1 Dragon Mining Limited ly Activities Report For ended 31 December 2014 For personal use only Overview at a Glance Safety, improvement in safety continues in Finland with Vammala Plant achieving 388 days accident free. One Lost Time Injury (LTI) occurred during quarter when a contractor truck driver slipped when climbing from cabin injuring his coccyx. A comprehensive follow up was completed with contractor. Gold Production C1 Cash Cost US/Oz (1) 14,690 ounces US$956 Gold production of 14,690 ounces was higher than budget by 2,227 ounces due to higher grades from both Jokisivu and Orivesi Gold Mines. The higher ore grades also resulted in higher than budgeted recoveries in Vammala Plant, furr boosting gold production. C1 Cash Costs of US$956/oz achieved during quarter. This achievement was driven by higher grades, improved recovery from Vammala Production Centre and lower refining costs through processing of Jokisivu concentrate at Svartliden Production Centre. A metallurgical breakthrough was achieved during quarter with benchscale testwork indicating that processing of Orivesi concentrate at Svartliden can be completed economically. 100% of concentrate from Finland can now be processed at Svartliden with significant savings compared to smelting. A 1000t production test was successfully completed on material sourced from Fäboliden Gold Project which is located 25km south east of Svartliden Plant. This test forms part of Company s review of nearby gold deposits that could extend operating life of Svartliden Production Centre. A$2.6M generated in cash during quarter. Available cash (bank accounts plus trade receivables less accounts payable) amounted to A$20.3m at end of quarter. Safety Performance Available Cash (2) ( end) 1 LTI A$20.3m Notes: (1) The group uses C1 Cash Cost definitions as set out by Mackenzie Wood (2) Available Cash = Cash at bank plus Receivables less Accounts Payable Ounces 20,000 15,000 10,000 5,000 0 Dragon Mining ly Gold Production and C1 Cash Cost 3Q12 4Q12 1Q13 2Q13 3Q13 4Q13 1Q14 2Q14 3Q14 4Q14 Ounces Produced (Oz, LHS) C1 Cash Cost (USD/Oz, RHS) 3,000 2,000 1,000 0 USD/Oz The Orivesi Gold Mine decline reinforcement project progressed during Q4 and is expected to be completed during Q The project will improve safety and reduce production risks associated with rock stresses in Orivesi. Improved stability in caved stope at Orivesi was achieved with commencement of backfilling of stope. Improved stope designs have been implemented for future mining areas. The positive outcome of environmental case against Svartliden was not appealed and legal costs have been reimbursed by environmental agency. The Sale of non-core Norrn Finland interests progressed with Aurion Resources Limited issuing Company with Second, and subsequent to quarter end Third Tranche of Common Shares, lifting Dragon Mining s holding in Aurion to 9.40%. 300, , ,000 Ore Mined vs Ore Milled 0 3Q12 4Q12 1Q13 2Q13 3Q13 4Q13 1Q14 2Q14 3Q14 4Q14 Ore Mined (t) Ore Milled (t) Page 1

2 Dragon Mining Limited ly Activities Report ended 31 December 2014 Operations Review Gold production for quarter was 14,690 ounces with a C1 Cash Cost of US$956/oz, including refining costs of US$130/oz. The gold production for quarter was higher than budgeted by 2,227 ounces due to higher grades from Jokisivu Gold Mine ( Jokisivu ) and Orivesi Gold Mines ( Orivesi ), in particular Orivesi achieved milled grades over 5.12g/t gold, 11% higher than budget. The higher head grades also resulted in higher recoveries in Vammala Plant, furr boosting gold production. While higher grades and recovery were main contributors to improved C1 Cash Cost, processing of Jokisivu concentrate at Svartliden Production Centre continued to impact positively on refining costs during quarter. Vammala Production Centre, Sourn Finland Ore Mined (t) Ore Milled (t) Head Grade (g/t) Recovery (%) Plant Utilisation (%) Total Gold Production (Ounces) C1 Cash Cost USD/oz Mar ,164 79, ,322 Jun ,874 74, , , ,056 Sep ,954 75, , Dec ,224 73, , The C1 Cash Costs for March and June 2014 have been changed from those reported in 30 June 2014 quarterly Report. The change was caused by an error that resulted in restatement of Company s 2013 Audited Financial Statements as announced to ASX on 5 August, 2014 Restatement of 2013 Audited Financial Statements. Safety A new safety record of 388 days without an LTI was achieved by Vammala Production Plant on 22 December This can be attributed to overhaul of safety in Finnish operations that was initiated in early 2014 as part of a Company-wide focus on safety and safety procedures. A total of 14 reportable incidents were reported during quarter; 6 at Orivesi, 7 at Vammala and 1 at Jokisivu. One LTI took place at Orivesi when a contractor s truck driver was stepping down from truck s cabin and his foot slipped from footstep. The driver lost his balance and his grip of truck causing driver to fall. The Company has held safety discussions with contractor to ensure future incidents of this nature can avoided by maintaining three points of contact. The rolling 12 month accident frequency rate per 1 million working hours reduced significantly from 42.6 in Q1 to 20.3 by end of Q4. Backfilling of cave in at L5 stope at Orivesi began during quarter, (presently back fill is on 840 metre level). A miner s risk assessment workshop was held during quarter at Orivesi. The safety committee had a meeting at Jokisivu with following issues discussed: Smoke free work place; Alcohol testing post-accident; Avoid working alone at high places; Mapping of cables and pipes; and The organisation of a crisis management course. Page 2

3 Dragon Mining Limited ly Activities Report ended 31 December 2014 Production Gold production at Vammala Production Centre for quarter was 11,022 ounces, which is 3,236 ounces above budget. This was driven by 16% higher feed grades from Orivesi, and 56% higher feed grades from Jokisivu. A 3.6% decrease in gold recovery levels for Orivesi ore in Vammala Plant is due to large variation of ore types processed during quarter. Mill feed at Vammala comprised 48,051 tonnes from Orivesi at 5.38 g/t gold and 25,448 tonnes from Jokisivu at 5.65 g/t gold. Orivesi Gold Mine Production from Orivesi was 51,397 tonnes of ore, mined from Kutema lode system, Pipe 2 and 5. Orivesi achieved higher mined grades in spite of dilution that resulted from stope cave in. By end of quarter decline had reached 1080 metre level. A decision to extend decline will be made pending results of a diamond drilling program, expected to be completed in March Backfilling of cave-in of L5 stope began during quarter with backfilling presently at 840 metre level. The L5 stope has been mined out and backfilled successfully. Development works advanced a total of 545 metres during quarter. Decline development was affected by unfavourable (high stressed) rock conditions and a 2 day break caused by unavailability of contractor s shotcrete truck. The contract negotiations between Maakasi Oy (ore haulage) and Company have taken place and are ongoing. A remote controlled hydraulic breaker and loader were delivered to Orivesi in December. This will be used to improve safety of breaking big boulders inside stope. The decline reinforcement project has advanced as follows: Meshed 57% (vs planned 100%); Shotcreted 46% (vs planned 48%); and Cable bolted 76% (vs planned 100%). Sludge transport from surface to bottom of Sarvisuo was stopped due to winter conditions. Transport will recommence in norrn spring. 3D-modelling of Orivesi by Aalto University was completed during quarter. The modelling concluded decline rock burst that occurred in 2013 and 2014 was not caused by stoping. Jokisivu Gold Mine Ore mined totalled 34,827 tonnes (48% above target) and development advanced 387 metres (as planned) during quarter (refer to Advanced Projects section). Jokisivu s mill feed grades exceeded planned grades by 2.0 g/t gold and was a major driver for quarter s positive result. The relocation of ramp away from open pit wall to improve safety was completed. A surface drilling program targeting at Arpola deposit was completed during quarter with results still pending. The Company continued its heating gas contract with ADVENT. The agreement is now valid until October 2016 with a six month notice period. Presently, Jokisivu has two stoping areas which will improve mines productivity. The stopes, despite ir irregular geometry have remained stable. Contract negotiations with mining contractor, SK-Kaivin, are ongoing. Vammala Plant Ore milled totalled 73,499 tonnes and mill recovery averaged 80.6%. The processing of Orivesi ore is still proving difficult with ph controls in use every second day. A longer unplanned stoppage took place during quarter. A bearing on a vibrating screen broke and was repaired later that same day. The following occurred during quarter: The second half of annual overhaul was completed on schedule and included installation of a new hydraulic unit and electricity feed to Page 3

