1 Corporate Energy Conservation & Demand Management Plan (CECDMP) Prepared By:

2 Table of Contents Our Commitment to Energy Conservation Plan Overview Introduction Plan Development Plan Scope Ontario s Energy Picture Energy Supply and Pricing Forecasts for Ontario Green Energy Act and Regulation 397/ The Corporate Energy Management Policy Stratford s Current Energy Performance Stratford s Energy Baseline Current Energy Procurement and Pricing The Energy Conservation Team Our Successes Completed Energy Conservation Measures Energy Conservation Action Plan Action Plan List Schedule and Forecast Appendix A: Corporate Energy Conservation Action Plan Appendix B: Project Delivery Schedule

3 Our Commitment to Energy Conservation Message from the Mayor The City of Stratford has a long and proud tradition of municipal leadership, including earning a position in the Top 7 Intelligent Community of the Yea rankings for the last three years, creating the Stratford Global Standard, and a successful track record of pro-actively identifying and delivering energy conservation initiatives. In step with this tradition, and in light of rising energy costs and recent regulatory requirements, the City has developed a comprehensive 5-year Corporate Energy Conservation & Demand Management Plan. This Plan lays out our vision and our commitment to energy conservation and fulfills all of the requirements specified under Regulation 397/11 of Ontario s Green Energy Act. We have selected three strategic priorities to facilitate the achievement of our vision and our 5-year conservation goals. Our first priority is to provide tools to consistently monitor and track energy consumption across all corporate facilities. The second focuses on energy awareness and technology training to enable key personnel to find energy conservation opportunities and actively participate in reduction initiatives. Lastly, we intend to continue identifying and delivering energy cost savings projects, programs and processes across all of our corporate facilities. We intend to honour the City s commitment to environmental and fiscal leadership by taking action to improve the energy consumption within our buildings and services, while reducing associated costs and carbon emissions. Along with City Council and senior City Staff, I fully endorse the contents of this Plan and its related strategies and initiatives. Sincerely, Dan Mathieson Mayor of Stratford Page 1 of 30

4 1.0 Plan Overview 1.1 Introduction Energy management has become increasingly important across Ontario municipalities as energy prices continue to rise and interest in reducing our environmental impact continues to be a priority. Ontario s Long Term Energy Plan predicts that electricity costs will rise an average of 20%, or roughly 4% per year, over the next five years. Natural gas prices, although relatively low compared to historical averages, have begun to rise as illustrated by significant increases in spot market prices through the winter of 2013/2014. In addition to energy cost pressures, regulatory requirements have been recently enacted to increase the focus on energy conservation. Ontario Regulation 397/11 of the Green Energy Act requires all municipalities to develop and publish a Corporate Energy Conservation and Demand Management Plan (CECDMP) on or before July 1, The City of Stratford (the City) has developed a CECDMP (this Plan) to formalize and consolidate its energy management efforts. Responsible energy management planning will allow the City to develop energy reduction strategies within the constraints of existing operating budgets. Specifically, this Plan will help the City meet a number of objectives, including improving environmental performance, reducing greenhouse gas emissions, lowering energy consumption, improving accountability to taxpayers and reducing operating costs. It also fits within the City s broader planning context, complementing the City of Stratford Strategic Priority Framework and the Sustainability Strategy. In line with the regulation s requirements, this Plan includes the following key elements: 1 A clear corporate vision and policy that includes goals, objectives and strategic priorities for managing energy use. 2 Details about the City s energy baseline and a summary of past successes and present initiatives. 3 A specific, actionable and prioritized inventory of energy conservation and demand management measures which includes associated estimated cost and energy savings information. The City intends to revisit and update this Plan every five years, as required under the regulation. Page 2 of 30

5 1.2 Plan Development The City would like to thank the committee assembled to steer the development of this Plan with support and direction from Blue Sky Energy Engineering & Consulting and Posterity Group. The City committee members include: Dave Carroll, Chief Building Official Jim Bryson, Community Facilities Manager Joe Salter, Manager of Water Treatment & Distribution Mike Gornyiczki, Deputy Fire Chief In addition to the committee, the City would like to recognize the contribution of numerous staff who offered ideas, input, and review to ensure this plan was consistent with the overall goals of the region and included the current best ideas and creative thinking. Generating the plan consisted of the following three activities: 1) Assessing the City s current state of energy management, 2) Establishing its energy management vision & objectives, and 3) Defining specific and measurable actions for improvement. Before the City s vision for improvement could be defined, it was important to understand how the City was currently managing its energy. Existing energy management efforts were assessed against several broad energy management categories in order to recognize the City s achievements and inform the development of this Plan s strategic objectives. These energy management categories included: Energy Management Policy, Goals and Commitment; Resources and Accountability; Investment Decisions and Purchasing; Training, Capacity Development & Awareness; Energy Monitoring & Tracking; Opportunity Identification & Project Delivery; and Project and Program Management To ensure that this Plan included input from all City departments, an energy policy survey was delivered to over 10 senior staff members. The survey included questions on 5 year planning goals, objectives and energy conservation opportunities. In addition, a second and more technically-focused survey was delivered to over 15 staff who gave feedback on existing energy management and energy conservation projects as well as ideas for conservation. Page 3 of 30

6 Lastly, energy audits were performed at five key municipal facilities to identify additional measures for City s action plan. Facilities assessments were undertaken at City Hall, Fire Hall #2, Annex Building, Kiwanis Centre and the Library. 1.3 Plan Scope For the purposes of this Plan, energy management has been defined as the continuous process of managing behavioural, organizational and technical change to improve energy performance. This Plan will serve as a guide to empower all City personnel to improve the City s energy management practices. The remainder of this document presents the Plan under the following sections: Section 2 Ontario s Energy Picture Section 3 The Corporate Energy Management Policy Section 4 Stratford s Current Energy Performance Section 5 The Energy Conservation Team Section 6 - Our Successes Section 7 Energy Conservation Action Plan Exhibit 1 (next page) provides an overview of the City s infrastructure considered to be within the scope of this Plan. The infrastructure is divided into four main energy account centres: facilities, water & sewage, parks, and street/traffic lights. Page 4 of 30

7 Exhibit 1 City Facilities and Infrastructure within the Boundaries of this Plan Name Address Use Area (ft 2 ) Facilities City Hall 1 Wellington Street Administrative Office 23,400 Annex Building 82 Erie Street Administrative Office 26,054 Tourism Alliance 47 Downie Street Administrative Office 5,610 Community Services 27 Morenz Drive Administrative Office 3,064 Avondale Cemetery 4 Avondale Avenue Administrative Office 5,535 Landfill Office 777 Romeo Street Administrative Office 608 Public Library 19 Andrew Street Public Library 17,202 Rotary Complex 353 McCarthy Road Indoor Ice Rink 155,600 William Allman Arena 17 Morenz Drive Indoor Ice Rink 38,610 Kiwanis Centre 111 Lakeside Drive Community Centre 35,770 Boathouse Information Centre 30 York Street Storage Facility 335 Queens Park Snack Bar 1 Upper Queens Park Storage Facility 7,275 Youth Focus Centre 171 Downie Street Community Centre 3,500 Dufferin Arena 51 Oak Street Indoor Ice Rink 35,000 Fire Station #1 388 Erie Street Fire Facility 7,292 Fire Station #2 44 McCarthy Road Fire Facility 4,832 Police Station 17 George Street Police Facility 28,800 Public Works Garage/Office 303 King Street Storage Facility 13,853 Transit Garage 20 Corcaran Street Storage Facility 12,640 Salt & Equipment Storage Shed 303 King Street Storage Facility 13,745 Traffic/Sewer Storage Shed 303 King Street Storage Facility 4,897 Anne Hathaway Day Care Centre 103 Bruce Street Other 5,500 Stratford Airport 3022 Line 40 Unit A Other 4,000 Economic Development Office 73 Albert Street Administrative Office 2,727 Lion s Pool 1 William Street Other 4,050 Police Building 154 Downie Street Police Facility 28,800 Storage 246 Railway Avenue Other 800 Normal School 270 Water Street Performing Arts Facility 35,200 Water & Sewage Waste Water Treatment Plant 701 West Gore Street WW Treatment - Sewage Pumping Stations (8 accounts) Various Sewage Pumping - Well/Water Pumping Stations (5 accounts) Various Water Treatment & - Distribution Water Towers (2 accounts) Various Other - Storm Water Ponds 3165 Line 33 Other - Monitoring Well 153 Wellington Street Other - Parks Park Infrastructure (26 accounts) Various Other - Street/Traffic Lights Street & Traffic Lights (6 accounts) Various Other - Page 5 of 30

