1 MGT 3110: Exam 2 Study Guide 1. What is aggregate planning? What is its purpose? 2. What are demand options for aggregate planning? Give examples and discuss the effects of each. 3. Why is there a need for aggregate planning? 4. Briefly discuss the advantages and disadvantages of each of these planning strategies: a. Maintain a level rate of output and let inventories absorb fluctuations in demand. b. Vary the size of the workforce to correspond to predicted changes in demand requirements. c. Maintain a constant workforce size, but vary hours worked to correspond to predicted demand requirements. 5. What is Master Production Schedule? 6. What are the inputs to master scheduling? What are the outputs? 7. Define independent and dependent demand items. 8. What is Bill of Materials? 9. What is Low-Level coding and what how is it used? 10. What are the benefits of MRP? 11. What are the inputs required for MRP? 12. What is Lot Sizing in MRP? 13. What are the reasons for using a lot sizing method other than Lot-for-lot? 14. What is the objective of ABC analysis? 15. Describe the thumb rule used in ABC classification. 16. List the assumptions needed for developing the EOQ formula. 17. What costs are included in the total cost for the EOQ model? 18. The EOQ formula consists of three numbers, D, S, and H. Increasing which of these three will result in increase in the value of EOQ. 19. If annual demand were to double, would the value of EOQ also double? Why or why not? 20. Which of the assumptions required for developing the EOQ formula is not necessary for the Economic Production Quantity Model? 21. For the Economic Production Quantity to be valid, production rate p must be greater than the demand rate u. Explain the reasons for this. 22. What costs are included in the total cost if quantity discount is allowed? PROBLEMS 1. Wormwood, Ltd., produces a variety of furniture products. The planning committee wants to prepare an aggregate plan for the next five months. Demand forecast as given below Demand Cost of production per unit using regular time is $50, using overtime it is $75, and using subcontracting it is $80. Inventory holding cost per unit per period is $5. Backorder cost is $60 per unit. Hiring cost is $150 per worker. Firing cost is $200 per worker.
2 Currently there are 12 workers and each can produce 15 units per period. Workers can be hired or fired, but at most only 12 workers can be on the roll. Overtime capacity is 30 units per period and subcontracting capacity is 10 units per period. Beginning inventory is zero. No backorder is allowed at the end of period 5. When computing number of workers needed, make sure you round the number up to a whole number. a. Develop a chase and determine the cost. b. Develop a level and determine the cost. c. An image of the spreadsheet Solver model is give below. Fill out the formulas in the appropriate cells. d. Fill out the Solver parameters in the table below. A B C D E F G 1 Solver model 2 3 Capacity 4 No. of workers 12 5 Production/worker/period 15 6 Capacity/period 7 Overtime capacity 30 8 Subcontracting capacity 10 9 Initial inventory 0 10 Safety stock Costs 13 Output cost per unit 14 Regular time $10 15 Overtime $16 16 Subcontracting $20 17 Inventory/unit/period $2 18 Backorder/unit $25 19 Hiring cost/worker $ Firing cost/worker $ Forecast Workers Total 26 Beginning workers 27 Hires 28 Fires 29 Workers available
3 30 31 Output Total 32 Regular time 33 Overtime 34 Subcontracting 35 Total output 36 Output-Forecast Inventory Total 39 Beginning 40 Available 41 Ending 42 Average 43 Backlog Costs Total 46 Output 47 Regular time 48 Overtime 49 Subcontracting 50 Inventory 51 Backorder 52 Hiring cost 53 Firing cost 54 Total Solver parameters Set Target Cell Changing cells Constraints
4 2. The forecast is 30 units for each of the first two periods and 40 units for each of the next four periods. The starting inventory is 50 units. The lot size of 60 units. Develop the master schedule and available to promise given the following committed customer orders. Week Customer order A Bill of Materials is desired for a bracket (A) that is made up of a base (B), two springs (C) and four clamps (D). The base is assembled from one clamp (D) and two housings (E). Each clamp has one handle (F) and one casting (G). Each housing has two bearings (H) and one shaft (I). a. Develop a product structure tree. b. The lead time for the parts are given below. Develop a time-phased product structure. c. The available inventory for each part is given in the table below. Determine the net requirement quantities of all parts required to assemble 50 units of bracket A. Item Lead time Available A 1 5 B 2 5 C 3 10 D 2 20 E 1 50 F G 1 50 H 1 5 I A product (A) consists of a base (B) and a casting (C). The base consists of a plate (P) and three fasteners (F). The lead time, current on-hand inventory and scheduled receipts are given below. All components are lot for lot. The Master Schedule requires 100 units of product A be available in week 4 and 150 in week 6. Produce the MRP for the upcoming six weeks. Produce a list of all planned order releases. Part Lead time On-hand Scheduled receipts A 1 20 None B in week 1 C in week 1, 30 in week 2 P in week 1 F in week 1, 40 in week 3 5. A company has 12 items in its inventory. Using the data given below classify the items
