Blackstone Gas Fired Power Station
|
|
|
- Lizbeth Nelson
- 9 years ago
- Views:
Transcription
1 Blackstone Gas Fired Power Station
2 Existing Swan B site Proposed Blackstone site About Blackstone Project The proposed Blackstone gas fired power station will be built within the Swanbank- New Chum Enterprise Park, an existing 500 hectare industrial park near Ipswich. If approved, construction would be likely to start in 2014 with the power station being developed in stages. The initial power station will be capable of generating around 500MW, increasing to a total capacity of up to 1500MW as demand for energy increases enough electricity to generate 10% of Queensland s electricity supply. Benefits to the region The Blackstone power station will provide the following major benefits to the Ipswich community: A total project budget of approximately $350 million, some of which will flow through to the local economy via wages, rate payments as well as the use of local products and services. The project will create 400 new jobs during construction of the first stage alone and full time jobs when the power station has been fully developed and is operational. Blackstone will produce 85% less greenhouse gas emissions than Swanbank B power station, improving air quality in the local area. Greater energy security for all Queenslanders.
3 What will it look like? Blackstone Power Station Located approximately 7 kilometres south east of the Ipswich city centre, the Blackstone Power station will include: A high efficiency gas turbine generator and auxiliary equipment turbine exhaust stacks high voltage switchyard a short transmission line evaporation ponds and bio-retention basins water treatment system office and workshop. Pipeline and Compressor station As part of this development, we are also looking to build a new gas transportation and storage pipeline to supply the gas needed to fuel the Blackstone power station. Our pipeline follows existing energy infrastructure and road corridors and avoids sensitive ecological and community amenity sites. A small, 1 kilometre section of the pipeline will run underneath Collingwood Drive. TRUenergy will use a technique known as Horizontal Directional Drilling (HDD) for construction of this pipeline section to minimise land disturbance and disruption to residents and local road users. The new pipeline will be designed to a specification considered non rupturable by Australian Standards ensuring the highest standards of safety for the local community.
4 Why we are building Blackstone Australia s national energy market operator predicts that Queensland will require investment in new energy generation facilities around 2015 in order to maintain a secure electricity supply for Queensland households and businesses. In order to meet this demand for energy from our customers, TRUenergy is seeking development approval for two new highefficiency gas-fired power stations in Queensland, one near Ipswich and the other near Gladstone. Our proposed power stations will secure the future of Queensland s energy supply. TRUenergy will construct these projects in line with growing household and business electricity needs.
5 Planning Considerations Our development application for the Blackstone power station must comply with Queensland s regulatory guidelines as well as the Environmental Protection and Biodiversity Conservation Act (EPBC Act). We have engaged independent expert consultants to evaluate and, where necessary, recommend modifications to our plans. As part of this, we have undertaken a range of assessments including: visual amenity cultural significance traffic noise soil and water quality air quality Existing infrastructure at the proposed site, such as electrical transmission lines, gas pipelines, roads and water, will help reduce the overall environmental impact of our Blackstone development. Consultation As well as this consultation, TRUenergy will provide advance notification directly to residents that may be impacted by construction works relating to the proposed development.
6 About TRUenergy We are one of Australia s largest, integrated energy businesses, having grown steadily since we entered the Australian energy market in We have long standing experience in developing and operating energy generation facilities. In developing any project, our primary aim is to balance our business requirements with the environmental, social and economic needs of our stakeholders, customers and the local community. We have experience in all aspects of energy generation, development and energy retailing. Our portfolio includes: 2.8 million business and customer accounts Australia s most efficient gas fired power station, the 420MW Tallawarra power station in Wollongong, NSW Hallett gas power station, SA (180MW) Yallourn coal-fired power station (1480MW) and adjacent mine in the Latrobe Valley, VIC Iona gas storage facility near Port Campbell, VIC The Waterloo wind farm, SA (111MW) 50% share in Cathedral Rocks wind farm (66MW) Ipswich - Helping to power Queensland Our project shows that we both understand and remain committed to meeting Queensland s energy needs. TRUenergy s investment in the Blackstone power station will generate local jobs and contribute to the local economy.