8 2.0 Ontario s Energy Picture 2.1 Energy Supply and Pricing Forecasts for Ontario In 2013, Ontario had a total electricity supply mix of terawatt-hours (TWh), including avoided energy use as a result of conservation. Looking forward, supply requirements are expected to increase by approximately 20% over the next two decades. Acknowledging that energy efficiency is the cheapest source of new energy supply, Ontario s 2013 Long-Term Energy Plan 1 places a strong emphasis on conservation and demand management to avoid adding new generation to the grid. For example: In 2013, conservation represented 5%, or 8.6 TWh, of Ontario s total electricity supply; Over the next 20 years, the Province expects to offset almost all growth in electricity demand through energy efficiency programs and improved codes and standards. This represents a conservation forecast of 30 TWh, or 16% of Ontario s total electricity supply mix by Ontario municipalities are expected to contribute to this conservation target by developing energy management plans and taking action to improve their energy performance. Electricity costs are expected to increase over 20%, or roughly 4% per year, over the next five years. This further supports the need for Ontario municipalities to carefully manage their electricity use. Natural gas prices, although relatively low compared to historical averages, have begun to rise as illustrated by significant increases in spot market prices through the winter of 2013/2014. As a result, Union Gas has applied to the Ontario Energy Board for a rate increase of nearly 30%, which was approved in April Although this rate may be subject to change, any upward trend in gas costs will impact municipalities bottom lines. 2.2 Green Energy Act and Regulation 397/11 Ontario Regulation 397/11 of the Green Energy Act was developed to help public agencies, including municipalities, understand and better manage their energy consumption. Under the regulation, the City is required to develop and publish a five- 1 Ministry of Energy. December Achieving Balance: Ontario s Long-Term Energy Plan. Page 6 of 30

9 year corporate energy conservation and demand management plan by July 1, 2014, and update this plan every five years thereafter. Energy conservation and demand management plans are required to include: A summary of the City s energy consumption and emissions, A description of previous and current energy conservation measures, A description of renewable energy measures, Details on the goals, objectives and proposed measures that have been developed, A forecast of expected results for current and proposed measures, and A commitment from the City s senior management. This Plan has been structured to comply with each of the requirements specified in the regulation. Page 7 of 30

10 3.0 The Corporate Energy Management Policy The Stratford Corporate Energy Conservation Policy outlines the City s commitment to energy management, its vision statement, short- and long-term goals, and strategic objectives: Our Commitment As part of our long term financial planning strategy, the City of Stratford is committed to responsible energy management. To this end, the City will allocate the necessary staff and resources to implement a strategic energy management plan that will reduce energy consumption, and its related environmental impact. We are committed to using energy efficient practices throughout all of the facilities, fleet, operations and equipment wherever it is cost effective to do so. Our Vision Through an energized and engaged organization, Stratford will continuously improve the energy performance of its built environment in order to minimize carbon emissions and energy costs. Our Goals Short Term: 4 % Reduction in Energy Consumption by 2019 over the base year of Long Term: 6 % Reduction in Energy Consumption by 2024 over the base year of Strategic Objectives (Pillars) Pillar 1: Energy Monitoring & Tracking Monitor and track energy use by providing an energy information system that makes energy consumption visible to all staff, supports management decision making, and improves opportunity identification and continuous improvement efforts. Pillar 2: Training, Capacity Development and Awareness Develop a training program which ensures key employees have the appropriate knowledge regarding energy use and conservation. The program will support the creation of a conservation culture through engagement and awareness. Pillar 3: Opportunity Identification and Project Delivery Deliver energy cost savings through the identification and implementation of processes, programs and projects which reduce energy consumption. Page 8 of 30

11 4.0 Stratford s Current Energy Performance 4.1 Stratford s Energy Baseline An energy baseline has been compiled to provide a quantitative reference case for comparing the City s future energy performance. Energy consumption data for 2011 were collected from Festival Hydro and Union Gas for each of the City s facilities, as well as its water and sewage facilities, parks, and street lighting accounts. The resulting data set is representative of the City s current level of energy performance, however, it has not been corrected for yearly weather variations. Exhibit 2 presents the City s baseline energy data by fuel type and in aggregate, expressed in equivalent kilowatt hours (ekwh). In 2011, the City consumed 23,405,310 ekwh and was responsible for 2,651 tonnes of associated greenhouse gas (GHG) emissions. Account Centre Exhibit 2 City Energy Baseline (2011) Peak Demand (kw) Electricity (kwh) Nat. Gas (m 3 ) Total Energy (ekwh) Facilities 1,543 6,587, ,589 14,543,747 Water & Sewage 1,129 5,724,360-5,724,360 Parks , ,164 Street/Traffic Lights 633 2,879,039-2,879,039 Total by Fuel Source (ekwh) 15,448, ,714 23,405,310 Greenhouse Gas Emissions 2,651.4 tonnes Exhibit 3 (next page) shows the breakdown of the City s total baseline energy consumption by energy source. Approximately one third of its energy requirements are met by natural gas; the primary heating source for most City facilities. The remaining two thirds are met by electricity. Page 9 of 30

12 Exhibit 3 Energy Use By Source Exhibit 4 shows the breakdown of the City s total baseline energy by energy account centre. Facilities account for the majority of energy use, while water and sewage infrastructure represents a quarter, and street lighting represents an eighth of the City s energy use. Exhibit 4 Percentage Energy Use (kwh) By Energy Account Centre Exhibit 5 (next page) compares energy use for each City facility by ekwh which combines electrical and natural gas consumption: The Rotary Complex is by far the largest consumer, using approximately 5 million ekwh per year (representing 34% of the total consumption for the Facilities account centre); The William Allman Arena is second, using approximately 2 million ekwh per year (representing 14%); and Page 10 of 30

13 The Kiwanis Centre, City Hall, and Dufferin Arena are tied for third, each using approximately 1 million ekwh per year (representing 7% each) Exhibit 5 Facility Energy Use (ekwh) The City s Waste Water Treatment Plant and Water Treatment facilities fall under the Water and Sewage account centre and are not included in this graph. For reference, Page 11 of 30

14 Energy Intensity [ekwh/ft 2 ] Ratio [Actual/Benchmark] City of Stratford Corporate Energy Conservation & Demand Management Plan they consume approximately 5.4 million ekwh per year, slightly more than the Rotary Complex. To put Exhibit 5 into perspective, it is helpful to compare the top consuming facilities to average benchmarks in Ontario s municipal sector. Exhibit 6 presents the energy intensities (ekwh/ft 2 ) of the City s major facilities ordered from best (left) to worst (right) compared to average benchmarks. The lower the Energy Intensity, the more energy efficient the building, as this is a measure of energy consumption per square foot of conditioned space. The benchmarking data is drawn from Local Authority Services Energy Performance Benchmarking of Ontario s Municipal Secto report. Exhibit 6 Facility Energy Intensity Benchmarks The City facilities perform very well as a whole against other municipal districts and this is in part due to the retrofit work that has already been completed conservation team. The facilities shown in Exhibit 6 can be categorized into two groups: Better than the Average Benchmark: The Police Station, Public Library, Rotary Complex, Transit Garage, Fire Station #1, Public Works Garage/Office, Page 12 of 30

15 Youth Focus Centre, Fire Station #2, Annex Building, Dufferin Arena, Kiwanis Centre and Tourism Alliance have better than average energy intensities (ratios of actual vs. benchmark that are less than one). Worse than Average Benchmark: William Allman Arena and City Hall have worse than average energy intensities (ratios of actual vs. benchmark that are greater than one). 4.2 Current Energy Procurement and Pricing Exhibit 7 shows that the City is currently spending over $2 million a year on energy across its four account centres. Exhibit 7 Current Energy Expenses (Pre-Tax) Account Centre Expense Facilities $1,032,950 Water & Sewage $621,500 Parks $56,750 Street/Traffic Lights $334,050 Total Cost $2,045,250 Electricity: While electricity is delivered by Festival Hydro, the City has contracted Local Authority Services to supply electricity under its electricity hedge purchase program. The majority of City s accounts fall under one of two rate categories: General Service Less than 50 kw: Monthly Fixed Cost = $38.90 Variable Consumption Cost = $0.13/kWh (including LAS commodity, global adjustment, delivery, regulatory, and debt-retirement charges) General Service 50 kw to 4,999 kw: Monthly Fixed Cost = $ Variable Demand Cost = $6.48/kW (including commodity and delivery charges) Variable Consumption Cost = $0.10/kWh (including LAS commodity, global adjustment, delivery, regulatory, and debt-retirement charges) Natural Gas: The City s natural gas is supplied by Union Gas and the current price ranges from $0.24 to $0.26/m 3. Page 13 of 30

16 5.0 The Energy Conservation Team The City of Stratford s Energy Conservation Team has provided the leadership required to achieve significant energy conservation savings across the built environment. The team, described below, will continue to be responsible for delivering the plan s vision, objectives and goals as well as maintaining the City s focus on energy efficiency in the years to come. Energy Conservation Sponsor: Ron Shaw, C.A.O. The Energy Conservation Sponsor is responsible for legitimizing the Plan s high-level goals and objectives, keeping abreast of major project activities, and approving resources and funding for the team and its approved projects. This position is ultimately responsible for securing spending authority and resources for the Plan and is therefore the highest ranking management person on the Energy Conservation Team. Finance Champion: Andre Morin, Director of Corporate Services The role of the Finance Champion is to provide clear guidance, assistance and support to the Energy Conservation Team on internal and external funding mechanisms and to include the team in relevant decision-making and budget discussions. The Finance Champion will support the use of life cycle costing and discounted cash flow-based assessments for capital projects and will include energy efficiency in procurement criteria where relevant. In addition the Finance Champion will ensure that suppliers offer energy efficient alternatives/options where available and include energy criteria/performance in service contracts. Energy Management Champion: Dave Carroll, Chief Building Official The Energy Management Champion has direct knowledge of the City s major energyusing facilities and assets and is responsible for developing and maintaining the focus for the Energy Conservation Team. Their role is to coordinate meetings, set agendas, and delegate and manage tasks related to the Energy Conservation Team. This person also helps create and own the vision for the Plan and will help the Plan to maintain momentum, particularly if barriers arise. Page 14 of 30

