AGREEMENT. Between. And

Size: px
Start display at page:

Download "AGREEMENT. Between. And"

Transcription

1 AGREEMENT Between The organisation XXXX, partner in the CIP-IEE Project ERASME Energy Audits in SMEs, located in xxx (address), tel and , VAT n. xxx, represented by xxxxx in his function of xxx, hereinafter identified as the Partner And The Energy Auditor xxx xxx, born in xxx, the xxth of xxx xxxx, resident in xxx, (address), mob. Phone xxx, e- mail xxxx, VAT n. xxxx, identified hereinafter as the Auditor, Concerning: Considering that: The implementation of Energy Audits in SMEs, in the region xxxxxxxx, (country) The Partner has signed a contract with EACi, European Agency for Competitiveness and Innovation, concerning the ERASME project; As part of the ERASME project the Partner has develoedp a training module of 20 hours to train Energy Auditors for implementing Energy Audits in SMEs; The Partner has developed a Check List, an Energy Audit model report, a Handbook for performning Energy Audits in SMEs and Guidelines for financing energy investments in SMEs. The Auditor accepts to: Participate in the ERASME training module, including the 20 hours of lectures and the following project work consisting in a pilot Energy Audit in a SME, assisted by the trainers; having overcome the training course final test, the Auditor enters in the list of the authorised Energy auditors of the ERASME project; Implement surveys in SMEs according to the ERASME methodology, consisting in an interview with the person in charge for energy, a walk-though in the factory and the production of a First Phase Eneergy Audit Report as described in the ERASME procedures (called hereinafter first phase report ); Produce the First Phase Report free of charge for the client, and without any financial support from the Partner, as a promotional activity; Propose to the client, following the delivery of the First Phase Report, the performance of a detailed Energy Audit (second phase Energy Audit), including a Feasibility Study (according to the 1

2 ERASME model) on one or more of the most appealing measures proposed in the First Phase Report; Produce the detailed Energy Audit and annexes according to the tariff scheme proposed by ERASME, benefiting of a financial contribution from the Partner, which will reduce the cost for the client. The Auditor is free to propose to the client other services, like the preparation of an application for loans, grants or any other incentive, the deailed design for the measures, the selection of suppliers and the supervision of works, according to the agreements privately signed by him with the client himself. Keeping confidential all information received regarding the SME premises energy performance and any consulting provided to it; The Partner engages in: Assigning to the Auditor a certain number of SMEs interested in the Energy Audit; Providing technical support through his internal personnel or external consultants; Keeping confidential all information received regarding the SME premises energy performance; Providing information on grants and low-interest loans to be proposed to the client; Making available a contribution for the supply of the Second Phase Report. The partner has the right to receive copy of the First Phase Report, the Second Phase Report, and of the design documents supplied to the client, to verify them and in case of need ask clarifications and agrre modifications with the Auditor. In case of repeated refusal to implement the requested modifications, or in case of repeated unsatisfaction of clients, the Partner has the right to remove the Auditor from the list of authorised Auditors within the ERASME project. xxxxxxx, 10 novembre 2012 The Auditor The Partner 2

3 AGREEMENT Between The organisation XXXX, partner in the CIP-IEE Project ERASME Energy Audits in SMEs, located in xxx (address), tel and , VAT n. xxx, represented by xxxxx in his function of xxx, hereinafter identified as the Partner And The Company xxx xxx, located in (address), VAT n. xxxx, represented by xxxxxx, born in xxx, the xxth of xxx xxxx, resident in xxx, (address), mob. Phone xxx, xxxx,, identified hereinafter as the SME, Concerning: Considering that: The implementation of Energy Audits in SMEs, in the region xxxxxxxx, (country) The Partner has signed a contract with EACi, European Agency for Competitiveness and Innovation, concerning the ERASME project; The Partner has signed an Agreement with the Association of SMEs xxxxx, for the Region xxxx, in order to select at least 50 SMEs participating in the ERASME initiative; As part of the ERASME initiative the Partner has trained and accredited Energy Auditors, in order to appoint an Energy Auditor, for implementing an Energy Audit, for each SME participating in the ERASME initiative (hereinafter indicated as The Auditor ; The Partner has developed a Check List, an Energy Audit model report, a Handbook for performning Energy Audits in SME and Guidelines for financing energy investments in SMEs; The SME declares its interest in: Receiving an Energy Audit in the frame of the ERASME project; Implementing an energy Action Plan including cost effective measures for reducing energy consumption and costs, which may be composed of a better energy management, and/or zero- or low-cost measures and/or some capital investment, providing a return on investment in less than 3 or 4 years, and eligible for the access to financial incentives helping the cash flow. The SME accepts to: Give access to the Auditor in its premises and provide him all the information related to energy consumption and energy expenditure, quality and quantity of the energy consuming devices and 3

4 components, time schedules and modes of operation of the facility, and any other information for evaluating the present energy performance and the possible mesures to be inserted in a multiannual company s Action Plan for energy; Accept the ERASME methodology, consisting in an interview of the Auditor with the person in charge for energy, for collecting the information, then a walk-though in the factory, and the production of a First Phase Eneergy Audit Report as described in the ERASME procedures (called hereinafter first phase report ); Receive the First Phase Report free of charge from the assigned Auditor, subject to the condition to consider carefully the measures herein presented, as part of multi-annual energy Action Plan, particularly the ones having a payback shorter than 3/4 years; Receive a proposal of a detailed Energy Audit (second phase Energy Audit) from the Auditor, following the delivery of the First Phase Report, including a Feasibility Study (according to the ERASME model) on one or more of the most appealing measures proposed in the First Phase Report, at a fixed price of xxxx, which will be discounted by xxx, as the Partner will offer a contribution of this amount directly to the Auditor; Evaluate the proposal of other services by the Auditor, like: the preparation of an application for loans, grants or any other incentive, the deailed design for the measures, the assistance for selection of suppliers and the supervision of works, signing an additional agreement with the Auditor himself. The Partner engages in: Assigning a qualified Auditor to the SME, who engages in signing a Confidentiality Agreement with the SME; Providing him an additional technical support, whenever necessary, through his internal personnel or external consultants; Providing information on grants and low-interest loans to be proposed to the client; Keeping confidential all information received regarding the SME premises energy performance; Making available a contribution for the supply of the Second Phase Report. The Partner has the right to receive copy of the First Phase Report, the Second Phase Report, and of the design documents supplied to the client by the Auditor, to operate a control on the campaign, by verifying the produced documents and in case of need ask clarifications and agree modifications with the Auditor. xxx, 10 novembre 2012 The SME The Partner 4

