SafeProd. Functional safety in complex products.
|
|
- Harvey Stewart Stevens
- 7 years ago
- Views:
Transcription
1 SafeProd Functional safety in complex products Johan Hedberg SP Swedish National Testing and Research Institute Phone: ,
2 Participants SP Swedish National Testing and Research Institute has the main responsibility for the SafeProd project The research has been performed together with Lund University (LTH) A number of industry companies have also been involved in the project - ABB - TetraPak - EKA Chemicals Also the Swedish Work Environment Authority has been involved in the project
3 Aim Support SMEs in the application of new functional safety standards Develop guidelines and templates to support the use of these new safety critical control systems ANALYSIS Overall planning 6 Overall 7 Overall operation & safety maintenance validation planning planning REALISATION Overall installation & commissioning planning Concept Overall scope definition Hazard and risk analysis Overall safety requirements Safety requirements allocation 9 Safety-related systems: E/E/PES Realisation (see E/E/PES safety lifecycle) Safety-related 10 systems: other technology Realisation 12 Overall installation & commissioning External risk 11 reduction facilities Realisation OPERATION 13 Overall safety validation 14 Overall operation, maintenance & repair 16 Decommissioning or disposal 15 Overall modification & retrofit
4 Why is functional safety important? Analogue control systems are rapidly exchanged for programmable control systems in Swedish industry, also in safety systems These new control systems gives increased flexibility and productivity One drawback with these new control systems is that they also give an increased level of complexity and makes it more difficult to overview potential risks that could occur Functional safety includes all measures performed to guarantee that a component/system performs its intended function The aim of SafeProd has been to support Swedish industry when using complex programmable control systems as part of safety systems
5 Overall safety life-cycle 6 Overall operation & maintenance planning Overall planning 7 Overall safety validation planning Overall installation & commissioning planning Concept Overall scope definition Hazard and risk analysis Overall safety requirements Safety requirements allocation 9 Safety-related systems: E/E/PES Realisation (see E/E/PES safety lifecycle) Overall installation & commissioning Overall safety validation Safety-related 10 systems: other technology Realisation 14 Overall operation, maintenance & repair External risk reduction facilities Realisation Back to appropriate overall safety lifecycle phase Overall modification & retrofit 16 Decommissioning or disposal
6 Industry focus Safety of machinery Process safety
7 Project focus The project has been divided into two parts, one applied part and one more theoretical part, where both did have a strong industrial connection The theoretical part has been focusing on research in the area of safety critical control systems which have resulted in a number of publications, for instance at the well known conference SafeComp, The International Conference on Computer Safety, Reliability and Security ( The applied part has been focusing on developing guidelines and templates to support Swedish industry when trying to fulfil new requirements related to design of safety critical control systems
8 Guidelines and templates Safety management Hazard and risk analysis SIL assignment Safety requirements specification (SRS) Hardware safety integrity Design of application software Validation Operation and maintenance
9 Effects on Swedish industry Developed guidelines and methods has been important for Swedish industry when trying to apply these new requirements for safety critical control systems It has been important for Swedish industry that the Swedish Work Environment Authority has been participating in the project to get their view on how to handle these new complex programmable control systems (The result of the project has also been presented for the other Nordic authorities) Ongoing contacts with the SSG which is a large Swedish organisation that develops standards for the forest-/steel- and mining industry
10 Continuation, Effects on Swedish industry Presentation of the research results on both academically and industrial international conferences Swedish process industry has been informed about the results from the project by visiting them at site The result from the project has been informed to Swedish industry consultancies Large number of downloaded reports from the SafeProd homepage, up to today more than 1500 reports has been downloaded from the homepage