17 Corporate Energy Conservation Team: The Energy Conservation Team functions on a strategic level to set expectations for each of the facilities, to develop metrics for tracking overall energy improvement, and to build accountability for energy management activities. In addition, this crossfunctional team has direct responsibility for the consumption of energy within their respective departments. As a group, the team supports and monitors energy management initiatives (processes, programs, and projects) at the various facilities and across the corporation. The Energy Conservation Team consists of: Dave Carroll, Chief Building Official Jim Bryson, Community Facilities Manager Joe Salter, Manager of Water Treatment Mike Gornyiczki, Deputy Fire Chief Page 15 of 30

18 6.0 Our Successes 6.1 Completed Energy Conservation Measures The City has completed a number of energy conservation projects over the last ten years which have contributed significantly to energy savings. These projects demonstrate that the City has already established itself as a corporation that actively manages energy, and provide a strong base of energy management experience upon which to build. Exhibit 8 below summarized the details of the completed projects. Exhibit 8 Completed Energy Conservation Measures Facility Measure Type Project Implementation Date General Lighting Replaced Incandescent lights with CFLs across all City facilities Completed over recent years General Lighting Replaced T12s with T8s across all City facilities Completed over recent years Well Pump Stations Envelope Insulated well pump stations at the same time other maintenance was being done Ongoing over recent years Rotary Arena Refrigeration Implemented laser level ice resurfacing 2008 Ice Plant William Allman Refrigeration Installed new refrigeration system Arena Ice Plant William Allman Refrigeration Installed reverse osmosis system (Jet Ice) Arena Ice Plant Rotary Arena Power Factor Power factor correction 2010 Dufferin Arena Deep Retrofit Implemented deep retrofit project. Measures 2010 Project included: Refrigeration Ice Plant: ECO CHILL refrigeration system installed. Waste heat being used to heat concrete flooring of dressing rooms, domestic hot water, and snow melting Lighting: T5 fixtures installed, Solera glass panels installed in arena to enable daylighting Envelope: Green roof installed Controls: New ice plant control system (CIMCO 6000E) is also controlling other major building systems Police Station HVAC Installed new efficient roof top unit Police Station Envelope Window replacement Ongoing over recent years Tourism Building Envelope Replaced single pane glazing in the atrium with double 2011 pane thermal glazing. Public Works Garage/Office Envelope Installed new overhead doors Completed over recent years Annex Controls Installed lighting motion sensors 2010 Annex Controls Updated lighting circuits to increase number of 2012 Page 16 of 30

19 Facility Measure Type Project Implementation Date lighting switches. Annex Power Factor Power factor correction 2010 Library HVAC Installed high efficiency boiler 2004 Library HVAC Installed new A/C for server room 2013 Kiwanis Centre Lighting Installed induction lighting in Tom Patterson part of 2010 the facility. City Hall Controls Installed lighting motion sensors 2010 Fire Station #1 Envelope Installed six new overhead doors Fire Station #1 HVAC Installed LG (LS090CP) A/C unit (serving Dispatch) 2007 Fire Station #1 HVAC Installed Lochinvar Knight KBN 285 natural gas boiler 2009 (serving Office/Living Area); installed 2 Beacon Morris BRT 120 power vented unit heaters (serving Apparatus Floor) Fire Station #1 DHW Installed Lochinvar SSS081 indirect water heater 2009 Fire Station #1 HVAC Installed 2 more Beacon Morris BRT 120 power vented 2010 unit heaters (serving Apparatus Floor) Fire Station #1 Fire Equipment Installed new station compressor 2010 Fire Station #2 Envelope Installed four new overhead doors 2004 Fire Station #2 HVAC Installed Resner unit heater 2005 Fire Station #2 HVAC / DHW Installed 90% AFUE boiler / domestic hot water system 2007 Fire Station #2 HVAC Installed Beacon Morris unit heater 2010 Fire Station #2 Fire Equipment Installed new station compressor 2010 Police Station HVAC Installed new efficient roof top unit Transit Garage Envelope Installed new overhead doors 2013 Fire Station #1 Lighting 7 exterior HPS wall packs replaced with CFLs 2012 Fire Station #2 Lighting 3 exterior HPS wall packs replaces with CFLs; 1 exterior HPS 250W flood light replaced with CFL Fire Station #2 Envelope Installed new roof and increased attic ventilation to R Page 17 of 30

20 7.0 Energy Conservation Action Plan 7.1 Action Plan List A critical part of any plan is the detailed list of specific actions needed to achieve the desired goals and objectives. The City of Stratford has developed a key project list which will help ensure the City meets the energy reduction goals set out in the Corporate Energy Management Policy (section 3.0). The plan has been divided into three sections to match the three pillars of the Policy: Pillar 1: Energy Monitoring & Tracking Pillar 2: Training, Capacity Development and Awareness Pillar 3: Opportunity Identification and Project Delivery The detailed list of project included in the plan, which covers a period from July 2014 to June 2019, can be found in Appendix A. 7.2 Schedule and Forecast The specific projects from the Action Plan (Appendix A) have been summarized in a delivery schedule which can be found in Appendix B. Using the schedule as a baseline, a cumulative savings graph has been generated to show forecasted annual savings from the conservation measures over time. Please see Exhibit 9 (next page). It is projected that over $180,000 of annual avoided energy cost will be saved once the projects have been completed. It should be noted that the projections have been calculated in 2014 dollars and do not include expected rises in energy costs. For this reason, the estimate is most likely conservative. The projects which result in the largest savings are in three different departments. The retrofit of the street lighting to LED, the lighting upgrade to the Rotary Arena, and the equipment upgrades in the Waste Water Treatment Plant. Additionally, a major heating and lighting retrofit of the Kiwanis Centre will contribute significant energy savings. The Kiwanis Centre project has not been added to the energy conservation summary in this report because the estimated savings have not yet been finalized. Page 18 of 30

21 Exhibit 9 Projected Cumulative Annual Energy Savings from ECMs (2014 Dollars and Energy Pricing) Exhibit 10 Total Energy Savings by Account Centre Account Centre Baseline (ekwh) Energy Savings (ekwh) % of Baseline Facilities & Parks 14,801, , % Water & Sewage 5,724, , % Street/Traffic Lights 2,879,039 1,000, % Total 23,405,310 1,773, % Exhibit 10 above shows the energy savings as a function of building/account type. A percent savings of over 7.0% could be achieved if all of the projects are completed as scheduled. The energy baseline and savings are shown in ekwh or equivalent kwh which is a combination of all energy sources (electricity and natural gas) measured. The baseline year is Page 19 of 30

22 Appendix A: Corporate Energy Conservation Action Plan Page 20 of 30

23 Appendix A: Action Plan City of Stratford Corporate Energy Conservation Action Plan Vision: Through an energized and engaged organization, Stratford will continuously improve the energy performance of its built environment in order to minimize carbon emissions and energy costs. Goal: 4% Reduction in Energy Consumption by 2019 over the base year of Notes: The projected savings and cost estimates are based on 2014 energy prices and dollars. All capital projects are subject to funding availability and council approval. PILLAR 1: ENERGY MONITORING & TRACKING Facility General Measure Type Monitoring & Tracking Activity Description Develop a performance baseline for top 10 energy using facilities which clearly identifies weather dependant and independent consumption. Purchase or develop a system to track monthly energy and cost data consistently across departments. This may be in conjunction with the performance baseline program above. Report on performance for key facilities, and for the City s complete asset portfolio to various levels of the organization. Develop method of making energy consumption visible to all employees. Projected Annual Savings Indirect Savings 1 Cost Estimate Internal labour costs & External consultant fees (TBD) Completion Date and Performance Indicators Duration Q4, 2015 Historical energy and weather data is used to statistically define the end use breakdown for the facilities. Techniques like CUSUM and linear regression are used to develop accurate baseline models. Billing data is being entered on monthly basis consistently across departments Department tracking data is reported to the Energy Committee on a quarterly basis and aggregated Energy committee has working knowledge of baseline models and is able to monitor facility performance and portfolio performance on a quarterly basis and an annual basis moving forward Quarterly and Annual Report templates are established for department managers, key City staff, and Council All staff has access to cost and consumption of energy in the facility in which they work. 1 Actions identified through monitoring and tracking could result in a 5-10% reduction in HVAC energy consumption at a given facility. PILLAR 2: TRAINING, CAPACITY DEVELOPMENT and AWARENESS Facility Measure Type Action Projected Annual Savings Cost Estimate Completion Date Performance Indicators Page 21 of 30