5 AGREEMENT Confidentiality Agreement Between The Energy Auditor xxx xxx, born in xxx, the xxth of xxx xxxx, resident in xxx, (address), mob. Phone xxx, e- mail xxxx, VAT n. xxxx, identified hereinafter as the Auditor And The Company xxx xxx, located in (address), VAT n. xxxx, represented by xxxxxx, born in xxx, the xxth of xxx xxxx, resident in xxx, (address), mob. Phone xxx, xxxx,, identified hereinafter as the SME, Concerning: Considering that: The implementation of Energy Audits in SMEs, in the region xxxxxxxx, (country) The Auditor has signed a contract with the organisation XXXX, partner in the CIP-IEE Project ERASME Energy Audits in SMEs ; The Company xxx xxx has signed also an Agreement with organisation XXXX, partner in the CIP-IEE Project ERASME Energy Audits in SMEs ; As part of the ERASME initiative the organization xxx xxx has trained and accredited Energy Auditors, in order to appoint an Energy Auditor, for implementing an Energy Audit, for each SME participating in the ERASME initiative; The Auditor has to use materials and the model deloped by the ERASME Project during the implementation of the Energy Audit in the SME; The SME declares its interest in: Receiving an Energy Audit in the frame of the ERASME project; Implementing an energy Action Plan including cost effective measures for reducing energy consumption and costs, which may be composed of a better energy management, and/or zero- or low-cost measures and/or some capital investment, providing a return on investment in less than 3 or 4 years, and eligible for the access to financial incentives helping the cash flow. The Auditor accepts to: Implement surveys in SMEs according to the ERASME methodology, consisting in an interview with the person in charge for energy, a walk-though in the SME and the production of a First Phase Eneergy Audit Report as described in the ERASME procedures (called hereinafter first phase report ); 5

6 Produce the First Phase Report free of charge for the client, and without any financial support from the SME, as a promotional activity; Propose to the SME, following the delivery of the First Phase Report, the performance of a detailed Energy Audit (second phase Energy Audit), including a Feasibility Study (according to the ERASME model) on one or more of the most appealing measures proposed in the First Phase Report; Produce the detailed Energy Audit and annexes according to the tariff scheme proposed by ERASME, benefiting of a financial contribution from the Organization xxx xxx, which will reduce the cost for the SME. The Auditor is free to propose to the SME other services, like the preparation of an application for loans, grants or any other incentive, the deailed design for the measures, the selection of suppliers and the supervision of works, according to the agreements privately signed by him with the SME himself. Keeping confidential all information received regarding the SME premises energy performance and any consulting provided to it; The Auditor will provide the final report both to the SME and to the Organization xxx xxx that will certificate the good and correct work of the Energy Audit. The SME accepts to: Give access to the Auditor in its premises and provide him all the information related to energy consumption and energy expenditure, quality and quantity of the energy consuming devices and components, time schedules and modes of operation of the facility, and any other information for evaluating the present energy performance and the possible mesures to be inserted in a multiannual company s Action Plan for energy; Accept the ERASME methodology, consisting in an interview of the Auditor with the person in charge for energy, for collecting the information, then a walk-though in the factory, and the production of a First Phase Eneergy Audit Report as described in the ERASME procedures (called hereinafter first phase report ); Receive the First Phase Report free of charge from the assigned Auditor, subject to the condition to consider carefully the measures herein presented, as part of multi-annual energy Action Plan, particularly the ones having a payback shorter than 3/4 years; Receive a proposal of a detailed Energy Audit (second phase Energy Audit) from the Auditor, following the delivery of the First Phase Report, including a Feasibility Study (according to the ERASME model) on one or more of the most appealing measures proposed in the First Phase Report, at a fixed price of xxxx, which will be discounted by xxx, as the Organization xxx xxx, as Partner in the ERASME Project will offer a contribution of this amount directly to the Auditor; 6

7 Evaluate the proposal of other services by the Auditor, like: the preparation of an application for loans, grants or any other incentive, the deailed design for the measures, the assistance for selection of suppliers and the supervision of works, signing an additional agreement with the Auditor himself. The Partner engages in: Providing technical support, whenever necessary, through internal personnel or external consultants; Providing information on grants and low-interest loans to be proposed to the client; Keeping confidential all information received regarding the SME premises energy performance; Making available a contribution for the supply of the Second Phase Report. The Organization xxx xxx, as Partner of the ERASME Project, has the right to receive copy of the First Phase Report, the Second Phase Report, and of the design documents supplied to the SME by the Auditor, to operate a control on the campaign, by verifying the produced documents and in case of need ask clarifications and agree modifications with the Auditor or the SME. xxx, 10 novembre 2012 The SME The Auditor 7

ASUH Funding Fiscal Procedures

ASUH Funding Fiscal Procedures ASUH Funding Fiscal Procedures 2465 Campus Rd., Honolulu, HI 96822 Phone #: (808) 956-4822 Fax #: (808) 956-5360 Email: asuh@hawaii.edu Website: http://asuh.hawaii.edu/ Table of Contents Cover Sheet 1

More information

PRCP CE. Version 5.0 of 16 June 2013. Date of entry into force: 1 July 2013

PRCP CE. Version 5.0 of 16 June 2013. Date of entry into force: 1 July 2013 npo Founded by SECO and BBRI PARTICULAR RULES FOR THE CERTIFICATION OF PRODUCTS AND PRODUCTION CONTROL SYSTEMS WITHIN DE FRAMEWORK OF THE EUROPEAN CONSTRUCTION PRODUCTS REGULATION N 305/2011 PRCP CE Version

More information

P: 1800 733 416 E: info@redbackconferencing.com.au W: www.redbackconferencing.com.au

P: 1800 733 416 E: info@redbackconferencing.com.au W: www.redbackconferencing.com.au P: 1800 733 416 E: info@redbackconferencing.com.au W: www.redbackconferencing.com.au The Implementation Plan below outlines the transition process between your company and Redback. The aim is to establish

More information

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes 3 Terms and definitions 3.4 third-party certification audit audit carried out by an auditing organization independent of the client and the user, for the purpose of certifying the client's management system