5 into A, B, and C classes. SKU Annual usage (units) Unit $ value D E C E B B E A E A F B Herbert Adams sells bicycles. One particular model is highly popular with annual sales of 2,000 units per year. The cost of one such bicycle is $ Annual holding costs are 25% of the item's cost, and the ordering cost is $40. The store is open 250 days a year. a. What is the economic order quantity? b. What is the average number of orders per year? c. What is the average cycle time in days? d. What is the annual total costs? 7. Montegut Manufacturing produces a product for which the annual demand is 10,000. Production averages 100 per day, while demand is 40 per day. Holding costs are $1.50 per unit per year; set-up costs $ If they wish to produce this product in economic batches, what size batch should be used? What is the maximum inventory level? What is the time between orders? What is the time to producing a lot? How many order cycles are there per year? Determine the total annual inventory cost? 8. The annual demand, ordering cost, and the inventory carrying cost rate for a certain item are D = 600 units, S = $10/order and holding cost is 30% of item price. Price is established by the following quantity discount schedule. What should the order quantity be in order to minimize the total annual cost? Quantity 1 to to and up Unit price $5.00 $4.50 $4.10 Answers to discussion questions: 1. What is aggregate planning? What is its purpose? Aggregate planning involves developing a general plan for employment, output, and inventory levels. The goal is to develop a plan which makes efficient use of the resources of an organization. Planners attempt to determine the best way to meet forecasting demand requirements within the constraints imposed by long-term decisions. 2. What are demand options for aggregate planning? Give examples and discuss the effects
6 of each. Demand options are techniques used to even out fluctuations in demand. Following are some examples. Back ordering during high- demand periods (Effective if substitute products are not available, but may result in loss of customer orders to competition and lost customer good will) Counter-seasonal product mix (effective in reducing huge ups and downs in demand, but may lead to products or services outside the company s areas of expertise Economic incentives such as discounts (loss of profit) 3. Why is there a need for aggregate planning? The need for aggregate planning is to begin to translate long-term decisions into shortterm operating plans. Aggregate planning constitutes the intermediate step in this process. 4. Briefly discuss the advantages and disadvantages of each of these planning strategies: a. Maintain a level rate of output and let inventories absorb fluctuations in demand. b. Vary the size of the workforce to correspond to predicted changes in demand requirements. c. Maintain a constant workforce size, but vary hours worked to correspond to predicted demand requirements. a. Maintaining a constant workforce has the advantage of making estimation of labor costs relatively easy, is good for morale, and minimizes hiring and layoff costs. However, inventory carrying costs tend to be high. b. Since labor force has to be continually adjusted, hiring and layoff costs tend to be high. Due to the instability of the labor force, employee morale is low. However, the inventory carrying costs are very low because production is matched with demand, resulting in little or no inventory. c. Varying the workforce can cause morale problems. Moreover, working overtime generally is less productive, increases quality problems, and increases the risk of accidents. 5. What is Master Production Schedule? Master Production Schedule specifies production quantities of each Independent Demand item for a planning horizon of 12 to 15 weeks. Total of MPS quantities must be in accordance with the aggregate production plan. 6. What are the inputs to master scheduling? What are the outputs? The master schedule has three inputs: the beginning inventory, forecasts for each period of the schedule, and customer orders. Its outputs are projected inventory, production requirements, and uncommitted (available-to-promise) inventory. 7. Define independent and dependent demand items. Finished products whose demand is independent of production decisions are called Independent demand items. Items for which demand can be directly calculated from production decisions are called Dependent demand items. These are raw-materials and parts required for the production of the finished goods. 8. What is Bill of Materials?
7 Bill of materials is structured list of components, ingredients, and materials needed to make an end product. Items needed to produce a given part are called components or children. The part into which the components go us called Parent. The BOM also gives the number of units of a child item needed to produce one unit of the parent item. 9. What is Low-Level coding and what how is it used? A level code starting from zero at the top of the BOM tree and incremented by 1 going down each level of the BOM tree is assigned. Then, the lowest level at which an item appears is called Low-Level code. The MRP computations are processed one level at a time, starting from level zero. 10. What are the benefits of MRP? Better response to customer orders Faster response to market changes Improved utilization of facilities and labor Reduced inventory levels 11. What are the inputs required for MRP? Master Production Schedule Bill of Materials Inventory status 12. What is Lot Sizing in MRP? The process of combining net requirements into production lots is called lot sizing. 13. What are the reasons for using a lot sizing method other than Lot-for-lot? Lot-for-lot often requires too many lots that may not be economically justifiable Sometime lot-for-lot generates absurdly small lots 14. What is the objective of ABC analysis? The objective of ABC analysis is to identify the inventory items with (i) the largest annual dollar expenditure (class A), (ii) least annual dollar investment (class C), and (iii) all other items that fall in between (class B). 15. Describe the thumb rule used in ABC classification. Class A: 10 to 20% of items, 60 to 70% annual $ usage Class B: intermediate items Class C: 50 to 60% of items, <= 15% annual $ usage 16. List the assumptions needed for developing the EOQ formula. Only one product is involved. Annual demand requirements are known. Demand is spread evenly throughout the year so that the demand rate is reasonably constant. Lead time is known and constant. Each order is received in a single delivery. There are no quantity discounts. 17. What costs are included in the total cost for the EOQ model?