24 Appendix A: Action Plan PILLAR 2: TRAINING, CAPACITY DEVELOPMENT and AWARENESS Facility Measure Type Action General Training Undertake a training needs assessment to address capacity gaps and coordinate general energy management training for employees. Projected Annual Savings Cost Estimate Completion Date Performance Indicators Indirect TBD Q4, 2014 Specific training needs identified, specific to staff s needs Savings 2 Training courses identified, booked and delivered General Training Investigate specific technical training options for targeted staff to bridge identified training gaps (assess NRCan s customized Dollars to $ense Energy Management Workshops as a possible option). General Process Develop formal method for collecting employee ideas and returning feedback (for example special address for ideas). General Process Develop method for evaluating new ideas / technologies. Use the method to investigate and evaluate non-traditional ideas (Backyard power; Kinetic Matting; Use of Broadband Network; Waterloo Portal; Toshiba; Light Pipes; Multiuse buildings (Police, Fire, Library etc.)). Indirect TBD Q3, 2014 Savings 2 N/A N/A Internal labour costs Internal labour costs Training needs identified for arena and custodial staff (focus on refrigeration and general knowledge) Initial training for Q3, 2014 booked Complete Q4, 2015 Q4, 2015 Mechanism in place to collect ideas Incentive defined to encourage participation Employees notified about mechanism and incentive Ideas being generated and feedback being provided Q4, 2015 Mechanism in place to evaluate ideas 2 Behaviour changes caused by training could result in a 5-10% reduction in energy consumption at a particular facility, or for a given building system (e.g. refrigeration plant). PILLAR 3: OPPORTUNITY IDENTIFICATION and PROJECT, PROGRAM and PROCESS DELIVERY Facility Measure Type Action Elect. Projected Annual Savings Nat. Gas. $ Cost Estimate Completion Date Performance Indicators General Lighting Develop LED street lighting proposal (Subject to >1,000 December Proposal approved - >$142,000 $1,179,000 council approval) MWh 2015 LED street lighting installed General Controls Investigate options for improving building External Report completed with January automation and HVAC controls N/A N/A N/A consultant recommendations and 2015 fees (TBD) business case. General HVAC Replace all plug-in electric heaters with low 1350 kwh - $235 $100 November All plug-in electric heaters Page 22 of 30

25 Appendix A: Action Plan PILLAR 3: OPPORTUNITY IDENTIFICATION and PROJECT, PROGRAM and PROCESS DELIVERY Facility Measure Type Projected Annual Savings Cost Estimate Completion Date Action Elect. Nat. $ Performance Indicators Gas. wattage radiant panel heaters 1.3kW 2014 have been replaced General Program Develop energy efficiency guidelines and add to purchasing policy for expense items N/A N/A N/A Internal labour costs Q4, 2014 Energy efficiency guidelines developed and integrated with City purchasing policy General Program Develop energy efficiency and life cycle costing requirements and add to RFP and purchasing protocols for capital items and projects N/A N/A N/A Internal labour costs Q4, 2014 Energy efficiency and life cycle costing requirements defined and integrated with RFP and purchasing protocols Waste Water Treatmen t Plan (WWTP) Process Installation of VFDs on influent pumps WWTP Process Replacement of screw pump motor #1 in the filter building with high efficiency NEMA motor WWTP Process Replace sludge pumps in the digester building with new pumps that have high efficiency NEMA motors and install a VFD to control sludge flow WWTP Process Replacement and resizing of current RAS pumps with new pumps that have high efficiency NEMA motors Romeo Well Pumping Station Romeo Well Pumping Station Romeo Well Pumping Process Process Process 100,000 kwh 42,000 kwh 70,000 kwh 300,000 kwh Installation of a VFD for both 50 HP deep well low lift pumps (field wells 6 and 7) 25,000 kwh Investigate replacement of motors for high lift vertical turbine pumps (2 x 50 HP, 1 x 60 HP) with high efficiency NEMA motors Installation of VFDs on all four 20 HP deep well low lift pumps (field wells 1 4) - $13,000 $70,000 Q4, $5,500 $21,000 Q4, $9,000 $50,000 Q4, $30,000 $130,000 Q4, $3,200 $30,000 Q4, 2018 N/A - N/A 18,000 kwh Internal labour costs Q4, $2,300 $28,000 Q4, 2016 VFDs installed New motor installed New pumps and VFD installed New pumps installed VFDs installed Report completed with recommendations and business case VFDs installed Page 23 of 30

26 Appendix A: Action Plan PILLAR 3: OPPORTUNITY IDENTIFICATION and PROJECT, PROGRAM and PROCESS DELIVERY Facility Station O Loane Well Pumping Station Rotary Arena Rotary Arena Rotary Arena Rotary Arena Rotary Arena Rotary Arena William Allman Arena William Allman Arena Measure Type Process Lighting Lighting Refrig. Ice Plant Refrig. - Ice Plant Controls HVAC Lighting Refrig. Ice Plant Action Installation of a capacitor bank to improve power factor LED retrofit over both ice pads replacing W MH fixtures with 420W LED Replace T8, CFLs etc. lighting with LED. Motion sensors and zonal wiring Install reverse osmosis system Install Desuperheater to preheat DHW (CIMCO) Elect. Projected Annual Savings Nat. Gas. $ Cost Estimate Completion Date - - >$3,000 $3,000 Q4, ,000 kwh Scope TBD - >$18,900 $47,400 April 2014 Scope TBD Scope TBD Scope TBD Q4, 2015 Scope TBD - Scope TBD Scope TBD Q4, 2016 Scope TBD Investigate increasing setback at night (currently 4C) with gradual reheat before 6:00am. Scope TBD Installation of a Snow Pit Replace 1000 MH lighting with LED lighting on one pad Add heat recovery to the refrigeration plant. Desuperheater from CIMCO. Scope TBD Scope TBD Scope TBD Scope TBD Q2, 2016 Scope TBD $0 Q3, 2014 TBD $1,000,000 Q2, ,800 kwh Scope TBD - >$9,400 $23,700 TBD Scope TBD Scope TBD Scope TBD Q3, 2016 Performance Indicators Capacitor bank installed LEDs installed over ice pads Additional heat load savings in ice plant. Scope finalized (complete with savings and cost estimates) Lighting retrofit implemented Scope finalized (complete with savings and cost estimates) Reverse osmosis system installed Scope finalized (complete with savings and cost estimates) Heat recovery project implemented Scope finalized (complete with savings estimates) Setback increased Dehumidification and space conditioning savings LEDs installed over ice pad Scope finalized (complete with savings and cost estimates) Heat recovery project implemented Page 24 of 30

27 Appendix A: Action Plan PILLAR 3: OPPORTUNITY IDENTIFICATION and PROJECT, PROGRAM and PROCESS DELIVERY Facility Dufferin Arena Police Building Anne Hathaway Day Care Centre Measure Type Refrig. Ice Plant Action Install reverse osmosis system Elect. HVAC Replace 2 more RTUs: > 5% reduction in HVAC sys. HVAC Replace 5 original cooling rooftop units (20yrs old) Replace 5 internal furnace units (30yrs old) Annex Lighting Upgrade elevator T12 lighting to efficient T8 and install occupancy sensor Annex Lighting Upgrade exterior wall packs and flood lights to LED technology Annex Controls Install occupancy sensor in 3rd Flr file/plotter room Projected Annual Savings Nat. Gas. $ Cost Estimate Completion Date Scope TBD - Scope TBD Scope TBD Q4, 2017 > 15% reduction in HVAC sys > 10% reductio n in HVAC > 30% reductio n in HVAC Scope TBD ~ $18,000 Jan., 2016 Scope TBD $40,000 June, kwh $35 $300 Q3, kwh $545 $ Q3, kwh $100 $250 Q3, 2014 Annex Controls Install timer on DHW recirc pump to shut off after hours 375 kwh - $45 $100 Q4, 2014 Annex DWH Insulate hot water pipes at hot water heater 4-9% HWH $200 Q4, 2014 savings Annex Controls Integrate supplemental baseboard heating with I- vu rooftop units controls TBD Q4, 2015 Library Lighting Upgrade lighting in upstairs storage area outside 650 kwh offices from T12 to T8 (or T5) (0.2 kw) $75 $300 Q1, 2015 Library Lighting Upgrade elevator T12 lighting to efficient T8 and install occupancy sensor 300 kwh $35 $200 Q1, 2015 Library Controls Install occupancy sensor in staff washroom Est. 50% $200/sensor (lunchroom) and single use washroom (elevator) reduction Q3, 2014 Library Controls Re-program thermostats to deeper setback based 2% on occupied schedule savings $0 Q3, 2014 for Performance Indicators Scope finalized (complete with savings and cost estimates) Reverse osmosis system installed Scope finalized (complete with savings and cost estimates) RTUs installed Scope finalized (complete with savings and cost estimates) RTUs installed T8 lighting installed Exterior wall pack upgraded Occupancy sensors installed Timer installed Hot water pipes insulated System integrated Lighting retrofit completed T8 lighting installed Occupancy sensors installed Thermostats re-programmed Page 25 of 30

