure to or from a well head. Applicable activities include drill stem testing, swabbing, cementing, well servicing and stimulation of the well, as well as service rig well servicing activities that uses flow piping systems. Proposed subsections 23.69(1) and (2): Integrity assurance program The current wording of subsection 23.69(1) requires flow piping systems to be anchored during well testing and stimulation, unless there is an effective quality assurance program to ensure the integrity of the piping system. Subsection (2) elaborates on what is required as part of the quality assurance program. WorkSafeBC is proposing that employers develop and implement an effective program for ensuring the integrity of the flow piping systems regardless of whether it is anchored or the type of well operation. In the oil and gas industry, this program is commonly referred as an Operations and Maintenance (O&M) Program. Flow piping systems experience a variety of harsh operational conditions, such as high pressures, corrosion, and extreme temperatures. Under the dynamic nature of well operations, the implementation of the program is one of the ways to ensure that flow piping systems do not fail in a catastrophic manner. The pertinent points contained in the current prevention Guideline G23.69, Flow Piping, were incorporated in the proposed requirements of the program in subsection (2). Proposed subsection 23.69(3): Qualified person to administer the program The proposed subsection 23.69(3) requires that the employer assign a qualified person responsibilities for administering the program. This is a person who has knowledge of the flow piping system and ensures that the required elements of the program are fully implemented. Proposed subsection : Selection, installation, operation and inspection During the last public consultation, stakeholders raised that the proposed amendments with a requirement for a professional engineer to certify flow piping systems prior to use was redundant and unnecessary since the components of flow piping systems already have operating specifications from the manufacturer. Based on the stakeholder feedback, the proposed amendments have removed the requirement for flow piping systems to be certified by a professional engineer. Instead, the proposed section requires that the employer ensure that flow piping systems are selected based on the anticipated operating conditions and installed, operated and inspected in accordance with the manufacturer s instructions and specifications. Copies of the flow piping manufacturer s instructions and specifications must be readily available at the worksite. Proposed subsection : Restraint systems Currently, subsection 23.69(3) requires that, if swivel joints or hoses are used in well stimulation and similar operations, the piping system be secured at the well head and the supply vehicle or pumping unit end with wire rope safety lines not less than 11 mm (7/16 in.) in diameter, or Page 7

8 chains of equal strength. This requirement is restrictive to employers who may wish to use other restraint systems that may offer equal or better protection to workers. Also, stakeholders have informed WorkSafeBC that some well heads may not be designed for the purpose of withstanding external loads and there are similar issues with anchoring to pumping units or vehicles. Current subsection 23.69(4) states that flowback lines must be anchored and restrained. The proposed subsection requires that each flow piping system be restrained by an engineered restraint system and anchored at specified locations. The engineered restraint system must be designed and manufactured for the purpose of safely restraining the flow piping system and it must be able to withstand the forces likely encountered during failure of the flow piping system. The proposed amendments allow restraint systems that were not commercially manufactured to be used if they were designed and made for the purpose of restraining piping systems and there is detailed engineering documentation for the restraint system. As stated in the current Prevention Guideline G23.69 (3), the detailed engineering documentation would include information such as: installation instructions, engineering specifications and drawings, precautionary information and limitations, testing certification, other instructions for component use, maintenance, inspection and removal from service, and certification by a professional engineer that the restraint system has been engineered and is adequate for the intended purpose. The proposed amendments require that a restraint system is anchored in accordance with the instructions and specifications of the manufacturer of the restraint system at the well head, the supply vehicle or pumping unit, but not necessarily to the well head or the supply vehicle or pumping unit. Other effective anchor points must be used in close proximity to the well head, the supply vehicle or pumping unit. The manufacturer or the engineering documentation may also stipulate other locations as well. When ground anchors are used, they must be pull tested prior to initial use. Where ground anchors may not be feasible, other types of anchors, such as cement weights may be used. Proposed subsection : Other requirements The intent of the proposed subsection (1) is similar to the current requirement of subsection 23.69(7), except that the proposed pressure is lowered from 3500 kpa to 3000 kpa to be consistent with Alberta s requirement and it is more protective. It is likely that most operations are well beyond this threshold so the impact of the change to industry stakeholders should be minimal. The intent of the proposed subsections (2), (3), and (4) is similar to the current requirements of subsections 23.69(8), (9) and (11) with some changes to the wording for clarity. Proposed subsection : Liquefied gas used for purging or gauging operations or well stimulation A consequential amendment is proposed to add a new subsection , relating to liquefied gas used for purging or gauging operations or well stimulation. The proposed new subsection is to address the potential hazards of using liquefied gas for purging or gauging operations or well stimulation. Currently, the hazards of liquefied gas are addressed in section Page 8

