1 TERMS OF REFERENCE TECHNICAL, FINANCIAL AND ECONOMIC ASSESSEMENT MODEL (TOOLKIT) FOR EVALUATING RENEWABLE ENERGY PROJECTS 1. INTRODUCTION The Electricity Control Board (ECB) is the statutory regulatory authority established in terms of Electricity Act (Act 4 of 2007). The ECB has the core responsibility of exercising control over the electricity supply industry (ESI); which entails regulation of generation, transmission, distribution, supply, use, import and export of electricity in Namibia. The Electricity Control Board has the mandate to manage licenses and to approve electricity tariffs in Namibia and in this regard has developed tariff methodologies for generation, transmission and distribution. The ECB has also developed an Independent Power Producer (IPP) and investment market framework to ensure an equitable market model for Namibia, that addresses the concerns of investors and mitigates risk for NamPower and the government. Due to the shortage of energy in the Southern African Region, and a large interest by private developers for projects, regulators are finding it challenging to identify the most financially feasible and attractive project among different renewable energy technologies. Regulators also have a responsibility to ensure that consumers pay affordable tariffs but at the same time that the proposed projects are financially feasible. In view of the above the ECB decided to engage a consultant to develop a financial and economic performance model to allow the Regulator to assess the financial viability of project proposals to ensure that utilities/independent Power Producers (IPPs) are maintaining a strong financial position with the tariffs as proposed by the IPP for approval by the Regulator. In view of the above the ECB decided to engage a consultant to: Develop a technical, financial and economic (model) toolkit for evaluating Renewable Energy (RE) projects. 2. OBJECTIVE To obtain the services of a consultant/s, with appropriate and relevant economic, engineering, financial tariff modeling, economic, financial analysis and financial advisory expertise in the energy sector that shall assist the ECB in developing an investment decision-making process, and professional spreadsheets for the detailed financial project appraisal, including the determination of a tariff level. 01/08/2014 Page 1 of 5

2 3. SCOPE OF SERVICE Develop a model to evaluate and communicate the financial performance of a project, prior to an investment decision-making process. The model should consist of, but not limited to the following characteristics. 3.1 An MS excel model consisting of the following functional sheets; Input, analysis and results (outputs), including sensitivity tests, the model must also have the following capabilities: Assist with investment decision-making procedure by testing the financial feasibility of proposed projects Assessment of the economic and financial costs and benefits of projects Financial analysis calculations and financial performance of the project(s) considering individual funding scenarios and financial support schemes, and financing for project financed projects The model (toolkit) should be structured to allow for sufficient flexibility and to permit extensive sensitivity testing The model should be user-friendly - designed in a way that should minimise the difficulties during its use, e.g. colour code for easy interpretation, cost categorizing, comments & name cells Clearly identify what cost data and input (technical, economic and financial) parameters are required to conduct the feasibility assessment Develop an information requirement sheet comprising of cost (input) data (technical, economic and financial) and relevant parameters necessary to conduct the feasibility assessment with the model Determine an indicative tariff for the project based on available relevant technical, economic and financial information Conduct different financial feasibility scenarios depending on the source of funding (debt or equity) and advice on the return to be allowed (WACC differentiation) Risk identification matrix for financial risks, mitigation strategies. 3.2 The toolkit should be equipped for the following functions: A risk assessment tool for the review of project risk and mitigation measures Benefit calculation (avoided electricity demand) Troubleshooting Evaluation matrix for Financial Viability (project financial Internal Rate of Return (FIRR); financial Net Present Value (FNPV); Debt Service Coverage Ratio (DCSR); Return on Equity (RoE); Payback; and Dynamic Unit Cost (DUC) Defining of funding scenarios 01/08/2014 Page 2 of 5

3 3.2.6 Comparison of funding scenarios Sensitivity analysis on relevant project parameters Free cash flow calculation Financial statements (pro-forma cash flow statement; profit and loss statement; balance sheet and key financial indicators) Key performance ratios The model should be time flexible (being able to choose from different time profiles, representing different intervals of consideration (e.g semi annual, full years). It should also be able to assign different time profiles to the different phases in the project (i.e. Construction and Operation) It is expected of the consultant to produce a manual to guide the users in the efficient use of the model A brief report that summarizes how the model was constructed and how it works including worksheet descriptions, key formulas and limitations The consultant is expected to input and conduct up to two scenarios of identified projects It is expected of the consultant to produce a report on the out-come of the scenarios. 4. REFERENCE DOCUMENTATION/INFORMATION SOURCES 4.1 ECB WACC Methodology National Integrated Resource Plan (NIRP) Development of procurement Mechanisms for Renewable energy resources in Namibia IPP and Investment Market Framework 4.5 National tariff study ECB latest pricing path to cost reflectivity in the ESI 4.7 Application for a license to Generate Electricity in Terms of the Electricity Act 4 of Generation Licence Application Technical Review Information Requirements 4.9 The ECB IPP Financial Model 5. ASSUMPTIONS 5.1 The ECB will appoint a representative to co-ordinate the project with the consultant. 5.2 After appointment the successful consultant shall convene a conceptual meeting with the ECB. 5.3 All meetings will be held between the consultant and ECB. The consultant shall be responsible for record keeping of all proceedings and minutes of meetings. 5.4 The ECB or consultant may request additional ad-hoc meetings on specific issues if required 5.5 All reports, minutes, presentations, models (including calculations & source codes) and studies conducted shall be made available to the ECB in full electronic media. PDF or any 01/08/2014 Page 3 of 5

