1 Kaizen Training 6 Step Approach
2 - - KAIZEN IS A STRUCTURED AND PROVEN PROBLEM SOLVING APPROACH WORKING EVERYWHERE 1a. PROBLEM DEFINITION 1b. QUANTIFICATION OF PROBLEM Conclusion from quantification analysis: Solving issue 1 would address X% of non-productive time Description of problem to solve: Current outcome: Target outcome: What is excluded from the solution space : Nonproductive time Issue 1 Issue 2 Issue 3 Issue 4 Issue 5 1 Define e problem and objectiveses 5. PROGRESS UPDATE Period: Action Solution A2: Action A2.1: Action A2.2: Solution B1: Action B1.1: Action B1.2: Status Main highlights since last review Main challenges 5 Implement 6 Check and make sustainable? M M 2 Analyze the facts 2a. ROOT CAUSE ANALYSIS THE FISHBONE Man Machine Environment 2b. RANKING OF CAUSES Conclusion from ranking: Addressing causes A, B, C would solve X% of the issue % of inefficiency caused M M Method Material Cause A Cause B Cause C Cause D Cause E Cause F Cause G 4. IMPLEMENTATION PLAN 4 Plan Generate potential solutions 3a. IDENTIFICATION OF SOLUTIONS Root cause Possible solutions (title and brief description) Action Solution A2: Action A2.1: Action A2.2: Responsible Name Start date Date End date Date Completed? Name Date Date Get approval Cause A Cause B Solution A1 Solution A2 Solution A3 Solution B1 Solution B2 Solution B1: Action B1.1: Action B1.2: Name Name Date Date Date Date Cause C Solution C1 Solution C2 Solution C3 Solution C4 3c. SOLUTIONS APPROVAL TEMPLATE 3d. APPROVALS PLAN Solution title B1. Brief description Expected impact Required investment Time until capturing impact Who needs to approve By when Who is responsible for getting the approval Approval received 3b. PRIORITISATION OF SOLUTIONS Do it soon A2. Igor Boševski 16 June 2007 John Smith Do if there is Plan time B2. C2. C4. A1. Impact Low High Do it soon Plan A2 B2 B1 C2 C4 Do if there is time Skip A3 C1 A1 C3 Legend (explanation of symbols) A1: A2: A3: B1: B2: C1: C2: C3: C4: 1 Low Effort High
3 STOPPING THE BLAME GAME Focus on problem itself, not who caused it 2
4 1 PROBLEM DEFINITION Statement: Non Value Added time is 40% Bad Example: Reduce the non value added time Good Example: Reduce the non value added time due to walking from 2 hours per shift to 0,5 hours per shift within one month KEY CRITERIAS - Describe problem specificly - Give Target - Give deadline 3
5 1a. PROBLEM DEFINITION Description of problem to solve: Current outcome: Target outcome: What is excluded from the solution space : 4
6 1b. QUANTIFICATION OF PROBLEM Conclusion from quantification analysis: NVA time 5
7 ROOT CAUSE ANALYSIS WITH THE 5 WHY s 1. Why did the machine stop? Bearing is overheated! Man 2. Why is the bearing overheated? Has too little oil! 3. Why too little oil? Pump doesn t supply enough oil! 4. Why doesn t the pump supply enough oil? The filter is fouled! 5. Why is the filter fouled? Maintenance interval too long! Root cause of the problem 6
8 2a. ROOT CAUSE ANALYSIS THE FISHBONE Man Machine - - NVA time Method Material 7
9 2b. RANKING OF CAUSES Conclusion from ranking: % of NVA time caused Cause A Cause B Cause C Cause D Cause E Cause F Cause G 8
10 3 SOLUTION DEVELOPMENT Speed fast / impact high Speed slow / impact low Problem Primary cause Fifth cause Countermeasures Speed of implementation Impact Excessive time for cleaning to remove rusts Man Inspection criteria is inconsistent among inspectors High variation of criteria in determining the occurrence of rust Lack of approved sample to be compared or applied Manufacture samples and approve Machine Lack of ant-rust facilities on the shop floor Anti-moisture indoor shop Cleaning brush is easily broken. Material is not flexible and easily erodable Use elastic and antierodable material Tool is not suitable. The drill for manual work is revamped Material A lot of holes and thick T/S Carbon material is exposed Close holes when cleaned up Rust may easily reoccur Contact with water when removing oil Change chemicals use in removing oil Method Rust can not be removed manually Lack of automatic tool for exclusive use Develop tools for exclusive use A lot of dust created Apply tool using air 9
