1 ICE MAKE REFRIGERATION PVT. LTD SURVEY # 226 / 227, DANTALI INDUSTRIAL ESTATE, GOTA VADSAR ROAD, VIA AHMEDABAD, AT.: DANTALI, TA. KALOL, DIST.: GANDHINAGAR PH. NO. : / 784 Website: hr@icemakeindia.com On-Site Emergency Plan (December ) Prepared By Shriji EHS Management Services Ahmedabad 1

2 Preface The management of ICE Make Refrigerations Pvt. Ltd. Survey no. 226,227, Dantali Industrial Estate, Gota-vadsar Road, At.: Dantali, Ta,:Kalol, Dist.: Gandhinagar has entrusted us for the task of preparing on-site emergency plan for their expansion work. Accordingly, We have prepared on-site emergency plan for any emerging out of storage, use, handling and transport of hazardous chemicals to be used in the plant area. The factory is proposed to store hazardous chemicals and hence it falls under category Hazardous Process i-e section (2cb) of factories Act. Hence management has decided to prepare On Site emergency Plan. And once plan is prepared, it is decided to conduct mock drill. This is the management s pursuance regarding hazards and measures to be taken in case of any emergency while operating the plant. We have tried fully to prepare the plan as per the data provided by the management. Mr.Rajendrabhai Patel - Director and Mr. Hirenbhai Limbachia HR & Safety Dept., have extensively participated in preparing the plan. The plan will be useful to the management in combating emergency. Place : Ahmedabad Date : 28/12/2015 Shriji EHS Management Services 2

3 INDEX Sr.NO. Content Page Part I (Guidelines) 1 Preface 2 2. Chapter-I Preliminary 5 3. Chapter-II Risk and Environmental Impact Assessment Chapter-III Emergency Organization Chapter-I V Communication System Chapter-V Action on site Chapter-VI Off-site Emergency Plan Chapter-VII Training, Rehearsal and Records 43 9 Chapter-VIII First Aid 45 Annex No. Part II (Annexure Section) 1. Identification of the factory Map of the Area Factory Layout Storage Hazards and Controls Material Safety Data sheets Process and Vessel Hazardous and Controls Other Hazards and Controls Trade Waste Disposal Records of Past Incidents Gas Dispersion Concentrations Evacuation Table Environmental Impact Assessment Weather Conditions Incident Controllers Deputy Incident Controllers Site Main Controller Key Personnel Essential Workers Assembly Points Emergency Control Center Fire & Toxicity Control Arrangements 80 3

4 22. Medical Arrangements Transport and Evacuation Arrangements Pollution Control Arrangements Other Arrangements Alarms and Sirens Internal Phones External Phones Nominated Persons to declare Major Emergency Form to record Emergency Telephone Calls Statutory Communication Separation Distances Emergency Instruction Booklet 96 A List of Fire Extinguishers 100 B List of First-Aid Boxes 101 C List of Personal Protective Equipments (PPES) 102 D Health Check up Records 103 E List of Sand Buckets 105 F List of Safety Guards 106 Emergency procedure local language 107 4

5 PART I CHAPTER 1 PRELIMINARY 1.0 INTRODUCTION OF EMERGENCY PLAN Today s world produces many kind of chemicals in enormous quantities, probably beyond safe manageable levels, and that too in many cases with record speed. People working in chemical factories, transporting the chemicals and using chemicals are constantly exposed to chemical hazards like explosion, fire, gas leakage, spillage of chemicals etc. Disaster means accident causing catastrophic situation in which the day to day patterns of life are in many instances, suddenly disrupted and people are plunged in to helpless ness and suffering and as a result need protection, clothing, shelter, medical and social care and other necessities of life. Disaster may occur by natural phenomenon or by men or by men s impact upon the environment. This plan has been prepared in view of the potential hazards prevailing in our factory and in the surrounding area. A sincere effort is made to give action plan for all other not only ourselves but for concerned agencies such as workers, office staff, general public, surrounding people, fire brigade, transporters, Government Authorities etc. This plan is in two parts. The first part explains basic requirements, definitions, objectives, hazard identification, risk analysis and environmental impact assessment, organizational set up, communication system, actions on site, link with off-site emergency plan and the aspect of training, rehearsal and records The second part is given as Annexure Section containing 33 useful annexure. The information in annexure will also be useful to our unit as well as to the surrounding units as a mutual aid and to the Government in preparing Off-site Emergency Plan under Chemical Accidents (Emergency Planning, Preparedness and Response) Rules It reveals strengths and weaknesses in the plan and suggests residual preparedness if any. 5

6 1.1 ABOUT ORGANISATION M/s. ICE MAKE Refrigerations Pvt. Ltd. proposes for the expansion of the existing manufacturing capacity of refrigeration units, with manufacturing of PUF at site. The existing unit is located at Survey no. 226,227, Dantali Industrial Estate, Gota-vadsar Road, At.: Dantali, Ta:, Kalol, Dist.: Gandhinagar, company is proposing the expansion of existing unit within this premises. There will be no requirement of new construction, as having existing setup for infrastructure as well as of existing manufacturing set up. The unit will 180 no. of direct labours, staff and contractor s labours and indirect employment after the expansion. The Product name and capacities are shown here in table 1. Table -1 - LIST OF PRODUCTS AND RAW MATERIALS WITH THEIR QUANTITIES A. The Product details with capacities (existing and proposed) Product name Existing capacity, Unit/month Proposed expansion in Unit/month All type of Commercial & Industrial Refrigeration Equipment using PUF Total capacity in Unit/month 200 nos nos nos. B. The Raw Materials Consumption details (existing and proposed) Existing Expansion Total Raw material (kg/month) (kg/month) (kg/month) Polyol (1,1-dichloro-1- fluoroethane (HCFC 141b) Tris (2-chloro-1- methylethyl) phosphate) - 26,400 26,400 Diphenyl Methane Di-isocyanate (MDI) - 34,200 34,200 6

7 C. Fuel Consumption Fuel name Consumption Existing Expansion Total HSD 10 lph - 10 lph (Reusing) Wood Frames (waste materials) received in Packing materials of Raw Materials - 20 kg/day 20 kg/day D. The Raw Materials Fitting Assembly details (existing and proposed) No. Existing Expansion Total Raw material (Unit/Month) (Unit/Month) (Unit/Month) 1 Compressor 192 nos 950 nos 1,142 nos 2 Condenser 190 nos 950 nos 1,140 nos 3 Aluminum checker 360 nos 1,800 nos 2,160 nos plates 4 Condenser unit 10 nos 50 nos 60 nos 5 Copper tubes 3,000 kgs 15,000 kgs 18,000 kgs 6 Door closer 180 nos 900 nos 1,080 nos 7 Fan motors 380 nos 1,900 nos 2,280 nos 8 Refrigerant A 404 CFC free 135 kgs 675 kgs 810 kgs B R kgs 150 kgs C R kgs 300 kgs 9 Gasket (door) 850 MTR 4,250 MTR 5,100 MTR 10 G. P. Sheet 23,500 kgs 1,17,500 kgs 1,41,000 kgs 11 Handel 170 nos 850 nos 1,020 kgs 12 Heater 22 nos 110 nos 132 nos 13 Hingis 320 nos 1,600 nos 1,920 nos 14 M. S. Angel 3700 kg 18,500 kgs 22,200 kgs 15 PVC Door Profile 490 MTR 2,450 MTR 2,940 MTR 16 S. S. Angel & Sheet 5,000 kg 25,000 kgs 30,000 kgs 17 Heat Exchanger - 11 nos 11 nos 18 Evaporator - 60 nos 60 nos 1.2 IDENTIFICATION OF THE FACTORY : Annexure-1 gives basic information about the factory. 1.3 FACTORY LAYOUT PLAN Factory layout plan showing the various details required for emergency preparedness such as entry and exit gates, plant, storage area, emergency control center, assembly 7

8 point, location of process and non chemical vessels, etc. shown in the enclosed Annexure 3. Area of the factory is sufficient for safe working and factory compound and building are well maintained. Ways and passages are free from obstruction. 1.4 VARIOUS USEFUL DEFINITIONS Some definitions relevant to emergency planning are given below ACCIDENT An accident is an unplanned event, which has a probability of causing personal injury or property damage or both. It may result in physical harm in the shape of injury or decease to people, damage to property, loss to the company, a near miss or any combination of these effects MAJOR ACCIDENT A major accident is a sudden, unexpected, unplanned event, resulting from uncontrolled developments during an industrial activity, which causes, or has the potential to cause (a) (b) (c) (d) (e) Serious adverse effects immediate or delayed resulting to death, injuries, poisoning or hospitalization to a number of people inside the installation and / or to persons outside the establishment. Significant damage to crops, plants or animals, significant contamination of land, water or air. An emergency intervention outside the establishment e.g. evacuation of local population, stopping or local traffic. Significant changes in the process operating conditions such as stoppage or suspension of normal work in the concerned plant for a significant period of time. Any combination of above effects EMERGENCY An emergency could be defined as any situation, which presents a threat to safety of person and/or property. It may require out side help also MAJOR EMERGENCY A major emergency occurring at a work is one that may affect several departments within it or may cause serious injuries, loss of life, extensive damage to property or serious 8