4 Dragon Mining Limited ly Activities Report ended 31 December 2014 horizontal feeder. This will support fine ore silo, new lifters to ball mill, new cyclone and many or smaller items. An audit of Vammala laboratory was completed by CRS Kemia, a service based laboratory, with new valuable processing data being received since ore tracking was implemented. Independent consultants, Ramboll Oy have inspected tailings dam works and will write a recommendation letter to ELY. The sample preparation room is now ready for use and commissioning of new cyclone is progressing. A new high quality supplier for milling balls was sourced. The contract of hauling concentrate with Ranta-Pere was signed with savings over existing contractor. The ELY Centre has requested additional information relating to potential environmental impacts in event Company exceeded its permitted ore production rate of 200,000 tonnes per annum by end of January Environment Orivesi Gold Mine In 2013, environmental organisation Friends of Earth measured elevated uranium concentrations, compared to background levels, in sediments downstream of Orivesi. These observations were later confirmed by new measurements carried out by environmental authorities. However, according to STUK, The Finnish Radiation and Nuclear Safety Authority, uranium concentrations in measured sediment samples do not cause any risk to humans and uranium levels in water are well below standards established for drinking water. The situation was subject to furr investigations. The investigations were carried out by an external consultant according to a plan agreed with ELY. The study report, completed in October, discusses source of uranium and its transportation and enrichment processes. The report confirms that uranium levels in bedrock are at background levels and that uranium levels in water discharged from mine site are below requirements set for drinking water standards. The study and its contents were accepted by ELY in November. The yearly environmental inspection at Orivesi was carried out in October, which resulted in a request for more detailed information relating to extension of waste rock pile, its design and potential environmental impacts as a result of extending waste rock pile (in direction of Lake Ylä-Jalkajärvi). During quarter, an external consultant carried out planning of extension to waste rock pile. The work is expected to be completed during Q and will be submitted to ELY for approval. During quarter, signs of water originating from mine site were observed in Sarvisuo area (next to eastern side of mine area). Water quantities are very minor but actions for preventing water discharging to east are planned immediately following winter. A supplement to Environmental Permit application that was filed in 2010 was submitted to Regional State Administrative Agency at end of December. The main content of supplement was Natura assessment. In addition, uranium study report, information on noise levels and general environmental compliance was also filed. Vammala Plant In June, Company received an Environmental Permit to increase ore production to 300,000 tpa, use of A-pond and processing of material from Kaapelinkulma. The decision was appealed by Company with a few or parties. The primary reason for appealing was because Permit does not allow Company to discharge water to Ekojoki River. In September, Company was provided an opportunity to respond to appeals made by or parties. The Company s reply was filed in October. Page 4

5 Dragon Mining Limited ly Activities Report ended 31 December 2014 In October, re was a discussion with ELY who advised Company needs to ensure it complies with its effective Environment Permit of 200,000 tpa. The Company agreed to undertake a furr study to determine differences on environmental impact, from operating Vammala Plant at a 200,000 tpa level and at a 300,000 tpa level. Kaapelinkulma Gold Project An application for a review of current Environmental Permit was filed in August. A request to complete application was received in November. The Permit setting authority, Regional State Administrative Agency has requested additional information to be included in application in addition to a waste management plan. The due date for completing application is end of February Svartliden Production Centre, Sweden Ore Mined (t) Ore Milled (t) Head Grade (g/t) Recovery (%) Plant Utilisation (%) Total Gold Production (Ounces) C1 Cash Cost USD/oz Mar , ,094 Jun , , Sep , , Dec , , ,448 1 The C1 Cash Costs for March and June 2014 have been changed from those reported in 30 June 2014 quarterly Report. The change was caused by an error that resulted in restatement of Company s 2013 Audited Financial Statements as announced to ASX on 5 August, 2014 Restatement of 2013 Audited Financial Statements. 2 The C1 Cash Cost was impacted negatively due to an out of court settlement of a claim arising from underground mining contract in addition to lower ore grades and lower recovery. Safety The Svartliden Production Centre was free from Lost Time Injuries (LTI s) for quarter. Despite this rolling 12 month accident frequency rate per 1 million working hours (including contractors) was By comparison, Swedish Mining Industry average was 8.0 for Svartliden has had one accident in last 12 months and is currently 286 days LTI free. During quarter: A detailed risk assessment for processing of concentrate was performed; Process Plant pipework was remarked to ensure visible and legible markings; and Q4 Site Safety Committee meeting was held. Production With completion of underground mining in 2013, Svartliden Plant is now processing stockpiled low grade material through to Q Svartliden produced 3,669 ounces of gold from 75,818 tonnes of ore milled from stockpiles at an average head grade of 1.7 g/t gold for quarter at a C1 Cash Cost of US$1,448/oz. The C1 Cash Cost was impacted negatively due to an out of court settlement of a claim arising from underground mining contract from 2013; removing this impact C1 was US$1,281/oz. Or significant factors contributing to high C1 were lower grades and recovery. Gold recovery for ore was only 87.6%, this low level was caused by heavily oxidised stockpiled ore as older parts of stockpile are progressively excavated. This effect is expected to continue. The process plant utilisation was very high at 99.3% with successful identification and rectification of intermittent mill motor fault reported in Q3. In addition, only a short planned stoppage was performed to inspect ball mill liners. Page 5

6 Dragon Mining Limited ly Activities Report ended 31 December 2014 During quarter Svartliden successfully processed 100% of Jokisivu concentrate generating a benefit of approximately US$70/oz. The Company, in conjunction with independent Western Australian based consultants Minnovo, achieved a major breakthrough in leaching testwork on Orivesi Pipe 5 concentrates, with bench work tests indicating Orivesi concentrate leaching is more economical than smelter. Based on above, Company has commenced full scale testing of Orivesi concentrate in Svartliden. During quarter County Administrative Board accepted notification of processing mixed ore and concentrate, with up to 20,000t of concentrate in 2015, sufficient for Jokisivu, Orivesi, and or potential third party sources. Options for securing additional feed for Svartliden Plant are continuing to be investigated. During quarter, discussions continued with third parties regarding possible toll processing of ir concentrates at Svartliden. In conjunction with this, evaluation work and discussions continued with or various parties regarding options to acquire nearby gold deposits. Evaluation work included a 1,000t production test of material from Fäboliden Gold Project ( Fäboliden ) located 25km south east from Svartliden Plant. The production test of material stockpiled at surface, collected from a test mining and processing campaign undertaken in 2005, has shown that material from Fäboliden is amenable to processing through Svartliden Plant. The stockpiled material, which was originally sourced from a near surface zone of higher grade mineralization, had a head grade of 3.02 g/t gold and yielded gold extraction levels of 79.4%. This production test confirmed recent bench scale leach test work carried out by Company on representative drill core that indicated gold extraction levels exceeding approximately 75% are unlikely for material from Fäboliden at Svartliden. Environment For quarter, all discharge levels were lower than Environmental Permit constraints. The Water Treatment Plant ( WTP ) remained on standby with onset of colder winter months and normal water levels in Tailings Storage Facility (TSF). This water treatment is part of site s continuing rehabilitation. The or year round water treatment processes ran effectively during quarter, se include arsenic and cyanide removal from process water discharged to TSF and removal of heavy metals from runoff water from Waste Rock Storage Facility. With respect to 2009 allegations related to environmental offenses, Swedish Court of Appeal proceedings took place September 2014 in Umeå, Sweden. The Court ruling released on 15 October 2014 upheld Lycksele District Court ruling and acquitted Company on all counts and ruled that Company s legal costs be refunded by State. No appeal was made and ruling gained legal force. Legal costs were accordingly reimbursed to Company. Advanced Projects Drilling campaigns directed at defining and upgrading Mineral Resources continued at Orivesi and Jokisivu mining operations, whilst drilling activities recommenced at Kaapelinkulma Gold Project during December quarter. Three underground diamond core rigs and one surface diamond core rig were active during quarter, completing a total of 9,845 metres (Total 2014: 19,790 metres) Sourn Finland Orivesi Gold Mine Underground diamond core drilling continued at Orivesi with 29 holes drilled for an advance of 4,841 metres during quarter. Available results from drilling campaigns undertaken have previously been released to ASX subsequent to end of quarter on 19 January 2015 Encouraging Results from Sourn Finland Drilling Activities. This announcement can be found at (Code: DRA). Drilling commenced on a 12 hole program during quarter that was designed to assist with stope definition at Kutema. Four holes, metres were completed, with results returning better intercepts of g/t gold and g/t Page 6

