LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST
|
|
- Dora Sherman
- 1 years ago
- Views:
Transcription
1 LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST The following checklist has been developed to ensure that all required aspects of a project approved for Federal funding have been addressed and a responsible party assigned for each task. After a project has been approved for Federal funding in the Statewide Transportation Improvement Program, the Colorado Department of Transportation (CDOT) Project Manager, Local Agency Project Manager, and CDOT Resident Engineer prepare the checklist. It becomes a part of the contractual agreement between the Local Agency and CDOT. The CDOT Agreements Unit will not process a Local Agency agreement without this completed checklist. It will be reviewed at the Final Office Review meeting to ensure that all parties remain in agreement as to who is responsible for performing individual tasks. xvii
2 xviii
3 COLORADO DEPARTMENT OF TRANSPORTATION LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST Project No. STIP No. Project Code Region Project Location Date Project Description Local Agency Local Agency Project Manager CDOT Resident Engineer CDOT Project Manager INSTRUCTIONS: This checklist shall be utilized to establish the contract administration responsibilities of the individual parties to this agreement. The checklist becomes an attachment to the Local Agency agreement. Section numbers correspond to the applicable chapters of the CDOT Local Agency Manual. The checklist shall be prepared by placing an "" under the responsible party, opposite each of the tasks. The denotes the party responsible for initiating and executing the task. Only one responsible party should be selected. When neither CDOT nor the Local Agency is responsible for a task, not applicable (NA) shall be noted. In addition, a # will denote that CDOT must concur or approve. Tasks that will be performed by Headquarters staff will be indicated. The Regions, in accordance with established policies and procedures, will determine who will perform all other tasks that are the responsibility of CDOT. The checklist shall be prepared by the CDOT Resident Engineer or the CDOT Project Manager, in cooperation with the Local Agency Project Manager, and submitted to the Region Program Engineer. If contract administration responsibilities change, the CDOT Resident Engineer, in cooperation with the Local Agency Project Manager, will prepare and distribute a revised checklist. Note: Failure to comply with applicable Federal and State requirements may result in the loss of Federal or State participation in funding. NO. TIP / STIP AND LONG-RANGE PLANS 2.1 Review Project to ensure it is consistent with STIP and amendments thereto FEDERAL FUNDING OBLIGATION AND AUTHORIZATION 4.1 Authorize funding by phases (CDOT Form Federal-aid Program Data. Requires FHWA concurrence/involvement) PROJECT DEVELOPMENT 5.1 Prepare Design Data - CDOT Form Prepare Local Agency/CDOT Inter-Governmental Agreement (see also Chapter 3) 5.3 Conduct Consultant Selection/Execute Consultant Agreement Project Development Construction Contract Administration (including Fabrication Inspection Services) 5.4 Conduct Design Scoping Review Meeting 5.5 Conduct Public Involvement 5.6 Conduct Field Inspection Review (FIR) 5.7 Conduct Environmental Processes (may require FHWA concurrence/involvement) 5.8 Acquire Right-of-Way (may require FHWA concurrence/involvement) 5.9 Obtain Utility and Railroad Agreements 5.10 Conduct Final Office Review (FOR) CDOT Form /16 Page 1 of 4
4 NO Justify Force Account Work by the Local Agency 5.12 Justify Proprietary, Sole Source, or Local Agency Furnished Items 5.13 Document Design Exceptions - CDOT Form Prepare Plans, Specifications, Construction Cost Estimates and Submittals 5.15 Ensure Authorization of Funds for Construction PROJECT DEVELOPMENT CIVIL RIGHTS AND LABOR COMPLIANCE 6.1 Set Disadvantaged Business Enterprise (DBE) Goals for Consultant and Construction Contracts (CDOT Region EEO/Civil Rights Specialist). 6.2 Determine Applicability of Davis-Bacon Act This project is is not exempt from Davis-Bacon requirements as determined by the functional classification of the project location (Projects located on local roads and rural minor collectors may be exempt.) CDOT Resident Engineer (Signature on File) Date 6.3 Set On-the-Job Training Goals (CDOT Region EEO/Civil Rights Specialist) 6.4 Title VI Assurances Ensure the correct Federal Wage Decision, all required Disadvantaged Business Enterprise/On-the-Job Training special provisions and FHWA Form 1273 are included in the Contract (CDOT Resident Engineer) ADVERTISE, BID AND AWARD of CONSTRUCTION PROJECTS 7.1 Obtain Approval for Advertisement Period of Less Than Three Weeks 7.2 Advertise for Bids 7.3 Distribute Advertisement Set of Plans and Specifications 7.4 Review Worksite and Plan Details with Prospective Bidders While Project Is Under Advertisement 7.5 Open Bids 7.6 Process Bids for Compliance Check CDOT Form 1415 Commitment Confirmation when the low bidder meets DBE goals Evaluate CDOT Form Good Faith Effort Report and determine if the Contractor has made a good faith effort when the low