11 Visitors at the SafeProd homepage (1 october june 2006)
12 Challenges One of the biggest challenges for the moment in the area of safety critical control systems is to support industry on how to handle requiremnts related to reliability, both on components and systems
Version: 1.0 Latest Edition: 2006-08-24. Guideline
Management of Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:johan.hedberg@sp.se Quoting of this report is allowed but please
More informationVersion: 1.0 Last Edited: 2005-10-27. Guideline
Process hazard and risk Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:johan.hedberg@sp.se -1- Summary This report will try
More informationHardware safety integrity Guideline
Hardware safety integrity Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:johan.hedberg@sp.se Quoting of this report is allowed
More informationControlling Risks Safety Lifecycle
Controlling Risks Safety Lifecycle Objective Introduce the concept of a safety lifecycle and the applicability and context in safety systems. Lifecycle Management A risk based management plan for a system
More informationFunctional Safety Management of the development process of safety related programmable electronic systems at Jaquet Technology Group
Functional Safety Management of the development process of safety related programmable electronic systems at Jaquet Technology Group Document type: Certification Report Client: Jaquet Technology Group
More informationSafety Requirements Specification Guideline
Safety Requirements Specification Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:johan.hedberg@sp.se -1- Summary Safety Requirement
More informationELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL
61508-3 ª IEC: 1997 1 Version 12.0 05/12/97 COMMISSION CEI ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL COMMISSION Functional safety of electrical/electronic/ programmable
More informationIntroduction to 61508 - part III - Overview of 61508
to - Overview of rg> December 22, 2015 Outline to - to of Some of /pre-existing SW intro Focus: System scope embedding functional safety Managing complexity - system context Provide Methodology of achieving
More informationIs your current safety system compliant to today's safety standard?
Is your current safety system compliant to today's safety standard? Abstract It is estimated that about 66% of the Programmable Electronic Systems (PES) running in the process industry were installed before
More informationEWICS TC7 an insider s tip for safety and security guidance 1 by Odd Nordland
EWICS TC7 an insider s tip for safety and security guidance 1 by Odd Nordland Introduction The European Workshop on Industrial Computer Systems (EWICS) was founded in 1974 as the European branch of the
More informationFrequently Asked Questions
Frequently Asked Questions The exida 61508 Certification Program V1 R8 October 19, 2007 exida Geneva, Switzerland Sellersville, PA 18960, USA, +1-215-453-1720 Munich, Germany, +49 89 4900 0547 1 Exida
More informationIEC 61508 Overview Report
IEC 61508 Overview Report A Summary of the IEC 61508 Standard for Functional Safety of Electrical/Electronic/Programmable Electronic Safety-Related Systems exida Sellersville, PA 18960, USA +1-215-453-1720
More informationABB Drive Services Your choice, your future
ABB Drive Services Your choice, your future Your choice, your future The future of your drives depends on the service you choose. Whatever you choose, it should be a well-informed decision. No guesswork.
More informationOverview of IEC 61508 - Design of electrical / electronic / programmable electronic safety-related systems
Overview of IEC 61508 - Design of electrical / electronic / programmable electronic safety-related systems Simon Brown The author is with the Health & Safety Executive, Magdalen House, Bootle, Merseyside,
More informationHow to design safe machine control systems a guideline to EN ISO 13849-1
How to design safe machine control systems a guideline to EN ISO 13849-1 SP Technical Research Institute of Sweden Johan Hedberg Andreas Söderberg Jan Tegehall SP Electronics SP REPORT 2011:81 How to design
More informationBrochure. Projects and engineering Engineering expertise to enhance your operations
Brochure Projects and engineering Engineering expertise to enhance your operations Overview Do you need to deliver plant upgrades but find them disruptive and lack the resources? Are you concerned about
More informationAn introduction to Functional Safety and IEC 61508
An introduction to Functional Safety and IEC 61508 Application Note AN9025 Contents Page 1 INTRODUCTION........................................................... 1 2 FUNCTIONAL SAFETY.......................................................
