1 ADDENDUM #2 FORMAL BID KITSAP COUNTY PARKS DEPARTMENT LOBE FIELD IMPROVEMENTS PHASE 1 TO: FROM: All Respondents Colby Wattling, Buyer CLOSING DATE: December 16, 2015 at 3:00PM (UNCHANGED) REF NO.: LOBE FIELD IMPROVEMENTS PHASE 1 DATE: December 8, 2015 PROJECT MANUAL ITEMS: A. Section Capital Projects Contract, Page 12, Section 31 Liquidated Damages: Revise One Thousand Five Hundred Dollars ($1,500.00) to read Five Hundred Dollars ($500.00). B. Section Temporary Facilities and Controls, Page 2, Paragraph 2.2.B: Revise to read Existing concession stand toilets may be used during construction at no usage charge. C. Section Temporary Facilities and Controls, Page 3, Paragraph 3.2.B.2: Revise to read At completion of construction, re-stock concession stand consumable supplies equal to the amount in place at the start of construction. Clean concession stand toilets to match condition at the start of construction. D. Section Project Record Documents: Section was not included in original Project Manual. Section is attached to this Addendum. E. Section Chain Link Fences and Gates, Page 6, Paragraph 3.3.K Backstop Netting, Subparagraph 1, revised Tie rope-bound nets to cables to read Secure rope-bound nets to cables to allow nets to slide down the cables for winter storage. F. Section Chain Link Fences and Gates, Page 6, Paragraph 3.3.K Backstop Netting: Add subparagraph 2 as follows: 2. Provide quick disconnect hooks at top of backstop netting to allow netting to be disconnected at the top and slid down the cables and bundled in place for winter storage. PROJECT DRAWING ITEMS A. A21.01 Site Plan: Revise note reading Relocate existing chain link fence as indicated. Reuse components at contractors discretion or provide new. Match existing heights to read Relocate existing chain link fence and netting as indicated. Reuse components at contractor s discretion or provide new. Match existing construction materials and height. B. A23.01 Enlarged Floor Plan and Elevation, Enlarged Floor Plan 1: Add three foot high chain link fence at open end of each dugout area, (1) section 18 feet long at each of the two dugouts. C. A23.01 Enlarged Floor Plan and Elevation, Existing Backstop Elevation 2: Add note per attached sketch. SUBSTITUTION REQUESTS: Section Benches: National Recreation Systems: Accepted Kay Park Recreation: Not Accepted Page 1 of 2

2 Addendum 2 Formal Bid PRE-BID WALK-THROUGH QUESTIONS AND RESPONSES A. Permit who will do this? The Architect will submit for the fence permit. B. Is bonding required? Yes, a Bid Bond and a Performance & Payment Bond is required. This is spelled out in the bid document. C. Are we supposed to take out the existing backstop? Just up to 16 mark. Posts remain. D. Where do we bring in the concrete truck and pour from? The truck will need to come in from field 5 (staff will show you where this is) and down the roadway between fields 3 & 4. The concrete will need to be poured from the asphalt area (near the concession building) and pumped to the field area. E. Will there be water available? Yes, a hose bid is available at the concession stand at no usage charge. Nominal electric power (110 v) for small tools is also available at the concession stand at no usage charge. This is in the bid documents. F. Is there an area where we can clean up after working with concrete? No, you will need to provide this. G. Will we be able to use the existing restrooms or will we need to bring in sani-cans? You will be able to use the restrooms. H. If we are supposed to get this completed in time to get play on the field by February 29th, how much space is needed for this to take place? We will move the practices to a different field. The first game is listed as March 13. We will need the entire infield to be available and in good shape in order to play on this day. We expect the contractor to use plywood to protect the field from damage beyond the actual construction zone. We expect this project to be done prior to this date and for our staff to be able to put in the mound, dish, base paths and warning track, so the end of February is still the date needed for the project to be complete. I. What are liquidating damages expected to be? They will be revised $500 per day. J. Will staff move the irrigation prior to our start date? Yes K. What is the expected day of project start? Soonest the contract can be awarded will be January 18, ATTACHMENTS: A. Section Project Record Documents, 6 pages. B. A23.01 Existing Backstop Elevation 2, 1 page. C. Pre-Bid Walk-though Sign-In Sheet and contact information, 2 pages. There are no other changes to the original specifications other than what is changed by Addendum 1 and 2; Acknowledgement of receipt of this and all ADDENDA are required. END OF ADDENDUM #2 Page 2 of 2