bidder does not meet DBE goals Submit required documentation for CDOT award concurrence 7.7 Concurrence from CDOT to Award 7.8 Approve Rejection of Low Bidder 7.9 Award Contract 7.10 Provide Award and Record Sets of Plans and Specifications CONSTRUCTION MANAGEMENT 8.1 Issue Notice to Proceed to the Contractor 8.2 Project Safety 8.3 Conduct Conferences: Pre-Construction Conference (Appendix B) Fabrication Inspection Notifications Pre-survey Construction staking Monumentation Partnering (Optional) Structural Concrete Pre-Pour (Agenda is in CDOT Construction Manual) Concrete Pavement Pre-Paving (Agenda is in CDOT Construction Manual) HMA Pre-Paving (Agenda is in CDOT Construction Manual) 8.4 Develop and distribute Public Notice of Planned Construction to media and local residents CDOT Form /16 Page 2 of 4
5 NO. 8.5 Supervise Construction A Professional Engineer (PE) registered in Colorado, who will be in responsible charge of construction supervision. Local Agency Professional Engineer or Phone number CDOT Resident Engineer Provide competent, experienced staff who will ensure the Contract work is constructed in accordance with the plans and specifications Construction inspection and documentation Fabrication Inspection and documentation 8.6 Approve Shop Drawings 8.7 Perform Traffic Control Inspections 8.8 Perform Construction Surveying 8.9 Monument Right-of-Way 8.10 Prepare and Approve Interim and Final Contractor Pay Estimates. Collect and review CDOT Form 1418 (or equivalent) Provide the name and phone number of the person authorized for this task. Local Agency Representative Phone number 8.11 Prepare and Approve Interim and Final Utility and Railroad Billings 8.12 Prepare and Authorize Change Orders 8.13 Submit Change Order Package to CDOT 8.14 Prepare Local Agency Reimbursement Requests 8.15 Monitor Project Financial Status 8.16 Prepare and Submit Monthly Progress Reports 8.17 Resolve Contractor Claims and Disputes 8.18 Conduct Routine and Random Project Reviews Provide the name and phone number of the person responsible for this task. CDOT Resident Engineer Phone number 8.19 Ongoing Oversight of DBE Participation MATERIALS 9.1 Discuss Materials at Pre-Construction Meeting Buy America documentation required prior to installation of steel 9.2 Complete CDOT Form Materials Documentation Record Generate form, which includes determining the minimum number of required tests and applicable material submittals for all materials placed on the project Update the form as work progresses Complete and distribute form after work is completed 9.3 Perform Project Acceptance Samples and Tests 9.4 Perform Laboratory Verification Tests 9.5 Accept Manufactured Products Inspection of structural components: Fabrication of structural steel and pre-stressed concrete structural components Bridge modular expansion devices (0 to 6 or greater) Fabrication of bearing devices 9.6 Approve Sources of Materials 9.7 Independent Assurance Testing (IAT), Local Agency Procedures CDOT Procedures Generate IAT schedule Schedule and provide notification Conduct IAT CDOT Form /16 Page 3 of 4
6 NO. 9.8 Approve mix designs Concrete Hot mix asphalt 9.9 Check Final Materials Documentation 9.10 Complete and Distribute Final Materials Documentation CONSTRUCTION CIVIL RIGHTS AND LABOR COMPLIANCE 10.1 Fulfill Project Bulletin Board and Pre-Construction Packet Requirements 10.2 Process CDOT Form Sublet Permit Application Review and sign completed CDOT Form 205 for each subcontractor, and submit to EEO/Civil Rights Specialist 10.3 Conduct Equal Employment Opportunity and Labor Compliance Verification Employee Interviews. Complete CDOT Form Monitor Disadvantaged Business Enterprise Participation to Ensure Compliance with the Commercially Useful Function Requirements 10.5 Conduct Interviews When Project Utilizes On-the-Job Trainees. Complete CDOT Form 1337 Contractor Commitment to Meet OJT Requirements. Complete CDOT Form 838 OJT Trainee / Apprentice Record. Complete CDOT Form OJT Training Questionnaire 10.6 Check Certified Payrolls (Contact the Region EEO/Civil Rights Specialists for training requirements.) 10.7 Submit FHWA Form Highway Construction Contractor s Annual EEO Report FINALS 11.1 Conduct Final Project Inspection. Complete and submit CDOT Form Final Acceptance Report (Resident Engineer with mandatory Local Agency participation.) 11.2 Write Final Project Acceptance Letter 11.3 Advertise for Final Settlement 11.4 Prepare and Distribute Final As-Constructed Plans 11.5 Prepare EEO Certification and Collect EEO Forms 11.6 Check Final Quantities, Plans, and Pay Estimate; Check Project Documentation; and submit Final Certifications 11.7 Check Material Documentation and Accept Final Material Certification (See Chapter 9) 11.8 Obtain CDOT Form 1419 from the Contractor and Submit to the CDOT Project Manager 11.9 (FHWA Form 47 discontinued) Complete and Submit CDOT Form 1212 Final Acceptance Report (by CDOT) Process Final Payment Complete and Submit CDOT Form Project Closure Retain Project Records for Six Years from Date of Project Closure Retain Final Version of Local Agency Contract Administration Checklist cc: CDOT Resident Engineer/Project Manager CDOT Region Program Engineer CDOT Region EEO/Civil Rights Specialist CDOT Region Materials Engineer CDOT Contracts and Market Analysis Branch Local Agency Project Manager CDOT Form /16 Page 4 of 4
LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST
LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST The following checklist has been developed to ensure that all required aspects of a project approved for Federal funding have been addressed and a responsible
Scope of Work Construction Inspection and Materials Testing Services
Glenwood Resident Engineer 202 Centennial Drive Glenwood Springs, CO 81601 Scope of Work Construction Inspection and Materials Testing Services Estimated Start Date: November 1, 2015 Region 3 Project:
CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES
CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES 15.1 OVERVIEW To effectively assure Equal Employment Opportunity (EEO), the Federal Highway Administration (FHWA) requires
Equal Employment Opportunity (EEO)
Local Agency (ERM) Preconstruction Meeting Federal-Aid EEO/DBE/Wages Construction Contract Compliance Requirements Rev 04/2011 Local Agency: Palm Beach County/ERM Date: Time: Location of Meeting: PBC/ERM,
LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONTRACT COMPLIANCE PROGRAM MANUAL DECEMBER 2013 EQUAL EMPLOYMENT OPPORTUNITY PROGRAM CONTRACT COMPLIANCE PROGRAM LOUISIANA DEPARTMENT OF TRANSPORTATION
CIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY. Field Procedures Manual
New Mexico Department of Transportation Office of Equal Opportunity Programs CIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY Field Procedures Manual Americans with Disabilities Act (ADA) Program Disadvantaged
QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park
QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park The purpose of this program is to provide assurance that the materials incorporated into the construction projects are in conformance with the contract
CONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division
CONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division Contractor: Complete this checklist. Attach all required documentation and send to the NDOT Contract
Quality Assurance Procedures for Construction and Materials Sampling and Testing 14
Page 1 Quality Assurance Procedures for Construction and Materials Sampling and Testing 14 1. PURPOSE 1.1 To prescribe policies, procedures, and guidelines to assure the quality of materials on all Colorado
MDOT Prevailing Wage Compliance
MDOT Prevailing Wage Compliance Introduction - MDOT Oversight / Labor Standards Statutes Chris Roe MDOT Prevailing Wage Compliance (517) 202-3716 roec@michigan.gov Contract Documents Wage Decisions Wage
Section 000 Organization of an Engineering District (Construction)
Table of Contents 1. General Policies and Provisions... 000-1 2. District Executive... 000-2 3. Assistant District Executive Design... 000-3 4. Assistant District Executive Maintenance... 000-4 5. Assistant
Getting Connected with the Colorado Department of Transportation (CDOT)
Getting Connected with the Colorado Department of Transportation (CDOT) INTRODUCTION Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges State government agency with funding
FHWA Emergency Relief (FHWA-ER) Training
FHWA Emergency Relief (FHWA-ER) Training Training Developed and Coordinated By Colorado Department of Transportation 2 Agenda FHWA Flowchart Policies, Purpose, Agency Roles Application Process Eligibility
Project Management On-line Guide
Project Management On-line Guide Project Life Cycle Processes Flowchart Department Policy Memorandum Project Management Policy To support the Project Management Initiative, respond to Policy Agreement
Work Breakdown Structure Element Dictionary Construction
Initiation CON 5.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope, including the solicitation for a contractor
CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015
CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015 The Code of Federal Regulations (CFR) Title 23, part 112, and 23 CFR
SCOPE OF WORK. COLORADO DEPARTMENT OF TRANSPORTATION Statewide
SCOPE OF WORK Construction Management Construction Inspection & Materials Testing Services For the Calendar Year 2016 Program COLORADO DEPARTMENT OF TRANSPORTATION Statewide SCOPE OF WORK FOR: I. Construction
Construction Management/ General Contractor Alternative Contracting Process
Clean Water State Revolving Fund Loan Program Construction Management/ General Contractor Alternative July 2011 Last Updated: 08/03/2011 By: Larry McAllister DEQ 11-WQ-027 Prepared by: Clean Water State
CHAPTER 21 - CONSTRUCTION ADVERTISING AND AWARD PROCEDURES
CHAPTER 21 - CONSTRUCTION ADVERTISING AND AWARD PROCEDURES 21.1 OVERVIEW This Chapter outlines the general process for Local Agencies that advertise and award construction contracts under the Department
Contents Amendment Record
VIRGINIA DEPARTMENT OF TRANSPORTATION Minimum Requirements for Quality Assurance & Quality Control on Design Build & Public-Private Transportation Act Projects August 2008 (Revised July 2008) Contents
225 statewide business consultants, 15 transportation consultants and 8 former CDOT engineers available to help you immediately!