9 23.69(11), but it is specific to the locations of valves during a well stimulation activity. There are other hazards associated with handling liquefied gas that workers must be protected from, such as extreme temperatures and pressures. Proposed subsections 23.72(1) to (6): pressure testing requirements The proposed amendments to section clarify the current requirements by reflecting the current practices of the industry. The current requirement does not provide guidance to stakeholders about the maximum test pressures. Under some circumstances, it is not practicable to hydraulically pressure test piping, pumps, valves and fittings, so a provision was made to pressure test with an inert gas. Also, these components must be tested to the test pressures recommended by the manufacturer of these parts. If the manufacturer has not recommended a test pressure, the test pressure must be at least 10% above the maximum operating pressure anticipated by the well owner, but not exceed the maximum pressure rating of that piping, pump, valve or fitting. Page 9

Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines

Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines The INGAA Foundation, Inc. 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines for the safety of all personnel and the general public during pressure (e.g., hydrostatic, pneumatic)

More information

Procedures for Inspection, Maintenance, Repair and Remanufacture of Drilling Equipment

Procedures for Inspection, Maintenance, Repair and Remanufacture of Drilling Equipment Addendum 2 April 2006 Procedures for Inspection, Maintenance, Repair and Remanufacture of Drilling Equipment API RECOMMENDED PRACTICE 7L FIRST EDITION, DECEMBER 1995 Procedures for Inspection, Maintenance,

More information

Standard Pneumatic Test Procedure Requirements for Piping Systems

Standard Pneumatic Test Procedure Requirements for Piping Systems the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 0 Issued 2012-06-28 Table of Contents FOREWORD... 3 1.0 INTRODUCTION...

More information

OREGON FIRE CODE Interpretations and Technical Advisories

OREGON FIRE CODE Interpretations and Technical Advisories OREGON FIRE CODE Interpretations and Technical Advisories A collaborative service by local and state fire professionals, along with our stakeholders and customers, to provide consistent and concise application

More information

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable

More information

Standard Hydraulic Piping Flushing Procedure

Standard Hydraulic Piping Flushing Procedure Page 1 of 6 1.0 Scope This procedure covers the minimum technical requirements for cleaning and flushing of Hydraulic and Piping, and related accessories. 2.0 Introduction In hydraulic fluid power systems,

More information

NITROUS TRANSFER PUMP INSTRUCTIONS

NITROUS TRANSFER PUMP INSTRUCTIONS NITROUS TRANSFER PUMP INSTRUCTIONS SAFETY TIPS Never directly inhale nitrous oxide. When inhaled in large quantities, nitrous oxide can cause respiratory ailments or in extreme cases, death by suffocation.

More information

CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach

CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach Greg Orloff, MBA Government Relations Officer North America and Europe CSA Group Z662 Technical Committee (TC) Over 250

More information

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! Atlanta (Monroe) GA 770-267-3787 gpm@gpmhydraulic.com www.gpmhydraulic.com What You Don t Know About Hydraulic Accumulators Can Kill You TABLE OF CONTENTS

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not

More information

1 What is the purpose of this document?

1 What is the purpose of this document? Executive Summary Comparing the Oil and Gas Drilling Regulatory Regimes of the, the, the U.K,, and 1 What is the purpose of this document? The National Energy Board (NEB) regulates offshore oil and gas

More information

COMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder.

COMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder. Page 1 of 5 COMPRESSED GASES A compressed gas is defined as any mixture of gases in a container with a pressure exceeding 40 psi. at 70 o F, or 104 psi. at 130 o F; or any flammable liquid with an absolute

More information

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES Review the following information pertaining to Construction Fire Safety Planning: B.C. Building Code Sections 8.1 up to and including Subsection 8.2.3 B.C.

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information

OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES

OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES Reference: National Fire Protection Association (NFPA) Pamphlet No. 58 Liquefied Petroleum Gas Code, 2001, Chapter 11 Type of Facility: Petroleum

More information

Pressure Vessels (Air Compressors) and LPG Tanks

Pressure Vessels (Air Compressors) and LPG Tanks Pressure Vessels (Air Compressors) and LPG Tanks 1. Identification of Workplace Hazard Any container, tank or vessel that contains pressurized material is a potential hazard to employees due to the force

More information

Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations

Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations Leak testing may be used to find leaks in a newly constructed or newly modified

More information

Root & Contributing Causes. Site Answers & Comments: Preventative / Recommended / Accepted Steps of Risk Mitigation, Points of Interest:

Root & Contributing Causes. Site Answers & Comments: Preventative / Recommended / Accepted Steps of Risk Mitigation, Points of Interest: EMESRT RISK: Risk of injury due to stored energy systems, such as accumulators, with no means to isolate or reduce to zero energy. Click to view this EMESRT Risk Failure under pressure All mines are strongly

More information

PART 3: RIGHTS AND RESPONSIBILITIES

PART 3: RIGHTS AND RESPONSIBILITIES PART 3: RIGHTS AND RESPONSIBILITIES When program required OCCUPATIONAL HEALTH AND SAFETY PROGRAMS 3.1 (1) An occupational health and safety program as outlined in section 3.3 must be initiated and maintained

More information

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS FIRE DEPARTMENT Bureau of Fire Protection and Life Safety www.cityofsanmateo.org 1900 O Farrell, Suite 140 San Mateo, CA 94403-1332 (650) 522-7940 FAX: (650) 522-7941 TDD: (650) 522-7047 MAINTENANCE AND

More information

INSTRUCTION MANUAL IM042. Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

INSTRUCTION MANUAL IM042. Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS INSTRUCTION MANUAL IM042 Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TABLE OF CONTENTS SUBJECT PAGE Safety Instructions... 3 Descriptions and Specifications...

More information

Examples of pressure systems and equipment are:

Examples of pressure systems and equipment are: Pressure systems A brief guide to safety Introduction Pressure systems A brief guide to safety If pressure equipment fails in use, it can seriously injure or kill people nearby and cause serious damage

More information

PREPIPED LIQUID FUEL MANIFOLDS PLPM

PREPIPED LIQUID FUEL MANIFOLDS PLPM PREPIPED LIQUID FUEL MANIFOLDS PLPM INSTRUCTIONS WARNING These instructions are intended for use only by experienced, qualified combustion start-up personnel. Adjustment of this equipment and its components,

More information

American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at www.api.org/publications

American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at www.api.org/publications Purchase API Spec online at www.api.org/publications 7.9.3 Forgings and Castings All repair welding shall be performed in accordance with the manufacturer s written welding specifications. WPSs shall be

More information

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

ELECTRIC/DIESEL FIRE PUMP CHECK LIST BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested

More information

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap 1263050/6 IM-P126-07 ST Issue 6 BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

