Power Sector. Managing EPC Power Project

Size: px
Start display at page:

Download "Power Sector. Managing EPC Power Project"

Transcription

1 Power Sector Managing EPC Power Project ABSTRACT Engineering, procurement and construction (EPC) Contract are the most common form of Project used to undertake construction works by the Public and private sector companies for large-scale and complex Power projects. Under an EPC Project a Projector is obliged to deliver a complete facility to a developer who need only turn a key to start operating the facility, hence EPC Projects are sometimes called Turnkey Projects. Managing the Project in an ad-hoc manner is resulting in high risk and cost. It ensures that both parties meet or exceed the expectations of one another.the paper being presented attempts to provide an analysisof different Power Project contracting Options with followings 1. Power Project Contracting Options 2. Pros and Cons of each Options 3. EPC Vs Package Route 4. Key Challenges in EPC Projects 5. Overcoming Challenges Key motive here is to have a detail analysis on contracting analysis being adopted in top energy sector, the motive is to establish a process for adopting different options to reduce the risk and contribute in high demand of Power in fastest growing GDP. The study shall concludes with a brief summary of the importance of EPC route,its pros and cons of system in energy sector,further suggestion to do improvements. This paper analysis the major merit of EPC route ie. High degree of Stakeholder management which enforced the statement Effective Stakeholder management make a big difference Adopting EPC route in power sector will help to deliver projects on time, within budget and enhance Make in India concept run by Government of India.

2 Content:- 1. Introduction 2. Power Project Contracting Options 3. Pros and Cons of each Options 4. EPC Vs Package Route 5. Key Challenges in EPC Projects 6. Overcoming Challenges Introduction: -In India, Power Sector is in very crucial stage and day by day the demand of electricity increases.it s an important gradient in GDP growth. India has installed capacity of Electricity GW at end Nov India's Central Electricity Authority anticipated, for , a base load energy deficit and peaking shortage to be 5.1% and 2% respectively. India also expects all regions to face energy shortage up to a maximum of 17.4% in North Eastern region. Projected Requirement of Electricity Source: IMaCS Research Energy Requirement Peak Demand Installed Capacity Required (Billion kwh) (GW) (GW) GDP growth at 8.0% 9.0% 8.0% 9.0% 8.0% 9.0% ,097 1, ,524 1, ,118 2, ,866 3, ,880 4, In India, in power sector, there are Centre /state government owned companies (PSUs/Electricity board) and different contracting options being followed to construct a power plant. Power industry is the backbone for any economy.

3 Power Project Contracting Options The options which are being adopted in India may be classify as follows Multiple Packages In this type of contracting methods, the project is broken in small packages and awarded to different vendors. The integration is being done by developer. In power sector, the no of packages close to 25 to 40. These packages may be only material supplies or may include Engineering and Supply type contract. Construction is a separate package. BTG-EPC &BoP Multiple Packages In this type of contracting method, the power plant is divided to two parts i.e BTG (Boiler, Turbine and Generator) and BoP (Balance of Plant) Here BTG is awarded based upon EPC (Engineering Procurement and Constructions) and Again BoP is awarded in multiple packages. The integration is being done by developer. The complexity is less. BTG-EPC and BoP-EPC It is similar to above but both BTG and BoP are awarded based upon EPC concept. The integration is being done by developer and having lesser complexity than above two options. Complete EPC In this type of concept whole power plant is awarded as single package on EPC basis. The integration is being done by Contractor. It is clear from above Pic-1 that in first two cases BoP is ordered in multiple package and in last Two cases BoP is ordered on EPC basis.

4 Pros and Cons of each Options Pros: Cost of package lesser, savings in multiple purchase and negotiations Control over several vendors Least spares cost over project life cycle

5 Cons: Responsibility of project management between packages lies with Developer Requires extensive interface management Ordering cycle time and interface risks to managed by developer Requires huge skilled staff to handle multiple packages Technical interface and coordination among all packages vendors. Each package contractor will confirm its guarantees, interface during PG test to be sorted. This route is possible with developers who have Extensive experience in handling different packages Excellent coordination and project management staff Interface management and its engineering closures

6 Pros: Single point Executions &coordination responsibility Execution, coordination between packages being done by EPC contractor Guarantees calculation being done by EPC contractor Better negotiation Reduce technical and managerial risks at developer end.

7 Cons: Higher initial cost as order is released to one EPC contractor Lesser control over subvendors.

8 EPC Vs Package Route There is different option about weather project should awarded on EPC or package route. Below is the different attributes and division of responsibilities (DOR) in different route. Attribute Package Route EPC Route Project Engineering External Consultant to be appointed. Owner bears additional Cost EPC Contractor Responsibility Interface Engineering Owner has to co-ordinate. Owner bears additional manpower and risk EPC Contractor Responsibility Probability of Timely completion of Project Low due to Multiple vendors High due to single vendor responsibility and higher stakes Project Cost Project Management Uncertain : Default of even one vendor adversely impact project completion schedule High cost as large staff to be employed by Owner Assured : Minimal variations expected Minimal cost as single vendor employed Functional Guarantees Numerous : Owner to handle multiple contractors for equipment / system level performance guarantees Key Plant level performance guarantees : EPC Contractors single point responsibility Benefits of design standardization and optimization Selection of Reputed & reliable Contractors After sales services Support Difficult : Largely dependent on Owner s experience / practices Difficult to maintain uniformity in contractor s competence and capability levels Low : Small size contractor / vendors Easy : EPC contractors are better equipped & updated to provide value for money Easy : Selection restricted only to performing and competent EPC contractors High : Reputation at stake