More information

NEXT. Tools of the Participant Portal: Scientific Reports & Deliverables

NEXT. Tools of the Participant Portal: Scientific Reports & Deliverables NEXT Tools of the Participant Portal: Scientific Reports & Deliverables Scientific Reporting and Deliverables: Terminology Scientific Reporting: Standardised format & always due at the end of Reporting

More information

CORPORATE AFFAIRS COMMISSION

CORPORATE AFFAIRS COMMISSION CORPORATE AFFAIRS COMMISSION FORM CAC/IT 1 INCORPORATED TRUSTEES APPLICATION FORM NAME OF THE ASSOCIATION......... REGISTERED OFFICE ADDRESS........... AIMS AND OBJECTS OF THE ASSOCIATION S/N AIMS/OBJECTS

More information

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2 is an integral part of the Framework Agreement between the Swiss Federal Council and the Government of the Republic of Poland

More information

TAFE TEACHERS AND RELATED EMPLOYEES ENTERPRISE AGREEMENT 2013. Statements of duties for proposed new roles

TAFE TEACHERS AND RELATED EMPLOYEES ENTERPRISE AGREEMENT 2013. Statements of duties for proposed new roles TAFE TEACHERS AND RELATED EMPLOYEES ENTERPRISE AGREEMENT 2013 Statements of duties for proposed new roles Education Support Officer Assessor Head Teacher Band 3 POSITION INFORMATION Education Support Officer

More information

Energy Saving Business in Japan

Energy Saving Business in Japan Energy Saving Business in Japan (Energy Service Company) JICA Study Team Eco-mind of the Company in Japan 1. Obligation to the Energy User in Regulation and Law Energy users are required to report energy

More information

PAUL VOGEL MANAGING DIRECTOR, GLOBAL BUSINESS AND SENIOR VICE PRESIDENT

PAUL VOGEL MANAGING DIRECTOR, GLOBAL BUSINESS AND SENIOR VICE PRESIDENT February 12, 2008 GEORGE W. WRIGHT ACTING VICE PRESIDENT, CHIEF TECHNOLOGY OFFICER SUSAN M. PLONKEY VICE PRESIDENT, CUSTOMER SERVICE PAUL VOGEL MANAGING DIRECTOR, GLOBAL BUSINESS AND SENIOR VICE PRESIDENT

More information

Authorised administrative official for the purpose of contract signature

Authorised administrative official for the purpose of contract signature STANDARD GRANT APPLICATION FORM 1. Particulars of grant applicant Identity of applicant Business name (full legal name): Short name (where applicable): Acronym (where applicable): Official registration

More information

Invitation to Quote (ITQ) for STREET WORKS IT SOLUTION

Invitation to Quote (ITQ) for STREET WORKS IT SOLUTION Easthampstead House, Town Square, Bracknell, Berkshire RG12 1AQ Tel: (01344) 352000 Invitation to Quote (ITQ) for STREET WORKS IT SOLUTION xxx COMPLETED BY ORGANISATION [Supplier to complete] NAME DATE

More information

Your new ScottishPower invoice explained ScottishPower: switching you on to the right choice for your business.

Your new ScottishPower invoice explained ScottishPower: switching you on to the right choice for your business. Your new ScottishPower invoice explained ScottishPower: switching you on to the right choice for your business. About your new invoices At ScottishPower, we have listened to feedback from our customers

More information

Freshly Investigated Credit Report

Freshly Investigated Credit Report Experian Ltd E-Series Business Freshly Investigated Credit Report Company Details Global Identifier P099XXXX Company SAMPLE AG (Sample Report GERMANY) Germany Tel [+49] XXXX-XXXX Fax [+49] XXXX-XXXX E-Mail

More information

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: pcn@bindt.org CP14 ISSUE 5 DATED 1 st OCTOBER

More information

Sales Agency Contract

Sales Agency Contract Sales Agency Contract Between: (Supplier) whose registered office is at: (hereinafter called "the Principal") and: (Sales Agency) whose registered office is at: it is agreed as follow: (hereinafter called

More information

PPM 500 VOCATIONAL REHABILITATION COUNSELING & GUIDANCE

PPM 500 VOCATIONAL REHABILITATION COUNSELING & GUIDANCE VOCATIONAL REHABILITATION COUNSELING & GUIDANCE CONTENTS: GENERAL REQUIREMENTS 500.01 Purpose of Counseling and Guidance (pp.1-2) 500.02 Qualifying Individuals (p.2) 500.03 Accommodations (p.2) NATURE

More information

CAPITAL RESOURCES AND PROFESSIONAL INDEMNITY INSURANCE REQUIREMENTS FOR PERSONAL INVESTMENT FIRMS (NO 2) INSTRUMENT 2015

CAPITAL RESOURCES AND PROFESSIONAL INDEMNITY INSURANCE REQUIREMENTS FOR PERSONAL INVESTMENT FIRMS (NO 2) INSTRUMENT 2015 CAPITAL RESOURCES AND PROFESSIONAL INDEMNITY INSURANCE REQUIREMENTS FOR PERSONAL INVESTMENT FIRMS (NO 2) INSTRUMENT 2015 Powers exercised A. The Financial Conduct Authority makes this instrument in the

More information

Xx Primary School. Finance Policy

Xx Primary School. Finance Policy Xx Primary School Finance Policy 1. AIMS 1.1 This document has been adopted by the Governing Body, as the basis for the administration and management of finances. The aim of the policy is to create a framework

More information

Business Model. 07.02.2014 NettoWatt

Business Model. 07.02.2014 NettoWatt Business Model 07.02.2014 NettoWatt The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EACI

More information

Paying and Terms. Postage Meter Users. Effective January 11, 2016. canadapost.ca/postalservices

Paying and Terms. Postage Meter Users. Effective January 11, 2016. canadapost.ca/postalservices Paying and Terms Postage Meter Users Effective January 11, 2016 Trade-mark of Canada Post Corporation. OM Official mark of Canada Post Corporation. canadapost.ca/postalservices T455625 Postage Meter Users

More information

CIS COMPLIANCE PROGRAMME

CIS COMPLIANCE PROGRAMME IFIA CIS COMPLIANCE PROGRAMME 1 INDEX SECTION A : CIS Compliance Principles SECTION B : CIS Compliance Programme 2 SECTION A : CIS Compliance Principles 1. Integrity CIS Commodity Inspection Services is