SUBCONTRACTING ON CDOT CONSTRUCTION PROJECTS Ramp Up Ridgway! Connect2DOT Colorado Small Business Development Center Network (SBDC) program funded by CDOT Free training, consulting, and resources for small
Project Management Procedures
1201 Main Street, Suite 1600 Columbia, South Carolina 29201 Project Management Procedures Start Up The grant becomes effective upon return of one copy of the grant award executed by the Chief Executive
CONTRACTOR COMPLIANCE
CONTRACTOR COMPLIANCE The Arkansas State Highway and Transportation Department is committed to equal employment opportunity. This commitment includes working cooperatively with highway construction contractors
INDIANA DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING PROGRAM & PARTNERSHIP AGREEMENT
INDIANA DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING PROGRAM & PARTNERSHIP AGREEMENT Table of Contents 1.1 Definitions. 1 1.2 Policy Statement.... 1 1.3 Nondiscrimination in Programs and Activities
GENERAL. This manual addresses five local programs that are funded under the current Highway Act:
OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal
Quality Assurance Program for Design-Build Projects with an Optional 15-Year Capital Maintenance Agreement
Quality Assurance Program for Design-Build Projects with an Optional 15-Year Capital Maintenance Agreement July 25, 2011 2011 by Texas Department of Transportation (512) 416-2055 All Rights Reserved TABLE
Chapter 10 - Contract Completion
Chapter 10 - Contract Completion Construction Manual 1-1000 General This Chapter contains guidelines that are followed on projects inspected and administered by the Department and its construction engineering
External Equal Opportunity (EO) Contract Compliance Requirements for Contractors
External Equal Opportunity (EO) Contract Compliance Requirements for Contractors 2015 Tammie Y. Greene External EO and OJT Program Coordinator Office of Business Development & Special Programs South Carolina
Work Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management
The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies the requirements a firm must meet to become pre-qualified
ADVERTISING, SALE & AWARD
ADVERTISING, SALE & AWARD PRIMARY ROLES & RESPONSIBILITIES PRIMARY TASK ODOT LPA DEVELOP BID PROPOSAL If project estimate exceeds $500,000, submit engineer estimate to LPA Coordinator to obtain DBE goal.
NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2014 THROUGH 2016
NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2014 THROUGH 2016 The New Jersey Department of Transportation (NJDOT) has established a Disadvantaged
Document TABLE OF CONTENTS. Doc. No. Document Title Doc. Date INTRODUCTORY INFORMATION
Document 00010 NOTE: Bold capitalized Specification Sections are included in the City of Houston Department of Public Works and Engineering Standard Construction Specifications for Wastewater Collection
Design-Build Process for Project Managers
Vermont Agency of Transportation Design-Build Process for Project Managers This document provides guidance on the preliminary engineering and procurement process and roles and responsibilities of key personnel
Review of the Selection and Award of Subcontracts through Construction Manager at Risk Agreements
Exhibit 1 Review of the Selection and Award of Subcontracts through Construction Manager at Risk (CM@Risk) Agreements June 22, 2011 Report No. 11-07 Evan A. Lukic, CPA County Auditor Table of Contents
Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402
Date: May 18, 2015 Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402 TO: RE: Prospective Quoters Request for Quotation (RFQ) Electricity The Greater Dayton Regional Transit Authority
CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB
Certified Payrolls Certified Payrolls Submittal Requirements Notice of Delinquent Certified Payroll
Certified Payrolls Certified Payrolls Weekly certified payrolls covering the s and sub s workforce shall be submitted to the engineer on all MDOT-let contracts. Certified payrolls are required for all
THE HUDSON COUNTY IMPROVEMENT AUTHORITY AFFIRMATIVE ACTION COMPLIANCE/MANDATORY EEO LANGUAGE N.J.S.A.
