1 Rifeng PEX Piping System Installation Guidelines (Updated June 2008)

2 Index 1. Rifeng PEX pipe descriptions... P-3 2. Marking and explanation... P-3 Explanation... P-3 3. Rifeng PEX System fittings and tools... P Fittings available... P Tools available... P-5 4. Making a connection...p-5 4.1Connecting PF1 screw fittings with Rifeng PEX pipes...p Connecting PF2 axial-press fittings with Rifeng PEX pipes... P Connecting PF5 radial-press fittings with Rifeng PEX pipes... P-8 5. Installation...P Manifold System...P Pipe-in-corrugated pipe... P Fixing the corrugated pipe...p Pipe-in-insulation pipe...p Termination Box Sets... P Expansion and Contraction...P Bend pipe with/without Supports... P Pipe fixing... P Pipework... P Test system... P Pipe line flushing... P-16 Contact us at: Serivice@rifeng.com page: 2

3 Rifeng PEX Piping System Installation guidelines Notice: This manual contains recommended installation instructions for Rifeng PEX piping system. Failure to observe these installation instructions may result in substandard performance of the system. Rifeng Piping Systems expressly disclaim any responsibility or liability for substandard performance resulting from failure to comply with installation instructions. 1. Rifeng PEX pipe descriptions Rifeng PEX pipes are produced from crosslinkable polyethylene. We provide PEX pipes with diameter ranging from 10 to 40 mm for European standard sizes or up to 1 1/2" for American standard sizes; the maximal pressure and temperature range could reach 10 bar and 90. Rifeng PEX pipes with EVOH oxygen barrier could be made into 3-layer or 5-layer structure. The layer of adhesive bonds the layer of cross-linked polyethylene and barrier layer by a thermal reaction. The barrier layer is on outside for 3-layer pipe and is right in the center for 5-layer. Following pictures show their structures. 3-layer Rifeng PEX pipe 5-layer Rifeng PEX pipe 2. Marking and explanation All Rifeng PEX pipes are marked with nominal size, wall thickness, pressure/temprature ratings, applicable standards and other information. See following example for marking. 012A RIFENG PEX-b/EVOH OXYGEN BARRIER Class A EN ISO Tmax=90 P D =10bar 000m Explanation 012A0111 Batch number Production time (YYYY-MM-DD-HH-MM-SS) RIFENG PEX-b/EVOH OXYGEN BARRIER Manufacturer and logo Pipe materials/structure (PEX-c/EVOH, PEX-b/EVOH/PEX-b etc. are also available) With oxygen barrier function Outer diameter wall thickness by mm Class A Dimension class Contact us at: Serivice@rifeng.com page: 3

4 EN ISO Tmax=90 P D =10bar Reference Standard number Maximum design temperature Design pressure 3. Rifeng PEX System fittings and tools Fittings: Made of strong brass by forging, PF1 screw fitting, PF2 axial-press fitting and PF5 radial-press fitting are available for PEX pipe. PF1 and PF2 fittings are dimensionally designed according to European EN ISO PEX piping system standards, popular in Europe, Oceania,South America and other areas where European standard is prevailing, while PF5 is dimensionally designed to American ASTM F1807 and ASTM F876/877 PEX piping system standards. 3.1 Fittings available PF1: series: Special tool is not necessary. PF2 series: Special tool is necessary. PF5 series: Special tool is necessary Contact us at: Serivice@rifeng.com page: 4

5 3.2 Tools available Cutter : GJ2-2 Designed for smooth, even cutting, the tool's jaw should fit firmly over the pipe to allow a square, burr-free cut. Expander tool: (KKQ-16, KKQ-20, KKQ25, KKQ-32) The expanding adapter is to expand the pipe end in order to insert the PF2 fitting into the pipe. It s better to expand the pipe end twice. The Axial-pressing Tool: (KYQ-16, KYQ-20,KYQ25, KYQ-32) for PF2 fitting installation Small, light and very handy, complete assortment of Rifeng compression heads, quick and interchangeable 15" Manual pressing crimp: (SYQ2-3/8-3/4 ), for PF5 fitting(copper crimp ring style) installation, including crimp ring and crimp gage. 19" Manual pressing crimp: (SYQ /4 ), for PF5 fitting(copper crimp ring style) installation, including crimp ring and crimp gage. 4. Making a connection IMPORTANT:Rifeng Piping Systems disclaim any responsibility or liability failures due to unauthorized tools,components or fittings application in Rifeng PEX piping system.user can consult us for suitable fittings or tools at service@rifeng.com or by tel: Connecting PF1 screw fittings with Rifeng PEX pipes 1. Cut the pipe vertically with a pipe cutter(gj2-2), make sure to cut in a proper way. Contact us at: Serivice@rifeng.com page: 5

6 2. Choose the correct fitting according to PEX pipe dimension. 3. Slide the compression nut onto the pipe first, then the split ring (pay attention to the direction of nut) 4. Aim and straight push the fitting into the pipe until the pipe reach the end of fitting corner. 5. Screw-tighten the compression nut with the fitting body by hand 6. Screw-tighten the fitting lastly (Spanners are recommended). Contact us at: page: 6

7 4.2 Connecting PF2 axial-press fitting with Rifeng PEX pipes 1, Cut the pipe vertically by PEX pipe cutter(gj2-2), make sure to cut in a proper way. 2, Choose right size of expander head for the expanding adapter. Note: There are different sizes of expander head for pipe and fitting installation in the kit, make sure select the right head before expanding. The two handles of the expander must remain 90-degree open for installing the head. 3, Expand the pipe end a) Slide the fitting sleeve on to the pipe firstly but do not too close to the pipe end which is to be expanded and connected with fitting insert, keep the handles of the expander 90-degree open while fully inserting the expander head into the pipe end. b) Close the handles until they are locked with 30-degree open between them, then return to 90-degree position and pull the head out off the pipe. 4, Installation of fitting a) After expanding the pipe end, fully straight push the fitting insert into the pipe and move the sleeve towards the expanded pipe end position. Contact us at: Serivice@rifeng.com page: 7