3 SECTION PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for Project Record Documents, including the following: 1. Record Drawings. 2. Record Specifications. 3. Record Product Data. 4. Record Permit and Inspection Documents. 5. Operating and Maintenance Manuals B. Related Sections include the following: 1. Division 1 Section "Closeout Procedures" for general closeout procedures. 2. Divisions 2 through 49 Sections for specific requirements for Project Record Documents of the Work in those Sections. 1.3 SUBMITTALS A. Record Drawings, Specifications, and Operating and Maintenance Manuals: Comply with the following: 1. Initial Submittal: Submit one set(s) of marked-up Record Drawings and Specifications, and one copy of Operating and Maintenance Manual. Architect will review whether general scope of changes, additional information recorded, and quality of notations are acceptable. 2. Final Submittal: Submit one set of marked-up Record Drawings and Specifications, and Operating and Maintenance Manual including each Drawing and Specification section, whether or not changes and additional information were recorded. B. Record Product Data: Provide Record Product Data with each copy of Operation and Maintenance Manuals. PROJECT RECORD DOCUMENTS

4 PART 2 - PRODUCTS 2.1 RECORD DRAWINGS A. Record Prints: Maintain one set of black-line white prints of the Contract Drawings and Shop Drawings. 1. Preparation: Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints. a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later. b. Accurately record information in an understandable drawing technique. c. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations. 2. Content: Types of items requiring marking include, but are not limited to, the following: a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. c. Locations and depths of underground utilities. d. Revisions to routing of piping and conduits. e. Revisions to electrical circuitry. f. Actual equipment locations. g. Duct size and routing. h. Locations of concealed internal utilities. i. Changes made by Change Order or Field Directive. j. Changes made following Architect's written orders. k. Changes made by RFI s. l. Changes made by Supplemental Instructions. m. Addendum. n. Details not on the original Contract Drawings. o. Field records for variable and concealed conditions. p. Record information on the Work that is shown only schematically. q. Depth, location, and type of existing and new underground utilities exposed during the course of this work. 3. Mark the Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, show cross-reference on the Contract Drawings. 4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location. 5. Mark important additional information that was either shown schematically or omitted from original Drawings. PROJECT RECORD DOCUMENTS

5 6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable. B. Format: Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. 1. Record Prints: Organize Record Prints and newly prepared Record Drawings into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets. 2. Identification: As follows: a. Project name. b. Date. c. Designation "PROJECT RECORD DRAWINGS." d. Name of Architect. e. Name of Contractor. 2.2 RECORD SPECIFICATIONS A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications. 1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. 2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected. 3. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made. 4. For each principal product, indicate whether Record Product Data has been submitted in operation and maintenance manuals instead of submitted as Record Product Data. 5. Note related Change Orders, Record Product Data, and Record Drawings where applicable. 6. Changes made by Change Order or Field Directive. 7. Changes made following Architect's written orders. 8. Changes made by RFI s. 9. Changes made by Supplemental Instructions. 10. Addendum. 2.3 RECORD PRODUCT DATA A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal. 1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. PROJECT RECORD DOCUMENTS

6 2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation. 3. Note related Change Orders, Record Specifications, and Record Drawings where applicable. 2.4 MISCELLANEOUS RECORD SUBMITTALS A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference. 2.5 RECORD PERMIT AND INSPECTION DOCUMENTS 2.6 Examples of miscellaneous Record Submittals in this Article include documentation of foundation depths, special measurements, tests and inspections, surveys, mix records, and inspections by authorities having jurisdiction. If necessary, add a list of specific submittals. 2.7 Submit one set of original permit drawings, specifications, permit card, inspection cards, and all inspection reports provided by the Authority Having Jurisdiction, showing Intermediate and Final Inspection sign-off s. Obtain and provide final Occupancy Permit. Provide inspection cards and documents in 3-ring binder as described in Division 1 Operating and Maintenance Data. 2.8 OPERATING AND MAINTENANCE MANUALS A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain the following materials, in the order listed: 1. Title page. 2. Table of contents. 3. Manual contents. B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information: 1. Subject matter included in manual. 2. Name and address of Project. 3. Name and address of Owner. 4. Date of submittal. 5. Name, address, and telephone number of Contractor. 6. Name and address of Architect. PROJECT RECORD DOCUMENTS