11 3 SOLUTION DEVELOPMENT 1 If you do a good root cause analysis, then you can easily develop solutions Problem Primary cause Fifth cause Countermeasures Speed fast / impact high Speed slow / impact low Speed of implementation Impact Excessive time for cleaning to remove rusts Man Inspection criteria is inconsistent among inspectors High variation of criteria in determining the occurrence of rust Lack of approved sample to be compared or applied Manufacture samples and approve Machine Lack of ant-rust facilities on the shop floor Anti-moisture indoor shop Cleaning brush is easily broken. Tool is not suitable. Material is not flexible and easily erodable The drill for manual work is revamped 2 Use elastic and antierodable material Prioritize the solutions based on impact and easiness Material A lot of holes and thick T/S Carbon material is exposed Close holes when cleaned up Rust may easily reoccur Contact with water when removing oil Change chemicals use in removing oil Method Rust can not be removed manually Lack of automatic tool for exclusive use Develop tools for exclusive use A lot of dust created Apply tool using air 10
12 THINK LONG TERM Implementing a Band-Aid A Band-Aid is a temporary solution, to contain a problem A countermeasure must address the root cause! 11
13 3a. IDENTIFICATION OF SOLUTIONS Root cause Cause A Cause B Possible solutions (title and brief description) Solution A1 Solution A2 Solution A3 Solution B1 Solution B2 Solution B3 12
14 3b. PRIORITISATION OF SOLUTIONS Do it soon Plan Legend (explanation of symbols) Impa act High B2 A2 Do if there is time A1 Skip B1 A1 A2 A3 B1 B2 B3 Low A3 B3 Low High Effort 13
15 3c. SOLUTIONS APPROVAL TEMPLATE Solution title Brief description Expected impact Required investment Time until capturing impact Do it soon A2 B2 A1 B1 Pla an Do if the ere is time A3 14
16 3d. APPROVALS PLAN Who is responsible for Who needs to approve By when getting g the approval Approval received 15
17 4. PLAN WITH APPROVAL Action 1 DEADLINE 2 RESPONSIBLE Approval received Order new pipe 16 Feb 2008 Maintenance Engineer Train new operator 10 Feb 2008 Supervisor Review SOP 12 Feb 2008 Team with Prod. Mgr. Approved by Igor Boševski 16
18 4. IMPLEMENTATION PLAN Action Responsible Start date End date Completed? Action A1.1 1 Name Date Date Action A1.2 Name Date Date Action B1.1 Action B1.2 Approved by Igor Boševski 17
19 STEP 5: IMPLEMENT THE SOLUTION STEP 6: SUSTAIN IMPLEMENT SUSTAIN TELL TRAIN MONITOR CHECK 18
20 5. PROGRESS UPDATE Period: Action Status Main highlights since last review Main challenges Action A1.1 Action A1.2 Action B1.1 Action B1.2 19
21 Problem Solving 20
22 Trees should be mathematical correct EXAMPLE? What is wrong? 1 Avoid double testing Examples QC QC tests for raw materials from other Company sites Reduce number of samples per batch + 2 Use random sampling Combine batches in one delivery from supplier to one batch for sampling Reduce costs of testing x Reduce number of tests + Reduce number of tests per sample 3 Install automatic testing in production 4 Reduce number of repeats + 5 Reduce number of independent tests Perform real-time measurement of selected parameters Establish robustness of test to eliminate doubletesting of samples Reduce aspiration level Reduce quality control cost + Reduce costs per test? 6 Eliminate activities 7 Increase efficiency Install data base to automatically coordinate process changes Replace newer technology Reduce costs of supporting tasks? 21 8 Eliminate activities 9 Increase efficiency Transfer test results electronically to external parties Create order database for tests outside regular supply chain (e.g., R&D)
23 Empty templates 22
24 1a. PROBLEM DEFINITION Description of problem to solve: Current outcome: Target outcome: What is excluded from the solution space : 23
25 1b. QUANTIFICATION OF PROBLEM Conclusion from quantification analysis: 24
26 2a. ROOT CAUSE ANALYSIS THE FISHBONE Man Machine - - NVA time Method Material 25
27 2b. RANKING OF CAUSES Conclusion from ranking: % of caused Cause A Cause B Cause C Cause D Cause E Cause F Cause G 26
28 3a. IDENTIFICATION OF SOLUTIONS Root cause Possible solutions (title and brief description) 27