4 encoded files will not be accepted. 5.6 Copyright of all reports, minutes, presentations, models and studies shall vest in the ECB. 5.7 Work must be original and tailor made to Namibian circumstances extensive copying from other similar reports whatever the origin will not be accepted. 5.8 All models developed during the consultancy shall be the property of the ECB. 5.9 The consultant shall conduct at least three workshops The consultant shall provide training to the relevant ECB staff on the maintenance and use of various models developed in the course of this assignment. 6. DURATION 6.1 The work should be completed by end of January The Consultant shall submit a detailed project program to the ECB within a week after the approval of the proposal. 7. Proposals to be submitted The proposals should be submitted in two separate envelopes clearly marked Technical and Financial proposal, of which two copies should be provided and a soft copy version. The Technical Proposal shall, at least, contain: 7.1 Profiles of all Companies participating in the bid, including, but not limited to the scope of business similar experience and overall human, operational & financial resources. 7.2 The proposed key human resources (project team) and general qualifications, this includes education and training, length of experience, type of position held etc. 7.3 Experience from similar projects, in relation to the project, the suitability to perform the tasks of the assignment. Should have worked in a human resource study research environment (corporate environment, utility, regulator or have done similar projects for the ESI), contact details for all reference projects should accompany the proposal. 7.4 The proposed methodology to be implemented to cover the scope of services. 7.5 The proposed work plan (including time frames) to be implemented to cover the scope of services. 7.6 The available resources of the consultant, including the necessary support. Consultant should provide proof of the ability to replace members in the team with new members of equal competence / expertise. The consultant should prove a broad range of different relevant expertise possessed by the team. 7.7 The Namibian component of the company shareholding and human resources. The consultant should prove ownership of companies participating and use of local expertise (foreign bidders), transfer of skills / technology (foreign bidders) 7.8 The consultant s affirmative action and BEE policies and achievements. 01/08/2014 Page 4 of 5

5 The Financial Proposal shall be: 7.9 In the Namibian Dollar currency Inclusive of all relevant taxes Inclusive of professional fees, transportation cost, accommodation and subsistence cost and administration fees (including logistical arrangements for meetings, workshops, venues and catering). 8. Evaluation Criteria The bids will be evaluated using the two (2)-envelope process whereby the technical proposals will be evaluated first. The financial proposals of the qualifying tenderers will also be evaluated. To qualify, a tenderer needs to score 75% or higher in the technical component. The main criteria in the technical evaluation will be: 8.1 Methodology. 8.2 Work plan and time frames. 8.3 Knowledge, Qualifications and Relevant Experience of the key Team members (project team). 8.4 Consultants resources (Operational, Human & Commercial). 8.5 Affirmative action & BEE policies and achievements. 8.6 Namibian component & skills transfer. 9. GENERAL 9.1 The consultant shall provide the ECB with a proposal that contains a full technical and financial proposal inclusive of all costs. 9.2 The deadline for submission of proposals is 16:00 on 22 August Proposals should be submitted before the deadline date and time to the offices of the ECB, at 8 Bismarck Street, ECB House, Windhoek, Namibia. Electronic tenders or faxed tenders will not be accepted. 9.4 The ECB reserves the right to change the scope of this project subject to negotiations with the successful contractor. 9.5 No proposals will be accepted unless submitted in a plain, sealed envelope addressed to the Chief Executive Officer and bearing the word Tender followed by the tender number, RSS 2014/ RSS, and tender description Develop a technical, financial and economic toolkit for evaluating Renewable Energy projects. 9.6 Enquiries should be directed to Mr. Tonateni Amakutuwa, Financial Analyst, Tel , Fax , tamakutuwa@ecb.org.na. 9.7 The ECB retains the right to, at any time to change its criteria. 01/08/2014 Page 5 of 5

REF: RFP No: ECB/HN/1/2014 TERMS OF REFERENCE

REF: RFP No: ECB/HN/1/2014 TERMS OF REFERENCE Tel.: +264 61 374 300 8 Bismarck Street P.O. Box 2923 Fax: +264 61 374 305 Windhoek WINDHOEK E-mail: hndilula@ecb.org.na REF: RFP No: ECB/HN/1/2014 TERMS OF REFERENCE Implementation of an Electronic Document

More information

TENDER NUMBER: ITT/SACU/015/2015/O Information and Communication Technology (ICT) Audit IT Effectiveness Review

TENDER NUMBER: ITT/SACU/015/2015/O Information and Communication Technology (ICT) Audit IT Effectiveness Review TENDER NUMBER: ITT/SACU/015/2015/O Information and Communication Technology (ICT) Audit IT Effectiveness Review CLOSING DATE & TIME FRIDAY, 23 JANUARY 2015 17H00 (Namibian Time) POSTAL & PHYSICAL ADDRESS

More information

A SKILLED AND CAPABLE WORKFORCE FOR AN INCLUSIVE GROWTH

A SKILLED AND CAPABLE WORKFORCE FOR AN INCLUSIVE GROWTH A SKILLED AND CAPABLE WORKFORCE FOR AN INCLUSIVE GROWTH BRANCH: UNIVERSITY EDUCATION DEPUTY DIRECTOR: TRANSFORMATION (DHET 150/11/2015) SALARY: All-inclusive remuneration package of R569 538 per annum

More information

How To Manage Two Web Portals In South Africa

How To Manage Two Web Portals In South Africa TERMS OF REFERENCE FOR WEBSITE MAINTENANCE AND SUPPORT FOR THE LED.CO.ZA AND LGICT.ORG.ZA WEB PORTALS HOSTED BY SALGA BACKGROUND The South African LED Network and LGICT Network are projects hosted by the

More information

RECOMMENDATIONS ON BUSINESS PLAN PREPARATION

RECOMMENDATIONS ON BUSINESS PLAN PREPARATION RECOMMENDATIONS ON BUSINESS PLAN PREPARATION 1. General provisions Business plan must contain: name of the investment project, as well description of its essence and feasibility; substantiation of the