9 disruption outside the works. It will require the use of outside resources to handle it effectively. Usually the result of a malfunction of normal operating procedures, it may also be precipitated by the intervention of an outside agency, such as a sever electrical storm, flooding, crashed aircraft or deliberate acts or arson or sabotage Emergency due to operating conditions such as uncontrolled reactions, small fire, small gas leak, spill, failure or power, water, air, steam, cooling media, scrubbing media etc. and which can be locally handled by plant personnel without outside help is not considered as major emergency. Operating instructions in the safety manual shall cover this area, though the on-site emergency plan will also be useful DISASTER Disaster is a catastrophic situation in which the day to day patterns of life are in many instances, suddenly disrupted and people are plunged in to helplessness and suffering, and as a result need protection, clothing, shelter medical and social care other necessities of life, such as: a) Disasters resulting from natural phenomena like earthquakes, volcanic eruptions, storm, surges, cyclones, tropical storms, flood, land slides, fierce fires and massive insect infestation. Also in this group, violent draught which will cause a creeping disaster leading to famine, disease and death must be included. b) Second group includes disastrous events occasioned by man, or man s impact up on the environment, such as armed conflict, industrial accidents, factory fires, explosions and escape of toxic gases or chemical substances, river pollution, mining or other structural collapses, air, sea, rail and road transport accidents, aircraft crashes, collisions of vehicles carrying inflammable liquids, oil spills at sea and dam failures HAZARDS Hazard is a physical situation, which may cause human injury, damage to property or the environment or some combination of these criteria RISK Risk is the likely hood of an undesired event (i.e. accident, injury or death) occurring with a specified period or under specified circumstances. It may be either a frequency or a probability depending on the circumstances. 9

10 1.4.8 THE ON-SITE EMERGENCY PLAN The on-site emergency plan deals with measures to prevent and control emergencies within the factory and not affecting outside public or environment THE OFF-SITE EMERGENCY PLAN The off-site emergency plan deals with measures to prevent and control emergencies affecting public and the environment outside the premises. The manufacturer should provide the necessary information on the nature, extent and likely effects of such incidents. 1.5 OBJECTIVES OF THE EMERGENCY PLAN An emergency can not be always prevented, but it can be controlled within limits and its effects can be minimized by using the best resources available at the time. Emergency planning is a management s function and it should not be considered in isolated. Management should evaluate the activities, operations and processes carried out within the works before starting to plan an emergency operation. A check must be made to ensure that all required steps have already been taken which are included in emergency planning. Considering our number of employees, materials and processes, availability of resources, location of site, size and complexity of the works, we have prepared this emergency plan. In our plan, we have shown the clear instructions without overlap or confusion for all concerned staff members. The same details are prepared as per Annexure No THE OBJECTIVE OF THE EMERGENCY PLANNING ARE AS UNDER (a) (b) (c) (d) To define and to assess emergencies, including risk and environmental impact assessment. To prevent the emergency turning into a disaster. To safeguard employees and people in vicinity. To minimize damage to property or / and the environment (e) To inform employees, the general public and the authority about the hazards / risks assessed, safeguards provided, residual risk if any and the role to be played by them in the event of emergency. 10

11 (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) To be ready for Mutual Aid if need is raised to help neighboring unit. Normal jurisdiction of an OEP is the own premises only, but looking to the time factor in arriving the external help or off-site plan agency; the jurisdiction must be extended outside to the extent possible in case of emergency occurring outside. To inform authorities and mutual-aid centers to come for help. To effect rescue and treatment of casualties. To identify and list any dead. To inform and help relatives. To secure the safe rehabilitation of affected areas and to restore normalcy. To provide authoritative information to the new media. To preserve records, equipments etc. and to organize investigation into the cause of the emergency and preventive measures to stop its reoccurrence. To ensure safely of the works before personnel re-enter and resume work. To work out a plan with all provisions to handle emergencies and to provide for emergency preparedness and periodical rehearsal of the plan. 11

12 CHAPTER 2 RISK AND ENVIRONMENTAL IMPACT ASSESSMENT 2.0 INTRODUCTION Identification, analysis and assessment of hazards and risk provide vital information to Risk Management. Due to non-availability of failure rate data, reliability rate, gas dispersion rate, suitability of Industry for Indian environment, acceptable criteria for risk to public and environment etc. the complete Risk Assessment is not possible. Based on available data, we have made the hazard identification for our factory. While doing so, best available technology is used in design, installation, operation and maintenance of different processes, plants, equipments and machineries. There are mainly three hazards in our factory: (a) Fire hazards (b) Spillage of chemicals. (c) Toxic release 2.1 AVAILABLE FACILITIES SHOWN ON FACTORY To control and to minimize the various hazards, various facilities are available in the factory and the same is shown on the factory layout plan. The same is given in the Annexure 2. Some of the facilities are listed below: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) Entry and exit gates. Boundary wall. Situation of various departments. Emergency control center. Situation of fire extinguishers, storage of fire extinguishers. First Aid centers. Process area Storage area for raw material and bonded storage area for hazardous chemicals Storage of finished products. Drinking water centers. 12

13 (k) (l) (m) Situation of Siren. Administrative block. Assembly point. The factory lay out plan is kept in Security office/emergency CONTROL CENTRE so that the concerned authority can take proper and immediate action. 2.2 OTHER FACILITIES SHOWN IN THE KEY PLAN The Annexure 2 gives the idea of surrounding vicinity and emergency time facilities such as: (1) Surrounding area, population, and residential premises. (2) Factory location. (3) Approaches to the factory. (4) Hospital, nursing home (5) Fire station (6) Police station (7) Railway/bus stand (8) Mutual aid center. (9) North direction, wind direction, wind velocity, etc. This key plan is also kept in the Emergency Control Center so that proper and immediate action can be taken by the concerned authority. 2.3 STORAGE HAZARDS AND CONTROLS In Factory lay out plan, we have shown the place where the raw materials including hazardous substances are stored. The complete details regarding hazardous raw material, are given in the enclosed Annexure No. 4. Where as the complete details regarding material identification, their use, hazardous ingredients of material, physical data for material, fire and explosion hazard of material, reactivity data, toxicological properties of material, personal protective method and first aid measures is given in the enclosed Annexure 5 (MSDS). Release of explosive and flammable chemicals and may create emergency if proper precautionary measures are not taken. 13

14 2.4 ABOUT VARIOUS CATEGORIES OF HAZARDS The storage hazards can be divided in following three different categories: (a) Fire hazards (b) Spillage of chemicals. (c) Toxic release Above hazards should be taken into consideration because some of the chemicals used, stored are having flammable, and toxic & corrosive properties. Now we will describe about each hazards in details FIRE HAZARDS In our factory the most common hazard is of fire. In our factory EDC and Pyridine are stored/ used which is flammable, and can cause dangerous Fire hazards and in spite of all precautionary measures, risk cannot be avoided. Hence, substance that is susceptible to fire and explosion is stored separately at the distance to stop the fire developing with other area methanol is stored separately and storage is approved by controller of explosives. The fire may take place because of any one or more of the following reasons; (a) Naked flame (b) Hot surfaces (c) Leakage, spillage (d) Electric spark (e) Static electricity (f) Rise in temperature & pressure beyond permissible limit. TO CONTROL THE FIRE HAZARDS, FOLLOWING ACTIONS ARE TAKEN It is very important for the factory to take all possible steps to pre-empt a fire whenever it can occur and thus avert the possible disaster. In our factory several precautionary measures has been taken to prevent a fire and to fight it promptly and extinguish it even if a fire does occur in any part of the factory. The important measures are out lined below (a) Naked flames, hot surfaces and other ignition sources should be eliminated from the area, where flammable materials are stored and handled. 14