APPENDIX E-13 THE HUDSON COUNTY IMPROVEMENT AUTHORITY AFFIRMATIVE ACTION COMPLIANCE/MANDATORY EEO LANGUAGE N.J.S.A. 10:5-31 et seq. (P.L. 1975, C. 127) N.J.A.C. 17:27 CONSTRUCTION CONTRACTS This form is
DOING BUSINESS WITH CDOT
DOING BUSINESS WITH CDOT Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges One of the largest state government agencies with an annual budget of $1.2 billion Primarily
Welcome to the City of Chicago. Department of Procurement Services. Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer
Welcome to the Bid & Bond Room Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer The remains committed to the growth and development of small, minority and women-owned business enterprises and
10 Advertisement for Bid and Project Award
10 Advertisement for Bid and Project Award 10.1 Introduction This chapter describes the requirements, considerations and procedures for advertising, opening and evaluating bids and awarding a federal aid
Conditions for using the Owner Construction or Owner Performed Services delivery method are:
Water and Environmental Programs RUS Instruction 1780 Owner Construction & Owner Performed Services Requirements Iowa Guide A-5 Design-bid-build is the preferred project delivery method for completing
VTrans Quality Assurance Program TABLE OF CONTENTS
TABLE OF CONTENTS VTrans Quality Assurance Program 1.0 INTRODUCTION...1 2.0 POLICY...1 3.0 TERMINOLOGY...2 3.1 DEFINITIONS...3 3.2 ACRONYMS...8 4.0 LEVEL DETERMINATION...8 4.1 FHWA OVERSIGHT...9 4.2 PRIMARY
MISCELLANEOUS BASIC PLAN READING
BASIC PLAN READING Job Element Date Project Inspector s Signature Completes the Location & Design Division s Plan Reading Guide (Imperial), which is found on the Intranet by selecting: >Divisions >Location
OVERSIGHT ENGINEER FIELD GUIDELINES
DIVISION OF CONSTRUCTION OVERSIGHT ENGINEER FIELD GUIDELINES Issued by Division of Construction California Department of Transportation State of California 2004 California Department of Transportation
Contract Administration
Chapter 5 Contract Administration Section 3 Change Orders 5-301 General 5-302 Change Order Policy 5-303 Purpose of Change Orders 5-304 Initiation of Change Orders 5-305 Preliminary Considerations 5-306
PROCUREMENT PRACTICES AT PUBLIC HOUSING AGENCIES
PROCUREMENT PRACTICES AT PUBLIC HOUSING AGENCIES Table of Contents Procurement Regulations and Agency 3 Procurement Policies and Procedures 3 Roles and Responsibilities 4 Board of Commissioners 4 Sample
Date: DRAFT Initiated by: AAS-100
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Quality Management for Federally Funded Airport Construction Projects Date: DRAFT Initiated by: AAS-100 AC No.:
CONSTRUCTION COST ESTIMATES
Chapter 8 CONSTRUCTION COST ESTIMATES SCDOT BRIDGE DESIGN MANUAL April 2006 Table of Contents Section Page 8.1 PROGRAMMING ESTIMATES...8-1 8.1.1 Bridge Replacement Projects...8-1 8.1.2 Other Projects...8-1
PROJECT CLOSEOUT PROCESS & PROCEDURES
PROJECT CLOSEOUT PROCESS & PROCEDURES MARY HENDERSON-REPS, CONTRACT ADMINISTRATOR DENVER INTERNATIONAL AIRPORT FEBRUARY, 2016 CLOSEOUT PROCESS - Closeout is defined as being The period that represents
Implementing Agency Responsibilities on State Highway Projects Revised June 2006
Implementing Agency Responsibilities on State Highway Projects Purpose of this Document... 1 Background... 2 Sponsors, Implementing Agencies and Project Components... 2 Quality Assurance... 2 Key Roles...