More information

REQUEST FOR TENDER (RFT) DEVELOPMENT OF AN ONLINE HARMONIZED CUSTOMS AND EXCISE TARIFF DATABASE AND REFERENCE TOOL. RFT Number: TFRM/03/2010

REQUEST FOR TENDER (RFT) DEVELOPMENT OF AN ONLINE HARMONIZED CUSTOMS AND EXCISE TARIFF DATABASE AND REFERENCE TOOL. RFT Number: TFRM/03/2010 REQUEST FOR TENDER (RFT) DEVELOPMENT OF AN ONLINE HARMONIZED CUSTOMS AND EXCISE TARIFF DATABASE RFT Number: TFRM/03/2010 Closing Date FRIDAY, 07 th JANUARY 2011, at 15H00 (Namibian Time) Postal & Physical

More information

SPECIAL CONDITIONS OF CONTRACT RT20-2015

SPECIAL CONDITIONS OF CONTRACT RT20-2015 SPECIAL CONDITIONS OF CONTRACT RT20-2015 THE APPOINTMENT OF A PANEL OF PROFESSIONAL SERVICE PROVIDERS FOR FINANCIAL MANAGEMENT AND RELATED SERVICES FOR THE STATE PERIOD 1 SEPTEMBER 2015 TO 31 AUGUST 2018

More information

TENDER NUMBER: SACU/004/2015/O Provision of Short-Term Insurance. CLOSING DATE & TIME 12 AUGUST 2014 17H00 (Namibian Time)

TENDER NUMBER: SACU/004/2015/O Provision of Short-Term Insurance. CLOSING DATE & TIME 12 AUGUST 2014 17H00 (Namibian Time) TENDER NUMBER: SACU/004/2015/O Provision of Short-Term Insurance CLOSING DATE & TIME 12 AUGUST 2014 17H00 (Namibian Time) POSTAL & PHYSICAL ADDRESS FOR TENDER SUBMISSION Southern African Customs Union

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Project Title: The development of a business plan for (TYPE OF BUSINESS) in (COMMUNITY), NU Statement of Request: XXXX with the support of (Kakivak, KPID or KIA), is inviting qualified

More information

DEBT MANAGEMENT OFFICE NIGERIA

DEBT MANAGEMENT OFFICE NIGERIA DEBT MANAGEMENT OFFICE NIGERIA APPOINTMENT OF A GOVERNMENT STOCKBROKER: REQUEST FOR PROPOSAL The Debt Management Office (DMO) on behalf of the Federal Government of Nigeria (FGN) is seeking to engage the

More information

Final Report Bid Evaluation and Selection Process For Wind-Generated Electricity Hydro-Quebec Distribution Call For Tenders Process.

Final Report Bid Evaluation and Selection Process For Wind-Generated Electricity Hydro-Quebec Distribution Call For Tenders Process. Final Report Bid Evaluation and Selection Process For Wind-Generated Electricity Hydro-Quebec Distribution Call For Tenders Process March, 2005 Prepared by Merrimack Energy Group, Inc. Merrimack M Energy

More information

Guidelines for Preparation of a Business Plan

Guidelines for Preparation of a Business Plan Guidelines for Preparation of a Business Plan These notes are provided as a guide for preparation and submission of a Business Plan detailed presentation of a project, business venture or technology development,

More information

PROCUREMENT PROGRAMME PROCUREMENT OF CONSULTANTS HEAD OF WASTE STRATEGY AND CONTRACTS

PROCUREMENT PROGRAMME PROCUREMENT OF CONSULTANTS HEAD OF WASTE STRATEGY AND CONTRACTS NORTH LONDON WASTE AUTHORITY Agenda Item No: REPORT TITLE: PROCUREMENT PROGRAMME PROCUREMENT OF CONSULTANTS REPORT OF: HEAD OF WASTE STRATEGY AND CONTRACTS FOR SUBMISSION TO: DATE: AUTHORITY MEETING 11

More information

Enquiry 2014 15 Ref 034

Enquiry 2014 15 Ref 034 2014 12 03 Request for Quotation: Design, Printing and Supply of the Buffelsdraai Information Booklet and Brochure for the Environmental Planning and Climate Protection Department 1. Background Enquiry

More information

Advertise Date: 15 January 2015 Tender Reference Number: SABFS 00001/2015

Advertise Date: 15 January 2015 Tender Reference Number: SABFS 00001/2015 1 12 January 2015 ATTENTION ALL SERVICE PROVIDERS RE: REQUEST FOR PROPOSALS FOR THE RE-DESIGN AND DEVELOPMENT, UPGRADE, MAINTENANCE AND MANAGEMENT OF THE SOUTH AFRICAN BOARD FOR SHERIFFS WEBSITE SABFS

More information

Feasibility. A guide to feasibility planning for junior mining companies

Feasibility. A guide to feasibility planning for junior mining companies Financial institutions Energy Infrastructure, mining and commodities Transport Technology and innovation Life sciences and healthcare Feasibility A guide to feasibility planning for junior mining companies

More information

Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL. XXXXX PPP Unit

Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL. XXXXX PPP Unit Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL XXXXX PPP Unit Chief Executive Officer Job Description: The CEO is tasked with the establishment of a PPP Unit for the Government

More information

https://www.ofgem.gov.uk/publications-and-updates/ofto-build-providing-additional-flexibility-through-extendedframework

https://www.ofgem.gov.uk/publications-and-updates/ofto-build-providing-additional-flexibility-through-extendedframework All interested parties Direct Dial: 020 7901 1849 Email: transmissioncompetition@ofgem.gov.uk Date: 17 November 2015 Dear Colleague EPC Contract Principles for OFTO Build Tenders This letter provides guidance

More information

Financing PPPs: Project Finance June 2006

Financing PPPs: Project Finance June 2006 Financing PPPs: Project Finance June 2006 Index Section I. Section II. Section III. Project Finance Spanish Market Advantages Risk Matrix P. 2 Section I Project Finance Project Finance Definition Definition:

More information

ASSET MANAGEMENT. a best practices checklist WHAT IS ASSET MANAGEMENT? HERE IS WHAT YOU WILL LEARN:

ASSET MANAGEMENT. a best practices checklist WHAT IS ASSET MANAGEMENT? HERE IS WHAT YOU WILL LEARN: ASSET MANAGEMENT a best practices checklist WHAT IS ASSET MANAGEMENT? The Institute of Asset Management defines asset management as the coordinated activity of an organization to realize value from assets.