28 Appendix A: Action Plan PILLAR 3: OPPORTUNITY IDENTIFICATION and PROJECT, PROGRAM and PROCESS DELIVERY Projected Annual Savings Facility Measure Action Type Elect. Nat. Gas. $ every 1F setback Library Envelope Weather-strip around operable windows and seal Decreas around non-operable ed heat loss Library DHW Insulate hot water pipes at hot water heater 4-9% HWH savings Library HVAC Replace 2 smaller rooftop units > 5% reduction in HVAC sys. Kiwanis Centre Kiwanis Centre Kiwanis Centre Kiwanis Centre Kiwanis Centre HVAC Phase 1 Tom Patterson part of the building. Implement major HVAC retrofit. Project scope involves AHU replacement, boilers, and VAV boxes in every room. HVAC Phase 2 The rest of building. HVAC retrofit, boilers, BAS, VAV boxes Lighting Controls Appliance s Upgrade T12, MH, CFL lighting in various areas to LED technology with occupancy sensors. 20% Reduction 20% Reduction 550 kwh (1.06 kw) > 10% reductio n in HVAC 30% Reducti on 30% Reducti on Cost Estimate Completion Date $300 Q3, 2014 $200 Q3, 2014 Scope TBD ~ $18,000 Q4, 2014 Complete March 2014 Sept $70 $ Q3, 2014 Install occupancy sensor in large kitchen, stage workroom, and theatre dressing rooms 4500 kwh $540 $1200 Q3, 2014 Unplug or remove unnecessary fridges, upgrade fridge in kitchenette 1000 kwh $120 $600 Q3, 2014 City Hall HVAC Replace Electric Heaters with Radiant Panels 1350 kwh 1.3kW - $235 $100 Nov City Hall Controls Temperature Setbacks 3-4% Savings for every 1 C setback $0 Q4, 2014 City Hall Controls Temperature Set Point in Unfinished Attic 5-7% Savings in Attic Heat for every 1 C $0 Q4, 2014 reduction Performance Indicators Weather-stripping installed Hot water pipes insulated Scope finalized (complete with savings and cost estimates) RTUs installed Phase 1 of major retrofit completed Phase 2 of major retrofit completed Lighting retrofit completed Jim to update with info from Phillips Occupancy sensors installed Jim to update with info from Phillips Appliances unplugged or removed Plug-in electric heaters have been replaced Temperature setback implemented Temperature set point adjusted Page 26 of 30

29 Appendix A: Action Plan PILLAR 3: OPPORTUNITY IDENTIFICATION and PROJECT, PROGRAM and PROCESS DELIVERY Projected Annual Savings Facility Measure Action Type Elect. Nat. Gas. $ City Hall Envelope Draft Reduction Heat Loss Reducti on City Hall Lighting Replace Metal Halide Floodlights on Roof with LED alternative. City Hall Lighting Replace T12 lights with T8 with motion sensor in Elevators Fire Controls Programmable Thermostats Station #2 Fire Station #2 Fire Station #2 Fire Station #2 Controls Timers for A/C Units 9,600-14,000 kwh - $1000- $1400 Cost Estimate Completion Date $350 Q4, 2014 $ $10,000 Q4, kwh $35 $200 Q2, % savings for every 1 C setback $850 $900 Q4, kwh - $55 $32 Q4, 2014 Envelope Draft Reduction Weather Stripping and Caulking Heat Loss Reducti on $200 Q4, 2014 Lighting Occupancy Sensors in Offices, WRs, Lounge and Mechanical Room 870 kwh $110 $450 Q4, 2014 Performance Indicators Weather-stripping and caulking implemented Roof floodlights replaced T8 lighting installed Programmable thermostats installed A/C timers installed Weather-stripping and caulking implemented Occupancy sensors installed Page 27 of 30

30 City of Stratford Project Delivery Schedule Corporate Energy Conservation & Demand Management Appendix B: Energy Conservation Plan Project Delivery Schedule Page 28 of 30

31 Appendix B: Project Schedule City of Stratford CECDMP - Project Schedule Facility Measure Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 General Monitoring & Tracking x General General energy management training x General Technical training for targeted staff x General Develop method for collecting ideas x General Develop method for evaluating ideas x General LED street lighting proposal x General Options for improving building automation x General Low wattage radiant panel heaters x General Add EE guidelines to purchasing policy x General Add EE requirements to purchasing protocols x WWTP VFDs on influent pumps x WWTP Replace screw pump motor x WWTP Replace sludge pumps and add VFDs x WWTP Replace RAS pumps x Romeo Well VFDs on deep well low lift pumps (field x Romeo Well Investigate motor replacement for high lift x Romeo Well VFDs on deep well low lift pumps (filed x O'Loane Well Capacitor Bank x Rotary Arena LED retrofit (ice pads) x Rotary Arena Lighting retrofit x Rotary Arena Reverse osmosis system x Rotary Arena Heat recovery from refrigeration plant x Rotary Arena Nightime temperature setback x Rotary Arena Snow Pit Installation x William Allman LED retrofit (ice pad) William Allman Heat recovery from refrigeration plant x Dufferin Arena Reverse osmosis system x Police Building RTU replacement (x2) x Day Care Centre RTU replacement (x5) x Annex T8 lighting (elevator) x Annex Exterior lighting x Annex Occupancy sensors x Annex Timer for DHW recirc pump x Annex Hot water pipe insulation x Page 29 of 30

32 Appendix B: Project Schedule Continued: City of Stratford CECDMP - Project Schedule Facility Measure Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Library Lighting retrofit (upstairs storage area) x Library T8 lighting (elevator) x Library Occupancy sensors x Library Re-program thermostats to deep setback x Library Window weather-stripping x Library Hot water pipe insulation x Library RTU replacement (x2) x Kiwanis Centre Major HVAC retrofit - Phase 1 x Kiwanis Centre Major HVAC retrofit - Phase 2 x Kiwanis Centre Lighting retrofit x Kiwanis Centre Occupancy sensors x Kiwanis Centre Unplug/remove appliances x City Hall Low wattage radiant panel heaters x City Hall Temperature setbacks x City Hall Lower tempearture setpoint in attic x City Hall Draft reduction x City Hall Roof floodlights x City Hall T8 lighting (elevator) x Fire Station #2 Programmable thermostats x Fire Station #2 Timers for A/C units x Fire Station #2 Weather-stripping and caulking x Fire Station #2 Occupancy sensors x Page 30 of 30

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Table of Contents Our Commitment to Energy Conservation...1 1.0 Introduction...2 2.0 Energy Supply in Ontario...3 2.1 Energy Supply

More information

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Developed by the Energy Management Committee with Assistance from: Table of Contents 1.0 Introduction...1 1.1 Overview... 1 1.2

More information

Corporate Energy Conservation and Demand Management Plan 2014. Engineering Department. Public Works Division

Corporate Energy Conservation and Demand Management Plan 2014. Engineering Department. Public Works Division Engineering Department Public Works Division August 14 th, 2014 Table of Contents 1.0 Current State of Corporate Energy Management... 3 1.1 Energy Data Management... 3 1.2 Energy Supply Management... 3

More information

Energy Conservation and Demand Management Plan. Township of Wellesley: 2014-2019. Developed by Wendy Smith, Administrative Assistant Fire/Recreation

Energy Conservation and Demand Management Plan. Township of Wellesley: 2014-2019. Developed by Wendy Smith, Administrative Assistant Fire/Recreation Energy Conservation and Demand Management Plan Township of Wellesley: 2014-2019 The Township of Wellesley will strive to continually reduce our total energy consumption and associated greenhouse gases

More information

Commitment. Everyone has a role in the wise use of Energy and to showcase the appropriate leadership within Corporation Facilities and Operations.

Commitment. Everyone has a role in the wise use of Energy and to showcase the appropriate leadership within Corporation Facilities and Operations. Township of McNab/Braeside 2014 2018 Energy Management Plan Commitment Declaration of Commitment: The Mayor, Council, and Senior Management, will demonstrate both the Leadership and Commitment required,

More information

Engineering Department. Public Works Division. August 14th, 2014

Engineering Department. Public Works Division. August 14th, 2014 Corporate Energy Conservation and Demand Management Plan 201,) C000ui Ontaria,Canada "Ontario's Feel Good Town' Engineering Department Public Works Division August 14th, 2014 Corporate Energy Conservation

More information

Town of Petawawa Corporate Energy Management Plan

Town of Petawawa Corporate Energy Management Plan Town of Petawawa Corporate Energy Management Plan 2014/05/20 Page i TABLE OF CONTENTS SECTION PAGE 1. PURPOSE... 3-1 1. ENERGY MANAGEMENT PLAN OUTLINE FOUR VITAL PILLARS... 3-2 1.1 Top Management Support...

More information

Township of T Tay Energy Conservation and Demand Management Plan July 1, 2014 to June 30, 2019

Township of T Tay Energy Conservation and Demand Management Plan July 1, 2014 to June 30, 2019 Township of Tay Energy Conservation and Demand Management Plan July 1, 2014 to June 30, 2019 Table of Contents Executive Summary... 4 Introduction... 5 Organization... 5 Personnel Involved... 6 Commitment...

More information

Home Energy Efficiency and Conservation: Call to Action. July 23, 2015 Dave Blake and David Wood REEP Green Solutions

Home Energy Efficiency and Conservation: Call to Action. July 23, 2015 Dave Blake and David Wood REEP Green Solutions Home Energy Efficiency and Conservation: Call to Action July 23, 2015 Dave Blake and David Wood REEP Green Solutions Today s Agenda Background Understanding where you are: Energy Usage EnerGuide Home Energy

More information

STRATEGIC ENERGY MANAGEMENT PLAN FOR NORFOLK GENERAL HOSPITAL 2014

STRATEGIC ENERGY MANAGEMENT PLAN FOR NORFOLK GENERAL HOSPITAL 2014 STRATEGIC ENERGY MANAGEMENT PLAN FOR NORFOLK GENERAL HOSPITAL 2014 1 TABLE OF CONTENTS Introduction Energy Management Vision Guiding Principles for Energy Management Business Case for Strategic Energy

More information

DATE: June 16, 2014 REPORT NO. PW2014-050. Chair and Members Committee of the Whole Operations and Administration

DATE: June 16, 2014 REPORT NO. PW2014-050. Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION DATE: June 16, 2014 REPORT NO. PW2014-050 TO: FROM: Chair and Members Committee of the Whole Operations and Administration Geoff Rae, MBA, P.Eng. General

More information

Electrical infrastructure serving the city of London CITY OF LONDON. 2012 Corporate Energy Consumption Report

Electrical infrastructure serving the city of London CITY OF LONDON. 2012 Corporate Energy Consumption Report Electrical infrastructure serving the city of London CITY OF LONDON 2012 Corporate Energy Consumption Report September 2013 TABLE OF CONTENTS CORPORATE ENERGY MANAGEMENT - UPDATE... 3 1 CORPORATE ENERGY

More information

This guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in TAME+.

This guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in TAME+. TAME+ Guidebook This guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in TAME+. November 2015 Contents 1.0 Program Overview...

More information

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit? Industrial Green Building 101 Opportunities and Challenges Joanne Sawatzky Senior Project Manager, Light House Sustainability at Work Re-visioning a Sustainable False Creek Flats Light Industrial Green

More information

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings J A NUARY 2015 INTRODUCTION This Research Report explores best practices and approaches for reducing greenhouse gas (GHG)

More information

COUNTY OF PETERBOROUGH - ENERGY MANAGEMENT PLAN TEMPLATE

COUNTY OF PETERBOROUGH - ENERGY MANAGEMENT PLAN TEMPLATE COUNTY OF PETERBOROUGH - ENERGY MANAGEMENT PLAN TEMPLATE Energy management plans can be extremely large, complicated, and expensive. But they don t need to be. In its simplest form, an energy management

More information

City of Peterborough s Corporate Energy Management Plan

City of Peterborough s Corporate Energy Management Plan City of Peterborough s Corporate Energy Management Plan 1. troduction Successful energy management depends on the integration of energy efficient practices into the business as usual conduct of the organization,

More information

Energy Conservation and Demand Management Plan Municipality of Oliver Paipoonge 2011 to 2018

Energy Conservation and Demand Management Plan Municipality of Oliver Paipoonge 2011 to 2018 Energy Conservation and Demand Management Plan Municipality of Oliver Paipoonge 2011 to 2018 COMMITMENT Declaration of Commitment: The Municipality of Oliver Paipoonge will allocate the necessary resources

More information

SAVE ENERGY AT HOME INSULATE AND AIR SEAL

SAVE ENERGY AT HOME INSULATE AND AIR SEAL SAVE ENERGY AT HOME INSULATE AND AIR SEAL Check the roof insulation level and add insulation to maintain minimum R-38 (6 of blown cellulose or equal). Use R-19 between frame or R-10 rigid insulation for

More information

Corporate Energy Management Plan Date: June 18, 2014

Corporate Energy Management Plan Date: June 18, 2014 Corporate Management Plan Date: June 18, 2014 Local Authority (LAS) Contents 1. Executive Summary... 3 2. Commitments... 4 2.1 Declaration of Commitment... 4 2.2 Vision... 4 2.3 Policy... 4 2.4 Goals...

More information

Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response

Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response Overcoming Financial Barriers to Energy Efficiency April 6, 2010 Overview PG&E and Energy Efficiency CA Energy Efficiency Regulatory & Policy Roadmap Financing Options for Efficiency & Demand Response

More information

County of Hastings. Energy Management Plan. July 1, 2014- June 30, 2019

County of Hastings. Energy Management Plan. July 1, 2014- June 30, 2019 County of Hastings Energy Management Plan July 1, 2014- June 30, 2019 Energy Management Plan Framework Commitment Declaration of Commitment Vision Statement Energy Management Champion & Team Understanding

More information

Energy Audits Waste Water Treatment Plants

Energy Audits Waste Water Treatment Plants Energy Audits Waste Water Treatment Plants Ohio Water Environment Association Conference June 20, 2012 Presented by: Samuel J. Morgan, P.E., LEED AP CT Consultants, Inc. World Energy Trend US Total Energy

More information

Energy Efficiency Market Transformation Opportunities for Texas

Energy Efficiency Market Transformation Opportunities for Texas Energy Efficiency Market Transformation Opportunities for Texas September 13, 2007 A Public Example: Investing in Energy Efficiency FRED YEBRA, P.E., MBA, DirectorofDemand of Demand Side Management Austin

More information

Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project

Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project Anthony Marshall, P.Eng., CEM January 2012 For Creative Trust for Arts & Culture Table of Contents Introduction

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

Energy Management Performance Contract

Energy Management Performance Contract Energy Management Performance Contract March 18, 2013 1 Agenda Johnson Control Team Introduction to Performance Contracting Project Timeline Energy Baseline Energy Conservation Measures (ECM s) Traditional

More information

Corporate Energy Management Plan

Corporate Energy Management Plan Corporate Energy Management Plan Corporate Energy Management Plan Town of Aurora This document was prepared for the Town of Aurora by IndEco Strategic Consulting Inc. For additional information about

More information

STAFF REPORT Facilities & Fleet

STAFF REPORT Facilities & Fleet 1 Corporate Services STAFF REPORT Facilities & Fleet Title: Energy Efficient & Greenhouse Gas Emission Reducing Retrofits in City of Waterloo Facilities Report Number: CORP2013-034 Author: Jean Starchuk,

More information

Green Guide for Businesses Strategy: Energy

Green Guide for Businesses Strategy: Energy Green Guide for Businesses Strategy: Energy Reduce Energy Use in New and Existing Businesses - In the United States buildings account for: o 72% of electricity consumption, o 39% of energy use, o 38% of

More information

Tips on Saving Energy in Your Business

Tips on Saving Energy in Your Business Fact Sheet #3 Tips on Saving Energy in Your Business In this fact sheet you will discover: Quick and easy changes to save energy. Cost effective ways to reduce your heating, cooling, lighting and office

More information

Energy Depot for Business Energy Audit Question Set

Energy Depot for Business Energy Audit Question Set This questionnaire matches the one you can use to perform an online energy audit of your business. You complete the online questionnaire, or if you prefer, you can print this form and answer the questions

More information

Energy Management Plan

Energy Management Plan Management Plan JUNE 18, 2014 1 P a ge Liability disclaimer This Management Plan (EMP) has been prepared and publicly disclosed in accordance with the requirements established by the Province of Ontario

More information

Township of Severn Energy Management Plan

Township of Severn Energy Management Plan Township of Severn Management Plan Figure 1: Management Plan Framework Commit Declaration of Commitment Vision Statement Understand Stakeholder Needs Current Situation Past & Present Initiatives Plan Goals

More information

First Time Home Buyers Energy Efficiency Workshop Guide

First Time Home Buyers Energy Efficiency Workshop Guide First Time Home Buyers Energy Efficiency Workshop Guide Why is efficiency important when buying a home? Affordability: lower utility bills Environmental responsibility: reduces your carbon footprint and

More information

CHAPTER 10: APPLIANCES AND LIGHTING

CHAPTER 10: APPLIANCES AND LIGHTING Chapter 10: Appliances and Lighting 151 CHAPTER 10: APPLIANCES AND LIGHTING According to the U.S. Environmental Protection Agency, appliances and home electronics account for 20% of energy bills in the

More information

Energy Audits. Green Asset Management Presentation

Energy Audits. Green Asset Management Presentation Energy Audits Green Asset Management Presentation What to Expect An initial walk through by Energy Consultant to Supply a Quote. The Quote should include: Found Energy Saving Opportunities, List of Applicable

More information

Xcel Energy s Commercial Industrial Energy Efficiency Programs. Overview of Colorado Business Rebate Programs

Xcel Energy s Commercial Industrial Energy Efficiency Programs. Overview of Colorado Business Rebate Programs Xcel Energy s Commercial Industrial Energy Efficiency Programs Overview of Colorado Business Rebate Programs Trade Relation Managers Derek Shockley 303-294-2082 John.D.Shockley@XcelEnergy.com Commercial

More information

Corporate Energy Management Plan

Corporate Energy Management Plan Corporate Energy Management Plan 2014-2019 Corporate energy management plan of Pickering This document was prepared for the of Pickering by IndEco Strategic Consulting Inc. For additional information

More information

Saving energy saves you money

Saving energy saves you money Saving energy saves you money The tips in this book can help you find energy saving opportunities around your home, along with over $100 in coupons for energy-efficient products so you can start saving

More information

Energy Analysis for Internal and External Window Film Applications for Existing Homes in Florida

Energy Analysis for Internal and External Window Film Applications for Existing Homes in Florida Energy & Environmental Solutions Energy Analysis for Internal and External Window Film Applications for Existing Homes in Florida PREPARED FOR: INTERNATIONAL WINDOW FILM ASSOCIATION P.O. BOX 3871 MARTINSVILLE,

More information

ENERGY AUDIT IN THE KACST BUILDING

ENERGY AUDIT IN THE KACST BUILDING ENERGY AUDIT IN THE KACST BUILDING S. M. Hasnain, S. H. Alawaji, A. M. Al-Ibrahim and S. M. Smiai Energy Research Institute (ERI) King Abdulaziz City for Science and Technology (KACST) P.O. Box 6086, Riyadh

More information

STRATEGIC ENERGY MANAGEMENT PLAN ENGLEHART AND DISTRICT HOSPITAL 2014-2019

STRATEGIC ENERGY MANAGEMENT PLAN ENGLEHART AND DISTRICT HOSPITAL 2014-2019 STRATEGIC ENERGY MANAGEMENT PLAN ENGLEHART AND DISTRICT HOSPITAL 2014-2019 TABLE OF CONTENTS Introduction Energy Management Vision Guiding Principles for Energy Management Business Case for Strategic Energy