8 Annual holding cost and annual ordering cost 18. The EOQ formula consists of three numbers, D, S, and H. Increasing which of these three will result in increase in the value of EOQ. D and S are in the numerator of the EOQ formula. Therefore increasing these two values will result in higher value for EOQ. 19. If annual demand were to double, would the value of EOQ also double? Why or why not? No. The annual demand is inside square-root. 20. Which of the assumptions required for developing the EOQ formula is not necessary for the Production Lot Size Model? The assumption that each order is received in a single delivery is not necessary. 21. For the Production Lot Size to be valid, production rate p must be greater than the demand rate u. Explain the reasons for this. If p < u, a negative number will result inside the square-root. If p = u, a zero will result in the denominator. These two cases represent situations where the production needs to be continuous without a stop, i.e. there is no determinable batch size. 22. What costs are included in the total cost if quantity discount is allowed? Annual holding cost, annual ordering cost, and annual item cost Answers to problems 1. (a) Chase: 2. Forecast Output Regular time Overtime Subcontracting Total output Output-Forecast Workers Hires 2 2 Fires Inventory Beginning Available Ending Average
9 Backlog Costs Output Regular time $7,500 $8,500 $9,000 $8,000 $8,000 $41,000 Overtime $0 $0 $0 $0 $0 $0 Subcontracting $0 $0 $0 $0 $0 $0 Hiring cost $0 $300 $0 $0 $0 $300 Firing cost $400 $0 $0 $200 $0 $600 Inventory $0 $0 $0 $0 $0 $0 Backorder $0 $0 $0 $0 $0 $0 Total $7,900 $8,800 $9,000 $8,200 $8,000 $41,900 (b) Level: Average demand = 164 Number of workers = or 11 Forecast Output Regular time Overtime 0 Subcontracting 0 Total output Output-Forecast Workers Hires 0 Fires 1 1 Inventory Beginning Available Ending Average Backlog Costs Output Regular time $8,200 $8,200 $8,200 $8,200 $8, Overtime $0 $0 $0 $0 $0 0
10 Subcontracting $0 $0 $0 $0 $0 0 Hiring cost $0 $0 $0 $0 $0 0 Firing cost $200 $0 $0 $0 $0 200 Inventory $35 $55 $20 $0 $0 110 Backorder $0 $0 $480 $240 $0 720 Total $8,435 $8,255 $8,700 $8,440 $8,200 $42,030 A B C D E F G 1 Solver model 2 3 Capacity 4 No. of workers 12 5 Production/worker/period 15 6 Capacity/period =B4*B5 7 Overtime capacity 30 8 Subcontracting capacity 10 9 Initial inventory 0 10 Safety stock Costs 13 Output cost per unit 14 Regular time $10 15 Overtime $16 16 Subcontracting $20 17 Inventory/unit/period $2 18 Backorder/unit $25 19 Hiring cost/worker $ Firing cost/worker $ Forecast Workers Total 26 Beginning workers =B4 =B29 =COPY 27 Hires =SUM(B27:F27) Changing cells 28 Fires =SUM(B27:F27) 29 Workers available =B26+B27-B28 COPY Output Total 32 Regular time =B29*$B$5 =SUM(B32:F32) 33 Overtime 34 Subcontracting Changing cells 35 Total output =SUM(B32:B34)
11 36 Output-Forecast =B35-B Inventory Total 39 Beginning =B9 =B41 40 Available =B39+B35 41 Ending =MAX(0,B40-B23) =MAX(0,C40- (C23+B43)) 42 Average =(B39+B41)/2 43 Backlog =MAX(0,B23-B40) =MAX(0,(C23+B43)- C40) =SUM(B43:F43) Costs Total 46 Output 47 Regular time =B32*$B14 =SUM(B47:F47) 48 Overtime 49 Subcontracting 50 Inventory =B42*$B17 51 Backorder 52 Hiring cost =B27*$B19 63 Firing cost 54 Total =SUM(B45:B51) =SUM(B54:F54) Solver parameters Set Target Cell =G54 MINIMIZE Changing cells Constraints B27:F28, B33:F34 B33:F33 <= B7 B34:F34 <= B8 G43 = 0 B33:F33 = INT B34:F34 = INT #2. Fixed order quantity 60 Period Forecast Customer orders - committed Projected on-hand inventory
12 MPS Available to promise #3. (a) A B C 2 D 1 E 2 D 4 F G H 2 I F G (b) Lead time = 7 weeks F G D I H E C B A F G D (c) Part Gross Available Net A = 45 B 1 x A = = 40 C 2 x A = 2 x 45 = = 80 D 4 x A + 1 x B = 4 x = = 200 E 2 x B = = 30 F 1 x D = = 50 G 1 x D = = 150
13 H 2 x E = 2 x 30 = = 55 I 1 x E = = 30 #4. Item A Lead time = 1 Week: Gross requirement Scheduled receipts Projected on-hand Planned receipts Planned order releases Item B Lead time = 1 Week: Gross requirement Scheduled receipts 50 Projected on-hand Planned receipts Planned order releases Item C Lead time = 3 Week: Gross requirement Scheduled receipts Projected on-hand Planned receipts Planned order releases Item P Lead time = 2 Week: Gross requirement Scheduled receipts 50 Projected on-hand Planned receipts Planned order releases Item F Lead time = 3 Week Gross requirement Scheduled receipts Projected on-hand Planned receipts Planned order releases Action report: Order 170 units of F; Exception: None
14 5. No. SKU Annual usage (units) Unit $ value Annual Dollar volume Dollar % Cum. % for $ Cum. % for no. of items Class 1 B , % 44.4% 8.3% A 2 B , % 62.8% 16.7% A 3 C , % 70.5% 25.0% B 4 E , % 77.8% 33.3% B 5 A , % 84.9% 41.7% B 6 E , % 88.9% 50.0% B 7 D , % 92.6% 58.3% C 8 E , % 95.2% 66.7% C 9 A , % 97.3% 75.0% C 10 E , % 98.7% 83.3% C 11 B , % 99.7% 91.7% C 12 F % 100.0% 100.0% C % 6. D = 2000, No. of days = 250, H = 25% x $800 = $200, S = $40 2(2000)40 a. EOQ = = b. N = D/Q = 2000/28 = 70.7 c. u = D/No. of days per year = 2000/250 = 8, T = Q/u = 28/8 = 3.5 days d. Annual total cost = (D/Q)S + (Q/2)H = (2000/28)40 + (28/2)200 = $5, D = 10,000, H = $1.50, S = $200, p = 100/day, u = 40/day EPQ = =. = 2108 I max = (Q/p)(p - u) = (2108/100)(100-40) = Average number of orders per year = D/Q = 10000/2108 = 4.74 Cycle time (Time between orders) = Q/d = 2108/40 = 52.7 days Production time = Q/p = 2108/100 = days Annual holding cost = (I max /2) x H = ( /2) x 1.50 = $948.60
