1 ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 1.47% Cu (0.2% Cu cutoff) and 0.13 g/t Au, containing some 14,134 tonnes of copper metal and 3,859 ounces of gold First copper sulphide deposit recorded in the Duck Creek area Previous drill results at Horseshoe ML 2778 (see ASX announcement 17 October 2011) o 2.66% Cu, 0.23g/t Au and 238ppm Co o Cu, 0.17g/t Au and 111ppm Co o Cu, 0.20g/t Au and 309ppm Co Resource Estimate Queensland Mining Corporation (QMC; ASX - QMN) announces that it has completed an initial resource estimate for its Horseshoe copper deposit within the Company s Duck Creek Project area. The Horseshoe copper deposit is located approximately 37 km southwest of Cloncurry in northwest Queensland and falls within the EPM EPM is in the name of Goldsearch Limited and is subject to a joint venture with QMC. (Figures 1 and 2) A total indicated and inferred mineral resource of 0.96 million tonnes at 1.47% Cu has been delineated by a 14-hole RC drilling program on ML 2778 totalling 1,810m completed in August 2011 (see ASX release on 17 October 2011), which forms the database for the current resource estimate (see Table 1). This is the first copper sulphide deposit recorded in the Duck Creek area and highlights the substantial prospectivity at depth of this well-known area with a long history of surface mining for copper oxides. Table 1: Horseshoe Mineral Resources as at 11 October 2012 (0.2% Cu cut-off grade) Category Tonnes (Mt) Cu (%) Co (ppm) Au (g/t) Cu (t) Co (lb) Au (oz) Indicated , , Inferred , ,200 2,874 Total , ,800 3,859 Suite 2, Level 24, 56 Pitt Street Sydney NSW 2000 AUSTRALIA FACSIMILE GPO BOX 4876 Sydney NSW 2001 AUSTRALIA WEBSITE 1

2 Figure 1: Regional location of the Horseshoe prospect Copper mineralization at Horseshoe is mainly characterized by chalcopyrite-pyrite mineralisation hosted by massive to semi-massive quartz veins occurring within sub-vertical to steeply south dipping shear zones striking approximately east-west, and as disseminations in the adjacent metavolcanic wall rock. The Duck Creek area hosts a significant number of these E-W shear zone systems, outcropping as resistant, silicified zones, typically with surface continuity >500m (Figures 4 and 5). 2

3 Figure 2: QMC s White Range project area, south Cloncurry district Horseshoe Mining Lease QMC s tenement holding in the Horseshoe area consists of five of wholly owned mining leases (ML 2778, ML 2777, ML 2540, ML 2537 and ML 2544) totalling 24 hectares and the surrounding EPM covering an area of 12km 2 (Figures 1 and 2). The EPM is subject to a joint venture with Goldsearch Limited, under which QMC has a right to earn in a 75% interest. Future Program QMC plans further drilling and project assessments with the aim of: Upgrading the resource category at deeper levels of the resource through in-fill drilling, which may support a scoping study; More closely defining the extent of mineralisation along strike to the west and down dip to the south through step-out drilling; Diamond core drilling to collect samples for preliminary metallurgical test work 3

4 We are very pleased to announce this maiden resource of 14,133 tonnes of contained copper said Howard Renshaw, MD of QMC We are planning follow-up drill programs in the Duck Creek area and working on the relevant permits to upgrade and expand the Horseshoe resource as the outlined mineralization is open along strike and at depth. More importantly, this resource occurs within a mining lease and is located only 2 km off the Mt Isa-Townsville railway line and sealed public road. In addition, there are other nearby sources of copper mineralization and the Horseshoe deposit could potentially be jointly developed to increase the copper production opportunity. This may provide an ideal opportunity for the Company to seek cash flow through mining, joint venture or a project sale. For further details please contact: Howard V. Renshaw (Managing Director) Tel: (+61 2) admin@qmcl.com.au or visit our Website at: Competent Persons Statement Information in this report relates to Exploration Results and Mineral Resource estimates based on information compiled by Dr Guojian Xu and Mr Doug McLean. Dr Xu is a Member of the Australasian Institute of Mining and Metallurgy and a Fellow of the Society of Economic Geologists. He is a consultant to Queensland Mining Corporation Limited through Redrock Exploration Services Pty Ltd. Mr McLean is a Member of the Australasian Institute of Mining and Metallurgy and is a full time employee to Queensland Mining Corporation Limited. With respect to their respective contributions, these persons qualify as Competent Persons as defined in 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Xu and Mr McLean consent to the inclusion in this report of the matters based on the respective information provided by each of them, in the form and context in which it appears. 4