29 3b. PRIORITISATION OF SOLUTIONS Do it soon Plan Legend (explanation of symbols) Low High Impa act Do if there is time Skip Low High Effort 28
30 3c. SOLUTIONS APPROVAL TEMPLATE Solution title Brief description Expected impact Required investment Time until capturing impact Pla an Do it soon Do if the ere is time 29
31 3d. APPROVALS PLAN Who is responsible for Who needs to approve By when getting g the approval Approval received 30
32 4. IMPLEMENTATION PLAN Action Responsible Start date End date Completed? 31
33 5. PROGRESS UPDATE Period: Action Status Main highlights since last review Main challenges 32
The Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1
The Thinking Approach LEAN CONCEPTS All rights reserved 1 Basic Thinking to Manage the Journey MANAGEMENT TACTICS OF A LEAN TRANSFORMATION All rights reserved 2 LEAN MANAGEMENT Two key questions What is
More informationTraining Pack. Kaizen PDCA ( Plan / Do / Check / Act )
Training Pack Kaizen PDCA ( Plan / Do / Check / Act ) Introductions Name Department Current knowledge of Plan Do Check Act Aims & Objectives Target Audience : All! Purpose of Module : To train the delegates
More informationFMEA and FTA Analysis
FMEA and FTA Analysis Why it is Coming to Your Hospital and Your Laboratory Tina A. Krenc Director, R&D Phase Systems Abbott Laboratories 1 Agenda Background on requirements for risk management Tools to
More informationCAPA Essentials Root Cause Analysis Tools and Techniques
CAPA Essentials Root Cause Analysis Tools and Techniques Presented by Edna R. Falkenberg 21/10/2014 Slide 1 in numbers: Growing from strength to strength 1 One-stop technical solution provider 150 years
More informationProcess Based Business Management. J Croker ThoughtPower July 2003
Process Based Business Management J Croker ThoughtPower July 2003 Business Processes Market Leadership Why Sound Processes are Critical to Business Success Process Definitions Describing a Process Process
More informationSTANDARDIZED WORK 2ND SESSION. Art of Lean, Inc. 1 www.artoflean.com
STANDARDIZED WORK 2ND SESSION 1 STANDARDIZED WORK AND WORK STANDARDS - SESSION 2 AIM (1) Understand the Importance of Standardization in TPS (2) Introduce Various Standards Sheets and Basics of Creation
More informationImplementation of Lean Six Sigma Principles: Making Data Cleansing Lean
Implementation of Lean Six Sigma Principles: Making Data Cleansing Lean Nityanand Wachche B.E in Computer Engineering University of Mumbai Mumbai, India ABSTRACT Data cleansing is required before performing
More informationTurning Data into Knowledge: 7 Key Attributes of Successful Visualization with Dashboards & KPIs
Turning Data into Knowledge: 7 Key Attributes of Successful Visualization with Dashboards & KPIs An Industry White Paper Jason Kasper, Industry Marketing Manager, Aspen Technology, Inc. About AspenTech
More informationThat is why leading vacuum pump manufacturers put their trust in the top-quality products of MANN+HUMMEL.
MANN-FILTER Partnership that pays off Hi-tech made in Germany >> Matching OE quality Modern vacuum pumps for maximum process reliability require mature filter technology in OE quality. For MANN-FILTER,
More informationISSUE RESOLUTION & ESCALATION Training Pack
ISSUE RESOLUTION & ESCALATION Training Pack Aims and Objectives Target Audience : All Operations and Support Management Teams Purpose of Module : To understand the need for a consistent root cause problem
More informationHow to Plan a Successful Load Testing Programme for today s websites
How to Plan a Successful Load Testing Programme for today s websites This guide introduces best practise for load testing to overcome the complexities of today s rich, dynamic websites. It includes 10
More informationQA GLP audits. Alain Piton. Antipolis,, France. alain.piton@galderma.com
Risk based assessment applied to QA GLP audits Alain Piton Galderma R&D, Sophia-Antipolis Antipolis,, France alain.piton@galderma.com RISK BASED ASSESSMENT FOR GLP AUDITS INTRODUCTION Since the origin
More informationObjectives To identify and propose improvements on aircraft maintenance process focusing on solid waste generation reduction.