15 Annual setup cost = (D/Q) x S = (10000/2108) x 200 = $ Total cost = = $1, D = 600 S = 10 Holding cost = 30% Q Price Holding cost Formula Q Candidate Q Formula Q > upper limit -- not a candidate Formula Q is within range, = Candidate Q = Formula Q & above Formula Q < lower limit, Candidate Q = lower limit 250 Q Price Candidate Q Ordering cost Holding cost Item cost Total cost >= EOQ = P = $4.10
MGT 3110 - Exam 2 Formulas. Item $ Usage % of $ usage Cumulative % of $ Cumulative % of no. of items Class
Chapter 12 Inventory Management MGT 3110 - Exam 2 Formulas ABC Classification rule: Class A: ~15% of items, 70-80% annual $ usage Class B: ~30% of items, 15-25% annual $ usage Class C: ~55% of items, 5%
More informationUniversidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning
Aggregate, Material Requirement, and Capacity Topic: Aggregate, Material Requirement, and Capacity Slide 1 Welcome to Workshop Eight presentation: Aggregate planning, material requirement planning, and
More informationCHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부
CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부 Learning Objectives You should be able to: Describe the hierarchical operations planning process in terms of materials planning & capacity
More informationMATERIAL REQUIREMENTS PLANNING
MATERIAL REQUIREMENTS PLANNING A basic tool for performing the detailed material planning function in the manufacture of component parts and their assembly into finished items. MRP s Managerial objective
More informationTEACHING AGGREGATE PLANNING IN AN OPERATIONS MANAGEMENT COURSE
TEACHING AGGREGATE PLANNING IN AN OPERATIONS MANAGEMENT COURSE Johnny C. Ho, Turner College of Business, Columbus State University, Columbus, GA 31907 David Ang, School of Business, Auburn University Montgomery,
More informationA Cross-Functional View of Inventory Management, Why Collaboration among Marketing, Finance/Accounting and Operations Management is Necessary
A Cross-Functional View of Inventory Management, Why Collaboration among Marketing, Finance/Accounting and Operations Management is Necessary Richard E. Crandall, Appalachian State University, John A.
More informationASPECTS OF AGGREGATE PLANNING. Aggregate planning focuses on intermediate-rang production planning problems.
ASPECTS OF AGGREGATE PLANNING Aggregate planning focuses on intermediate-rang production planning problems. The aggregate production plan states in general terms the total amount of output that is the
More informationMOS 3330 Test 2 Review Problems & Solutions
MOS 3330 Test 2 Review Problems & Solutions General Information Test date, time, location: See the course outline See also the course web site: dan.uwo.ca/courses/3330 Test time conflict (due to having
More information1 Aggregate Production Planning
IEOR 4000: Production Management Lecture 5 Professor Guillermo Gallego 9 October 2001 1 Aggregate Production Planning Aggregate production planning is concerned with the determination of production, inventory,
More informationMaterial Requirements Planning. Lecturer: Stanley B. Gershwin
Material Requirements Planning Lecturer: Stanley B. Gershwin MRP Overview Primary source: Factory Physics by Hopp and Spearman. Basic idea: Once the final due date for a product is known, and the time
More informationMaterial Requirements Planning (MRP)
Material Requirements Planning (MRP) Unlike many other approaches and techniques, material requirements planning works which is its best recommendation. Joseph Orlicky, 1974 1 History Begun around 1960
More informationAGGREGATE & CAPACITY PLANNING
7 Ir. Haery Sihombing/IP Pensyarah Fakulti Kejuruteraan Pembuatan Universiti Teknologi Malaysia Melaka AGGREGATE & CAPACITY PLANNING Aggregate Planning Determine the resource capacity needed to meet demand
More informationISE 421 QUANTATIVE PRODUCTION PLANNING
ISE 421 QUANTATIVE PRODUCTION PLANNING LECTURE III MRP, MRPII, ERP, APS Dr. Arslan ÖRNEK 2013 2014 Fall Term PRODUCTION PLANNING & SCHEDULING (PP&S) PP&S is one of the most critical activities in a manufacturing
More informationMaster Scheduling and Rough-cut Capacity Planning
Master Scheduling and Rough-cut Capacity Planning SUPPLEMENT D Before studying this supplement you should know or, if necessary, review 1. Capacity management concepts, Chapter 9, pp. 316 322. 2. Work
More informationMASTER PRODUCTION SCHEDULE
6 MASTER PRODUCTION SCHEDULE MGT2405, University of Toronto, Denny Hong-Mo Yeh So far, in discussing material requirement planning (MRP), we have assumed that master production schedule (MPS) is ready
More informationPlanning Optimization in AX2012
Planning Optimization in AX2012 Streamline your manufacturing operations with Master Planning and Forecasting Kevin Cosman 11 June 2013 About the Presenter Kevin Cosman, Senior Solutions consultant with