More information

Basic Rules of Issuing Invoices and Receipts 2014

Basic Rules of Issuing Invoices and Receipts 2014 Basic Rules of Issuing Invoices and Receipts 2014 Most requirements pertaining to invoicing are contained in Act CXXVII of 2007 on Value Added Tax (hereinafter: VAT Act) and the decrees issued on the basis

More information

How To Get A Small Business License In Australia

How To Get A Small Business License In Australia 1 L.R.O. 2007 Small Business Development CAP. 318C CHAPTER 318C SMALL BUSINESS DEVELOPMENT ARRANGEMENT OF SECTIONS SECTION 1. Short title. 2. Interpretation. 3. Small business. 4. Approved small business

More information

LAW ON STATE AUDIT I. GENERAL PROVISIONS

LAW ON STATE AUDIT I. GENERAL PROVISIONS LAW ON STATE AUDIT I. GENERAL PROVISIONS Article 1 This Law shall define the terms and manner for performing state audit of public expenditures, financial reports and financial transactions and other questions

More information

Establishing and operating HEA accredited provision policy

Establishing and operating HEA accredited provision policy Page 1 of 13 Establishing and operating HEA accredited provision policy 1. Introduction The Higher Education Academy (HEA) accredits initial and continuing professional development provision delivered

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /..

COMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /.. EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XX/XX/2007 COM(2006) XXX COMMISSION REGULATION (EC) No /.. of [ ] implementing Council Regulation (EC) No 1085/2006 establishing an instrument

More information

Investigation into potential conflicts of interest in the award of Disabled Students Allowance

Investigation into potential conflicts of interest in the award of Disabled Students Allowance Report by the Comptroller and Auditor General Department for Business, Innovation & Skills Investigation into potential conflicts of interest in the award of Disabled Students Allowance HC 1112 SESSION

More information

Xxxxxxxxxxxxxxxx Xxxxxxxxxxxxxxxx

Xxxxxxxxxxxxxxxx Xxxxxxxxxxxxxxxx DEPARTMENT OF THE TREASURY INTERNAL REVENUE SERVICE WASHINGTON, D.C. 20224 201432038 TAX EXEMPT AND GOVERNMENT ENTITIES DIVISION MAY 1 5 2014 Uniform Issue List: 408.03-00 Legend: Taxpayer A IRA X IRAY

More information

SAMPLE CONSULTANCY AGREEMENT. Name here (Hereinafter referred as the Company) Name here (Hereinafter referred to as the Consultant)

SAMPLE CONSULTANCY AGREEMENT. Name here (Hereinafter referred as the Company) Name here (Hereinafter referred to as the Consultant) [Appendix A] Nest time you need an agreement, use this one. It has stood the test of time and can cover just about any eventuality. How do I know that, I ve used it for ten years and it was put together

More information

EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A.

EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A. EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A. 89 CHLOIS & LIKOVRISEOS STR. - 144 52 METAMORFOSI TEL: +30 210 6253927, 210 6252495 INTERNET SITE: www.eurocert.gr E-mail: eurocert@otenet.gr FAX: +30

More information

Quality Assurance Agreement (QAA)

Quality Assurance Agreement (QAA) Quality Assurance Agreement (QAA) History and Release Notes: Version Date Acronym 0.1 15.04.2010 AB Draft 0.2 10.06.2010 AB Revision in the core team 1.0 28.03.2011 AB,RK, RH Release Status of revision;

More information

POSTING RCT AND VAT TRANSACTIONS ON COMPUTERISED ACCOUNTS SYSTEMS A GUIDE FOR ACCOUNTS PERSONNEL

POSTING RCT AND VAT TRANSACTIONS ON COMPUTERISED ACCOUNTS SYSTEMS A GUIDE FOR ACCOUNTS PERSONNEL POSTING RCT AND VAT TRANSACTIONS ON COMPUTERISED ACCOUNTS SYSTEMS A GUIDE FOR ACCOUNTS PERSONNEL 1 CONTENTS TAS Menu Page Introduction 3 Section 1 TAS SETUP 1. Set up VAT and RCT NOMINAL CODES 111 5 2.

More information

The Terms of Reference should be completed by the Beneficiary and be agreed with the Auditor

The Terms of Reference should be completed by the Beneficiary and be agreed with the Auditor ANNEX V-A FORM - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS TABLE OF CONTENTS TERMS OF REFERENCE FOR AN INDEPENDENT REPORT OF FACTUAL FINDINGS ON COSTS CLAIMED UNDER A ERC GRANT AGREEMENT

More information

Application for an Operator s Licence for the Carriage of Goods by Road

Application for an Operator s Licence for the Carriage of Goods by Road Application for an Operator s Licence for the Carriage of Goods by Road To avoid delays in processing your application, kindly read this form carefully, and fill it in completely. The Authority for Transport

More information

APPLICATION FOR BUILDING WARRANT

APPLICATION FOR BUILDING WARRANT THE BUILDING (SCOTLAND) ACT 2003 Application Under Section 9 for a Building Warrant to Construct, Demolish or Convert a Building, or to Provide Services, Fittings or Equipment in or in connection with

More information

3.4 Standard terms and conditions of business for conveyancing

3.4 Standard terms and conditions of business for conveyancing 3.4 Standard terms and conditions of business for conveyancing clients PLEASE SIGN AND RETURN Deibel & Allen Terms and Conditions of business - property transactions We set out in this statement the basis

More information

SHORT LISTING ASSESSMENT. Name of Applicant SC1 SC2 SC3 SC4 SC5 SC6 Interview? Y/N

SHORT LISTING ASSESSMENT. Name of Applicant SC1 SC2 SC3 SC4 SC5 SC6 Interview? Y/N SHORT LISTING ASSESSMENT Job Title: Name of Applicant SC1 SC2 SC3 SC4 SC5 SC6 Interview? Y/N Comments NB - Comments should be made in the case of all candidates, especially those not shortlisted for interview.