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
Changes in regulated electricity prices from 1 July 2012
Independent Pricing and Regulatory Tribunal FACT SHEET Changes in regulated electricity prices from 1 July 2012 Based on Final Determination, 13 June 2012 The Independent Pricing and Regulatory Tribunal
The Electricity Grid. The why, the where and the future. 26 March 2015. Dr Robert Barr AM. Sothern Highlands & Tablelands Group Engineers Australia
The Electricity Grid The why, the where and the future 26 March 2015 Sothern Highlands & Tablelands Group Engineers Australia Dr Robert Barr AM 2015 1 02. Distribution Network Components 2 02. Distribution
23 November 2011. Contact Energy Geothermal update November 2011
Contact Energy Geothermal update November 2011 Disclaimer This presentation may contain projections or forward looking statements regarding a variety of items. Such forward-looking statements are based
Port Jackson Partners
Port Jackson Partners NOT JUST A CARBON HIT ON ELECTRICITY PRICES Many factors will drive a doubling of electricity prices in many states by 15. This will have a major impact on virtually all businesses.
Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government
Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests
. (1) the prospectivity of Victoria s geology for commercial sources of onshore unconventional gas;
To the Government of the day. From Rob & Sharon Rentsch, We have been farming at the above address for nearly 35 years and very fortunate to have been able to farm at Byaduk for the last 10 years. We are
Energy Options in a Carbon Constrained World. Martin Sevior, School of Physics, University of Melbourne http://nuclearinfo.net
Energy Options in a Carbon Constrained World. Martin Sevior, School of Physics, University of Melbourne Energy underpins our Civilization Imagine one week without Electricity Imagine one week without Motorized
Alphington sewer replacement
Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800
ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource
NEW PO Box 11-595 ZEALAND GEOTHERMAL Tel: 64-9-474 2187 ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource Current Status, Costs and Advantages of Geothermal East
Cliff Head Oil Field Development- 20 km south of Dongara, Shire of Irwin Roc Oil (WA) Limited
Cliff Head Oil Field Development- 20 km south of Dongara, Shire of Irwin Roc Oil (WA) Limited Report and recommendations of the Environmental Protection Authority Environmental Protection Authority Perth,
There s power in wind: fact sheet
There s power in wind: fact sheet Why do we need clean energy? Australia s clean energy future The climate is changing. The majority of climate scientists from around the world confirm greenhouse gases
Exploration for natural gas
FACT SHEET NO. 42 Exploration for natural gas Quick facts QGC holds licences from the Queensland Government called Authorities to Prospect that allow us to explore in areas known as tenements We work with
London Underground Environment Strategy
London Underground Environment Strategy 2008 2013 mayor of london Transport for London Contents Introduction 3 London Underground Environment strategy 4 Managing environmental impacts 5 Embedding environment
Overview on SEA output
1 st SEA workshop of the revised PDP VII Overview on SEA output of Project N a t i o n a l P o w e r D e v e l o p m e n t P l a n p e r i o d 2 0 11-2 0 2 0, v i s i o n 2 0 3 0 ( P D P V I I ) P r e
2014 Residential Electricity Price Trends
FINAL REPORT 2014 Residential Electricity Price Trends To COAG Energy Council 5 December 2014 Reference: EPR0040 2014 Residential Price Trends Inquiries Australian Energy Market Commission PO Box A2449
WE RE HERE TO CHANGE BUSINESS ENERGY IN AUSTRALIA FOREVER.
