1 SURFACE WELL COMPLETION

2 Basic training operator Oil & gas Advisafe Risk Management B.V. Copyright Advisafe Risk Management B.V. Version 1.0 All rights reserved. No part of this publication may be duplicated, stored in a computerised database, or disclosed in any form or any way, either electronically, mechanically, by means of photocopies, recordings or any other way whatsoever, without prior written consent from Advisafe Risk Management B.V. Surface Well Completion Page 2

3 Content 1. Casinghead-housing and spools Summary of surface well completion Casing head housing and spools The Cameron CA casing hanger The Cameron BRX type 2 casing hanger X-bushing with P-seal Tubingheads and metal seals Summary of tubing heads and metal seal Tubingheads and metal seal LDO tubing head SRT tubing head Metal seal Boll-weevil tubing head Christmas-tree Summary of the Christmas-tree The solid block Christmas tree The components of the composite Xmas tree The Xmas tree for the production cross for gas lift oil wells The Xmas tree setup on clusters Gate valves Summary of Gate valves The principle structure of a gate valve Requirements set for valves The method of sealing gate valves Sealing compound method The McEvoy gate valve, model C The Cameron gate valve, type F Surface Well Completion Page 3

4 Surface Well Completion Page 4

5 1. Casinghead-housing and spools 1.1. Summary of surface well completion The functions of the surface well completion are: hanging the successive casings and sealing them off from one another and the surrounding area; providing the option of shutting down well production; providing the option of making observations and having controlled access to the well for various activities. The completion consists of the following components: Casing head housing Casing head spools Tubing head Christmas tree Surface Well Completion Page 5

6 5 1/8 API 5000 type F solid-block tree 6 double P seal Check port Metal seal Plastic packing ports Intermediate flange SRT tubing head 10 x 6 API 5000 control head Tubing hanger nippel 7 5/8 double P seal Plastic packing ports Casinghead spool 16 API 3000 x 10 API 5000 Casinghead type WF Check port CA slip and seal assembly 10 x 7 5/8 x-busing 16 x 10 ¾ o.d. casing Check port CA slip and seal assembly 16 x 10 ¾ Casinghead housing 16 API 3000 x Casinghead type WF 16 casing 10 3/4" casing 7 5/8 casing 5 1/2 casing Overview surface well completion Surface Well Completion Page 6

7 1.2. Casing head housing and spools The casing head housing is screwed (and sometimes welded) on top of the conductor and serves to: anchor the blowout preventer to the first casing stack during drilling; support the above-ground well completion; support the next, smaller casing stack via the casing head spool and the casing hangers; seal the annular space between the two largest casing stacks;ensure access to the annulus Tubing head spool Test channel 10 casing outlet 16 x10 casing head spool BRX type 2 Casing hanger x-bushing 16 casing outlet Injection channel Tubing 5 1/2" 16 casing outlet Tubing 5 1/ 2 The casing head housing is installed on the casing (see figure). There is a flange connection on top, on which the casing head spool will be mounted at a later stage. The housing has two 3 drain holes opposite each other, with flanges threaded on the inside. The annulus shut-off valves are attached to this in order to enable mud circulation. On the inside, the casing head housing is a bore that is partially straight and partially tapered. Annulus 5 1/2 x 7 3/4 Casing 7 3/4 Annulus 5 1/2 x 10 3/4 Casing 10 3/4" Annulus 10 3/4 x 16 Conductor 16 Casing head housing and casing head spools Surface Well Completion Page 7

8 The first casing head spool is connected to the casing head housing by means of a flange fitted with a metallic packing (ring joint). The number of casing head spools depends on the number of casing stacks with which the well is equipped. In the case of the figure above, only two casing stacks (the 10¾ and 7¾ casings) are taken in, in addition to the 16 conductor, and only one casing head spool is used. The spool connects the various flanges with reduced diameters, which correspond with various consecutive casing stacks. The spool consists of a housing with a conical notch for the casing hanger at the top. When the Cameron CA casing hanger is used, there is space for the X-bushing with P-seal in the lower flange. A filling and test port for the P-seal are also installed in the lower flange. When the Cameron BRX casing hanger is used there are two filling ports and two test ports in the lower flange. Two ports with thread and flanges in the side wall of the housing provide access to the annular space. Valves are installed on the side flanges of the casing head housing and casing head spools. These valves provide access to the annular spaces to measure the pressure or, if necessary, to vent the pressures accumulated. The tubing head spool is installed on the top flange of the top casing head spool, in which the tubing is hung. Surface Well Completion Page 8

9 1.3. The Cameron CA casing hanger After a casing stack is inserted at depth, the string with slips is hung from the rotary table. The casing hanger is installed around the pipe. The casing, with the casing hanger around it, is lifted with the hoisting facility and passes through the hole in the rotary table and the BOP stack to the desirable depth, after which the casing hanger is secured. The hanging system consists of two slips (components that enclose a flexible packing component) and is called slip and seal assembly. 16 casinghead housing Slip A Slip C Seal Slip D Slip B 10 3/4" casing Cameron CA casing hanger with slip and seal assembly Surface Well Completion Page 9

10 The whole packet is pressed together and kept together by long threaded bolts. By hanging it the serrated slips are pushed against the outside of the casing. Slip D drags against the conical inside wall of the casing head housing and ensures the hanging process. The flexible packing component is pressed against the wall laterally and forms a seal between the two successive casing stacks. An advantage of the CA hanger system is that the hanger drops to the desirable level around the casing and catches at the place with the serrated slips. The disadvantages are: The casing hanger is not installed until the casing head housing or spool is attached. In practice the hanger is placed through the BOP with the risk that the hanger will get stuck or drag to a halt in the BOP. The 'slip and seal assembly' often leaks, while the additional seal formed by the X- bushing with single P-seal is also inadequate. To eliminate these disadvantages, a Cameron modified BPX hanger was developed, which, working in collaboration with Cameron, resulted in the BRX type 2 casing hanger. Surface Well Completion Page 10

11 1.4. The Cameron BRX type 2 casing hanger This hanger is likewise used in a casing head housing as well as in a casing head spool. Injection port P-seal Casing head spool Test port Ring joing 16 casing head housing Ring joint BRX hanger Cameron BRX type 2 casing hanger 10 3/4 casing The conical casing hanger is screwed to the last casing pipe, which must be cut off at a length accurately specified in advance and threaded. All this is lowered into the well from a running tool which is screwed into the top of the casing hanger, till the conical section drags against the conical support in the casing head spool. Dropping is a lot easier through the BOP than with the slip and seal assembly. The BRX hanger and the conical support of the casing head housing/spool both have a smooth finish. The seal is obtained by two canvas seal rings in the BRX hanger. The BRX type 2 hanger is tapped with a left-hand thread into which the running tool can be screwed. After shut off, the running tool is unscrewed. At a later stage, the polished surface right above the left-hand thread can be sealed with a double P-seal. Surface Well Completion Page 11

12 The advantages of the hanger are: improved control of casing hanging through the BOP. better sealing systems X-bushing with P-seal The purpose of the X-bushing with P-seal is to provide additional sealing in the casing hanging (for CA casing hangers, see figure on the left). Tubinghead spool Test channel Casing hanger Casinghead spool X-bushing Injection channel The X-bushing with P-seal is enclosed in a chamber bored at the bottom of the casing head spool. The seal by the P-seal can be servo-assisted via an injection port in the flange and inspected via a test port. The X-bushing is a metal, ring-shaped component that is slid over the cut-off casing end and is locked into the chamber bored into the casing head spool above. Casing hanger Casinghead housing Casing head spool Surface Well Completion Page 12

13 Casinghead spool 1/2 test port Non return valve Shut-off cap 16 casinghead housing housing 10 3 /4 casing X-bushing P-seal Non-return valve Injection channel Pressure plug Bleeder plug Ring Joint Profile RX L-seal The seal between the housing of the casing head spool and the outside circumference of the X- bushing is obtained by two l- shaped seal rings in the outside circumference of the X-bushing. The seal between the casing and the X-bushing on the inside is obtained by a canvas ring in the inside circumference of the X- bushing. This packing ring can be activated via an injection port with plastic packing material, whereby the P-seal comes in contact with the casing. X-bushing met P-seal The sealed-off space between the X-bushing ring joint and the casing hanger is pressure tested via a ½ test port and checked for leakage through the P-seal. Only one P-seal is used for the X-bushing, which was found to be a shortcoming. Nowadays a different type of casing hanging is used, with a double P-seal as a seal above it. If one leaks, a good seal can still be obtained with the other P-seal. Surface Well Completion Page 13