7 C. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual. D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder. 1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets. a. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number/total number for multiple-volume sets, i.e. Volume 1 of Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual. 3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment. 4. Supplementary Text: Prepared on 8-1/2-by-11-inch white bond paper. 5. Provide Record Product Data in each section of manual. 6. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text. a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts. b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations. PART 3 - EXECUTION 3.1 RECORDING AND MAINTENANCE A. Recording: Maintain one copy of each submittal during the construction period for Project Record Document purposes. Post changes and modifications to Project Record Documents as they occur; do not wait until the end of Project. B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field office apart from the Contract Documents used for construction. Do not use Project Record Documents for construction purposes. Maintain Record Documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to Project Record Documents for Architect's reference during normal working hours. PROJECT RECORD DOCUMENTS

8 C. Provide Transmittals with Project Name and Number for all Record Document submittals. END OF SECTION PROJECT RECORD DOCUMENTS

9 7'-6"+/- 5'-6"+/- 24'-6" 8'-6"+/- 10'-6"+/- REMOVE ALL FENCE FABRIC, PROVIDE NEW FENCE POSTS AND TOP RAIL TO SUPPORT NEW NETTING NEW NETTING UP TO 16"-0" HIGH +/- +/- +/- +/- 30' +/- +/- +/- +/- +/- BACKSTOP AREA REMOVE (2) ROWS OF FENCE PIPE MIDRAIL AT APPROXIMATELY 3.5' AFF AND 7' AFF REMOVE ALL FENCE FABRIC AND BACKSTOP MATERIAL UP TO 16 FEET. SECURE NEW BACKSTOP NETTING TO EXISTING RAIL AT 16 FEET. EXISTING FENCE FABRIC ABOVE 16 FEET REMAINS EXISTING BACKSTOP ELEVATION 2 2 NTS

10

11

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RFP #2016-02 REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES FOR SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RELEASE DATE: January 29, 2016 DUE DATE: February

More information

SECTION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

LANSING COMMUNITY COLLEGE 14205.00 TLC BUILDING SERVER ROOM UPGRADES SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

LANSING COMMUNITY COLLEGE 14205.00 TLC BUILDING SERVER ROOM UPGRADES SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1. SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings,

More information

SECTION 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

SECTION 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY SECTION 28 05 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections, apply

More information

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected

More information

Houston ISD Deadly Middle School RR Renovations- Phase 3 VCS Architects, LLC

Houston ISD Deadly Middle School RR Renovations- Phase 3 VCS Architects, LLC SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. Use Charges: Installation and removal of and use charges for temporary facilities shall be included in the

More information

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851 FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104

From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104 MAHLUM SECTION 00 91 11 ADDENDUM No.1 Date: June 15, 2012 From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104 NOTICE TO ALL CONTRACTORS, SUBCONTRACTORS, AND SUPPLIERS This

More information

SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. Regulations: Comply with industry standards and applicable laws and regulations of authorities

More information

PROJECT MANUAL INCLUDING SPECIFICATIONS FOR OXNARD SCHOOL DISTRICT EDUCATIONAL SERVICE CENTER DATA ROOM ALTERATION. Oxnard, CA

PROJECT MANUAL INCLUDING SPECIFICATIONS FOR OXNARD SCHOOL DISTRICT EDUCATIONAL SERVICE CENTER DATA ROOM ALTERATION. Oxnard, CA PROJECT MANUAL INCLUDING SPECIFICATIONS FOR OXNARD SCHOOL DISTRICT Oxnard, CA Client Project Number: ARCHITECT MVE INSTITUTIONAL, INC. 3 MacArthur Place, Suite 850 Santa Ana, CA 92707 Telephone: 949.809.3380