8 b) Choose the right size of compression heads for the axialpressing tool and install the heads by following the tool instruction. c) Place the fitting and the sleeve in the compression groove at the right position(as shown from the picture), then close and open up the handles repeatedly along the ratchet bar until the sleeve is stopped by the metal block on the fitting. d) Remove the tool head and check the compressing. 4.3 Connecting PF5 radial-press fittings with Rifeng PEX pipes 1, Cut the pipe vertically by PEX pipe cutter(gj2-2), make sure to cut in a proper way. 2, Choose the right size of fitting and jaw of the crimping tool. Contact us at: Serivice@rifeng.com page: 8

9 3, Slide the copper crimp ring onto the pipe at the open end. then insert the ribbed end of the fitting into the pipe until the pipe reaches the shoulder of the fitting, make sure the insert is completely inside the pipe, and the contact between fitting and pipe is clean and free of impurity. 4 The crimp ring should be positioned on the pipe so the edge of the crimp ring is 1/8 to 1/4 inch(3.2 to 6.4mm)from the end of the pipe. 5. The jaws of the crimping tool should be centered over the crimp ring, and the tool should be held so that the crimping jaws are perpendicular to the axis of the barb. The jaws of the crimping tool should be closed around the crimp ring,compressing the crimp ring onto the pipe. Warning:The crimp ring should not be crimped more than once. Contact us at: Serivice@rifeng.com page: 9

10 Important:Crimping tools should be checked and adjusted before use. Users could make a testing crimp connection and check it with the crimp gage. If the connection is proper, the tool is regarded as good for work. We recommend checking each crimp connection with the Gage. 6. Crimp gage is included in the kit of Rifeng Manual pressing tools(syq2-3/8-3/4 ) and (SYQ /4 ), please see below picture of the gage, and read the note for which section is "Go" Gage or "No-Go" Gage. After making crimp connections, users should use the appropriate opening of this flat "Go/No-Go" Gage to check your finished crimp.if the crmped ring slides into the "Go" slot section,but stops at the scale(see below picture) between "Go"and "No-Go" section,then the pressing is acceptable. If the crimped ring fails to go across the "Go"slot section,or if the crimped ring goes across the scale,the crimped joint must be replaced,additionally,the crimp tool may need adjustment,follow the recommendations of the tool manufacturers. There is a scale on each tooth,each tooth is for one diameter's crimp check. The section below the scale is "Go" area. The section above the scale is "No-Go" area Crimp gage included in the kit of Rifeng Manual pressing tool SYQ2-3/8-3/4 5. Installation The Rifeng PEX Plumbing System is widely used in potable water system, under floor heating system and snow melting system etc. Each of them could be made from Manifold System, Pipe-in-Pipe System etc. Users should read below guidelines. If you have any questions, please do not hesitate to consult us. Contact us at: Serivice@rifeng.com page: 10

11 5.1 Manifold System The basic principle of the Rifeng manifold system is to provide joint free pipe runs from a centrally positioned manifold to each radiator valve or tap or water outlet. The system can be designed with one single pipe dimension from the manifold to the draw-off point, which simplifies design and installation work. With joints only at the manifold and the radiator, taps, the risk of leakage from joints is considerably reduced and there are no connections within the walls. Since also there are no other draw-off points on the same pipe, pressure and temperature variations are minimal when taps are turned on and off. Small pipe diameters and fewer fittings save on installation time and labour costs. 5.2 Pipe-in-corrugated pipe system Rifeng Pipe-in-Corrugated Pipe allows the pipe to be withdrawn and replaced particularly in solid floors or walls. Supplied to site with the pipe already threaded into the corrugated pipe, this system saves time and money on site. Any leakage is retained within the corrugated pipe and can be detected. In addition, in a concealed pipe run without any Tee-joints, an accidentally damaged section of pipe can be withdrawn and replaced whilst minimizing structural damage. 5.3 Fixing the corrugated pipe Corrugated pipe should be properly fixed to simplify any subsequent pipe replacement. Rifeng Pipe-in- Corrugated pipe should be laid with the fewest possible bends and the largest possible bend radii. This will also make it easier to remove the pipe at a later stage if necessary. In concrete structures, corrugated pipes Contact us at: Serivice@rifeng.com page: 11

12 should be fixed to the reinforcing steel with metal or plastic ties. In a floor screed, corrugated pipe should be fixed to the surface of the concrete slab with suitably sized plastic clips. Fixings must not deform or damage the pipe or the corrugated pipe. Where the pipe bends, the Corrugated pipe should be supported using a pipe bend support or fixed at either side of the bend using suitable clips. 5.4 Pipe-in-insulation pipe For those occasions where it is necessary to keep certain temperature or to avoid heat-loss during transport, Rifeng provide Pipe-in-insulation pipe. The coefficient of thermal conductivity of the insulation layer is no more than 0.040W/(m K). The pipe in insulation pipe is not allowed to be withdrawn and replaced as pipe-incorrugated pipe, but is similar in installation, it also should be laid with the fewest possible bends and the largest possible bend radii. To achieve better insulating effect, the insulated pipe should be laid as continuous as possible,and connections should be ensured with insulation too. 5.5 Termination Box Sets The pipe is terminated in the floor or wall and final connection to the radiator is made using a radiator connection pipe. Termination boxes are positioned so the face of the box is at the finished floor level directly below each radiator valve or tap. They are designed so that the joint is accessible and so that the pipe can be removed and replaced without damage to the building structure. Contact us at: Serivice@rifeng.com page: 12