Marion County Public Works
Marion County Public Works Federally Funded Transportation Program Title VI Annual Accomplishment Report Fiscal Year 2014/15 Marion County Public Works Department Introduction The Marion County Department
BID PROPOSAL GENERAL BID CITY OF LOWELL, MASSACHUSETTS
BID PROPOSAL GENERAL BID CITY OF LOWELL, MASSACHUSETTS Project: 2015 STREET PAVING AND COLD PLANING IN THE CITY OF LOWELL - WRAP Lowell, Massachusetts To the City of Lowell, Massachusetts (hereinafter
Reasons for Change Orders
T E X A S D E PA R T M E N T O F T R A N S P O R TAT I O N A change order is defined in the 2004 Standard Specification Book as a written order to the Contractor detailing changes to the specified work,
CHAPTER 11 BEFORE ON-SITE WORK CAN BEGIN
CHAPTER 11 BEFORE ON-SITE WORK CAN BEGIN The Contractor shall not begin On-Site Work until it has, as specified in 00180.40(b): 1. Received Notice to Proceed; 2. Filed the required public works bond with
GUIDELINES FOR SMALL BUSINESS CONSTRUCTION CONTRACTS
GUIDELINES FOR SMALL BUSINESS CONSTRUCTION CONTRACTS HARRISBURG, PENNSYLVANIA 2013 EDITION Guidelines for the DGS Small Business Reserve Program For Construction Contracts 1 General a.) Pursuant to Executive
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS 8.1.1 PURPOSE This procedure provides guidelines related to the implementation of quality control and quality assurance
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISON OF PROFESSIONAL REGULATIONS RULES AND REGULATIONS RELATING TO PREVAILING WAGES
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISON OF PROFESSIONAL REGULATIONS RULES AND REGULATIONS RELATING TO PREVAILING WAGES As Amended: November 2012 March 2012 1) Any contractor who has been
SCOPE OF WORK. PROJECT SPECIFIC Construction Inspection ARRA FEDERAL AID PROJECT NO. ES6 C0852-103 PROJECT CODE NO. 17679
SCOPE OF WORK PROJECT SPECIFIC Construction Inspection ARRA FEDERAL AID PROJECT NO. ES6 C0852-103 PROJECT CODE NO. 17679 PROJECT NAME: US 85 / C-470 Interchange Improvement Southbound to Eastbound Flyover
2013 Roadway Construction Webinar. Davis Bacon Compliance
2013 Roadway Construction Webinar Davis Bacon Compliance Current Wage Determinations (Posted 9/30/2011) Significant increase in wage rates from prior wage decisions Worker classifications decreased from
Sponsor's Guide To Non-Traditional Transportation Project Implementation
Sponsor's Guide To Non-Traditional Transportation Project Implementation Published By: Read this guide before starting your project. Transportation Project Implementation December 2015 Page intentionally
PITTSBURG UNIFIED SCHOOL DISTRICT
PITTSBURG UNIFIED SCHOOL DISTRICT New Construction and Modernization Projects PRE-QUALIFICATION PROGRAM QUESTIONNAIRE FOR PROJECTS $20 MILLION AND OVER TABLE OF CONTENTS PAGE NO. GENERAL INFORMATION.......i
Navigating Contractor Compliance. Kathy Terrio Contractor Compliance Specialist 406.444.9270 kterrio@mt.gov
Navigating Contractor Compliance Kathy Terrio Contractor Compliance Specialist 406.444.9270 kterrio@mt.gov Contractor Compliance Ensures that contractors and subcontractors performing work on Federally
The Change in Status is used to start, suspend or resume time charges on a project or to indicate that the project is completed.