More information

SUBSTITUTION PROCEDURES 01 62 04-1

SUBSTITUTION PROCEDURES 01 62 04-1 Section 01 62 04 Substitution Procedures PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.2 SUBSTITUTIONS 1. Administrative and procedural requirements for substitutions. A. Base Bid shall be in accordance

More information

Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES A. The Owner will contract separately and directly for the majority of the commissioning work

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015 Fairfield Center School Kitchen and Bathroom Renovation Project Specifications Owner: Fairfield Center School, 57 Park Street, Fairfield VT 05455 Franklin Central Supervisory Union, 28 Catherine Street,

More information

CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES

CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES CITY OF BELL 6330 PINE AVENUE BELL, CA 90201 PH: (323) 588-6211 FAX: (323) 771-9473 CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES I. INTRODUCTION City of Bell

More information

ADDENDUM NO. 2 TO PROJECT NO. 43153

ADDENDUM NO. 2 TO PROJECT NO. 43153 ADDENDUM NO. 2 TO PROJECT NO. 43153 CONSTRUCTION WORK, MECHANICAL WORK, PLUMBING WORK, ELECTRICAL WORK PROVIDE VISITOR CENTER BUILDING AND SITE IMPROVEMENTS FIVE RIVERS ENVIRONMENTAL EDUCTION CENTER 56

More information

Suffolk County Department of Health Services. Division of Environmental Quality

Suffolk County Department of Health Services. Division of Environmental Quality Suffolk County Department of Health Services Division of Environmental Quality Guidelines For the Construction of Storage Areas for Portable Containers ~~~~ Clare B. Bradley, M.D., M.P.H. Suffolk County

More information

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows: Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 14-MC-2194 ADDENDUM NUMBER ONE January 24, 2014 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES AGREEMENT FOR PROFESSIONAL DESIGN SERVICES This Professional Design Services (this "Agreement"), made as of 20 by and between the University of Cincinnati (the "University") by the Division of Administration

More information

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 PERMIT AUTHORIZATION EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 El Lago ordinances require the issuance of building permits as a method of enforcing code minimums, ensuring

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

Florida s Turnpike Enterprise (FTE) Shop Drawing Review Process for Design Bid Build (Conventional) Projects

Florida s Turnpike Enterprise (FTE) Shop Drawing Review Process for Design Bid Build (Conventional) Projects General: Florida s Turnpike Enterprise (FTE) Shop Drawing Review Process for Design Bid Build (Conventional) Projects The information outlined within this document, depicts a portion of Florida s Turnpike

More information

OCFRD TENT STANDARD 6000. This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.

OCFRD TENT STANDARD 6000. This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes. 1. Authority Orange County Fire Rescue Department Tents & Membrane Structures Office of The Fire Marshall - 109 E. Church Street, Lower Level - Orlando, Florida 32801-3319 Phone: 407-836-0004 Fax: 407-836-8310

More information

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents and Prior Addenda if any, as identified above.

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents and Prior Addenda if any, as identified above. To: All Vendors Bidding on The College of New Jersey Security Cameras Phase III From: Roselle Horodeski Finance and Business Services Date: April 10, 2015 ADDENDUM NO. 1 ISSUE DATE: April 10, 2015 REFERENCE:

More information

CSTM 102 Spring 2013. Construction Documents to Contract Documents

CSTM 102 Spring 2013. Construction Documents to Contract Documents CSTM 102 Spring 2013 Construction Documents to Contract Documents The Construction Industry THE PROJECT TEAM A Project and a Client A Designer Constructors THE GAME PLAN Risk Management Scope of Work The

More information

Project Implementation Guide for CT, PET/CT, X-Ray, and Nuclear Systems

Project Implementation Guide for CT, PET/CT, X-Ray, and Nuclear Systems GE Healthcare Project Implementation Guide for CT, PET/CT, X-Ray, and Nuclear Systems Working together to get your new technology online so you can begin providing patient care. Table of Contents Table

More information

General Fire Code Requirements Within Commercial Tenant Spaces

General Fire Code Requirements Within Commercial Tenant Spaces FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding

More information

Close-Out Documents... 9

Close-Out Documents... 9 Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter

More information

MASTER AGREEMENT CONSTRUCTION MANAGEMENT SERVICES

MASTER AGREEMENT CONSTRUCTION MANAGEMENT SERVICES MASTER AGREEMENT CONSTRUCTION MANAGEMENT SERVICES This Master Agreement made this 11 day of December, 2012, by and between the St. Lucie County School Board (hereinafter referred to as the School Board

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION 01000 - SPECIAL PROVISIONS

DIVISION 1 - GENERAL REQUIREMENTS SECTION 01000 - SPECIAL PROVISIONS TEMPO PARK IMPROVEMENTS PROJECT # 2012-3-4202-86 1.01 SCOPE OF WORK DIVISION 1 - GENERAL REQUIREMENTS SECTION 01000 - SPECIAL PROVISIONS The Contractor shall perform, furnish and complete the following

More information

REQUEST FOR PROPOSAL FOR: Fire and Security Alarm Service and Monitoring

REQUEST FOR PROPOSAL FOR: Fire and Security Alarm Service and Monitoring MCC13-04 REQUEST FOR PROPOSAL FOR: Fire and Security Alarm Service and Monitoring Manchester Community College PURPOSE: The purpose of this REQUEST FOR PROPOSAL is to establish a contract for Manchester

More information

Page 1 of 3. This alternate has been removed from the scope of work.

Page 1 of 3. This alternate has been removed from the scope of work. Mecklenburg County Customer Service Center and Office Renovation PreBid Requests for Information #1 August 13, 2015 Number Request Answer 1 Per Specification 012300 there is an Alternate 01A to provide

More information

PLANNING TOOL FOR FUTURE LEAGUE NEEDS

PLANNING TOOL FOR FUTURE LEAGUE NEEDS Facility surveys may also be entered online at: http://facilitysurveymuscocom LITTLE LEAGUE BASEBALL & SOFTBALL NATIONAL FACILITY SURVEY 2016 District #: (if needed) (if needed) City: State: President:

More information

REQUEST FOR PROPOSAL FOR MAR K E T ING SERVICES FOR. CIT Y AND COUNT Y OF DE NV E R Acting by and thr ough the M ayor s Office

REQUEST FOR PROPOSAL FOR MAR K E T ING SERVICES FOR. CIT Y AND COUNT Y OF DE NV E R Acting by and thr ough the M ayor s Office REQUEST FOR PROPOSAL FOR MAR K E T ING SERVICES FOR CIT Y AND COUNT Y OF DE NV E R Acting by and thr ough the M ayor s Office Date of I ssuance: M ar ch 22, 2012 Advertisement and Notice of Invitation

More information

City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement

City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement City of Balch Springs, Texas Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement Balch Springs is a city in Dallas County, Texas, United States. It is a suburb of Dallas and part

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

EXAM GUIDE. Construction Documents & Services

EXAM GUIDE. Construction Documents & Services RE EXAM GUIDE Construction Documents & 2 Knowledge / 3 5 Choice Answers 15 16 Sample Passing Solution 18 Sample Failing Solution 19 20 Copyright 2015 This document, effective August 2015, supersedes all

More information

One-third of all fatalities in the U.S. construction

One-third of all fatalities in the U.S. construction Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations

More information

Document A312" 2010. of business) OWNER'S REPRESENTATIVE: (Architect, Engineer or other party:) 500 North Main Street Monroe, North Carolina 28112

Document A312 2010. of business) OWNER'S REPRESENTATIVE: (Architect, Engineer or other party:) 500 North Main Street Monroe, North Carolina 28112 Document A312" 2010 Payment Bond CONTRACTOR: (Name, legal status and address) OWNER: (Name, legal status and address) Union County 500 North Main Street Monroe, North Carolina 28112 CONSTRUCTION CONTRACT

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Construction Management At-Risk

Construction Management At-Risk Oconee County Schools P.O. Box 146, 34 School Street Watkinsville, GA 30677 706-769-5130 706-769-3513 REQUEST FOR PROPOSALS ISSUE DATE: March 10, 2016 RFP REF: Construction Management At-Risk Construction

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the th day of in the year 2014 (In words, indicate day, month and year.) BETWEEN the Architect s client

More information

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION REQUEST FOR PROPOSAL For MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES For VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION CITY OF ROCHESTER November 2009 TABLE OF CONTENTS GENERAL INFORMATION

More information

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT ATTACHED ARE THE REQUIREMENTS FOR OBTAINING A BUILDING PERMIT INCOMPLETE SUBMISSIONS WILL BE RETURNED IN THEIR ENTIRETY -- NO EXCEPTIONS!!

