Project reports and reviews in FP6
|
|
|
- Lionel Lee
- 9 years ago
- Views:
Transcription
1 Project reports and reviews in FP6 Zoe Ketselidou IST Operations NCP meeting Brussels, 8 March 2005
2 Periodic reporting At the end of each reporting period 1. Periodic activity report (overview of progress) 2. Periodic management report (financial data) 3. Periodic report on the distribution of the Community contribution between contractors 4. Planning for next 18 months (IPs and NoEs only) For the first reporting period, this covers months Supplementary reports 2
3 Periodic reporting (cont) At the end of the 1st reporting period only 6. Interim Science & Society questionnaire (all) 7. Interim questionnaire on the implementation of the Gender Action Plan (IPs and NoEs only) 8. Interim questionnaire on Workforce statistics (all except IPs and NoEs) 9. Interim Socio-economic questionnaire (all) As specified in Annex I 10.Interim activity reports 11.Deliverables 3
4 Activity report Publishable executive summary (free layout) Section 1 Project objectives and major achievements Section 2 Workpackage progress Section 3 Consortium management Section 4 Other issues Annex Plan for using and disseminating the knowledge (stand-alone alone part of the report) 4
5 Management report Section 1 Justification of resources and major costs Major cost items: no official definition exists Overview of budgeted vs actual costs Overview of budgeted vs actual person-months Section 2 Form C Financial statement (plus audit certificate, if required) Section 3 Summary financial report The overview tables of Section 1 of the Management report should be linked to the t status of each WP in Sections 2 and 3 of the Activity report and vice versa 5
6 Tabular overview of costs and resources Requested in Section 1 of the Management report Examples provided in App 2 of the Reporting guidelines Consortia are encouraged to use their own management tables (nevertheless, the example templates are now available in Word format on Cordis) Cost budget follow-up table Budgeted vs actual costs by contractor and by major cost item AC contractors must indicate all their costs incurred for the period (not just the additional eligible costs reported in Form C), Art II.24.d Person-month status table Budgeted vs actual person-months by contractor and by WP AC contractors must identify all resources employed for the period, Art II.24.d 6
7 Submission Within 45 days from the end of the reporting period For final activity and management reports may be extended to 90 days, if requested For the final report on the distribution of the Community contribution 60 days after receipt of final payment Interim reports and deliverables must be submitted at the periods indicated in Annex I 7
8 Submission (cont) All reports (incl( Form C) and deliverables must be submitted both on paper (1 copy) and electronically Exception: for audit certificates only a paper copy is requested Signatures (when needed) only on paper copy Delivery date: time of arrival of the paper version of the complete set of reports 8
9 Project reporting guidelines Reporting guidelines (current version of October 2004) available at: doc.htm#reporting Excel templates provided for all financial forms To be replaced soon by the Form C editor Example templates in Word provided for the overview tables No standard template for reports and deliverables Questionnaires The on-line tool (called SESAM) still under preparation. If not ready in time for the first periodic reporting, consortia are not required to complete the questionnaires (unless otherwise instructed by the PO) 9
10 Periodic project reviews 10
11 Periodic project reviews Definition: Assessment of project reports and deliverables by the Commission at the end of a reporting period, with the assistance of independent experts (reviewers), if needed Independent reviewers mandatory for the reviews of IPs & NoEs The contractors may refuse one or several experts on grounds of commercial confidentiality The review should take place when all periodic reports and deliverables have been received by the Commission (incl( financial forms) 11
12 Subject of reviews Fulfilment of workplan / deliverables / objectives Planning for next period (18 months for IPs and NoEs) Plan for using and disseminating the knowledge Management Necessity of resources Economy and necessity of costs Continued relevance 12
13 Possible review outcomes Approval of reports and deliverables and continuation of the project (with minor modifications, if any) Request for resubmission of reports and completion of work or additional work, if needed Re-negotiation of the work for next period (exceptionally combined with a suspension) Termination NoEs: : the Commission may propose to the consortium to choose between 1-yr continuation w/o pre-financing, subject to a new review or termination 13
14 Reminders The Commission is not obliged to follow the recommendations of the independent experts IPs and NoEs: : As soon as the plan for the next 18 months is approved by the Commission, the coordinator must submit in writing a request for amendment in order to update Annex I. When approved, the plan will be effective retroactively as of the first day of the next reporting period. However, during the time lapse between the end of the reporting period and the approval of the amendment request, the existing contract and its annexes will apply. 14
15 Timeline for periodic project reviews End of reporting period Submission of reports and deliverables Approval of reports and deliverables Tacit approval of periodic activity report Payment Max 45 days Normally max 45 days Max 90 days Max 45 days 15
Project reporting in FP6
Guidance notes for Integrated Projects, Networks of Excellence, Specific Targeted Research or Innovation Projects, Coordination Actions, Specific Support Actions, Co-operative Research Projects and Collective
Negotiations feedback for successful project preparation. ERANIS workshop, 27.11.2007, Minsk
Negotiations feedback for successful project preparation Negotiations procedure Feedback from the Commission on the project plan issues that need to be explained in more detail Request to formulate Annex
PRIORITY 2 INFORMATION SOCIETY TECHNOLOGIES (IST) FREQUENTLY ASKED QUESTIONS on Project management in FP6
PRIORITY 2 INFORMATION SOCIETY TECHNOLOGIES (IST) FREQUENTLY ASKED QUESTIONS on Project management in FP6 March 2005 Evolution of the consortium 1. If a sum has been allocated within the budget for new
Project management in FP7. Gorgias Garofalakis ETAT S.A.