14 2. Tubingheads and metal seals 2.1. Summary of tubing heads and metal seal The tubing is connected in the bottom of the well to the packer, which seals the casing and the tubing. The connection between the tubing and the annulus must also be sealed at the top, meaning above-ground. The total weight of the tubing string must also be absorbed, which is dealt with by the tubing head spool and the tubing hanger nipple connected to the tubing. 5 1/8 API 5000 type F Solid-block tree 6 double P seal Check port Metal seal SRT tubing head 10 x 6 API 5000 conrol head Tubing-hanger nippel 7 5/8 double P seal Plastic packing ports Casing spool 16 API 3000 x Casinghead type WF Check port Casinghead housing 16 API 3000 Casinghead type WF Plastic packing ports Plastic packing ports Check port CA slip and seal assembly 10 x 7 5/8 X-bushing 16 x 10 3/4 o.d. casing Plastic packing ports CA slip and seal assembly 16: x 10 3/4" The tubing head spool is a transition from the narrowest casing to the Xmas tree or to a temporary adapter. Internally, the tubing head spool is processed in such a way that the tubing hangs in it with tubing hanger nipple and seals it. The method of hanging depends to a large extent on the temperature of the medium flowing through during production. Tubing is hung without prestressing in cold shallow wells. In deep wells, large differences in length can be created between the cold, enclosed well and the warm producing well. In such wells the tubing is prestressed before hanging, which means installed in the cold well after prestressing. 16 casing 10 3/4 casing 7 5/8 casing 5 1/2 casing Surface well completion Surface Well Completion Page 14

15 As soon as the temperature of the well increases during production, this prestress disappears for the most part due to expansion of the tubing material. However, enough tensile strength will be left in the tubing for it to seal properly and not buckle, which would cause production or wireline problems. The following tubing heads are mostly used: LDO tubing head SRT tubing head Boll-weevil tubing head LDO and SRT tubing head is used in gas wells, in which the tubing is prestressed before hanging in order to ensure that the tubing will always be stressed when hanging at temperature differences. A boll-weevil tubing head is used for oil wells and injection, wells in which the tubing hangs free in the centre of the casing. A plug can be installed in the tubing hanger nipple for all three systems, thereby protecting the well from fluid or gas flowing out during an exchange in completion aboveground or when a blowout preventer (BOP) is installed. The above-ground completion can also be pressure tested using this plug after installation or exchanges. Surface Well Completion Page 15

16 3. Tubingheads and metal seal 3.1. LDO tubing head This head is installed on the top casing head spool. Production cross Tubing hanger -nippel plastic or P-seal injection ports Soft metal seal ring (metal seal) Control of test ports Intermediate flange for metal seal Ring joint Body of LDO head Body of LDO head Conductor pin plastic or P-seal injection ports with bleeder plugs V-packingset cover with packed spindle (2x) Seal check with bleeder plugs Bleeder plugs Casinghead spool LDO head The tubing is hung from the rams in the tubing head spool. The tubing hanger nipple, which is attached to the tubing, is used for this purpose. A packing is installed in the rams to ensure sealing on the polished surface of this nipple and the LDO head. The tubing is hung by closing the rams around the polished section of the tubing hanger nipple so the front of it rests on the rams. The rams are opened and closed by screw spindles. One must pay attention that the tubing hanger nipple is centred as accurately as possible. The rams are fitted with rubber Surface Well Completion Page 16

17 seals which ensure that by tightening the spindles and the weight of the tubing a proper seal between the tubing and the casing is obtained. The tubing hanger nipple is threaded on both sides and has a landing nipple profile on the inside so it can shut off a plug by means of wireline SRT tubing head Nowadays so-called tension heads, type Cameron SRT, are installed in new gas wells. Also, the LDO heads used before are now often replaced with SRT heads during a workover. This tubing head is also installed on the top most casing head spool. Production cross Plastic injection port Metal seal with controlport Intermediate flange Packing securing bolts Packingset Body Ledge cover Ledge cover Stops of centring the tubing hanger Controlof test port Controlof test port Cameron SRT tension head Ring joint Surface Well Completion Page 17

18 Just as it is for the LDO head, the tubing is hung on the rams here by means of a polished tubing hanger nipple provided with internal notches so that plugs can be shut off. The advantages over LDO heads are: The rams only serve to hang the tubing in a central position, thus not to seal it. Because the rams drag to a halt on a stop, we know for a fact that the tubing hanger is in the centre after the rams have been screwed in completely. A separate packing bushing (sandwich seal) ensures sealing. If there are any leaks, plastic can still be injected to thereby rectify the leaks. A workover mast is no longer required should the packing need to be changed, because the tubing hanger nipple continues to hang on the rams. Surface Well Completion Page 18

19 Plugged Metal seal Connection for hydraulic inspection Tubing hanger nippel Control line to ball valve Access to the annulus The tubing head housing has two openings on the side through which a connection with the annulus can be established. A set of double valves are installed in either opening. Via one set of valves, which are sealed in the open position, the kill pump line is connected from the kill pump manifold to the annulus so that the well can be killed at any time. A non-return valve is installed in the kill pump to prevent the pipe and the manifold from being subject to the full well pressure in case of a leak between the tubing and the annulus. The servo-condensate mixture that serves to combat the corrosion of the tubing by CO is also pumped into the annulus via these valves. The annulus is filled entirely with servo-condensate and can be injected into the tubing via the injection valve in the bottom most SPM. This is accomplished by pumping the servo-condensate into the annulus by means of a membrane pump. The valves on the additional side openings to the annulus are closed. An inspection port is sometimes installed here. SC SSV control line Nowadays the ¼ control line to the SC SSV usually runs via the metal seal through the wall of the tubing hanger nipple and thereafter to the safety valve via the annulus. The purpose of the control line is to operate the SC SSV hydraulically. Detail of SC-SSV hydraulic control line though the wall of the SRT tubing hanger nipple Surface Well Completion Page 19

20 3.3. Metal seal The metal seal for the hanger nipple is the most important seal between the tubing and the annulus. The seal consists of a soft metal ring, which is butted up against the tubing hanger nipple between the Christmas tree and the flange beneath it. Intermediate flange, specially installed for the soft metal ring seal. Intermediate flange specially installed for the soft metal ring seal. Flange of composite production cross. Tubing-hanger-nippel Control of testport Plastic injection port P-seals Metal seal Ring joint Packing securing bolts An inspection or test port of the space between the tubing hanger nipple and the soft metal ring provides indications on possible leakage through the inside. Leakage passing the soft metal ring on the outside must be detected by listening for air passing or using a gas detector. This test port is also used as a passage for the hydraulic control pressure for the underground safety valve (SC SSV). However, not one leak has been detected during 10 years of experience with metal seals. Leakage along the plastic seals (P-seals) in the Christmas tree can be rectified by injecting more plastic. This seal only serves to prevent corrosive fluid from the tubing from corroding the metal seal. Seal around the tubing hanger nipple Surface Well Completion Page 20

21 3.4. Boll-weevil tubing head The boll-weevil hanging method is used for oil wells since the requirements imposed on the sealing are not as strict as those for gas wells, as the pressures are lower. A polished hanger nipple is also used here, with notches for installation of plugs by the Wireline department. Packing ring Hanger nipple Spherical cone with packing component Packed pressure bolt Guide pin Wireline plug rabbet Lip Chamber Boll weevil Polished for sesaling the wireline plug Tubing Boll-weevil hanging The short hanger nipple is tube-threaded on both sides: on one hand to establish the connection between the hanger nipple and the tubing, and on the other hand so that the boll-weevil hanger assembly can be put into position in the boll-weevil spool through the BOP by means of auxiliary tubing screwed into the top. The boll-weevil hanging is a combination of a boll-weevil hanger assembly and a bollweevil spool, which is installed on the top most casing head spool. The boll-weevil hanging consists of a spherical cone fitted with a packing ring. The purpose of the pressure bolts is to compress the packing component in order to obtain a good seal between the tubing and the casing head. A plug can be screwed into the hanger nipple to allow for pressure testing and for temporary protection when the above-ground well completion is exchanged. Sometimes a Cameron type H two-way check valve (a non-return valve that works in two directions) is installed so that the well can be temporarily shut down when the aboveground well completion or adaptor are exchanged for a BOP, or vice versa. This valve has Surface Well Completion Page 21