5 Appendix 1 Resource Estimation Methodologies The RC drillhole spacing was primarily a 25m by 25m pattern grading to a 30m by 80m pattern at depth. QMC s drillhole collar locations were surveyed using a differential GPS at sub-metre accuracy. A total of 58 downhole surveys were performed for the 2011 drilling program in Horseshoe. No diamond drilling has been undertaken in Horseshoe so that bulk density was determined using 13 rock samples collected from the stockpiled ore left over by previous mining operations near the Horseshoe pit. Specific gravity of 2.64 for oxide, 2.75 for transitional and 2.88 for fresh sulphide were measured by ALS Laboratory in Townsville. The mineral resource models were undertaken by block modelling within a wireframe snapped to the drillholes. The wireframe of mineralization was generated using a copper grade of =>0.2% Cu. Ordinary Kriging was used to estimate 3D blocks for Cu, Co and Au variables. Quantitative Kriging Neighbourhood Analysis was used to optimise parameters for the Kriging search strategies Top cuts of 6% Cu, 0.15% Co and 1g/t Au were used to treat the high-grade outliers of copper, cobalt and gold based on a review of the domain histogram and log probability. This estimation method combined with the search parameters used resulted in the first pass estimating approximately 30% of the domain block, this was considered sufficient for an Indicated Resource. The second and third passes have been categorised as Inferred Resources. The second pass estimated approximately 60% of the domain block with the third pass accounting for the remaining 5% of blocks. Table 2 list the results of the combined Indicated + Inferred estimations respectively at a range of cut-offs. The estimate at 0.2% Cu cut-off grade is mainly based on the type of mineralization in Horseshoe where sulphide-quartz veins normally exhibit a clear cut boundary with the host rocks and hence the cut-off grade has little impact on the overall tonnage and average grade of the resources from % Cu cut-off. Table 2: Horseshoe Mineral Resource tonnage-grade relationship as at 11 October 2012 Indicated and Inferred Resources Cutoff (Cu%) Tonnes Grade (Cu%) , , , , , , ,

6 , , , , , , , , , , A view of the resource model is shown in Figure 3. Figure 3: Plan view on resource classification of the Horseshoe deposit with drillhole traces (blue- Indicated; green-inferred, grey-unclassified). 6

7 Figure 4: Breccia vein showing quartz clasts cemented by massive sulphide (pyrite and chaclcopyrite) from the Horseshoe pit. Figure 5: Sulphide boulders at Horseshoe recovered from previous open pit mining operations 7

ALCYONE REPORTS JORC SILVER RESOURCES

ALCYONE REPORTS JORC SILVER RESOURCES ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR

More information

For personal use only

For personal use only ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for

More information

AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE KEFI Minerals Plc Doğu Akdeniz Mineralleri San. Tic. Ltd. Şti. Cemal Gürsel Cad. Yalı Apt. No:304 K:4 D:9 Karşıyaka İZMİR Tel: +90 232 381 9431 Fax: +90 232 381 9071 Email: info@kefi-minerals.com AIM:

More information

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY

More information

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY 10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3

More information

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS). ASX ANNOUNCEMENT Monday 1 st February 2016 Hot Chili to Raise A$1.6m via Placement to Strategic Shareholders Hot Chili Limited (ASX Code: HCH) is pleased to announce that it has received commitments from

More information

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current

More information

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016 Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes

More information

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 6 November 2006 Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 TROPICANA JV (IGO 30%) PROJECT UPDATE KEY POINTS: New significant drill

More information

Highlights. Quarterly Report For the quarter ended 30 June 2014. Horizon Healthcare Solutions Pty Ltd

Highlights. Quarterly Report For the quarter ended 30 June 2014. Horizon Healthcare Solutions Pty Ltd Quarterly Report For the quarter ended 30 June 2014 Highlights Horizon Healthcare Solutions Pty Ltd During the quarter negotiations commenced with Horizon to see if there was an opportunity to purchase

More information

NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT

NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT 8 October 2015 ASX: AOH, FSE: A2O NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT Excellent results from previously un-assayed drill core. Best intersection of 29.1 metres at 1.41% copper, 0.11g/t gold.