More information

TOWN OF CALEDON. Corporate Energy Management Plan

TOWN OF CALEDON. Corporate Energy Management Plan TOWN OF CALEDON Corporate Energy T A B L E O F C O N T E N T S Click below to learn more about the Town of Caledon Corporate Energy. Current State of Corporate Energy Current Energy Concerns Background

More information

Energy Benchmarking Report for Lafayette Elementary School Bound Brook, NJ

Energy Benchmarking Report for Lafayette Elementary School Bound Brook, NJ Energy Benchmarking Report for Lafayette Elementary School Bound Brook, NJ (for the period: March 2007 through February 2009) Prepared by: Background & Findings The New Jersey Clean Energy Program (NJCEP)

More information

Heating & Cooling Efficiency

Heating & Cooling Efficiency Heating & Cooling Efficiency Advantages of Geothermal HVAC Efficiency Keith Swilley Gulf Power Company Why Gulf Power Promotes Energy Efficiency? Customer Satisfaction Education Help Customers Make Smart

More information

Vancouver Community College 2010 Carbon Neutral Action Report

Vancouver Community College 2010 Carbon Neutral Action Report Vancouver Community College 2010 Carbon Neutral Report Executive Summary Vancouver Community College is pleased to submit its Carbon Neutral Report in support of the Provincial initiative to reduce Greenhouse

More information

Current Programs available to Limited Income Customers. Residential and Multifamily

Current Programs available to Limited Income Customers. Residential and Multifamily Current Programs available to Limited Income Customers Residential and Multifamily CAP Program- Residential and Multifamily The City of Austin offers programs to help customers facing temporary and long-term

More information

Xcel Business Customers: Program and Rebate Summary

Xcel Business Customers: Program and Rebate Summary Xcel Business Customers: Program and Rebate Summary Rebates for New Energy-Efficient Equipment Xcel offers prescriptive rebates to its business customers. What s a prescriptive rebate? It simply means

More information

Catalyst RTU Controller Study Report

Catalyst RTU Controller Study Report Catalyst RTU Controller Study Report Sacramento Municipal Utility District December 15, 2014 Prepared by: Daniel J. Chapmand, ADM and Bruce Baccei, SMUD Project # ET13SMUD1037 The information in this report

More information

The sample report format is applicable to many different building types and systems and the examples provided cover a variety of applications.

The sample report format is applicable to many different building types and systems and the examples provided cover a variety of applications. Purpose Power Smart s Minimum Requirements for an Energy Study (see Appendix) provides a comprehensive list of the basic elements which must be included in an Energy Study Report. The intent of this sample

More information

Corporate Carbon Neutral Plan

Corporate Carbon Neutral Plan This Carbon Neutral Plan will guide the District of 100 Mile House decision making process in terms of reducing corporate energy consumption and greenhouse gas emissions and in achieving carbon neutrality.

More information

City of Timmins Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014 to 2019. Prepared by:

City of Timmins Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014 to 2019. Prepared by: City of Timmins Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014 to 2019 Prepared by: Issued June 2014 Timmins Corporate Energy Conservation & Demand Management Plan (CECDMP) Table&of&Contents&

More information

Case Studies: Infrared Heating in Industrial Applications

Case Studies: Infrared Heating in Industrial Applications Case Studies: Infrared Heating in Industrial Applications Chao Chen, Puget Sound Energy ABSTRACT Puget Sound Energy (PSE) is a utility which serves more than one million electric customers and over 700,000

More information

2014-2024 Energy Planning Working Group CORPORATE ENERGY PLAN

2014-2024 Energy Planning Working Group CORPORATE ENERGY PLAN 2014-2024 Energy Planning Working Group CORPORATE ENERGY PLAN Table Of Contents Acknowledgements 2 A Message from The Regional Chair (AND CAO) 3 Executive Summary 4 1. Background: Celebrating Past Successes

More information

This report presents the findings and recommendations of the assessment of energy use and

This report presents the findings and recommendations of the assessment of energy use and This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that

More information

Birmingham City Council Author: BCCASNHL. BEST Leaders & Building User Groups

Birmingham City Council Author: BCCASNHL. BEST Leaders & Building User Groups BCCÊs Sustainable Energy Project & Sustainable Schools Programme BCCÊs Sustainable Energy Project Currently, six workstreams to reduce BCCÊs energy consumption by 50% by 2018: 1. Improved Energy Management

More information

Sustain GRANT. accepted.***

Sustain GRANT. accepted.*** City of Atlanta Sustain able Initiative Challenge Grants Program GRANT TS APPLICATION PACKET The Submissions Deadline for Applications is January 3, 2014 ***Incomplete applications and those received after

More information

Georgian Bay General Hospital Strategic Energy Management Plan 2014

Georgian Bay General Hospital Strategic Energy Management Plan 2014 Georgian Bay General Hospital Strategic Energy Management Plan 2014 TABLE OF CONTENTS TABLE OF CONTENTS... 2 INTRODUCTION... 3 ENERGY MANAGEMENT VISION... 4 GUIDING PRINCIPLES FOR STRATEGIC ENERGY MANAGEMENT...

More information

Case Studies in Existing Building Audits

Case Studies in Existing Building Audits Case Studies in Existing Building Audits Erica Brabon Steven Winter Associates, Inc. 307 7 th Ave., NY, NY ebrabon@swinter.com Who we are Steven Winter Associates, Inc. (SWA) is a 37 yearold architecture

More information

City of Cornwall Social Housing Division Top 10 Energy & Water Saving Tips. in Multi-Unit Residential Buildings

City of Cornwall Social Housing Division Top 10 Energy & Water Saving Tips. in Multi-Unit Residential Buildings City of Cornwall Social Housing Division Top 10 Energy & Water Saving Tips in Multi-Unit Residential Buildings Duncan Hill Canada Mortgage and Housing Corporation Andrew Pride Minto Developments Inc. Energy

More information

HEATING, VENTILATION & AIR CONDITIONING

HEATING, VENTILATION & AIR CONDITIONING HEATING, VENTILATION & AIR CONDITIONING as part of the Energy Efficiency Information Grants Program Heating and cooling can account for approximately 23 % of energy use in pubs and hotels 1. Reducing heating

More information

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,

More information

Energy Efficiency Workshops For Commercial Customers

Energy Efficiency Workshops For Commercial Customers Energy Efficiency Workshops For Commercial Customers Takeaways Energy is a business issue Energy improvements are an investment Save energy because you can Enjoy the next hour- this really isn t work!

More information

Sea Water Heat Pump Project

Sea Water Heat Pump Project Sea Water Heat Pump Project Alaska SeaLife Center, Seward, AK Presenter: Andy Baker, PE, YourCleanEnergy LLC Also Present is ASLC Operations Manager: Darryl Schaefermeyer ACEP Rural Energy Conference Forum

More information

New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings

New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings Gary E Finger Ombudsman April 2013 NJ Clean Energy Program Background Introduced

More information

Printing and Publishing Energy Savings Guide

Printing and Publishing Energy Savings Guide Printing and Publishing Energy Savings Guide Oregon printing and publishing plants face challenges of rising operating costs, environmental and other regulations, outdated equipment and customer demand

More information

Oakland County Executive Department of Facilities Management. Energy Management Procedures October 5, 2009

Oakland County Executive Department of Facilities Management. Energy Management Procedures October 5, 2009 Oakland County Executive Department of Facilities Management Energy Management Procedures October 5, 2009 1. Goal The acquisition and management of energy is fundamental to the mission and operation of

More information

NORTHUMBERLAND HILLS HOSPITAL STRATEGIC ENERGY MANAGEMENT PLAN FOR 2014 TO 2019

NORTHUMBERLAND HILLS HOSPITAL STRATEGIC ENERGY MANAGEMENT PLAN FOR 2014 TO 2019 NORTHUMBERLAND HILLS HOSPITAL STRATEGIC ENERGY MANAGEMENT PLAN FOR 2014 TO 2019 TABLE OF CONTENTS Introduction Page 2 Breakdown of NHH Energy Usage Page 2 Energy Management Vision Page 3 Guiding Principles

More information

ENERGY AUDITS (OR SURVEYS) & ENERGY MANAGEMENT PROGRAMS SECTION B

ENERGY AUDITS (OR SURVEYS) & ENERGY MANAGEMENT PROGRAMS SECTION B ENERGY AUDITS (OR SURVEYS) & ENERGY MANAGEMENT PROGRAMS SECTION B GOALS OF THE ENERGY AUDIT Clearly identify types and costs of energy use Understand how energy is being used--and possibly wasted Identify

More information

Draft UCL Heating, Cooling and Ventilation Policy

Draft UCL Heating, Cooling and Ventilation Policy Draft UCL Heating, Cooling and Ventilation Policy Page 1 of 7 UCL Estates UCL Heating, Cooling & UCL Heating, Cooling and Document Owner UCL Estates Leadership Team is the Owner of this document. Distribution

More information

Table C33. Total fuel oil consumption and expenditures, 2012

Table C33. Total fuel oil consumption and expenditures, 2012 Release date: May 2016 Table C33. fuel oil consumption and, 2012 ) gallons) dollars) Building ( 1,001 to 5,000 204 604 3.0 21 151 522 5,001 to 10,000 74 559 7.6 10 74 253 10,001 to 25,000 67 1,123 16.7