Objectives To identify and propose improvements on aircraft maintenance process focusing on solid waste generation reduction. To establish the integration of Six Sigma, Lean Manufacturing and Cleaner Production
More informationImplementing Automation after Making Lean Improvements
Implementing Automation after Making Lean Improvements Frank C. Garcia, P.E., Director Business Solutions & Engineering Services Tom Lawton, President Advent Design Corporation Bristol, PA, USA December
More informationFAILURE INVESTIGATION AND ROOT CAUSE ANALYSIS
FAILURE INVESTIGATION AND ROOT CAUSE ANALYSIS Presented By Clay Anselmo, R.A.C. President and C.O.O. Reglera L.L.C. Denver, CO Learning Objectives Understand the Definitions of Failure Investigation and
More informationBusiness Process Evaluation and Improvement Tool for Inspection Systems. A Partnership for Food Protection Resource Document
Business Process Evaluation and Improvement Tool for Inspection Systems A Partnership for Food Protection Resource Document Produced by: the Partnership for Food Protection May 2014 This tool was created
More informationSHAIYO TRIPLE A GROUP. Hochiminh City, 16 September 2013
Integrated Biomass Power Generation in Thailand: Lesson Learnt and Transfer to Vietnam SHAIYO TRIPLE A GROUP Hochiminh City, 16 September 2013 Shaiyo Triple A is a world class agricultural based organization
More informationWaterloo Agile Lean P2P Group
Waterloo Agile Lean P2P Group Lean Thoughtware Philip Kirby July 21, 2009 Waterloo Ontario Lean Thoughtware-The Thesis Adoption of a Lean Culture will Improve Financial Performance Improved Financial Performance
More informationManufacturing Analytics: Uncovering Secrets on Your Factory Floor
SIGHT MACHINE WHITE PAPER Manufacturing Analytics: Uncovering Secrets on Your Factory Floor Quick Take For manufacturers, operational insight is often masked by mountains of process and part data flowing
More informationCITY OF GOLDEN DEPARTMENT OF PUBLIC WORKS, ENVIRONMENTAL SERVICES DIVISION
CITY OF GOLDEN DEPARTMENT OF PUBLIC WORKS, ENVIRONMENTAL SERVICES DIVISION Grease, So What's the Problem? Does your facility produce grease? All commercial cooking facilities generate Fats, Oil, and Grease
More informationIntegrating Leader Standard Work with Visual Management Tools. with Joe Murli
Integrating Leader Standard Work with Visual Management Tools with Joe Murli Housekeeping To enlarge slides, use the magnifying glass icon just beneath the slides and to the right on your display console
More informationPlanning. Quality Management. SAP ERFA Årsmøde. December 2014
Planning Quality Management SAP ERFA Årsmøde December 2014 Planning How to Manage Non- Conformities and Create Input to Process Improvement Work Quality Notifications December 2014 And we are Eva Ahrens
More informationLean Management Standards: Manufacturing
Leader Standard Work. Do leaders have standard work? Do they follow it? Do you carry it with you as a routine? Do you have it with you now?. Is leader standard work regularly reviewed for updating? Has
More informationSession 6: WHO Prequalification Programme. Key Process Steps WHO: Medicines UNFPA: Condoms and IUDs
Session 6: WHO Prequalification Programme Key Process Steps WHO: Medicines UNFPA: Condoms and IUDs Session adapted from the WHO training workshop on prequalification and the WHO technical briefing seminar
More informationIntroducing the. Tools for. Continuous Improvement
Introducing the Tools for Continuous Improvement The Concept In today s highly competitive business environment it has become a truism that only the fittest survive. Organisations invest in many different
More informationLEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0
MODULE 1 LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 1. Cultural Enablers 15% 20% 25% 1.1. Principles of Cultural Enablers 3% 4% 5% 1.1.1. Respect for the individual 1.1.2. Humility 1.2. Processes
More informationMisMatched Unions have caused fatal accidents! Do you know :
MisMatched Unions have caused fatal accidents! Do you know : what are Weco Unions and who makes them? what are the Dowell Standards? of the potentially fatal hazards? how to eliminate the hazards? what
More informationUnderstanding Your Training Process
Understanding Your Training Process In a previous article and presentation, Transforming Your Training Department Into A High Performance Strategic Partner (available at www.trainingonashoestring.com),
More informationQuality Management Systems. Compliance Driven or Quality Driven?