13 5.6 Expansion and Contraction As is common with all plastic materials, Rifeng PEX pipe has a higher coefficient of expansion than metal. This must be considered when installing plastic pipework. All hot water pipes should be laid in soft serpentine bends or with expansion loops to accommodate the expansion. Allow for 1.5% expansion & contraction of the pipe when installed at 20 C for use at 80 C. Contraction or shrinkage up to 1.5% of the pipe length occurs when the pipes have been in use and the temperature and pressure drops. The grip of a correctly installed fitting is greater than that of the shrinkage force, and if the pipe has been installed allowing for expansion, there should be no problem. After about 15 temperature cycles the pipe will stabilize and no more shrinkage will occur. 5.7 Bend pipe with/without Supports Rifeng PEX pipes may normally be bent without the need for any special tool. To make a bend in Rifeng PEX pipe, fix the pipe at one end and gently curve the pipe by hand and fix the pipe at the other end. Use pipe bend supports to hold the pipe in position. The minimum bend radius is given below table and care should be taken not to bend the pipe beyond this radius since this may cause the pipe to kink. Pipes that have been damaged during bending should not be used. Table for bend radius Bend radius Bend radius Dimension Dimension Without support With support Without support With support Bending with support 1 Bending with support 2 Contact us at: Serivice@rifeng.com page: 13

14 5.8 Pipe fixing Rifeng PEX pipes are not self-supporting and should be fixed using pipe clips to provide adequate support whilst allowing for thermal expansion. A certain degree of sagging is to be expected in horizontal pipe runs, this will not affect the performance of the pipe. Rifeng supply a variety of plastic pipe clips to fix Rifeng pipe products into position. U-clip Plastic socket closed/open aluminium socket fixed/slide socket Supports should always be installed at either side of a bend. It is recommended that pipes be supported at not more than 150 mm from connections, junctions, valves and other controls. Additional support must always be provided for pumps and other heavy items. Below table is recommended spacing of fixing points for internal pipework. Table for recommended spacing of fixing points Diameter Horizontal Vertical runs Diameter Horizontal Vertical (mm) rums (mm) (mm) (mm) rums (mm) runs (mm) Pipework Pipes which pass through walls, floors, concrete or brickwork must be protected by a suitable pipe sleeve, such as Rifeng pipe in corrugated pipe. Pipes laid in floors or walls should be run in soft serpentine bends to allow for thermal movement of the pipe. This also applies to pipe-in-corrugated pipe and pipe-in-insulation pipe. Where pipes cross-over, do not allow hot and cold water pipes to come into contact with each other. The relative positions of cold water pipes to hot water pipes should be such that the cold water pipes are not warmed, particularly when pipes are running parallel. Do not allow pipe to make contact with any sharp or abrasive surfaces which could damage the pipe. Pipe at high level or in ceiling voids can be laid on a metal tray which will allow for thermal movement. Caution:Pressure testing should be performed right after piping installation,if there is no leakage found Contact us at: Serivice@rifeng.com page: 14

15 after pressure testing, the piping system can then be buried with concretes,for maximum allowed diameters and shapes of hard blocks which might be included in the burying concretes,please follow local codes or regulations.rifeng Piping Systems expressly disclaim any responsibility or liability for any damage on the established piping system resulting from hard blocks included in buring concretes with exceeding diameters or out-of-regulation sharp shapes. The following pressure testing with water is just for installer s reference,installer can use local installation practices or codes for intallation checking. 6. Test system Hydraulic pressure testing shall be undertaken before the Rifeng PEX pipes system is taken into operation. Hydraulic pressure testing is not a substitute for the correct installation of the PEX pipe and associated fittings. It is essential that the correct size, inserts and fittings are used for the pipe and that thermal movements are taken into account when installing the pipe. The test pressure applied to the system should be 10 bar or 1.5 times of the maximum pressure rating of the lowest rated component in the system.the maximum test pressure applied to Rifeng PEX pipe should not exceed 15 bar at 20 C. Other equipment in the system, such as boilers, valves, etc. should be checked with manufacturer as to their maximum pressure rating before any pressure test of the complete system is performed. A pressure gage must be connected at the lowest point of the installation being tested and a visual inspection of all pipe connections is to be made before pressure testing with water. Vent and fill the system with potable drinking water. Visually inspect the whole system for leaks. Pressurize the installation to a test pressure of not less than 1.5 times the maximum working pressure. The maximum test pressure applied to Rifeng PEX pipe should not exceed 15 bar at 20 C. Apply the test pressure by pumping for a period of 30 times. Inspect for leaks. Reduce the pressure in the pipework by bleeding water from the system to 0.5 times the maximum working pressure. Contact us at: Serivice@rifeng.com page: 15

16 Close the bleed valve. Visually check for leakage and monitor for 90 minutes. If there is no reduction in pressure the system is regarded as leak tight. 7. Pipe line flushing Total system is to be flushed thoroughly as soon as possible after installation of the piping and following the pressure test. To ensure a sufficient flushing effect, this procedure could be based on pulsating flow of water or water and air. Warning: Once the pressure test and flush complete, you should expel water with compressed air. Because the test water might cause freezing or damage of the piping system in winter prior to use. Rifeng Piping Systems claim this Rifeng PEX Piping System Installation Guidelines does not include all cases possibly met during Rifeng PEX piping system s services. If users meet any new case or have any questions on above guidelines, please contact us by service@rifeng.com or by tel: Contact us at: Serivice@rifeng.com page: 16