More information

4.03. Brampton Civic Hospital Public-private Partnership Project. Chapter 4 Section. Background. Follow-up on VFM Section 3.03, 2008 Annual Report

4.03. Brampton Civic Hospital Public-private Partnership Project. Chapter 4 Section. Background. Follow-up on VFM Section 3.03, 2008 Annual Report Chapter 4 Section 4.03 Brampton Civic Hospital Public-private Partnership Project Follow-up on VFM Section 3.03, 2008 Annual Report Background In 2001, the then Minister of Finance announced that public

More information

Feasibility Study Requirements. Qatar Development Bank

Feasibility Study Requirements. Qatar Development Bank Feasibility Study Requirements Qatar Development Bank i. Feasibility Study Requirements The Feasibility study should ideally encompass the following areas / sections A. Executive Summary. B. Project details

More information

How to write a proposal

How to write a proposal How to write a proposal Workshop Innovative space-based solutions for Future Cities July 8-9, 2014 Vienna Rob Postema Telecommunications and Integrated Applications Directorate European Space Agency ESA

More information

Registrar of Community Housing 5. Financial Viability

Registrar of Community Housing 5. Financial Viability 5. Financial Viability Version 2.0 WWW.RCH.NSW.GOV.AU The Registration Process 1 Published by The 2010 This work is copyright. It may be produced in whole or in part for study or training purposes subject

More information

Simple project evaluation spreadsheet model

Simple project evaluation spreadsheet model Simple project evaluation spreadsheet model Africa Electricity Institute Practitioner Workshop 15 November 2011 -- Dakar, Senegal Chris Greacen Two very different models Used by: Excel financial model

More information

TERMS OF REFERENCE For the Provision of Long Term Advisor Services To the Government Technical Advisory Centre

TERMS OF REFERENCE For the Provision of Long Term Advisor Services To the Government Technical Advisory Centre TERMS OF REFERENCE For the Provision of Long Term Advisor Services To the Government Technical Advisory Centre Tender reference: GTAC : 004/2015 Contracting authority Name of project Accounting officer

More information

Time of Brief: 11:00am refer to advert instructions. Tender Reference Number: SABFS 00010/2015

Time of Brief: 11:00am refer to advert instructions. Tender Reference Number: SABFS 00010/2015 1 15 OCTOBER 2015 ATTENTION ALL SERVICE PROVIDERS RE: REQUEST FOR PROPOSALS FOR THE SERVICE PROVIDERS WHO SPECIALISES IN THE DISASTER RECOVERY AND IT SERVICE CONTINUITY MANAGEMENT FOR THE SOUTH AFRICAN

More information

Financial/Accounting Analysis Ratios Excel Calculator

Financial/Accounting Analysis Ratios Excel Calculator User Guide Financial/Accounting Analysis Ratios Excel Calculator Dec 2008 Version 2 copyright 2008 Business Tools Templates Financial/Accounting Analysis Ratios Excel Calculator Financial Analysis Ratios

More information

Lao PDR Public-Private Partnership Policy

Lao PDR Public-Private Partnership Policy Lao PDR Public-Private Partnership Policy Supported by the Asian Development Bank GRANT-0309 LAO Governance and Capacity Development in Public Sector Management Program (Public Private Partnerships) Table

More information

Facilitating Renewable Energy Finance Presenting your Project to Financial Institutions

Facilitating Renewable Energy Finance Presenting your Project to Financial Institutions Facilitating Renewable Energy Finance Presenting your Project to Financial Institutions Deltcho Vitchev Renaissance Finance International Financing Renewable Energy One of the main issues - lack of bankable

More information

Joint Bidding Guide. 9. Opportunity Assessment. prepared for Leaders of Potential Consortia and Bid Managers

Joint Bidding Guide. 9. Opportunity Assessment. prepared for Leaders of Potential Consortia and Bid Managers Joint Bidding Guide 9. Opportunity Assessment prepared for Leaders of Potential Consortia and Bid Managers Figure 1.1 The Joint Bidding Cycle Key Chapter for Both Sides 1. Introduction Chapter for Supply

More information

Rent to Buy 2015 to 2017

Rent to Buy 2015 to 2017 Rent to Buy 2015 to 2017 BIDDING PROSPECTUS September 2014 Rent to Buy Contents Page Number Ministerial Foreword 2 Chapter 1 Overview of the fund 3 Chapter 2 The funding model 4 Chapter 3 Bidding requirements

More information

NSW BOARDING ACCOMODATION CALCULATOR USER GUIDELINES

NSW BOARDING ACCOMODATION CALCULATOR USER GUIDELINES NSW BOARDING ACCOMODATION CALCULATOR USER GUIDELINES ORIGINALLY PREPARED FOR NSW DEPARTMENT OF HOUSING IN MAY 2007 BY HILL PDA. AMENDED JULY 2010 BY HOUSING NSW 1 WHAT IS THE BOARDING ACCOMMODATION CALCULATOR?

