Reporting and advising course of action required from tasking given by Project PSO s.

Size: px
Start display at page:

Download "Reporting and advising course of action required from tasking given by Project PSO s."

Transcription

1 Synopsis Mechanical Engineer currently working in Product Safety as Lead auditor for Product Safety Audits on Vendors. Quality Engineer16 years Contracting for GEC Alsthom & GEC Marconi Various roles 22 Years in the RAF as an Aircraft Engineering Technician and Junior Manager Employment Experience: 2011 to Date BAE Systems, Maritime Services, Torpedoes, Broad Oak Product Safety & Environmental Engineer - Responsible to the Head of Product Safety for: Day to Day Management of the Torpedoes Capability Contract Product Safety audits, and associated regular up-issues and supporting status reports Provide peer review for team documentation reports as required Support and maintain own project and product baselines Provision of engineering support to functional engineering staff for Safety advice Producing Safety engineering documentation as required by PSO Support engineering technical meeting to advise on safety related issues To plan, organise, review and provide detailed Safety Audit plans To ensure compliance with all health and safety requirements Support to Software Release as Quality Assurance as required, but planned with consent of Head of Product Safety Support ISA Audits and implement agreed recommendations Support all LCM / ELCM Design Review Assessments Support and attend Safety Governance meetings as required Support Environmental SME as required Carry out Environmental assessment of suppliers as required. Advising / offering specialist advice Project Management/ Specification of safety requirements Product Safety Consultant for the Archerfish New Battery Design, liaising with the Project to ensure they gain the right level of information from the sub-contractor design authority. Providing budget estimates for amount of cover required. Specifying the safety requirement required from the new design. Auditing sub-contractors for Product Safety, advising where they fall short of BAE Systems ethics and legal requirements. (Legislation & Regulations) Advising Product Safety Officers (PSO s) on Subcontract findings and raising actions on suppliers to fulfil BAE Systems ethics and legal/regulatory requirements. Reporting and advising course of action required from tasking given by Project PSO s. Analysis/ Safety analysis Conducting Fault Tree analysis (FTA) and reporting findings to Project as tasked and advising Project on course of action resulting from FTA via a formal report. Conduct trend and statistically analyse surveillance activities across 5 differing explosive products and 2 safety critical products looking back to 1998 to current date. Report and give conclusions on findings. The surveillance activities include x-ray reports, numerous chemical breakdown findings and results from proof firing products. Major achievement Transference of Best Practice In Feb 2011 I transferred from Quality Assurance into Product Safety undergoing a six month transition period where I undertook in-house and external training. During this period I was 1 of 5

2 requested to undertake 2 nd Party (external) Product Safety audits on 15 key suppliers and to complete those audits before the end of the year. I accepted the challenge, however when I started I found that there was no governance or guidance on what to look for. So I started from scratch interviewing the Chief Engineer, the various design authorities or design advisers associated with each of the supplier s products to establish the company s needs from this audit. From there I constructed an individual checklist for each product and supplier and drafted an audit plan for the Project. After approximately 18 months of being in the Product safety role I realised that the company needed something a bit more robust than a simple Project Plan and that the company should have a governance document applicable to all projects. I spent 6 month drafting a document in my own time to establish a Product Safety Audit guide based on ISO 9001:2008 and a supporting checklist for both Internal and external Product Safety Audits. This has been well received by my company. Software Quality Assurance Retained my position as part of the Software authorisation and release Board, if and when other full time members are not available. My role being to ensure that compliance of the software to our processes and that it is fit for purpose to Feb 2011 BAE Systems Electronics Limited,INSYTE, Broad Oak Though Underwater Weapons merged with Integrated Systems Technology in January 2008, we still kept to our old roles until moving to Broad Oak in August Since then my role has been more focused on Design Quality Assurance. Project Support - Currently supporting a 10m contract, and a number minor projects and 2 of 5 Numerous Software Projects Software Quality Assurance Project guidance, S/Ware Verification & release, Internal and 2 nd party audits to TickIT. Quality Management Job Title: Project Quality Manager My role required monitoring the Project s activities for compliance to my Quality Plan for the Project. I conducted internal Audits against all their plans. During this period I was responsible for budget management and had a number of Quality Engineers from manufacturing quality to conduct supplier audits on my behalf or other tasks as and when required. I reported monthly expenditure from my budget to the Project. Software Quality Assurance Part of the Software authorisation and release Board. My role being to ensure that compliance of the software to our processes and that it was fit for purpose to Aug 2008 BAE Systems Underwater Weapons Division, Waterlooville Role: Principal Product & Software Quality Assurance Engineer Prime contractor to the MOD & International clients providing Design solutions, Manufactured Product & after sales service. Project Support - Currently supporting a major contract, and 2 minor projects and Numerous Software Projects. Software Quality Assurance Project guidance, S/Ware Verification & release, Internal and 2 nd party audits to TickIT. Attendance required at any Customer Acceptance Trials to Interface with Customer. Supplier Monitoring Quality Management Issues Interfacing with DQAFF GQAR s (MoD Civil Servants) at Suppliers APQP implementation at Suppliers- PFMEA, CTQ, Process Flow, Control Plan, SPC Customer point of contact for Minor Projects Last Minor Project involved overseeing the Project from Design Concept through to Production and onward delivery to the customer.