More informationTeaching Manual-Operation Management. Gunadarma University. Week : 9 Subject : INVENTORY MANAGEMENT Content :
Week : 9 Subject : INVENTORY MANAGEMENT Content : WHY INVENTORY a. One of the most expensive assets of many companies representing as much as 50% of total invested capital b. Operations managers must balance
More informationIM 322 Inventory Management
IM 322 Inventory Management Chapter 9: Material Requirement Planning -1- Textbook: Donald Waters, Inventory Control and Management, 2 nd ed Chapter Outline Master Scheduling The use of MRP (Material Requirement
More informationPRINCIPLES OF INVENTORY AND MATERIALS MANAGEMENT
PRINCIPLES OF INVENTORY AND MATERIALS MANAGEMENT Fourth Edition Richard J. Tersine The University of Oklahoma TEGHNISCHE HOCHSCHULE DARMSTADT Fochbereich 1 Gesonr> 11-. ib I iothek Betiier >wi rtschottsiehre
More informationTU-E2020 ADVANCED OPERATIONS MANAGEMENT. Demand management Sales & Operations Planning Master Production Scheduling
TU-E2020 ADVANCED OPERATIONS MANAGEMENT Demand management Sales & Operations Planning Master Production Scheduling 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999
More informationProduction Planning Solution Techniques Part 1 MRP, MRP-II
Production Planning Solution Techniques Part 1 MRP, MRP-II Mads Kehlet Jepsen Production Planning Solution Techniques Part 1 MRP, MRP-II p.1/31 Overview Production Planning Solution Techniques Part 1 MRP,
More informationChapter 14 Inventory Management
Chapter 14 Inventory Management Overview Nature of Inventories Opposing Views of Inventories Fixed Order Quantity Systems Fixed Order Period Systems Other Inventory Models Some Realities of Inventory Planning
More informationERP-DOM (Spring 2016) Content
Aggregate Planning Content Business planning Sales and operations planning Different aggregate planning strategies & options for changing demand and/or capacity in aggregate plans Develop aggregate plans,
More informationChapter 7. Production, Capacity and Material Planning
Chapter 7 Production, Capacity and Material Planning Production, Capacity and Material Planning Production plan quantities of final product, subassemblies, parts needed at distinct points in time To generate
More informationBy: ATEEKH UR REHMAN 12-1
12 Inventory Management By: ATEEKH UR REHMAN 12-1 Inventory Management The objective of inventory management is to strike a balance between inventory investment and customer service 12-2 Importance of
More information12 MRP and ERP. Dr. Ron Lembke
12 MRP and ERP Dr. Ron Lembke Historical Perspective MRP II Manufacturing Resource Planning ERP- Enterprise Resource Planning mrp material requirements planning MRP Crusade (1975) Material Requirements
More informationMaterial Requirement Planning (MRP) Mohd Yusnurahman Bin Mohd Yuznah
Material Requirement Planning (MRP) Nur'Ain Binti Yahaya Hazwan Bin Ismail Mohd Yusnurahman Bin Mohd Yuznah Nurhazwani Binti Jaya B050810172 B050810289 B050810294 B050810188 What is MRP? a system that
More informationSupply Chain Inventory Management Chapter 9. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall 09-01
Supply Chain Inventory Management Chapter 9 09-01 What is a Inventory Management? Inventory Management The planning and controlling of inventories in order to meet the competitive priorities of the organization.
More informationINVENTORY MANAGEMENT
7 INVENTORY MANAGEMENT MGT2405, University of Toronto, Denny Hong-Mo Yeh Inventory management is the branch of business management that covers the planning and control of the inventory. In the previous
More informationDemand forecasting & Aggregate planning in a Supply chain. Session Speaker Prof.P.S.Satish
Demand forecasting & Aggregate planning in a Supply chain Session Speaker Prof.P.S.Satish 1 Introduction PEMP-EMM2506 Forecasting provides an estimate of future demand Factors that influence demand and
More informationAntti Salonen KPP227 - HT 2015 KPP227
- HT 2015 1 Inventory management Inventory management concerns short-range decisions about supplies, inventories, production levels, staffing patterns, schedules and distribution. The decisions are often
More informationINVENTORY MANAGEMENT. 1. Raw Materials (including component parts) 2. Work-In-Process 3. Maintenance/Repair/Operating Supply (MRO) 4.
INVENTORY MANAGEMENT Inventory is a stock of materials and products used to facilitate production or to satisfy customer demand. Types of inventory include: 1. Raw Materials (including component parts)
More informationInventory Management - A Teaching Note
Inventory Management - A Teaching Note Sundaravalli Narayanaswami W.P. No.2014-09-01 September 2014 INDIAN INSTITUTE OF MANAGEMENT AHMEDABAD-380 015 INDIA Inventory Management - A Teaching Note Sundaravalli
More informationMATERIALS MANAGEMENT. Module 9 July 22, 2014
MATERIALS MANAGEMENT Module 9 July 22, 2014 Inventories and their Management Inventories =? New Car Inventory Sitting in Parking Lots Types of Inventory 1. Materials A. Raw material B. WIP C. Finished
More informationLogistics Management Inventory Cycle Inventory. Özgür Kabak, Ph.D.