More information

K-12 Entrepreneurship Standards

K-12 Entrepreneurship Standards competitiveness. The focus will be on business innovation, change and issues related to the United States, which has achieved its highest economic performance during the last 10 years by fostering and

More information

Property Framework 2014-2018

Property Framework 2014-2018 Property Framework 2014-2018 Schedule of Services 1. Property consultancy services 2. Property Agency services 3. Estate Management services 4. Property Investment and Financial services 5. Valuation Services

More information

Role Description Curator - Digital Assets

Role Description Curator - Digital Assets Role Description Curator - Digital Assets Cluster Agency Division/Branch/Unit Location Department of Planning & Environment Sydney Living Museums Collections & Access The Mint Classification/Grade/Band

More information

MALAYSIA S GOVERNMENT PROCUREMENT REGIME

MALAYSIA S GOVERNMENT PROCUREMENT REGIME MALAYSIA S GOVERNMENT PROCUREMENT REGIME 1. INTRODUCTION The prime objective of the Malaysian Government procurement is to support Government programmes by obtaining value for money through acquisition

More information

DEPARTMENT OF TRANSPORT

DEPARTMENT OF TRANSPORT ANNEXURE L DEPARTMENT OF TRANSPORT Department of Transport is an equal opportunity, affirmative action employer with clear employment equity targets. Women and people with disabilities are encouraged to

More information

ethekwini MUNICIPALITY ECONOMIC DEVELOPMENT & INVESTMENT PROMOTION UNIT DEPARTMENT OF INVESTMENT PROMOTION PQ: 7G-16816:

ethekwini MUNICIPALITY ECONOMIC DEVELOPMENT & INVESTMENT PROMOTION UNIT DEPARTMENT OF INVESTMENT PROMOTION PQ: 7G-16816: ethekwini MUNICIPALITY ECONOMIC DEVELOPMENT & INVESTMENT PROMOTION UNIT DEPARTMENT OF INVESTMENT PROMOTION Description Securing of Five Containers for Informal Traders in Phoenix Industrial Park PQ Number

More information

Corporate Governance Report

Corporate Governance Report Corporate Governance Report Chairman s introduction From 1 January 2015 until 31 December 2015, the company applied the 2014 edition of the UK Corporate Governance Code (the Code ). 1. BOARD COMPOSITION

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority MECHANISM FOR DETERMINATION OF TARIFF FOR HYDROPOWER PROJECTS Preamble Conservative estimates show total hydroelectric potential in the country to be 45000

More information

Developing a Public-Private Partnership Framework: Policies and PPP Units

Developing a Public-Private Partnership Framework: Policies and PPP Units Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework

More information

TO ALL TENDERERS, PLEASE NOTE THE FOLLOWING VERY IMPORTANT NOTICE: YOU MUST SUBMIT YOUR TENDER OFFER BY THE CLOSING TIME INDICATED BELOW

TO ALL TENDERERS, PLEASE NOTE THE FOLLOWING VERY IMPORTANT NOTICE: YOU MUST SUBMIT YOUR TENDER OFFER BY THE CLOSING TIME INDICATED BELOW TO ALL TENDERERS, PLEASE NOTE THE FOLLOWING VERY IMPORTANT NOTICE: YOU MUST SUBMIT YOUR TENDER OFFER BY THE CLOSING TIME INDICATED BELOW REGARDLESS OF THE REASONS FOR LATE SUBMISSION, YOUR TENDER OFFER

More information

PPP Seminar : Health Royal Liverpool Hospital Case study

PPP Seminar : Health Royal Liverpool Hospital Case study PPP Seminar : Health Royal Liverpool Hospital Case study Gavin Quantock Deloitte Corporate Finance 23 July 2014 Case study Royal Liverpool hospital PPP and Health Background Deloitte involvement Structure

More information

INVITATION TO TENDER SUPPY, INSTALLATION AND TRAINING ON THE USAGE OF COMPUTER ASSISTED AUDIT TOOLS & TECHNIQUES (CAAT) TENDER No.

INVITATION TO TENDER SUPPY, INSTALLATION AND TRAINING ON THE USAGE OF COMPUTER ASSISTED AUDIT TOOLS & TECHNIQUES (CAAT) TENDER No. INVITATION TO TENDER SUPPY, INSTALLATION AND TRAINING ON THE USAGE OF COMPUTER ASSISTED AUDIT TOOLS & TECHNIQUES (CAAT) TENDER No. CS/28-01-13/1 January 2013 (Readvertised February 2013) Introduction The

More information

Weighted Average Cost of Capital (WACC)

Weighted Average Cost of Capital (WACC) Financial Modeling Templates (WACC) http://spreadsheetml.com/finance/weightedaveragecostofcapital.shtml Copyright (c) 2009-2014, ConnectCode All Rights Reserved. ConnectCode accepts no responsibility for

More information

High level principles for risk management

High level principles for risk management 16 February 2010 High level principles for risk management Background and introduction 1. In their declaration of 15 November 2008, the G-20 leaders stated that regulators should develop enhanced guidance

More information

RECOMMENDATIONS ON FINANCIAL MODEL DEVELOPMENT

RECOMMENDATIONS ON FINANCIAL MODEL DEVELOPMENT RECOMMENDATIONS ON FINANCIAL MODEL DEVELOPMENT 1. Requirements to functionability of a financial model A financial model should be made in Microsoft Excel (97 or later version) format unless otherwise

More information

Practical, Engaging Financial Training for Non-Financial People

Practical, Engaging Financial Training for Non-Financial People info@financetalking.com +44 (0)1572 717000 Practical, Engaging Financial Training for Non-Financial People Learn to speak the language of the board room FinanceTalking s elearning Tailored in-company training

More information

Improve your equity research productivity

Improve your equity research productivity Improve your equity research productivity Creating and updating company models Standardized Excel based company models ensure each analyst s work seamlessly integrates with research database and can be

More information

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES)

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES) REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES) AFRICAN DEVELOPMENT BANK Avenue Jean Paul II Immeuble CCIA, Abidjan Plateau 01 BP 1387 Abidjan 01 COTE D IVOIRE 1. BACKGROUND The African Development

More information

BAHRAIN TELECOMMUNICATIONS COMPANY B.S.C. AUDIT COMMITTEE CHARTER

BAHRAIN TELECOMMUNICATIONS COMPANY B.S.C. AUDIT COMMITTEE CHARTER BAHRAIN TELECOMMUNICATIONS COMPANY B.S.C. AUDIT COMMITTEE CHARTER Contents I. Audit Committee... 1 1. Purpose and Mission... 1 2. Authority... 1 3. Membership... 2 4. Secretary... 3 5. Quorum... 3 6. Decisions...