7 Dragon Mining Limited ly Activities Report ended 31 December 2014 gold at approximately 1040m level (Appendix 1). Drilling of program will resume when drilling positions are available at 1060m and 1080m levels. The drilling of a 30 hole underground diamond core program is now in progress from 1020m and 1040m levels. This program has been planned to better define extent and geometry of Kutema lode system between 1060m and 1220m levels. Eighteen holes have been drilled to end of quarter for an advance of 3,814 metres. Assay results have been received for 11 holes returning better intercepts of g/t gold, g/t gold and g/t gold, whilst returning significant results down to 1165m level, deepest recorded to date from Kutema lode system (Appendix 2). Results from 7 holes are pending. Drilling continued on a 12 hole campaign of underground diamond core drilling that was designed to test continuation of Kutema lodes between levels 980m and 1020m. A furr 7 holes were completed during quarter in addition to 4 holes completed in previous quarter. Results have been received for 5 holes that were designed to drill down line of near vertical Pipe 2 from 980m level and returned a best intercept of g/t gold from approximately 1010m level. Results are provided in Appendix 3. The results from this campaign have been incorporated into an updated model that indicates last production level for Pipe 2 will be at 980m level. The Pipe 2 position however, will continue to be tested as mine progresses deeper. Jokisivu Gold Mine Underground and surface diamond core drilling campaigns were undertaken at Jokisivu Gold Mine during quarter with 29 holes completed for an advance of 4,341 metres. Available results from drilling campaigns undertaken have previously been released to ASX, subsequent to end of quarter on 19 January 2015 Encouraging Results from Sourn Finland Drilling Activities. This announcement can be found at (Code: DRA). The final 5 holes in a 10 hole campaign targeting Kujankallio Main Zone and Hinge Zone between 290m and 340m levels was completed. Assays have been received from 6 holes returning a number of significant intercepts including narrow, high grade g/t gold, g/t gold and g/t gold (Appendix 4). Results from 4 holes are pending. The drilling of a 9 hole program at Arpola, first underground infill program undertaken at this deposit was completed during quarter. Assays have been received from all holes yielding encouraging narrow, high grade intercepts of g/t gold, g/t gold and g/t gold, as well as better intercepts of g/t gold and g/t gold (Appendix 5). The results indicate that high grade zones which were intercepted with drifting on 50m and 65m levels continue through to 80m level. Surveyed fault planes on upper levels however may have a bearing on way se zones continue through. A surface exploration drilling program of 15 holes, 2,931 metres was completed at Arpola. Ten holes from this program were positioned to evaluate immediate extensions of main Arpola lodes that could not be intersected from available underground development positions or decline, 5 holes were planned to furr test an area souast of Arpola open-pit where historic drilling returned near surface high-grade intercepts. Assays have been received from 7 holes returning a number of significant intercepts including g/t gold, g/t gold and very high grade g/t gold (Appendix 6). Results from 8 holes are pending. Kaapelinkulma Gold Project A 45 hole, 3,046m diamond core drilling program commenced at Kaapelinkulma Gold Project during quarter. This program has been designed to improve density of drilling of sourn lode system with objective of updating Mineral Resource in readiness for a detailed study into viability of establishing Dragon Mining s third gold mine in sourn Finland region. Core logging, sampling and analysis is progressing for 10 holes drilled during quarter. Page 7

8 Dragon Mining Limited ly Activities Report ended 31 December 2014 Norrn Finland Kuusamo Gold Project The Company acknowledges complexity of social and environmental aspects of developing Kuusamo Gold Project, including municipal councils concerns for mining in area. Dragon Mining has continued to focus its efforts on environmental and community relations during quarter. To assist process going forward Company has established a new Finnish subsidiary called Kuusamo Gold OY. Radiological Baseline Study Work on radiological baseline study by Finnish Radiation and Nuclear Safety Authority ( STUK ) was completed with issue of final report during quarter. Results from report have previously been released to ASX on 19 December 2014 Radiological Baseline Study Report for Kuusamo Gold Project Completed. This announcement can be found at (Code: DRA). The aim of radiological baseline study was to examine natural radioactivity in environment, around Kuusamo Gold Project area. The baseline study is required when planning a mining operation in areas that may contain elevated radiation levels. STUK reported that samples were collected in 2012 and 2013 from various environmental settings in Juomasuo area, which hosts Juomasuo, Hangaslampi and Pohjasvaara gold deposits. The samples were analysed for concentrations of naturally occurring radioactive substances such as uranium (U-238 & U-234); radium (Ra-226 & Ra-228), lead (Pb-210) and polonium (Po-210). In addition external radiation dose rates were measured onsite and area was measured for outdoor radon.. It was concluded from study that radioactive concentrations in Juomasuo area and its near vicinity are comparable to concentrations measured elsewhere in nature. The highest concentration levels were measured in sediment samples, water plant, mosses and fish and were similar to samples of same kind, collected elsewhere in Finland. The activity levels in environmental samples showed no significant annual variation, any variation linked to sample type and location. The natural products in area such as mushrooms, berries, as well as foods, fish, agricultural products, game and reindeer meat can be used safely as normal. A copy of final report in Finnish and English translation of report Summary are available on Dragon Mining website Exploration Norrn Finland Hanhimaa Gold Project (Diluting to 30% Interest) Agnico Eagle Mines Limited (NYSE:AEM) (TSX:AEM) ( Agnico Eagle ) advised Company that no drilling activities were undertaken on Hanhimaa Gold Project during quarter. The Company and Agnico Eagle entered into Hanhimaa Earn-In Agreement in 2013, whereby Agnico Eagle could earn up to 70% interest in Hanhimaa Gold Project in norrn Finland, with staged expenditure of 9 million over seven years. Page 8

9 Dragon Mining Limited ly Activities Report ended 31 December 2014 Corporate Share Sale Agreement with Ausinox plc Subsequent to end of quarter, Company announced it had executed a Share Sale Agreement ( Agreement ) with Ausinox plc ( Ausinox ) to sell Company s 39.95% interest in Weld Range Minerals Limited ( Weld Range ). The Agreement supersedes Share Buy Back Agreement executed with Weld Range, as previously announced. Pursuant to Agreement, Ausinox will buy 10.3 million Weld Range shares from Company. In addition, debt Weld Range currently owes Company ($3.8 million comprising principal and accrued interest to 30 June 2014) will be assigned to Ausinox. Consideration payable to Company by Ausinox will be $1 million (less costs). Shares in Aurion Resources Limited Received On 26 November 2014, Company announced Second Tranche of Common Shares in Canadian explorer, Aurion Resources Limited ( Aurion ) had been received, following seventeen Claims that comprise Silasselkä project (Silasselkä 1 5; 8-19) becoming valid, as defined in Definitive Purchase Agreement for Kutuvuoma and Silasselkä Projects in Norrn Finland. Subsequent to end of quarter, on 13 January 2015, Company announced that Third Tranche of Common Shares in Aurion had been received, following eighteen Claims that comprise portion of Kutuvuoma project (Kutuvuoma 4-21) becoming valid. The Second and Third Tranches of Common Shares, increases Company s holding to 4m Common Shares and represents a 9.40% holding in Aurion, on an undiluted basis. The Common Shares are escrowed for 18 months from date of issuance of initial Tranche of Common Shares in Aurion on 8 September Employee Share Options Cash Generation During quarter cash generated totalled A$2.6 million. At end of quarter, group had A$15.0 million in bank, trade receivables of A$9.5 million and accounts payable of A$4.2 million. Available cash (cash at bank plus trade receivables less accounts payable) was A$20.3 million. Cash Flows Operating Cash Flows A$ Revenue 21.4 Operating Costs (20.0) Cash outflows for taxation, rehabilitation bonds, overhead and operational support costs 2.4 Exploration (1.0) Net operating cash flows 2.8 Investing Cash Flows Development expenditure (0.7) Capital purchases (0.1) Or (0.2) Net investing cash flows (0.9) Financing Cash Flows Drawdown/(Repayment) of gold concentrate factoring facility (0.0) Foreign exchange gains/(losses) 0.7 Net financing cash flows 0.7 Increase in Cash 2.6 On 12 December 2014, Company announced that 2,054,000 unlisted options held by current and former employees of Company expired or lapsed unexercised due to resignation or cancellation by agreement for nil consideration. Page 9