Quality Management Systems Compliance Driven or Quality Driven? Written by N. Richard Puglielli Page 1 of 7 Overview ISO standards have been around for quite some time now and the concept behind these
More informationRecent Updates on European Requirements and what QPs are expected to do
Recent Updates on European Requirements and what QPs are expected to do QP Forum 28/29 November 2013, Lisbon Dr. Bernd Renger Modified: Georg Goestl 1 Written Conformation for API-Import Actual Status
More informationAutomated Equipment Data Analytics to Detect Issues, Trends, Faults & Anomalies
AABC Commissioning Group AIA Provider Number 50111116 Automated Equipment Data Analytics to Detect Issues, Trends, Faults & Anomalies Course Number: CXENERGY1633 Paul Bergquist SkyFoundry April 12, 2016
More informationSEWING MAINTENANCE CHECKLIST
SEWING MAINTENANCE CHECKLIST Many Retail, Brand-name Marketing, Mail Order and Sourcing Companies are visiting existing and potential Contractor sewing facilities and evaluating their sewing capabilities
More informationASSET RECOVERY ASSET RECOVERY. & Management Group, LTD. Integrators of Best In Class. Technology for Filtration & Chip Handling Applications
ASSET RECOVERY ASSET RECOVERY Integrators of Best In Class Our DBOOM Model includes a comprehensive approach to operating and maintaining our installations Asset Recovery can support any of your current
More informationSupplier Training 8D Problem Solving Approach. 2013 Brooks Automation, Inc.
Supplier Training 8D Problem Solving Approach What is the 8D method? 8D stands for the 8 disciplines or the 8 critical steps for solving problems. It is a highly disciplined and effective scientific approach
More informationRestoring bore pump performance
Factory 28, no 94-102 Keys Rd. Tel: 03 9555 2524 Moorabbin Vic 3189 Fax: 03 9553 2090 Website: www.aquariusdrilling.com.au Email: aquariusdrilling@hotkey.net.au Restoring bore pump performance Do you have
More information1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment
WATER AND SEWER UTILITY OPERATION AND MAINTENANCE Although sewage systems the operation and maintenance of public utilities are not considered themselves are not a chronic sources of stormwater pollution,
More informationDIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER PIPING REPORT HOLDER: CURAFLO IP LLC 4035 E. OASIS STREET MESA, AZ 85215
0 ICC ES Report ICC ES (800) 423 6587 (562) 699 0543 www.icc es.org 000 Most Widely Accepted and Trusted PMG 1057 Valid: 02/15 to 02/16 DIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER PIPING
More information6001-602 NOTCHED MARKER DISCS/HUBS BOX
6001-602 NOTCHED MARKER DISCS/HUBS BOX YETTER MANUFACTURING CO. FOUNDED 1930 Colchester, IL 62326-0358 Toll free: 800/447-5777 309/776-3222 (Fax) Website: www.yetterco.com Email: info@yetterco.com 1 6001-602
More informationSupplier/ Vendor Evaluation Form
. Dated 1. General: Supplier/ Vendor Evaluation Form i. Name of Supplier/ Vendor: i Address of Supplier/ Vendor: Contact Person: Phone. v. Fax. v vi ix. Email: Web Address: Year of Establishment: Facility
More informationBrochure. Projects and engineering Engineering expertise to enhance your operations
Brochure Projects and engineering Engineering expertise to enhance your operations Overview Do you need to deliver plant upgrades but find them disruptive and lack the resources? Are you concerned about
More informationStarting a new Oil Analysis Program Burden or Benefit?
Starting a new Oil Analysis Program Burden or Benefit? Introduction So someone in senior management has finally realized the drain on the bottom line of your company caused by reactive maintenance in the
More informationManagement Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur
Management Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur Lecture - 02 Introduction Part II Welcome to all of you
More informationASTCCR2 - SQA Unit Code H548 04 Carry out and complete clean-room cleaning operations
Carry out and complete clean-room cleaning Overview 1 Carry out clean-room 2 Remove and store equipment, tools and materials after clean-room 3 Remove and dispose of contaminated material after clean-room
More informationRole & Responsibility Charting (RACI)
Role & Responsibility Charting (RACI) By Michael L Smith and James Erwin See RACI Template too. By Sandra Diaferio OVERVIEW Definition Responsibility Charting is a technique for identifying functional
More informationExposure to high noise levels from your own and others work activities can cause incurable damage to your hearing
SG11:15 Noise 1. INTRODUCTION Exposure to high noise levels from your own and others work activities can cause incurable damage to your hearing This guidance note has been revised to take account of the
More informationWHITE PAPERS. Process Safety Management
WHITE PAPERS Process Safety Management The building blocks of a successful Process Safety Management (PSM) program are detailed piping and instrumentation diagrams (P&IDs) and standard operating procedures
More informationAre You Using Word, Excel or PowerPoint to Create and Manage Your Assembly Work Instructions and Supporting Documentation?