3 Internal and 2 nd party audits on suppliers. Internal audits include Environmental Audits to 14001:2004 Major achievements: Successful handling of a difficult supplier has been recognised by both UWS and customer with the granting of a monetary award for excellence over and above the normal expectancy in Successful completion of a minor Project has been recognised by both UWS and customer with a granting of a monetary award in Mar 2003 Oct 2003 New Product Introduction Centre (Europe), APW Electronic Solutions Chandlers Ford, Eastleigh Role: Senior Project Quality Engineer - to do the following: Design & Construct system for Material Declaration to be implemented globally within APW NPIC s in Europe, Asia, & South America Design & Construct system for Document Control in line with Global APW guidelines Design & Construct system for Internal Non Conformance control Standardise use of 8D Create procedure for consistent dealings with Customer Issues Facilitate introduction of ISO 9000:2000 Quality System After successful introduction maintain & manage Quality System Advanced Product Quality Planning (APQP). Design Failure Mode Effects Analysis (DFMEA) Design Producibility Reviews (DPR) Process Failure Mode Effects Analysis (PFMEA) Quality representative at customer meetings and conference calls Nov 2002 Feb 2003 APW Electronic Solutions Chandlers Ford, Eastleigh seconded during rundown of factory at Hedge End. Role: Project Quality Engineer APQP. Design Producibility Review (DPR) PFMEA Quality representative at customer meetings and conference calls Environmental Material Declaration for main customer Dec 2000 Nov 2002 APW Electronic Solutions Hedge End Southampton Manufacturer of complex, highly technical backplanes & assemblies for the computer & telecomms industry. Part of a global footprint of 30 sites manufacturing to level 5 integration. Role: Quality & Environmental Systems Engineer Quality Systems Audits. Process Improvement Audits. 1 st point of contact for customer & supplier issues. Establishment and continuous improvement of the Goods In Inspection & Customer returns processes. Quality representative at customer & supplier meetings and ongoing assessment visits. Working with suppliers on score carding system Setting up and improvement of weekly reportable performance metrics and reporting systems. Solely responsible for ISO 9000:2000 transition, process-mapping business. Environmental System Audits, including the realisation of the years schedule. Environmental Impact assessment reviews with process engineering. Setting up and improving supplier environmental impacts on the business Co-representative on environmental ongoing assessments. 3 of 5

4 Setting up of environmental reporting system. Deputise for the Quality & Environmental Leader in his absence. Support 5S activities on shop floor Support Kiazen initiatives where needed Major achievements: Reduced inventory value of customer returns from 75k to 1k in 7 months. Reduced significantly the number of quality issues with major customers. Reducing Quality System deficiencies with assessing body. Reducing Packaging waste for a major customer. Re-organisation of Goods In to include traceable supplier monitoring BAE Systems Electronics Limited (previously known as GEC Marconi Limited) Waterlooville, Hampshire Prime contractor to the MOD & International clients providing Design solutions, Manufactured Product & after sales service Roles: Principal Quality Engineer Directly Responsible to the Divisions Quality Manager for Production Quality. Reporting on a daily basis to the Production Manager. The customer interface for the project. Monthly meetings with the customer to discuss issues. Responsible for instigating Corrective and Remedial Actions on Customer rejects or complaints Software & Test equipment release to the customer Quality system Audits both internal & suppliers Product Audits Chair weekly MRB meetings Oversee process improvements Main signatory for the release of project material to the MOD Senior Production Quality Engineer Quality investigations internal & external Directly involved with process improvements Internal Quality System Audits Product Audits Main signatory for the release of project material to the MOD Customer interface Assist Production in implementing POKE YOKE activities Major achievement: Successful introduction of cell working improvement. (C.W.I.P.) based on 20 keys by Iwao Kobayashi. 4 of 5 Project Product Assurance Engineer Quality investigations internal & external Repair MRB s Signatory for the release of project material to the MOD Customer Interface Manufacturing Engineer Mechanical assembly Production Controller Material Controller Royal Air Force Various UK & Overseas Stations Trade: Aircraft (Airframes) Engineering Technician Roles:

5 JNCO in charge of the Role Equipment Bay of 115 Squadron. (1 year) JNCO in charge of a Team of 4 Airmen in the Hydraulic Bay, Servicing Electro-hydraulic Valves, Jacks and Brakes etc from six different types of aircraft, plus hands on work. (6 Years) Team Member & Deputy Team Leader - Jaguar Major Servicing. (2 Years) JNCO Coordinator of Mechanical & Hydraulic components servicing team, plus hands on work. (6 Years) Team member of major repair facility travelling all over UK & overseas -specialist deep airframes repairs (2 Years) Aircraft Mechanic Various duties ranging from Flight line to Major servicing of Aircraft (5 years) 5 of 5

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014 Title: Quality Manual Uncontrolled if Hardcopy CCD MARINE LTD th Date: 29 September 2014 Doc Ref: Q0.000 Issued By: Sarah Leighton Rev No: 2 Title Revision: Date: QUALITY MANUAL PROCEDURE Q0.000 2 29 September

More information

QSS 0: Products and Services without Bespoke Contracts.

QSS 0: Products and Services without Bespoke Contracts. QSS 0: Products and Services without Bespoke Contracts. Amendment History Version Date Status v.1 Dec 2014 Updated For 2015 deployment Table of Contents 1. DEFINITIONS 3 2. INTRODUCTION 3 3. WORKING WITH

More information

MERGER BETWEEN BRITISH AEROSPACE PLC AND THE MARCONI ELECTRONIC SYSTEMS BUSINESS OF THE GENERAL ELECTRIC COMPANY PLC

MERGER BETWEEN BRITISH AEROSPACE PLC AND THE MARCONI ELECTRONIC SYSTEMS BUSINESS OF THE GENERAL ELECTRIC COMPANY PLC MERGER BETWEEN BRITISH AEROSPACE PLC AND THE MARCONI ELECTRONIC SYSTEMS BUSINESS OF THE GENERAL ELECTRIC COMPANY PLC UNDERTAKINGS GIVEN TO THE SECRETARY OF STATE FOR TRADE AND INDUSTRY BY BAE SYSTEMS PLC

More information

IT06 - Information Technology (IT) Hardware and Software Policy

IT06 - Information Technology (IT) Hardware and Software Policy IT06 - Information Technology (IT) Hardware and Software Policy Introduction 1 This policy sets out the general rules for the use of Southampton Solent University IT hardware and software. Southampton

More information

UK Aerospace Industry Controlled Other Party (ICOP) Auditor Authentication Scheme

UK Aerospace Industry Controlled Other Party (ICOP) Auditor Authentication Scheme How to apply for and maintain UK Aerospace Industry Controlled Other Party (ICOP) Auditor Authentication Scheme Contents 1. General information 2 2. IRCA Aerospace auditor authentication grades 3 3. Criteria

More information

An Introduction to Internal Audits

An Introduction to Internal Audits An BRC Global Standards. Trust in Quality Internal Audits (Section 3.4 excluding 3.4.4) An internal audit is any audit completed by or on behalf of the company, rather than conducted by a second or third

More information

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM CONTENTS Page No 1 GENERAL REQUIREMENTS 1 1.1 Requirements 1

More information

Training Schedule for 2016/2017 CERTIFIED COURSES

Training Schedule for 2016/2017 CERTIFIED COURSES S I N G A P O R E Q U A L I T Y I N S T I T U T E Website: www.sqi.org.sg Email: enquiries@sqi.org.sg Our World Partner in Quality Training Schedule for 2016/2017 CERTIFIED COURSES Course Day / Hour Commencement

More information

Information Governance Strategy

Information Governance Strategy Information Governance Strategy ONCE PRINTED OFF, THIS IS AN UNCONTROLLED DOCUMENT. PLEASE CHECK THE INTRANET FOR THE MOST UP TO DATE COPY Target Audience: All staff employed or working on behalf of the

More information

Certification Process Requirements

Certification Process Requirements SAAS Certification Process Requirements SAAS Procedure 200 Social Accountability Accreditation Services, June 2010 Accreditation Process and Policies SAAS Normative Requirements SAAS maintains a set of

More information

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding between Department for Business, Innovation and Skills and United Kingdom Accreditation Service Page 1 of 13 Contents 1 Purpose... 3 2 Background... 3 3 Scope of activity...