CONSTRUCTION STATUS The Change in Status is used to start, suspend or resume time charges on a project or to indicate that the project is completed. Depending on the type of completion date shown in the
GUIDELINES FOR RECRUITMENT AND SELECTION OF MINORITY BUSINESSES FOR PARTICIPATION IN STATE CONSTRUCTION CONTRACTS
GUIDELINES FOR RECRUITMENT AND SELECTION OF MINORITY BUSINESSES FOR PARTICIPATION IN STATE CONSTRUCTION CONTRACTS In accordance with G.S. 143-128.2 (effective January 1, 2002) these guidelines establish
Project Number Section 01290
Project Number Section 01290 Project Name PAYMENT PROCEDURES Guide Specifications The following specification is intended to be used, generally verbatim, in the contract documents. [Specifier Notes] shall
Jeffery Peyton Office of Contracts Ohio Department of Transportation
Jeffery Peyton Office of Contracts Ohio Department of Transportation The USDOT OIG has identified DBE fraud as one of their top priorities. Increased oversight of the DBE Program by numerous Federal agencies
Request for Proposal (RFP) for Contract Management
Request for Proposal (RFP) for Contract Management The City of Belton seeks a qualified management consulting firm to assist in the administration of the HOME Program to be awarded through the Texas Department
Design-Build Mississippi Gate Additional Lane
Design-Build Mississippi Gate Additional Lane Buckley Air Force Base, Colorado Completion Date: December 2010 Client: United States Army Corps of Engineers Omaha District Project Reference: Jennifer McQueen,
Hot Mix Asphalt Test Result Verification and Dispute Resolution
Colorado Procedure 17-15 Standard Practice for Hot Mix Asphalt Test Result Verification and Dispute Resolution 1. SCOPE 1.1 The purpose of this Hot Mix Asphalt (HMA) Test Result Verification and Dispute
TASK 1 CONSULTANT (CEI) CONSTRUCTION VIDEO AND PHOTOGRAPHS
SCHEDULE A SCOPE OF SERVICES Contract #13-6178 Construction, Engineering, and Inspection (CEI) Services for Vanderbilt MSTU: Utility Conversion Phase II, III, and IV The Vanderbilt Beach MSTU is managing
102-12 D/M/WBE UTILIZATION
102-12 D/M/WBE UTILIZATION I. GENERAL Disadvantaged Business Enterprise (DBE) requirements apply to Federally Assisted contracts and have one goal. Minority/Women's Business Enterprise (M/WBE) requirements
CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY
Exhibit 1 CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY The undersigned certifies on behalf of the Contractor or Subcontractor
Delaware Department of Transportation. Contractor Compliance Manual
Delaware Department of Transportation Contractor Compliance Manual Table of Contents TABLE OF CONTENTS CHAPTER 1 GENERAL INFORMATION I. OVERVIEW A. Background B. Goals C. Authority D. FHWA Responsibilities
CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (03/10) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Exhibit B MDOT PROJECT MANAGER JOB NUMBER (JN) CONTROL SECTION (CS) Dennis
Transforming Lives... pportunity. at a. Time. On-the-Job Training Program OFFICE OF CIVIL RIGHTS
O TEXAS DEPARTMENT OF TRANSPORTATION Transforming Lives... ne pportunity at a Time On-the-Job Training Program OFFICE OF CIVIL RIGHTS TABLE OF CONTENTS DEFINITIONS... 3 INTRODUCTION... 4 Nondiscrimination
JOSEPHINE COUNTY PUBLIC WORKS DEPARTMENT GRANTS PASS, OREGON CONTRACTOR'S PREQUALIFICATION APPLICATION
JOSEPHINE COUNTY PUBLIC WORKS DEPARTMENT GRANTS PASS, OREGON 97527 CONTRACTOR'S PREQUALIFICATION APPLICATION Equipment and Experience Questionnaire JOSEPHINE COUNTY PUBLIC WORKS DEPARTMENT 201 River Heights
HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL
HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL Pennsylvania Department of Transportation PUB 412 (12-05) TABLE OF CONTENTS FOREWORD 3 DISCLAIMER 3 1.0 Doing Business with PennDOT 4 1.1 Contractor Requirements
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874
ADVERTISEMENT FOR LETTERS OF INTEREST FOR A DESIGN BUILD PROJECT (PROCUREMENT METHOD SHORTLISTING OF PROPOSERS WITH TECHNICAL AND PRICE EVALUATION BY ADJUSTED SCORE) PROCUREMENT NUMBER: E2N44 Financial
Policy Number: 3-804 Policy Name: Professional Services and Construction Services Procurement
Page 1 3-804 Professional Services and Construction A. Project Delivery Methods 1. A university may procure design services, construction and construction services, as applicable, under any of the following
MAIN CIVIL WORKS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS
MAIN CIVIL WORKS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS 1 INTERPRETATION... 1 1.1 Definitions... 1 2 QUALITY MANAGEMENT SYSTEM... 2 2.1 Quality Management System... 2 2.2 Contractor Responsibilities...