More information

Invitation for Expression of Interest

Invitation for Expression of Interest Invitation for Expression of Interest Consulting Services for the Transaction Advisory Services for involvement of operator being able to manage based on a lease contract in areas serviced by Yerevan Water

More information

For personal use only

For personal use only STOCK EXCHANGE ANNOUNCEMENT 11 November 2015 OWNERSHIP CONSOLIDATION, DEBT EXTINGUISHMENT & NEW FUNDING Further to the Company s announcement on 28 October 2015, Bannerman Resources Limited (ASX: BMN,

More information

INVITATION OF PROPOSAL

INVITATION OF PROPOSAL INVITATION OF PROPOSAL for Study on Status and Opportunities for Indian Consulting Industry CONSULTANCY DEVELOPMENT CENTRE (Autonomous Institution of DSIR, Ministry of Science & Technology) 2 nd Floor,

More information

ICT Digital Transformation Programme

ICT Digital Transformation Programme Officer and Date Item Cabinet 11 th May 2016 Public ICT Digital Transformation Programme Responsible Officer: Clive Wright, Chief Executive Email: Clive.wright@shropshire.gov.uk Tel: 01743 252007 1.0 Summary

More information

The South African Council for the Project and Construction Management Professions (SACPCMP)

The South African Council for the Project and Construction Management Professions (SACPCMP) The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Professional Construction Mentors in terms of Section 18(1) (c) of the Act, 2000 (Act

More information

Records Information Management System Development and Implementation

Records Information Management System Development and Implementation ENQUIRIES: SUPPLY CHAIN MANAGEMENT UNIT TEL NO. : + 27 (0)11 830 2200 FAX NO. : + 27 (0)11 830 2201 EMAIL : procurement@mgsl.co.za WEBSITE : www.mgslg.co.za 40 Hull Street, Cnr. 8th Street and Hull Streets

More information

Guidelines. for. Construction and Renovation. Parish Facilities

Guidelines. for. Construction and Renovation. Parish Facilities Guidelines for Construction and Renovation of Parish Facilities Building Commission Diocese of Des Moines 2014 Table of Contents Introduction.. 1 Pastoral Planning. 2 Approval of Bishop. 2 Needs Assessment

More information

6 STEP 6 - PREPARING THE ACTION PLAN 2

6 STEP 6 - PREPARING THE ACTION PLAN 2 CONTENTS 6 STEP 6 - PREPARING THE ACTION PLAN 2 6.1 USER GUIDE TO THIS STEP 2 6.2 KEY MESSAGES OF THIS STEP 4 6.3 PREPARING THE ACTION PLAN 5 6.4 PRE-FEASIBILITY STUDY 8 6.5 PREPARING AN INVESTMENT PLAN

More information

REQUEST FOR QUOTE. RFQ Reference Number: RFQ <<INSERT e.g SWR 03-11/12>> <<Enter Course Name>>

REQUEST FOR QUOTE. RFQ Reference Number: RFQ <<INSERT e.g SWR 03-11/12>> <<Enter Course Name>> REQUEST FOR QUOTE RFQ Reference Number: RFQ Date of Issue: Name of Business Unit: Address: Contact Person: Telephone: Email:

More information

Procurement of Services

Procurement of Services AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA African Union Standard Bidding Documents Procurement of Services Provision of Fumigation and Pest control Services Procurement Number: AUC/AFMD/OT/1350 Date

More information

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS 122 HANDBOOK FOR THE ECONOMIC ANALYSIS OF WATER SUPPLY PROJECTS CONTENTS 5.1 Introduction...123 5.2 Financial Revenues...124 5.3 Project Costs...126 5.3.1 Investments...127

More information

Course Brochure. New York. Doha

Course Brochure. New York. Doha Course Brochure LONDON New York Dubai Hong Kong Singapore Johannesburg Doha Aberdeen abuja kuala lumpur Table of contents Background page 3 Oil & Gas Faculty pages 5-8 Mining Faculty pages 9-11 Public

More information

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6 Related To FEWA Electricity Network (Transmission & Distribution) Version 1.0 December 2014 TABLE OF CONTENTS Page I. Introduction 3 II. Contractor Pre-Qualification Criteria 4 III. Procedure for Application

More information

Kentucky Enterprise Fund. Guidelines. 1. Stimulate private investment in Kentucky-based technology and/or innovation-driven companies;

Kentucky Enterprise Fund. Guidelines. 1. Stimulate private investment in Kentucky-based technology and/or innovation-driven companies; Kentucky Enterprise Fund Guidelines The goals of the Kentucky Enterprise Fund are to: 1. Stimulate private investment in Kentucky-based technology and/or innovation-driven companies; 2. Accelerate knowledge

More information

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and

More information

ANGLOGOLD ASHANTI LIMITED

ANGLOGOLD ASHANTI LIMITED ANGLOGOLD ASHANTI LIMITED Registration No. 1944/017354/06 ( AGA or the Company ) REMUNERATION AND HUMAN RESOURCES COMMITTEE TERMS OF REFERENCE APPROVED BY THE BOARD OF DIRECTORS ON 30 OCTOBER 2014 1.0