15 (b) (c) (d) (e) (f) (g) (h) (i) (j) Flammable chemicals stored with all recommended storage and handling practices. Storage and process areas are posted with No Smoking signs. Smoking is prohibited throughout the factory. All management staff, Executives on their rounds to factory ensures the compliance. Protective equipments are for use during transferring operations. Flameproof and short circuit proof electrical fittings will be provided in EDC and Pyridine Storage and Process area. While unloading Flammable chemicals electrostatic spark is avoided. Earthing of all storage tanks and all electrical installation have been carried out All required personal protective equipments are kept in every plant and provided to workers working in hazardous area. Sufficient amount of water and bore wells available in the factory to put out the fire of other origin. Two under ground water tank of capacity 10,000 liters capacity each are kept. EDC and Pyridine Methanol is pumped in closed pipeline. On site emergency plan is prepared LEAKAGE & SPILLAGE HAZARD OF CHEMICAL The second major hazard is leakage or spillage of toxic chemical. These chemicals cause chemical burns. As storage and transport of liquid chemicals are carried out in closed system there is ordinarily no chance of any splashing of chemical. TO CONTROL THE SPILLAGE HAZARD, FOLLOWING ACTIONS ARE TAKEN (a) (b) (c) (d) (e) (f) (g) All Storage tanks are under ground provided with dike wall & sand filling All liquid chemicals are stored in tank or drum. Pegs and clamps are provided to empty out any tank having uncontrollable leakage. Spare tanks & barrels of sufficient quantity kept ready.liquid chemicals are transferred by closed pipeline. The pipe lines are painted with different colors to distinguish it.. Leak pans will be provided for collecting leakage, if any. 15

16 (h) Out going effluent will have to be blocked and taken to effluent treatment plant. It will be discharged after treatment only. Continuous neutralization will also be arranged TOXIC RELEASE HAZARD Ice Make Refrigeration Pvt.Ltd. is a middle scale factory where another hazard is of toxic release MDI, Polyol is used which is Toxic and can cause Toxic hazards. In spite of all precautionary measures, risk can not be avoided. The toxic release may take place because of any one or more of the following reasons; (a) Gas leakage from pipe joint (b) Gas release from safety valve (c) Gas leakage from vent (d) Rise in temp. & pressure beyond permissible limit (e) Liquid spillage TO CONTROL THE TOXIC HAZARDS, FOLLOWING ACTIONS ARE TAKEN It is very important for the factory to take all possible steps to pre-empt a toxic release whenever it can occur and thus avert the possible disaster. In our factory several precautionary measures has been taken to prevent a toxic release and to fight it promptly and control it even if a toxic release does occur in any part of the factory. The important measures are out lined below. (a) All pipe joints are provided with heavy duty champion gaskets to prevent any leakage (b) MDI, Polyol and approachable place. (c) Protective equipments are for use during transferring operations. (d) All required personal protective equipments are kept in every plant and provided to workers working in hazardous area. (e) Self breathing apparatus will be provided and workers will be trained about their use. (f) Workers are trained to control any kind of leakage. (g) On site emergency plan is prepared. 16

17 2.4 PROCESS HAZARDS (Annexure-6) (1) Toxic Release (2) Fire 2.5 CONTROL MEASURES PROVIDED Looking to the nature of materials processed normal temperature and pressure involved, wide range of characteristics of processes and nature of operations, following process controls and interlocks have been employed. (a) (b) (c) (d) (e) (f) (g) (h) (j) (l) Procedures and actions have been well defined and know to all operating personnel for safe start up and shut down of plant. Fire extinguisher and sand buckets are also installed in the plant area. All the motors and other machines are provided with safety guards. All exposed parts of moving machineries are provided with suitable guards for personnel safety. All elevated structures are protected with lightening arrestors. Insulation of piping as per requirement is provided. Regarding all components of the plant proper certificates are taken. Also testing and inspection shall not be compromised before deliveries. All procedures are well defined and standardized with safety angle. Temp.controlled by thermostat. Emergency power supply from D.G. set OPERATIONAL SAFETY : (1) Hand gloves, safety goggles, dust mask, helmets, self-breathing apparatus, safety shoes etc. safety appliances are provided to workers. (2) First Aid kit is kept available in Emergency control center. (3) Non destructive thickness measurements are carried out to prevent sudden bursting by thinning out of metal by erosion or corrosion. (4) Preventive maintenance to avoid failure is carried out. External inspection of piping and testing of lifting tackles cranes etc. is bearing done at regular interval. 17

18 2.6 LEAKAGES: CONTROLS Depending on the leaking rate / source etc., the Following actions will be taken: (a) Isolation / Cutting of supply of the leaking point transfer to some other vessels / equipments using protective appliances like hand gloves, gum boots, gas mask, PVC suits, etc. (b) Dilution / Flushing with large quantities of water, fumes / vapors will be knocked down with large quantities of water. (c) If leakage is from tank / road tanker, attempts will be made to transfer the content of the tank road tanker to some other suitable spare tank as in case of toxic chemicals. (d) Out going effluent will have to be blocked and taken to effluent treatment plant. It will be discharged after treatment only. Continuous neutralization will also be arranged. 2.7 OTHER HAZARDS AND CONTROLS (Annexure-7) In our factory, in addition to the storage hazards, process hazards and vessel hazards there are few more hazards which are possible: (a) (b) (c) (d) (e) Hazards due to electric short circuit. Fall Accident Natural calamity Bad housekeeping Structural collapse : HAZARDS DUE TO ELECTRIC SHORT CIRCUIT Electric short circuit is possible because of any one or more of the following reasons : (a) (b) (c) Loose wiring. Faulty equipment. Lack of earthing 18

19 (d) (e) Choking Overheating. Proper earthing, periodical checking of contacts, proper insulation of equipment, flame proof fitting in solvent area, electrician to be provided Fall Accident Falling from height is possible any where in the plant when workman is working at height without safety belt. Safety belt, helmet, safety platform will be provided at the time of work supervised Natural Disaster Earth quake, lightening, structure collapse, accidental gas release from neighboring unit is possible natural disaster Lightening arrester, fire fighting equipment and PPEs make ready, mutual aid, on site / off-site emergency plan to be activated Bad house keeping Minor or major injury is possible due to bad house keeping. Proper handling, regular cleaning, proper placement of material will be observed in plant HAZARDS DUE TO STRUCTURAL COLLAPSE: Structural collapse is possible because of any one or more of the following reasons: (a) (b) (c) (d) (e) Corrosion. Old structure. Heavy load. Extensive vibration. Heavy stress on structure. To avoid the above, regular checking will be done by a competent authority in above case, if major emergency may arise suddenly, the outside emergency services can be utilized. 2.8 RECORDS OF PAST INCIDENTS (NO PAST MAJOR INCIDENT) 19

20 2.8.1 ABOUT RISK ASSESSMENT PLAN The risk assessment can be broadly divided in the following heads: (a) Identification of hazards. (b) Causes of hazards. (c) The measures for reducing the hazards. (d) Hazard operability study. Considering the above, now we will study about the details regarding various hazards available in our factory IDENTIFICATION OF HAZARDS OF FACTORY The following three are the main hazards in our factory. (a) Fire hazards (b) Spillage of chemicals. (c) Toxic release More details about above all hazards are given in previous points of this report. Probability or frequency of above hazards will give details regarding risks involved and analysis of the same will give details regarding how they could occur. The estimation of the extend, magnitude and likelihood of any harmful effects or consequences will give details regarding risk analysis. 2.9 LIMITATIONS OF RISK ASSESSMENT PLAN The risk assessment study has following limitations.- (a) (b) (c) (d) (e) (f) (g) (h) Non-availability of norms for our Country. Non-availability of correct analysis data. High cost for getting expertise from foreign developed Countries. Lack of expertise in our Country. Difficulty of checking the final results with experiments. Non-availability of past accident data about damages. Complexity and laboriousness of the techniques. Non-availability of acceptable criteria. 20

21 2.10 VARIOUS METHODS AVAILABLE FOR RISK ASSESSMENT Various methods are available for the risk assessment. We are giving hereunder a method to identify the potential hazards and operability problems that foreseen by studying the logic of operation. (a) To define a process sequence. (b) To apply a guide word. (c) To generate a deviation. (d) To found out probable causes. (e) To derive possible consequences. (f) To evaluate need for action. 21