More informationFrequently Asked Questions
Frequently Asked Questions The exida Certification Program Functional Safety (SIL) Cyber-Security V2 R3 June 14, 2012 exida Sellersville, PA 18960, USA, +1-215-453-1720 Munich, Germany, +49 89 4900 0547
More informationRECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF
RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF No.: 070 Date effective: 1.02.2001 Revision no.: 01 Date revised: NA
More informationGuidelines. Safety Integrity Level - SIL - Valves and valve actuators. March 2009. Valves
Valves Guidelines Safety Integrity Level - SIL - Valves and valve actuators March 2009 VDMA German Engineering Federation Valves Manufacturers Association Chairman: Prof.-Dr.-Ing. Heinfried Hoffmann Managing
More informationSIL manual. Structure. Structure
With regard to the supply of products, the current issue of the following document is applicable: The General Terms of Delivery for Products and Services of the Electrical Industry, published by the Central
More informationIndependent Safety Assessment White Paper
Independent Safety Assessment White Paper Kevin J Anderson and Tariq Mahmood Evans & Peck Advisory Consultants Level 15, 607 Bourke Street Melbourne VIC 3000 Australia kanderson@evanspeck.com, tmahmood@evanspeck.com
More informationChange Impact analysis
1 Change Impact analysis and the safety standard IEC 61508:2010 series Author and presenter: Thor Myklebust SINTEF ICT Authors: Tor Stålhane, IDI NTNU Geir Hanssen, SINTEF ICT Børge Haugset, SINTEF ICT
More informationWhat is Functional Safety Management?
What is Functional Safety Management? This document gives a brief overview of what Functional Safety Management includes DISCLAIMER: Whilst every effort has been made to ensure the accuracy of the information
More informationRIIWBP601D Establish and maintain waste and by-product management system
RIIWBP601D Establish and maintain waste and by-product management system Release: 1 RIIWBP601D Establish and maintain waste and by-product management system Modification History Not applicable. Approved
More informationProcesses for Software in Safety Critical Systems
This is a preprint of an article published in Software Process: Improvement and Practice, volume 6, issue 1, pp. 47-62, 2001, copyright John Wiley and Sons Ltd., 2001, http://www.interscience.wiley.com
More informationLife Cycle Asset Management
Rx Whitepaper CONTENTS PAGE 1: Overview PAGE 1-2: Foundational Elements Management Strategy Development Organizational Design Long-term Asset Planning PAGE 2-7: Risk Management Concept and Design Construction
More informationCompliance ow - managing the compliance of dynamic and complex processes
Loughborough University Institutional Repository Compliance ow - managing the compliance of dynamic and complex processes This item was submitted to Loughborough University's Institutional Repository by
More informationThe relationship between risk and asset management
The relationship between risk and asset management Peter Kohler Principal Analyst, Asset Sustainability and Member of ISO PC251 Asset Management Asset management seminar 22 November 2012 Agenda This presentation
More informationTÜ V Rheinland Industrie Service
TÜ V Rheinland Industrie Service Business Area: Automation / Functional Safety Contact Minsung Lee +82-2-860-9969 mailto : minsung.lee@kor.tuv.com Sales Account Manager for Functional Safety Fax +82-2-860-9862
More informationFunctional safety Standardization activities
Functional safety Standardization activities Bart Aertgeerts Symposium VIK/TI 3 November 2007 Crowne Plaza Antwerp Dangers Overall safety EUC (Machinery, process installation, apparatus, ) Electrical installations
More informationApplication Functional Safety IEC 61511
Application Functional Safety IEC 61511 Introduction Functional safety must be an integral part of the project execution if we shall succeed to make safe application program We can t test and audit safety