Hydraulic control unit series 0086-372-01

Hydraulic control unit series 0086-372-01 Technical Product Information No. 1290 EN Hydraulic control unit series 0086-372-01 Contents Page About this Technical Product Information (TPI) 2 The ORTLINGHAUS numbering system 2 About the product 3

More information

Visage. Digital. Digital diverter. Installation guide. Visage Digital diverter installation instructions Page 1

Visage. Digital. Digital diverter. Installation guide. Visage Digital diverter installation instructions Page 1 Visage Digital Digital diverter TM Installation guide Visage Digital diverter installation instructions Page 1 Visage Digital diverter Visage Digital concealed with adjustable and fixed head Visage Digital

More information

PSAC/SAIT Well Testing Training Program Learning Outcomes/Objectives Level D

PSAC/SAIT Well Testing Training Program Learning Outcomes/Objectives Level D s/objectives Level D ENVS 6006: Environmental Operating Procedures When you complete this module, you will be able to Describe how and where environmental operating procedures can be employed in industry.

More information

Series 30000 Hose Reels

Series 30000 Hose Reels Operating Instructions and Parts List for Series 30000 Hose Reels - MANUAL DRIVEN - - POWER DRIVEN - SAFETY PRECAUTIONS Personal injury and/or equipment damage may result if proper safety precautions are

More information

ASMECourseCatalog. www.energyu.org www.midwestenergy.org

ASMECourseCatalog. www.energyu.org www.midwestenergy.org ASMECourseCatalog www.energyu.org www.midwestenergy.org ASME Abnormal Operating Conditions... 6 ASME GAS01 Hazards of Natural Gas and Prevention of Accidental Ignition... 6 ASME 0001 Measure Structure-to-Electrolyte

More information

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC) APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines

More information

On-Site Risk Management Audit Checklist for Program Level 3 Process

On-Site Risk Management Audit Checklist for Program Level 3 Process On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:

More information

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG IP THE INSTITUTE OF PETROLEUM Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG MODEL CODE OF SAFE PRACTICE PART 9 ISBN 0 471 91612 9 First'printed 1987 Reprinted October

More information

NFPA31FuelOilPiping 1 Revised 3-1-11

NFPA31FuelOilPiping 1 Revised 3-1-11 NFPA 31 Fuel Oil Piping, Installation and Testing Chapter 8 Fuel Piping Systems and Components 8.1 Scope. This chapter shall apply to piping systems and their components used to transfer fuel oil from

More information

Process Safety Management of Highly Hazardous & Explosive Chemicals. Application, Exclusions & Definitions

Process Safety Management of Highly Hazardous & Explosive Chemicals. Application, Exclusions & Definitions Process Safety Management of Highly Hazardous & Explosive Chemicals Application, Exclusions & Definitions Application 1910.119(a)(i) A process which involves a chemical at or above the specified threshold

More information

University of Tennessee Safety Guidelines

University of Tennessee Safety Guidelines University of Tennessee Safety Guidelines Guideline Subject: Compressed Gases and Cryogenics Safety Guidelines Approval Date: 10/1/15 (Rev. 1) Next Scheduled Review: 10/1/19 Date Effective: 1/01/09 Contact

More information

Topics of the Presentation

Topics of the Presentation Drill Rig Safety Topics of the Presentation Personnel safety and monitoring PPE Health (Drugs and Alcohol) Drill Rig operation Safe set up procedures Safe operation of machine Safety related accidents

More information

TANKER - SHORE SAFETY CHECK-LIST

TANKER - SHORE SAFETY CHECK-LIST TANKE - SHOE SAFETY CHECK-LIST Part A - Bulk Liquid General - Physical Checks Bulk Liquid - General Tanker Terminal Code emarks 1 There is safe access between the tanker and shore. L1 The fendering arrangements

More information

BRAZED PLATE INSTALLATION MANUAL

BRAZED PLATE INSTALLATION MANUAL www.brazedplate.com BRAZED PLATE INSTALLATION MANUAL S.E.C. Heat Exchangers P.E.I. CANADA C0A 1A0 tel; 902-659-2424 fax; 902-659-2800 Table of Contents Description...2 Mounting position...3 Piping connections......3