More information

For personal use only

For personal use only Investigator Resources Limited Date: 7 th February 2012 up to 2.25% Ag at the new Paris prospect in South Australia First assays received for new drilling on Paris Line 7 with all three holes assayed returning

More information

Update on Heap Leach potential of the Murchison gold project

Update on Heap Leach potential of the Murchison gold project 3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and

More information

Positioned for Production: Exploring for Growth

Positioned for Production: Exploring for Growth ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors

More information

For personal use only

For personal use only Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio

More information

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT 3 APRIL 2009 CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT Key Points Chalice Gold Mines and Sub Sahara Resources agree to merge by

More information

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37. ASX Announcement 15 January 2013 JACQUES GOLD PROSPECT RETURNS 37.7g/t Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.7g/t Second phase drilling program

More information

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT July 7 th, 2015 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT RC Drilling has returned shallow high grades at the Gaffney

More information

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 STRATEGIC MINERALS CORPORATION N.L. 29th January 2016 ASX Release ASX Code: SMC QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 WOOLGAR GOLD PROJECT QUEENSLAND (100% SMC) Highlights

More information

How To Mine And Treat Ore From Castle Hill Stage 1

How To Mine And Treat Ore From Castle Hill Stage 1 ` Dated: 5 th August 2014 NORTON TAKES UP OPTION TO MINE AND TREAT ORE FROM CASTLE HILL STAGE 1 ASX: PXG, PXGOA HIGHLIGHTS Development of Castle Hill Stage 1 with Norton Gold Fields potentially adds a

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX:AWV Anova Metals Limited ABN 20 147 678 779 Directors Jon Parker Chairman & NED Tim Dobson Managing Director Bill Fry NED Mal James NED Management Tim Dobson Managing Director Geoff

More information

Exploration and Development Activity

Exploration and Development Activity For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara

More information

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER Dacian Gold Ltd ( Dacian or the Company ) (ASX:DCN) is pleased to announce that it has completed a major geological review and reinterpretation

More information

KYLYLAHTI RESOURCE INCREASED

KYLYLAHTI RESOURCE INCREASED 26 March 2014 ASX: AOH, FSE: A2O KYLYLAHTI RESOURCE INCREASED Copper in Resources exceeds pre-mining estimates 2 years after first production commenced Contained copper up 17% from June 2013 after mine

More information

Barkly Phosphate Project Tenement Granted

Barkly Phosphate Project Tenement Granted MANTLE MINING ASX: MNM DIRECTORS Mr Martin Blakeman Non-Executive Chairman Mr Ian Kraemer Managing Director Mr Peter Anderton Non-Executive Director Mr Stephen de Belle Non-Executive Director ASX Release

More information

FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU

FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU 5 June 2015 ASX Code: COY FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU Mineral explorer Coppermoly Limited (Coppermoly and the Company) is pleased to announce final assay results

More information

MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND

MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND Assets, Experience, Growth ASX ANNOUNCEMENT 7 July 2015 MAJOR NEW COPPER EXPLORATION PROGRAM UNDERWAY IN NORTH QUEENSLAND DEEP DIAMOND DRILLING COMMENCING AT BARBARA THIS WEEK, AIRBORNE VTEM UNDERWAY AND

More information

Mineralisation remains open in all directions with an untested downhole EM conductor at depth

Mineralisation remains open in all directions with an untested downhole EM conductor at depth Quarterly Report For the Period Ending 31 December 2015 Key Points Nanadie Well Project (CopperNickelPGE s) Latest drill results double strike extent of copper nickel PGE mineralised massive sulphides

More information

COPPER DISCOVERY GROWS AT TURKEY CREEK

COPPER DISCOVERY GROWS AT TURKEY CREEK 28 October 2014 ASX: AOH, FSE: A2O COPPER DISCOVERY GROWS AT TURKEY CREEK HIGHLIGHTS RC drilling highlights prospectivity of Cloncurry Copper Project Infill and Extension RC drilling about to recommence