More information

Level 2 Certificate in Bookkeeping (QCF) (Accreditation number 500/9053/7) Sample Assessment Material

Level 2 Certificate in Bookkeeping (QCF) (Accreditation number 500/9053/7) Sample Assessment Material Level 2 Certificate in Bookkeeping (QCF) (Accreditation number 500/9053/7) Sample Assessment Material KNOWLEDGE TESTS 1 VAT at the Standard Rate of 20% IAB Student Number: Student Name: Name of Centre:

More information

Advanced training for tax auditors in the field of computer audit. 1.1 CRIS Number: 2006/018-180.01-03 Twinning No: PL/06/IB/FI/01/TL

Advanced training for tax auditors in the field of computer audit. 1.1 CRIS Number: 2006/018-180.01-03 Twinning No: PL/06/IB/FI/01/TL 1. Basic Information Advanced training for tax auditors in the field of computer audit 1.1 CRIS Number: 2006/018-180.01-03 Twinning No: PL/06/IB/FI/01/TL 1.2 Title: Advanced training for tax auditors in

More information

How to apply for an interest free Energy-Efficiency Loan

How to apply for an interest free Energy-Efficiency Loan How to apply for an interest free Energy-Efficiency Loan Introduction This document will help you to correctly complete the online Carbon Trust loan application. When to make a Loan application You should

More information

REGULATIONS FOR THE CERTIFICATION OF MANAGEMENT SYSTEMS

REGULATIONS FOR THE CERTIFICATION OF MANAGEMENT SYSTEMS CONTENTS 1. PURPOSE AND SCOPE 2. GENERAL PRINCIPLES AND GUARANTEES FOR THE CLIENT 3. STATUTORY AND REGULATORY REQUIREMENTS AND LEGALITY CONTROL LIMITS 4. ACCESS REQUIREMENTS FOR CERTIFICATION 5. CERTIFICATION

More information

* NB Eligible projects include irrigation and./ or water reuse equipment damage from Cyclone Yasi & Cyclone Anthony. Guidelines

* NB Eligible projects include irrigation and./ or water reuse equipment damage from Cyclone Yasi & Cyclone Anthony. Guidelines * NB Eligible projects include irrigation and./ or water reuse equipment damage from Cyclone Yasi & Cyclone Anthony Guidelines May 2011 The Dairy & Fodder Water for Profit (DFWP) program has been successful

More information

CODE OF PRACTICE DEALING WITH THE RELATIONSHIP BETWEEN THE NATIONAL AUDIT OFFICE AND THE COMPTROLLER AND AUDITOR GENERAL

CODE OF PRACTICE DEALING WITH THE RELATIONSHIP BETWEEN THE NATIONAL AUDIT OFFICE AND THE COMPTROLLER AND AUDITOR GENERAL CODE OF PRACTICE DEALING WITH THE RELATIONSHIP BETWEEN THE NATIONAL AUDIT OFFICE AND THE COMPTROLLER AND AUDITOR GENERAL The Budget Responsibility and National Audit Act received Royal Assent in March

More information

SME INSTRUMENT PHASE 1 - FINAL REPORT SME Instrument Phase 1 FINAL REPORT

SME INSTRUMENT PHASE 1 - FINAL REPORT SME Instrument Phase 1 FINAL REPORT SME INSTRUMENT PHASE 1 - FINAL REPORT SME Instrument Phase 1 FINAL REPORT Grant Agreement number: Acronym: Title: Type of the action: SME Instrument Phase 1 Date of latest version of Annex I against which

More information

Office of Personnel Management Policy Directive. Purpose

Office of Personnel Management Policy Directive. Purpose Office of Personnel Management Policy Directive Policy Title: Citation: Arkansas Code Annotated 21-11-101 through 109 Forms: Employee Suggestion Form Employee Suggestion Evaluator Form Purpose The Employee

More information

MANAGEMENT ACCOUNTANT TO FINANCE DIRECTOR DEVELOP YOUR PERSONAL AND MANAGEMENT SKILLS FOR YOUR PROFESSIONAL JOURNEY 2014 PROGRAMME

MANAGEMENT ACCOUNTANT TO FINANCE DIRECTOR DEVELOP YOUR PERSONAL AND MANAGEMENT SKILLS FOR YOUR PROFESSIONAL JOURNEY 2014 PROGRAMME MANAGEMENT ACCOUNTANT TO FINANCE DIRECTOR DEVELOP YOUR PERSONAL AND MANAGEMENT SKILLS FOR YOUR PROFESSIONAL JOURNEY 2014 PROGRAMME Introduction Speakers When taking the crucial step from accountant to

More information

DG RTD COMMON AUDIT SERVICE SPECIFIC PRIVACY STATEMENT EXTERNAL AUDIT AND CONTROL

DG RTD COMMON AUDIT SERVICE SPECIFIC PRIVACY STATEMENT EXTERNAL AUDIT AND CONTROL DG RTD COMMON AUDIT SERVICE SPECIFIC PRIVACY STATEMENT EXTERNAL AUDIT AND CONTROL Version Date Description of changes Page 1.1 21 August 2014 New online location in the Participant Portal (as the file

More information

Growth by acquisition.

Growth by acquisition. Forward thinking Growth by acquisition. A practical guide for owner-managed businesses Acquisitions can be an excellent means of enhancing shareholder value in a privately owned business. However, selecting

More information

SUBJECT: Audit Report Electronic Data Systems Contract Invoice Approval Procedures (Report Number CA-AR-05-002)

SUBJECT: Audit Report Electronic Data Systems Contract Invoice Approval Procedures (Report Number CA-AR-05-002) Office of Inspector General May 13, 2005 KEITH STRANGE VICE PRESIDENT, SUPPLY MANAGEMENT SUBJECT: Audit Report Electronic Data Systems Contract Invoice Approval Procedures (Report Number ) This report

More information

Amendments and Modifications to Internal Procedure Rules of AS Talveaed.

Amendments and Modifications to Internal Procedure Rules of AS Talveaed. TRANSLATION FROM RUSSIAN Amendments and Modifications to Internal Procedure Rules of AS Talveaed. General Part Division I New clauses 7-18 are added: 7 TLVD&EasyPay electronic system of express payments

More information

Standard Tender Evaluation Format. Procurement of Goods or Works. Public Procurement Authority. Accra, Ghana

Standard Tender Evaluation Format. Procurement of Goods or Works. Public Procurement Authority. Accra, Ghana STANDARD TENDER DOCUMENTS Standard Tender Evaluation Format Procurement of Goods or Works Public Procurement Authority Accra, Ghana 1 Preface Procurement under projects financed from the Public Funds

More information

Application form. Application Checklist. Application process. Eligibility criteria. Energy Saving Scotland Small Business Loans

Application form. Application Checklist. Application process. Eligibility criteria. Energy Saving Scotland Small Business Loans Energy Saving Scotland Small Business Loans ESSSBL0512 Helping Scottish businesses reduce their energy costs Application form Eligibility criteria The scheme is aimed at Scottish businesses that fall within