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

Addendum Number 1 Request for Bids #15-004 BUD BENDER PARK REHABILITATION PROJECT City Project No. CB 1302

Addendum Number 1 Request for Bids #15-004 BUD BENDER PARK REHABILITATION PROJECT City Project No. CB 1302 Addendum Number 1 Request for Bids #15-004 City Project CB 1302 To all prospective bidders under specifications for Request for Bids #15-004, the Bud Bender Park Rehabilitation Project, City Project CB

More information

REQUEST FOR QUOTATION Goods and Services. Detwiler Golf Course Club House. Re-Roof Project. Purchase Requisition Number 10001195

REQUEST FOR QUOTATION Goods and Services. Detwiler Golf Course Club House. Re-Roof Project. Purchase Requisition Number 10001195 City of Toledo One Government Center 640 Jackson Street Toledo, Ohio 43604 REQUEST FOR QUOTATION Goods and Services Detwiler Golf Course Club House Re-Roof Project Purchase Requisition Number 10001195

More information

DOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle

DOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle DOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) 1.1 PROJECT INFORMATION A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle B. Owner: Brownsville Housing Finance Corporation.

More information

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal.

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal. Addendum #1 Fire Damage Repairs 4316 City View Terrace, Units A and B City View Terrace, OH5-13C, AMP 4 IFB #14-03 October 23, 2014 Greater Dayton Premier Management 400 Wayne Ave. Dayton, Ohio 45410 This

More information

Project Implementation Guide for Interventional Systems

Project Implementation Guide for Interventional Systems GE Healthcare Project Implementation Guide for Interventional Systems Working together to get your new technology online so you can begin providing patient care. Table of Contents Table of Contents...

More information

SECTION 013200a - CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 013200a - CONSTRUCTION PROGRESS DOCUMENTATION SECTION 013200a - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 Related Documents A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

ADDENDUM #1 Bid # 14021

ADDENDUM #1 Bid # 14021 DATE: February 20, 2014 TO: ALL PLAN HOLDERS FROM: Jay Hummel, Project Engineer SUBJECT: Addendum #1 to Sewer Lake Line Replacement at Meydenbauer Bay The enclosed changes and/or additions are hereby made

More information

ADDENDUM NUMBER ONE (1)

ADDENDUM NUMBER ONE (1) Page 1 of 1 MINNESOTA DEPARTMENT OF TRANSPORTATION Office of Maintenance: Building Services Section ADDENDUM NUMBER ONE (1) ADDENDUM DATE: 19 October 2012 Request for Proposals for Designer Selection for

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum No.

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum No. Charles H. Cross III, AIA, NCARB, LEED AP Charles Cross Architecture, PC Renovations for a New 18 Bed Gero-Psych Nursing Unit Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum

More information

GUIDANCE AND MODEL LANGUAGE

GUIDANCE AND MODEL LANGUAGE Document A503 2007 Guide for Supplementary Conditions INTRODUCTION Purpose of This Guide Arrangement of This Guide How to Use This Guide Choice of Location for Contract Provisions Modifications to the

More information

IRRIGATION PUMPING Table of Contents - Section 900

IRRIGATION PUMPING Table of Contents - Section 900 IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS

More information

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

CITY OF SELMA, TEXAS Inspection Checklist: Commercial Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Part I: Proposal Information A. General Information The Berwick Area School District is soliciting proposals for construction management services

More information

Department of Community Affairs FLORIDA BUILDING COMMISSION 2555 Shumard Oak Boulevard Tallahassee, Florida 32399-2100

Department of Community Affairs FLORIDA BUILDING COMMISSION 2555 Shumard Oak Boulevard Tallahassee, Florida 32399-2100 Department of Community Affairs FLORIDA BUILDING COMMISSION 2555 Shumard Oak Boulevard Tallahassee, Florida 32399-2100 NOTICE TO WAIVER APPLICANTS Please make certain you comply with the following: The

More information

SECTION 33 12 19 FIRE HYDRANTS

SECTION 33 12 19 FIRE HYDRANTS SECTION 33 12 19 FIRE HYDRANTS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals.