22 two seats and seals both above and below the valve (function of an inside BOP) and is thus also suitable for pressuring test the BOP. The valve is loosened and pulled with a special pulling tool, whereby any pressure under the valve can be equalised, either with or without the use of a lubricator. The tubing stack is screwed into the bottom most threaded box. Its tensile stress is transferred to the casing head via a chamber with lip and the cone. Surface Well Completion Page 22

23 4. Christmas-tree 4.1. Summary of the Christmas-tree The Christmas-tree is the part of the above-ground well completion between the tubing head and the flow pipe. The purpose of the Christmas tree is to provide the option of closing the gas and/or oil flow off from the formation by means of a manually operated valve or by means of an automatically operated valve: the Otis valve. Furthermore, the flow pipe can be opened or closed by means of the flow-arm valve. Above-ground, gas wells are completed to as great an extent possible with a production cross forged from one piece (solid block Xmas tree), which consists of one body or housing in which the various valves are installed. Older gas wells are still equipped with a composite production cross (composite Xmas tree). The various cut-off valves are assembled together in a so-called Y-form block. In comparison to the composite cross, the forged cross has the following advantages: Noticeably fewer flange connections, thus less chance of leakage, which above all provides more safety in case of a blowout or a fire in an adjacent well. Less high, thus more easily accessible to operating personnel; moreover, a lower well cage will suffice. A disadvantage of the forged production cross in comparison to the composite production cross is apparent when damaged valves are changed. It may happen that the body is seriously damaged near one of the wing valves (e.g. the flow arm valve) or near the top valve. In that case, the entire Xmas tree must be exchanged and thus the entire well must be killed. In case of a composite production cross, the entire Y piece with wing valves and top valve can be changed, for example, just by closing the two master valves. For various reasons there are two main valves, the master valve and the Otis (also referred to as the first and second master valves): First of all, the gas flow can be shut off by means of the manually operable valve if the Otis valve is not closing for one reason or another, while this is desired. Second, statutory safety requirements stipulate that installation components may only be worked on if two closed valves are installed in series, between the pressurised part of the installation and the pressure-free part. This implies that if the flow pipe valve must be repaired, for example, this can take place in safe conditions if both master valves are closed and the pressure-free part, in which the flow pipe valve is installed, has an open connection to the atmosphere. Surface Well Completion Page 23

24 4.2. The solid block Christmas tree The solid block Christmas tree is used for most gas wells. These consist of a forged steel block, which includes the valves. Top + cap E-top valve bypass C-tubingcasingconnection valve Tubing-casing connection Flow-arm valve Otis operated master valve Master valve Flow line Sandfilter Intermediate flange Tubing-head spool (type LDO) Scheme Bril flange Kill pumpline Non return valve L zero point for wireline depth gauge Alarm switch Casinghead spool Casinghead housing 5 VAM casing as return stack 7 casing 10 3/4 casing 16 casing 20 stovepipe The solid block Christmas tree Surface Well Completion Page 24

25 The Christmas tree consists of the following components: the manually operable master valve the Otis operated master valve the block in which the valves are installed a flow arm valve a top valve an additional valve on the other side of the flow arm valve a top connection with cap (access for well service activities). The Otis valve is similar to the bottom master valve, with the difference that an automatic operating mechanism is installed instead of a hand wheel. This operating mechanism, usually called the Otis actuator, is activated when the pressure in the Christmas tree drops too low. This may be the case, for example, if a pipe ruptures or if the NTS or flapper valve in the tubing closes. The Otis actuator also closes the valve if the control air required to operate Otis stops flowing or if a failure occurs in the installation. There is also the option of closing the Otis during regular production from the control room by means of an electrical signal. The Otis valve is of great importance for safety. The gas supply to the production installation can be closed off by means of the flow arm valve. The top valve is a vertical access required for a large number of well service activities, such as wireline, perforation and stimulation. Surface Well Completion Page 25

26 4.3. The components of the composite Xmas tree Top + cap E-top valve scheme Bypass Brill flange C-tubing-casing connection valve Y-shape block Tubing-casing connection Flow-arm valve Otis operated master valve pilot solenoid Orifice union 3 bar air Master valve Tubing-head spool (type LDO) Flowline Sand filter Kill pump line Alarm switch Non return valve L Zero point for wireline dept gauge Casing head spool Casinghead housing 5 VAM casing as return stack 7 casing 10 3/4 casing 16 casing 20 stovepipe The composite Xmas tree Surface Well Completion Page 26

27 The composite tree is put together from separate components. This Xmas tree consists of the following components, from top to bottom: the manually operable master valve the Otis valve (secondary valve) the 3-way piece the valve for the tubing casing connection a flow valve a top valve a top connection with cap Various valves are installed on the 3-way piece: the Otis valve at the bottom three valves from left to right at the top: o the valve in the tubing casing connection o the top valve with the top connection on it o the flow pipe valve The tubing casing connection serves to release excessive pressure in the annulus to the flow pipe via the tubing casing connection valve. The top valve with connection serves to enable wireline work. The flow line valve can shut off the gas supply to the installation. A choke is installed in some cases past the flow pipe valve. One can make a well produce at different speeds by means of various chokes. In most cases, however, one is liable to find the choke in the installation. Surface Well Completion Page 27

28 4.4. The Xmas tree for the production cross for gas lift oil wells The Xmas tree is built out of the following components: casing hangers and nipples flow line gas lift supply pipe the usual valves. Production valve Xmastree cap Adapter flange T-piece bullplug The flow line is equipped with a hand choke, which is used when the well is started. Remote operable valves (ROVs) are installed in the gas lift pipe as well as in the flow line. The ROVs are connected to a number of shut-down actions; the latter depends on the situation (hot well, H 2 S well, etc.) T piece Master valve or main valve Adapter flange Tubinghead spool (boll weevil) Casingheadspool Casinghead housing Top valve or lubricator valve Tubing-casing connector Casing valve Flow wing of Injection valve Liftgas Conductor valve 4 1/2", 3 1/2 or 2 7/ /4 24 Examples of shut-down actions are: On ROV in flow line o HPSD high pressure shutdown o LPSD - low pressure shutdown o HTSD high temperature shutdown On ROV in flow line and gas lift pipe o Leak alarm o H 2 S alarm Emergency stop from the measuring station If a corrosion inhibitor pump is installed, it will also stop at a shut-down action. 16 Example of a Xms tree for gas lift oil wells Surface Well Completion Page 28

29 4.5. The Xmas tree setup on clusters As indicated in the figures in the preceding two chapters, all onshore wells have a cellar. Top cap Top valve (open) Closed and blinded off Controlline outlet Tie-line valve cellardeck No tubing-annulus connector pipe Flow line (injectionline) Flow-arm valve (open) Otis-actuated master valve (main valve) Hand operated master valve Sealed in open position Intermediate deck Tpiece 1/2 kerotest valve Intermediate platform The purpose of the cellar is to keep the most frequently used master and operating valves of the Xmas tree at a workable height and to catch any small oil or condensate/servo leaks. In principle, cellars are never made any bigger than strictly necessary to accommodate the part of the above-ground completion, such casing head housing, casing head spools, tubing head spool and annulus connections. The annulus valves, connection and tapping facilities are not operated on a daily basis. One must descend into the cellar for this, unless extension tools are used. The accumulated rain water is suctioned from the cellar from time to time. The depth of the cellar can be approximately 2.5 metres or more, depending on the number of casings to be sealed off from one another and the type of the well. The immediate environment is also taken into consideration by keeping the tree as low as possible. Some completions are recessed in a cellar for the greater part. Above-ground well structure of an offshore gas well Surface Well Completion Page 29