More informationThe Concepts of IEC 61508
The Concepts of IEC 61508 An Overview and Analysis Sommersemester 2001 Prof. Peter B. Ladkin PhD ladkin@rvs.uni-bielefeld.de Motivation: Clear Concepts Concepts must be clear in order to enable easy and
More informationRecords management in SharePoint 2010
Records management in SharePoint 2010 Implications and issues Crown copyright 2011 You may re-use this information (excluding logos) free of charge in any format or medium, under the terms of the Open
More informationwww.aspireeurope.com
The blueprint has been one of the key concepts within the Managing Successful Programmes framework since it was first released in 1999. In 2007 it had a chapter dedicated to it, which has been enhanced
More informationCASS TEMPLATES FOR SOFTWARE REQUIREMENTS IN RELATION TO IEC 61508 PART 3 SAFETY FUNCTION ASSESSMENT Version 1.0 (5128)
CASS TEMPLATES FOR SOFTWARE REQUIREMENTS IN RELATION TO PART 3 SAFETY FUNCTION ASSESSMENT Version 1.0 (5128) Report No. T6A01 Prepared for: The CASS Scheme Ltd By: The 61508 Association All comment or
More informationIntroduction of ISO/DIS 26262 (ISO 26262) Parts of ISO 26262 ASIL Levels Part 6 : Product Development Software Level
ISO 26262 the Emerging Automotive Safety Standard Agenda Introduction of ISO/DIS 26262 (ISO 26262) Parts of ISO 26262 ASIL Levels Part 4 : Product Development System Level Part 6 : Product Development
More informationManaging the Services Lifecycle SOA & BPM
Managing the Services Lifecycle SOA & BPM Agenda The service Lifecycle what does it look like? Methods and processes for service evolution Supporting tools & techniques Governing the service-cycle Best
More informationFunctional safety. Essential to overall safety
Functional safety Essential to overall safety What is Functional safety? In public spaces, factories, offi ces or homes; we are surrounded by an increasing number of electric and electronic devices and
More informationAPPLICATION OF IEC 61508 AND IEC 61511 IN THE NORWEGIAN PETROLEUM INDUSTRY
1 of 159 APPLICATION OF IEC 61508 AND IEC 61511 IN THE NORWEGIAN PETROLEUM INDUSTRY 2 of 159 Table of content FOREWORD...5 1 INTRODUCTION...6 1.1 SCOPE AND PURPOSE OF DOCUMENT...6 1.2 RISK REDUCTION, SIS
More informationUniversity of Paderborn Software Engineering Group II-25. Dr. Holger Giese. University of Paderborn Software Engineering Group. External facilities
II.2 Life Cycle and Safety Safety Life Cycle: The necessary activities involving safety-related systems, occurring during a period of time that starts at the concept phase of a project and finishes when
More informationESKITP7052 IT/Technology Management and Support Level 2 Role
Overview This sub-discipline is about the competencies required to ensure that the infrastructure required to support the delivery of IT/technology systems, services and assets for an organisation remain
More informationThe Centre for Environmental Management (CEM) offers the following Environmental and Occupational Health & Safety Management Courses
Schedule 2016 Course dates 2016 Rev 2016-40 Page 1 of 10 Course Dates 2016 Internal Box 150, Private Bag X6001, Potchefstroom, South Africa 2520 Centre for Environmental Management Tel: +27 (0) 18 299-2714
More informationSelecting Sensors for Safety Instrumented Systems per IEC 61511 (ISA 84.00.01 2004)
Selecting Sensors for Safety Instrumented Systems per IEC 61511 (ISA 84.00.01 2004) Dale Perry Worldwide Pressure Marketing Manager Emerson Process Management Rosemount Division Chanhassen, MN 55317 USA
More informationcodebeamer INTLAND SOFTWARE codebeamer Medical ALM Solution is built for IEC62304 compliance and provides a wealth of medical development knowledge