9 In the packages route, risks are high and owner is having responsibilities of integration.in package route, the integration in not only limited for interface issues related to construction and deciding the priorities but also integration of different technology/design. It was experienced & observed that in package route system, the interface issues starts from design phase and there are issues in technology integration also. It is perception that if the package route is less costly and it is experienced that the high skill manpower which is required at owner end needs large in number. The project completion period is also greater than EPC route. Owner/Client has more risk which started due to responsibilities of integrations Key Challenges in EPC Projects High degree of coordination requirement within the departments (Engineering, procurement & Construction by Contractor Alleviating Time and Cost Over Run Interfacing related issues between sub systems 3M Dynamics : manpower,material and machinery Risk of scope creep Below are the challenges which impact on Time and Cost Challenges Impact on Time Impact on Cost Scope Creep Interface issues Delay in regulatory clearance Ambiguity in design and engineering - Access to site Passive response of supplier Shortage of Skill Man Power Lack of fund/delay payment from client Hyperinflation

10 Detail of impact of challenges as below Scope creep increases the resource requirement and utilization which results cost overrun. Stakeholder management is key to success for EPC project. Interface issues may impact contract time line may result cost overrun. Delay in clearances may impact start date of project and impact the budgeted cost due to different time line of start Undefined or ambiguous specification may lead in conflict and delay and cost overrun Availability of site and approach or local issue may lead in delay and cost overrun Skilled manpower is key success for EPC project and now a risk also Economy trend and hyperinflation may derail the project Risks involved in different time line of project in case of EPC route to contractors are as below Risk Type Pre- Bid Stage Post-Bid Stage Execution Stage Technical Insufficient Scope creep, change Unfamiliarity with knowledge of scope, requirement,change in condition of location technological design.resettlement and requirements, results rehabilitation in aggressive schedule and cost. Financial Wrong estimation Cash flow or investment Cash flow and other results due to technical risks issue. issues in Taxes, duties and foreign exchange Contractual/ Legal Unawareness of local rules and regulations Political Political Stability in the country and type of government. DOR is undefined about local rules and regulations Delay in clearances and availability of land DOR is undefined about local rules and regulations Availability of fuel (Coal/Gas). Policy on such critical part. Environmental - Delay in approvals Adverse climate condition Force Majeure - - Natural calamity,terrorism,political un rest

11 Overcoming the challenges Careful selection of Project Conduct adequate studies to understand economic and political cycles in the country. Taken care in contracts to factor in any force majeure events. Ensureall required approvals and availability of land are in place prior to work commencement Adequate geo-technical surveys and climate surveys prior to construction phase planning Clearing understanding of standard and specification prior to Bidding to avoid the risk of scope creep. Appropriation of Scope and design change in contracts to factor Detail studies to be done for source procurement of materials and build appropriate transport costs Clearly defined of scope of work, and extensive use of Bottom Up approach for estimation at time of bidding. Clearly define contractual obligations on both parties for cost escalations to avoid ambiguities Clearly defined payment terms condition for timely payment and define interest or other penalty in case of default Clearly understand variations from home country laws and Consult appropriate legal experts Moving higher along the value chain and creating in house PMC and high value engineering divisions Entering JVs to to gain access to technology and new regions Create an in-house team of experienced project management personnel Adopt and rely on sophisticated project management tools and techniques Develop a tracking system for all critical activities to avoid slippages on a daily basis. Unambiguously defined claim procedure

12 Conclusion Power sector is essential part of GDP growth and will play vital role in coming success story of India. To bring the projects on time and within the cost is major challenge of government and private developer of India. Every method of contracting has its pros and cons, organization to select the method of contracting based upon the criteria defined and risk taking capacity. In our view, to avoid larger risk, EPC route is the better options.

THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE. John R. Lethbridge

THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE. John R. Lethbridge Page 1 of 5 TRANSPORTATION, WATER AND URBAN DEVELOPMENT DEPARTMENT THE WORLD BANK November 1990 Transport No. PS-2 THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE John R. Lethbridge The use of outside

More information

CAPITAL PROJECTS IMPLEMENTATION

CAPITAL PROJECTS IMPLEMENTATION CAPITAL PROJECTS IMPLEMENTATION 2.4 Over the years, I have been reporting on the shortcomings encountered during implementation of projects. These include, among others, excessive delays, variation costs,

More information

Contracting Practices in Mega Projects

Contracting Practices in Mega Projects CEM 520 Term Paper Contracting Practices in Mega Projects EPC and EPCM A L I A B D U L L A H A L - S A L E M 2 0 0 3 4 2 5 1 0 Outline Introduction Types of Contracts Contracting Strategies The Difference

More information

PROCUREMENT GUIDE: SELECTING A CONTRACTOR/PROJECT DEVELOPER

PROCUREMENT GUIDE: SELECTING A CONTRACTOR/PROJECT DEVELOPER PROCUREMENT GUIDE: SELECTING A CONTRACTOR/PROJECT DEVELOPER 1. Overview CHP project development and implementation are similar to many central plant construction projects or comprehensive energy conservation