More information

Energy Efficiency Operations & Maintenance Plan August 25, 2010

Energy Efficiency Operations & Maintenance Plan August 25, 2010 Energy Efficiency Operations & Maintenance Plan August 25, 2010 Table of Contents Introduction... 3 Repair, Maintain and Operate Existing Equipment Efficiently... 3 Citywide Requirements Contract... 4

More information

Conservation Demand Management Plan London Health Sciences Centre Made for Ontario Regulation 397/11 Green Energy Act, 2009

Conservation Demand Management Plan London Health Sciences Centre Made for Ontario Regulation 397/11 Green Energy Act, 2009 Conservation Demand Management Plan London Health Sciences Centre Made for Ontario Regulation 397/11 Green Energy Act, 2009 The Green Energy Act - Regulation 397 The Conservation Demand Management (CDM)

More information

TOWER RENEWAL CASE STUDY

TOWER RENEWAL CASE STUDY TOWER RENEWAL CASE STUDY Energy Monitoring and Management: A Case Study of Brentwood Towers, Toronto Executive Summary Through good management, and new technologies, O Shanter Development has achieved

More information

Earth Hour 2013. City Hall, City of London CITY OF LONDON. Culture of Conservation The Next Steps

Earth Hour 2013. City Hall, City of London CITY OF LONDON. Culture of Conservation The Next Steps Earth Hour 2013. City Hall, City of London CITY OF LONDON Culture of Conservation The Next Steps September 2013 TABLE OF CONTENTS CORPORATE ENERGY MANAGEMENT - UPDATE... 3 CULTURE OF CONSERVATION PROGRAM

More information

MEMORANDUM. Framework for developing the City s Ten-Year Energy Efficiency Targets for the period 2014 to 2023

MEMORANDUM. Framework for developing the City s Ten-Year Energy Efficiency Targets for the period 2014 to 2023 MEMORANDUM TO: FROM: UTILITIES ADVISORY COMMISSION UTILITIES DEPARTMENT DATE: JUNE 6, 2012 SUBJECT: Framework for developing the City s Ten-Year Energy Efficiency Targets for the period 2014 to 2023 This

More information

Energy Benchmarking Report for Lakeside Middle School. Millville, NJ

Energy Benchmarking Report for Lakeside Middle School. Millville, NJ Energy Benchmarking Report for Lakeside Middle School Millville, NJ (for the period: June 1, 2008 through May 31, 2009) Prepared by: Background & Findings: The New Jersey Clean Energy Program (NJCEP) developed

More information

The Only GUY To Call. Why are my utility bills so high? What can I do to lower my energy expenses?

The Only GUY To Call. Why are my utility bills so high? What can I do to lower my energy expenses? The Only GUY To Call May 2014 412.885.2356 Why are my utility bills so high? What can I do to lower my energy expenses? Did you know... that between 2007 and 2012, the average U.S. household spent more

More information

Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11

Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11 STAFF REPORT ACTION REQUIRED Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11 Date: June 9, 2014 To: From: Wards: Reference Number: Parks and Environment

More information

D5.3 Energy audit report

D5.3 Energy audit report Project Acronym: EPLACE Project Title: Eco public PLAtform for smart green CityzEn s living labs Call identifier: CIP-ICT-PSP Call 6 Theme 1: ICT for SMART CITIES Objective1.1: Smart Urban digital services

More information

Sample Customer 123 Conservation Way TAMPA FL 33626 Tracking Number: 000675309

Sample Customer 123 Conservation Way TAMPA FL 33626 Tracking Number: 000675309 Thank you for completing the Online Home Energy Audit. Based on the answers that you provided in the questionnaire, the following is a complete analysis of your household's energy consumption. We have

More information

energy-saving checklist a guide for rental property owners

energy-saving checklist a guide for rental property owners energy-saving checklist a guide for rental property owners taking responsibility As an individual, your efficient use of energy brings benefits such as lower bills, improved comfort levels in your home

More information

Glossary of Heating, Ventilation and Air Conditioning Terms

Glossary of Heating, Ventilation and Air Conditioning Terms Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment

More information

Module One Energy Use & Reduction Steps

Module One Energy Use & Reduction Steps Module One Energy Use & Reduction Steps 2012 Specialty Coffee Association of America The Specialty Coffee Association of America (SCAA) is the world s coffee authority and largest coffee trade association

More information

Energy Efficiency Improvements in New & Existing Homes

Energy Efficiency Improvements in New & Existing Homes Energy Efficiency Improvements in New & Existing Homes Matthew Phillips Residential Energy Efficiency Program matthew.phillips@austinenergy.com Austin Energy awarded: & Sustained Excellence Award 2007-2009

More information

Sustainable Design and Energy-Efficient Building Techniques for Existing Housing

Sustainable Design and Energy-Efficient Building Techniques for Existing Housing Sustainable Design and Energy-Efficient Building Techniques for Existing Housing PATH Energy Retrofit Project Henderson, Nevada NREL Research Site, Lebanon NJ Energy Retrofit Goals PROJECT GOALS Identify,

More information

BEST PRACTICES FOR ENERGY RETROFIT PROGRAM DESIGN CASE STUDY: AUSTIN ENERGY RESIDENTIAL POWER SAVER PROGRAM

BEST PRACTICES FOR ENERGY RETROFIT PROGRAM DESIGN CASE STUDY: AUSTIN ENERGY RESIDENTIAL POWER SAVER PROGRAM BEST PRACTICES FOR ENERGY RETROFIT PROGRAM DESIGN CASE STUDY: AUSTIN ENERGY RESIDENTIAL POWER SAVER PROGRAM MARCH 2010 This document is one of nine case studies conducted by the Best Practices Committee

More information

Identify ways to save energy in the home, either through energy efficiency or energy conservation.

Identify ways to save energy in the home, either through energy efficiency or energy conservation. Home Energy Audit TEACHER GUIDE Students will learn about energy conservation and energy efficiency. By conducting an audit of their own homes, they will learn to identify energy-efficient features and

More information

Energizing Indiana Commercial and Industrial Prescriptive Incentive Program

Energizing Indiana Commercial and Industrial Prescriptive Incentive Program Duke Energy Indiana Smart $aver Incentive Program 2012 Program Expansion Energizing Indiana Commercial and Industrial Prescriptive Incentive Program 2012 Program Introduction Overview of New Energy Efficiency

More information

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary January 2013 TABLE OF CONTENTS INTRODUCTION... 3 GENERAL RECOMMENDATIONS... 3 Communication with customers in the field of environmental sustainability...

More information

Council s energy efficiency upgrades benefit community

Council s energy efficiency upgrades benefit community Council s energy efficiency upgrades benefit community Project Snapshot Objective: reduce energy, save money & improve comfort in public buildings Where: Meander Valley Council, Northern Tasmania Total

More information

Massey Hall Energy and Water Audit. Prepared for: The Corporation of Massey Hall and Roy Thomson Hall. April 2014 8914003-001

Massey Hall Energy and Water Audit. Prepared for: The Corporation of Massey Hall and Roy Thomson Hall. April 2014 8914003-001 Massey Hall Energy and Water Audit Prepared for: The Corporation of Massey Hall and Roy Thomson Hall April 2014 8914003-001 CONTENTS APPENDICES... I 1.0 EXECUTIVE SUMMARY... 1 2.0 INTRODUCTION... 3 2.1

More information

ENERGY STAR Certified Homes, Version 3 Cost & Savings Estimates

ENERGY STAR Certified Homes, Version 3 Cost & Savings Estimates November 1, 2013 Contents ENERGY STAR Certified Homes, Version 3 Section 1: Executive Summary... 3 Section 2: Detailed Incremental Cost Estimates... 6 Section 3: Incremental Cost & Savings of the Thermal

More information

Creating Efficient HVAC Systems

Creating Efficient HVAC Systems Creating Efficient HVAC Systems Heating and Cooling Fundamentals for Commercial Buildings Heating, ventilating, and air conditioning (HVAC) systems account for nearly half of the energy used in a typical

More information

Energy Audits. Good energy management begins with an energy audit

Energy Audits. Good energy management begins with an energy audit Energy Audits Good energy management begins with an energy audit Effective management of energy-consuming systems can lead to significant cost and energy savings as well as increased comfort, lower maintenance

More information

Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP

Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP Tysons Sustainability Summit Evidence Based Urban Design 2013 Autodesk Roger E. Frechette III, PE, LEED-AP Live in Harmony with Nature Transit Community Energy Waste Air Quality Water Yujiapu Financial

More information

It Pays. To Save Energy FPO. Guide to Xcel Energy rebates, incentives and programs for residential customers in Minnesota

It Pays. To Save Energy FPO. Guide to Xcel Energy rebates, incentives and programs for residential customers in Minnesota It Pays To Save Energy Guide to Xcel Energy rebates, incentives and programs for residential customers in Minnesota FPO 10% Cert no. SW-COC-1865 xcelenergy.com 2012 Xcel Energy Inc. Xcel Energy is a registered

More information

Energy Efficiency HOSPITALITY. www.energia.ie

Energy Efficiency HOSPITALITY. www.energia.ie Energy Efficiency HOSPITALITY www.energia.ie Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could make a real

More information

Building Energy Systems. - HVAC: Heating, Distribution -

Building Energy Systems. - HVAC: Heating, Distribution - * Some of the images used in these slides are taken from the internet for instructional purposes only Building Energy Systems - HVAC: Heating, Distribution - Bryan Eisenhower Associate Director Center

More information