codebeamer Medical ALM Solution is built for INTLAND Traceability matrix Medical wiki Risk management IEC 62304 compliance codebeamer INTLAND codebeamer Medical ALM Solution is built for Medical Device
More informationValue Paper Author: Edgar C. Ramirez. Diverse redundancy used in SIS technology to achieve higher safety integrity
Value Paper Author: Edgar C. Ramirez Diverse redundancy used in SIS technology to achieve higher safety integrity Diverse redundancy used in SIS technology to achieve higher safety integrity Abstract SIS
More informationReduce Medical Device Compliance Costs with Best Practices. mark.pitchford@ldra.com
Reduce Medical Device Compliance Costs with Best Practices mark.pitchford@ldra.com 1 Agenda Medical Software Certification How new is Critical Software Certification? What do we need to do? What Best Practises
More informationSAFETY LIFE-CYCLE HOW TO IMPLEMENT A
AS SEEN IN THE SUMMER 2007 ISSUE OF... HOW TO IMPLEMENT A SAFETY LIFE-CYCLE A SAFER PLANT, DECREASED ENGINEERING, OPERATION AND MAINTENANCE COSTS, AND INCREASED PROCESS UP-TIME ARE ALL ACHIEVABLE WITH
More informationHow to Make RAM Part of the Business Process
How to Make RAM Part of the Business Process 14th Transport Sector Coordinating Committee (TSCC) Meeting of the Central Asia Regional Economic Cooperation Program 27-30 April 2015 Ulaanbaatar, Mongolia
More informationISO/IEC 15504 Part 10 Safety Extension. Giuseppe Lami Istituto di Scienza e Tecnologie dell Informazione Consiglio Nezionale delle Ricerche Pisa
ISO/IEC 15504 Part 10 Safety Extension Giuseppe Lami Istituto di Scienza e Tecnologie dell Informazione Consiglio Nezionale delle Ricerche Pisa ISO/IEC 15504 Part 10 talk overview Foundation of the draft
More informationSafety Integrated. SIMATIC Safety Matrix. The Management Tool for all Phases of the Safety Lifecycle. Brochure September 2010. Answers for industry.
SIMATIC Safety Matrix The Management Tool for all Phases of the Safety Lifecycle Brochure September 2010 Safety Integrated Answers for industry. Functional safety and Safety Lifecycle Management Hazard
More informationAutomotive SPICE & ISO/CD 26262 Their Mutual Relationship
utomotive SPICE & ISO/CD 26262 Their Mutual Relationship Dr. Erwin Petry KUGLER MG CIE GmbH Leibnizstraße 11 D-70806 Kornwestheim Mobil: +49 17 67877 E-Mail: erwin.petry@kuglermaag.com Internet: www.kuglermaag.com
More informationElements Elements describe the essential outcomes.
AURETU005 Application Competency Field Unit Sector Elements Elements describe the essential outcomes. Retrofit and modify air conditioning and HVAC systems This unit describes the performance outcomes
More informationMeasuring the Impact of Volunteering
Measuring the Impact of Volunteering Why is measuring the impact of volunteering important? It is increasingly important for organisations or groups to describe the difference that volunteering makes to,
More informationDublin City University
Asset Management Policy Asset Management Policy Contents Purpose... 1 Scope... 1 Physical Assets... 1 Software Assets... 1 Information Assets... 1 Policies and management... 2 Asset Life Cycle... 2 Asset
More informationManaging competence for safety-related systems
Managing competence for safety-related systems Crown copyright 2007 This guidance is issued by the Health and Safety, the Institution of Engineering Technology and the British Computer Society. Following
More informationHealth, Security, Safety and Environment (HSE)
Health, Security, Safety and Environment (HSE) Content: 1 Objective 2 Application and Scope 21 Application of HSE Directive with underlying documents 22 Scope of HSE Management system 3 Framework for our
More informationSCQF HOW TO: USE THE SCQF FOR WORKFORCE DEVELOPMENT
SCQF HOW TO: USE THE SCQF FOR WORKFORCE DEVELOPMENT CONTENTS THE SCQF AND WORKFORCE DEVELOPMENT 01 HOW DOES THIS WORK IN PRACTICE FOR EMPLOYERS? 03 PERFORMING THE SKILLS AUDIT 04 STEP 1 05 STEP 2 05 EVIDENCING