10 Dragon Mining Limited ly Activities Report ended 31 December 2014 Competent Persons Statement The information in this report that relates to Exploration Results pertaining to Sourn Finland was previously released to ASX on 19 January 2014 Encouraging Results from Sourn Finland Drilling Activities, which can be found at (Code:DRA). It fairly represents, information and supporting documentation that was compiled by Mr. Neale Edwards BSc (Hons), a Fellow of Australian Institute of Geoscientists and Mr. Matti Talikka MSc (Geology), a Member of Australasian Institute of Mining and Metallurgy, who are full time employees of company and have sufficient experience which is relevant to style of mineralisation and type of deposit under consideration and to activity which y are undertaking to qualify as Competent Persons as defined in 2012 Edition of Australasian Code of Reporting for Exploration Results, Mineral Resources and Ore Reserves. Written consent was provided by Mr. Neale Edwards and Mr. Matti Talikka for 19 January 2014 announcement. The Company confirms that form and context in which information is presented has not been materially modified and it is not aware of any new information or data that materially affects information included in relevant market announcement, as detailed in body of this announcement and Appendices. The information in this report that relates to all or Exploration Results is based on information compiled by Mr. Neale Edwards BSc (Hons), a Fellow of Australian Institute of Geoscientists and Mr. Matti Talikka MSc (Geology), a Member of Australasian Institute of Mining and Metallurgy, who are full time employees of company and have sufficient experience which is relevant to style of mineralisation and type of deposit under consideration and to activity which y are undertaking to qualify as Competent Persons as defined in 2012 Edition of Australasian Code of Reporting for Exploration Results, Mineral Resources and Ore Reserves. Mr. Neale Edwards and Mr. Matti Talikka have provided written consent for inclusion in announcement of matters based on ir information in form and context in which it appears. Page 10

11 Dragon Mining Limited ly Activities Report ended 31 December 2014 Appendix 1 Results from underground diamond core drilling program designed to assist in stope definition of Pipe 5 at Kutema, Orivesi Gold Mine. All intercepts reported at a 1 g/t gold cut-off. (ASX Release 19 January 2015) Hole North East Elevation Azimuth Dip Length From Interval KU KU Gold (g/t) KU KU Appendix 2 Results from underground diamond core drilling program designed to to better define extent and geometry of Kutema lode system between 1060m and 1220m levels, Orivesi Gold Mine. All intercepts reported at a 1 g/t gold cut-off. (ASX Release 19 January 2015) Hole North East Elevation Azimuth Dip Length From Interval KU No significant intercepts KU KU KU KU No significant intercepts KU KU Gold (g/t) Page 11

12 Dragon Mining Limited ly Activities Report ended 31 December KU KU KU KU Appendix 3 Results from underground diamond core drilling program examining extensions of Pipe 2 at Kutema, Orivesi Gold Mine. All intercepts reported at a 1 g/t gold cut-off. (ASX Release 19 January 2015) Hole North East Elevation Azimuth Dip Length From Interval KU KU Gold (g/t) Page 12

13 Dragon Mining Limited ly Activities Report ended 31 December 2014 KU KU KU-1400b Appendix 4 Results from underground diamond core drilling program targeting Kujankallio Main Zone and Hinge Zone between 290m and 340m levels, Jokisivu Gold Mine. All intercepts reported at a 1 g/t gold cut-off. (ASX Release 19 January 2015) Hole North East Elevation Azimuth Dip Length From Interval HU/JS Includes g/t gold from metres HU/JS Includes g/t gold from metres HU/JS HU/JS HU/JS Gold (g/t) Page 13

14 Dragon Mining Limited ly Activities Report ended 31 December 2014 HU/JS Appendix 5 Results from underground diamond core drilling program targeting Arpola deposit, Jokisivu Gold Mine. All intercepts reported at a 1 g/t gold cut-off. (ASX Release 19 January 2015) Hole North East Elevation Azimuth Dip Length From Interval HU/JS HU/JS Includes g/t gold from metres HU/JS HU/JS HU/JS Includes g/t gold from metres HU/JS HU/JS Gold (g/t) Page 14

15 Dragon Mining Limited ly Activities Report ended 31 December HU/JS HU/JS Appendix 6 Results from surface diamond core drilling program targeting Arpola deposit, Jokisivu Gold Mine. All intercepts reported at a 1 g/t gold cut-off. (ASX Release 19 January 2015) Hole North East Elevation Azimuth Dip Length From Interval HU/JS HU/JS HU/JS HU/JS HU/JS Includes g/t gold from metres Gold (g/t) Page 15

16 Dragon Mining Limited ly Activities Report ended 31 December HU/JS HU/JS Appendix 7 Company Tenement Holding Mining Tenements Project Tenements Held at end of Acquired during Disposed during ID Name Type % % % SWEDEN Svartlidengruvan K nr 1 EC Svartliden FINLAND Orivesi Jokisivu Vammala Kaapelinkulma 2004:114 Svartliden nr 2 EP :351 Pauträsk nr 4 EP :45 Alsträsket nr 2 EP :67 Tallberget nr 4 EP :144 Råberget EP Orivesi MC ML2013: H Sarvisuo 1-2 EL /1 Sarvisuo 3 Claim /1 Yläinensilmäke Claim Jokisivu MC ML2012: H Jokisivu 4-5 EL /1 Jokisivu 6 Claim /1 Jokisivu 7 Claim /2 Jokisivu 8 Claim Stormi MC /1 Ekojoki Claim /2 Kärmeenmaa Claim ML2013: H Ekojoki EL ML2014: H Kärmeenmaa EL K7094 Kaapelinkulma MC /1 Kaapelinkulma Claim Page 16

17 Dragon Mining Limited ly Activities Report ended 31 December 2014 Project Ritakallio Kuusamo Kutuvuoma Tenements Held at end of ID Name Type % % Acquired during 7094/2 Perkoonsuo 1 Claim ML2012: H Ritakallionmaa 1-2 EL Meurastuksenaho MC Juomasuo MC Sivakkaharju MC /9 Konttiaho 1 Claim /11 Konttiaho 2 Claim /12 Konttiaho 3 Claim /13 Konttiaho 4 Claim /14 Konttiaho 5 Claim /15 Konttiaho 6 Claim /32 Murronmaa Claim /1 Petajavaara 1 Claim /2 Petajavaara 2 Claim /3 Petajavaara 3 Claim /4 Petajavaara 4 Claim /5 Petajavaara 5 Claim /6 Petajavaara 6 Claim /7 Petajavaara 7 Claim /8 Petajavaara 8 Claim /9 Petajavaara 9 Claim /10 Petajavaara 10 Claim /11 Petajavaara 11 Claim Hangaslampi 7- ML2014: H 12 EL /1 Mutka-Aho 1 Claim /1 Mutka-Aho 2 Claim /2 Mutka-Aho 3 Claim /3 Mutka-Aho 4 Claim /4 Mutka-Aho 5 Claim /5 Mutka-Aho 6 Claim 0-0 ML2011: H Hangaslampi 13 EL ML2012: H Hangaslampi 14 EL ML2011: H Ollinsuo EL ML2011: H Konttiaho 33 EL 0-0 ML2011: H Murronmaa 2 EL 0-0 ML2012: H Koppelokorpi EL ML2013: H Sarvisuo EL ML2013: H Peräpalo EL ML2014: H Kontti-mutka 1-6 EL VA2013: Reposuo Res VA2013: Salmijärvi Res VA2013: Korkeaharjunsuo Res VA2014: H Hangaslehto Res Kutuvuoma MP /1 Kutuvuoma 4 Claim /2 Kutuvuoma 5 Claim /1 Kutuvuoma 6 Claim Disposed during % Page 17