More information

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003 1 RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003 New drill holes in the Suurikuusikko area, Finland, have further intersected high gold grades over considerable widths, increasing the depth extent

More information

Savannah North Scoping Study Looking into the future 3 February 2016

Savannah North Scoping Study Looking into the future 3 February 2016 Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement

More information

Resources Rising Stars

Resources Rising Stars ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources

More information

Press Release 30 th October 2015

Press Release 30 th October 2015 Press Release 30 th October 2015 SEPTEMBER 2015 QUARTERLY ACTIVITIES REPORT Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned and 100%- earning gold and copper-gold projects

More information

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES Suite 250, 1075 West Georgia Street Vancouver, BC, Canada V6E 3C9 Tel: 1.778.373.0102 Fax: 1.604.434.1487 NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

More information

Sorby Hills Silver Lead Project

Sorby Hills Silver Lead Project ASX RELEASE Sorby Hills Silver Lead Project Major Milestone Achieved with Environmental Approval As announced on 3 April, the WA Minister for Environment has approved the development of the Sorby Hills

More information

Walford Creek: New Generation Base Development

Walford Creek: New Generation Base Development Walford Creek: New Generation Base Development May, 2015 Sydney Resources Round-up ASX Code: AQR Disclaimer Important Information This document has been prepared by Aeon Metals Limited (Aeon) for the purpose

More information

For personal use only. MRV Metals Launch February 2016

For personal use only. MRV Metals Launch February 2016 MRV Metals Launch February 2016 Important Information This document has been prepared by Moreton Resources Limited ( Moreton or Company ) for the purpose of providing a company and technical overview to

More information

For personal use only

For personal use only Investor Presentation August 2012 Disclaimer/Competent Person s Disclaimer: This presentation has been prepared by Buxton Resources ( Buxton ). The information contained in this presentation is a professional

More information

Merlin Diamonds Limited

Merlin Diamonds Limited Merlin s Limited 29 January 2016 Manager Companies Australian Securities Exchange Level 6, 20 Bridge Street Sydney NSW 2000 By ELodgement REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 Merlin s Limited

More information

ANNUAL GENERAL MEETING 2015. 30 November 2015

ANNUAL GENERAL MEETING 2015. 30 November 2015 ANNUAL GENERAL MEETING 2015 30 November 2015 Disclaimer Competent Person Statement This presentation may contain some references to forecasts, estimates, assumptions and other forward-looking statements.

More information

Quarterly Activities Report

Quarterly Activities Report ASX Release Friday 3 October 215 Quarterly Activities Report 3 September 215 Highlights ASX Code: SAU* *Deferred settlement: SAUDA Issued Shares: 35.17M ABN: 3 17 424 519 Directors Greg Boulton AM (Chair)

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering

More information

ASX Announcement (ASX: HMX)

ASX Announcement (ASX: HMX) ASX Announcement (ASX: HMX) 18 th March 2015 Drilling at Hammertime and Overlander to commence 3D-IP enhances gravity and magnetic target at Overlander North IOCG Hammer Metals Limited (ASX: HMX) ( Hammer

More information

Pacifico set to commence drilling at Borroloola West Project and co-funding secured from NT Government

Pacifico set to commence drilling at Borroloola West Project and co-funding secured from NT Government CORPORATE DIRECTORY Managing Director Simon Noon Directors Richard Monti (Chairman) Peter Harold (Non-exec.) Andrew Parker (Non-exec.) Company Secretary Joshua Ward Patrick Holywell Registered office Level

More information

24 m @ 1.25 g/t Au (BAGC00504) 6 m @ 3.91 g/t Au (BAGC00516) A$11.4 M cash at hand as at December 31, 2015

24 m @ 1.25 g/t Au (BAGC00504) 6 m @ 3.91 g/t Au (BAGC00516) A$11.4 M cash at hand as at December 31, 2015 Corporate Details Ordinary Shares: 742,695,372 Market Capitalisation: ~A$31 million Cash at 31 December 2015: $A11.4 million Debt $A3.7 million ASX Code: MOY Board of Directors Richard Procter Non-Executive