22 CHAPTER-3 EMERGENCY ORGANIZATION 3.0 No plan will succeed without effective organization. Emergency Organization is the heart of On-site and Off-site Emergency plan. Due weightage has been given to select and assign suitable responsibilities to the most appropriate person from the respective departments in our factory. Due care has been exercised to earmark the emergency duties from day to day responsibilities. The emergency organization shall prove effective, if activities are carried out in a defined way. To get the maximum advantage of the emergency organization, we have defined the activities of various officers / workers in the following manner. 3.1 INCIDENT CONTROLLER (IC) Primary duty of incident controller is to take charge at the scene of the incident. In the initial stages he may be required to take decisions involving the operation of the other plants or to stop or continue any process and to take technical decisions to control the incident. Therefore he should have full knowledge for these purposes. For our purpose, General Manager - Operations is appointed as Incident Controller. In the absence of Incident Controller the next person either production in charge or shift chemist whoever present, will be Incident Controller THE RESPONSIBILITIES OF INCIDENT CONTROLLER DURING ON SITE EMERGENCY Being received the primary information from runner about the occurrence, Incident Controller will access the situation and he will try to control the emergency by internal resources. If the situation seen is uncontrollable, he will consult S.M.C. to declare emergency and will sound the siren to announce emergency in the factory as well as ask for mutual aid from surroundings. Further declaring off-site emergency, He will also inform the fire brigade, police, Dist. Disaster Controller and Factory Inspector. He will arrange for safety equipments and tools for the member of rescue teams. He will evacuate non essential workers near Assembly point. He will search for causalities. He will call all key personnel, essential workers and allot them duties. 22

23 3.2 DEPUTY INCIDENT CONTROLLER One officer in each shift has been identified as Dy. IC, he will assist Incident Controller and will help in mobilizing the required gadgets. Dy.-Incident Controller will carry out internal communication and will confirm with other service department about their actions and he will co-ordinate between Incident Controller and Site Main Controller (S.M.C.). Their functions are mentioned in Annexure 33. Their name, designation, place of availability, etc. are given in Annexure 16. In case of non-availability of both Incident Controller and Deputy Incident Controller We have appointed other substitute persons to take the charge of I.C. and Dy. I.C. their details are given in Annexure RESPONSIBILITIES OF DY. INCIDENT CONTROLLER DURING ON SITE AND OFF SITE EMERGENCY In absence of Incident Controller, Dy. Incident Controller will take charge of I.C. and will work in the same line as that I.C. the duties and responsibilities of Dy. I.C. during onsite and off-site will remain the same as given in Point No and 3.5 of this plan. 3.3 SITE MAIN CONTROLLER (S.M.C.) He has overall responsibility for directing operations and calling outside help from Emergency Control Center. As he is required to take decision by collaboration between the senior managers at the site (works) and the senior officers of the outside services, the top executive (C.E.O.) is appointed as site main controller The moment, the message is received site main controller. are supposed to reach the plant site either with their vehicle or with alternate transport arrangement without wasting a single minute. Their duties / functions in emergency are mentioned in details in Annexure 33, name, designation, place of availability, etc. is given in Annexure RESPONSIBILITIES OF SITE MAIN CONTROLLER. DURING ON-SITE AND OFF- SITE EMERGENCY (a) (b) (c) Declare emergency. Get it touch with the District Authority or its nominees to take over the control of the emergency. Inform mutual aid facilities and seek their help if they have the required facilities. 23

24 (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) (s) (t) (u) (v) (w) Call Incident Controller and ask him to proceed with the work of controlling the incident. Inform fire brigade if help is required. Inform factory medical officer and hospital authority. Ask the security to account for personnel. Arrange to get ambulances to send injured workers to hospitals, in case of causality. Nominate a person to give information to the media public, and members of families of the affected area. Arrange for admission of the injured workers and affected public to the hospitals. Find out how many members of the public are likely to be affected. Arrange through police to warn the public and advise the public regarding the precautions to be taken. Advise the police to evacuate people from the localities likely to the affected. Arrange alternate shelter and food for the evacuated public and workers. Inform police and advise them to control traffic law and order. Also ask them to help in taking injured to hospitals. Take the help of outside experts, if necessary. Inform the factory inspector and G.P.C.B. Remain in touch with the Incident Controller and keep the public informed about the status of emergency. Assemble the pre-decided team of workers to assist to perform the above functions. Advise the services like water, electricity, etc. if these have to be cut of resumed for safety of the public. Give all clear signal after the emergency has come under complete control. Arrange to send the evacuated workers and public back to their homes and assist them to resettle. If services have been cut off, inform the concerned services to restart after the emergency is controlled 24

25 3.4 RUNNER S AND THEIR RESPONSIBILITIES DURING ON-SITE AND OFF-SITE EMERGENCY. The entire runner s of Site Main Controller, Incident controller and Dy. Incident Controller are to remain alert all the time on receiving the message about any emergency. After receiving the massage, it will be the duty of runner to rush to security office or to incident controller. 3.5 KEY PERSONNEL In the light of information received on the developing situation at the emergency, key personnel will take directive from Site Main Controllers to control emergency in the respective fields. We will nominate, Key Persons to handle the situation of emergency person wise. Annexure 17 gives complete detail of persons and their duties in normal and abnormal situation. In case of unavailability of these persons next person will also be nominated. In the emergency instruction booklet, we have added their duties person wise RESPONSIBILITIES OF KEY PERSONNEL DURING ON-SITE & OFF-SITE EMERGENCY (a) (b) (c) (d) (e) (f) The communication will be established by telephone or by sending person with special message by available vehicle When grave emergency is declared, all the workers will have to leave their work and to reach at safe place knowing the wind direction indicated by the flag hosted at the highest place and as per announcement the plant will be shut down, workers will gather near the assembly point. We will select a team of workers in each shift and they will take roll call of workers and remove the affected workers to safe place and will provide the medical help which will be kept ready by Incident Controller by summoning the doctor as soon as the emergency is declared. Counting of workers take place immediately at gate and compared with those present. Injured workers to be shifted to hospital, if required with the help of police. Lists of hospital, ambulances are kept in the office, as well as with security office near the gate. Arrangement will be made by the Incident Controller / Site Main controller to inform the relatives of injured workers and Liaison will be maintained with fire brigade and police about the extent of likely spread of gas / fire. 25

26 3.6 ESSENTIAL WORKERS Workers those are trained for fire fighting and first aid are selected as essential workers. Essential workers are identified and listed in emergency plan. Many more employees will be trained for the fire fighting and first aid in each group. So their services can be utilized, if required. Their list will be available in Emergency Control Center (E.C.C.). Identified essential workers are supposed to report at EMERGENCY SIGHT to take instruction from Incident Controller. Details of their functions are mentioned in Annexure RESPONSIBILITIES OF FACTORY MEDICAL OFFICER (a) (b) (c) (d) (e) (f) Send assistant to the place where evacuated workers are reporting. Ensure that those requiring medical assistance are separated. Treat all those who can be treated within the factory. Get in touch with Doctors of different hospitals and inform them the nature of injuries etc. Inform out side hospitals about antidotes and their availability / supplier etc. Supply antidotes to out side hospitals, if not available and are required by them. 3.8 ASSEMBLY POINTS Open space near security gate is decided as Assembly Point because, 1. It is away from the process plant. 2. It has separate approaches. 3. Open space is adequate enough to assemble even at one point. Looking to the wind direction and emergency site, the assembly point is selected at security gate, as there are separate approaches available in case of evacuation; vehicle entry is available on the very spot. Details of assembly point are given in Annexure EMERGENCY CONTROL CENTRE Administrative office/security office will be declared as Emergency Control Center, Location of E.C.C. is away from the place hence it is considered as an ideal one. Telephone and other facilities required with required documents are well displayed near the emergency control center for ready reference, Site Main Controller will operate from 26

27 Emergency Control Center, and details regarding Emergency Control Center are given in Annexure FIRE AND TOXICITY ARRANGEMENTS Adequate fire fighting equipments and personal protective equipments will be available in factory premises. Portable fire extinguishers will be installed at various locations in plant and will be easily accessible too. They will be regularly inspected for their working conditions. In the same fashion, all personal protective appliances will be maintained in good working condition so the same can be utilized in emergency. Essential workers and other personnel will be regularly trained to use both fire fighting and personal protective equipments. Details of such information are given in Annexure 21 (A, B, C) MEDICAL ARRANGEMENTS First Aid boxes will be provided in every department. These boxes equipped with all required first aid facilities like bandages, antidotes, antiseptics to deal with minor injuries and to help in major exposure, until the victim is transferred to the hospital or until the doctor arrives. First Aid box will be in charge of trained person. A stand by emergency vehicle is always kept if victims are required to be transferred to outside hospitals. Telephone numbers of nearby factories are also available, if ambulances are required at a short notice. FMO is also available on call. Moreover, efforts will be put to train essential workers and other employees to give first aid. Details of such information are given in Annexure 22 (A, B) TRANSPORT / EVACUATION ARRANGEMENT After declaring the emergency depending on the situation (1) Non-essential persons like casual contract labourers, other non required company workers, will be evacuated to pre-determined safe assembly points or outside the factory depending on the severity. There are no. of safe assembly points which may be utilized depending on the wind direction, distance from the incident. (2) People residing outside the Company and at close distances, will be requested to evacuate. They will be evacuated and transported to safe places / shelters. 27