A Special Report for Production, Manufacturing and Continuous Improvement Executives. Are You Using Word, Excel or PowerPoint to Create and Manage Your Assembly Work Instructions and Supporting Documentation?
More informationProduction/Machine Operator Life Sciences CURRICULUM/SYLLABUS
Production/Machine Operator Life Sciences CURRICULUM/SYLLABUS This program is aimed at training candidates for the job of a Production/Machine Operator, in the Life Sciences Sector/Industry and aims at
More informationSAP Global Batch Traceability
SAP Global Traceability Table of contents Executive Summary 2 SAP Global Traceability 2 Data transfer principle 3 Functionality 4 Web user interface for easy searching 4 Graphical display of the batch
More informationMAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
More informationCAUSE-AND-EFFECT DIAGRAM
Module 5 CAUSE-AND-EFFECT DIAGRAM CAUSE-AND-EFFECT DIAGRAM 1 What is a Cause-and-Effect Diagram? A Cause-and-Effect Diagram is a tool that helps identify, sort, and display possible causes of a specific
More informationDUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD
DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD JOB DESCRIPTION POSITION TITLE: Air Conditioning Mechanic DEPARTMENT: Plant TITLE OF IMMEDIATE SUPERVISOR: Supervisor, Maintenance Services Position Summary
More informationPPG SUPPLIER DEVELOPMENT ASSESSMENT
Supplier: Address: Products: Assessment Date: Assessment Team: Certification: Supplier Contacts Position E-mail Phone General Comments: Assessment Results Summary Sections Non-conformity Action Point Quality
More information1.6 The Order of Operations
1.6 The Order of Operations Contents: Operations Grouping Symbols The Order of Operations Exponents and Negative Numbers Negative Square Roots Square Root of a Negative Number Order of Operations and Negative
More informationUGANDA BUREAU OF STATISTICS
UGANDA BUREAU OF STATISTICS In any correspondence on this subject please quote No: UBOS/10/2/1 Plot 9, Colville Street P. O. Box 7186 Kampala - Uganda THE REPUBLIC OF UGANDA Tel: +(256)41 4706000 Fax:
More informationThe Tools of Lean - Value Stream Mapping
ASQ Section 1302 Summer 2004 Series Mahoney State Park The Tools of Lean - Value Stream Mapping Stan Gidley Managing Director Institute of Business Excellence July 15, 2004 Outline Two Stories 1 English,
More informationOperations Management and Lean Six Sigma. Presented by: David Muncaster Manager, CI and CSAT Staples Advantage Canada
Operations Management and Lean Six Sigma Presented by: David Muncaster Manager, CI and CSAT Staples Advantage Canada Who is this guy standing up in front of you? Manager, Continuous Improvement and CSAT
More informationFEDERAL RESERVE BANKS OF ST. LOUIS AND PHILADELPHIA
FEDERAL RESERVE BANKS OF ST. LOUIS AND PHILADELPHIA ECONOMIC EDUCATION By Mercer Mayer / ISBN: 978-0-06-083557-6 Lesson Author Amanda Hughey, University of Delaware Standards and Benchmarks (see page 19)
More informationSupplier Quality Assurance
Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on
More information9 RUN CHART RUN CHART
Module 9 RUN CHART RUN CHART 1 What is a Run Chart? A Run Chart is the most basic tool used to display how a process performs over time. It is a line graph of data points plotted in chronological order
More informationHelping You Make An Informed Decision. Website Design
Helping You Make An Informed Decision This document is provided as a tool to assist businesses that are in the process of selecting a Web Marketing company to work or partner with. It is designed to help
More informationUNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
More informationEffective management of customer complaints
Effective management of customer complaints 2 nd FICCI Quality Systems Excellence Awards for Manufacturing & Conference on Sustainable Manufacturing Growth through Quality Systems New Delhi 16.05.2013
More informationTPM at the heart of Lean - March 2005 Art Smalley
TPM at the heart of Lean - March 2005 Art Smalley Total Productive Maintenance (TPM) has been a very important tool for equipment intensive manufacturing sectors. It is a key means for increasing machine
More information1A Rate of reaction. AS Chemistry introduced the qualitative aspects of rates of reaction. These include:
1A Rate of reaction AS Chemistry introduced the qualitative aspects of rates of reaction. These include: Collision theory Effect of temperature Effect of concentration Effect of pressure Activation energy
More informationFinding and Fixing Leaks
Finding and Fixing Leaks Where did all that water go? Could we have splashed all that water out of the tub? These are all common thoughts that can run through your mind when you open up the hot tub cover