18 Dragon Mining Limited ly Activities Report ended 31 December 2014 Project Tenements Held at end of Acquired during Disposed during ID Name Type % % % Silasselkä Aakenusvaara Käsivarsi 9275/2 Kutuvuoma 7 Claim /3 Kutuvuoma 8 Claim /4 Kutuvuoma 9 Claim /5 Kutuvuoma 10 Claim /6 Kutuvuoma 11 Claim /7 Kutuvuoma 12 Claim /8 Kutuvuoma 13 Claim /9 Kutuvuoma 14 Claim /10 Kutuvuoma 15 Claim /11 Kutuvuoma 16 Claim /12 Kutuvuoma 17 Claim /13 Kutuvuoma 18 Claim /14 Kutuvuoma 19 Claim /15 Kutuvuoma 20 Claim /16 Kutuvuoma 21 Claim VA2014: H Kutuvuoma North Res VA2014: H Kutuvuoma South Res /1 Silasselkä 1 Claim /2 Silasselkä 2 Claim /3 Silasselkä 3 Claim /4 Silasselkä 4 Claim /5 Silasselkä 5 Claim /8 Silasselkä 8 Claim /9 Silasselkä 9 Claim /10 Silasselkä 10 Claim /11 Silasselkä 11 Claim /12 Silasselkä 12 Claim /13 Silasselkä 13 Claim /14 Silasselkä 14 Claim /15 Silasselkä 15 Claim /16 Silasselkä 16 Claim /17 Silasselkä 17 Claim /18 Silasselkä 18 Claim /19 Silasselkä 19 Claim VA2014: H Silasselkä-East Res VA2014: H Silasselkä North Res ML2014: H Aakenusvaara EL /1 Aakenusvaara Claim /1 Saattopora 1 Claim /2 Saattopora 3 Claim /3 Saattopora 2 Claim /16 Ruossa 9 Claim /17 Ruossa 10 Claim /20 Ruossa 13 Claim /21 Ruossa 14 Claim /22 Ruossa 15 Claim /23 Ruossa 16 Claim /1 Sarvi 1 Claim Page 18

19 Dragon Mining Limited ly Activities Report ended 31 December 2014 Project Tenements Held at end of ID Name Type % % Acquired during 8330/2 Sarvi 2 Claim Hietaharju MC Peura-aho MC 5-5 ML2012:0047 Vaara EL Kuhmo Joint ML2013:0048 Kauniinlampi EL Venture (Note ML2013:0002 Peura-aho EL ) 8745/1 Hietaharju North Claim ML2013:0047 Sika-aho EL 5-5 ML2013:0003 Arola EL AUSTRALIA WESTERN AUSTRALIA Weld Range (Note 2) M 20/246 M M 51/434 M M 51/442 M M 51/443 M M 51/457 M M 51/481 M M 51/498 M M 20/246 M M 51/719 M M 51/872 M M 51/873 M M 51/874 M M 51/875 M M 51/876 M E 20/844 E E 20/845 E Disposed during Notes * Includes area previously referred to as Pohjasvaara Dragon Mining hold a free carried 5% interest in Kuhmo Joint Venture. Dragon Mining 1 hold full rights to gold and silver on Kuhmo Joint Venture tenements. 2 Dragon Mining hold a 39.95% interest in unlisted entity Weld Range Metals Limited. % EC EP EL MC Res M E Exploitation Concession (Sweden) Exploration Permit (Sweden) Exploration Licence (Finland) Refers to tenements applied for after 1 July 2011 in accordance with new Finnish Mining Act. Prior to 1 July 2011 tenements were referred to as Claims. Mining Concession (Finland) Reservation Notification (Finland) Mining Lease (Western Australia) Exploration Licence (Western Australia) Page 19

20 Dragon Mining Limited ly Activities Report ended 31 December 2014 Farm-ins/Farm-outs Project Tenements Held at end of Acquired during Disposed during ID Name Type % % % FINLAND Hanhimaa Earn-In (Note 1) ML2013: H Suksee 1 EL ML2012: H Kello 47 EL ML2014: H Kello EL Kello 47 Claim /2 Kello 48 Claim /3 Kello 49 Claim /4 Kello 50 Claim /1 Kello 51 Claim /2 Kello 52 Claim /3 Kello 53 Claim /1 Kello 54 Claim /2 Kello 55 Claim /3 Kello 56 Claim /4 Kello 57 Claim /5 Kello 58 Claim /6 Kello 59 Claim /7 Kello 60 Claim /8 Kello 61 Claim /9 Kello 62 Claim /10 Kello 63 Claim /11 Kello 64 Claim /12 Kello 65 Claim /13 Kello 66 Claim /14 Kello 67 Claim /15 Kello 68 Claim /16 Kello 69 Claim /17 Kello 70 Claim /18 Kello 71 Claim /19 Kello 72 Claim /20 Kello 73 Claim /21 Kello 74 Claim /22 Kello 75 Claim /1 Kello 78 Claim /1 Kello 79 Claim /2 Kello 80 Claim /3 Kello 81 Claim /1 Kello 82 Claim /2 Kello 83 Claim /3 Kello 84 Claim /4 Kello 85 Claim /5 Kello 86 Claim /6 Kello 87 Claim /7 Kello 88 Claim Page 20

21 Dragon Mining Limited ly Activities Report ended 31 December 2014 Project Tenements Held at end of Acquired during Disposed during ID Name Type % % % ML2011:0005 Kielisenmaa EL ML2012:0095 Suksee 2-16 EL ML2011:0065 Kello 12 EL ML2013: H Sieku EL Notes 1 Dragon Mining diluting down to 30% interest. EL Res Exploration Licence (Finland) Reservation Notification (Finland) Page 21

Dragon Mining A Growing Nordic Gold Producer. RMG Helsinki Mining Summit October 2012

Dragon Mining A Growing Nordic Gold Producer. RMG Helsinki Mining Summit October 2012 Dragon Mining A Growing Nordic Gold Producer RMG Helsinki Mining Summit October 2012 Disclaimer The purpose of this presentation is to provide general information about Dragon Mining Limited (the "Company").