Logistics Management Inventory Cycle Inventory Özgür Kabak, Ph.D. Role of Inventory in the Supply Chain Improve Matching of Supply and Demand Improved Forecasting Reduce Material Flow Time Reduce Waiting
More informationDependent vs Independent Demand. The Evolution of MRP II. MRP II:Manufacturing Resource Planning Systems. The Modules In MRP II System
MRP II:Manufacturing Resource Planning Systems IE 505: Production Planning Control Lecture Notes* Rakesh Nagi University at Buffalo * Adapted in part from Lecture Notes of Dr. George Harhalakis, University
More informationMaterial Requirements Planning MRP
Material Requirements Planning MRP ENM308 Planning and Control I Spring 2013 Haluk Yapıcıoğlu, PhD Hierarchy of Decisions Forecast of Demand Aggregate Planning Master Schedule Inventory Control Operations
More information1 Material Requirements Planning (MRP)
IEOR 4000: Production Management page 1 Professor Guillermo Gallego 1 Material Requirements Planning (MRP) Material Requirements Planning (MRP) is a computer-based production planning and inventory control
More informationOperations Management Study Guide
Operations Management Study Guide Inventory Management Amazon.com example Wanted to be a virtual retailer (no inventory, no warehouse, no overhead) Now, they are one of the largest retailers Obtain knowledge
More informationProduction Planning & Control. Chapter 2. Aggregate Planning & Master Production Scheduling. Chapter2 1
Production Planning & Control Chapter 2 Aggregate Planning & Master Production Scheduling Chapter2 1 Aggregate Planning & Master Production Scheduling W hy Aggregate Planning Is Necessary Fully load facilities
More informationMaterial Requirements Planning (MRP)
The Priority Enterprise Management System Material Requirements Planning (MRP) Contents MRP - Introduction...2 Calculating Demand for Top-Level Parts...2 Calculating Demand for Sub-assemblies and Raw Materials...3
More informationPARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling
PARADIGMS THAT DRIVE COSTS IN MANUFACTURING The whole purpose of a business enterprise is pretty simple to make a profit by selling products or services to persons who desire those particular goods or
More informationIT-375 using the 6 th Edition PRODUCTION AND INVENTORY CONTROL CHAPTER 1: INTRODUCTION TO MATERIALS MANAGEMENT
IT-375 using the 6 th Edition PRODUCTION AND INVENTORY CONTROL CHAPTER 1: INTRODUCTION TO MATERIALS MANAGEMENT What is wealth? GDP = production = profits What is the source of wealth? The conversion process
More informationCHAPTER 05 STRATEGIC CAPACITY PLANNING FOR PRODUCTS AND SERVICES
CHAPTER 05 STRATEGIC CAPACITY PLANNING FOR PRODUCTS AND SERVICES Solutions Actual output 7 1. a. Utilizatio n x100% 70.00% Design capacity 10 Actual output 7 Efficiency x100% 87.50% Effective capacity
More informationIssues in Information Systems Volume 14, Issue 2, pp.353-358, 2013
A MODEL FOR SIMULTANEOUS DECISIONS ON MASTER PRODUCTION SCHEDULING, LOT SIZING, AND CAPACITY REQUIREMENTS PLANNING Harish C. Bahl, California State University-Chico, hbahl@csuchico.edu Neelam Bahl, California
More informationInventory Management: Fundamental Concepts & EOQ. Chris Caplice ESD.260/15.770/1.260 Logistics Systems Oct 2006
Inventory Management: Fundamental Concepts & EOQ Chris Caplice ESD.260/15.770/1.260 Logistics Systems Oct 2006 Agenda Wrap up of Demand Forecasting Fundamentals of Inventory Management Economic Order Quantity
More informationInventory Control Models
Chapter 12 Inventory Control Models Learning Objectives After completing this chapter, students will be able to: 1. Understand the importance of inventory control. 2. Use inventory control models to determine
More informationSchool of Management and Languages Capacity Planning
School of Management and Languages Capacity Planning Dr Neil Towers 1 Learning Objectives a. To understand Capacity Planning and Control b. To manage the supply chain capabilities effectively Dr Neil Towers
More informationChapter 12 Inventory Control and Management
Chapter 12 Inventory Control and Management Learning Outcomes Describe the functions and costs of an inventory system. Determine the order quantity and Economic Order Quantity. Determine the reorder point
More informationOperations Management
13-1 MRP and ERP Operations Management William J. Stevenson 8 th edition 13-2 MRP and ERP CHAPTER 13 MRP and ERP McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright
More informationHow to Configure and Use MRP
SAP Business One How-To Guide PUBLIC How to Configure and Use MRP Applicable Release: SAP Business One 8.8 All Countries English October 2009 Table of Contents Purpose... 3 The MRP Process in SAP Business
More informationOperations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras
Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras Lecture - 41 Value of Information In this lecture, we look at the Value
More informationPlanning and Scheduling Operations in Dynamic Supply Chain
Planning and Scheduling Operations in Dynamic Supply Chain Sung Joo Bae Assistant Professor Yonsei University 14 1 Supply Chain Management 14 2 Supply Chains Tier 3 Poland USA Canada Australia Malaysia
More informationChapter 6. Inventory Control Models
Chapter 6 Inventory Control Models Learning Objectives After completing this chapter, students will be able to: 1. Understand the importance of inventory control and ABC analysis. 2. Use the economic order
More informationOperations Management
11-1 Inventory Management 11-2 Inventory Management Operations Management William J. Stevenson CHAPTER 11 Inventory Management 8 th edition McGraw-Hill/Irwin Operations Management, Eighth Edition, by William
More informationPaper P1 Performance Operations Post Exam Guide September 2010 Exam
General Comments This was the second sitting of the new P1 syllabus and candidate performance was generally better than that achieved in the May diet. There were however still core areas of the syllabus
More informationSAP APO SNP (Supply Network Planning) Sample training content and overview
SAP APO SNP (Supply Network Planning) Sample training content and overview Course Objectives At the completion of this course, you will be able to: Understand the concepts of SNP and supply chain network
More informationOperations Management. 3.3 Justify the need for Operational Planning and Control in a selected Production Process