More information

PBX Series Quick Fit Connector Bimetallic Steam Traps

PBX Series Quick Fit Connector Bimetallic Steam Traps 6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR 1910.147

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR 1910.147 Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR 1910.147 Contents I. Introduction II. Scope and Application III. Definitions IV. Lockout/Tagout Manual V. Energy Control Procedures 1. Applying Energy

More information

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion Annex 17, page 1 ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16 Part B Prevention of fire and explosion Regulation 4 Probability of ignition 1 The existing paragraph 5.5 is replaced

More information

INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 16303

INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 16303 WATER MIST HAND PORTABLE FIRE EXTINGUISHERS Model B270 ¾ Gallon Model B272 2 ½ Gallon INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 6303 All fire extinguishers should be installed, inspected

More information

LINDGREN-PITMAN, INC. Super Spool III Installation Instructions

LINDGREN-PITMAN, INC. Super Spool III Installation Instructions LINDGREN-PITMAN, INC. Super Spool III Installation Instructions LINDGREN-PITMAN, INC. 2615 N.E. 5th Avenue * Pompano Beach, Florida 33064 * U.S.A. (954)943-4243 * (954)943-7877 Fax E-mail: longline@gate.net

More information

Select the Right Relief Valve - Part 1 Saeid Rahimi

Select the Right Relief Valve - Part 1 Saeid Rahimi Select the Right Relief Valve - Part 1 Saeid Rahimi 8-Apr-01 Introduction Selecting a proper type of relief valve is an essential part of an overpressure protection system design. The selection process

More information

Citation 1 Item 1a. #22: Struck by Inspection #1081105

Citation 1 Item 1a. #22: Struck by Inspection #1081105 A 35 year old male employee was removing a high pressure hydraulic hose from an aluminum die-casting machine accumulator, when it fatality struck the employee in the neck & chest. The 3,000 ton die cast

More information

Steam System Best Practices Condensate System Piping

Steam System Best Practices Condensate System Piping Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum

More information

3M Water Filtration Products. CFS01 Series, CFS02 Series, CFS11 Series, and CFS12 Series Housings. Installation and Instruction Manual For:

3M Water Filtration Products. CFS01 Series, CFS02 Series, CFS11 Series, and CFS12 Series Housings. Installation and Instruction Manual For: 3M Water Filtration Products Installation and Instruction Manual For: CFS01 Series, CFS02 Series, CFS11 Series, and CFS12 Series Housings Installer: Please leave this manual with owner/operator. Owner/Operator:

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin January 2016 CEC-10 [rev-9] Page 1 of 8 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and Bonding Rule 10-204 Grounding Connections for Alternating-Current

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

Important Ontario Fire Code Information for Building Owners in the City of Windsor

Important Ontario Fire Code Information for Building Owners in the City of Windsor Important Ontario Fire Code Information for Building Owners in the City of Windsor This information is intended to be used a reference only. For a complete listing consult the Ontario Fire Code or contact

More information

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions FJ2 2 Ton Trolley Floor Jack Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. This manual provides important information on proper operation & maintenance.

More information

BLADDER SURGE CONTROL SYSTEM

BLADDER SURGE CONTROL SYSTEM PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures

More information

Recharge Procedure for Telemark TVP-2000 and TVP-3500

Recharge Procedure for Telemark TVP-2000 and TVP-3500 Recharge Procedure for Telemark TVP-2000 and TVP-3500 Required items: 1.) Refrigeration service manifold. 2.) Charge recovery system. 3.) Dry nitrogen gas. If a high pressure cylinder is used, a pressure

More information

Pressure Testing Procedures for Building Services Piping

Pressure Testing Procedures for Building Services Piping Pressure Testing Procedures for Building Services Piping Document Number Revision 0 Approved By Ric Morris McMurdo, Palmer, and South Pole February 25, 2005 Active Divisions/Departments FEMC Raytheon Polar

More information

10 Wireline operations

10 Wireline operations 10 WIRELINE OPERATIONS... 1 10.1 GENERAL... 1 10.2 WELL BARRIER SCHEMATICS... 1 10.3 WELL BARRIER ACCEPTANCE CRITERIA... 1 10.3.1 Well control equipment configuration... 1 10.3.2 Deployment of toolstrings...