More information

DRAGON MINING LIMITED ABN 19 009 450 051

DRAGON MINING LIMITED ABN 19 009 450 051 DRAGON MINING LIMITED ABN 19 009 450 051 ANNUAL REPORT 2015 Contents CHAIRMAN S REPORT 3 EXECUTIVE DIRECTOR S REPORT 4 OPERATIONS REVIEW 6 OCCUPATIONAL HEALTH & SAFETY REVIEW 11 ENVIRONMENT REVIEW 11 EXPLORATION

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering

More information

ALCYONE REPORTS JORC SILVER RESOURCES

ALCYONE REPORTS JORC SILVER RESOURCES ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR

More information

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY

More information

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME African Gold Group, Inc. TSX-V: AGG Yonge & Richmond Centre 151 Yonge Street, 11th Floor. Toronto Canada M5C 2W7 Tel: +1 647 775 8538 website : www.africangoldgroup.com AFRICAN GOLD GROUP, INC. DEFINITIVE

More information

D e c e m b e r 2 0 1 5 Q u a r t e r l y A c t i v i t y R e p o r t

D e c e m b e r 2 0 1 5 Q u a r t e r l y A c t i v i t y R e p o r t 29 January 2016 ASX Release ASX Code: CXX D e c e m b e r 2 0 1 5 Q u a r t e r l y A c t i v i t y R e p o r t Highlights Final stage Pilot Plant progressing well Definitive Feasibility Study on track

More information

September 2015 Quarterly Activities Report

September 2015 Quarterly Activities Report ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 ASX RELEASE ASX:AWV 29 January 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 HIGHLIGHTS Review of updated pit optimisation undertaken Metallurgical testwork report received confirming

More information

VULCAN RESOURCES LIMITED ABN 60 100 072 624 REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2006

VULCAN RESOURCES LIMITED ABN 60 100 072 624 REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2006 REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER CONTENTS Page No. Directors Report 1 Financial Statements 4 Declaration by Directors 14 Declaration of Independence 15 Independent Review Report 16 DIRECTORS

More information

Exploration and Development Activity

Exploration and Development Activity For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara

More information

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%

More information

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current

More information

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ASX ANNOUNCEMENT & MEDIA RELEASE 25 November 2010 ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ENTITLEMENT OFFER TO FUND FURTHER EXPLORATION, ACQUISITION OF LONG-LEAD

More information

Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project, Australia

Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project, Australia Keras Resources plc / Index: AIM / Epic: KRS / Sector: Mining 14 January 2016 Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project,

More information

For personal use only

For personal use only ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for

More information

Quarterly Activities Report

Quarterly Activities Report ASX Release Thursday 28 January 215 Quarterly Activities Report ASX Code: SAU Issued Shares: 36.53M Directors Greg Boulton AM (Chair) Simon Mitchell (MD) Michael Billing David Turvey Head Office Southern

More information

Merlin Diamonds Limited

Merlin Diamonds Limited Merlin s Limited 29 January 2016 Manager Companies Australian Securities Exchange Level 6, 20 Bridge Street Sydney NSW 2000 By ELodgement REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 Merlin s Limited

More information

Detour Gold Provides New Life of Mine Plan for Detour Lake

Detour Gold Provides New Life of Mine Plan for Detour Lake January 25, 2016 NEWS RELEASE Detour Gold Provides New Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce a new life of mine plan

More information

UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES

UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES 6 October 2015 SX: OH, FSE: 2O UPDTE ON SRIG - LTON TRNSCTION GREED WORK ND DRILLING PROGRMME COMMENCES greed Work Programme ltona Mining Limited s ( ltona or the Company ) and Sichuan Railway Investment

More information

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37. ASX Announcement 15 January 2013 JACQUES GOLD PROSPECT RETURNS 37.7g/t Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.7g/t Second phase drilling program

More information

For personal use only

For personal use only 1 QUARTERLY REPORT Atlantic Limited (ASX: ATI; Atlantic or the Company) is pleased to present its report for the ended 31 December 2010. HIGHLIGHTS WINDIMURRA Major sales agreement signed for 100% of ferrovanadium

More information

Positioned for Production: Exploring for Growth

Positioned for Production: Exploring for Growth ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors

More information

London STOCK EXCHANGE

London STOCK EXCHANGE London STOCK EXCHANGE 16 March 2006 For the attention of the Nominated Advisers/ Finance Directors/ Company Secretaries, all AIM Companies 10 Paternoster Square London EC4M 7LS Telephone 020 7797 1000

More information

How To Mine And Treat Ore From Castle Hill Stage 1

How To Mine And Treat Ore From Castle Hill Stage 1 ` Dated: 5 th August 2014 NORTON TAKES UP OPTION TO MINE AND TREAT ORE FROM CASTLE HILL STAGE 1 ASX: PXG, PXGOA HIGHLIGHTS Development of Castle Hill Stage 1 with Norton Gold Fields potentially adds a

More information

Sorby Hills Silver Lead Project

Sorby Hills Silver Lead Project ASX RELEASE Sorby Hills Silver Lead Project Major Milestone Achieved with Environmental Approval As announced on 3 April, the WA Minister for Environment has approved the development of the Sorby Hills

More information

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing ASX Announcement 29 January 2016 ACTIVITIES FOR THE QUARTER ENDED 31 DECEMBER 2015 The 31 December 2015 capped off what has been an exceptional year for Metals of Africa Limited (ASX: MTA) ( the Company

More information

DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS

DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS 29 th January 2016 DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS Minerals Development Licence (MDL) formal application lodged with all requested associated technical documentation, awaiting Departmental approval

More information

Savannah North Scoping Study Looking into the future 3 February 2016

Savannah North Scoping Study Looking into the future 3 February 2016 Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement

More information

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9 NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9 A G U I D E T O A I M U K TA X B E N E F I T S 2 AIM Note for Mining, Oil and Gas Companies Contents Introduction 1 Companies to which this Note

More information

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014 Second Floor, 9 Havelock Street West Perth WA 6005 Postal Address: PO Box 689, West Perth WA 6872 ABN 60 060 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email: info@hamptonhill.com.au

More information

JUNE 2015 QUARTERLY REPORT

JUNE 2015 QUARTERLY REPORT ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 31 JULY 2015 JUNE 2015 QUARTERLY REPORT WCP Resources Limited ( WCP or Company ) presents its June 2015 quarterly report. Highlights during the quarter

More information

For personal use only

For personal use only Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio

More information

FOCUS MINERALS LIMITED

FOCUS MINERALS LIMITED FOCUS MINERALS LIMITED Aggressively Expanding into a Rising Gold Price Campbell Baird, Chief Executive Officer ASX: FML www.focusminerals.com.au 2 Disclaimer and Competent Person s Statement This presentation

More information

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B, 3 MONTHS TO SEPTEMBER 2011

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B, 3 MONTHS TO SEPTEMBER 2011 Level 6 122 Walker St North Sydney NSW 2060, Australia T +61 (0)2 9460 1856 F +61 (0)2 9460 1857 31 October 2011 ASX ANNOUNCEMENT QUARTERLY ACTIVITIES REPORT & APPENDIX 5B, 3 MONTHS TO SEPTEMBER 2011 HIGHLIGHTS

More information

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY 10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3

More information

Resources Rising Stars

Resources Rising Stars ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources

More information

ABN 64 087 595 980. Half Yearly Report 30 June 2014

ABN 64 087 595 980. Half Yearly Report 30 June 2014 ABN 64 087 595 980 Half Yearly Report 30 June 2014 DIRECTORS Bob Richardson (Chairman) Sia Hok Kiang Geoffrey S Eupene Peter W Walker Malcolm K Smartt SECRETARY Malcolm K Smartt REGISTERED OFFICE Level

More information

Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review

Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining 17 November 2015 Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review Ferrex plc, the AIM quoted

More information

Silver Mine Project Investment Opportunity in Scandinavia

Silver Mine Project Investment Opportunity in Scandinavia Silver Mine Project Investment Opportunity in Scandinavia KPMG Corporate Finance ( KPMG ) has been retained by Sotkamo Silver as exclusive Financial and Strategic adviser in connection with the Project

More information

For personal use only

For personal use only Investigator Resources Limited Date: 7 th February 2012 up to 2.25% Ag at the new Paris prospect in South Australia First assays received for new drilling on Paris Line 7 with all three holes assayed returning

More information

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Toronto, Ontario, November 17, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the

More information

Cannon Big Pit Given the Green Light

Cannon Big Pit Given the Green Light ASX Release Tuesday 3 November 2015 Cannon Big Pit Given the Green Light Southern Gold maintains 50% profit share on Cannon Metals X estimate open pit recovered gold +270% to ~50koz Significant cash flow

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE FOR IMMEDIATE RELEASE March 19, 2014 NEWS NYSE MKT: GORO GOLD RESOURCE CORPORATION REPORTS $16.2M NET INCOME AND RECORD ANNUAL METAL PRODUCTION FOR 2014; PROVIDES 2015 PRODUCTION OUTLOOK COLORADO SPRINGS

More information

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 6 November 2006 Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 TROPICANA JV (IGO 30%) PROJECT UPDATE KEY POINTS: New significant drill