Engineering Specifications

Engineering Specifications PUREFLOW PEX PRODUCTS PART 1 GENERAL 1.1 SUMMARY 1.1.1 This specification covers Branch & Main, Parallel Water Distribution Systems (MANABLOC), Cross-linked Polyethylene tubing and fittings using PEX Press

More information

www.the Floor Heating Warehouse.co.uk

www.the Floor Heating Warehouse.co.uk www.the Floor Heating Warehouse.co.uk Underfloor Heating Installation Guide (Grundfoss Pump System) General Overview: Our water based underfloor heating system can be installed by your own plumber or heating

More information

Select Radiators Installation Guide

Select Radiators Installation Guide Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall

More information

INSTALLATION INSTRUCTIONS. SharkBite. Connection System. The SharkBite System

INSTALLATION INSTRUCTIONS. SharkBite. Connection System. The SharkBite System INSTALLATION INSTRUCTIONS SharkBite Connection System The SharkBite System The SharkBite connection system uses an advanced push-fit design that works in two stages. When the tube is inserted into the

More information

Qual-PB Polybutylene Plumbing, Central & Underfloor Heating Pipe

Qual-PB Polybutylene Plumbing, Central & Underfloor Heating Pipe CI/SfB (4-) Nh2 CERTIFICATE No. 06/0249 Quality Plastics Ltd., P.O. Box 29, Whites Cross, Cork, Ireland Tel: 021 4884700 Fax: 021 4884701 Qual-PB Polybutylene Plumbing, Central & Underfloor Heating Pipe

More information

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE

More information

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2 STANDARD for Plumbing, Heating, Hot Water, Cold Water & Electrical work undertaken by owners within the building known as Sussex Lodge London W2 & 16 Stanhope Terrace London W2 BPME Consulting Engineers

More information

758 Heavy-duty Ratchet Guy Wire Cutter

758 Heavy-duty Ratchet Guy Wire Cutter INSTRUCTION MANUAL 758 Heavy-duty Ratchet Guy Wire Cutter Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register this product

More information

NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE

NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE B4 NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE AVAILABLE IN CARBON AND STAINLESS STEEL 23 THEORY

More information

60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING

60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING 60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed

More information

BASIC PLUMBING. 2 - Preparation. The simple skills required for basic plumbing are explained in this project.

BASIC PLUMBING. 2 - Preparation. The simple skills required for basic plumbing are explained in this project. BASIC PLUMBING The simple skills required for basic plumbing are explained in this project. It helps to have some metalworking experience. Take care when working with a blowtorch in loft spaces. Be aware

More information

Removing chips is a method for producing plastic threads of small diameters and high batches, which cause frequent failures of thread punches.

Removing chips is a method for producing plastic threads of small diameters and high batches, which cause frequent failures of thread punches. Plastic Threads Technical University of Gabrovo Yordanka Atanasova Threads in plastic products can be produced in three ways: a) by direct moulding with thread punch or die; b) by placing a threaded metal

More information

PEX TUBING FAQ WHAT IS PEX?

PEX TUBING FAQ WHAT IS PEX? PEX TUBING FAQ WHAT IS PEX? Pex is cross-linked polyethylene. Through one of several processes, links between polyethylene macromolecules are formed to create bridges between PE molecules (thus the term

More information

Qual-PEX Plumbing & Heating Pipe

Qual-PEX Plumbing & Heating Pipe Qual-PEX Plumbing & Heating Pipe Crosslinked polyethylene pipe for Hot & Cold Water, Central Heating and Underfloor Heating Systems Light to carry Easy to cut More frost resistant More heat efficient Flexible

More information

Draft Specification PEX tubing. Section 23 83 16. Radiant-Heating Hydronic Piping. (Roth Radiant Heating Systems)

Draft Specification PEX tubing. Section 23 83 16. Radiant-Heating Hydronic Piping. (Roth Radiant Heating Systems) This draft specification is for hydronic radiant heating systems using PEX tubing in slab, floor, wall and ceiling applications, and as distribution piping. Roth Industries supplies these systems under

More information

Installation Instructions 4508 4508S

Installation Instructions 4508 4508S SYMPHONY Spread Lavatory Faucet with Speed Connect Drain Congratulations on purchasing your American Standard faucet with Speed Connect drain, a feature found only on American Standard faucets. Speed Connect

More information

OUTLINE. How PEX pipes are made Capabilities of PEX pipes, standards, testing PEX pipes for Plumbing and other applications

OUTLINE. How PEX pipes are made Capabilities of PEX pipes, standards, testing PEX pipes for Plumbing and other applications PEX Pipes for Plumbing Presented at the 40 th ASPE Convention, Oct 2004 Lance MacNevin, Chair, PPI High Temperature Plastics Division Camille George Rubeiz, P.E., Director of Engineering, PPI OUTLINE How

More information

Die casting Figure M2.3.1

Die casting Figure M2.3.1 Die casting Die casting is a moulding process in which the molten metal is injected under high pressure and velocity into a split mould die. It is also called pressure die casting. The split mould used

More information

PRINETO PE/AL/PEX Plumbing, Central & Underfloor Heating System

PRINETO PE/AL/PEX Plumbing, Central & Underfloor Heating System CI/SfB (4-) Nh2 CERTIFICATE No. 08/0312 IVT GmbH & Co. KG, Gewerbering Nord 5, D 91189 Rohr, Germany. PH. 0049 9876 9786 0 FAX. 0049 9876 9786 90 PRINETO PE/AL/PEX Plumbing, Central & Underfloor Heating

More information

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED. CAST IRON THE BASICS 1. DO NOT LIFT ON YOUR OWN. 2. ONLY LIFT THE RADIATOR VERTICALLY. 3. DO NOT LIFT MORE THAN 8/10 SECTIONS AT ANY ONE TIME. 4. POSITION THE RADIATOR BEFORE FINAL ASSEMBLY. 5. THIS PRODUCT

More information

LK Wallbox UNI Push. Assembly. Only intended for LK PE-X Universal Pipe X.