More informationSafety in design: An Australian Offshore Petroleum regulatory perspective. Jeremy Dunster GM Investigations & Strategic Services
Safety in design: An Australian Offshore Petroleum regulatory perspective Jeremy Dunster GM Investigations & Strategic Services AOG Conference & Exhibition February 2013 Regulatory functions Monitor and
More informationMAKING YOUR PROJECTS REAL SOCIETE GENERALE EQUIPMENT FINANCE CLEAN AND RENEWABLE TECHNOLOGIES
2016 MAKING YOUR PROJECTS REAL SOCIETE GENERALE EQUIPMENT FINANCE CLEAN AND RENEWABLE TECHNOLOGIES SOCIETE GENERALE EQUIPMENT FINANCE IS A GLOBAL LEADER AND AN AWARD-WINNING FUNDER FOR THE PROVISION OF
More informationESKITP5022v2 Perform software development activities under direction
Perform development activities under direction Overview This sub discipline covers the core competencies required to create to address business problems and realise opportunities, resulting in a variety
More informationEQF CODE EQF. European Competence Profiles in e-content Professions. http://www.ubique.org/eqfcode
EQF CODE EQF European Competence Profiles in e-content Professions http://www.ubique.org/eqfcode European Competence Profiles in e-content Professions This project has been funded with support from the
More informationAPPLICATION INSTRUCTIONS
Version 1.1 APPLICATION INSTRUCTIONS Instructions for completing the Preparatory project call application form for the Northern Periphery and Arctic Programme 2014-2020 The application instructions are
More informationDeveloping a Public Health Skills Passport
Developing a Public Health Skills Passport Claire Cotter and Lauren King October 2014 Outline Why are we developing a Public Health Skills Passport? What is a Skills Passport? What is the aim of the Public
More informationAssociated Files: Managing resources. Expected Duration: 2 hours
Unit 2 Business Managing Instructions and answers for Teachers These instructions should accompany the OCR resource Managing, which supports the OCR Level 3 Cambridge Technical Certificate in Business
More informationBrochure. Hazard identification and risk assessment For the hazardous process industries
Brochure Hazard identification and risk assessment For the hazardous process industries Overview Delivering excellent process safety performance is a given for any operating company in the hazardous process
More informationCONTRACT RESEARCH REPORT. Developing advisory software to comply with IEC-61508 HSE. Prepared by Adelard for the Health and Safety Executive
HSE Health & Safety Executive Developing advisory software to comply with IEC-61508 Prepared by Adelard for the Health and Safety Executive CONTRACT RESEARCH REPORT 419/2002 HSE Health & Safety Executive
More informationADMISSION. Eligibility. Language test. Entrance examinations. Entry permits. Financial issues. Accommodation
STUDY IN VAASA ADMISSION Applying to programmes conducted in English at Finnish Universities of Applied Sciences takes place through a system of joint application. The application form will be submitted
More informationOur Email Marketing Models: What Suits You Best. Cost Per Thousand [CPM] Cost Per Open [CPO] Cost Per Click [CPC]
Our Email Marketing Models: What Suits You Best Cost Per Thousand [CPM] Cost Per Open [CPO] Cost Per Click [CPC] Focus Area To get the best value out of any email marketing campaign, you should be aware
More informationA Capital Expenditure Programme is an integral part of the annual budgeting process, and contains the following elements:
3 Capital Expenditure 1. Introduction A Capital Expenditure Programme is an integral part of the annual budgeting process, and contains the following elements: a) Major Capital Works Programme building
More informationLogic solver application software and operator interface