28 (3) Help of Police, Civil Authorities etc. will be taken for evacuating outside people. (4) Personnel required to be transported to medical care, will be transported to hospital by ambulance or vehicle available. (5) SMC along with respective key personnel will arrange for such activities including rescue and transportation of injured persons, casualties etc. (6) Transportation arrangements will have to be made for people / essential workers / experts / key personnel to be brought from their houses 3.13 USE OF EXTERNAL AUTHORITIES (1) Experts on safety, health, pollution control special technologist will be contacted and their skills will be utilized. A list of such experts should be kept ready with phone numbers, mobile numbers, etc. so that at the time of emergency they can be available easily. (2) Police, District Collector, Factory Inspector, Controller of Explosive, Pollution Control Board Experts, Health and Medical Officer etc. will be contacted and called in for help. (3) R&B Civil Engineers also can be contacted for specialized activities like temporary shelter requirements, digging work, provision of facilities in Public Building etc. (4) Help of Institution, Social Organizations, Corporation, and Voluntary Bodies etc. will be taken as per need. A list of such organization will be kept ready with telephones. Communication in normal times will help speedy response. 28

29 CHAPTER-4 COMMUNICATION SYSTEM 4.0 we have gone through the details regarding the assessment of risks and their possible environmental impact till now. To deal with the any hazardous situation, we have to make communication system up-to-date and ready in all respect. The efficient communication is a very crucial factor in handling an emergency. The emergency organization will prove worth only if the communication system operates effectively and in time / everything will be paralyzed, The communication system beginning with raising the alarm (siren) declaring the major emergency and procedure to make it known to others is given hereunder. 4.1 RAISING THE ALARM Any employees of our company noticing an emergency will raise the alarm (siren). Essential workers will act as messengers for spreading the emergency position. 4.2 EXTERNAL TELEPHONE(Annexure 28) (a) All-important EXTERNAL TELEPHONE NUMBERS are listed in Annexure 28. (b) It is very essential to have a complete list of external telephone to communicate with the following in case of any emergency. 1. Key personnel residing outside the township. 2. Mutual Aid facilities, hospitals, ambulances, fire brigades, transports etc. 3. Authorities like Dist. Collector, DSP, SRP, Home guards etc. 4. Inspector of Factories / Dept. of Explosives, Electrical inspector, Boiler inspector etc. 4.3 DECLARING THE MAJOR EMERGENCY (Annexure 29) Once the incident has been noticed by somebody in the plant shift in charge / operator will be informed immediately. He will act as incident controller (IC) to control the emergency simultaneously. Other plant control rooms will be informed immediately as per priority and requirements. 29

30 (a) (b) (c) (d) Occupier and other staff etc. will be informed immediately. Fire and safety key personnel, maintenance key personnel and other key personnel will also be informed at the earliest possible. Now to decide whether the emergency is a major or not, is very important. We have to declare it at the earliest, making the necessary judgment of the incident for any major emergency or potential for the same. Care will have to be taken so that immature judgment does not occur and inadequate thought is not given as declaration of major emergency puts many agencies into action. We have nominated persons to declare the major emergency at the earliest with adequate judgment. There may be joint decision also but it must be without wasting the time 4.4 TELEPHONE MESSAGES After knowing the emergency and emergency declaration or on receiving the emergency message on telephone, They should be precise, sharp, attentive and quick in receiving and noting the message and then for immediate subsequent action of further communication. The complete details of the instruction in the event of declaration of emergency are given in Annexure No COMMUNICATION OF EMERGENCY The state of emergency has to be communicated to the following group of people. (a) Inside the factory to the workers including key personnel and essential workers, who are on duty and or inside the factory premises during normal working hours. (b) To the key personnel and essential workers who are not on duty and are outside the factory premises besides the normal working hours. (c) To the outside emergency services including Government Authorities, (d) To the neighboring firms and the general public in the vicinity. Now we are giving details regarding the system which we have planned the effective implementation for the above. 30

31 4.5.1 INSIDE THE FACTORY TO THE WORKERS To handle the emergency safely and timely, all following information are made known to the workers in the shade of booklet so that they prepare themselves to prevent or to control the emergency. (a) Safety manual and booklets. (b) Hazards involved in the process. (c) MSDS of all the hazardous chemicals used by us. (d) Various physical and health hazard. (e) Various measure to ensure safety and control of physical and health hazard. (f) Various measure to be taken by the workers to ensure the safe handling, storage and transportation of hazardous chemicals. (g) Various personal protective equipments available for handling hazardous chemicals. (h) Messaging of various label and marking on containers of hazardous chemical. (i) Measures to be taken by the workers in case of spillage or leakage of hazardous chemicals. (j) Worker s role in emergency KEY PERSONNEL AND ESSENTIAL WORKERS Key personnel and essential workers are available in all shifts or can be made available with short notice. But due to some reasons, if they are outside or not on duty and if their help is required, their where about is available in the Annexure 14 to 18 which are kept in the emergency control center. List of the name in order of priority is kept near telephone junction OUTSIDE EMERGENCY SERVICES & AUTHORITY Once the declaration of emergency is made, we have planned to inform the following services immediately. (a) (b) (c) (d) Fire Brigade Police station ESI hospital Ambulance 31

32 (e) (f) (g) (h) (i) (j) (k) (l) Civil defense Hospital / Private Nursing home Key personal of mutual aid scheme Pollution control board Factory Inspector, Regional Collector, District Collector. Municipality Press, Radio and TV The phone numbers with concerned person for the above agencies are available near telephone 32

33 CHAPTER-5 ACTION ON-SITE 5.0 The purpose of preparing on-site emergency plan is readiness of the unit for any kind of emergency and also to plan the co related activities. We have planned the following three stage activities as they are co-related for emergency preparedness and emergency actions with subsequent follow ups. (a) Pre-emergency activity. (b) Emergency time activity and (c) Post emergency activity 5.1 PRE-EMERGENCY ACTIVITY To take care for pre-emergency activity, the care should be taken for the following important aspects. (a) Internal safety survey. (b) Third party survey. (c) Non-destructive testing. (d) Safety valves testing. (e) Fire system testing. (f) Mutual aid scheme. (g) Mock drill and training. (h) Protective equipments. (i) Communication. (j) Emergency light. (k) Emergency control light (l) Plant assemblies and assembly points. (m) Liaison with State authorities. (n) Hospital facilities. (o) Outside shelters (p) Statutory information. 33

34 5.1.1 INTERNAL SAFETY SURVEY We have made an attempt to combat any emergency that may arise and have prepared a short procedure or action to be taken by every one to fight against such events. In our factory at any time minimum one Supervisor / Chemist always remain present and at any time incident controller can be contacted to take the emergency charge. Some of the important points are as under : (a) We have already identified various hazards in plant area and are keeping a sharp and alert watch on various likely emergency spots. (b) Protective equipments are regularly checked and kept easily accessible and easily workable during emergency. (c) Other personal protective equipments are also kept ready duly tested at a regular interval. (d) Other safety installation like available quantity of running water is regularly watched twice a day. (e) Other facilities like vehicles are also kept ready in working condition to combat any emergency. (f) To combat leakage of liquid materials sufficient stock of Sand is kept available nearby the storage area. (g) Fire water pumps, system and hose pipes are regularly watches to see the flow of water and working condition. (h) Suggestions from worker s and other staff always welcomed for any requirement / modification to make the system more reliable and effective THIRD PARTY SAFETY AUDIT The third party safety audit as per IS will be planned PRESSURE VESSEL TESTING:- Pressure vessels are fitted with safety valves. List of Pressure vessels along with testing procedure is made. All vessels are tested as per statutory requirement and record is kept in form no

Vishesh Diagnostics Pvt. Ltd. EMP

Vishesh Diagnostics Pvt. Ltd. EMP DISASTER MANAGEMENT PLAN Vishesh Diagnostics Pvt. Ltd. 1.1 INTRODUCTION A disaster is a catastrophic situation in which suddenly, people are plunged into helplessness and suffering and, as a result, need

More information

EMP OF VIDYUT NAGAR GRAHA NIRMAN SAHAKARI SAMITI MARYADIT, GWALIOR

EMP OF VIDYUT NAGAR GRAHA NIRMAN SAHAKARI SAMITI MARYADIT, GWALIOR DISASTER MANAGEMENT PLAN 1.1 INTRODUCTION A disaster is a catastrophic situation in which suddenly, people are plunged into helplessness and suffering and, as a result, need protection, clothing, shelter,