LK Wallbox UNI Push. Assembly. Only intended for LK PE-X Universal Pipe X. LK Wallbox UNI Push Only intended for LK PE-X Universal Pipe X. LK Wallbox UNI Push 16 Single Article no. 188 06 38 LK Wallbox UNI Push 20 Single Article no. 188 06 39 LK Distance template LK Wallbox UNI

More information

Coolflo Safe Touch Shower Mixing Valve ST20015CP

Coolflo Safe Touch Shower Mixing Valve ST20015CP Coolflo Safe Touch Shower Mixing Valve ST20015CP Installation and Maintenance Instructions In this procedure document we have endeavoured to make the information as accurate as possible. We cannot accept

More information

building applications copper - redefined

building applications copper - redefined building applications copper - redefined copper - redefined The task The development of an innovative tube for the future: economical, environmentally friendly, ecological, completely safe and easy to

More information

W I T H I N J O I ST S I N STA L L AT I ON

W I T H I N J O I ST S I N STA L L AT I ON Radiantec W I T H I N J O I ST S I N STA L L AT I ON I N S TA L L AT I O N S U P P L E M E N T 260 Joists When tubing is placed beneath a joisted floor system, it is weaved between the joists and supported

More information

Green Thread Product Data

Green Thread Product Data Green Thread Product Data Applications Dilute Acids Caustics Produced Water Industrial Waste Hot Water Condensate Return Materials and Construction All pipe manufactured by filament winding process using

More information

STATFlow. Direct-to-Drain System. For use with STATIM 2000 and STATIM 5000 Autoclaves. Installation Guide and Operator s Manual

STATFlow. Direct-to-Drain System. For use with STATIM 2000 and STATIM 5000 Autoclaves. Installation Guide and Operator s Manual STATFlow Direct-to-Drain System For use with STATIM 2000 and STATIM 5000 Autoclaves Installation Guide and Operator s Manual STATFlow Installation Guide and Operator s Manual 95-113193 Rev 2.0. Copyright

More information

Water Underfloor Heating Kit

Water Underfloor Heating Kit Water Underfloor Heating Kit INSTALLATION MANUAL For small & large rooms 50 year pipe warranty CE approved Easy to install SINGLE ROOM SYSTEM INSTALLATION MANUAL Manufactured in Europe! SINGLE ROOM SYSTEM

More information

Qualification Guide. BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation. BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation

Qualification Guide. BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation. BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation Qualification Guide BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation BPEC 600/5270/3 - Level 2 NVQ Diploma in Plumbing and Heating BPEC

More information

THE PUSH-FIT SOLUTION FOR PLUMBING AND HEATING SYSTEMS

THE PUSH-FIT SOLUTION FOR PLUMBING AND HEATING SYSTEMS THE PUSH-FIT SOLUTION FOR PLUMBING AND HEATING SYSTEMS Speedfit Fittings are suitable for use with copper pipe. Included in this leaflet: Product Guide Trade Tips How Speedfit Works Making a Good Connection

More information

Puddle Flange. FRANK Puddle Flange

Puddle Flange. FRANK Puddle Flange Puddle Flange FRANK Puddle Flange The problem Problems keep on occurring when connecting pipes during construction work. Pipes laid in the ground must be introduced into concrete walls or shafts. In many

More information

Chill 4 Hole Bath Shower Mixer

Chill 4 Hole Bath Shower Mixer Chill 4 Hole Bath Shower Mixer Fitting Instructions & Contents List Please keep these instructions for future reference and request of replacement parts Contents Page 1. Introduction 02 2. Safety Note

More information

Metal Pressfitting Pipe Systems

Metal Pressfitting Pipe Systems VdS Guidelines for water extinguishing systems VdS 2100-26-3en Requirements and test methods Part 3: Additional provisions for Pipe Systems made of galvanized steel VdS 2100-26-3en : 2012-04 (01) Publishing

More information

TYPE E Main Valve Sizes 3 /8 through 12

TYPE E Main Valve Sizes 3 /8 through 12 SD 3001F PRINTED IN U.S.A. SD 3001F/0707 A B TYPE E MAIN VALVE C D E TYPE E Main Valve Sizes 3 /8 through 12 The Spence Type E Main Valve is of normally closed, single seat design featuring packless construction,

More information

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant

More information

Solid shape molding is not desired in injection molding due to following reasons.

Solid shape molding is not desired in injection molding due to following reasons. PLASTICS PART DESIGN and MOULDABILITY Injection molding is popular manufacturing method because of its high-speed production capability. Performance of plastics part is limited by its properties which

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

Introduction...3. Types of Plumbing Systems...4. Dos and Don ts for SharkBite PEX Tubing...9 Cross Linking Methods...10 Installation Tips...