More information

For personal use only

For personal use only DECEMBER 2011 Issued 31 January 2012 HIGHLIGHTS INDIAN IRON ORE MINING PROJECT Significant on-site work completed and installation of phase one processing infrastructure underway at Kurnool iron beneficiation

More information

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ASX ANNOUNCEMENT & MEDIA RELEASE 25 November 2010 ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ENTITLEMENT OFFER TO FUND FURTHER EXPLORATION, ACQUISITION OF LONG-LEAD

More information

JUNE 2015 QUARTERLY REPORT

JUNE 2015 QUARTERLY REPORT ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 31 JULY 2015 JUNE 2015 QUARTERLY REPORT WCP Resources Limited ( WCP or Company ) presents its June 2015 quarterly report. Highlights during the quarter

More information

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE 22 August 2013 ASX: AOH, FSE: A2O HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE Upper part of Wombat zone returns excellent drilling intersections: - 29.0m at 4.7% copper - 37.6m at 3.2% copper

More information

Core : CXO. and. Uranium Session SAREIC Conference Adelaide 13th April 2015

Core : CXO. and. Uranium Session SAREIC Conference Adelaide 13th April 2015 Core : CXO and Uranium Session SAREIC Conference Adelaide 13th April 2015 Disclaimer The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled

More information

UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES

UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES 6 October 2015 SX: OH, FSE: 2O UPDTE ON SRIG - LTON TRNSCTION GREED WORK ND DRILLING PROGRMME COMMENCES greed Work Programme ltona Mining Limited s ( ltona or the Company ) and Sichuan Railway Investment

More information

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015 29 October 2015 QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015 Scoping Study Highlights Mt Morgans Gold Project (MMGP) Scoping Study was released during the quarter. Key outcomes include: An estimated

More information

NOVEMBER 2015. January 2013

NOVEMBER 2015. January 2013 NOVEMBER 2015 President & CEO: Wayne Reid wreid@gtaresources.com 709-699- 1733 VP Exploration: Robert Duess rduess@gtaresources.com 613-453-7947 January 2013 TSXV: GTA www.gtaresources.com DISCLAIMER This

More information

f or the P ROJECT Agreement with copper-gold Bluebird. comprises a 1.6 mineralisation are often discordant to the Proterozoic deposits found in HIG

f or the P ROJECT Agreement with copper-gold Bluebird. comprises a 1.6 mineralisation are often discordant to the Proterozoic deposits found in HIG ASX ANNOUNCEMENT 30 April 2015 QUARTERLY ACTIVITIES f or the quarterr ended REPORT 31 Mar ch 2015 BARKLY COPPER-GOLD Limited is in a Farm-In Joint Venture P ROJECT Blaze International Agreement with Meteoric

More information

Quarterly Activities Report - for the period ended 31 December 2015

Quarterly Activities Report - for the period ended 31 December 2015 ASX Release: 27 January 2016 Quarterly Activities Report - for the period ended 31 December 2015 ASX Code: WRM Issued Securities Shares: 271.9 million Options: 7 million Cash on hand (31 Dec 2015) $0.4M

More information

ASX RELEASE. Mineral Resource Estimate increases 160% to 60.5Mt

ASX RELEASE. Mineral Resource Estimate increases 160% to 60.5Mt 5 July 2016 ASX RELEASE Mineral Resource Estimate increases 160% to 60.5Mt Mineral Resources Limited (ASX: MIN) ( MRL ), Neometals Ltd (ASX: NMT) ( Neometals ) and Ganfeng Lithium Co., Ltd (SZSE: 002460)

More information

QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT ASX Announcement 30 January 2008 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 31 DECEMBER 2007 OVERVIEW Electromagnetic (EM) geophysical surveys were conducted during the quarter within the Nagambie

More information

Press Release 29 th January 2016

Press Release 29 th January 2016 Press Release 29 th January 2016 DECEMBER 2015 QUARTERLY REPORT West African Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned gold and copper-gold projects in Burkina Faso,

More information

Five targets advanced to drill-ready stage ahead of drilling anticipated to commence during the September 2013 Quarter.