30 The Xmas tree setup on platforms The space available on offshore production platforms is restricted as a result of which the freedom and options during design are also reduced. Platforms have no cellar, but a cellar deck is still referred to. Stairs with an intermediate platform are installed from the cellar deck to operate the valves. Surface Well Completion Page 30

31 5. Gate valves 5.1. Summary of Gate valves The gas and oil industry makes frequent use of gate valves. Gate valves are the only valves installed in the Christmas tree. These valves must meet various requirements. We will discuss two sealing principles for this type of valves at this point. The gas the Christmas tree and the valves are in contact with is at high pressure, can contain H 2 S and can contain fluid or sand particles. The high speeds of the gas that are generated when the valve is opened and closed require special sealing provisions to limit wear from erosion The principle structure of a gate valve In principle, a gate valve consists of a body with exchangeable, parallel seats, in which the gate can move. handwheel Internal thread (left) Pressure bearing Packing Seal Cap or bonnet Screw spindle House or body Gate Exchangeble seat Principle of a direct acting gate valve A packed screw stem with pressure bearing is installed in the bonnet or cap of the valve. The gate can be opened or closed by turning the hand wheel of the stem, since the gate is moved upward and downward along the thread of the stem. If the gate is in the closed position in the bottom of the body, one uses the term 'direct acting valve'. There are also valves whereby the gate rather seizes against the cap or bonnet in closed position. This type is called 'reverse acting valves' and they are used in Christmas trees in combination with an Otis U (pneumatic and hydraulic) and UX actuator. Clockwise rotation of the hand wheel closes a direct acting valve. Surface Well Completion Page 31

32 The two gate valves we will discuss are both direct-acting valves. They have a nonrising stem. One cannot see from the outside whether the valve is open or closed. Gate valves are open/close valves and not control valves. The valve may never be left in the middle position, thus half open and half closed, for example. If the hand wheel of an open gate valve (at the top gate position) is turned counterclockwise, it will seize up because the left-hand thread of the stem comes to the end of the thread in the gate (Cameron type F) or in the lift nut (McEvoy model C). If the gate valve is closed, the hand wheel also seizes against a shut-off valve if turned clockwise any further. For these valves tightening the hand wheel has no effect on sealing, but it does close the sealing valve installed for changing the stem packing. After the valve has been opened or closed, one must turn the hand wheel back at least a quarter turn to prevent the thread between the stem and the gate as well as the gate itself from seizing. Such seizing up can be aggravated by temperature variations during production and production stops and by the ambient temperature. Turning back a quarter turn also assists with detecting the closed/open position of the valve, namely by first turning the hand wheel clockwise. If the valve is closed, the hand wheel blocks after a quarter turn or half a turn, and in open position one can rotate further (direct acting valves) Requirements set for valves Valves must above all be safe. This leads to a number of technical requirements, such as: Valves must be bubble tight, even though there is dirt in the gas or the valve is slightly damaged. It often happens that valves start leaking anyway after some time, so that pressure is built up past the closed valve. The speed at which the pressure builds up depends on the volume of the space past the valve and the magnitude of the leak. The valve must be operable under all conditions, even if the valve separates a large pressure difference, i.e. operable by one person (opening/closing). The number of turns required to open and close the valve must be limited. If the valve is open, passage must be straight, thereby preventing or limiting turbulence (erosion). The valve must be resistant to corrosive and/or erosive components in the oil or gas as well as to weather and wind. The valve must be resistant to very high well pressures. The following requirements are set for maintenance work on a valve: valves must be of such structure that the packings and the bearings of the gate spindle can be inspected and/or replaced during production without removing the valve or releasing the pressure on it valves must make it possible to replace the gate or the seats at the location; valves must require little maintenance. Surface Well Completion Page 32

33 5.4. The method of sealing gate valves Gate valves can be sealed in various ways. Different methods are used for the gate valves in use in the gas and oil industry. We will succinctly discuss the two most important methods: Metal to metal seal method Sealing compound method. Metal to metal seal method If a valve is in the closed position, the valve will be under full pressure, while there will be lower pressure past the valve. This pressure difference results in a force. handwheel Internal thread (left) Pressure bearing Packing Seal Cap or bonnet Screw spindle House or body Gate Exchangeble seat Principle of a direct acting gate valve A packed screw stem with pressure bearing is installed in the bonnet or cap of the valve. The gate can be opened or closed by turning the hand wheel of the stem, since the gate is moved upward and downward along the thread of the stem. If the gate is in the closed position in the bottom of the body, one uses the term 'direct acting valve'. There are also valves whereby the gate rather seizes against the cap or bonnet in closed position. This type is called 'reverse acting valves' and they are used in Christmas trees in combination with an Otis U (pneumatic and hydraulic) and UX actuator. Clockwise rotation of the hand wheel closes a direct acting valve Sealing compound method The force due to the pressure difference on the valve is often insufficient to guarantee a 100% seal. Moreover, bigger leaks can be caused by irregularities or scratches. For these reasons, an additional sealing compound is applied automatically between the gate and the seat to ensure complete sealing. The surfaces of the gate and the seat are then finished normally smooth and parallel. This sealing method is used in the McEvoy valves. Surface Well Completion Page 33

34 Screwcap Seal valve and slanted seat for exchanging packing and bearing Hand wheel Grease nippel Pressure bearing Spindle packing Bonnet Nipple with venting plug Lefthand threaded screw spindle Piston Reservoir for sealing compound lift nut to move the gate along the spindle Slide block Exchangeble seats Space for water-repellent grease Mc-Evoy gate valve - model C (closed position) Surface Well Completion Page 34

35 5.6. The McEvoy gate valve, model C All McEvoy solid block Christmas trees are equipped with this type. Screwcap Seal valve and slanted seat for exchanging packing and bearing Bonnet Grease nippel Pressure bearing Spindle packing Bonnet Nipple with venting plug Lefthand threaded screw spindle Piston Reservoir for sealing compound lift nut to move the gate along the spindle Slide block Exchangeble seats Space for water-repellent grease Mc-Evoy gate valve - model C (closed position) Surface Well Completion Page 35

36 The gate of the McEvoy gate valve consists of two parallel halves kept apart against the seats by pressure springs. Because the gate is parallel, it cannot seize between the seat rings, and additional tightening of the hand wheel has no effect on the seal. The valves in gas flows can be subject to more serious erosion at the time the gate practically closes the passage. The two so-called sealing surfaces must be very smoothly polished to guarantee complete sealing. The eventual seal between the gate and the seats in the McEvoy valve is established by a special sealing compound. This compound is stored in two reservoirs on either side of the gate. The reservoirs can be topped up via external grease nipples, which is very important for correct performance of the valve. The advantage of this type of valve is that if any leakage is detected, it can easily be remedied in a short time by injecting a sealing compound. The space underneath the gate can be filled up with water-repellent grease to prevent accumulation of fluids, hydrates and dirt The Cameron gate valve, type F The Cameron gate valve, type F (see figure). A great deal of research has been done to limit wear of the gate and the seat and to find a good solution for such wear. Gas flows through a very narrow space at high speeds especially when a valve is just being opened and nearly closed. The erosion that occurs at that time is extensive and the wear on the gate and the seat as well as leakage appearing at a later stage will be the result. The Cameron gate valve is fitted with a seat that can rotate (rotating seat). The intention of this is that a new piece of the seat is exposed to wear by the gas flow each time. This way, the wear of the seat is distributed evenly across the entire circumference. Surface Well Completion Page 36

37 Hand wheel connection piece Grease nipple, also pressure release with non-terun valve Shear pin Pressure piece Hand wheel Pressure bearings Screw spindle with left hand thread in gate Screw cap Packingcap Bonnet flange Seal valve and slanted seat for sealing when the packing set is exchanged Center pin Gate Seat Teeth aong the circumference Palm mechanism Cameron gate valve type F (closed position) Surface Well Completion Page 37