Introduction...3. Types of Plumbing Systems...4. Dos and Don ts for SharkBite PEX Tubing...9 Cross Linking Methods...10 Installation Tips... Table of Contents Introduction...3 Features and Benefits of SharkBite Tubing Features and Benefits of SharkBite push-fittings Features and Benefits of Clamp/Barb Systems Types of Plumbing Systems...4 Truck

More information

VdS 2100-09en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS 2100-09en : 2011-05 (01)

VdS 2100-09en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS 2100-09en : 2011-05 (01) VdS Guidelines for water extinguishing systems VdS 2100-09en Requirements and test methods VdS 2100-09en : 2011-05 (01) Publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln,

More information

THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494

THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494 THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494 1. BEFORE YOU BEGIN IMPORTANT INSTRUCTIONS READ AND SAVE FOR THE CONSUMER WARNING: Risk of scalding or other severe injury. Before completing installation,

More information

How to build a Pizza Oven in 4 days

How to build a Pizza Oven in 4 days How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY

More information

Lenntech. 1000 psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503

Lenntech. 1000 psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503 1 User s Guide to: Phoenix Vessel Technology Limited 1000 psi End port pressure vessels 2.5. Model number: 1503 Lenntech info@lenntech.com Tel. +31-152-610-900 www.lenntech.com Fax. +31-152-616-289 Phoenix

More information

Close Coupled & Back To Wall WC Saintaryware. Fitting Instructions

Close Coupled & Back To Wall WC Saintaryware. Fitting Instructions Close Coupled & Back To Wall WC Saintaryware Fitting Instructions Before starting any installation project please consider the following: Prior to drilling into walls, check there are no hidden electrical

More information

Arctic Leash Instruction Manual Alaskan Products Company LLC.

Arctic Leash Instruction Manual Alaskan Products Company LLC. Retractable Cord Reel for Engine Block Heaters Arctic Leash Instruction Manual Alaskan Products Company LLC. INSTALLATION INSTRUCTIONS This instruction manual is a reference guide for installing and operating

More information

EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME 2 ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS

EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME 2 ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS ENGINEERING COMPONENTS EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS Structural members: struts and ties; direct stress and strain,

More information

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S January 2009 Issue 6 Valu Guide Brackets The Ultimate in Adjustability and Cost Savings Valu Guide brackets are part of a family

More information

Gear PEPSI CAN STOVE INSTRUCTIONS

Gear PEPSI CAN STOVE INSTRUCTIONS Gear PEPSI CAN STOVE INSTRUCTIONS [NOTE: Updated Instructions are now available. The new stove is less likely to develop flame leaks and the fuel/air mixture is improved. Instructions for a simmer ring

More information

RayClic Connection System Installation Instructions

RayClic Connection System Installation Instructions F M -W RayClic Connection System Installation Instructions RayClic WARNING: Shock Hazard 718K Pipe Heating Cable with HWAT, IceStop, also Listed De-icing and and XL-Trace heating Snow Melting Equipment

More information

Flanged and Butt-= Weld Type

Flanged and Butt-= Weld Type Document : PG00 Year : 09 Product Group 00 Flanged and Butt-= Weld Type (LNG and LPG) Page 09 Document : PG00 Year : 09 Product Group 00 Cryogenic Butterfly valves The Cryogenic Butterfly Valve Design

More information

Chapter 7 Plumbing Connections

Chapter 7 Plumbing Connections Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions

More information

1 DESCRIPTION OF THE APPLIANCE

1 DESCRIPTION OF THE APPLIANCE 1 DESCRIPTION OF THE APPLIANCE 1.1 INTRODUCTION The cast iron SF boilers are a valid solution for the present energetic problems, since they can run with solid fuels: wood and coal. These series of boilers

More information

1 TON FOLDING CRANE CFC1000

1 TON FOLDING CRANE CFC1000 1 TON FOLDING CRANE CFC1000 OPERATION &MAINTENANCE INSTRUCTIONS 0401 SPECIFICATIONS MAXIMUM SAFE WORKING LOADS (kg) 1 2 3 4 1000 750 500 250 MAXIMUM LIFT HEIGHT - 1920mm HYDRAULIC RAM OIL CAPACITY - 450CC

More information

Guidance Notes For Provision Of Water Expansion For 10 & 15 Litre Unvented Hot Water Heaters

Guidance Notes For Provision Of Water Expansion For 10 & 15 Litre Unvented Hot Water Heaters Guidance Notes For Provision Of Water Expansion For 10 & 15 Litre Unvented Hot Water Heaters When water is heated, it naturally expands and allowance has to be made for this. Vented water heaters usually

More information

Installation guide Nordic mixer taps. Before installing read this guide first

Installation guide Nordic mixer taps. Before installing read this guide first Installation guide Nordic mixer taps Before installing read this guide first Introduction Installation, maintenance and warranty The Nordic Twintaps are our latest innovation for your kitchen a boiling-water

More information

SELECTION, APPLICATION & MAINTENANCE

SELECTION, APPLICATION & MAINTENANCE DIESEL PROTECTION SYSTEMS TPZ Engine Air Intake Shut Down Valves (Combined Automatic Overspeed and Air Pressure Operated Shut Down Bendix Types) SELECTION, APPLICATION & MAINTENANCE Valve Numbers TPZ-101

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

plumbing products guide

plumbing products guide plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly

More information

OD 1401 9 PRECISION MEASURING INSTRUMENTS

OD 1401 9 PRECISION MEASURING INSTRUMENTS SUBCOURSE EDITION OD 1401 9 PRECISION MEASURING INSTRUMENTS PRECISION MEASURING INSTRUMENTS SUBCOURSE OD1401 EDITION 9 Unites States Army Combined Arms Support Command Fort Lee, VA 23801-1809 5 CREDIT

More information

Pipe threads for tubes and fittings where pressure-tight joints are not made on the threads. (requires PTFE sealing tape or liquid sealant).

Pipe threads for tubes and fittings where pressure-tight joints are not made on the threads. (requires PTFE sealing tape or liquid sealant). Fittings for CO 2 Pipe Threads Pipe thread references quoted in this catalogue conform with the requirements specified in the latest issue and amendments of the following ISO Standards: ISO 7-1 (BS21)

More information

SIMPLAIR PIPING. www.irtools.com 1-800-376-TOOL

SIMPLAIR PIPING. www.irtools.com 1-800-376-TOOL SIMPLAIR PIPING INGERSOLL-RAND SIMPLAIR PIPING With push-in fittings and lightweight anodized aluminum pipe, a SimplAir system provides ideal connection throughout your entire air distribution system.