Five targets advanced to drill-ready stage ahead of drilling anticipated to commence during the September 2013 Quarter. Quarterly Report For the Period Ending 30 June 2013 Highlights Copper Exploration Northern Territory Five targets advanced to drillready stage ahead of drilling anticipated to commence during the September

More information

DALGARANGA MINERAL RESOURCE GROWS TO OVER ONE MILLION OUNCES

DALGARANGA MINERAL RESOURCE GROWS TO OVER ONE MILLION OUNCES November 4th, 2015 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA MINERAL RESOURCE GROWS TO OVER ONE MILLION OUNCES Total Dalgaranga Mineral Resource increased

More information

Cannon Big Pit Given the Green Light

Cannon Big Pit Given the Green Light ASX Release Tuesday 3 November 2015 Cannon Big Pit Given the Green Light Southern Gold maintains 50% profit share on Cannon Metals X estimate open pit recovered gold +270% to ~50koz Significant cash flow

More information

QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE:

QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE: QUARTERLY REPORT Three Months Ending: 30 September 2012 ASX CODE: MZM ISSUED SHARES: 67.66M 52 WEEK HIGH: $0.80 52 WEEK LOW: $0.16 CASH ON HAND: $6.13M CONTACT: JUSTIN BROWN Managing Director +61 8 6315

More information

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing ASX Announcement 29 January 2016 ACTIVITIES FOR THE QUARTER ENDED 31 DECEMBER 2015 The 31 December 2015 capped off what has been an exceptional year for Metals of Africa Limited (ASX: MTA) ( the Company

More information

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014 Second Floor, 9 Havelock Street West Perth WA 6005 Postal Address: PO Box 689, West Perth WA 6872 ABN 60 060 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email: info@hamptonhill.com.au

More information

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL FOR IMMEDIATE RELEASE April 26, 2012 NEWS NYSE Amex: GORO GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL COLORADO SPRINGS April 26, 2012

More information

For personal use only

For personal use only 27 January 2016 Savannah North Scoping Study Positive results demonstrate robust, long life, Ni-Cu-Co Project Highlights Mining Inventory of 6.07Mt @ 1.26%Ni, 0.64% Cu and 0.09% Co for 76,500t Ni, 38,600t

More information

New technology and new approach uncovers new opportunities in WA s Fraser Range

New technology and new approach uncovers new opportunities in WA s Fraser Range ASX Code: WIN New technology and new approach uncovers new opportunities in WA s Fraser Range Investor Update May 2016 Bronwyn Barnes, Executive Chair Important Information The information contained in

More information

Punching Above Its Weight

Punching Above Its Weight Punching Above Its Weight Stephen Stone Managing Director Helmsec Global Capital New Dawn Resources Forum Hong Kong 25 th March 2010 Leveraged to Gold Price, Resource Upgrades Very modest ~A$45M market

More information

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO BUILDING A COPPER COMPANY IN BRAZIL PDAC Feb - 2014 - TORONTO CORPORATE & GOALS Shares on Issue 1.355B Significant Shareholders Share Price ~Au$0.07* Glencore 15% Market Cap ~Au$95m* BlackRock 5% Cash

More information

Cummins Range Rare Earths Project

Cummins Range Rare Earths Project Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 ASX RELEASE ASX:AWV 29 January 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 HIGHLIGHTS Review of updated pit optimisation undertaken Metallurgical testwork report received confirming

More information

POTENTIAL NEW SYENITE CORRIDORS IDENTIFIED FOLLOWING DETAILED MAGNETIC SURVEY AT JUPITER

POTENTIAL NEW SYENITE CORRIDORS IDENTIFIED FOLLOWING DETAILED MAGNETIC SURVEY AT JUPITER 4 NOVEMBER 2015 POTENTIAL NEW SYENITE CORRIDORS IDENTIFIED FOLLOWING DETAILED MAGNETIC SURVEY AT JUPITER Dacian Gold Ltd ( Dacian or the Company ) (ASX:DCN) is pleased to announce an update on the exploration