38 The valves are mostly not fitted with a rotary seat and a catch mechanism. Problems caused by teeth breaking off were more serious than the advantages. The valve gate is not shared and moves back and forth between two seats through a threaded stem. The seal is formed by a metal to metal seal. The gate and the seat require a very accurate and smooth finish for this reason. In order to protect the gate, the stem and other internal parts from overload, the force applied to the hand wheel is transferred to the stem via a shear pin. This shear pin is not part of the McEvoy gate valve, model C. The forces on the stem during operation are absorbed by two pressure bearings. One packing set, enclosed by a screwed pressure piece, ensures that no leakage can occur along the stem. Since the packing pressure piece is attached by means of thread, the pressure bearing at the Cameron valve can be exchanged under pressure without other precautions being taken. If the packing set must be changed during production, the space for this above the packing can be closed off from the pipe pressure, just as is the case for the McEvoy valve. A slanted disc (front) is installed on the stem, which moves up after the valve is closed by turning it further clockwise (due to the left-had thread in the gate) and will seal against the slanted seat in the bonnet flange. The pressure that prevails above the slanted seat can be released via the lubrication nipple with the non-return valve. To do so the ball is pushed from its seat by means of a special tool, whereby the pressure can be released. The screw cap can be safely turned loose and the packing set inspected or replaced only after no more gas is escaping. Tightening the hand wheel has no effect on the seal, just as is the case for the McEvoy valve. Maintenance of the valve is simple thanks to its structure. The seats and the gate can easily be replaced. Depending on the use, the valve must be lubricated from time to time. One disadvantage of the Cameron valve type F is that, if it turns out during wireline work that the valve leaks, it must first be repaired, while the McEvoy valve, model C, can usually be sealed again by refilling up the sealing compound reservoir. Surface Well Completion Page 38

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES GATE VALVE O.S. & Y 1.0 Periodic Inspections 1.1 The valve stem packing should be inspected at least monthly. If the stem packing shows signs of leakage, simply tighten the adjusting nuts to compress the

More information

Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water

Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water 1 Foreword 1.1 Thank you for choosing one of the range of AEON's BS standard valves. For safety purposes, the user shall read this instruction to fully understand the operation of the product. 2 AEON Design

More information

M A N U A L 13-10-05

M A N U A L 13-10-05 Documentation The following information sheets illustrate the description below: 12-WW01-4G-E Sectional view of the lance with main dimensions 12-W101-6G-E Sectional view of the head of the lance with

More information

BOWIE PUMPS OPERATION - MAINTENANCE

BOWIE PUMPS OPERATION - MAINTENANCE BOWIE PUMPS OPERATION - MAINTENANCE PUMPING PRINCIPLE: The meshing owieeof the gears cause a slight depression, with the resulting enmeshing of the gears causing a vacuum drawing the fluid being pumped

More information

Unit 24: Applications of Pneumatics and Hydraulics

Unit 24: Applications of Pneumatics and Hydraulics Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 4 DIRECTIONAL CONTROL VALVES The material needed for outcome 2 is very extensive

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47)

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47) 47 Brakes - Hydraulic Components (Page GR-47) FS III front brake calipers, servicing Front brake caliper piston, removing and installing FN 3 front brake calipers, servicing Front caliper piston, removing

More information

Pallet Jack. OWNER S MANUAL Model MH1230. Important Safety Instructions Assembly Instructions Parts and Hardware Identification

Pallet Jack. OWNER S MANUAL Model MH1230. Important Safety Instructions Assembly Instructions Parts and Hardware Identification OWNER S MANUAL Model MH1230 Important Safety Instructions Assembly Instructions Parts and Hardware Identification Pallet Jack CAUTION: Read, understand and follow ALL instructions before using this product

More information

SunMaxx Solar Filling Station Operating Instructions

SunMaxx Solar Filling Station Operating Instructions SunMaxx Solar Filling Operating Instructions Content 1. Declaration of conformity... 2 2. Introduction... 2 3. Transportation and unpacking... 4 4. Mounting and commissioning... 5 5. End of operation...

More information

Well control equipment. Matanović Davorin, professor

Well control equipment. Matanović Davorin, professor Well control equipment Matanović Davorin, professor Blowout Preventers Blowout preventers (BOPs), in conjunction with other equipment and techniques, are used to close the well in and allow the crew to

More information

INSTALLATION, OPERATION & MAINTENANCE MANUAL

INSTALLATION, OPERATION & MAINTENANCE MANUAL INSTALLATION, OPERATION & MAINTENANCE MANUAL Flanged Disk Check Valve with Strainer Ref. GENEBRE: 2450 2451 2452 1 INSTRUCTIONS FOR INSTALLATION, OPERATION & MAINTENANCE MANUAL 1. Spare parts... 3 1.1

More information

MODEL G300 BRAKE BLEEDER

MODEL G300 BRAKE BLEEDER MODEL G300 BRAKE BLEEDER Installation, Operation & Repair Parts Information Branick Industries, Inc. 4245 Main Avenue P.O. Box 1937 Fargo, North Dakota 58103 REV060616 P/N: 81-0035G 1 THIS PAGE INTENTIONALLY

More information

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS SETTING UP THE PRESS FOR OPERATION For shipping convenience, the gauge, pump handle, hoist crank, screw nose and base angles

More information

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! Atlanta (Monroe) GA 770-267-3787 gpm@gpmhydraulic.com www.gpmhydraulic.com What You Don t Know About Hydraulic Accumulators Can Kill You TABLE OF CONTENTS

More information

TYPE E Main Valve Sizes 3 /8 through 12

TYPE E Main Valve Sizes 3 /8 through 12 SD 3001F PRINTED IN U.S.A. SD 3001F/0707 A B TYPE E MAIN VALVE C D E TYPE E Main Valve Sizes 3 /8 through 12 The Spence Type E Main Valve is of normally closed, single seat design featuring packless construction,

More information

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation Instruction Manual 1052 Size 20 Actuator (F & G) Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation Contents Introduction... 1 Scope of manual... 1 Description... 1 Specifications...

More information

TITAN 13 x 2 ½ BRAKES

TITAN 13 x 2 ½ BRAKES INSTALLATION INSTRUCTION AND SERVICE MANUAL Actuator/Trailer Dealer - Please provide these instructions to the consumer. Consumer - Read and follow these instructions. Keep them with the trailer for future

More information

Ve-Lock manufactures Needle Valves from Solid bar stock Materials & all parts details are as below:

Ve-Lock manufactures Needle Valves from Solid bar stock Materials & all parts details are as below: Needle Valves : - Needle valves have a slender, tapered point at the end of the valve stem that is lowered through the seat to restrict or block flow. Fluid flowing through the Needle valve turns 90 degrees

More information

Unit 24: Applications of Pneumatics and Hydraulics

Unit 24: Applications of Pneumatics and Hydraulics Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 2 HYDRAULIC AND PNEUMATIC CYLINDERS The material needed for outcome 2 is very extensive

More information

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED. CAST IRON THE BASICS 1. DO NOT LIFT ON YOUR OWN. 2. ONLY LIFT THE RADIATOR VERTICALLY. 3. DO NOT LIFT MORE THAN 8/10 SECTIONS AT ANY ONE TIME. 4. POSITION THE RADIATOR BEFORE FINAL ASSEMBLY. 5. THIS PRODUCT

More information

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19 Table of Contents Overview 1 Pump Disassembly 2 Control Disassembly / Reassembly 7 Pump Reassembly 13 Adjustment Procedures DR Control 19 Adjustment Procedures DRG Control 20 Adjustment Procedures DFR

More information

I BEAM TRACK INSTALLATION

I BEAM TRACK INSTALLATION PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17) 17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure

More information

Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008)

Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008) Rear Wheel/Brake/Suspension 13. Rear Wheel/Brake/Suspension Service Information 13-1 Troubleshooting 13-2 Rear Wheel 13-3 Rear Cushion 13-4 Rear Swing Arm 13-7 Service Information General Safety If the

More information

3", 4", 6" & 8" Model H Series Alarm Check Valve Installation and Maintenance Guide

3, 4, 6 & 8 Model H Series Alarm Check Valve Installation and Maintenance Guide ", ", " & " Model H Series Alarm Check Valve Installation and Maintenance Guide 077 AIRPARK DRIVE STANDISH, MICHIGAN PHONE 99-- 00-2-0 FAX 99--92 www.globesprinkler.com OCTOBER 2 C- BULLETIN A.C.V.I.M.,

More information

Front axle components, overview

Front axle components, overview just a test. Front axle components, overview 40-1 General Information Load bearing components and parts of the suspension must not be welded or straightened. Vehicles without drive axle must not be moved,

More information

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller January 2013 AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller Milliken Valve Company 190 Brodhead Avenue, Suite 100 Bethlehem, PA 18017 Phone: (610) 861-8803 Fax:

More information

The Ford Model A Water Pump

The Ford Model A Water Pump The Ford Model A Water Pump George Washington Chapter, Inc. 3903 Old Lee Highway Fairfax, VA 22030 1 Table of Contents Introduction/Specifications.. 3 1. Water Pump Inspection and Removal. 4 a. Removal..