More information

How To Manage A Contract

How To Manage A Contract Contract Management Checklist Preparation This section deals with laying good foundations before a contract is let. The contract should be actively managed. You should have a plan for doing this, which

More information

Developing a Public-Private Partnership Framework: Policies and PPP Units

Developing a Public-Private Partnership Framework: Policies and PPP Units Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework

More information

RISK MANAGEMENT POLICY

RISK MANAGEMENT POLICY RISK MANAGEMENT POLICY 1. Preamble: Rail Vikas Nigam Ltd (RVNL) is a Public Sector Undertaking specializing in development and execution of railway projects. In the course of its operations, it is prone

More information

CONTRACT MANAGEMENT FRAMEWORK

CONTRACT MANAGEMENT FRAMEWORK CONTRACT MANAGEMENT FRAMEWORK August 2010 Page 1 of 20 Table of contents 1 Introduction to the CMF... 3 1.1 Purpose and scope of the CMF... 3 1.2 Importance of contract management... 4 1.3 Managing contracts...

More information

National Electric Power Regulatory Authority

National Electric Power Regulatory Authority National Electric Power Regulatory Authority MECHANISM FOR DETERMINATION OF TARIFF FOR HYDROPOWER PROJECTS Preamble Conservative estimates show total hydroelectric potential in the country to be 45000

More information

Civil Work: Civil work is the essence of any project, which house capital equipment.

Civil Work: Civil work is the essence of any project, which house capital equipment. Policy decision on ineligible items in proposals received for Financial Assistance Under APEDA scheme component Infrastructure Development assistance is provided to both public sector as well as private

More information

IAG EFFECTIVE SCOPE MANAGEMENT THROUGH MULTI-LEVEL CLIENT ENGAGEMENT

IAG EFFECTIVE SCOPE MANAGEMENT THROUGH MULTI-LEVEL CLIENT ENGAGEMENT Your Trusted Partner for Technology Driven Energy Projects IAG EFFECTIVE SCOPE MANAGEMENT THROUGH MULTI-LEVEL CLIENT ENGAGEMENT International Alliance Group IAG is an international program management organization

More information

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7 INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006 Control Objectives Example Control Activities Audit Procedures 1. INTERNAL AUDITS Management should periodically

More information

Risks and uncertainties

Risks and uncertainties Risks and uncertainties Our risk management approach We have a well-established risk management methodology which we use throughout the business to allow us to identify and manage the principal risks that

More information

Downstream upgrade challenges and solutions

Downstream upgrade challenges and solutions Downstream upgrade challenges and solutions July 5th 2013 Having a huge performance gap compared to world-class level, Russian refineries started an unprecedented modernization program in 2008 Modernization

More information

Causes, Effects and Minimization of Delays in Construction Projects

Causes, Effects and Minimization of Delays in Construction Projects Causes, Effects and Minimization of Delays in Construction Projects Divya.R 1, S.Ramya 2 Assistant Professor Department of Civil Engineering Bharathiyar Institute of Engineering for Women, Deviyakurichi

More information

American College of Real Estate Lawyers Tucson, Arizona March 18, 2005. FORCE MAJEURE IN BUILD-TO-SUIT LEASES By: Charles W.

American College of Real Estate Lawyers Tucson, Arizona March 18, 2005. FORCE MAJEURE IN BUILD-TO-SUIT LEASES By: Charles W. American College of Real Estate Lawyers Tucson, Arizona March 18, 2005 FORCE MAJEURE IN BUILD-TO-SUIT LEASES By: Charles W. Trainor An excusable delay, or force majeure, clause is an important element

More information

Vendor Management. Minimizing Value Leakage. Deloitte Consulting LLP. November 19, 2013

Vendor Management. Minimizing Value Leakage. Deloitte Consulting LLP. November 19, 2013 Vendor Management Minimizing Value Leakage Deloitte Consulting LLP November 19, 2013 Vendor Management is a rapidly emerging business practice in the outsourcing industry Define sourcing strategy Assess

More information

OVERSTRAND MUNICIPALITY

OVERSTRAND MUNICIPALITY C 3 / 001 OVERSTRAND MUNICIPALITY CONTRACT MANAGEMENT POLICY Approved by Council 28 May 2015 Implementation date: 1 July 2015 TABLE OF CONTENTS C 3 / 002 1. PRE-AMBLE 2 2. DEFINITIONS 3 3. ABBREVIATIONS

More information

Best Practices and Approaches to Supply Chain Management

Best Practices and Approaches to Supply Chain Management Best Practices and Approaches to Supply Chain Management ATOMEX Forum 2012 Moscow 12.12. 14.12.2012 AF-Consult Switzerland Ltd Jan Kocourek 1 Objectives Provide information available regarding both the

More information

Procurement Routes. Curtin University of Technology

Procurement Routes. Curtin University of Technology Procurement Routes An Overview Curtin University of Technology Overview of Principal Routes Traditional / conventional design led Design and construct Management (Fee) Traditional Client appoints consultants

More information

COSTS AND PROJECT RISKS

COSTS AND PROJECT RISKS COSTS AND PROJECT RISKS ASSOCIATED WITH OWNERSHIP AND CONTRACTING MODELS IN NUCLEAR NEW BUILD Sabin Sabinov, WorleyParsons Nuclear Services Bulatom Conference, Varna, 2014 Key Presentation Topics Cost