More information

Professional Doctorate Regulations: Doctor of Education (EdD) for Students Registering after January 2012

Professional Doctorate Regulations: Doctor of Education (EdD) for Students Registering after January 2012 Professional Doctorate Regulations: Doctor of Education (EdD) for Students Registering after January 2012 Introduction 1. Preamble (a) This programme is a Joint Award approved and delivered by Roehampton

More information

Deutsche Bank Paper Invoice Submission and Compliance Requirements Manual (PO and Non PO) India Region

Deutsche Bank Paper Invoice Submission and Compliance Requirements Manual (PO and Non PO) India Region November - 2015 Deutsche Bank Paper Invoice Submission and Compliance (PO and Non PO) India Region Contents: 1.Introduction 2.Invoice Submission 3.Invoice Contact Compliance 4.Policy Compliance 5.Other

More information

MSC Malaysia Cloud Computing Enablement Initiative

MSC Malaysia Cloud Computing Enablement Initiative MSC Malaysia Cloud Computing Enablement Initiative me 2013 Application Form MSC MALAYSIA CLOUD COMPUTING ENABLEMENT INITIATIVE Multimedia Development Corporation MSC Malaysia Headquarters 2360 Persiaran

More information

Circular to SVAT Registered Persons SEC 2012/04 INSTRUCTIONS ON SUSPENDED VAT (SVAT) SCHEME

Circular to SVAT Registered Persons SEC 2012/04 INSTRUCTIONS ON SUSPENDED VAT (SVAT) SCHEME Circular to Registered Persons SEC 2012/04 INSTRUCTIONS ON SUSPENDED VAT () SCHEME 1. Who is eligible to come under this scheme? Registered persons for VAT, but optional VAT payers are not eligible. 2.

More information

The British Institute of Non-Destructive Testing. Accreditation of NDT Training Organisations

The British Institute of Non-Destructive Testing. Accreditation of NDT Training Organisations The British Institute of Non-Destructive Testing Accreditation of NDT Training Organisations Contents Part I Accreditation and Validation Page 2 Part II Minimum Requirements Page 7 Part III Specimen Forms

More information

Accounting Notes. Purchasing Merchandise under the Perpetual Inventory system:

Accounting Notes. Purchasing Merchandise under the Perpetual Inventory system: Systems: Perpetual VS Periodic " Keeps running record of all goods " Does not keep a running record bought and sold " is counted once a year " is counted at least once a year " Used for all types of goods

More information

Reducing energy costs and improving business...

Reducing energy costs and improving business... Reducing energy costs and improving business... Energy Procurement Energy Legislation Carbon Reduction Renewable Energy Water Services www.energyteam.co.uk Working in partnership with energyteam we have

More information

IAB LEVEL 1 AWARD IN COMPUTERISED BOOKKEEPING

IAB LEVEL 1 AWARD IN COMPUTERISED BOOKKEEPING IAB LEVEL 1 AWARD IN COMPUTERISED BOOKKEEPING Qualification Accreditation Number 500/9405/1 (Accreditation end date 31 st December 2012) CONTENTS QUALIFICATION SPECIFICATION 1. Introduction 2. Aims 3.

More information

Operation Plan 2016/17

Operation Plan 2016/17 The Hong Kong University of Science and Technology Operation Plan 2016/17 for Technology Start-up Support Scheme for Universities (TSSSU) ( 大 學 科 技 初 創 企 業 資 助 計 劃 ) Objective of the Scheme 1. In 2014-15,

More information

Applicant Guidance Notes - Flexible Business Support Grants

Applicant Guidance Notes - Flexible Business Support Grants Applicant Guidance Notes - Flexible Business Support Grants Introduction Gloucester City Council is actively encouraging a thriving local economy and, as a part of this, is looking to support new business

More information

Real Estate Investment Funds Regulations

Real Estate Investment Funds Regulations Real Estate Investment Funds Regulations Contents Part 1 : Preliminary Provisions Article 1 : Preliminary... 5 Article 2 : Definitions... 5 Part 2 : Authorization Article 3 : Authorization Requirements...

More information

REGIONAL CENTRE EUROPE OF THE INTERNATIONAL FEDERATION OF TRANSLATORS

REGIONAL CENTRE EUROPE OF THE INTERNATIONAL FEDERATION OF TRANSLATORS Recommendations on Criteria for Conformity Assessment and Certification under EN 15038 (The numbering of the sections below follows the numbering in the Standard) Note: In the light of practical experience

More information

HK Electric Smart Power Fund. Application Guideline

HK Electric Smart Power Fund. Application Guideline HK Electric Smart Power Fund Application Guideline Corporate Development Division 4/F Hongkong Electric Centre, 44 Kennedy Road, Hong Kong Hotline : 2887 3455 Fax : 2810 0506 Email : smartpowerfund@hkelectric.com

More information

Tax Credits for Micro Enterprises and the Self Employed APPLICATION FORM. Version 2.03

Tax Credits for Micro Enterprises and the Self Employed APPLICATION FORM. Version 2.03 Ministry of Finance, the Economy & Investment Industrial Estate San Gwann SGN 3000 - Malta Tel: +356 2542 3960 Fax: +356 2542 3401 www.maltaenterprise.com tax.credits@maltaenterprise.com Tax Credits for

More information

GUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING

GUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING GUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING The aim of this guide is to give a summary of the main points of the administrative and financial processes governing

More information

Official Journal of the European Union

Official Journal of the European Union L 132/32 COMMISSION IMPLEMTING REGULATION (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an

More information

INTERNAL AND EXTERNAL AUDITS

INTERNAL AND EXTERNAL AUDITS PROCEDURE INTERNAL AND EXTERNAL AUDITS This document is stored electronically. Printed version might not be the latest. SAOCOM PROJECT COMISION NACIONAL DE ACTIVIDADES ESPACIALES BUENOS AIRES ARGENTINA

More information

Lottery Capital Programme: Feasibility Studies

Lottery Capital Programme: Feasibility Studies Arts Council of Wales Funding Application Help Notes Lottery Capital Programme: Feasibility Studies October 2012 Arts Council of Wales is committed to making information available in large print, braille,