More information

Update on Heap Leach potential of the Murchison gold project

Update on Heap Leach potential of the Murchison gold project 3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and

More information

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015 FOR THE PERIOD ENDING 30 JUNE 2015 30 July 2015 ASX Code: AGS No. of pages: 11 QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE 2015 DETAILS OF ANNOUNCEMENT Quarterly Activity Report for the period ending

More information

Outokumpu Oyj. Mining Business. Stainless Steel Business Area AvestaPolarit Chrome Oy Kemi Mine. Base Metals Mines Tara Mines Ltd Hitura Mine

Outokumpu Oyj. Mining Business. Stainless Steel Business Area AvestaPolarit Chrome Oy Kemi Mine. Base Metals Mines Tara Mines Ltd Hitura Mine Outokumpu Oyj Mining Business Stainless Steel Business Area AvestaPolarit Chrome Oy Kemi Mine Base Metals Mines Tara Mines Ltd Hitura Mine Precious Metals Mines Orivesi Mine Vammala Plant Exploration for

More information

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015 29 October 2015 QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015 Scoping Study Highlights Mt Morgans Gold Project (MMGP) Scoping Study was released during the quarter. Key outcomes include: An estimated

More information

Types of Mining - Expert Table

Types of Mining - Expert Table See page 6 Minerals Downunder Teacher Guide (2002) - Activity 4a Types of Mining - Expert Table How to Jigsaw Information 1. Divide the class into Home Groups of five for the five different types of mining

More information

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL FOR IMMEDIATE RELEASE April 26, 2012 NEWS NYSE Amex: GORO GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL COLORADO SPRINGS April 26, 2012

More information

BEACONSFIELD GOLD NL Report on Activities for the Quarter ended 30 June 2008

BEACONSFIELD GOLD NL Report on Activities for the Quarter ended 30 June 2008 JUNE 2007 QUARTERLY REPORT BEACONSFIELD GOLD NL Report on Activities for the Quarter ended 30 June 2008 HIGHLIGHTS FOR THE QUARTER OPERATIONAL BEACONSFIELD GOLD MINE The site had operated for 216 days

More information

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016 Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes

More information

Mar Qtr 2015. Ore Mined t 79,000 68,000 119,200 143,000 Mine Grade g/t 8.43 6.08 4.77 4.30 Contained Gold oz 21,511 13,252 18,262 19,759

Mar Qtr 2015. Ore Mined t 79,000 68,000 119,200 143,000 Mine Grade g/t 8.43 6.08 4.77 4.30 Contained Gold oz 21,511 13,252 18,262 19,759 SARACEN MINERAL HOLDINGS LIMITED ACN: 009 215 347 QUARTERLY REPORT: SEPTEMBER Corporate Details: 21 October ASX code: SAR Corporate Structure: Ordinary shares on issue - 792.8m Unvested employee performance

More information

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE 22 August 2013 ASX: AOH, FSE: A2O HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE Upper part of Wombat zone returns excellent drilling intersections: - 29.0m at 4.7% copper - 37.6m at 3.2% copper

More information

RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target

RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target ASX Announcement 29 January 2016 Quarterly Report For the period ending 31 December 2015 ASX Code GOR ABN 13 109 289 527 Highlights Solid progress on Gruyere Pre Feasibility Study Gruyere PFS remains on

More information

For personal use only

For personal use only Alcyone Resources Ltd Directors: Charles Morgan Non Exec Chairman Andrew King Managing Director Andrew Richards Non Exec Director Silver Production Ramps Up as Alcyone Commences Mining HIGHLIGHTS Successful

More information

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015 ANNUAL GENERAL MEETING Investor Presentation 24 November 2015 Corporate Structure ASX Code: OVR Shares on Issue 205.4 million Top 20 133.0 million (64.8%) Market Capitalisation $1.23 million (share price

More information

RED 5 Limited The next gold producer

RED 5 Limited The next gold producer The next gold producer May 2011 Company highlights Target production Sept 2011 quarter at Siana Gold project Construction 0% complete, all plant equipment in country Forecast cash costs sub $400 per ounce,

More information

Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014

Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014 Management s Discussion and Analysis and Consolidated Financial Statements First Quarter 2014 For the three months ended March 31, 2014 TABLE OF CONTENTS Page Management s Discussion and Analysis INTRODUCTION...

More information

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM PRESS RELEASE Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM SILVERCORP ANNOUNCES POSITIVE PRELIMINARY ASSESSMENT FOR THE SILVERTIP SILVER-LEAD-ZINC PROJECT, BRITISH COLUMBIA, CANADA VANCOUVER, British

More information

September 2010 Quarterly Report

September 2010 Quarterly Report September 2010 Quarterly Report 25th October 2010 Corporate Details ASX Code: RCO Issued Capital: 52,714,183 Shares 2,950,000 Options @ 40c, 31/3/2011 (Unlisted) 510,000 Options @ 42c, 31/3/2011 (Unlisted)

More information

Quarterly Activities Report - for the period ended 31 December 2015

Quarterly Activities Report - for the period ended 31 December 2015 ASX Release: 27 January 2016 Quarterly Activities Report - for the period ended 31 December 2015 ASX Code: WRM Issued Securities Shares: 271.9 million Options: 7 million Cash on hand (31 Dec 2015) $0.4M

More information

Interim Financial Report for the half-year ended 31 December 2011

Interim Financial Report for the half-year ended 31 December 2011 Interim Financial Report for the half-year ended 31 December 2011 Note: The information contained herein should be read in conjunction with the most recent annual report. Aura Energy Limited Level 4, 66

More information

Press Release 30 th October 2015

Press Release 30 th October 2015 Press Release 30 th October 2015 SEPTEMBER 2015 QUARTERLY ACTIVITIES REPORT Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned and 100%- earning gold and copper-gold projects

More information

TIGER RESOURCES LTD ACN 077 110 304

TIGER RESOURCES LTD ACN 077 110 304 TIGER RESOURCES LTD ACN 077 110 304 1st Floor, 8 Parliament Place, West Perth WA 6005 PO Box 1618, West Perth WA 6872 Tel: (08) 9481-7833 Fax: (08) 9481-7835 Email: tiger@tigerez.com Website: www.tigerez.com

More information

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

THIRD QUARTER EARNINGS NOVEMBER 12, 2015 THIRD QUARTER EARNINGS NOVEMBER 12, 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure

More information

Barkly Phosphate Project Tenement Granted

Barkly Phosphate Project Tenement Granted MANTLE MINING ASX: MNM DIRECTORS Mr Martin Blakeman Non-Executive Chairman Mr Ian Kraemer Managing Director Mr Peter Anderton Non-Executive Director Mr Stephen de Belle Non-Executive Director ASX Release

More information

MGT Resources Limited 1305/109 Pitt St Sydney NSW 2000 Australia. December Quarterly Report QUARTERLY REPORT

MGT Resources Limited 1305/109 Pitt St Sydney NSW 2000 Australia. December Quarterly Report QUARTERLY REPORT QUARTERLY REPORT December 2015 December Quarterly Report Exploration Activities Report Quarter ended 31 st December 2015 During the December, MGT Resources Limited (MGT, ASX:MGS) worked towards finalising

More information

Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014

Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014 Management s Discussion and Analysis and Consolidated Financial Statements Second Quarter 2014 For the six months ended June 30, 2014 TABLE OF CONTENTS Page Management s Discussion and Analysis INTRODUCTION...