More information

Principal risks and uncertainties

Principal risks and uncertainties Principal risks and uncertainties Our risk management approach We have a well-established risk management methodology which we use throughout the business to allow us to identify and manage the principal

More information

How to successfully manage your mega-project

How to successfully manage your mega-project How to successfully manage your mega-project Part I Early planning and organizing for success kpmg.com 2 Building, Construction & Real Estate How to successfully manage your mega-project A three-part series

More information

Choosing the Right ERP Solution:

Choosing the Right ERP Solution: Choosing the Right ERP Solution: 3 CRITERIA FOR SUCCESS Table of Contents 1 2 Who We Are 3 The Key to Better Business Performance 4 ERP as the Focal Point of Your Business 5 Why Some ERP Solutions Fail

More information

The Economics of Public-Private Partnerships

The Economics of Public-Private Partnerships The Economics of Public-Private Partnerships Teresa Ter-Minassian Director, Fiscal Affairs Department International Monetary Fund OECD Working Party of Senior Budget Officials Symposium on Agencies and

More information

AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff. Risk Allocation in Construction Contracts

AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff. Risk Allocation in Construction Contracts 11 AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff Risk Allocation in Construction Contracts Risks 2 In the absence of a contract, all risks are the owner's Contracting is

More information

Remediation projects dealing process International evolution and experiences Jurgen BUHL (Cornelsen Umwelttechnologie GmbH, Germany)

Remediation projects dealing process International evolution and experiences Jurgen BUHL (Cornelsen Umwelttechnologie GmbH, Germany) Remediation projects dealing process International evolution and experiences Jurgen BUHL (Cornelsen Umwelttechnologie GmbH, Germany) Introduction According to recent estimates Soil contamination requiring

More information

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client

More information

Project Risk Management: Methodology Development for Engineering, Procurement and Construction Projects a Case Study in the Oil and Gas Industry

Project Risk Management: Methodology Development for Engineering, Procurement and Construction Projects a Case Study in the Oil and Gas Industry American Journal of Civil Engineering 2015; 3(3): 75-79 Published online April 13, 2015 (http://www.sciencepublishinggroup.com/j/ajce) doi: 10.11648/j.ajce.20150303.14 ISSN: 2330-8729 (Print); ISSN: 2330-8737

More information

Retail. White Paper. Driving Strategic Sourcing Effectively with Supply Market Intelligence

Retail. White Paper. Driving Strategic Sourcing Effectively with Supply Market Intelligence Retail White Paper Driving Strategic Sourcing Effectively with Supply Market Intelligence About the Author Devaraj Chithur Devaraj is part of the Supply Chain group within Tata Consultancy Services (TCS)

More information

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Australian National Audit Office Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Commonwealth of Australia 2002 ISBN 0 642 80678 0 10 December 2002 Dear Mr

More information

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT - INTRODUCTION 1.1. General. Kuwait Ports Authority (KPA) through the Ministry Of Finance (MOF) wishes

More information

PPP Models. Ownership of capital assets Responsibility for investment Assumption of risks, and Duration of contract.

PPP Models. Ownership of capital assets Responsibility for investment Assumption of risks, and Duration of contract. PPP Models The PPP models vary from short-term simple management contracts (with or without investment requirements) to long-term and very complex BOT form, to divestiture. These models vary mainly by:

More information

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects Dr. Rashad Zakieh (PMP) 27 April, 2010 Copyright Saudi Aramco, 2010. All rights reserved.

More information

1Steps to a Successful Core Vendor Evaluation & Selection. www.smslp.com 800-477-1772

1Steps to a Successful Core Vendor Evaluation & Selection. www.smslp.com 800-477-1772 1Steps to a Successful Core Vendor Evaluation & Selection Before you make an expensive, long-term decision Get the answers you need to select the best core vendor and technology partner for your bank.

More information

EST.491. Cost Estimation Challenges and Uncertainties Confronting Oil and Gas Companies

EST.491. Cost Estimation Challenges and Uncertainties Confronting Oil and Gas Companies EST.491 Cost Estimation Challenges and Uncertainties Confronting Oil and Gas Companies Nicolas Alexander Hall and Sarah Delille, PE ABSTRACT Usually, when a company has a history of successfully planning

More information

1.040 Project Management

1.040 Project Management MIT OpenCourseWare http://ocw.mit.edu 1.040 Project Management Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. Fred Moavenzadeh Spring 2009

More information

Project Appraisal and Scrutiny Committee Recommendation STRATEGY & RESOURCES 23 MARCH 2015

Project Appraisal and Scrutiny Committee Recommendation STRATEGY & RESOURCES 23 MARCH 2015 Cambridge City Council Project Appraisal and Scrutiny Committee Recommendation Project Name: Telecommunications To: Report by: Scrutiny committee: Wards affected: Recommendation/s Executive Councillor

More information

JOINT VENTURE IN INDIA A GUIDE FOR INVESTORS

JOINT VENTURE IN INDIA A GUIDE FOR INVESTORS JOINT VENTURE IN INDIA A GUIDE FOR INVESTORS India is the world's twelfth largest economy at market exchange rates and the fourth largest in purchasing power. Economic reforms have transformed it into