BUSINESS ELECTRICITY CAN BE BETTER. MUCH BETTER. ERM POWER HAS BEEN A QUIET ACHIEVER IN THE ENERGY INDUSTRY FOR MORE THAN 30 YEARS. WE SPECIALISE IN SELLING ELECTRICITY TO BUSINESS CUSTOMERS AND HAVE GROWN
IDBI Green Bond Framework
IDBI Green Bond Framework Background IDBI Bank Ltd. is a Universal Bank with its operations driven by a cutting edge core Banking IT platform. The Bank offers personalized banking and financial solutions
Cathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
STRADA ENERGY INTERNATIONAL LIMITED INVESTOR PRESENTATION
STRADA ENERGY INTERNATIONAL LIMITED INVESTOR PRESENTATION JANUARY 2016 THE COMPANY Privately owned Geothermal Energy Company Headquartered in Jersey, Channel Islands, with global operations Highly experienced
Renewable Choice Energy
Catawba College Table of Contents About Renewable Choice The Problem: Electricity Production Today The Solutions: Renewable Energy Sources Renewable Energy Credits (RECs) Who can participate in Renewable
Pollution Incident Response Plan
Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution
FACT SHEET. NEM fast facts:
(NEM) operates on one of the world s longest interconnected power systems, stretching from Port Douglas in Queensland to Port Lincoln in South Australia and across the Bass Strait to Tasmania a distance
APA Group UBS Emerging Australian Companies Conference
APA Group UBS Emerging Australian Companies Conference Mick McCormack, Managing Director Sydney, 1 April 2009 APA is Australia s leading gas pipeline business Objective Maximise value for securityholders
Heritage Place Code. Heritage Place Code
1 Application This Code will apply in assessing building work (including demolition), reconfiguring a lot or operational work where: on a premises that includes a heritage place within a heritage precinct
Western Australia and the Northern Territory are not connected to the NEM, primarily due to the distance between networks.
Australia has one of the world s longest alternating current (AC) systems, stretching from Port Douglas in Queensland to Port Lincoln in South Australia and across the Bass Strait to Tasmania a distance
CHARCOAL PRODUCTION AND COMMERCIALIZATION IN KENYA. Robert Pavel Oimeke Ag. Director Renewable Energy Energy Regulatory Commission, Kenya
CHARCOAL PRODUCTION AND COMMERCIALIZATION IN KENYA Robert Pavel Oimeke Ag. Director Renewable Energy Energy Regulatory Commission, Kenya Joint UN Habitat / IRENA workshop: Renewables for Growing Cities
SUBMISSION Performance Benchmarking of Australian Business Regulation: Planning, Zoning and Development Assessments
SUBMISSION Performance Benchmarking of Australian Business Regulation: Planning, Zoning and Development Assessments INTRODUCTION Cement Concrete and Aggregates Australia made a preliminary submission to
Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC).
Who are we? We re one of the world s leading power and gas companies. Here in the UK, we supply energy to more than 5 million customers, generate enough electricity for around 8 million homes and employ
23.1 RENEWABLE ENERGY
Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.
NUCLEAR FUEL CYCLE ROYAL COMMISSION. Advantages and disadvantages of different technologies and fuel sources; risks and opportunities
NUCLEAR FUEL CYCLE ROYAL COMMISSION Submission on Issues Paper 3: Advantages and disadvantages of different technologies and fuel sources; risks and opportunities 3.8 What issues should be considered in
California Energy Commission 2015 Accomplishments
California Energy Commission 2015 Accomplishments Responding to California s Drought Responded to the state's historic drought and Governor Edmund G. Brown Jr. s Executive Order B-29-15 by approving new
./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$7363 83%3te9. Sol9ara 1 Pro;ect. !"l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=?
./01&2/M./T34 1MP36T ST3T.M./T 1a$t3l$4 536e-al4 13$7363 83%3te9 Sol9ara 1 Pro;ect!"l$%e ( Mai$ &e(ort Te-t )e*te%,e- 2//0 :; =?@ ENVIRONMENTAL IMPACT STATEMENT VOLUME A: MAIN REPORT TEXT CR 7008_09_v4
COTTON AUSTRALIA LIMITED
Ms Sophie Dunstone Committee Secretary Select Committee on Electricity Prices GPO Box 854 CANBERRA ACT 2601 September 14 2012 Dear Ms Dunstone Re: Select Committee on Electricity Prices Thank you for the
Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011
Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management
Tomorrow s solutions today.