More information

Automatic Fire Sprinkler Submittal Requirements

Automatic Fire Sprinkler Submittal Requirements Automatic Fire Sprinkler Submittal Requirements All commercial and industrial buildings with a total floor area of 5000 sq. ft. shall have an approved automatic sprinkler system installed. The Windsor-Severance

More information

Residential Building Permit Process

Residential Building Permit Process Residential Building Permit Process Planning and Economic Development Department Development Services Division INTRODUCTION The City of Tulsa is committed to economic development and to being a helpful

More information

Volume II- Project Development Processes

Volume II- Project Development Processes Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required

More information

CSC-DIVISION 1-MASTER SECTIONS Description

CSC-DIVISION 1-MASTER SECTIONS Description CSC-DIVISION 1-MASTER SECTIONS Description 01 11 00 Summary of Work by Consultant 01 12 00 Multiple Contract Summary by Consultant 01 14 00 Work Restrictions see below 01 21 00 Allowances by Consultant

More information

Request for Qualifications 2015-162

Request for Qualifications 2015-162 Kitsap County Human Services Department Request for Qualifications 2015-162 Architectural and Project Management Services - Kitsap County Work Release Facility Remodel Response Deadline: November 17, 2015

More information

CONSTRUCTION MANAGER-AT-RISK AGREEMENT. between. Houston Independent School District. and. [insert legal name of firm] for

CONSTRUCTION MANAGER-AT-RISK AGREEMENT. between. Houston Independent School District. and. [insert legal name of firm] for DRAFT CONSTRUCTION MANAGER-AT-RISK AGREEMENT between Houston Independent School District and [insert legal name of firm] for [insert name of school or project] CONSTRUCTION MANAGER-AT-RISK AGREEMENT TABLE

More information

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project DOCUMENTS For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project February 11, 2013 OWNER Sandy Suburban Improvement District 8855 South 700 West Sandy, UT 84070

More information

Contractor Information 2011

Contractor Information 2011 Contractor Information 2011 The City of Dillon strives to make working in our community a pleasant experience. We are quite eager to assist contractors in the growth, development, and renovation of our

More information

A. Shop Drawing submittals shall include, but not be limited to, the following:

A. Shop Drawing submittals shall include, but not be limited to, the following: SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical

More information

MANAGING THE PROJECT RECORD

MANAGING THE PROJECT RECORD MANAGING THE PROJECT RECORD Project Record Filing System 2 Agency Submittals 2 Site Acquisition 3 Planning 3 Pre-Qualification of Bidders 3 Bidding 4 Construction 4 Inspection 4 Legal 5 Contracts 5 Accounting

More information

All other provisions of the contract documents, plans and specifications shall remain unchanged.

All other provisions of the contract documents, plans and specifications shall remain unchanged. B. Supplementary Conditions a. Reference Page CS-5, Section 11.0 Insurance, Section C3.3-11 Insurance Item c.7: Delete paragraph and replace with the following: Environmental Impairment Liability Coverage

More information

UNO CHARTER SCHOOL NETWORK ( UNO-CSN ) Invitation for Bids ( IFB ) for ELECTRICAL UPGRADES

UNO CHARTER SCHOOL NETWORK ( UNO-CSN ) Invitation for Bids ( IFB ) for ELECTRICAL UPGRADES UNO CHARTER SCHOOL NETWORK ( UNO-CSN ) Invitation for Bids ( IFB ) for ELECTRICAL UPGRADES All Bids must be sent electronically to: ucsnbidresponse@unocharterschools.org All communications should be addressed

More information

Building Permits Permit Counter

Building Permits Permit Counter Building Permits Permit Counter APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy of