More information

TECHNICAL ADVISORY BULLETIN

TECHNICAL ADVISORY BULLETIN RISK CONTROL AND CLAIM ADVOCACY PRACTICE TECHNICAL ADVISORY BULLETIN November 2014 www.willis.com FIRE PUMP TESTING Fire pumps are a critical part of a fire protection system, especially when they are

More information

An inventory of hazardous materials used in your workplace will prove useful.

An inventory of hazardous materials used in your workplace will prove useful. Introduction Fire Protection is an organized approach designed to prevent fires. In the event of a fire, a fire protection program will help prevent or minimize personal injuries, losses, and harm to the

More information

Modulex. Gas Fired Boiler Systems PIPING GUIDE GF-115-P. Modular, Condensing, Hot Water Boilers Models: 303, 454, 606, 757, 909, 1060. Instruction No.

Modulex. Gas Fired Boiler Systems PIPING GUIDE GF-115-P. Modular, Condensing, Hot Water Boilers Models: 303, 454, 606, 757, 909, 1060. Instruction No. Instruction No. AERCO INTERNATIONAL, Inc., Northvale, New Jersey, 07647 USA PIPING GUIDE GF-115-P Modulex Gas Fired Boiler Systems Modular, Condensing, Hot Water Boilers Models: 303, 454, 606, 757, 909,

More information

Life Saving Rules SAFETY BY CHOICE, NOT BY CHANCE

Life Saving Rules SAFETY BY CHOICE, NOT BY CHANCE Life Saving Rules SAFETY BY CHOICE, NOT BY CHANCE Foreword from Kevin Reinhart The 12 Life Saving Rules are a part of Nexen s continued commitment to create a safe work environment for our employees. The

More information

Inspection and Testing of Water-Based Systems

Inspection and Testing of Water-Based Systems Inspection and Testing of Water-Based Systems Standard Model/Computer-Based Testing Level III Content Outline The candidate for NICET certification at Level III in the Inspection and Testing of Water-Based

More information

Installation, Maintenance, & Repair Series 4000B/LF4000B

Installation, Maintenance, & Repair Series 4000B/LF4000B Installation, Maintenance, & Repair Series 4000B/LF4000B Reduced Pressure Zone Assemblies Sizes: 1 2" 2" (15 50mm) RP/IS-A-4000B 4000B/LF4000B Size: 3 /4"! WARNING Testing Read this Manual BEFORE using

More information

ACCUMULATOR INSTALLATION

ACCUMULATOR INSTALLATION 7001-7 ACCUMULATOR INSTALLATION BRAKE ACCUMULATORS I 308L93 Rae 7-59710 Issued 6-93 Printed in U.S.A 7001-8 Removal ACCUMULATOR VALVE 1. Park the machine on a level surface and lower the. loader bucket

More information

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3 SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE SAFETY - LIFE SAVING RULES Verify isolations of hazardous energy before any work begins. Date Issued: February

More information

Diagnosing Hydraulic Problems

Diagnosing Hydraulic Problems Diagnosing Hydraulic Problems 1 Problems A pressure test is a key check when you need to determine if a problem is caused by something that is inside or outside of the transmission. Low automatic transmission

More information

Compressed Gas Cylinder Storage and Handling Guide

Compressed Gas Cylinder Storage and Handling Guide Overview Compressed gas cylinders are used in many workplaces to store gases that vary from extremely flammable (acetylene) to extremely inert (helium). Many compressed gas cylinders are stored at extremely