Group Locations : Wingfield - Corner Wingfield and Hines Roads, Wingfield SA 5013 Lonsdale - Lot 6 & 6B Meyer Road, Lonsdale SA 5160 Dry Creek - Waste Derived Fill site, Hanson Road Extension, Dry Creek
TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE
RWE Innogy UK TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE The Planning Act 2008 requires developers to undertake pre-application consultation before submitting an application for a Development
Welcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community. www.fortisbc.
Welcome to our open house Thanks for coming Please sign in and help yourself to refreshments Integrated System Plan (ISP) Looks ahead 20 years to identify the energy and infrastructure needs of our customers
Levelized Cost of New Electricity Generating Technologies
Levelized Cost of New Electricity Generating Technologies The Energy Information Administration (EIA) produces forecasts of energy supply and demand for the next 20 years using the National Energy Modeling
Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY
Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY i P a g e www.energym adeclean.com CONTENTS
What do we already know about Bradford-on-Avon community area?
What do we already know about Bradford-on-Avon community area? Bradford-on-Avon is one of the smaller market towns in Wiltshire. It has good public transport connectivity and functions as a popular tourist
Who is National Grid?
Who is National Grid? National Grid is a leading international energy infrastructure business In the UK, our business includes electricity and gas transmission networks and gas distribution networks. We
Priority Target Performance measure Ensure a reliable
ENERGY Energy policy The NSW Government s priorities for energy as identified in the State Plan are to ensure a reliable electricity supply, and develop a clean energy future. The table below identifies
ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential
ESBI Carbon Solutions Partnering with Countries to Achieve their Full Carbon Credit Potential ESB International ESB International (ESBI) is a growing international energy company and one of Europe s leading
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Australian Remote Renewables: Opportunities for Investment
Australian Remote Renewables: Opportunities for Investment The largely untapped remote clean energy market and funding support available from the Australian Government creates an attractive opportunity
Overview - State Tax Review Discussion Paper
Overview - State Tax Review Discussion Paper FEBRUARY 2015 WWW.YOURSAY.SA.GOV.AU Why Are We Reviewing Our State Tax System? South Australia is already a great place to live and we value that as a community.
AGL ENERGY LIMITED TOMAGO TO HEXHAM PIPELINE
Lucas Engineering and Construction Pty Ltd AGL Energy Limited Tomago to Hexham Pipeline INCIDENT MANAGEMENT PLAN AGL ENERGY LIMITED TOMAGO TO HEXHAM PIPELINE 10371 HS 03 0003 NGSF LUC HPW HS PLN 0003 0
SOUND INSULATION FOR AIR CONDITIONERS AND OTHER EXTERNAL MECHANICAL PLANT. Installing and Maintaining Air Conditioning Units
SOUND INSULATION FOR AIR CONDITIONERS AND OTHER EXTERNAL MECHANICAL PLANT Excessive noise from the operation of machines and external mechanical plant can disturb neighbours, disrupt sleep, interfere with
AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES
AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question 2 The Fremont School District uses oil to heat school buildings. Go Green! is a new project the district will implement. The superintendent has
Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015
Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events)
Australia s top 10 climate polluters
Australia s top 10 climate polluters Foreword Page 2 Just 10 companies are responsible for nearly one third of our nation s greenhouse pollution through their production and use of energy. This report
CIRCULAR 2009. ircular PLANNING SERIES
5 HIERARCHY CIRCULAR 2009 OF DEVELOPMENTS ircular PLANNING SERIES Scottish Planning Series CIRCULAR 5 2009 Hierarchy of Developments July 2009 Crown copyright 2009 ISSN 0141-514X ISBN 978 0 7559 7572 3
Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
HUNTER WATER CORPORATION. Greenprint For Sust ainable Urb an Wat er Managem ent
HUNTER WATER CORPORATION Greenprint For Sust ainable Urb an Wat er Managem ent NOVEMBER 2012 Table of Contents Message from the Managing Director 4 1. Introduction 5 1.1 Cities of the Future 5 1.2 Our
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
Service Brochure. Spare parts / Service Capabilities Engineering / Test Facility
Service Brochure Spare parts / Service Capabilities Engineering / Test Facility Proven Leadership Perth-based Blakers Pumps Engineers became part of global industrial products company ITT Corporation in
POLICY BRIEF: Renewable Energy and the Carbon Price Brief prepared for WWF- Australia
REPUTEX ANALYTICS Brief prepared for WWF- REPORT SUMMARY This brief prepared by RepuTex and commissioned by WWF-, examines the relationship between the carbon price and renewable energy generation in.