More information

SECTION 00100 NOTICE TO BIDDERS IVY TECH COLLEGE OF INDIANA NMC INFRASTRUCTURE IMPROVEMENTS INDIANAPOLIS, INDIANA

SECTION 00100 NOTICE TO BIDDERS IVY TECH COLLEGE OF INDIANA NMC INFRASTRUCTURE IMPROVEMENTS INDIANAPOLIS, INDIANA Ivy Tech Community College of Indiana, hereinafter referred to as the Owner, furnishes the following information and special instructions to prospective Bidders desiring to submit Bids for the Work on

More information

E-Version SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT

E-Version SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL 1.1. SCOPE OF WORK A. Under this item the Contractor shall furnish and install a sodium hypochlorite solution metering system complete with all accessories

More information

2014 Inlet Rehab Project II Various Locations

2014 Inlet Rehab Project II Various Locations 2014 Inlet Rehab Project II Various Locations in the City of Sioux Falls, South Dakota Bid Request No. 14-1078 Prepared by: Engineering Division 224 West 9 th Street Sioux Falls, SD 57104 TABLE OF CONTENTS

More information

Lake County EOC. Vendor Quotes for Lightning Protection

Lake County EOC. Vendor Quotes for Lightning Protection Lake County EOC Vendor Quotes for Lightning Protection January 18, 2012 Electric Services Attn: Debbie Sutton Project: Subject: Lake County Emergency Communications & Operations Center Tavares, FL Lightning

More information

Document Comparison. AIA Documents A134 2009 and A131CMc 2003

Document Comparison. AIA Documents A134 2009 and A131CMc 2003 Document Comparison AIA Documents A134 2009 and A131CMc 2003 AIA Document A134 2009 is in the right-hand column. Corresponding sections of AIA Document A131 CMc 2003 are in the left-hand column. Sections

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA. 1. There is verbiage in the hazardous material report referring to a state licensed abatement contractor. Within the recommendations part of the report (page 64 of 111 of the specification pdf) is the

More information

Contractor s Guide. April 2016

Contractor s Guide. April 2016 Contractor s Guide April 2016 The Minnesota Housing Finance Agency does not discriminate on the basis of race, color, creed, national origin, sex, religion, marital status, status with regard to public

More information

NOTICE INVITING BIDS. CIVIC FACILITIES AIR CONDITIONING REPLACEMENT PROJECT, CIP No. 14 03

NOTICE INVITING BIDS. CIVIC FACILITIES AIR CONDITIONING REPLACEMENT PROJECT, CIP No. 14 03 NOTICE INVITING BIDS CIVIC FACILITIES AIR CONDITIONING REPLACEMENT PROJECT, CIP No. 14 03 PUBLIC NOTICE IS HEREBY GIVEN that the City of National City, hereinafter referred to as the Agency, invites sealed

More information

RURAL UTILITIES SERVICE

RURAL UTILITIES SERVICE Rural Development United States Department of Agriculture RURAL UTILITIES SERVICE RUS Bulletin 1738-2 Rural Broadband Access Loan and Loan Guarantee Advance and Construction Procedures Guide Page 1 According

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

SECTION 22 42 00 COMMERCIAL PLUMBING FIXTURES

SECTION 22 42 00 COMMERCIAL PLUMBING FIXTURES SECTION 22 42 00 COMMERCIAL PLUMBING FIXTURES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

SITE SPECIFIC FALL PROTECTION PLAN

SITE SPECIFIC FALL PROTECTION PLAN 1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING

More information

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015 Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015 For PROJECT : Renovation and Repair of Atlanta Jewish Academy

More information

G-704-0 SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years

G-704-0 SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years LAST REVIEW DATE: REVIEW CYCLE: 1/15/14 5 Years SPECIFICATION: TITLE: VOLUME: G-704-0 3 and Gas Yellow Book REVISIONS: (See ) 1) This specification is being issued for the first time. G-704-0 Gas Operations

More information

ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS

ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS 1.0 GENERAL INFORMATION Structural Interior Design includes all building related elements and components generally part of the building itself,

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) For the Project: CITY OF KATY NEW KATY FIRE STATION #2 Issued: August 13, 2015 Katy Fire Station #2 August 13, 2015 Page 1 of 17 Request

More information

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table

More information