More information

FLAMMABLE LIQUIDS COMPLIANCE NOTE

FLAMMABLE LIQUIDS COMPLIANCE NOTE Issued by: Heather Rice Page: 1 of 7 COMPLIANCE NOTE INTRODUCTION This document provides additional guidance to support the Arrangement on Flammable Liquids (Ref No. CYC/HS/A27) CONTENTS Section Topic

More information

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE 1 of 12 DOCUMENT REVISION HISTORY Revision No. Date DESCRIPTION OF CHANGES Pages Affected By 00 01/07/2003 Draft Issued For Comment All HSEQ Dept. 01 01/09/2003 Total Change First Approved Issue All HSEQ

More information

SAFETY GUIDANCE MATERIAL

SAFETY GUIDANCE MATERIAL SAFETY GUIDANCE MATERIAL SAFETY MANAGEMENT MONDAY MARCH 23,GUIDANCE 2015 This safety resource was written for the scrap industry by the scrap industry and was developed to assist you in making your scrap

More information

MAJOR PLANNING CONSIDERATIONS CHECKLIST

MAJOR PLANNING CONSIDERATIONS CHECKLIST MAJOR PLANNING CONSIDERATIONS CHECKLIST The following checklist is provided as a guide to assure that relevant considerations are identified in the emergency management planning process. Use the blank

More information

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION Page: 1/6 This checklist recognizes the major accident hazards found by experience of previous HAZID studies. It is not intended to be totally exhaustive and feedback from users should be incorporated

More information

Emergency procedures instructions to farm staff

Emergency procedures instructions to farm staff Emergency procedures instructions to farm staff The first priority in the event of an emergency is for the safety of all people present. Emergency phone numbers Dial 111 for Fire/Police/Ambulance 1. Tell

More information

STORE HAZARDOUS SUBSTANCES SAFELY. incompatibles gas cylinders

STORE HAZARDOUS SUBSTANCES SAFELY. incompatibles gas cylinders STORE HAZARDOUS SUBSTANCES SAFELY Suitable containers incompatibles gas cylinders Oxy-Acetylene welding flammable substances 35 36 STORE HAZARDOUS SUBSTANCES SAFELY STORE HAZARDOUS SUBSTANCES SAFELY Storing

More information

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND

More information

EMERGENCY PREPAREDNESS

EMERGENCY PREPAREDNESS EMERGENCY PREPAREDNESS Page 1 SECTION 11 EMERGENCY PREPAREDNESS CONSIDERATIONS FOR APPROPRIATE EMERGENCY PREPAREDNESS...3 EMERGENCY PREPAREDNESS POLICY Emergency Preparedness Policy - Sample...5 EMERGENCY

More information

An inventory of hazardous materials used in your workplace will prove useful.

An inventory of hazardous materials used in your workplace will prove useful. Introduction Fire Protection is an organized approach designed to prevent fires. In the event of a fire, a fire protection program will help prevent or minimize personal injuries, losses, and harm to the

More information

SHELTER-IN-PLACE OR EVACUATE

SHELTER-IN-PLACE OR EVACUATE SHELTER-IN-PLACE OR EVACUATE WOULD YOU KNOW WHAT TO DO? A PREPAREDNESS GUIDE FOR THE HOME No matter where you live, your community may experience a natural or man-made disaster a tornado, floor, winter

More information

Emergency Preparedness Guidelines

Emergency Preparedness Guidelines DM-PH&SD-P7-TG6 رقم النموذج : I. Introduction This Guideline on supports the national platform for disaster risk reduction. It specifies requirements to enable both the public and private sector to develop

More information

Wilkins Safety Group

Wilkins Safety Group H & S Guidance - Flammable Liquids See also: other pages INTRODUCTION Flammable liquids are liquids with a flashpoint of 55ºC or below and hence includes all liquids that are classified as flammable, highly

More information

Flammable and Combustible Liquids. Slide 1 (of 23)

Flammable and Combustible Liquids. Slide 1 (of 23) Flammable and Combustible Liquids Slide 1 (of 23) Introduction The two primary hazards associated with flammable and combustible liquids are explosion and fire Safe handling and storage of flammable liquids

More information

ROAD TRANSPORT EMERGENCY PREPAREDNESS

ROAD TRANSPORT EMERGENCY PREPAREDNESS ROAD TRANSPORT EMERGENCY PREPAREDNESS AIGA 039/06 Asia Industrial Gases Association 298 Tiong Bahru Road #20-01 Central Plaza Singapore 168730 Tel : +65 62760160 Fax : +65 62749379 Internet : http://www.asiaiga.org

More information

Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON

Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON Flood Checklist The following may serve as a checklist when preparing for a flood. This checklist should be tailored to processes/operations, flood protection equipment and flood potentials at your specific

More information

Pollution Incident Response Plan

Pollution Incident Response Plan Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company RISK MANAGEMENT PLAN is an integral part of a modernized and sophisticated residential complex. No efforts will be spared in identifying the all possible risks and disasters, evaluating them, installing

More information

Safety and Health Office WORKPLACE SAFETY CHECKLIST

Safety and Health Office WORKPLACE SAFETY CHECKLIST Location: Date: Inspected by: Safety and Health Office WORKPLACE SAFETY CHECKLIST WORK ENVIRONMENT Ventilation Removal of fumes and dust Temperature and humidity control Noise levels Vibration Lighting

More information

Example risk assessment for a motor vehicle mechanical repair workshop

Example risk assessment for a motor vehicle mechanical repair workshop Example risk assessment for a motor vehicle mechanical repair workshop Setting the scene The garage manager did the risk assessment. The business employed 12 mechanics, including two apprentices who carried

More information

CHEMICAL SPILL MANAGEMENT GUIDELINES

CHEMICAL SPILL MANAGEMENT GUIDELINES WHS Unit CHEMICAL SPILL MANAGEMENT GUIDELINES Contents 1 Purpose... 2 2 Scope... 2 3 Definitions... 2 4 Roles and Responsibilities... 2 5 General... 2 6 Defining Major or Minor Spill... 3 7 Major Spill

More information

Emergency Plan. This emergency plan provides a format of data essential in an emergency situation.

Emergency Plan. This emergency plan provides a format of data essential in an emergency situation. Emergency Plan A. Introduction This emergency plan provides a format of data essential in an emergency situation. B. Definition of Emergency Incident An emergency condition exists when we determine that

More information

Compressed Gas Cylinder Storage and Handling Guide

Compressed Gas Cylinder Storage and Handling Guide Overview Compressed gas cylinders are used in many workplaces to store gases that vary from extremely flammable (acetylene) to extremely inert (helium). Many compressed gas cylinders are stored at extremely

More information

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result

More information

ABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN

ABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN ABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN The purpose of this plan is to provide detailed instructions for slug prevention and control. A complete copy of this plan is maintained

More information

EMERGENCY PREPAREDNESS PLAN

EMERGENCY PREPAREDNESS PLAN EMERGENCY PREPAREDNESS PLAN Promontory Charter School ----------------Emergency 911--------------------- INTRODUCTION The purpose of this Emergency Preparedness Plan for Promontory Charter School is to

More information

Preventing Overheated Boiler Incidents

Preventing Overheated Boiler Incidents Preventing Overheated Boiler Incidents PSE&G Appliance Service October 2012 Runaway Boiler Explosion Review Items Hazard Background Past Incidents PSE&G Emergency Response Future Process Improvements What

More information

How To Handle An Emergency

How To Handle An Emergency Company Name Address Telephone Contact Name Title Last Revision Date Policy and Organizational Statements Identify the goals and objectives for the emergency response plan. Define what your emergency response

More information

Autoclave Safety. Autoclaves are sterilizers using high pressure and high temperature steam. The potential safety risks for the operators are:

Autoclave Safety. Autoclaves are sterilizers using high pressure and high temperature steam. The potential safety risks for the operators are: Autoclave Safety Purpose: Sterilization refers to the complete killing of all living organisms, including spores. Common sterilization techniques include the application of wet heat, dry heat, chemicals,

More information

Internal and External Accident Incident Reporting

Internal and External Accident Incident Reporting Phoenix Community Care Ltd Policy & Procedure Internal and External Accident Incident Reporting Version Written Updated Scheduled Review Date Author 1 2008 2008 2009 Anne Spriggs 2 2010 2013 Angela Kelly

More information

Static Electricity. A Health and Safety Guideline for Your Workplace. What Are Some Sources of Static Electricity? What is Static Electricity?