More information

REQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL SERVICES TOWN OF AVON, CONNECTICUT

REQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL SERVICES TOWN OF AVON, CONNECTICUT REQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL SERVICES TOWN OF AVON, CONNECTICUT The Town of Avon is seeking written responses to a Request for Proposal (RFP) for services of a landscape architect

More information

RISK MANAGEMENT SYSTEM

RISK MANAGEMENT SYSTEM Page 1 of 7 RISK MANAGEMENT SYSTEM 1) Disclose the following: (a) Overall management philosophy of the company; The Company has adopted a management policy that establishes a culture of disclosing, evaluating

More information

Eskom Holdings SOC Ltd s Standard Conditions of Tender

Eskom Holdings SOC Ltd s Standard Conditions of Tender 1. General Actions 1 The Employer, the Eskom Representative and each eligible er submitting a shall act timeously, ethically and in a manner which is fair, equitable, transparent, competitive and cost-effective.

More information

Guide to Licensing Application Process for Deposit Taking Entities

Guide to Licensing Application Process for Deposit Taking Entities Introduction Section 4 of the Banking Act and the Financial Institutions Act grants the Bank of Jamaica the responsibility for assessing all applications for a deposit-taking license to inform its recommendation

More information

RULES AND REGULATIONS FOR FINANCING PROJECTS AND COMMERCIAL ACTIVITIES

RULES AND REGULATIONS FOR FINANCING PROJECTS AND COMMERCIAL ACTIVITIES Page 1 of 8 Section 1. Purpose These Rules and Regulations are adopted by the Board of Governors pursuant to Article 13.3. of the Agreement Establishing the Black Sea Trade and Development Bank (Establishing

More information

STEPS IN THEATRE PROJECT PLANNING

STEPS IN THEATRE PROJECT PLANNING Janis A. Barlow & Associates Research, Planning and Management Consultants Specializing in Theatre since 1981 STEPS IN THEATRE PROJECT PLANNING Janis A. Barlow & Associates www.barlowandassociates.com

More information

DELAWARE STATE HOUSING AUTHORITY REQUEST FOR PROPOSALS FOR FINANCIAL ADVISORY SERVICES

DELAWARE STATE HOUSING AUTHORITY REQUEST FOR PROPOSALS FOR FINANCIAL ADVISORY SERVICES DELAWARE STATE HOUSING AUTHORITY REQUEST FOR PROPOSALS FOR FINANCIAL ADVISORY SERVICES I. Overview The Delaware State Housing Authority (DSHA) seeks firms interested in providing independent financial

More information

Project Governance. New Corporations Unit (NewCo) PWC Structural Separation Program

Project Governance. New Corporations Unit (NewCo) PWC Structural Separation Program New Corporations Unit (NewCo) Department of the Chief Minister Level 14, NT House, 22 Mitchell Street, Darwin PWC Structural Separation Program Project Governance January 2014 Table of Contents 1. Introduction...

More information

Hosted VoIP RFP. Throughout this document, the word District refers to Rankin County School District

Hosted VoIP RFP. Throughout this document, the word District refers to Rankin County School District Hosted VoIP RFP Throughout this document, the word District refers to Rankin County School District Subject RFP-For a 3, and 5 year contract, the District desires implement hosted VoIP services. The District

More information

GENESEE HEALTH SYSTEM REQUEST FOR QUOTE INTERNET BANDWIDTH ISSUED: 11/23/2014

GENESEE HEALTH SYSTEM REQUEST FOR QUOTE INTERNET BANDWIDTH ISSUED: 11/23/2014 GENESEE HEALTH SYSTEM REQUEST FOR QUOTE INTERNET BANDWIDTH ISSUED: 11/23/2014 TABLE OF CONTENTS I. PURPOSE AND SPECIFICATIONS II. III. IV. BIDDER CRITERIA AND RESPONSE REQUIREMENTS RFQ BIDDER COVER SHEET

More information

City of Dallas Specifications for Sewer Camera Maintenance & Repair Services with Parts BM1308

City of Dallas Specifications for Sewer Camera Maintenance & Repair Services with Parts BM1308 City of Dallas Specifications for Sewer Camera Maintenance & Repair Services with Parts BM1308 PURPOSE: The purpose for this specification is to establish a 36 month service contract for maintenance and

More information

Law No. 67 for the year 2010

Law No. 67 for the year 2010 Disclaimer This English translation of the Law No. 67 for the year 2010 has been reviewed by Zulficar & Partners Law Firm and Trowers & Hamlins in association with Nour Law Office. Neither The Ministry

More information

Peekskill City School District. Westchester County, New York REQUEST FOR PROPOSALS FOR A STUDENT MANAGEMENT SYSTEM

Peekskill City School District. Westchester County, New York REQUEST FOR PROPOSALS FOR A STUDENT MANAGEMENT SYSTEM Peekskill City School District Westchester County, New York REQUEST FOR PROPOSALS FOR A STUDENT MANAGEMENT SYSTEM October 18, 2006 Gregory J. Sullivan Assistant Superintendent for Business & Administrative

More information

The Embassy of Sweden in Addis Abeba

The Embassy of Sweden in Addis Abeba Ref. No.UM2015/11212/ADDI The Embassy of Sweden in Addis Abeba Invites Tenderers Regarding Framework Agreement for Local Audit Services The Embassy intends to enter into contract with not more than three

More information

Government of India Ministry of Communications &IT Department of Telecommunication

Government of India Ministry of Communications &IT Department of Telecommunication Government of India Ministry of Communications &IT Department of Telecommunication To, (As per by email) Subject: Invitation of Expression of Interest (EOI) for Implementation of ISO 9001:20008 project