Project management in FP7 Gorgias Garofalakis ETAT S.A. The whole process EU FP7 Project Project idea Proposal writing Evaluation Negotiations Project implementation Contact with partners after the evaluation
MANUAL FOR THE EURO-HEALTHY
MANUAL FOR THE EURO-HEALTHY INTERNAL AND PERIODIC PROJECT MONITORING AND REPORTING Coimbra, May, 2015 EURO-HEALTHY project has received funding from the European Union s Horizon 2020 research and innovation
Guidelines for reporting. for Accompanying Measures. implemented as. Specific Support Action
SIXTH FRAMEWORK PROGRAMME Research Infrastructures Action Guidelines for reporting for Accompanying Measures implemented as Specific Support Action This document can be found on the INTERNET at the following
Project deliverables and reviews
Project deliverables and reviews Angelo Marino REA.S.3 3 May 2012 Reporting requirements Periodic report (within 60 days after end of each reporting period) Final report (within 60 days after end of project)
Administrative + Management Aspects. EU - Framework Programme 7. Grant Agreement: Acronym FMT-XCT Project Kick-off Meeting, 14.05.
Administrative + Management Aspects EU - Framework Programme 7 Grant Agreement: Acronym FMT-XCT Project Kick-off Meeting, 14.05.2008 Dr. Jürgen Ertel Department Program Planing and Management Head of Project
FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Contractual and Financial issues
National Documentation Center (EKT/NHRF) FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Contractual and Financial issues Maria Samara, Administrative
Guidance notes and templates for Project Technical Review involving Independent Expert(s)
Guidance notes and templates for Project Technical Review involving Independent Expert(s) FP7 Collaborative Projects, Networks of Excellence, Coordination and Support Actions Version 18/12/2007 Disclaimer
Guide to Financial Issues relating to FP7 Indirect Actions
Guide to Financial Issues relating to FP7 Indirect Actions Version 3/10/2014 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are
Guidance notes and templates for Project Technical Review involving Independent Expert(s)
Guidance notes and templates for Project Technical Review involving Independent Expert(s) FP7 Collaborative Projects (CP), Networks of Excellence, Coordination and Support Actions (CSA), CP-CSA, ERA-NET,
EMPIR Reporting Guidelines Part 0 Guide to the parts
Part 0 Guide to the parts EMPIR Reporting Guidelines Part 0 Guide to the parts EURAMET MSU, Hampton Road, Teddington, Middlesex, TW11 0LW, UK Phone: +44 20 8943 6666 Email: [email protected] msu.euramet.org
Guidelines for applicants for the 2nd Transnational Call for Proposals (full-proposal phase)
SUSFOOD - An FP7 ERA-NET on Sustainable Food Production and Consumption Guidelines for applicants for the 2nd Transnational Call for Proposals (full-proposal phase) Closing date for full-proposals: August
Guide to Financial Issues relating to FP7 Indirect Actions
Guide to Financial Issues relating to FP7 Indirect Actions Version 28/02/2011 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are
Frequently Asked Questions to the Marie Curie Actions Financial Guidelines
Frequently Asked Questions to the Marie Curie Actions Financial Guidelines Updated 26/06/2012 Table of contents Q1: FOR CATEGORIES A-C (1-2 AS OF WP2011), WHICH AMOUNT HAS TO BE DECLARED IN THE FORM C
Grant Agreement Implementation and Reporting under H2020 in MSCA
Grant Agreement Implementation and Reporting under H2020 in MSCA Helsinki 21/4/2015 Marcela Groholova Research Executive Agency MSCA Date: in 12 pts A - Grant Agreement Implementation Structure of the
GUIDANCE NOTES ON PROJECT REPORTING
GUIDANCE NOTES ON PROJECT REPORTING Career Integration Grants (CIG) International Reintegration Grants (IRG) European Reintegration Grants (ERG) Marie Curie Actions http://ec.europa.eu/msca Version March
Proposal Negotiation. a guide. Constantine Vaitsas, [email protected]