Static Electricity. A Health and Safety Guideline for Your Workplace. What Are Some Sources of Static Electricity? What is Static Electricity? A Health and Safety Guideline for Your Workplace What is static electricity? What causes it? How is it hazardous? And, most importantly, how can it be controlled? All of these questions will be answered

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

How To Ensure Safety On A Caravan Site

How To Ensure Safety On A Caravan Site EAST CAMBRIDGESHIRE DISTRICT COUNCIL A Site Operators Guide to Health and Safety Introduction The Health and Safety at Work Etc. Act 1974 places a duty on all persons having control of a caravan site to

More information

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public Appendix J3 - Outline Fuel Spill Contingency Response Plan Control room receives call on fuel spill from staff or public Initial Actions to be taken after Fuel Spill reported Identification of the source

More information

Factors to Consider When Developing an Evacuation Plan

Factors to Consider When Developing an Evacuation Plan The following should be viewed only as suggestions: Factors to Consider When Developing an Evacuation Plan 1. You must identify your document with a specific title and explanation. Example: Evacuation

More information

Confined spaces can be deadly. What is a confined space?

Confined spaces can be deadly. What is a confined space? Confined spaces A brief guide to working safely This leaflet explains what you, as an employer, may need to do to protect your employees when working in confined spaces. It will also be useful to the self-employed

More information

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA Regulated Substance Management: All Regulated Substances, including chemical wastes, are to be managed

More information

FLA S FIRE SAFETY INITIATIVE

FLA S FIRE SAFETY INITIATIVE Improving Workers Lives Worldwide FLA S FIRE SAFETY INITIATIVE Preventing fires and saving lives by empowering workers and factory managers SCENARIO 1 OCCURS AT FACTORY ABC, WHICH HAS NOT IMPLEMENTED NECESSARY

More information

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES Review the following information pertaining to Construction Fire Safety Planning: B.C. Building Code Sections 8.1 up to and including Subsection 8.2.3 B.C.

More information

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency; Fire Action Plan FIRE ACTION PLAN SEStran aims to provide and maintain safe & healthy working conditions, equipment and systems of work for all our employees, and to provide such information, training

More information

Chippewa County Courthouse Security Emergency Procedures. Dial 9 9 1 1 FIRE POLICE AMBULANCE

Chippewa County Courthouse Security Emergency Procedures. Dial 9 9 1 1 FIRE POLICE AMBULANCE Chippewa County Courthouse Security Emergency Procedures Dial 9 9 1 1 FIRE POLICE AMBULANCE Table of Contents Introduction... 2 Explosion... 3 Civil Disorder/Threat to Personal Safety... 4 Chemical Spill...

More information

ANNEX 2 Emergency / Pollution Incident Response Plan

ANNEX 2 Emergency / Pollution Incident Response Plan ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...

More information

Civil Engineering Sector Labour-Management Health and Safety Committee

Civil Engineering Sector Labour-Management Health and Safety Committee PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION

More information

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASON FOR INCLUSION 2 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM AND PROCEDURAL REQUIREMENTS 5 8 PEOPLE REQUIREMENTS 7 APPENDIX

More information

DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION

DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION DEPARTMENT OF TRADE MERCHANT SHIPPING NOTICE NO.M.847 DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION Notice to Shipowners, Masters, Shipbuilders and Repairers 1. It has come to the notice

More information

Contingency Plan. Facility Name

Contingency Plan. Facility Name Contingency Plan Facility Name This plan is reviewed annually and amended whenever changes occur that will significantly affect the ability of this facility to respond to an emergency situation. This includes

More information

Installation Instructions for Alarm Module Kit A043F059

Installation Instructions for Alarm Module Kit A043F059 Instruction Sheet 07-2013 Installation Instructions for Alarm Module Kit A043F059 1 Introduction The information contained within is based on information available at the time of going to print. In line

More information

FIRE PREVENTION PLAN

FIRE PREVENTION PLAN FIRE PREVENTION PLAN 1 FIRE PREVENTION PLAN OSHA s Fire Prevention Plan regulation, found at 29 CFR 1910.38(b) and 29 CFR 1926.24, requires Northern Clearing, Inc. to have a written fire prevention plan

More information

SILICON VALLEY CLEAN WATER. May 2015

SILICON VALLEY CLEAN WATER. May 2015 SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial

More information

EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM

EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29CFR1910.36-29CFR1910.38-29CFR1910.157-29CFR1910.165 NFPA-10 BASIS: The OSHA Emergency Action Planning and the

More information

North Carolina State University Emergency Facilities Closure Checklist- Part I

North Carolina State University Emergency Facilities Closure Checklist- Part I North Carolina State University Emergency Facilities Closure Checklist- Part I Unplanned or spontaneous events often disrupt daily operations on campus. In the event that an incident may interrupt your

More information

Risk Assessment and Disaster Management Plan The Risk Assessment Study for the upcoming industrial area project of M/s. RIICO Ltd. has been conducted

Risk Assessment and Disaster Management Plan The Risk Assessment Study for the upcoming industrial area project of M/s. RIICO Ltd. has been conducted Risk Assessment and Disaster Management Plan The Risk Assessment Study for the upcoming industrial area project of M/s. RIICO Ltd. has been conducted by functional area expert of EIA Team. The risk assessment

More information

GUIDELINE FOR SAFETY IN THE HANDLING OF FLAMMABLE LIQUIDS

GUIDELINE FOR SAFETY IN THE HANDLING OF FLAMMABLE LIQUIDS GUIDELINE FOR SAFETY IN THE HANDLING OF FLAMMABLE LIQUIDS September 2007 Replaces the July 2004 edition 1. Purpose Purpose of present Guideline is to specify conditions for the safe handling of flammable

More information

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600 OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done

More information

Based on the initial size-up and any information available, Command will formulate an action plan to deal with the situation.

Based on the initial size-up and any information available, Command will formulate an action plan to deal with the situation. Hazardous Materials Response Clear Creek Fire Authority This plan provides a basic philosophy and strategic plan for hazardous materials situations. All Clear Creek Fire policies and procedures, unless

More information

OAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure

OAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure OAKPARK SECURITY SYSTEMS LIMITED Requests or suggestions for amendment to this procedure should be submitted to the owner of the process PROCESS OWNER: MANAGEMENT TEAM Current version: PREVIOUS VERSION

More information

Fire Safety Log Book

Fire Safety Log Book Fire Safety Log Book Company... Address........ Responsible Person. Competent Person. Date Started For Additional Information: Safety Management (UK) Ltd Holme Suite, Clawthorpe Hall Business Centre, Burton

More information

School of Engineering University of Glasgow

School of Engineering University of Glasgow School of Engineering University of Glasgow Electronics Workshops Rankine Building 319A (2 Technicians) 510 (1 Technician) 712A (4 Technicians, 1 Modern Apprentice) James Watt South 619 (2 Technicians)

More information

Decontamination of the victim. Protection of medical personnel. Disposing of contaminated protective equipment and wash solutions.

Decontamination of the victim. Protection of medical personnel. Disposing of contaminated protective equipment and wash solutions. Decontamination: Standard Operating Procedure This procedure should be followed in the event of an emergency where a victim or equipment should need to be decontaminated due to a chemical, biological,

More information

Safe Work in Confined Spaces

Safe Work in Confined Spaces Safe Work in Confined Spaces This publication is prepared by the Occupational Safety and Health Branch Labour Department Edition November 2010 This publication is issued free of charge and can be obtained

More information

Ingredion ANZ Pty Ltd

Ingredion ANZ Pty Ltd Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

SPILLS & SPILL KITS. Spills -General Guidelines:

SPILLS & SPILL KITS. Spills -General Guidelines: Spills -General Guidelines: If handled properly, a spill may be nothing more than a nuisance. If handled improperly, a spill can seriously disrupt your activities and the work of your colleagues. At worst,

More information

Notes. Material 1. Appropriate Flammable Liquids

Notes. Material 1. Appropriate Flammable Liquids 29 CFR 1910.106 Flammable Materials Flammable Liquids Preparation 1. Read Applicable Background information and related Company Policy Chapter. 2. Make Copies of this Lesson Plan for Personnel 3. Make

More information

EMERGENCY PREPAREDNESS PLAN FOR

EMERGENCY PREPAREDNESS PLAN FOR EMERGENCY PREPAREDNESS PLAN FOR Name of Child Care Center Provided by: 2014 Emergency Preparedness Plan Page 1 TABLE OF CONTENTS Page I: Introduction... 3 II: Emergency Response Organization... 3 III:

More information

Union College Campus Safety Emergency Action Guide

Union College Campus Safety Emergency Action Guide Union College Campus Safety Emergency Action Guide Emergency Telephone Numbers At Union College, for all campus emergencies dial Campus Safety at ext. 911. (If the line is busy on a second try, dial "6911".)