Operations Management 3.3 Justify the need for Operational Planning and Control in a selected Production Process Key Topics LO3 Understand how to organise a typical production process 3.3 justify the need
More informationMarginal Costing and Absorption Costing
Marginal Costing and Absorption Costing Learning Objectives To understand the meanings of marginal cost and marginal costing To distinguish between marginal costing and absorption costing To ascertain
More informationInventory Management. Material Requirements Planning. Chris Caplice ESD.260/15.770/1.260 Logistics Systems Oct 2006
Inventory Management Material Requirements Planning Chris Caplice ESD.260/15.770/1.260 Logistics Systems Oct 2006 Assumptions: Basic MRP Model Demand Constant vs Variable Known vs Random Continuous vs
More informationThe budgeting process
The budgeting process Question IM 15.1 Intermediate Question IM 15.2 Intermediate Question IM 15.3 Question IM 15.4 Question IM 15.5 Outline: (a) the objectives of budgetary planning and control systems;
More informationReorder level = demand during lead time = lead time x demand per unit time ROL = LT x D
Reorder Level Additional assumption: Lead time is known and constant No need to carrying stock from one cycle to the next So each order should be scheduled to arrive as existing stock runs out Reorder
More informationMED NITC MANUFACTURING REQUIREMENTS PLANNING (MNMRP) SOFTWARE PACKAGE
MED NITC MANUFACTURING REQUIREMENTS PLANNING (MNMRP) SOFTWARE PACKAGE A tool for material planning and scheduling of components and subassemblies of assembled products A tool useful for MSME Dr. V. Madhusudanan
More informationSPREADSHEET SIMULATOR FOR INVENTORY MANAGEMENT IN A SUPPLY CHAIN
SPREADSHEET SIMULATOR FOR INVENTORY MANAGEMENT IN A SUPPLY CHAIN ABSTRACT Sakir Esnaf Istanbul University, Faculty of Business Administration Department of Production Management Avcilar,Istanbul 34850
More information5.3.2015 г. OC = AAI + ACP
D. Dimov Working capital (or short-term financial) management is the management of current assets and current liabilities: Current assets include inventory, accounts receivable, marketable securities,
More information2.4 Capacity Planning
2.4 Capacity Planning Learning Objectives Explain functions & importance of capacity planning State four techniques for capacity planning Explain capacity planning factor and bill of capacity techniques
More informationAggregate Planning. Planning Process. Aggregate. Capacity options. Demand options. Five questions of aggregate planning. Scheduling Decisions
Aggregate Planning Planning Process Scheduling Decisions Operations Management Chapter 13 Short range Medium range Long range Chris Schrage OPS 13 2 Aggregate Combining appropriate resources into general
More informationProgram Number. 1 System Parameters SYS800 Defines system-wide parameters. 2 Chart of Accounts GLD103 Defines chart of accounts
Overview Inventory INV Maintenance Cycle: Program Sequence & Function INV Cycle Sequence Number Program Name Program Number Program Function 1 System Parameters SYS800 Defines system-wide parameters 2
More informationERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner
ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk 5.2.03 Information Systems September 16, 2008 2 Sales Finished and packaged
More informationStandard Work for Optimal Inventory Management
Standard Work for Optimal Inventory Management Putting practical science to work Presenter Edward S. Pound COO, Factory Physics Inc. 27 years in manufacturing JVC manufacturing engineering Honeywell (AlliedSignal)
More informationManufacturing Flow Management
Manufacturing Flow Management Distribution D Distribution Authorized to Department of Defense and U.S. DoD Contractors Only Aim High Fly - Fight - Win Supply Chain Management Processes Information Flow
More informationPART A: For each worker, determine that worker's marginal product of labor.
ECON 3310 Homework #4 - Solutions 1: Suppose the following indicates how many units of output y you can produce per hour with different levels of labor input (given your current factory capacity): PART
More informationPackage SCperf. February 19, 2015
Package SCperf February 19, 2015 Type Package Title Supply Chain Perform Version 1.0 Date 2012-01-22 Author Marlene Silva Marchena Maintainer The package implements different inventory models, the bullwhip
More informationINDUSTRIAL STATISTICS AND OPERATIONAL MANAGEMENT. 7. Inventory Management
INDUSTRIAL STATISTICS AND OPERATIONAL MANAGEMENT 7. Inventory Management Dr. Ravi Mahendra Gor Associate Dean ICFAI Business School ICFAI HOuse, Nr. GNFC INFO Tower S. G. Road Bodakdev Ahmedabad-380054
More informationSmall Lot Production. Chapter 5
Small Lot Production Chapter 5 1 Lot Size Basics Intuition leads many to believe we should manufacture products in large lots. - Save on setup time - Save on production costs Costs associated with Lots
More informationJune 2014 exam. (4CW) SME Cash and Working Capital. Instructions to students:
1 June 2014 exam (4CW) SME Cash and Working Capital Instructions to students: 1. Time allowed is 3 hours and 10 minutes, which includes 10 minutes reading time. 2. This is a closed book examination. 3.
More informationMaterials Management and Inventory Systems
Materials Management and Inventory Systems Richard J.Tersine Old Dominion University 'C & North-Holland PUBLISHING COMPANY NEW YORK AMSTERDAM Contents Preface Chapter 1 INTRODUCTION 1 Inventory 4 Types
More informationChapter 7 Production Planning
Production Planning and Control Chapter 7 Production Planning Professor JIANG Zhibin Dr GRANG Na Department of Industrial Engineering & Management Shanghai Jiao Tong University Contents Introduction Master
More informationPrinciples of Inventory and Materials Management
Principles of Inventory and Materials Management Second Edition Richard J. Tersine The University of Oklahoma m North Holland New York Amsterdam Oxford TECHNISCHE HOCHSCHULE DARMSTADT Fochbereich 1 Gesamthiblio-thek
More informationCHAPTER 5: MEASURING GDP AND ECONOMIC GROWTH
CHAPTER 5: MEASURING GDP AND ECONOMIC GROWTH Learning Goals for this Chapter: To know what we mean by GDP and to use the circular flow model to explain why GDP equals aggregate expenditure and aggregate
More informationBSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -
BSCM Sample TEST. 1. Which of the following demand fulfillment approaches typically provides the longest delivery time? A) Engineer-to-order. B) Make-to-order. C) Assemble-to-order. D) Make-to-stock. 2.