More information

Health and Social Care Act 2012

Health and Social Care Act 2012 Health and Social Care Act 2012 CHAPTER 7 Explanatory Notes have been produced to assist in the understanding of this Act and are available separately 44.75 Health and Social Care Act 2012 CHAPTER 7 CONTENTS

More information

ROYAL MAIL DIRECT MAIL CHRISTMAS SCHEME 2015 TERMS AND CONDITIONS

ROYAL MAIL DIRECT MAIL CHRISTMAS SCHEME 2015 TERMS AND CONDITIONS ROYAL MAIL DIRECT MAIL CHRISTMAS SCHEME 2015 TERMS AND CONDITIONS 1. Definitions 1.1 In these Terms and Conditions, the following words and expressions shall have the following meanings: Acceptance Actual

More information

Review of the Management of Sickness Absence Conwy County Borough Council

Review of the Management of Sickness Absence Conwy County Borough Council Audit 2004/2005 Date: December 2005 Authors: Ros Adams and George Jones Ref: 1072A2005 Review of the Management of Sickness Absence Conwy County Borough Council Contents Summary Report Introduction 3 Background

More information

January 20, 2009 GEORGE W. WRIGHT VICE PRESIDENT, INFORMATION TECHNOLOGY OPERATIONS

January 20, 2009 GEORGE W. WRIGHT VICE PRESIDENT, INFORMATION TECHNOLOGY OPERATIONS January 20, 2009 GEORGE W. WRIGHT VICE PRESIDENT, INFORMATION TECHNOLOGY OPERATIONS SUBJECT: Audit Report Service Continuity at the Information Technology and (Report Number ) This report presents the

More information

CODE OF PRACTICE. Safety Management. Occupational Safety and Health Branch Labour Department CODE OF PRACTICE ON SAFETY MANAGEMENT 1

CODE OF PRACTICE. Safety Management. Occupational Safety and Health Branch Labour Department CODE OF PRACTICE ON SAFETY MANAGEMENT 1 CODE OF PRACTICE On Safety Management Occupational Safety and Health Branch Labour Department CODE OF PRACTICE ON SAFETY MANAGEMENT 1 This Code of Practice is prepared by the Occupational Safety and Health

More information

ELECTRICITY SUPPLY/ TRADE LICENSE KORLEA INVEST A.S

ELECTRICITY SUPPLY/ TRADE LICENSE KORLEA INVEST A.S Hamdi Mramori Street, No 1 Prishtina 10000 Kosovo Tel: +381 (0) 38 247 615 ext. 103 Fax: +381 (0) 38 247 620 e-mail: info@ero-ks.org www.ero-ks.org ELECTRICITY SUPPLY/ TRADE LICENSE GRANTED TO: KORLEA

More information

Great Aycliffe Town Council. Purchase Ordering and Payment for Goods and Services Policy

Great Aycliffe Town Council. Purchase Ordering and Payment for Goods and Services Policy Great Aycliffe Town Council Purchase Ordering and Payment for Goods and Services Policy Finance Section April 2013 1.0 Introduction 1.1 This policy sets out the Council s arrangements for ordering, receiving,

More information

1.2 This license shall be subject to the provisions herein stated, the Telecommunications Law and any regulations issued thereunder.

1.2 This license shall be subject to the provisions herein stated, the Telecommunications Law and any regulations issued thereunder. FORM OF INDIVIDUAL LICENSE FOR INTERNATIONAL TELECOMMUNICATIONS SERVICES TO BE GRANTED TO THE BAHRAIN TELECOMMUNICATIONS COMPANY B.S.C. BY THE TELECOMMUNICATIONS REGULATORY AUTHORITY 1. GRANT OF LICENSE

More information

Public Audit (Wales) Act 2004

Public Audit (Wales) Act 2004 Public Audit (Wales) Act 2004 CHAPTER 23 CONTENTS PART 1 AUDITOR GENERAL FOR WALES New functions of the Auditor General for Wales 1 Transfer of functions of Assembly 2 Additional functions of Auditor General

More information

Tallinn Airport Ltd. Conditions of infrastructure use for ground handling service providers. Valid since 01.11.2010. Lennart Meri Tallinn Airport

Tallinn Airport Ltd. Conditions of infrastructure use for ground handling service providers. Valid since 01.11.2010. Lennart Meri Tallinn Airport Authorised with the 01 October 2010 Directive of the Chairman of the Management Board no 48 Tallinn Airport Ltd. Conditions of infrastructure use for ground handling service providers Valid since 01.11.2010

More information

BUSINESS PLAN TEMPLATE

BUSINESS PLAN TEMPLATE BUSINESS PLAN TEMPLATE Business Name: (Please provide details of owners / members involved) Name of owner(s): Address: Identity Number: Tel: ( ) Cell: 1 1. INTRODUCTION OF YOUR BUSINESS IDEA 1.1. Give

More information

General Rules for the certification of Management Systems

General Rules for the certification of Management Systems General Rules for the certification of Management Systems Effective from 19/11/2015 RINA Via Corsica 12 16128 Genova - Italy tel. +39 010 53851 fax +39 010 5351000 website : www.rina.org Technical rules

More information

FP7 GRANT AGREEMENT ANNEX VII - FORM D - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS

FP7 GRANT AGREEMENT ANNEX VII - FORM D - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS FP7 GRANT AGREEMENT ANNEX VII - FORM D - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS TABLE OF CONTENTS TERMS OF REFERENCE FOR AN INDEPENDENT REPORT OF FACTUAL FINDINGS ON COSTS CLAIMED

More information

BCS Foundation Certificate in Business Analysis Syllabus. Version 3.8 July 2016

BCS Foundation Certificate in Business Analysis Syllabus. Version 3.8 July 2016 BCS Foundation Certificate in Business Analysis Syllabus Version 3.8 July 2016 Copyright BCS 2015 BA Foundation Syllabus Change History Any changes made to the syllabus shall be clearly documented with

More information

PROTOCOL CONCERNING THE SETTLEMENT OF REFUGEES IN BULGARIA. SIGNED AT GENEVA, SEPTEMBER 9, 1926

PROTOCOL CONCERNING THE SETTLEMENT OF REFUGEES IN BULGARIA. SIGNED AT GENEVA, SEPTEMBER 9, 1926 PROTOCOL CONCERNING THE SETTLEMENT OF REFUGEES IN BULGARIA. SIGNED AT GENEVA, SEPTEMBER 9, 1926 Whereas the Bulgarian Government has requested the Council of the League of Nations to approve the issue