More information

MDB Harmonised Particular Conditions

MDB Harmonised Particular Conditions FIDIC Plant and Design-Build Contract MDB Harmonised Particular Conditions 1. Introduction There is a need for FIDIC to provide sample Particular Conditions that render the General Conditions of the 1st

More information

INSTITUTIONAL, REGULATORY AND COOPERATIVE FRAMEWORK MODEL FOR THE NILE BASIN POWER TRADE QUESTIONNAIRE FOR INFORMATION GATHERING AND MANUAL

INSTITUTIONAL, REGULATORY AND COOPERATIVE FRAMEWORK MODEL FOR THE NILE BASIN POWER TRADE QUESTIONNAIRE FOR INFORMATION GATHERING AND MANUAL INSTITUTIONAL, REGULATORY AND COOPERATIVE FRAMEWORK MODEL FOR THE NILE BASIN POWER TRADE QUESTIONNAIRE FOR INFORMATION GATHERING AND MANUAL Prepared for: Prepared by: MERCADOS ENERGY MARKETS INTERNATIONAL

More information

COSCSMO10 - SQA Unit Code FM1W 04 Implement strategic sourcing partnerships

COSCSMO10 - SQA Unit Code FM1W 04 Implement strategic sourcing partnerships Overview This Unit is about identifying and agreeing with the stakeholders what systems are most effective for managing the project. The systems identified will need to be prioritised and formalised if

More information

Solar Power Purchase Agreements & Leases

Solar Power Purchase Agreements & Leases Solar Power Purchase Agreements & Leases Angela Lipanovich, Esq. March 7, 2012 Copyright 2012, Estriatus Law. All rights reserved. Conditions of Usage and Disclaimer 1 Estriatus Law grants the following

More information

These guidelines can help you in taking the first step and adopt a sustainability policy as well as plan your further sustainability communication.

These guidelines can help you in taking the first step and adopt a sustainability policy as well as plan your further sustainability communication. SUSTAINABILITY POLICY AND COMMUNICATION GUIDELINES Why communicate about sustainability? IFU encourages all our investments to be transparent and informative about business and sustainability performance

More information

Guide on drawing up contracts for large industrial works

Guide on drawing up contracts for large industrial works Guide on drawing up contracts for large industrial works Topic: Construction, installation of plant, engineering Source: United Nations Economic Commission for Europe Palais des Nations Genève, Switzerland

More information

PFS Web Conference Frequently Asked Questions

PFS Web Conference Frequently Asked Questions PFS Web Conference Frequently Asked Questions 1. About PFS and its performance Q: Kindly brief about PTC India Financial Services? A: PTC India Financial Services Limited, also known as PFS, is one of

More information

A Study On Factors Influencing Construction Contract Claim Management

A Study On Factors Influencing Construction Contract Claim Management A Study On Factors Influencing Construction Contract Claim Management K.Sundhar #1, N.Nandhini #2 #1 PG Student (M.E Construction Engineering and Management), #2 Assistant Professor ( Department of civil

More information

Role Description Vendor Relationship Manager ICT

Role Description Vendor Relationship Manager ICT Role Description Vendor Relationship Manager ICT Classification/Grade/Band Clerk Grade 9/10 ANZSCO Code PCAT Code Date of Approval Primary purpose of the role The Vendor Relationship Manager ICT is responsible

More information

14. ENGINEERING AND CONSTRUCTION SCHEDULES. 14.1. Preparation of Schedules ALASKA ENERGY AUTHORITY AEA11-022 ENGINEERING FEASIBILITY REPORT

14. ENGINEERING AND CONSTRUCTION SCHEDULES. 14.1. Preparation of Schedules ALASKA ENERGY AUTHORITY AEA11-022 ENGINEERING FEASIBILITY REPORT 14. ENGINEERING AND CONSTRUCTION SCHEDULES The project procurement strategy and contract strategy based on the project risk profile have not yet been formulated. For the purposes of completing the construction

More information

On June 28, 2011, the Municipal Services Committee recommended that the City Council adopt the recommendations stated in the subject agenda report.

On June 28, 2011, the Municipal Services Committee recommended that the City Council adopt the recommendations stated in the subject agenda report. Agenda Report July 11, 2 0 11 TO: Honorable Mayor and City Council THROUGH: Municipal Services Committee (June 28, 2011) FROM: SUBJECT: Water and Power Department AUTHORIZE THE CITY MANAGER TO ENTER INTO

More information

Financial and Commercial Services HIRE OF MANAGEMENT IT/IS CONSULTANTS

Financial and Commercial Services HIRE OF MANAGEMENT IT/IS CONSULTANTS Financial and Commercial Services HIRE OF MANAGEMENT IT/IS CONSULTANTS Table of Contents Contents INTRODUCTION... 2 1. DEFINING MANAGEMENT CONSULTANCY... 2 2. KEY SUCCESS FACTORS... 3 3. THE PROJECT APPROACH

More information

The search for solid ground Can outsourcing stabilize your debt management performance?