More informationStructural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
More information360 View of Product Quality. Nader Fathi, CEO. www.sigmaquest.com. www.sigmaquest.com
360 View of Product Quality Nader Fathi, CEO Who is SigmaQuest? The On-Demand Leader in Scalable Solutions for Product Quality Management Number of Installations 150+ Selected Awards Electronic System
More informationBest Practice In A Change Management System
Quality & Compliance Associates, LLC Best Practice In A Change Management System President Quality & Compliance Associates, LLC Change Control and Its Role in a Continuous Improvement Environment 3 Benefits
More information21 CFR Part 11 Administrative Tools Part 11 Trackable Changes Maintenance Plans Upgrades Part 11 LDAP Support QC-SORT
Product Catalog Software Solutions Prolink offers an entire suite of software solutions to address and automate the data collection and quality analysis tasks performed throughout your organization. As
More informationIntegrating Your ERP and MES to Improve Operations
GE Intelligent Platforms Integrating Your ERP and MES to Improve Operations Advanced enterprise integration applications enable companies to leverage real-time information exchange between the business
More informationHEALTHCARE SIMULATION
HEALTHCARE SIMULATION SIMULATION IS USED BY HEALTH CARE AND HUMAN SERVICE ORGANIZATIONS ACROSS THE WORLD TO IMPROVE THEIR SYSTEMS OF CARE AND REDUCE COSTS. SIMULATION OFFERS EVIDENCE BASED, RISK FREE DECISION
More informationData centres in 2009 What is happening to facilities? November 2009
Data centres in 2009 What is happening to facilities? November 2009 Data centres in 2009 Should I teleconference or fly to California? Easy Should I teleconference or get the train to Luton? Harder Data
More informationCorrective and Preventive Actions
Corrective and Preventive Actions A Five Step Approach Topics to Be Covered What is CAPA? Governing authority Five steps to a good CAPA process Where companies have difficulty Example citations Recap What
More informationROTATING MACHINES. Alignment & Positioning of. Fast, easy and accurate alignment of rotating machines, pumps, drives, foundations, etc.
Alignment & Positioning of ROTATING MACHINES Fast, easy and accurate alignment of rotating machines, pumps, drives, foundations, etc. To compete in today s marketplace, you have to outperform your competitors
More informationMAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES
MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES John van Rijn INDEVELOPMENT MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES Any part of this publication may be
More informationimproved subsea blow out preventer (bop) control systems call for proposals
improved subsea blow out preventer (bop) control systems call for proposals July 2013 Aims This is an open invitation to any organisation, from any sector, seeking partners and funding for innovative technologies
More informationSt. Joseph, Missouri Water Protection Homeowners Guide to Your Sewer
St. Joseph, Missouri Water Protection Homeowners Guide to Your Sewer Out of Sight, Out of Mind: Don t wait until you have a problem to maintain your private lateral sewer line. Keeping Excess Water Out
More informationSafety Manual Title: Spill Prevention & Response Review Date: 6/1/2014
Operation s Purpose The purpose of this plan is to document spill prevention and response requirements. Each Elkhorn Construction, Inc. jobsite will develop a spill prevention and response plan based on
More informationInternal Audit Checklist
Internal Audit Checklist 4.2 Policy Verify required elements Verify management commitment Verify available to the public Verify implementation by tracing links back to policy statement Check review/revisions
More informationCustomer Relationship Management (CRM)
Customer Relationship Management (CRM) Improve your sales, marketing, and customer service performance with an Integrated CRM System The Integrated Solution Model (ISM) Organizational Benefits of Customer
More informationRoot cause analysis. Chartered Institute of Internal Auditors
27 June 2016 Root cause analysis Chartered Institute of Internal Auditors Root cause analysis is a process for understanding 'what happened' and solving a problem through looking back and drilling down
More informationAFLOAT ASBESTOS CONTROL
SAFETY TRAINING GOUGE #7 AFLOAT ASBESTOS CONTROL April 2012 Published by the Naval Safety and Environmental Training Center www.public.navy.mil/navsafecen/navsafenvtracen/ About Safety Training Gouge If
More informationClearing the air A simple guide to buying and using local exhaust ventilation (LEV)