More information

PEX Pipes for Plumbing Applications

PEX Pipes for Plumbing Applications PEX Pipes for Plumbing Applications Introduction How PEX pipes are made Reasons for using PEX systems Industry standards and tests PEX joining systems Code acceptance Design considerations Installation

More information

C I T Y O F S E L M A F I R E D E P A R T M E N T

C I T Y O F S E L M A F I R E D E P A R T M E N T C I T Y O F S E L M A F I R E D E P A R T M E N T Informational Bulletin Regarding Residential Fire Sprinkler Systems for One and Two Family Homes: Frequently Asked Questions ADMINISTRATIVE PROVISIONS:

More information

OWNER S MANUAL Table Tennis Table Patent Pending

OWNER S MANUAL Table Tennis Table Patent Pending OWNER S MANUAL Table Tennis Table Patent Pending Be sure to write your model number and serial number here for future reference. You can find these numbers printed on the bottom of the table. MODEL # T8179

More information

Artisan Thermostatic basin mixer. Fitting Instructions & Contents List

Artisan Thermostatic basin mixer. Fitting Instructions & Contents List Artisan Thermostatic basin mixer Fitting Instructions & Contents List Please keep these instructions for future reference and request of replacement parts 1. Introduction Thank you for choosing Bristan,

More information

Reasons for reissue are in Section 6, REVISION SUMMARY.

Reasons for reissue are in Section 6, REVISION SUMMARY. Figure 1 This instruction sheet covers the application of OPTIMATE FSMA Fiber Optic Connector Types 905 and 906 for data and telecommunications applications. Base part numbers which apply to each type

More information

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS ODEON IN-WALL TANK K-6283K/ K-6284K/ K-6286K Read installation guide in illustration and word file carefully, and install the tank according to instructions in the guide to avoid

More information

*PATENT PENDING. NS1100 / NS2200 Installation Manual & Owner s Guide

*PATENT PENDING. NS1100 / NS2200 Installation Manual & Owner s Guide *PATENT PENDING NS1100 / NS2200 Installation Manual & Owner s Guide Installation Tips Contents 1 Control Panel 1 Spool of Signal Wire 2 Mounting Screws & Drywall Inserts 2 Wire Clips 3 Wire Ties Tools

More information

4-600, 1000 psi. User s Guide to: Phoenix Vessel Technology Limited. End port pressure vessels Model numbers: 1386, 1384.

4-600, 1000 psi. User s Guide to: Phoenix Vessel Technology Limited. End port pressure vessels Model numbers: 1386, 1384. User s Guide to: Phoenix Vessel Technology Limited 4-600, 1000 psi End port pressure vessels Model numbers: 1386, 1384. Phoenix Vessel Technology Limited Unit 2, The Old Bakery, Lower Tuffley Lane, Gloucester

More information

series 5350 5351 Materials Body: 1/2, 3/4 and 1 : dezincification resistant alloy brass EN 12165 CW617N

series 5350 5351 Materials Body: 1/2, 3/4 and 1 : dezincification resistant alloy brass EN 12165 CW617N Pre-adjustable pressure reducing valves with self-contained cartridge - series CCREDITED ISO 9 FM ISO 9 No. CLEFFI / GB replaces / GB Function Pressure reducing valves are devices which, when installed

More information

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk This guide explains how to correctly install our chain link fencing and post system. The guide provides details of the

More information

Polypipe Plumbing & Heating

Polypipe Plumbing & Heating P&HIG1 JAN 2014 EFFECTIVE: 1ST JAN 2014 Polypipe Plumbing & Heating Installation Guide 2014 Contents 03 Introduction Plumbing & Heating Pipes & Fittings 05 Fittings 06 Plumbing and heating pipe 07 Pipe

More information

SELECTION, APPLICATION & MAINTENANCE

SELECTION, APPLICATION & MAINTENANCE DIESEL PROTECTION SYSTEMS SVX-Series Diesel Engine Shut Down Valves (Solenoid Latched Types with Manual Start Override/Emergency Stop) SELECTION, APPLICATION & MAINTENANCE Valve Numbers SVX-340 SVX-350

More information

RayClic Connection System Installation Instructions

RayClic Connection System Installation Instructions RayClic Connection System Installation Instructions Description RayClic-S Splice Kit RayClic-T Tee and End Seal Kit RayClic-X Cross and End Seal Kit These kits are for use with Raychem IceStop, XL-Trace

More information

IMPORTANT DOCUMENTATION DO NOT DISCARD!

IMPORTANT DOCUMENTATION DO NOT DISCARD! PART NO.: 6441-263C SERIES GRT 3 JAW PARALLEL GRIPPERS INFORMATION SHEET IMPORTANT DOCUMENTATION DO NOT DISCARD! Use this information sheet to assist with gripper installation and setup. File with maintenance

More information

Guidelines for Earthquake Bracing Residential Water Heaters

Guidelines for Earthquake Bracing Residential Water Heaters Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the

More information

STABITHERM INSTALLATION & SERVICE BOOKLET

STABITHERM INSTALLATION & SERVICE BOOKLET STABITHERM INSTALLATION & SERVICE BOOKLET TABLE OF CONTENTS Introduction...3 Warranty...3 Product Range and Physical Description...4 Method of Operation...5 Recommended Pressures and Temperatures...6 Flow

More information

Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes

Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes Naue GmbH&Co.KG Quality Control and Quality Assurance Manual For Geomembranes July 2004 V.O TABLE OF CONTENTS 1. Introduction 2. Quality Assurance and Control 2.1 General 2.2 Quality management acc. to