More information

Guide to Procedure for Competitive Tendering March 2003

Guide to Procedure for Competitive Tendering March 2003 Guide to Procedure for Competitive Tendering March 2003 The Landscape Institute 33 Great Portland Street London W1W 8QG Tel: +44 (0)20 7299 4500 Fax: +44 (0)20 72994501 Email: mail@landscapeinstitute.org

More information

BUSINESS PLAN TEMPLATE AND GUIDE FOR ANCHOR COMPANIES

BUSINESS PLAN TEMPLATE AND GUIDE FOR ANCHOR COMPANIES BUSINESS PLAN TEMPLATE AND GUIDE FOR ANCHOR COMPANIES IN NKEA AGRICULTURE COMPANY NAME: (company registration number: XXXXXX-Y) ADDRESS: TEL: FAX: URL: NOTE: This document serves ONLY as a reference guide

More information

First Dimension: Political, Social, Economic and Cultural Environment

First Dimension: Political, Social, Economic and Cultural Environment Different factors affect the performance of these collaboration projects. These factors are related either to the project's macro, meso or micro environments, to the partners involved, to the collaboration

More information

Invitation to Tender

Invitation to Tender Invitation to Tender Provision of Training in Technology Transfer and Related Areas for The Southern Africa Innovation Support Programme 1. Drawing up the tender The tender must be submitted in writing

More information

Guidelines for Preparation of the Initial Project Proposal General Guidelines

Guidelines for Preparation of the Initial Project Proposal General Guidelines Guidelines for Preparation of the Initial Project Proposal General Guidelines This document is provided as a guide for preparation and submission of an initial Project Proposal high level overview of a

More information

Guidelines for Setting Up of Private Power Projects Under Short Term Capacity Addition Initiative AUGUST 2010 Private Power and Infrastructure Board Ministry of Water & Power Government of Pakistan PART

More information

Request for Proposal Name of Organization Title of work project

Request for Proposal Name of Organization Title of work project Request for Proposal Name of Organization Title of work project Introduction Insert brief introduction here. Background Insert background information here. Scope of Work Work Elements (those elements listed

More information

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2 is an integral part of the Framework Agreement between the Swiss Federal Council and the Government of the Republic of Poland

More information

Gharbeya Water and Wastewater Company - Background

Gharbeya Water and Wastewater Company - Background Gharbeya Water and Wastewater Company - Background The Gharbeya company is located in the Delta Population: 4,170,000 Water coverage: 90% Water accounts: 730,000 Wastewater coverage: 35% Wastewater accounts:

More information

TERMS OF REFERENCE Health and Hygiene Promotion Approaches for Namibia Technical Assistance

TERMS OF REFERENCE Health and Hygiene Promotion Approaches for Namibia Technical Assistance 1. Summary Title Purpose TERMS OF REFERENCE Health and Hygiene Promotion Approaches for Namibia Technical Assistance Health and Hygiene Promotion (HHP) Approaches for Namibia To develop a common approach

More information

BCS Foundation Certificate in Business Analysis Syllabus. Version 3.8 July 2016

BCS Foundation Certificate in Business Analysis Syllabus. Version 3.8 July 2016 BCS Foundation Certificate in Business Analysis Syllabus Version 3.8 July 2016 Copyright BCS 2015 BA Foundation Syllabus Change History Any changes made to the syllabus shall be clearly documented with

More information

The Benefits of Management Information Systems to the Professional Practice

The Benefits of Management Information Systems to the Professional Practice The Benefits of Management Information Systems to the Professional Practice SAICE 15th Annual Conference on Computers in Civil Engineering By Dr James A Robertson PrEng & Reg M Barry, Financial Director,

More information

REQUEST FOR PROPOSALS FOR DISASTER RECOVERY ADMINISTRATIVE SERVICES

REQUEST FOR PROPOSALS FOR DISASTER RECOVERY ADMINISTRATIVE SERVICES REQUEST FOR PROPOSALS FOR DISASTER RECOVERY ADMINISTRATIVE SERVICES Notice is hereby given that the Santa Rosa County Board of County Commissioners is calling for and requesting proposals from qualified

More information

COMPETITIVE TENDER 153/16 FOR PROVISION OF DIGITAL MARKETING SERVICES. Closing Date of Tender: 29 February 2016.

COMPETITIVE TENDER 153/16 FOR PROVISION OF DIGITAL MARKETING SERVICES. Closing Date of Tender: 29 February 2016. COMPETITIVE TENDER 153/16 FOR PROVISION OF DIGITAL MARKETING SERVICES Closing Date of Tender: 29 February 2016. 1 TELONE ZIMBABWE COMPETITIVE TENDER 153/16: PROVISION OF DIGITAL MARKETING SERVICES. 1.0

More information

The Gateway Review Process

The Gateway Review Process The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible

More information

IMPLEMENTATION GUIDE REGULATIONS, 2011 PERTAINING TO THE PREFERENTIAL PROCUREMENT POLICY FRAMEWORK ACT, ACT NO 5 OF 2000

IMPLEMENTATION GUIDE REGULATIONS, 2011 PERTAINING TO THE PREFERENTIAL PROCUREMENT POLICY FRAMEWORK ACT, ACT NO 5 OF 2000 IMPLEMENTATION GUIDE PREFERENTIAL PROCUREMENT REGULATIONS, 2011 PERTAINING TO THE PREFERENTIAL PROCUREMENT POLICY FRAMEWORK ACT, ACT NO 5 OF 2000 1 December 2011 1 TABLE OF CONTENTS PART ONE GENERAL 1.

More information

PORT REFORM TOOLKIT WORLD BANK

PORT REFORM TOOLKIT WORLD BANK WORLD BANK FINANCIAL MODEL MANUAL Concession Project in the port sector 1/ PRELIMINARY ADVICE Required Software : Excel 2000 for PC Data & parameters of modelling : It appears in blue colour and exclusively

More information