More information

Easy Tool Retracting System CMC-SR2159ER36

Easy Tool Retracting System CMC-SR2159ER36 Easy Tool Retracting System CMC-SR2159ER36 Pepperl+Fuchs, Inc. 1600 Enterprise Parkway Twinsburg, Ohio 44087 Phone: +1 330 486 0002 e-mail: pa-info@us.pepperl-fuchs.com Mounting the Easy Tool Refer to

More information

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions FJ2 2 Ton Trolley Floor Jack Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. This manual provides important information on proper operation & maintenance.

More information

Installation Instructions 4508 4508S

Installation Instructions 4508 4508S SYMPHONY Spread Lavatory Faucet with Speed Connect Drain Congratulations on purchasing your American Standard faucet with Speed Connect drain, a feature found only on American Standard faucets. Speed Connect

More information

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification... OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS INTRODUCTION...1 Scope...1 Description...1 Valve Identification...2 1.0 VALVE INSTALLATION...2 2.0 VALVE MAINTENANCE...3 Actuator Disassembly...3

More information

Cooling system components, removing and installing

Cooling system components, removing and installing Engine BHW Cooling system components, removing and installing Page 1 / 24 19-1 Cooling system components, removing and installing Warning! When doing any repair work, especially in the engine compartment,

More information

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide: LO TORC Plug Valve The high value, dependable performance, and low maintenance requirements of Halliburton Lo Torc valves can help reduce overall operating costs and help cut downtime. These features have

More information

IF IT FLOWS THE BOWIE PUMP CAN PUMP IT

IF IT FLOWS THE BOWIE PUMP CAN PUMP IT IF IT FLOWS THE BOWIE PUMP CAN PUMP IT Bowie Industries, Inc. Bowie, TX 76230 USA Page 1 Bowie Pumps Manual General Pump Information..Page 2 300 Series Pumps.. Page 5 400 Series Pumps.Page 11 500 Series

More information

Fire Hydrant Troubleshooting

Fire Hydrant Troubleshooting Fire Hydrant Troubleshooting Pulsation or chatter during opening and flow of water from hydrant. Loose condition in stem at lower valve plate nut. Tighten lower valve plate nut and secure with SS lock

More information

Tri-Homo Style Operation and Maintenance Instructions

Tri-Homo Style Operation and Maintenance Instructions Tri-Homo Style Operation and Maintenance Instructions One Research Drive Stratford, CT 06615 (203) 375-0063 www.sonicmixing.com 1 Installation and Start-up Do not perform following adjustments without

More information

HYDRAULIC LIFT TABLE CART 2200-LB.

HYDRAULIC LIFT TABLE CART 2200-LB. HYDRAULIC LIFT TABLE CART 2200-LB. OWNER S MANUAL WARNING: Read carefully and understand all MACHINE ADJUSTMENT AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other

More information

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information Safety Safety Is Your Responsibility DANGER To avoid personal injury or death, carefully read and understand all instructions pertaining to the Anthony Liftgates product. Do not attempt to install, operate,

More information

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual Dive Rite 200 & 300 Bar Isolator Manifold Service Manual Principal Photography and Text by Pete Nawrocky Copyright 2003 Lamartek Inc. D/B/A Dive Rite 0 Warning This manual is only to be used as a guide

More information

BETTIS CONVERSION INSTRUCTIONS TO CONVERT HD SERIES ACTUATORS TO HD-M3, HD-SR-M3 HD-M3HW OR HD-SR-M3HW SERIES PNEUMATIC ACTUATORS

BETTIS CONVERSION INSTRUCTIONS TO CONVERT HD SERIES ACTUATORS TO HD-M3, HD-SR-M3 HD-M3HW OR HD-SR-M3HW SERIES PNEUMATIC ACTUATORS BETTIS CONVERSION INSTRUCTIONS TO CONVERT HD SERIES ACTUATORS TO HD-M3, HD-SR-M3 HD-M3HW OR HD-SR-M3HW SERIES PNEUMATIC ACTUATORS PART NUMBER: 132581 REVISION: A RELEASE DATE: 24 March 2000 Page 1 of 10

More information

10 Wireline operations

10 Wireline operations 10 WIRELINE OPERATIONS... 1 10.1 GENERAL... 1 10.2 WELL BARRIER SCHEMATICS... 1 10.3 WELL BARRIER ACCEPTANCE CRITERIA... 1 10.3.1 Well control equipment configuration... 1 10.3.2 Deployment of toolstrings...

More information

STEERING SYSTEM - POWER

STEERING SYSTEM - POWER STEERING SYSTEM - POWER 1990 Nissan 240SX 1990 STEERING Nissan - Power Rack & Pinion Axxess, Maxima, Pulsar NX, Sentra, Stanza, 240SX, 300ZX DESCRIPTION The power steering system consists of a rack and

More information

Chapter 7 Hydraulic System Troubleshooting

Chapter 7 Hydraulic System Troubleshooting Chapter 7 Hydraulic System Troubleshooting General The following troubleshooting information is provided as a general guide to identify, locate and correct problems that may be experienced with the hydraulic

More information

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE Cable Processor Module overview WARNING! When tipping the Cable Processor Module back, (after removing the toggle arm pin), use extreme caution not to drop

More information

Service Manual Rol-Lift

Service Manual Rol-Lift R 2000 Service Manual Rol-Lift Series: T and E Developed by Generic Parts Service This manual is intended for basic service and maintenance of the Rol-Lift pallet jack. The pallet jacks you are servicing

More information

Introduction to Subsea Production System

Introduction to Subsea Production System Introduction to Subsea Production System 04 Xmas Tree Systems Bjørn Søgård Xmas Tree Systems This module will cover: Main codes for XT equipment XT Principles and functions Typical schematic Main types

More information

Rexroth Hydraulic Pump A10VO Series User Manual

Rexroth Hydraulic Pump A10VO Series User Manual Rexroth Hydraulic Pump A10VO Series User Manual Rexroth Hydraulic pump A10VO Series User Manual Revised 5/1/2009 Page 1 of 12 Functional Purpose This pump is preferred over a fixed displacement (gear)

More information

Front brakes (FN- 3), servicing

Front brakes (FN- 3), servicing j a t Front brakes (FN- 3), servicing 46-1 Front brakes, servicing Note: Install complete repair kit. After replacing brake pads and before moving vehicle, depress brake pedal several times firmly to properly

More information

HYDRAULIC TABLE CART 500-LB.

HYDRAULIC TABLE CART 500-LB. HYDRAULIC TABLE CART 500-LB. OWNER S MANUAL WARNING: Read carefully and understand all MACHINE ADJUSTMENT AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic

More information

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions 4057250/8 IM-P405-16 AB Issue 8 ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation 4 Operation

More information

Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997

Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997 Char-Lynn Hydraulic Motor October, 1997 Repair Information Geroler Motor Two Speed 001 27 Retainer inside bore of valve plate bearingless motors only 4 15 16 3 6 35 Parts Drawing 25 2 2 1 19 17 36 40 47

More information

BOP PRESSURE TESTING PROCEDURE

BOP PRESSURE TESTING PROCEDURE 0 Discuss Operator BOP requirements WITH RIG MANAGER. Insure that all Romfor's BOP equipment is tested consistent with Romfor's policy. This may require Nabors to incur the cost for the testing subcontractor

More information

Overview PARTS LIST. B. Lever mounting base C. Flush handle assembly D. Grey/Blue float stop E. Grey float (Full Flush) F. Flush valve washer

Overview PARTS LIST. B. Lever mounting base C. Flush handle assembly D. Grey/Blue float stop E. Grey float (Full Flush) F. Flush valve washer Overview READ ENTIRE INSTRUCTIONS BEFORE STARTING INSTALLATION PARTS LIST A. Flush valve B. Lever mounting base C. Flush handle assembly D. Grey/Blue float stop E. Grey float (Full Flush) F. Flush valve

More information

The Secret of Hydraulic Schematics. BTPHydraulics www.iranfluidpower.com

The Secret of Hydraulic Schematics. BTPHydraulics www.iranfluidpower.com The Secret of Hydraulic Schematics BTPHydraulics www.iranfluidpower.com www.iranfluidpower.com Table of Contents The Secret to Reading and Interpreting Hydraulic Schematics... 1 Hydraulic System Schematics...