Audit of the Department of Public Works Contract Monitoring 1
Memorandum CITY OF DALLAS (Report No. A16-010) DATE: May 27, 2016 TO: Honorable Mayor and Members of the City Council SUBJECT: Audit of the Department of Public Works Contract Monitoring 1 In Fiscal Years
The Vermont Agency of Transportation Small Business Element of the Disadvantaged Business Enterprise (DBE) Program
The Vermont Agency of Transportation Small Business Element of the Disadvantaged Business Enterprise (DBE) Program Introduction and Overview of the Small Business Element: The Vermont Agency of Transportation
PROPOSAL LETTER. REQUEST FOR PROPOSAL CONTRACT NO. TBD (IFB/RFP No.) TBD (Solicitation Title)
HONORABLE CHAIRMAN AND MEMBERS OF THE BOARD LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY ONE GATEWAY PLAZA LOS ANGELES, CA 90012-2952 SUBJECT: REQUEST FOR PROPOSAL CONTRACT NO. TBD (IFB/RFP
MDOT Construction Field Services Update. 2013 MDOT LAP/Consultant Construction Kickoff Meetings
MDOT Construction Field Services Update 2013 MDOT LAP/Consultant Construction Kickoff Meetings Topic Overview Contract Administration Issues & Trends e-construction Documentation Buy America Construction
Request for Proposals
City of Sonora Request for Proposals City of Sonora Microenterprise Technical Assistance Program Lead Technical Assistance Consultant City of Sonora Community Development Department 94 N. Washington Street
RHODE ISLAND DEPARTMENT OF TRANSPORTATION
RHODE ISLAND DEPARTMENT OF TRANSPORTATION ON THE JOB TRAINING PROGRAM MANUAL 1 Introduction and Background The Federal Aid Highway Act of 1968 includes a special section devoted to promoting and insuring
Labor Compliance Program Guidebook For School Districts
Labor-Management-Consultants P.O. Box 24455 Oakland, CA 94623 Phone: (510) 835-7603 Fax: (510) 835-7613 www.davillier-sloan.com info@davillier-sloan.com Labor Compliance Program Guidebook For School Districts
Office of the County Auditor Evan A. Lukic, CPA County Auditor
Review of Management Services Billings - Terminal 4 Expansion Project Phase 1B at Fort Lauderdale Hollywood International Airport (RLI No. 20041222-0-AV-01) September 13, 2010 Report No. 10-14 Office of
CITY OF CHILLICOTHE REQUEST FOR PROPOSALS
CITY OF CHILLICOTHE REQUEST FOR PROPOSALS The City of Chillicothe is accepting sealed proposals for a Financial and Payroll software system for the Chillicothe Auditor s office. Proposal Must Be Sealed,
CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN-OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY
EXHIBIT 1 TO ATTACHMENT CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN-OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY The undersigned certifies on behalf of the Contractor
Your Road to a Successful BDI Project
Your Road to a Successful BDI Project About Construction Estimating Institute (CEI) CEI is a nonprofit corporation whose mission is to improve the skills of individuals working in the construction industry.
ADOT s Materials Quality Assurance Program. Presentation by Chad Auker November 20, 2014 2014 Arizona Pavement/Materials Conference
ADOT s Materials Quality Assurance Program Presentation by Chad Auker November 20, 2014 2014 Arizona Pavement/Materials Conference TRB Definition Quality 1) The degree of excellence of a product or service
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES ISSUED BY: INGLEWOOD UNIFIED SCHOOL DISTRICT Issued: November 20, 2015 Due: December 18, 2015 SCHEDULE OF EVENTS INGLEWOOD UNIFIED SCHOOL
DISADVANTAGED BUSINESS ENTEPRISE PROGRAM CONTRACT COMPLIANCE MONITORING
DBE PROGRAM OVERVIEW DISADVANTAGED BUSINESS ENTEPRISE PROGRAM CONTRACT COMPLIANCE MONITORING It is the policy of the Columbus Regional Airport Authority (CRAA), in compliance with federal law (49 CFR 26),
CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (03/12) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE MDOT PROJECT MANAGER JOB NUMBER (JN)
Appendix II - Attachment A of SI Manual Letter of Footing and Foundation SER assuming responsibility of PEMB SER
Appendix II - Attachment A of SI Manual Letter of Footing and Foundation SER assuming responsibility of PEMB SER Subject: Letter assuming the responsibility as Structural Engineer of Record (SER) for Pre-engineered
GUIDELINES FOR SMALL BUSINESS CONSTRUCTION CONTRACTS
GUIDELINES FOR SMALL BUSINESS CONSTRUCTION CONTRACTS HARRISBURG, PENNSYLVANIA MAY 2014 EDITION Guidelines for the DGS Small Business Reserve Program For Construction Contracts 1 General a.) Pursuant to
Section 5.6 QUALITY CONTROL PROGRAM
5.6.1 PURPOSE Section 5.6 QUALITY CONTROL PROGRAM This document describes activities for personnel who are involved with the Florida Department of Transportation s (Department) Quality Control (QC) Program,
MINNESOTA STATE COLLEGES AND UNIVERSITIES
Projects with an estimated construction cost of $50,000 or less may be bid without advertising. Funding: The College/University must take appropriate action to confirm that funds are available in an active