The search for solid ground Can outsourcing stabilize your debt management performance? The search for solid ground Can outsourcing stabilize your debt management performance? By Martin Kochman Chief Strategy Officer Transcom Uncertain times Throughout the global recession, the number of

More information

Comparison of Design Bid Build and Design Build Finance Operate Maintain Project Delivery

Comparison of Design Bid Build and Design Build Finance Operate Maintain Project Delivery Comparison of Design Bid Build and Design Build Finance Operate Maintain Project Delivery By Bob Prieto Design Bid Build (DBB) and Design Build Finance Operate Maintain (DBFOM) project delivery differ

More information

Contracts, agreements and tendering

Contracts, agreements and tendering Contracts, agreements and tendering 1) Introduction This guidance note provides an overview of the types of contracts and other agreements you might need to use in setting up and running a local energy

More information

Sealed bids will be received by the City of Dearborn, at the Office of the Purchasing

Sealed bids will be received by the City of Dearborn, at the Office of the Purchasing CITY OF DEARBORN ADVERTISEMENT FOR NATURAL GAS PROVIDER TO THE CITY OF DEARBORN, MICHIGAN Sealed bids will be received by the City of Dearborn, at the Office of the Purchasing Agent, 2951 Greenfield, Dearborn,

More information

The Gateway Review Process

The Gateway Review Process The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible

More information

Developing solar in emerging markets

Developing solar in emerging markets Developing solar in emerging markets Swedbank Conference March 17, 2016 Our values Predictable Driving results Change makers Working together Disclaimer The following presentation is being made only to,

More information

CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.????

CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.???? CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.???? 1 1. PRE-AMBLE All transactions undertaken by the Cape Winelands District Municipality involves a contract whether explicitly

More information

https://www.ofgem.gov.uk/publications-and-updates/ofto-build-providing-additional-flexibility-through-extendedframework

https://www.ofgem.gov.uk/publications-and-updates/ofto-build-providing-additional-flexibility-through-extendedframework All interested parties Direct Dial: 020 7901 1849 Email: transmissioncompetition@ofgem.gov.uk Date: 17 November 2015 Dear Colleague EPC Contract Principles for OFTO Build Tenders This letter provides guidance

More information

How to successfully manage your mega-project

How to successfully manage your mega-project BUILDING, CONSTRUCTION & REAL ESTATE How to successfully manage your mega-project Part II Stakeholder communication and project controls integration kpmg.com 2 Building, Construction & Real Estate How

More information

CONTRACT MANAGEMENT POLICY

CONTRACT MANAGEMENT POLICY CONTRACT MANAGEMENT POLICY Section Finance Approval Date 25/08/2014 Approved by Directorate Next Review Aug 2016 Responsibility Chief Operating Officer Key Evaluation Question 6 PURPOSE The purpose of

More information

What's Wrong with Project Management? Introduction. Welcome to the November 2009 INSIGHTS published by acumen7.

What's Wrong with Project Management? Introduction. Welcome to the November 2009 INSIGHTS published by acumen7. Welcome to the November 2009 INSIGHTS published by acumen7. The purpose of this newsletter is to bring you new perspectives on key subjects to stimulate your own thoughts and ideas. In each edition (which

More information

PROJECT FINANCE RE PROJECTS

PROJECT FINANCE RE PROJECTS PROJECT FINANCE RE PROJECTS TURKEY S RENEWABLE MARKET RE regime in Turkey sparked in 2001 when the Electiricity Market Law authorised the EMRA (Energy Market Regulatory Authority) to take measures to promote

More information

DEVELOPING A CONSTRUCTION INTEGRATED MANAGEMENT SYSTEM Yan-Chyuan Shiau, Ming-Teh Wang, Tsung-Pin Tsai, Wen-Chian Wang

DEVELOPING A CONSTRUCTION INTEGRATED MANAGEMENT SYSTEM Yan-Chyuan Shiau, Ming-Teh Wang, Tsung-Pin Tsai, Wen-Chian Wang DEVELOPING A CONSTRUCTION INTEGRATED MANAGEMENT SYSTEM Yan-Chyuan Shiau, Ming-Teh Wang, Tsung-Pin Tsai, Wen-Chian Wang Associate Professor Department of Construction Engineering Chung Hua University Email:

More information

Guidance on the template contract for social impact bonds and payment by results

Guidance on the template contract for social impact bonds and payment by results Guidance on the template contract for social impact bonds and payment by results Introduction These guidance notes have been prepared to assist users of the Cabinet Office template contract. The guidance

More information

The business case for lowest price tendering?

The business case for lowest price tendering? The business case for lowest price tendering? Health Warning. The use of lowest price tendering may seriously damage your financial health and reputation and may have undesirable and unexpected side effects.