Australian Government Response to the Senate Committee on Finance and Public Administration
Australian Government Response to the Senate Committee on Finance and Public Administration Australian Government Response to the Senate Committee on Finance and Public Administration Native Vegetation
ENERGY SAVINGS ACTION PLAN 2014 2018
Environment Unit ENERGY SAVINGS ACTION PLAN 2014 2018 LISA MILLER ENVIRONMENT MANAGER JOHN HAZELTON ENERGY & WATER SUSTAINABILITY PROJECTS ENGINEER FACILITIES MANAGEMENT DIVISION MAY 2014 APPROVED BY:
CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS
1. OBJECTIVE CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS August 2015 To provide direction and guidance for the management of pest animals on lands and waters managed by the Department
Climate Change and Infrastructure Planning Ahead
Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports
Kings Lynn B SoS Decision Letter. The Proposed Palm Paper CCGT 3 Order. Proposed Combined Cycle Gas Turbine by Palm Paper Ltd
Proposed Combined Cycle Gas Turbine by Palm Paper Ltd The Proposed Palm Paper CCGT 3 Order Palm Paper Mill, Saddlebow Industrial Estate, King s Lynn PINS Ref: EN010039 Document Ref: 12.11 Kings Lynn B
Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal
19 Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal TAKAO HASHIMOTO *1 KOICHI SAKAMOTO *2 YOSHIKI YAMAGUCHI *3 KOJI OURA *4 KENICHI ARIMA *5 TAKESHI SUZUKI *6 Mitsubishi
An airport for Western Sydney. Building Western Sydney s future
Building Western Sydney s future Western Sydney is already Australia's third largest economy and, in its own right, would be our fourth largest city. The fourth largest city in Australia should have its
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
Principles for Responsible Investment in Farmland
Principles for Responsible Investment in Farmland September 2011 Preamble ln recent years, investment in farmland A has emerged as a new asset class for institutional investors. These Principles for Responsible
MAC-ENC-PRO-057 AIR QUALITY MONITORING PROGRAM
MAC-ENC-PRO-057 AIR QUALITY MONITORING Document Owner Donna McLaughlin, Environment Superintendent Document Approver Rob Hayes, Manager Environment Revision History Version No. Date Published Details 1.2
Tree Management Guidelines
Tree Management Guidelines Overview Tree Management Guidelines The trees that make up Brisbane s urban forest create much of our subtropical landscape character and biodiversity. Almost half of the city
New power plant on the Maasvlakte. Clean, reliable, and affordable energy from coal and biomass. Benelux
New power plant on the Maasvlakte Clean, reliable, and affordable energy from coal and biomass Benelux Electricity: demand and production The Netherlands needs more and more electricity. Consumption has
PROPOSED ESTABLISHMENT OF THE TRANSALLOYS COAL-FIRED POWER PLANT NEAR EMALAHLENI, MPUMALANGA PROVINCE DEA Ref: 14/12/16/3/3/3/97
From the desk of Gabriele Wood E-mail: [email protected] 30 March 2015 Dear Stakeholder PROPOSED ESTABLISHMENT OF THE TRANSALLOYS COAL-FIRED POWER PLANT NEAR EMALAHLENI, MPUMALANGA PROVINCE DEA Ref:
Appendix A1. Register of legal and other requirements
Appendix A1 Register of legal and other requirements 1 Table 1 Legal register Act Activity / General Environmental Planning and Assessment Act 1979 All Comply with the terms Minister for Planning and Infrastructure