More information

This instruction is valid for all ACD pump models shown on page 2

This instruction is valid for all ACD pump models shown on page 2 Screw pumps ACD Maintenance and Service Instruction This instruction is valid for all ACD pump models shown on page 2 Contents Page List of components 2 Exploded view/ordering code 3 Service intervals

More information

Cane Creek Double Barrel Instructions

Cane Creek Double Barrel Instructions Cane Creek Double Barrel Instructions Congratulations on your purchase of the Cane Creek Double Barrel (CCDB) rear shock. Developed in partnership with Öhlins Racing, the Double Barrel brings revolutionary

More information

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors Char-Lynn Spool Valve Hydraulic Motors Repair Information W Series Geroler Motors with Parking Brake 004 Nut Key Ring, Retaining Bearing Ring, Retaining Ring, Retaining Washer (Thick), Pressure Washer,

More information

Fuel Injection Pump, Rotary (005-014)

Fuel Injection Pump, Rotary (005-014) Fuel Injection Pump, Rotary View Related Topic Page 1 of 30 Fuel Injection Pump, Rotary (005-014) Table of Contents Summary General Information Preparatory Steps Remove Front Gear Train Rear Gear Train

More information

Stainless Steel Single and Dual Circulation Kits

Stainless Steel Single and Dual Circulation Kits Instruction Sheet P/N 160780 01 Stainless Steel Single and Dual Circulation Kits Introduction The single and dual high-pressure circulation kits allow you to vary and control the circulation rate of coating

More information

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS Section: MOYNO 500 PUMPS Page: 1 of 8 Date: March 1, 1998 SERVICE MANUAL MOYNO 500 PUMPS 300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS Mechanical Seal Models Packing Gland Models MODELS DESIGN FEATURES

More information

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual Range Road RR Series Semi-Automatic Firewood Processor Crated Unit Assembly Manual 1 1) Undo 8-18mm x 19mm Nuts and bolts, 2 on each leg of top frame 2) Lift top of Metal crate off and move out of work

More information

TECHNICAL SERVICE MANUAL

TECHNICAL SERVICE MANUAL TECHNICAL SERVICE MANUAL HEAVY-DUTY PUMPS SERIES 4195 AND 495 SIZES GG - AL SECTION TSM 144 PAGE 1 of 10 ISSUE D CONTENTS Introduction....................... 1 Safety Information.................... 2

More information

Fleck 4650. Service Manual INSTALLATION AND START-UP PROCEDURE TABLE OF CONTENTS JOB SPECIFICATION SHEET

Fleck 4650. Service Manual INSTALLATION AND START-UP PROCEDURE TABLE OF CONTENTS JOB SPECIFICATION SHEET Fleck 4650 Service Manual TABLE OF CONTENTS JOB SPECIFICATION SHEET...1 INSTALLATION AND START-UP PROCEDURE...1 CONTROL VALVE DRIVE ASSEMBLY...2 CONTROL DRIVE ASSEMBLY FOR CLOCK...3 BYPASS VALVE ASSEMBLY...4

More information

PUMP MAINTENANCE SCHEDULE AND CHECKLISTS

PUMP MAINTENANCE SCHEDULE AND CHECKLISTS PUMP MAINTENANCE SCHEDULE AND CHECKLISTS Providing a maintenance schedule defined specifically by run hours or yardage pumped serves only as a general guideline given the large amount of variables a unit

More information

SELECTION, APPLICATION & MAINTENANCE

SELECTION, APPLICATION & MAINTENANCE DIESEL PROTECTION SYSTEMS TPZ Engine Air Intake Shut Down Valves (Combined Automatic Overspeed and Air Pressure Operated Shut Down Bendix Types) SELECTION, APPLICATION & MAINTENANCE Valve Numbers TPZ-101

More information

SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY

SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY 82-13-1 O-Ring (Rear) The Lead Screw Assembly is shipped separately. Note: Install Electrical and Pneumatic Circuitry. Be Sure electrical and pneumatic

More information

Trouble Shooting Tech Tips Operation

Trouble Shooting Tech Tips Operation Steering Components TroubleShooting Tech Tips Table of Contents Basic Steering System Operation 2 Sector Shaft Adjustments 4 Drag Link Adjustment 5 Relief Valve/Unloading Valve Adjustment 6 Ross TAS Automatic

More information

The "DAVID" Steam Engine By Alan Marconett Hobbit Engineering HTTP://WWW.HobbitEngineering.com Alan@HobbitEngineering.

The DAVID Steam Engine By Alan Marconett Hobbit Engineering HTTP://WWW.HobbitEngineering.com Alan@HobbitEngineering. The "DAVID" Steam Engine By Alan Marconett Hobbit Engineering HTTP://WWW.HobbitEngineering.com Alan@HobbitEngineering.com (c) 2/20/03 The David steam engine is a simple oscillating steam engine, many plans

More information

TECHNICAL DATA. Dry 122a. November 12, 2013

TECHNICAL DATA. Dry 122a. November 12, 2013 Dry 122a 1. PRODUCT DESCRIPTION The Viking is a quick-opening device. When installed with the required external Anti-flood Device, the assembly is designed to increase the operating speed of Viking Model

More information

Unique DV-ST UltraPure - Manuel: for valve sizes DN8 to DN80 (¼ to 3 )

Unique DV-ST UltraPure - Manuel: for valve sizes DN8 to DN80 (¼ to 3 ) Instruction Manual Unique DV-ST UltraPure - Manuel: for valve sizes DN8 to DN80 (¼ to 3 ) ESE01752-EN4 2014-02 Original manual Table of contents The information herein is correct at the time of issue

More information

Pressure Locking & Thermal Binding In Wedge Gate & Parallel Slide Gate Valves

Pressure Locking & Thermal Binding In Wedge Gate & Parallel Slide Gate Valves Pressure Locking & Thermal Binding In Wedge Gate & Parallel Slide Gate Valves CRANE Energy Flow Solutions TM Donald H. Johnson Crane Energy Flow Solutions 1 Crane Co. Resolution Made By Richard Teller

More information

13. REAR WHEEL/BRAKE/SUSPENSION

13. REAR WHEEL/BRAKE/SUSPENSION 13. REAR WHEEL/BRAKE/SUSPENSION 13 3.5~4.5kg-m 8.0~10.0kg-m 0.8~1.2kg-m 3.0~4.0kg-m 2.4~3.0kg-m 3.5~4.5kg-m 6.0~8.0kg-m 13-0 13. REAR WHEEL/BRAKE/SUSPENSION 13 REAR WHEEL/BRAKE/SUSPENSION SERVICE INFORMATION...