More informationINDEPENDENT STUDY PAILIN UDOMSANTI
1 INDEPENDENT STUDY ERP Comparison : Production Planning and Control Module PAILIN UDOMSANTI An Independent Study submitted in Partial Fulfillment of the requirements For the Degree of Master of Engineering
More informationChapter 5: Strategic Capacity Planning for Products and Services
Chapter 5: Strategic Capacity Planning for Products and Services Assistant Prof. Abed Schokry Operations and Productions Management First Semester 2010 / 2011 Learning Outcomes: Chapter 5 After finishing
More informationHow to Forecast Your Revenue and Sales A Step by Step Guide to Revenue and Sales Forecasting in a Small Business
How to Forecast Your Revenue and Sales A Step by Step Guide to Revenue and Sales Forecasting in a Small Business By BizMove Management Training Institute Other free books by BizMove that may interest you:
More informationManufacturing Applications in Microsoft Dynamics GP 10.0
Manufacturing Applications in Microsoft Dynamics GP 10.0 8817: Manufacturing Applications in Microsoft Dynamics GP 10.0 (4 Days) About this Course This four-day instructor-led course provides students
More informationAntti Salonen KPP227 KPP227 1
1 What is capacity? The maximum rate of output for a facility OR The rate at which output can be produced by an operating unit (machine, process, workstation, facility or an entire company). 2 Factors
More informationCosumnes River College Principles of Macroeconomics Problem Set 3 Due September 17, 2015
Cosumnes River College Principles of Macroeconomics Problem Set 3 Due September 17, 2015 Name: Solutions Fall 2015 Prof. Dowell Instructions: Write the answers clearly and concisely on these sheets in
More informationSociety of Certified Management Accountants of Sri Lanka
Copyright Reserved Serial No Technician Stage March 2009 Examination Examination Date : 28 th March 2009 Number of Pages : 06 Examination Time: 9.30a:m.- 12.30p:m. Number of Questions: 05 Instructions
More informationEconomics 212 Principles of Macroeconomics Study Guide. David L. Kelly
Economics 212 Principles of Macroeconomics Study Guide David L. Kelly Department of Economics University of Miami Box 248126 Coral Gables, FL 33134 dkelly@miami.edu First Version: Spring, 2006 Current
More informationACTIVANT. Prophet 21 ACTIVANT PROPHET 21. New Features Guide Version 11.0 INVENTORY MANAGEMENT NEW FEATURES GUIDE (INV, PUR) Pre-Release Documentation
ACTIVANT ACTIVANT PROPHET 21 Prophet 21 INVENTORY MANAGEMENT NEW FEATURES GUIDE (INV, PUR) New Features Guide Version 11.0 Version 11.0 Pre-Release Documentation This manual contains reference information
More informationBILL OF RESOURCES AND PRIORITY-CAPACITY BALANCING
Bill of Resources and PriorityCapacity Balancing 5 BILL OF RESOURCES AND PRIORITYCAPACITY BALANCING MGT2405, University of Toronto, Denny HongMo Yeh Load and capacity are terms that are often used interchangeably.
More informationabf Avercast Business Forecasting The Trusted Name in Demand Management. Software Features: Enterprise Level Software Solutions for: The Cloud
Avercast Business Forecasting Avercast Business Forecasting (ABF) is powered by an industry leading 187 forecasting algorithms. ABF systematically measures each algorithm against up to five years of historical
More informationInterpreting the Numbers: From Data to Design. William Elenbark, Consultant Gross & Associates 732-636-2666; belenbark@grossassociates.
Interpreting the Numbers: From Data to Design William Elenbark, Consultant Gross & Associates 732-636-2666; belenbark@grossassociates.com Robert Muller, Industrial Engineer Gross & Associates 732-636-2666;
More informationOR topics in MRP-II. Mads Jepsens. OR topics in MRP-II p.1/25
OR topics in MRP-II Mads Jepsens OR topics in MRP-II p.1/25 Overview Why bother? OR topics in MRP-II p.2/25 Why bother? Push and Pull systems Overview OR topics in MRP-II p.2/25 Overview Why bother? Push
More information11.1 Estimating Gross Domestic Product (GDP) Objectives
11.1 Estimating Gross Domestic Product (GDP) Objectives Describe what the gross domestic product measures. Learn two ways to calculate the gross domestic product, and explain why they are equivalent. 11.1
More informationEquations for Inventory Management
Equations for Inventory Management Chapter 1 Stocks and inventories Empirical observation for the amount of stock held in a number of locations: N 2 AS(N 2 ) = AS(N 1 ) N 1 where: N 2 = number of planned
More informationQAD Enterprise Applications Standard & Enterprise Edition. Training Guide MRP/CRP
QAD Enterprise Applications Standard & Enterprise Edition Training Guide MRP/CRP 70-3220A QAD 2011.1 Standard & Enterprise Edition Lab: Enterprise Edition 2011.1 r01 - Training Workspace: 10USA > 10USACO
More informationInventory Management. Topics on inventory management
Inventory Management ISyE 3104 Fall 2013 Topics on inventory management Objective An introduction to the fundamental concepts, tradeoffs and methods in inventory management Topics Deterministic inventory
More informationHow Constraint Management fits the Operations Management Philosophy
Constraint Management Chapter 7 How Constraint Management fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process Strategy Process Analysis
More informationQAD Enterprise Applications Standard and Enterprise Edition. Training Guide Product Structures and Formulas
QAD Enterprise Applications Standard and Enterprise Edition Training Guide Product Structures and Formulas 70-3224-2014SE_EE QAD 2014 Standard and Enterprise Edition March 2014 This document contains proprietary
More information