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 19 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

ABOVE-GROUND STORAGE TANKS

ABOVE-GROUND STORAGE TANKS ABOVE-GROUND STORAGE TANKS Above-ground storage tanks in Georgia are regulated by the State Fire Marshall and by the EPA. Above-ground tanks containing 1,100 gallons or less do not require any secondary

More information

AIR LINE VALVES AND GAUGES

AIR LINE VALVES AND GAUGES AIR LINE VALVES AND GAUGES INGERSOLL-RAND AIR LINE VALVES AND GAUGES Maintaining consistent air pressure throughout the entire system is crucial for maximum performance and productivity. Ingersoll-Rand

More information

Certain specific properties of compressed gases make them highly useful in various research activities.

Certain specific properties of compressed gases make them highly useful in various research activities. GAS CYLINDER SAFETY Introduction Certain specific properties of compressed gases make them highly useful in various research activities. These gases, however, can be dangerous if not handled in an appropriate

More information

UCLA - Compressed Gas Cylinder Storage and Handling

UCLA - Compressed Gas Cylinder Storage and Handling UCLA - Compressed Gas Cylinder Storage and Handling Purpose UCLA is committed to provide safety guidelines concerning the handling and use of portable compressed gas cylinders. Compressed gases represent

More information

Western Plant Health Association DOT MC 330 & 331 NH3 Cargo Tank Inspection Checklist Form

Western Plant Health Association DOT MC 330 & 331 NH3 Cargo Tank Inspection Checklist Form Western Plant Health Association DOT MC 330 & 331 NH3 Cargo Tank Inspection Checklist Form Title 49CFR Parts 107 through 180 & Parts 385-399 / CCR Title 8 409 / 29CFR 11910.11(b)(10) Company Name: NH3

More information

Voltmaster Trash Pumps Model TSP2, TSP3 and TSP4

Voltmaster Trash Pumps Model TSP2, TSP3 and TSP4 Model TSP2, TSP3 and TSP4 Owner s Manual July 2010 Table of Contents 1 Introduction...................................................... 1 1.1 Read before using..............................................

More information

Chapter 19 Purging Air from Piping and Vessels in Hydrocarbon Service

Chapter 19 Purging Air from Piping and Vessels in Hydrocarbon Service BP Lower 48 Onshore Operations Safety Manual Page 4.19 1 Chapter 19 Purging Air from Piping and Vessels in Hydrocarbon Service I. General Requirements A. After motor vehicle accidents and underground excavation

More information

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant

More information

NC General Statutes - Chapter 95 Article 7A 1

NC General Statutes - Chapter 95 Article 7A 1 Article 7A. Uniform Boiler and Pressure Vessel Act. 95-69.8. Short title. This Article shall be known as the Uniform Boiler and Pressure Vessel Act of North Carolina. (1975, c. 895, s. 1.) 95-69.9. Definitions.

More information

Compressed Gas Cylinder Program

Compressed Gas Cylinder Program Department of Environmental Health & Safety Procedures Compressed Gas Cylinder Program March 2010 Compressed Gas Cylinder Program Page 1 of 8 Table of Contents I. Introduction II. III. IV. Policy Scope

More information

3088 Lockout-Tagout Training Program Course Outline

3088 Lockout-Tagout Training Program Course Outline 3088 Lockout-Tagout Training Program Course Outline The following outline summarizes the major points of information presented in the course. The outline can be used to review the course before conducting

More information

Steam Coil Installation, Operation and Maintenance

Steam Coil Installation, Operation and Maintenance Steam Coil Installation, Operation and Maintenance Guidelines for the installation, operation and maintenance of the Heatcraft brand of steam heating coils manufactured by Luvata in Grenada, MS have been