More information

MAIDEN RESERVES EXCEED EXPECTATIONS FOR ANTAS COPPER

MAIDEN RESERVES EXCEED EXPECTATIONS FOR ANTAS COPPER ASX Release 17 September 2014 MAIDEN RESERVES EXCEED EXPECTATIONS FOR ANTAS COPPER Level 3, 680 Murray Street West Perth. WA 6005 PO Box 1726 West Perth. WA 6872 Tel: +61 8 9324 1865 Fax: +61 8 9200 1850

More information

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW NEWS RELEASE February 11, 2008 Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW INTERNATIONAL MINERALS ANNOUNCES 6.2 MILLION OUNCES OF MEASURED AND INDICATED GOLD RESOURCES AND RESULTS

More information

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX)

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX) News Release July 3 rd, 2012 Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX) Initial NI 43-101 Resource Estimate for the Chaminé and Casas Novas deposits within its 100% Boa Fé Gold Project,

More information

ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216

ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216 ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216 VERY HIGH GRADE PGM-COPPER-NICKEL IN MASSIVE NICKEL COPPER SULPHIDE AT PLATINUM SPRINGS, N.S.W. 0.6 metres at 11.5 g/t platinum, 25.6 g/t palladium,

More information

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015 Developing the Tanlouka Gold Project AGM Presentation 18th November 2015 1 Executive Summary West African Resources Ltd is an ASX and TSXV listed gold development company focussed on Burkina Faso Largest

More information

ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS

ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS ASX / MEDIA RELEASE 18 September 2015 HIGHLIGHTS: ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS St George acquires 100% of the Hawaii and Mt Alexander North nickel sulphide exploration projects from BHP

More information

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015 FOR THE PERIOD ENDING 30 JUNE 2015 30 July 2015 ASX Code: AGS No. of pages: 11 QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE 2015 DETAILS OF ANNOUNCEMENT Quarterly Activity Report for the period ending

More information

Exploration Update - Corunna

Exploration Update - Corunna ASX RELEASE 27 th August 2015 ASX: MGV Exploration Update - Corunna Anomalous lead, zinc and silver identified in aircore drilling at the Corunna project in South Australia Anomalous silver-lead-zinc zone

More information

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015 ANNUAL GENERAL MEETING Investor Presentation 24 November 2015 Corporate Structure ASX Code: OVR Shares on Issue 205.4 million Top 20 133.0 million (64.8%) Market Capitalisation $1.23 million (share price

More information

INVESTOR PRESENTATION JULY 2013

INVESTOR PRESENTATION JULY 2013 INVESTOR PRESENTATION JULY 2013 DISCLAIMER This presentation contains only a brief overview of Millennium Minerals Limited. The contents of this presentation, including matters relating to the geology

More information

ULYSSES MINERAL RESOURCE UPGRADE

ULYSSES MINERAL RESOURCE UPGRADE ASX Announcement 1 February 2016 ULYSSES MINERAL RESOURCE UPGRADE Ulysses total Mineral Resource increases by 10% to: 2.13 Mt @ 2.2 g/t gold for 151,500 ounces of gold Over 80% of the Mineral Resource

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 7 MARCH 2012 Phoenix Copper Limited ABN 67 127 446 271 Level 1, 135 Fullarton Road Rose Park, SA 5067 Australia Telephone +61 (0)8 8364 3188 Facsimile +61 (0)8 8364 4288 info@phoenixcopper.com.au

More information

PNG Mining & Petroleum Investment Conference December 2010. Geoff Day Executive General Manager PNG and Indonesia

PNG Mining & Petroleum Investment Conference December 2010. Geoff Day Executive General Manager PNG and Indonesia PNG Mining & Petroleum Investment Conference December 2010 Geoff Day Executive General Manager PNG and Indonesia Disclaimer Competent Persons Statement The information in this presentation that relates

More information

Quarterly Activities Report

Quarterly Activities Report ASX Release Thursday 28 January 215 Quarterly Activities Report ASX Code: SAU Issued Shares: 36.53M Directors Greg Boulton AM (Chair) Simon Mitchell (MD) Michael Billing David Turvey Head Office Southern

More information

FINANCIAL REPORT. Information should be read in conjunction with the 30 June 2015 Annual Report

FINANCIAL REPORT. Information should be read in conjunction with the 30 June 2015 Annual Report FINANCIAL REPORT HELIX RESOURCES LTD ACN 009 138 738 HALF YEAR ENDED 31 DECEMBER 2015 Information should be read in conjunction with the 30 June 2015 Annual Report Table of Contents Corporate Directory...