Logic solver application software and operator interface By RJ Perry, Control Systems Consultant Correctly implemented and structured functional logic, together with operator interface displays, can improve
More informationPROJECT MANAGEMENT METHODOLOGY OF OBJECT- ORIENTED SOFTWARE DEVELOPMENT
PROJECT MANAGEMENT METHODOLOGY OF OBJECT- ORIENTED SOFTWARE DEVELOPMENT Ing. David BEDNÁŘ, Doctoral Degree Programme (2) Dept. of Information Systems, FIT, BUT E-mail: bednar@fit.vutbr.cz Supervised by:
More information15 Guiding Principles
Health, Safety, Environment and Corporate Social Responsibility 15 Guiding Principles 2013 Message from President and CEO 0 New Gold has a complementary portfolio of assets in different countries and cultures
More informationICT Policy. Executive Summary. Date of ratification Executive Team Committee 22nd October 2013. Document Author(s) Collette McQueen
ICT Policy THCCGIT20 Version: 01 Executive Summary This document defines the Network Infrastructure and File Server Security Policy for Tower Hamlets Clinical Commissioning Group (CCG). The Network Infrastructure
More informationA Marketer s Quick Guide To Getting the Most From Your Pay Per Click Advertising
A Marketer s Quick Guide To Getting the Most From Your Pay Per Click Advertising What is Pay Per Click (PPC) advertising? Pay Per Click (PPC) advertising is a type of advertising where your ad (think of
More informationClinical Risk Management: its Application in the Manufacture of Health IT Systems - Implementation Guidance
Document filename: ISB 0129 Implementation Guidance v2.1 Directorate Solution Design Standards and Assurance Project Clinical Safety Document Reference NPFIT-FNT-TO-TOCLNSA-1300.03 Director Rob Shaw Status
More informationTechnical Bulletin. Understanding Servo Safety Functionality and SIL ratings
Technical Bulletin Understanding Servo Safety Functionality and SIL ratings What is meant by SIL rating and Stop Categories? Why do I need to understand how safety works if none of my current customers
More informationHow to Upgrade SPICE-Compliant Processes for Functional Safety
How to Upgrade SPICE-Compliant Processes for Functional Safety Dr. Erwin Petry KUGLER MAAG CIE GmbH Leibnizstraße 11 70806 Kornwestheim Germany Mobile: +49 173 67 87 337 Tel: +49 7154-1796-222 Fax: +49
More informationDocument Management & Workflow
New 2012 Guide! E-Records Institute SharePoint Governance: Leveraging MS SharePoint 2007/2010 for Document Management & Workflow Including Electronic Records Management, E- Discovery, Project Management
More informationMain References Educational Development (Gibbs 2009) Some trends over time
Experience with implementing teaching evaluation at the Faculty of Engineering at Lund University (LTH) Roy Andersson Roy.Andersson@cs.lth.se Aarhus, April 2013 Lund University Founded in 1666 8 faculties
More informationWeb CRM Partner Guide
Web CRM Partner Guide Agenda The business opportunity for Web CRM Why partnership with interworks What are the partner benefits How can I become a partner What s in the sales and partner kits CRM Market
More informationHealth and Safety in the Engineering Workplace
Unit 1: Health and Safety in the Engineering Workplace Unit code: QCF Level 3: Credit value: 10 Guided learning hours: 60 Aim and purpose T/600/0249 BTEC National This unit will give learners an understanding
More informationITIL Service Management Practices:
ITIL Service Management Practices: ITIL Master Qualification in IT Service Management Frequently Asked Questions (FAQs) May 2012 Page 1 Requirements Coverage 1 Do I have to cover every item listed in the
More informationCONTENT MARKETING Planning Template
2015 CONTENT MARKETING Planning Template 2015 CONTENT MARKETING PLANNING TEMPLATE Why You Need a Content Marketing Plan The adoption rate of inbound marketing has risen dramatically in 2014. The numbers
More informationFunctional Safety Hazard & Risk Analysis