More information

Determination of risk identification process employed by NHS for a PFI hospital project in the UK

Determination of risk identification process employed by NHS for a PFI hospital project in the UK Determination of risk identification process employed by NHS for a PFI hospital project in the UK F. E. Mohamed Ghazali, Shahid Kabir Universiti Sains Malaysia (MALAYSIA) cefarid@eng.usm.my; shahid.kabir@usherbrooke.ca

More information

DESIGN IS GOOD BUSINESS

DESIGN IS GOOD BUSINESS COMPENSATING YOUR ARCHITECT The creature comforts are one thing, but for a house to become a home it s got to be elevated to the point that it s about raising one s spirits as well. SAMUEL MOCKBEE Building

More information

Sponsor-CRO Collaboration Study. Executive Summary

Sponsor-CRO Collaboration Study. Executive Summary Sponsor-CRO Collaboration Study Executive Summary 2013 About Vantage Partners Vantage Partners, LLC is a global strategy and management consulting firm that specializes in helping companies achieve breakthrough

More information

CONTRACTOR DEFAULT & SURETY PERFORMANCE:

CONTRACTOR DEFAULT & SURETY PERFORMANCE: CONTRACTOR DEFAULT & SURETY PERFORMANCE: A PRACTICAL GUIDE FOR UNDERSTANDING AND NAVIGATING A BOND DEFAULT SITUATION TEXAS CITY ATTORNEYS ASSOCIATION SUMMER CONFERENCE JUNE 9-11, 2010 SOUTH PADRE ISLAND,

More information

Module 10 Procurement Management PMP Exam Questions

Module 10 Procurement Management PMP Exam Questions Module 10 Procurement Management PMP Exam Questions PMP, PMBOK and the Registered Education Provider logo are registered marks of the Project Management Institute, Inc Question 1 A company needs some work

More information

Canadian Manufacturers and Exporters

Canadian Manufacturers and Exporters Standing Committee on Finance (FINA) Pre-budget consultations 2012 Canadian Manufacturers and Exporters 1. Economic Recovery and Growth Responses Given the current climate of federal and global fiscal

More information

Offshore Transmission: Guidance for Cost Assessment Guidance Document

Offshore Transmission: Guidance for Cost Assessment Guidance Document Promoting choice and value for all gas and electricity customers Offshore Transmission: Guidance for Cost Assessment Guidance Document Reference: 183/12 Contact Roger Morgan, Senior Manager Publication

More information

IT Outsourcing Contracts Guidance On Building The Legal Infrastructure And Dispute Resolution Strategies

IT Outsourcing Contracts Guidance On Building The Legal Infrastructure And Dispute Resolution Strategies IT Outsourcing Contracts Guidance On Building The Legal Infrastructure And Dispute Resolution Strategies Rajesh Sreenivasan Partner, Rajah & Tann 14 July 2005 1 Outsourcing Agreements - General The transfer

More information

Copyright: Univan Ship Management Ltd.

Copyright: Univan Ship Management Ltd. Outsourcing Ship Management Should Owners Do It? Technical management may be : An in-house function for a Ship Owner OR Out-sourced to a third-party Ship Manager. The Owner s Musts : 1. Anticipate operating

More information

Corporate Social Responsibility

Corporate Social Responsibility Who should read this fact sheet? Social responsibility often also called Corporate Social Responsibility - is about improving the way your business responds to the needs of stakeholders. This means that

More information

What will it be; define the value

What will it be; define the value Level 2 Frame Facility: Greenfield Power Plant with Carbon Capture All 6 Project Phases All aspects for the relevant facility Stage Identify (Concept Study) Evaluate (Pre-Feasibility Study) Define (Feasibility/FEED

More information

Scrim And Texture Data Collection Contract Management S Chamberlain

Scrim And Texture Data Collection Contract Management S Chamberlain Scrim And Texture Data Collection Contract Management S Chamberlain Introduction Transit New Zealand (Transit) has been successfully managing SCRIM and texture data collection through external suppliers

More information

Working Capital and Guarantees

Working Capital and Guarantees WHITE PAPER Working Capital and Guarantees If you do business outside Canada, your foreign customers may require various types of guarantees before they ll sign a contract for your goods or services. These

More information

THE GROCERIES (SUPPLY CHAIN PRACTICES) MARKET INVESTIGATION ORDER 2009. Contents Page

THE GROCERIES (SUPPLY CHAIN PRACTICES) MARKET INVESTIGATION ORDER 2009. Contents Page THE GROCERIES (SUPPLY CHAIN PRACTICES) MARKET INVESTIGATION ORDER 2009 Contents Page PART 1...3 Citation, commencement and interpretation...3 1. Citation and commencement...3 2. General interpretation,

More information

Procurement Capability Standards

Procurement Capability Standards IPAA PROFESSIONAL CAPABILITIES PROJECT Procurement Capability Standards Definition Professional Role Procurement is the process of acquiring goods and/or services. It can include: identifying a procurement

More information

MANAGING THE COMPLEXITIES OF GLOBAL PHARMACEUTICAL SOURCING

MANAGING THE COMPLEXITIES OF GLOBAL PHARMACEUTICAL SOURCING DPT Thought Leadership Issue 10 MANAGING THE COMPLEXITIES OF GLOBAL PHARMACEUTICAL SOURCING With the increased globalization and complexity of the pharmaceutical supply chain, managing the sourcing of

More information

Competency-Based Organization For Project Management

Competency-Based Organization For Project Management Competency-Based Organization For Project Management Shekhar S. Patil, Ph.D. (USA) Abstract. Though the concept of organizational competence and competencies is well-established in the business and management

More information

INDIA CONSTRUCTION INTRODUCTION IMPORTANCE OF INFRASTRUCTURE CONSTRUCTION IN INDIA

INDIA CONSTRUCTION INTRODUCTION IMPORTANCE OF INFRASTRUCTURE CONSTRUCTION IN INDIA IMPORTANCE OF INFRASTRUCTURE CONSTRUCTION IN INDIA INTRODUCTION 1 5 M A R C H 2 0 0 9 Infrastructure development and maintenance is a major input to economic development and sustained growth in an economy.