Proposal Negotiation a guide Constantine Vaitsas, [email protected] Presentation Outline Proposal Time Scale Negotiation Process Legal Negotiations Financial Negotiations Technical Negotiations NEF
AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME
AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME GUIDANCE NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED
GUIDE FOR APPLICANTS
European Commission THE SEVENTH FRAMEWORK PROGRAMME The Seventh Framework Programme focuses on Community activities in the field of research, technological development and demonstration (RTD) for the period
Guidelines for reporting. for Transnational Access. implemented as. Specific Support Action
SIXTH FRAMEWORK PROGRAMME Research Infrastructures Action Guidelines for reporting for implemented as Specific Support Action This document can be found on the INTERNET at the following address: http://www.cordis.lu/fp6/infrastructures.htm
Model Grant Agreement
HORIZON HORIZON 2020 2020 Model Grant Agreement Horizon 2020 model Grant Agreement: Objectives Simplification Provisions Wording Flexibility To accommodate particularities Coherence Within H2020 and with
FP7 Project Reporting ****** Research Participant Portal. Peter Härtwich European Commission DG Research-A6
FP7 Project Reporting ****** Research Participant Portal Peter Härtwich European Commission DG Research-A6 1 Model grant agreement Reporting - Reference documents - Grant Agreement (GA): Article 4. - Annex
FP7 Project reporting. FP7 INCO National Contact Points Meeting 9 June 2010 - Athens Anne Mandenoff - European Commission - RTD A.
FP7 Project reporting FP7 INCO National Contact Points Meeting 9 June 2010 - Athens Anne Mandenoff - European Commission - RTD A.6 Reference documents 1 Model grant agreement - Grant Agreement (GA): Article
MCA Financial Statement (Form C) for Multi-Partner Contracts
EUROPEAN COMMISSION RESEARCH DG HUMAN RESOURCES AND MOBILITY MCA Financial Statement (Form C) for Multi-Partner Contracts Project No: 33481 Project Acronym: ELSA Project Full Name: European Leadership
GUIDE FOR APPLICANTS ECHORD++ PDTI activities
GUIDE FOR APPLICANTS ECHORD++ PDTI activities This guide, and all other information related to ECHORD++ Calls for Public enduser Driven Technological Innovation (PDTI) activities. The call text and other
IGLO Training Session Module 5
PROJECT MANAGEMENT LEGAL ISSUES IGLO Training Session Module 5 [email protected] +420 234 006 150 Reporting on project results (Foreground) Changes in project implementation Possible disputes within project
Research and Innovation Staff Exchange Frequently Asked Questions (FAQs)
Research and Innovation Staff Exchange Frequently Asked Questions (FAQs) Contents General Aspects... 2 Partnership... 3 Eligible Participants... 3 The essential nature of the participation must be endorsed
28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES
28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES 1 Table of Content 2 1. GENERAL PROVISIONS This document contains supplementary information to the
Guide to Financial Issues for Cleansky GAPs
Guide to Financial Issues for Cleansky GAPs Version of 16/01/2012 adopted by the Commission and subsequently adapted for the Clean Sky Joint Undertaking on 08/05/2012 Disclaimer This guide is aimed at
D E F I N I T I O N O F Q U A L I T Y C O N T R O L P R O C E D U R E
D E F I N I T I O N O F Q U A L I T Y C O N T R O L P R O C E D U R E D 1.1 Document identifier: V-Must.net - D1.1 Definition of quality control procedure V.1.1 Due Date of Delivery to EC End of Month
Administrative forms (Part A) Project proposal (Part B)
Ref. Ares(2015)2346168-04/06/2015 Project Grants (HP-PJ) Administrative forms (Part A) Project proposal (Part B) Version 2.0 05 June 2015 Disclaimer This document is aimed at informing potential applicants
The Marie Curie Actions FP7 Financial Guidelines
The Marie Curie Actions FP7 Financial Guidelines. These guidelines complement and should be considered in conjunction with the FP7 Guide on Financial Issues which is available for download at ftp://ftp.cordis.europa.eu/pub/fp7/docs/financialguide_en.pdf.