More information

BYELAWS OF THE COMPANY GENERAL MEETINGS ZAKŁADY URZĄDZEŃ KOMPUTEROWYCH ELZAB SPÓŁKA AKCYJNA [ ELZAB COMPUTER WORKS JOINT STOCK COMPANY]

BYELAWS OF THE COMPANY GENERAL MEETINGS ZAKŁADY URZĄDZEŃ KOMPUTEROWYCH ELZAB SPÓŁKA AKCYJNA [ ELZAB COMPUTER WORKS JOINT STOCK COMPANY] BYELAWS OF THE COMPANY GENERAL MEETINGS ZAKŁADY URZĄDZEŃ KOMPUTEROWYCH ELZAB SPÓŁKA AKCYJNA I. GENERAL. [ ELZAB COMPUTER WORKS JOINT STOCK COMPANY] WITH REGISTERED OFFICE IN ZABRZE 1. 1. These Bye-Laws,

More information

Accident Compensation Amendment Act 2015

Accident Compensation Amendment Act 2015 Accident Compensation Amendment Act 2015 Public Act 2015 No 71 Date of assent 4 September 2015 Commencement see section 2 Contents Page 1 Title 2 2 Commencement 2 3 Principal Act 2 4 New section 5A inserted

More information

Digital Malaysia Shared Cloud Enterprise Services. SME Cloud Computing Adoption Programme Application Form 2014

Digital Malaysia Shared Cloud Enterprise Services. SME Cloud Computing Adoption Programme Application Form 2014 Digital Malaysia Shared Cloud Enterprise Services SME Cloud Computing Adoption Programme Application Form 2014 Digital Malaysia Shared Cloud Enterprise Services 1 What is SME Cloud Computing Adoption Programme

More information

Estonian Health Insurance Fund Act

Estonian Health Insurance Fund Act Issuer: Riigikogu Type: act In force from: 23.03.2014 In force until: 31.12.2016 Translation published: 02.04.2014 Amended by the following acts Passed 14.06.2000 RT I 2000, 57, 374 Entry into force 01.01.2001,

More information

NATIONAL PEST TECHNICIANS ASSOCIATION

NATIONAL PEST TECHNICIANS ASSOCIATION NATIONAL PEST TECHNICIANS ASSOCIATION SERVICING COMPANY MEMBERSHIP APPLICATION FORM NPTA, NPTA House, 12 Farrington Way, Eastwood Link Office Park Eastwood, Nottingham, NG16 3BF Tel: 01773 717716 Fax:

More information

AUDITING GUIDELINES FOR CERTIFICATION BODIES FOR PSA 28:2013

AUDITING GUIDELINES FOR CERTIFICATION BODIES FOR PSA 28:2013 AUDITING GUIDELINES FOR CERTIFICATION BODIES FOR PSA 28:2013 June 2014 www.psa.gov.ie 1. AUDITING GUIDELINES...4 2. GENERAL...5 2.1 PSA Licensing Requirements...5 2.2 Audits...5 2.3 Audit Compliance...7

More information

Spillemyndigheden s Certification Programme Change Management Programme

Spillemyndigheden s Certification Programme Change Management Programme SCP.06.00.EN.2.0 Table of contents Table of contents... 2 1 Introduction... 4 1.1 Spillemyndigheden s certification programme... 4 1.2 Objectives of the change management programme... 4 1.3 Scope of this

More information

Energy: Price Comparison Tools BEUC response to the CEER public consultation on the draft advice on Price Comparison Tools

Energy: Price Comparison Tools BEUC response to the CEER public consultation on the draft advice on Price Comparison Tools Energy: Price Comparison Tools BEUC response to the CEER public consultation on the draft advice on Price Comparison Tools Contact: Guillermo Beltrà energy@beuc.eu Ref.: X/2012/003-17/01/12 Recommendation

More information

Housing Benefit and Council Tax Support Self-employed Income Form

Housing Benefit and Council Tax Support Self-employed Income Form Housing Benefit and Council Tax Support Self-employed Income Form If you want to claim Housing Benefit or Council Tax Support, fill in and return this form to tell us about any self-employment. Please

More information

2.5.3 Use basic database skills to enter information in a database

2.5.3 Use basic database skills to enter information in a database 2.5 Filling System Documentation and Databases 2.5.3 Use basic database skills to enter information in a database Be able to enter accurate and relevant data in an existing database system (LO018) Developed

More information

MU 47/11 (AMENDED 9 JAN 12) - LIA MINIMUM STANDARD FOR CONTINUING PROFESSIONAL DEVELOPMENT OF LIFE INSURANCE REPRESENTATIVES (W.E.F.

MU 47/11 (AMENDED 9 JAN 12) - LIA MINIMUM STANDARD FOR CONTINUING PROFESSIONAL DEVELOPMENT OF LIFE INSURANCE REPRESENTATIVES (W.E.F. Members' Undertaking No. 47 Amended 9 January 2012 To: Ordinary and associate members MU 47/11 (AMENDED 9 JAN 12) - LIA MINIMUM STANDARD FOR CONTINUING PROFESSIONAL DEVELOPMENT OF LIFE INSURANCE REPRESENTATIVES

More information

Official Journal of RS, No. 86/2006 of 11. 08. 2006 REGULATION

Official Journal of RS, No. 86/2006 of 11. 08. 2006 REGULATION Official Journal of RS, No. 86/2006 of 11. 08. 2006 Pursuant to Articles 10, 23, 36, 40, 43, 47, 53, 54, 63, 71, 72, 73, 74, 88 and 91 of the Protection of Documents and Archives and Archival Institutions

More information

(Informal Translation) Chapter One. General Provisions. 1- The deposit of securities with the Company or with any licensed entity;

(Informal Translation) Chapter One. General Provisions. 1- The deposit of securities with the Company or with any licensed entity; CAPITAL MARKET AUTHORITY (Informal Translation) Central Securities Depository and Registry Law No. 93 of 2000 Chapter One General Provisions Article 1 In this Law, the Company means a company licensed

More information

ANNEX VI MODEL TERMS OF REFERENCE FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS PART ï

ANNEX VI MODEL TERMS OF REFERENCE FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS PART ï '4. J ' S., --t r - i^v. ^l- ' 1 I Version of 18.11.2013 EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR EDUCATION AND CULTURE Lifelong learning: higher education and international affairs Cooperation and

More information