More information

TROY RESOURCES NL ABN 33 006 243 750

TROY RESOURCES NL ABN 33 006 243 750 TROY RESOURCES NL ABN 33 006 243 750 All Correspondence to: REGISTERED OFFICE Ground Floor 44 Ord Street West Perth 6005 Western Australia Telephone: (61 8) 9481 1277 Facsimile: (61 8) 9321 8237 Email:

More information

Quarterly Report for the three months ending 31 March 2011

Quarterly Report for the three months ending 31 March 2011 PANAUST LIMITED ABN 17 011 065 160 Level 2, 99 Melbourne Street PO Box 3468 South Brisbane QLD 4101 Australia T: +61 (0)7 3117 2000 F: +61 (0)7 3846 4899 E: info@panaust.com.au 20 April 2011 Quarterly

More information

Report for the Quarter Ended 30 September 2015

Report for the Quarter Ended 30 September 2015 Report for the Quarter Ended 30 September 2015 ASX: KIS Market Capitalisation $18.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 8.9 cents Share Price Board of Directors Johann

More information

BAUXITE RESOURCES LIMITED

BAUXITE RESOURCES LIMITED BAUXITE RESOURCES LIMITED POSITIVE EXPORT DSO BAUXITE SCOPING STUDY RESULTS RECEIVED FOR 100% BRL FORTUNA PROJECT Highlights Existing Mineral Resource and rail logistic chain can support a Direct Shipping

More information

This discussion and analysis contains forward-looking statements. Please refer to the cautionary language on page 19.

This discussion and analysis contains forward-looking statements. Please refer to the cautionary language on page 19. This discussion and analysis of financial condition and results of operation of Thompson Creek Metals Company Inc. ( Thompson Creek or the Corporation ) is prepared as at August 7, 2008, and should be

More information

Falcon Minerals Ltd ACN 009 256 535 Company Announcement

Falcon Minerals Ltd ACN 009 256 535 Company Announcement Falcon Minerals Ltd ACN 009 256 535 Company Announcement First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322 PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330 Date: 30 April

More information

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include: Quarterly Report To 31 December 2015 New Age Exploration Limited ( NAE or "the Company") is pleased to provide shareholders the Company s Quarterly Report for the period ending 31 December 2015. Highlights

More information

QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT ASX Announcement 30 January 2008 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 31 DECEMBER 2007 OVERVIEW Electromagnetic (EM) geophysical surveys were conducted during the quarter within the Nagambie

More information

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO BUILDING A COPPER COMPANY IN BRAZIL PDAC Feb - 2014 - TORONTO CORPORATE & GOALS Shares on Issue 1.355B Significant Shareholders Share Price ~Au$0.07* Glencore 15% Market Cap ~Au$95m* BlackRock 5% Cash

More information

Candelaria and Ojos del Salado Chile

Candelaria and Ojos del Salado Chile TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 124,000-128,000 tonnes copper Cash costs of $1.45 per lb copper after by-product credits

More information

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves 2001 Edition (as referred to in the Joint Ore Reserves Committee Code ( The JORC Code ) 1999 edition) Prepared

More information

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 STRATEGIC MINERALS CORPORATION N.L. 29th January 2016 ASX Release ASX Code: SMC QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 WOOLGAR GOLD PROJECT QUEENSLAND (100% SMC) Highlights

More information

Galahad Gold plc (Galahad)

Galahad Gold plc (Galahad) 23 January 2007 Galahad Gold plc (Galahad) 2006 Drilling Expands Northern Dynasty's Pebble East Deposit Pebble East Deposit Now Over 7000 Ft By 4000 Ft With Grades Exceeding 1% Cueq Galahad sets out below

More information

Black Mountain Resources

Black Mountain Resources Wednesday, 1 August 2012 Black Mountain Resources Speculative Buy Price: 17 19p Target: 35p Ticker: BMZ.L Index: AIM and ASX Sector: Mining Key Data Mkt. cap: 11.7m No. of shares: 68,769,792 Website: blackmountainresources.com.au

More information

For personal use only

For personal use only DECEMBER 2011 Issued 31 January 2012 HIGHLIGHTS INDIAN IRON ORE MINING PROJECT Significant on-site work completed and installation of phase one processing infrastructure underway at Kurnool iron beneficiation

More information

Mako Project, Eastern Senegal Completion of Scoping Study

Mako Project, Eastern Senegal Completion of Scoping Study Toro Gold Ltd Trafalgar Court Admiral Park, Guernsey. GY1 3EL. News Release: 18 th April 2013, Guernsey Mako Project, Eastern Senegal Completion of Scoping Study Toro Gold Ltd ( Toro Gold or the Company

More information

QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012

QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012 QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012 Metals Finance Limited (ASX: MFC) is pleased to provide its Quarterly Activities Report for the three month period ending 31 May 2012. HIGHLIGHTS Separate

More information

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016 Q4 & FY2015 OPERATING HIGHLIGHTS January 29, 2016 1 FORWARD-LOOKING STATEMENTS This presentation contains certain statements that constitute forward-looking information within the meaning of applicable

More information

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES Suite 250, 1075 West Georgia Street Vancouver, BC, Canada V6E 3C9 Tel: 1.778.373.0102 Fax: 1.604.434.1487 NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

More information

C R A D L E / T R E M O N T J V A C Q U I R E S 1 0 0 % O F P A N D A H I L L L I C E N C E S

C R A D L E / T R E M O N T J V A C Q U I R E S 1 0 0 % O F P A N D A H I L L L I C E N C E S 10 November 2015 ASX Release ASX Code: CXX C R A D L E / T R E M O N T J V A C Q U I R E S 1 0 0 % O F P A N D A H I L L L I C E N C E S Cradle Resources Limited is pleased to announce that Panda Hill

More information

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003 1 RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003 New drill holes in the Suurikuusikko area, Finland, have further intersected high gold grades over considerable widths, increasing the depth extent

More information

The final quarter of 2015 recorded 7,924 ounces of gold production, giving a year-end total of 32,629 ounces.

The final quarter of 2015 recorded 7,924 ounces of gold production, giving a year-end total of 32,629 ounces. Fourth quarter update on gold operations at Palito and Sao Chico, declaration of commercial production at Sao Chico and extension of loan repayment terms Serabi Gold plc (AIM:SRB, TSX:SBI), the Brazilian

More information

AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE KEFI Minerals Plc Doğu Akdeniz Mineralleri San. Tic. Ltd. Şti. Cemal Gürsel Cad. Yalı Apt. No:304 K:4 D:9 Karşıyaka İZMİR Tel: +90 232 381 9431 Fax: +90 232 381 9071 Email: info@kefi-minerals.com AIM:

More information

Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015. Successful Share Issue Raises A$5.6 Million

Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015. Successful Share Issue Raises A$5.6 Million Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015 Highlights Successful Share Issue Raises A$5.6 Million Successful Share Issue raises A$5.6 Million Non-binding bauxite Off-Take

More information

Quarterly Activities Report For the quarter to 31 December 2015

Quarterly Activities Report For the quarter to 31 December 2015 Tawana Resources NL (Incorporated in Australia) (Registration number ACN 085 166 721) Share code on the JSE Limited: TAW ISIN: AU000000TAW7 Share code on the Australian Stock Exchange Limited: TAW ISIN:

More information

ABN 51 000 617 176 CONSOLIDATED INTERIM FINANCIAL REPORT

ABN 51 000 617 176 CONSOLIDATED INTERIM FINANCIAL REPORT T A N A M I G O L D N L ABN 51 000 617 176 CONSOLIDATED INTERIM FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER CONTENTS Page DIRECTORS REPORT 2 LEAD AUDITOR S INDEPENDENCE DECLARATION 6 CONDENSED

More information

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Southern Cross Goldfields Ltd ASX Announcement 5 September 2014 Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Wonawinta Silver Project (60 M oz) to be acquired

More information

Mineralisation remains open in all directions with an untested downhole EM conductor at depth

Mineralisation remains open in all directions with an untested downhole EM conductor at depth Quarterly Report For the Period Ending 31 December 2015 Key Points Nanadie Well Project (CopperNickelPGE s) Latest drill results double strike extent of copper nickel PGE mineralised massive sulphides

More information

Press Release 29 th January 2016

Press Release 29 th January 2016 Press Release 29 th January 2016 DECEMBER 2015 QUARTERLY REPORT West African Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned gold and copper-gold projects in Burkina Faso,

More information

INVESTOR PRESENTATION JULY 2013

INVESTOR PRESENTATION JULY 2013 INVESTOR PRESENTATION JULY 2013 DISCLAIMER This presentation contains only a brief overview of Millennium Minerals Limited. The contents of this presentation, including matters relating to the geology

More information