Embedded - IC & Automation Fortronic Functional Safety Hazard & Risk Analysis MILANO - April, 23 rd 2013 CEFRIEL 2013; FOR DISCUSSION PURPOSES ONLY: ANY OTHER USE OF THIS PRESENTATION - INCLUDING REPRODUCTION
More informationBusiness Continuity Management For Small to Medium-Sized Businesses
Business Continuity Management For Small to Medium-Sized Businesses Produced by NORMIT and Norfolk County Council Resilience Team For an electronic copy of this document visit www.normit.org Telephone
More informationMasterclass Series. Sales Training Courses
Masterclass Series of Sales Training Courses Testimonials I always enjoy how I feel after a durhamlane workshop empowered and motivated to attack my sales objectives. Cost effective and very good value
More informationSAFETY COMMITTEE ANNUAL PLAN TEMPLATE
SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit s safety and health efforts. The Safety Committee Annual Plan provides a blueprint
More informationDesign and Development of Transport Aircraft Systems
Richard Smyth Design and Development of Transport Aircraft Systems RAeS, DGLR, VDI, HAW Hamburg Collaborative Engineering in Systems Development Contents Objectives and Drivers The Systems Development
More informationApplication of IEC 61508 and IEC 61511 in the Norwegian Petroleum Industry
Application of IEC 61508 and IEC 61511 in the Norwegian Petroleum Industry Lars Bodsberg Research Director SINTEF, Trondheim, Norway lars.bodsberg@sintef.no http://www.sintef.no/ 30 November 2005 Delft,
More informationSecurity Management. Security is taken for granted until something goes wrong.
Security Management Security Management Security is taken for granted until something goes wrong. Concerns about security have existed for as long as has mankind. The most obvious manifestation of this
More informationAsset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future
Asset Management Strategy (2013-2017) A New Approach for a sustainable future Contents Introduction... 2 The Asset Management Vision, Policy Statement & Strategic Themes... 5 Part B The Asset Management
More informationThe Control of Major Accident Hazards Regulations (Northern Ireland) 2015
STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September
More informationHow safe is your software?
Presentation Bio Return to Main Menu P R E S E N T A T I O N T4 Thursday, Dec 7, 2000 How safe is your software? Johan Hedberg International Conference On Software Testing, Analysis & Review DEC 4-8, 2000
More informationA methodology For the achievement of Target SIL
A methodology For the achievement of Target SIL Contents 1.0 Methodology... 3 1.1 SIL Achievement - A Definition... 4 1.2 Responsibilities... 6 1.3 Identification of Hazards and SIL Determination... 8
More informationSIMATIC Safety Workshop
Experience the fast and easy way to safe machines at highest productivity Unrestricted Siemens Industry, Inc. 2014-2015 All rights reserved. - Agenda Introduction Why Machine Safety? Why Safety PLC s?
More informationSAFETY LIFECYCLE WORKBOOK FOR THE PROCESS INDUSTRY SECTOR
SAFETY LIFECYCLE WORKBOOK FOR THE PROCESS INDUSTRY SECTOR SAFETY LIFECYCLE WORKBOOK FOR THE PROCESS INDUSTRY SECTOR The information and any recommendations that may be provided herein are not intended
More informationClinical Risk Management: Agile Development Implementation Guidance
Document filename: Directorate / Programme Document Reference NPFIT-FNT-TO-TOCLNSA-1306.02 CRM Agile Development Implementation Guidance v1.0 Solution Design Standards and Assurance Project Clinical Risk
More informationASSESSMENT OF THE ISO 26262 STANDARD, ROAD VEHICLES FUNCTIONAL SAFETY
ASSESSMENT OF THE ISO 26262 STANDARD, ROAD VEHICLES FUNCTIONAL SAFETY Dr. Qi Van Eikema Hommes SAE 2012 Government/Industry Meeting January 25, 2012 1 Outline ISO 26262 Overview Scope of the Assessment
More information