More information

Pathway to Production

Pathway to Production Charging forward with Lithium Pathway to Production 8th Lithium Supply & Markets Conference 24 26 May 2016 Las Vegas Disclaimer This presentation has been prepared by Altura Mining Limited ( Altura or

More information

KEY POINTS. Resource additions come at a discovery cost of <$10/oz ASX ANNOUNCEMENT 28 FEBRUARY 2013. Australian Securities Exchange Code: NST

KEY POINTS. Resource additions come at a discovery cost of <$10/oz ASX ANNOUNCEMENT 28 FEBRUARY 2013. Australian Securities Exchange Code: NST ASHBURTON RESOURCE SOARS 66% TO 1.7MOZ Inventory includes 647,000oz of oxide ore, putting Northern Star on track to develop its second low-cost operation KEY POINTS ASX ANNOUNCEMENT 28 FEBRUARY 2013 Australian

More information

RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target

RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target ASX Announcement 29 January 2016 Quarterly Report For the period ending 31 December 2015 ASX Code GOR ABN 13 109 289 527 Highlights Solid progress on Gruyere Pre Feasibility Study Gruyere PFS remains on

More information

KYLYLAHTI MINE INCREASES RESERVES AND MINE LIFE

KYLYLAHTI MINE INCREASES RESERVES AND MINE LIFE 29 August 2013 ASX: AOH, FSE: A2O KYLYLAHTI MINE INCREASES RESERVES AND MINE LIFE Ore Reserve tonnes increased 16% Ore Reserve contained copper increased 10% Mine life increased to over 7.5 years Copper

More information

INVESTOR PRESENTATION

INVESTOR PRESENTATION BUREY GOLD LIMITED BYR INVESTOR PRESENTATION Klaus Eckhof, Mark Gasson August 2014 1 Disclaimer The Material in this presentation ( material ) is not and does not constitute an offer, invitation or recommendation

More information

Black Mountain Resources

Black Mountain Resources Wednesday, 1 August 2012 Black Mountain Resources Speculative Buy Price: 17 19p Target: 35p Ticker: BMZ.L Index: AIM and ASX Sector: Mining Key Data Mkt. cap: 11.7m No. of shares: 68,769,792 Website: blackmountainresources.com.au

More information

Leapfrog : new software for faster and better 3D geological modelling

Leapfrog : new software for faster and better 3D geological modelling Leapfrog : new software for faster and better 3D geological modelling Paul Hodkiewicz, Principal Consultant (Geology), SRK Consulting, 10 Richardson Street, West Perth WA 6005, Australia, phodkiewicz@srk.com.au

More information

MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA

MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA February 8 th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA Significant new gold

More information

September 2015 Quarterly Activities Report

September 2015 Quarterly Activities Report ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production

More information

ARGENT MINERALS LIMITED ASX:ARD

ARGENT MINERALS LIMITED ASX:ARD ARGENT MINERALS LIMITED ASX:ARD ARGENT AT A GLANCE Capital Structure Ordinary shares (ASX: ARD) 300.3M Share price 1 $0.027 Market capitalisation 1 Cash 2 $8.1M $1.4M Options 3 6.57M ASX Listing 3 April

More information

C o r p o r a t e P r e s e n t a t i o n A u g u s t 2 0 1 5

C o r p o r a t e P r e s e n t a t i o n A u g u s t 2 0 1 5 C o r p o r a t e P r e s e n t a t i o n A u g u s t 2 0 1 5 Forward Looking Statements This presentation includes certain estimates, projections and forward looking statements within the meaning of Section

More information

Candelaria and Ojos del Salado Chile

Candelaria and Ojos del Salado Chile TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 124,000-128,000 tonnes copper Cash costs of $1.45 per lb copper after by-product credits

More information

For personal use only

For personal use only ASX Release 28 January 2016 QUARTERLY ACTIVITIES REPORT For the quarter ended 31 December 2015 Level 1, 672 Murray Street West Perth WA 6005 Locked Bag 8 West Perth WA 6872 t. +61 8 9322 1182 f. +61 8