More information

Long and Short Form. Contracts

Long and Short Form. Contracts www.pwc.com.au Model Forms of Contract and Contract Administration Tools Long and Short Form Model Forms of Contract and Contract Administration Tools Contracts Damian McNair 12 February 2016 Reference

More information

Financing Nuclear Power Projects: Challenges and IAEA Assistance in Capacity Building

Financing Nuclear Power Projects: Challenges and IAEA Assistance in Capacity Building Financing Nuclear Power Projects: Challenges and Assistance in Capacity Building International Framework for Nuclear Energy Cooperation Finance Workshop London, 9-10 May 2012 Nadira Barkatullah International

More information

Preparing and Evaluating A Request for Proposals: How to Select a Vendor Andrew Ness, Mercer Investment Consulting

Preparing and Evaluating A Request for Proposals: How to Select a Vendor Andrew Ness, Mercer Investment Consulting Preparing and Evaluating A Request for Proposals: How to Select a Vendor Andrew Ness, Mercer Investment Consulting Although sometimes thought of as a necessary evil for sponsors of defined contribution

More information

HOW PORTABLE STORAGE SERVES MULTIPLE NEEDS ON A CONSTRUCTION JOB SITE

HOW PORTABLE STORAGE SERVES MULTIPLE NEEDS ON A CONSTRUCTION JOB SITE HOW PORTABLE STORAGE SERVES MULTIPLE NEEDS ON A CONSTRUCTION JOB SITE Portable storage plays a crucial role on a construction job site. It enables effective supply chain management, on-time project completion

More information

ICE Legal Notes Series

ICE Legal Notes Series ICE Legal Notes Series Legal Notes Reviewing the work of another Engineer and replacing another Engineer Institution of Civil Engineers www.ice.org.uk Published by the Institution of Civil Engineers (ICE).

More information

Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel

Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel Page 1 of 6 ALM Properties, Inc. Page printed from: New York Law Journal Back to Article Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel James E. Hughes New York

More information

1 Scope and Objectives of Financial Management

1 Scope and Objectives of Financial Management 1 Scope and Objectives of Financial Management BASIC CONCEPTS 1. Definition of Financial Management Financial management comprises the forecasting, planning, organizing, directing, co-ordinating and controlling

More information

Do you have difficulty making purchasing decisions? Have you ever wished you could figure out how to decide more easily?

Do you have difficulty making purchasing decisions? Have you ever wished you could figure out how to decide more easily? Portable Skills Handout #1 Conducting a Cost Benefit Analysis Do you have difficulty making purchasing decisions? Have you ever wished you could figure out how to decide more easily? Some decisions, such

More information

CAD/CAE systems and cost engineering

CAD/CAE systems and cost engineering CAD/CAE systems and cost engineering The purpose of this article is to explain how total life-cycle solutions can help engineering procurement and construction and plant owner companies meet today s business

More information

Feasibility. A guide to feasibility planning for junior mining companies

Feasibility. A guide to feasibility planning for junior mining companies Financial institutions Energy Infrastructure, mining and commodities Transport Technology and innovation Life sciences and healthcare Feasibility A guide to feasibility planning for junior mining companies

More information

Why outsourcing is the dependable option for independent hotels. A white paper from Berendsen

Why outsourcing is the dependable option for independent hotels. A white paper from Berendsen Why outsourcing is the dependable option for independent hotels A white paper from Berendsen The UK s pipeline of hotels in development is strong and occupancy rates are forecast to increase. As the UK

More information

AFRICA ENERGY S.A. SENEGAL

AFRICA ENERGY S.A. SENEGAL AFRICA ENERGY S.A. SENEGAL NOTICE INVITING TENDERS Tender No: AESA ICB 001 (INTERNATIONAL COMPETITIVE BIDDING) For ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) FOR 3x100/120 MW COAL BASED THERMAL POWER

More information

Appendix 3: Project Management Substation Guidelines (General Process Flow Template)

Appendix 3: Project Management Substation Guidelines (General Process Flow Template) 365 Appendix 3: Project Management Substation Guidelines (General Process Flow Template) Checkpoint Methodology The schedule is issued prior to the go decision. It covers the duration of the project. It

More information

Strategic Framework to Analyze Supply Chains

Strategic Framework to Analyze Supply Chains Strategic Framework to Analyze Supply Chains 1 Andy Guo A Strategic Framework for Supply Chain Design, Planning, and Operation Part I: Understand the supply chain Part II: Supply chain performance Part

More information

Ensuring Quality Going Down the Supply Chain

Ensuring Quality Going Down the Supply Chain Ensuring Quality Going Down the Supply Chain (Including Vendor Qualification) What is the Role of Operators, Vendors and Regulators? April 21, 2015 DAE-HEE LEE Contents Nuclear Quality Issues The Role

More information

NUCLEAR SUPPLY CHAIN SYMPOSIUM

NUCLEAR SUPPLY CHAIN SYMPOSIUM NUCLEAR SUPPLY CHAIN SYMPOSIUM Canadian Contracting Models Darryl J. Brown Gowling Lafleur Henderson LLP November 10, 2015 Suite 1600 1 First Canadian Place 100 King Street West Toronto, Ontario Canada

More information