Clearing the air A simple guide to buying and using local exhaust ventilation (LEV) Clearing the air Health and Safety A simple guide to buying and using local exhaust ventilation (LEV) Every year, thousands
More informationCOST BENEFIT ANALYSIS
COST BENEFIT ANALYSIS WHAT IS A COST BENEFIT ANALYSIS? A cost benefit analysis, simply put, is the monetary or safety valuation of the risk of performing a task (or performing a task in a certain way)
More informationPerform Work Order Scheduling Process Improvements
Key Work Process(3.1): Perform Work Order Scheduling Process Owner: Perform Work Order Scheduling Process Improvements Work System Owner Ed Curry Work System Enabling Leader Dane Theodore, Director Priority
More informationADVANTAGES OF Tankless Adhesive Melting Systems For End-of-Line Packaging
White Paper ADVANTAGES OF Tankless Adhesive Melting Systems For End-of-Line Packaging Nordson Corporation For carton sealing, case sealing, tray forming and a host of other packaging applications, the
More informationElmTree System Engineering Laboratory Management System
ElmTree System Engineering Laboratory Management System Table of contents General History System Requirements Implementation System Analysis Installation Start-up Training Support Work Flow Overview Administration
More informationRoot Cause Analysis and Problem Solving
Root Cause Analysis and Problem Solving (Aligned with IAQG 9136 draft) Date: April 2014 www.iaqg.org/scmh Section 7.4 Objective Root cause analysis and problem Solving: Propose methodology to improve the
More informationClassification of Business
Name: Class: Date Taken: Total Possible Marks: 3 Classification of Business Complete the following questions in the time allowed by your teacher QUICK DEFINITIONS Write a short, accurate definition for
More informationCS10110 Introduction to personal computer equipment
CS10110 Introduction to personal computer equipment PRACTICAL 4 : Process, Task and Application Management In this practical you will: Use Unix shell commands to find out about the processes the operating
More informationPredictive Maintenance
PART ONE of a predictive maintenance series Predictive Maintenance Overview Predictive maintenance programs come in all shapes and sizes, depending on a facility s size, equipment, regulations, and productivity
More informationPermits to Dig / Permits to Excavate / Permits to work near underground services
Permits to Dig / Permits to Excavate / Permits to work near underground services Aim and purpose The aim of this guidance is to identify what should be included in a permit to excavate / dig and additional
More informationOperational Business Intelligence in Manufacturing
Operational Business Intelligence in Manufacturing Copyright 2007 KeyTone Technologies Inc. Page 1 SmartWIP - Intelligent Manufacturing with RFID Manufacturers are under competitive pressure to fulfill
More informationRisk-Based Environmental Monitoring. Marsha Stabler Hardiman Senior Consultant Concordia ValSource Wednesday September 17, 2014 FDA/PQRI
Risk-Based Environmental Monitoring Marsha Stabler Hardiman Senior Consultant Concordia ValSource Wednesday September 17, 2014 FDA/PQRI Presenter Marsha Stabler Hardiman Over 20 years experience in the
More informationProactive Asset Management with IIoT and Analytics
Proactive Asset Management with IIoT and Analytics by Ralph Rio in Industrial Internet of Things, Analytics & Big Data Summary The Industrial Internet of Things (IIoT) with advanced analytics, offers new
More informationPOS Connector Installation and Setup Guide
POS Connector Installation and Setup Guide Contents About POS Connector for Small Business Accounting... 1 What is POS Connector?... 1 How does POS Connector work?... 1 Is POS Connector easy to install
More informationTotal Quality Management and Cost of Quality
Total Quality Management and Cost of Quality Evsevios Hadjicostas The International Quality movement Operator Quality Control Foreman (Supervisor) Quality Control Full-time Inspectors Statistical Quality
More informationHazard Identification and Risk Assessment for the Use of Booster Fans in Underground Coal Mines
Hazard Identification and Risk Assessment for the Use of Booster Fans in Underground Coal Mines Felipe Calizaya Michael G. Nelson Mahesh Shriwas Feb 26, 2013 Outline Introduction Booster Fans in U/G Coal
More informationBINGO TRAINING. Last Updated August 2014
BINGO TRAINING Last Updated August 2014 Overview The Weekly Sunday Bingo at St John s is by far our greatest money maker. For the 2013-2014 Year, we made close to $225,000 in profit from Bingo. This effort
More information