More information

Todd & Cue Ltd Your Business Continuity Partner

Todd & Cue Ltd Your Business Continuity Partner Todd & Cue Ltd Your Business Continuity Partner Preparation and Planning We provide strategies, tools and resources to help you prepare for a business interruption whether it is caused by fire, water,

More information

Fire Safety PROCEDURES January 2011

Fire Safety PROCEDURES January 2011 Fire Safety PROCEDURES January 2011 firesafety@uwo.ca Campus Phones EMERGENCY Dial 911 Fire Safety Service is the focal point for the coordinated administration of the University Fire Safety program and

More information

EMERGENCY ACTION PLAN. for

EMERGENCY ACTION PLAN. for EMERGENCY ACTION PLAN for Facility Name: Facility Address: DATE PREPARED: / / EMERGENCY PERSONNEL NAMES AND PHONE NUMBERS EMERGENCY COORDINATOR: Name: Phone: ( ) AREA MONITORS (If applicable): Area: Name:

More information

Accident/Incident Investigation & Reporting Procedure

Accident/Incident Investigation & Reporting Procedure Accident/Incident Investigation & 1. Overview The recognises its obligation to ensure that all accidents and incidents are reported, recorded and investigated. We are committed to identifying corrective

More information

EMERGENCY PLANS FACT SHEET

EMERGENCY PLANS FACT SHEET EMERGENCY PLANS FACT SHEET Overview This fact sheet provides general guidance for persons conducting a business or undertaking (PCBUs) and workers on preparing and maintaining general emergency plans for

More information

Veterinary Practice Emergency Plan Instructions

Veterinary Practice Emergency Plan Instructions I. PURPOSE The purpose of this plan is to protect the health and well being of patients, employees and clients of (your practice name here) during times of disaster. In addition, this plan is designed

More information

Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy

Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy UVCE Storage tank Hydrocarbons Steam coil Corrosion Steam Instrumentation

More information

Safety Data Sheet SOMAmer Reagent

Safety Data Sheet SOMAmer Reagent SECTION 1: Identification Safety Data Sheet SOMAmer Reagent 1.1 Product identifier Product name SOMAmer Reagent (aptamer) 1.2 Supplier s details Name Address Email SomaLogic, Inc. 2945 Wilderness Place

More information

Emergency Management Audit For Businesses

Emergency Management Audit For Businesses Emergency Management Audit For Businesses Sponsor Acknowledgement: This manual is sponsored by NZ Safety Limited and produced for the Ministry of Civil Defence Public Education Advisory Committee by Auckland

More information

Safety and Environmental Information for External Companies Koehler Oberkirch

Safety and Environmental Information for External Companies Koehler Oberkirch and al and at Work 1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees,

More information

SWIMMING POOL HEAT PUMP

SWIMMING POOL HEAT PUMP SWIMMING POOL HEAT PUMP Installation & User Manual Model HP40B HP50B HP65B Hayward Pool Products Canada, Inc. T: 1-888-238-7665 www.haywardpool.ca CONTENT I. Application 4 II. Features 4 III. Technical

More information

SECTION 1: IDENTIFICATION OF THE SUBSTANCE/MIXTURE AND OF THE COMPANY/UNDERTAKING SULPHURIC ACID DRAIN CLEANER

SECTION 1: IDENTIFICATION OF THE SUBSTANCE/MIXTURE AND OF THE COMPANY/UNDERTAKING SULPHURIC ACID DRAIN CLEANER SECTION 1: IDENTIFICATION OF THE SUBSTANCE/MIXTURE AND OF THE COMPANY/UNDERTAKING 1.1. Product identifier Product name Product No. SULPHURIC ACID DRAIN CLEANER H094 1.2. Relevant identified uses of the

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

Sample Written Program. For. Flammable Liquids

Sample Written Program. For. Flammable Liquids Sample Written Program For Flammable Liquids 1 Flammable Liquids. (YOUR COMPANY NAME) Purpose Proper Storage and use of flammable liquids can significantly reduce the possibility of accidental fires and

More information

Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc

Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc By: Katie Tucker, Sales Representative, Rolyn Companies, Inc Are you and your facility disaster ready? As reported by the Red Cross, as many as 40 percent of small businesses do not reopen after a major

More information

Course of Construction Questionnaire

Course of Construction Questionnaire Course of Construction Questionnaire CLIENT DETAILS Broker: Contact: Insured s name: Policy number: Address undergoing works: Insured s contact phone number: 1) Name and address of Contractor: 2) Contractor

More information

WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS

WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS Aug 2013 WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS As a small business operator, you need to be aware of your health and safety responsibilities, and identify risks

More information

Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety

Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety Integrated Risk Management Master Workplace Inspection Checklist for General Shop Safety Document Type: Form Control Number: UIRM- FM_012_50 File Code: UIRM-001 Last Reviewed: March 2014 Department/Unit:

More information

4.1 RISK ASSESSMENT. The risk hazards may be of two types: 1. Natural disasters Earthquake Cyclone / Storm Flood / Draught Landslides etc

4.1 RISK ASSESSMENT. The risk hazards may be of two types: 1. Natural disasters Earthquake Cyclone / Storm Flood / Draught Landslides etc 4.1 RISK ASSESSMENT Hazard identification is the process used to identify all possible situations in the project Modernization and Redevelopment of Existing Hotel Claridges where people (Guest, staff,

More information

3620 W 11th Streetб Houston, TX 77008 Telephone: 713-635-6291 Email: sales@kellogg-american.com Website: www.kellogg-american.com

3620 W 11th Streetб Houston, TX 77008 Telephone: 713-635-6291 Email: sales@kellogg-american.com Website: www.kellogg-american.com Unpackaging & Handling Be sure to carefully inspect the unit before accepting the shipment. If any damage has occurred document it with the trucking company immediately. Contact your Kellogg Distributor

More information

Routine and Emergency Boiler Operation

Routine and Emergency Boiler Operation Routine and Emergency Boiler Operation Learning Outcome When you complete this module you will be able to: Describe the routine safe and efficient operation of a packaged boiler. Learning Objectives Here

More information

Director, National Institute for Occupational Safety and Health. California Fatality Assessment and Control Evaluation (CA/FACE) Program

Director, National Institute for Occupational Safety and Health. California Fatality Assessment and Control Evaluation (CA/FACE) Program TO: FROM: SUBJECT: Director, National Institute for Occupational Safety and Health California Fatality Assessment and Control Evaluation (CA/FACE) Program An Automotive Mechanic Dies from Thermal Burns

More information

All Oil and Gas Companies under the Jurisdiction of the National Energy Board (the Board or NEB) and All Interested Parties

All Oil and Gas Companies under the Jurisdiction of the National Energy Board (the Board or NEB) and All Interested Parties File 172-A000-73 24 April 2002 To: All Oil and Gas Companies under the Jurisdiction of the National Energy Board (the Board or NEB) and All Interested Parties SECURITY AND EMERGENCY PREPAREDNESS AND RESPONSE

More information

Presented by: Rich Perry Marsh Risk Consulting

Presented by: Rich Perry Marsh Risk Consulting Flammable and Combustible Liquids Presented by: Rich Perry Marsh Risk Consulting What s the Big Deal? Flammable and combustible liquids are easily ignited Ignite with explosive force Burn readily and give

More information

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING Chapter 24 PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING This Chapter provides guidance on precautions to be observed by both tanker and shore when cargo handling, ballasting, bunkering, tank

More information

CATERING CONTRACTORS General Code of Safety Practice

CATERING CONTRACTORS General Code of Safety Practice Residential & Business Services Director s Office CATERING CONTRACTORS General Code of Safety Practice CONTENTS 1 Introduction 2 2 Commencement of Work 3 3 Vehicles 3 4 Temperature control 3 5 Food hygiene

More information

For inspection purposes only.

For inspection purposes only. Emergency Response and Accident Prevention Procedures PURPOSE This provides a description of the plans for the Management of Emergencies in accordance with the Emergency Plan (Ref 1.). Separate procedures

More information

Sample Emergency and Critical Incident Policy and Procedure

Sample Emergency and Critical Incident Policy and Procedure Sample Emergency and Critical Incident Policy and Procedure 1. Purpose and Scope Emergencies and critical incidents in the workplace can affect people physically and psychologically, and affect program

More information

NORTH BIRMINGHAM ACADEMY

NORTH BIRMINGHAM ACADEMY NORTH BIRMINGHAM ACADEMY FIRE AND EVACUATION PROCEDURES FIRE DRILLS: These are carried out once a term. Observations and details of each drill are recorded in the logbook, which is kept by the Assistant

More information