More information

SELECTION, APPLICATION AND MAINTENANCE

SELECTION, APPLICATION AND MAINTENANCE DIESEL PROTECTION SYSTEMS D-Series Engine Automatic Overspeed Shut Down Valves (Spindle Types with Air Pressure and Manual Shut Down Options) SELECTION, APPLICATION AND MAINTENANCE Valve Numbers D92-AP

More information

AMX300 DirectConnect Mixing Valve Kits

AMX300 DirectConnect Mixing Valve Kits AMX300 DirectConnect Mixing Valve Kits INSTALLATION INSTRUCTIONS Tools needed (not supplied) 1. Wrench 2. Pliers Safety Definitions These safety terms identify information you must read. CAUTION Indicates

More information

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE FITTING YOUR KITCHEN GUIDE How to mark out a kitchen PAGE 1 Before starting on the installation, measure 870mm from the lowest point of the floor and mark a datum line around the room to indicate where

More information

building engineering services association specification for: Domestic Heating www.thebesa.com

building engineering services association specification for: Domestic Heating www.thebesa.com building engineering services association specification for: Domestic central Heating installation www.thebesa.com building engineering services association acknowledgments Guide to good practice: Domestic

More information

VW GOLF Mk4 TDI FRONT MOUNTING INTERCOOLER INSTALLATION INSTRUCTIONS

VW GOLF Mk4 TDI FRONT MOUNTING INTERCOOLER INSTALLATION INSTRUCTIONS VW GOLF Mk4 TDI FRONT MOUNTING INTERCOOLER INSTALLATION INSTRUCTIONS Tools required: 10mm/13mm socket and 3/8 drive ratchet with extension Torx T20/25/30 screwdrivers or bits Phillips head screwdriver,

More information

Basic Spring Motor Roller Shades

Basic Spring Motor Roller Shades Comprehensive Roller Shade Installation Guide Basic Spring Motor Roller Shades ATTENTION!!! READ CAREFULLY! This shade has a reliable long-lasting Spring Motor. The Spring Motor must have proper tension

More information

Saferand easierinstallation

Saferand easierinstallation EN 85-07 Saferand easierinstallation IföSigninstallationsystem andifösignbuilt-incistern www.ifosanitar.com/sign Aneffectivesolution withmanyadvantages. Ifö Sign installation system makes life a little

More information

Front Panel Board Cable Replacement Instructions

Front Panel Board Cable Replacement Instructions apple Mac Pro Front Panel Board Cable Replacement Instructions First Steps 1 Shut down computer. Note: Follow these instructions carefully. Failure to do so could damage your equipment and void its warranty.

More information

Alfa Romeo 147 On board instruments installation guide

Alfa Romeo 147 On board instruments installation guide Alfa Romeo 147 On board instruments installation guide Alfa Romeo 147 On board instruments installation guide This guide is describing how I installed oil temperature and oil pressure gauges to my Alfa

More information

TABLE OF CONTENTS. I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2

TABLE OF CONTENTS. I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2 BAL Accu-Slide System I. Table of Contents TABLE OF CONTENTS I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2 II. GETTING STARTED... 5 - Section 2.01: Tools You Will Need... 5 - Section

More information

Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit

Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit Roundhouse Engineering Co. Ltd. Units 6-10 Churchill Business Park. Churchill Road, Wheatley. Doncaster. DN1 2TF. England. Tel. 01302

More information

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL

More information

INSTALLATION INSTRUCTIONS SINGLE CIRCUIT

INSTALLATION INSTRUCTIONS SINGLE CIRCUIT INSTALLATION INSTRUCTIONS SINGLE CIRCUIT Unit 1 79 Friar Street Worcester WR1 2NT Tel: 01905 354 791 Fax: 01905 352 100 E-mail: info@underfloorheatingsystems.co.uk Website: www.underfloorheatingsystems.co.uk

More information

Cooling system components, removing and installing

Cooling system components, removing and installing Engine BHW Cooling system components, removing and installing Page 1 / 24 19-1 Cooling system components, removing and installing Warning! When doing any repair work, especially in the engine compartment,

More information

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final

More information

AISI O1 Cold work tool steel

AISI O1 Cold work tool steel T OOL STEEL FACTS AISI O1 Cold work tool steel Great Tooling Starts Here! This information is based on our present state of knowledge and is intended to provide general notes on our products and their

More information

T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A

T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A T A B L E T 1 1 of 7 Tests & Inspection Cable PCUT & PCUT-A (Table T1) T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A No. Test Scale MOC Requirements G 20:10:001:01 Defined Test

More information

POTABLE PIPING SYSTEM

POTABLE PIPING SYSTEM P R O D U C T I N S TA L L AT I O N G U I D E POTABLE PIPING SYSTEM Designed Especially for Contractors BOW SUPERPEX JANUARY 2008 PRODUCT INSTALLATION GUIDE IMPORTANT NOTICE The information in this manual

More information

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair 49 Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair In this chapter: The Over-the-Post Balustrade System Determining the Rail Centerline Using Rail Bolts Making a Pitch Block Laying Out

More information

Installation Instructions 6028.801

Installation Instructions 6028.801 DAZZLE Installation Instructions 08.80 Spread Lavatory Faucet with Speed Connect Drain* Congratulations on purchasing your American Standard faucet with Speed Connect drain, a feature found only on American

More information

Solar Collector Series. Product List

Solar Collector Series. Product List Solar Collector Series List FULL COLLECTORS (MANIFOLD, TUBES & ROOF FRAME) : CSR00051 Apricus Collector : AP10 10-Way Manifold, 10 Tubes and Standard Roof Frame CSR00052 Apricus Collector : AP20 20-Way

More information