Guide for ERC Grant Holders Part II
EUROPEAN RESEARCH COUNCIL Guide for ERC Grant Holders Part II Reference Manual on Financial Management and Administration of the ERC Grants Starting and advanced grants Version 1-24/06/2008 Disclaimer:
Amendments Guide for FP7 Grant Agreements
Amendments Guide for FP7 Grant Agreements Version 10/09/2013 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are not intended to
Guide for Applicants. Call for Proposal:
Guide for Applicants Call for Proposal: COSME Work Programme 2014 TABLE OF CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1. Relevant documents... 3 II.2. Participants... 4 II.2.1.
Frequently asked questions. FP7 Financial Guide
Frequently asked questions FP7 Financial Guide Budgetary matters Eligible costs of a project What are the criteria for determining whether the costs of a project are eligible? First of all, costs must
Mid-Term Review: A contractual obligation and a fruitful dialogue
FP7 Marie Curie Initial Training Networks Mid-Term Review: A contractual obligation and a fruitful dialogue Guidelines for the Mid-Term Review 1 January 2014 2 1 These guidelines shall guide through the
H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi)
H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi) Version 1.0 9 June 2015 HISTORY OF CHANGES Version Publication date Changes 1.0 09.06.2015 Initial version 1 EUROPEAN COMMISSION
CEF Energy model grant agreement
CEF Energy model grant agreement Main features, financial and reporting conditions CEF Energy Info Day Delphine Silhol - Legal Adviser, INEA 16 March 2015 Background Single model grant agreement for the
EUROPEAN COMMISSION INFORMATION SOCIETY AND MEDIA DIRECTORATE-GENERAL. [title of the project] Grant Agreement No ICT PSP GRANT AGREEMENT
EUROPEAN COMMISSION INFORMATION SOCIETY AND MEDIA DIRECTORATE-GENERAL [title of the project] Grant Agreement No ICT PSP GRANT AGREEMENT Version 3, 20/01/2012 GRANT AGREEMENT NO The European Union ( the
CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS
CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS MATERIALS PREPARED BY THE WORKING GROUP ON CERTIFICATE ON THE METHODOLOGY UNDER FP7: DG RESEARCH AND INNOVATION DG
Project Management WP10. Carlos Díaz SYNAPSE
Project Management WP10 Carlos Díaz SYNAPSE Project status - as of last GAM D2.2 D2.3 D3.3 D3.4 D3.5 D4.1 D1.4 D3.6 D3.7 D3.8 D4.2 D4.3 D1.5 D4.4 Report on Specific Issues Related to Patient Rights Iterative
Proposal template and GUIDE FOR APPLICANTS (updated by FIspace)
European Commission THE SEVENTH FRAMEWORK PROGRAMME The Seventh Framework Programme focuses on Community activities in the field of research, technological development and demonstration (RTD) for the period
Guide for Applicants COSME calls for proposals 2015
Guide for Applicants COSME calls for proposals 2015 CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1. Relevant documents... 3 II.2. Participants... 4 Consortium coordinator... 4
VELLA (Contract Number: 036469)
VELLA (Contract Number: 036469) PERIODIC MANAGEMENT REPORT (PMR-N : 2) Author(s): G. Benamati, ENEA S. De Grandis, ENEA Reporting period: e.g.: 01/10/20076-30/09/2008 Date of issue of this report : 15/12/2008
Guide for ERC Grant Holders
Ref. Ares(2012)894501-23/07/2012 European Research Council Guide for ERC Grant Holders [Final version July 2012] Disclaimer: This Guide includes two main parts: firstly an ERC grants descriptive part,
Version 0.3 25 September 2014
Guide for Grant Agreement Preparation Version 0.3 25 September 2014 Disclaimer: This document is aimed at assisting applicants and beneficiaries for Horizon 2020 funding. Its purpose is to explain the
Model Grant Agreement
HORIZON HORIZON 2020 2020 Model Grant Agreement Horizon 2020 model Grant Agreement: Objectives Simplification Provisions Wording Flexibility To accommodate particularities Coherence Within H2020 and with
SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS
SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS ALESSANDRO PRISTER PROGRAMME MANAGER ER, SJU ER CALL COORDINATOR List of topics covered Call
Guide for ERC Grant Holders PART I
EUROPEAN RESEARCH COUNCIL Guide for ERC Grant Holders PART I GENERAL GUIDANCE NOTES Starting and advanced grants Version 1 24/06/2008 Disclaimer: This Guide aims to assist grant holders, whether individual
EUROPEAN COMMISSION RESEARCH EXECUTIVE AGENCY (REA) H2020 1 MODEL GRANT AGREEMENT FOR MARIE SKŁODOWSKA-CURIE INDIVIDUAL FELLOWSHIPS 2 (MSC-IF MONO)
EUROPEAN COMMISSION RESEARCH EXECUTIVE AGENCY (REA) Director H2020 1 MODEL GRANT AGREEMENT FOR MARIE SKŁODOWSKA-CURIE INDIVIDUAL FELLOWSHIPS 2 (MSC-IF MONO) Introductory remark MSC-IF Mono deviates from
Robotics in Horizon 2020: Rules for participation
Robotics in Horizon 2020: Rules for participation Cécile Huet, Deputy Head of Unit Unit A2 - Robotics Directorate-General for Communication Networks, Content and Technology European Commission Brokerage
Factsheet: Rules under Horizon 2020
23 October 2013 Factsheet: Rules under Horizon 2020 The Horizon 2020 Framework Programme represents a radically new and comprehensive approach to the EU's research and innovation funding policies. The
ARTEMIS-ED-21-09. Guidance notes and templates for Project Technical Review involving independent expert(s)
Guidance notes and templates for Project Technical Review involving independent expert(s) 1 CONTENTS 1 INTRODUCTION... 3 2 THE PROJECT REVIEW PROCESS... 3 3 MANDATE OF THE INDEPENDENT EXPERT(S)... 5 3.1
Frequently Asked Questions
SME Instrument Frequently Asked Questions Contents FOR APPLICANTS A. Eligibility and type of SMEs targeted... 2 B. Preparing your application and submitting your proposal... 4 C. Evaluation of your proposal...
Smart Open Services for European Patients Open ehealth initiative for a European large scale pilot of patient summary and electronic prescription
Smart Open Services for European Patients Open ehealth initiative for a European large scale pilot of patient summary and electronic prescription Deliverable: Work Package Document WP3.7 D.3.7.2. FINAL
NEXT. Tools of the Participant Portal: Scientific Reports & Deliverables
NEXT Tools of the Participant Portal: Scientific Reports & Deliverables Scientific Reporting and Deliverables: Terminology Scientific Reporting: Standardised format & always due at the end of Reporting
Open Disruptive Innovation (ODI) & the SME instrument: Frequently Asked Questions
Open Disruptive Innovation (ODI) & the SME instrument: Frequently Asked Questions 1. The concept in a nutshell The SME instrument is targeted at all types of innovative SMEs showing a strong ambition to
Research proposal (Part B)
Research and Innovation Actions (RIA) Innovation Actions (IA) Research proposal (Part B) Version 1.1 3 November 2014 Disclaimer This document is aimed at informing potential applicants for Horizon 2020
PREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS
THE GENERAL SECRETARIAT FOR RESEARCH AND TECHNOLOGY AS PROGRAMME OPERATOR OF THE GREEK-EEA RESEARCH PROGRAMME IMPLEMENTED UNDER THE GREEK FINANCIAL MECHANISM 2009-2014 PREANNOUNCES RESEARCH WITHIN PRIORITY
HabEat - FP7-245012. HabEat
HabEat Determining factors and critical periods in food habit formation and breaking in early childhood: a multidisciplinary approach Grant agreement number: FP7-245012 Medium-scale Collaborative Project
From the light to the full application form focus on work plan
Lead Applicant Training, Prague, 20 October 2015 From the light to the full application form focus on work plan Monika Schönerklee-Grasser, Head of JS Evaluation and Monitoring Unit Full application form
GUIDELINES FOR PREPARING PROJECT REPORTS (may be downloaded from www.cordis.lu/ist/fethome.htm or www.cordis.lu/ist/fetusef.htm)