More information

Flanged and Butt-= Weld Type

Flanged and Butt-= Weld Type Document : PG00 Year : 09 Product Group 00 Flanged and Butt-= Weld Type (LNG and LPG) Page 09 Document : PG00 Year : 09 Product Group 00 Cryogenic Butterfly valves The Cryogenic Butterfly Valve Design

More information

Float and Thermostatic Traps Series H, C and X

Float and Thermostatic Traps Series H, C and X Hoffman Specialty Installation & Maintenance Instructions HS-(E) and Thermostatic Traps Series H, C and X Series C & NPT Series C NPT Series X NPT Series C NPT Series H Ratings Maximum Max. Operating NPT

More information

Example. Fluid Power. Circuits

Example. Fluid Power. Circuits Example Fluid Power Circuits To Enhance Symbol Reading Skills To Work On Circuit Reading Skills With Answers HI LO Pump Circuit 18 A1 B1 17 16 15 13 Set 14 2,000 PSI PG2 Set 500 PSI 12 11 7 8 10 PG1 9

More information

Vertical selfpriming Side-Channel Pumps Type WPV

Vertical selfpriming Side-Channel Pumps Type WPV Vertical selfpriming Side-Channel Pumps Type WPV FIELD OF APPLICATION The side-channel pumps are selfpriming and operate more economically (better efficiency) than normal centrifugal pumps when handling

More information

BACKPACK SPRAYERS. MODEL NOS: KSP16 & KSP20 Part Nos: 3402270 & 3402275 OPERATING & MAINTENANCE INSTRUCTIONS GC04/12

BACKPACK SPRAYERS. MODEL NOS: KSP16 & KSP20 Part Nos: 3402270 & 3402275 OPERATING & MAINTENANCE INSTRUCTIONS GC04/12 BACKPACK SPRAYERS MODEL NOS: KSP16 & KSP20 Part Nos: 3402270 & 3402275 OPERATING & MAINTENANCE INSTRUCTIONS GC04/12 INTRODUCTION Thank you for purchasing this CLARKE Sprayer, designed for use only with

More information

Type 3244-1 and Type 3244-7 Pneumatic Control Valves. Type 3244 1 (left) and Type 3244-7 (right) Mounting and Operating Instructions EB 8026 EN

Type 3244-1 and Type 3244-7 Pneumatic Control Valves. Type 3244 1 (left) and Type 3244-7 (right) Mounting and Operating Instructions EB 8026 EN Type 3244-1 and Type 3244-7 Pneumatic Control Valves Type 3244 1 (left) and Type 3244-7 (right) Mounting and Operating Instructions E 8026 EN Edition July 2014 Definition of signal words DNGER! Hazardous

More information

RMF Engineering 23 05 23

RMF Engineering 23 05 23 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

Professional Precharged Hunting Rifle

Professional Precharged Hunting Rifle TRIGGER ADJUSTMENT. The trigger is set at the factory, but some aspects can be adjusted to suit individual preferences. 1. This screw adjusts the weight of second stage trigger pull, to increase the weight

More information

Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations

Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations Instruction Manual 1061 F & G Actuator Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications...

More information

Trunnion-Design Ball Valves

Trunnion-Design Ball Valves Trunnion-Design Ball Valves 12" 20" (DN 300 500) Series 7150 12" (DN 300) Series 730S 12" 20" (DN 300 500) Series 7300 14" 24" (DN 350 600) Series 9150 14" 24" (DN 350 600) Series 9300 Installation, Maintenance

More information

MP-4V Heavy Duty Riveter / 39048

MP-4V Heavy Duty Riveter / 39048 MP-4V Heavy Duty Riveter / 39048 This newly designed heavy-duty air/hydraulic riveter is ergonomically designed with the professional in mind. The light weight 3.7 lbs. well balanced MP-4V includes a Vacuum

More information

Oxy-Fuel Gas Welding. Given a functional oxy-fuel gas unit, instruction and demonstration of use, each student will be able to:

Oxy-Fuel Gas Welding. Given a functional oxy-fuel gas unit, instruction and demonstration of use, each student will be able to: I. Competencies Oxy-Fuel Gas Welding Given a functional oxy-fuel gas unit, instruction and demonstration of use, each student will be able to: A. Identify the major parts of the oxy-fuel gas unit. B. Pass

More information

OPERATING INSTRUCTION MANUAL FOR S-240 HYDRAULIC CUTTERS WITH PARTS LIST

OPERATING INSTRUCTION MANUAL FOR S-240 HYDRAULIC CUTTERS WITH PARTS LIST HUSKIE TOOLS, INC. OPERATING INSTRUCTION MANUAL FOR S-240 HYDRAULIC CUTTERS WITH PARTS LIST GENERAL INFORMATION GUIDE FOR S-240 CUTTER The following steps are guidelines for safe operation of the Huskie

More information

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT POSEION 2-29, 2-25 & 2-22 POSEION 2-29, 2-25 & 2-22 XT Repair Manual Index A. Safety precautions 3 B. Technical data 4 C. Structure 5-6. Service / Repair 7-23 E. Tools 24 F. Function 25-26 G. Electric

More information

Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW

Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW Installation, Operating and Maintenance Instructions 90/4.5.5 Rev. 0 Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW Table of Contents SECTION I... 2 INSTALLATION...

More information

Machine needle shut-off nozzle type HP

Machine needle shut-off nozzle type HP Machine needle shut-off nozzle type HP pneumatically or hydraulically controlled Index of contents Chapter Page Safety instructions... 2 Installation instructions... 3 - Installation steps... 3 Initial

More information

BERMAD Fire Protection

BERMAD Fire Protection 400E-2M/700E-2M IOM Bermad Electrically Controlled Deluge Valve with EasyLock Manual Reset Model: 400E-2M/700E-2M INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 400E-2M/700E-2M Bermad

More information

PART 2 FORKLIFT HYDRAULIC SYSTEM

PART 2 FORKLIFT HYDRAULIC SYSTEM PART 2 FORKLIFT HYDRAULIC SYSTEM Chapter 1 Description and Operation Component Locations & Circuit Layouts 1 Hydraulic Pump 11 Control Valve 14 Valve Section Oil Flows 15 Anti-Cavitation Valve 22 Velocity

More information

Rebuild Instructions for 70001 and 70010 Transmission

Rebuild Instructions for 70001 and 70010 Transmission Rebuild Instructions for 70001 and 70010 Transmission Brinn, Incorporated 1615 Tech Drive Bay City, MI 48706 Telephone 989.686.8920 Fax 989.686.6520 www.brinninc.com Notice Read all instructions before

More information

Step-by-step instructions:

Step-by-step instructions: Spark plug thread repair for Ford Triton cylinder heads Step-by-step instructions: Identification Installation Verification Specifically designed and tested for 4.6L, 5.4L, and 6.8L 2 and 4 valve heads,

More information

Drive shaft, servicing

Drive shaft, servicing Volkswagen Passat B6 - Drive shaft, servicing Стр. 1 из 41 40-7 Drive shaft, servicing Drive shafts, overview I - Assembly overview: Drive axle with CV joint VL100 40-7, Drive axle with CV joint VL100,

More information

IMPACT SPRINKLER TROUBLESHOOTING GUIDE

IMPACT SPRINKLER TROUBLESHOOTING GUIDE RAIN USE AND OPERATION BIRD IMPACT SPRINKLER TROUBLESHOOTING GUIDE The diagrams below depict typical Rain Bird sprinklers with all available controls. Your particular model may have only some of these

More information

CHROME FRONT BRAKE MASTER CYLINDER KIT

CHROME FRONT BRAKE MASTER CYLINDER KIT -J075 REV. 009-0-0 CHROME FRONT BRAKE MASTER CYLINDER KIT GENERAL Kit Number 5-99D, 5-99D Models These Chrome Master Cylinder Kits are designed to replace the original equipment front brake master cylinder

More information

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17) 17 Engine-Lubrication system (Page GR-17) Lubrication system components, removing and installing Oil pan, removing and installing Oil pressure and oil pressure switch, checking Dynamic oil pressure warning

More information

Diaphragm Control Valves FLUXOTROL Series I and Series 25 Installation and Maintenance Instructions

Diaphragm Control Valves FLUXOTROL Series I and Series 25 Installation and Maintenance Instructions Diaphragm Control Valves FLUXOTROL Series I and Series 25 Installation and Maintenance Instructions 1. General 2. Installation instructions 3. Maintenance instructions 4. Spare parts list IMPORTANT SAFETY

More information

GATE VALVES ASAHI AV VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1

GATE VALVES ASAHI AV VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1 Serial No. H-V011-E-11 GATE VALVES Type P (Standard: Plug) Type S (Soft Seal) Contents (1) Be sure to read the following warranty clauses of our product 1 User s Manual (2) General operating instructions

More information

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE 4 3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE A. Changing the Control Board B. Replacing a Heating Element C. Thermistor Replacement D. High Limit Switch Replacement E. Level Detector Replacement

More information

COUNTERBALANCE VALVES

COUNTERBALANCE VALVES COUNTERBALANCE VALVES Introduction They are modulating valves which allow free flow into the actuator and then block the reverse flow until they feel a pilot pressure inversely proportional to the load

More information