More information

UltraTech International, Inc. Canadian Secondary Containment Requirements

UltraTech International, Inc. Canadian Secondary Containment Requirements UltraTech International, Inc. 11542 Davis Creek Court Jacksonville, Florida 32256 Canadian Secondary Containment Requirements The Canadian Council of Ministers of the Environment (CCME) is the major intergovernmental

More information

Handbook. Purchasing Guidelines. API Monogram Equipment. Purchase API Specs online at www.global.ihs.com

Handbook. Purchasing Guidelines. API Monogram Equipment. Purchase API Specs online at www.global.ihs.com Handbook Revision 10.01.09 Purchasing Guidelines Handbook API Monogram Copyright 2009 -. All rights reserved. Handbook Revision 10.01.09 Practical Guidelines for Making Practical Choices Dear Colleagues,

More information

REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE No. 9195 REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2013. All rights reserved. No part of this publication may be reproduced

More information

PSAC/SAIT Well Testing Training Program Learning Outcomes/Objectives Level B

PSAC/SAIT Well Testing Training Program Learning Outcomes/Objectives Level B s/objectives Level B CHEM 6014: Properties and Characteristics of Natural Gases Discuss the pertinent properties and uses of natural gases as they occur in gas processing. 1. Describe the physical properties

More information

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Air Conditioner Water Heater - A Product of HotSpot Energy LLC Air Conditioner Water Heater - A Product of HotSpot Energy LLC PLEASE READ THIS BEFORE YOU INSTALL THE UNIT 1. This air conditioner must be installed and/or repaired by a qualified technician. If you perform

More information

Grounding and Bonding Against Static Electricity. Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute

Grounding and Bonding Against Static Electricity. Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute Grounding and Bonding Against Static Electricity Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute Objectives Identify Sources of Ignition. Identify Hazards associated

More information

Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com

Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com Secondary Containment: Regulations & BMPs Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com Federal Secondary Containment Safeguarding method in addition to the primary

More information

Guidance for Those Who Use and Store Gas Cylinders

Guidance for Those Who Use and Store Gas Cylinders King s Gate Tel 6320 www.safety.ncl.ac.uk Safety Office February 2012 Guidance for Those Who Use and Store Gas Cylinders Version 3 Newcastle University 2012 This guide is designed to help staff manage

More information

A Code of Practice for Pressure Equipment in the Department of Physics

A Code of Practice for Pressure Equipment in the Department of Physics A Code of Practice for Pressure Equipment in the Department of Physics Scope This code of practice describes the management of equipment and systems operating above atmospheric pressure in the Department.

More information

Compressed Gas Cylinder Safety

Compressed Gas Cylinder Safety ISC Compressed Gas Cylinder Safety Training page 1 Compressed Gas Cylinder Safety This training program is adapted from the online OSHA training program on the Oklahoma State University OSHA training web

More information

An Introduction to Oil and Gas Well Servicing

An Introduction to Oil and Gas Well Servicing An Introduction to Oil and Gas Well Servicing Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals & Mining

More information

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components TITLE Pipelines and Terminals Manual/Volume 3 - SECTION 02: SUBJECT 20: PURPOSE AND SCOPE During the normal lifetime of a pipeline it becomes necessary to add or remove piping, modify existing piping or

More information

MATERIAL HANDLING PROGRAM (Section 10)

MATERIAL HANDLING PROGRAM (Section 10) MATERIAL HANDLING PROGRAM (Section 10) OVERVIEW (WMI Facility) (1) Only certified personnel will operate powered industrial lifts. (2) Training will be provided to those who require to be certified or

More information

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS Introduction When properly installed and maintained, automatic fire sprinkler systems have proven to be the most effective means for protecting

More information

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION Page 1 of 9 PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION COMPLIANCE DEMONSTRATION INSTRUCTIONS FOR THE CATEGORY NO. 38 AIR QUALITY PERMIT EXEMPTION CRITERIA The Category No. 38 exemption criteria

More information