THE FIFTH FRAMEWORK PROGRAMME The Fifth Framework Programme focuses on Community activities in the field of research, technological development and demonstration (RTD) for the period 1998 to 2002. INFORMATION
Full-Cost Accounting and Certification Modalities in FP7
Prague, 30 March 2009 Full-Cost Accounting and Certification Modalities in FP7 Philippe Coenjaarts European Commission DG Research Overview of presentation Accountability context FP7 Accounting modalities
2016 Home and Community-Based Services (HCBS) Scholarship Grant Program
2016 Home and Community-Based Services (HCBS) Scholarship Grant Program Application Guidelines Office of Rural Health & Primary Care The purpose of this document is to assist you in preparing an application
Administration and Finances under H2020 in MSCA Helsinki 21/4/2015
Administration and Finances under H2020 in MSCA Helsinki 21/4/2015 Marcela Groholova Research Executive Agency Overview 1. EU contribution 2. Eligible costs 3. Cost categories 4. Parental and maternity
EUROPEAN COMMISSION SERVICE SPECIFIC PRIVACY STATEMENT (SSPS) 1. Online services on the Participant Portal
EUROPEAN COMMISSION SERVICE SPECIFIC PRIVACY STATEMENT (SSPS) PROCESSING OPERATIONS OF APPLICANTS DATA 1. Online services on the Participant Portal The Participant Portal offers online electronic services
RULES FOR PARTICIPATION IN THE IMI JU COLLABORATIVE PROJECTS
Innovative Medicines Initiative IMI-GB-DEC-2012-12 RULES FOR PARTICIPATION IN THE IMI JU COLLABORATIVE PROJECTS OUTLINE 1. Definitions 2. Participation in an IMI JU collaborative project 2.1 General provisions
Summer (FY11 &12) $255,418 Article III - Summer Undergrad. Cost of Ed. $255,418 Total Summer Funding
STATE OF NEW JERSEY I. FY 2012 CONTRACT SUMMARY: CONTRACTOR: Organization Name: Bloomfield College CONTRACTING AGENCY: Educational Opportunity Fund 20 West State Street P.O. Box 542 Trenton, New Jersey
Consortium Agreement
DBGlobe IST-2001-32645 DBGlobe: A Data centric approach to Global Computing Start Date: 1/1/2002 End Date: 31/12/2003 Duration: 24 months Project Coordinator: University of Ioannina Partners: Institute
EVALUATION GUIDE CALL FOR PROPOSALS 22/11 SUPPORT FOR THE DEVELOPMENT OF ON AND OFF-LINE INTERACTIVE WORKS
EVALUATION GUIDE CALL FOR PROPOSALS 22/11 SUPPORT FOR THE DEVELOPMENT OF ON AND OFF-LINE INTERACTIVE WORKS 1 INTRODUCTION 1. Aim of the Evaluation Guide The aim of the Evaluation Guide is: - to identify
Erasmus+ General Information. Application Form Call: 2015. KA2 Cooperation and Innovation for Good Practices
General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating
MGA for PCP and PPI cofunds in Horizon 2020
MGA for PCP and PPI cofunds in Horizon 2020 Lieve Bos European Commission DG CONNECT (Communication Networks) F2 unit ( Innovation ) PCP-PPI Complementarity PCP to steer the development of solutions towards
IMI2 MANUAL FOR SUBMISSION,
Innovative Medicines Initiative IMI2 MANUAL FOR SUBMISSION, EVALUATION AND GRANT AWARD Innovative Medicines Initiative IMI/INT/2014-01783 Postal mail: IMI JU, TO 56, Office 6/5 1049 Brussels version 26
Guidelines for Applicants
Guidelines for Applicants CORNET 19 th Call for Proposals Opening National and Regional Programmes for transnational Collective Research between SME Associations and Research Organisations. Closing date:
Frequently Asked Questions version 3.0 09.09.2014
EUROPEAN COMMISSION Executive Agency for Small and Medium-sized Enterprises (EASME) Department A - Operations Unit A1 - COSME Frequently Asked Questions version 3.0 09.09.2014 COS-WP2014-2-05- Call for
Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014
the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed
Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014
Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 adopted by the Norwegian Ministry of Foreign Affairs pursuant to Article 8.8 of the Agreement between the Kingdom of Norway