More information

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL Printed QMS Documentation is Uncontrolled Page 1 of 19 QUALITY MANAGEMENT SYSTEM (QMS) MANUAL ISSUE/ REVISION DATE DESCRIPTION ISSUE HISTORY PREPARED/ APPROVED BY 09/04/2014 Initial issue G.Rees 11/04/2014

More information

Delivering progress towards meeting HMG targets on the SME growth agenda

Delivering progress towards meeting HMG targets on the SME growth agenda Delivering progress towards meeting HMG targets on the SME growth agenda Action Plan Version 1.1 dated 16 th August 2013 Author: Robert Astall, Head of Commercial Profession and Capability Background The

More information

WORK HEALTH AND SAFETY

WORK HEALTH AND SAFETY WORK HEALTH AND SAFETY SCOPE POLICY Work Health and Safety System Work Health and Safety Objectives Roles and Responsibilities Executive Responsibilities Manager Responsibilities Worker Responsibilities

More information

Compliance Audit Handbook

Compliance Audit Handbook Compliance Audit Handbook This Compliance Audit Handbook has been produced by the Compliance and Assurance Section of the Department of Environment and Conservation NSW (DEC). For technical information

More information

Current Employment Opportunities Full Time Staff. Current Vacancies: I. Senior Project Manager / Project Manager... 2

Current Employment Opportunities Full Time Staff. Current Vacancies: I. Senior Project Manager / Project Manager... 2 Current Vacancies: I. Senior Project Manager / Project Manager... 2 I. Senior Project Manager / Project Manager Introduction Maxwell Stamp PLC (MSP) is recognised as one of the world s leading development

More information

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties

More information

CONTENT OF BOOKLET. 4 Objective & Scope 5 Safe Management Practices. 6. Training. 8. Emergency Response. 9. Control of Operations. 10.

CONTENT OF BOOKLET. 4 Objective & Scope 5 Safe Management Practices. 6. Training. 8. Emergency Response. 9. Control of Operations. 10. ISSUE 1 - April 2002 Recommendations on Safety, Health and Environmental Management Practices for Logistics Service Providers CONTENT OF BOOKLET 4 Objective & Scope 5 Safe s 1. Commitment & Awareness of

More information

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ Manufacturers have worked to meet the stringent requirements of AS9100 for decades; the recent introduction of Revision C has further expanded

More information

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April 2012. Authorised by: Managing Director.

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April 2012. Authorised by: Managing Director. Quality Manual Issue 4 Forth Engineering (Cumbria) Limited QUALITY MANUAL Copy Number: 1 The information contained in this Manual is the property of Forth Engineering (Cumbria) Limited and must not be

More information

DCA metrics for the approval of Auditing Firms for Certifications Scheme VERSION 1.0

DCA metrics for the approval of Auditing Firms for Certifications Scheme VERSION 1.0 DCA metrics for the approval of Auditing Firms for Certifications Scheme VERSION 1.0 2013, Data Centre Alliance Limited (www.datacentrealliance.org). All rights reserved. This publication may not be reproduced

More information

User Guide for Contract Costs Statement

User Guide for Contract Costs Statement User Guide for Contract Costs Statement 1 Introduction 1. Introduction 1.1 This document is issued by the Single Source Regulations Office (SSRO) and sets out guidance to assist contractors with statutory

More information

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL OUR UNIQUE SOLUTION TO YOUR UNIQUE SITUATION SGS is recognised as the global benchmark for quality and integrity. We

More information

Report for Agenda Item: 19. QLDC Organisational Health Safety and Wellbeing Performance

Report for Agenda Item: 19. QLDC Organisational Health Safety and Wellbeing Performance QLDC Council 3 June 216 Department: Corporate Services Report for Agenda Item: 19 QLDC Organisational Health Safety and Wellbeing Performance Purpose The purpose of this report is to provide Councillors

More information

Managing ICT contracts in central government. An update

Managing ICT contracts in central government. An update Managing ICT contracts in central government An update Prepared by Audit Scotland June 2015 Auditor General for Scotland The Auditor General s role is to: appoint auditors to Scotland s central government

More information

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF:

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF: THE QUALITY POLICY STATEMENT OF: MP Plumbing & Heating Ltd Unit 8,The Metro Centre, Bridge Road, Orpington BR5 2BE Telephone: 01689 822188 Fax: 01689 897 733 E-Mail: info@mpplumbingheating.co.uk Web page:

More information

Health and Safety Policy and Procedures

Health and Safety Policy and Procedures Health and Safety Policy and Procedures Health & Safety Policy & Procedures Contents s REVISION AND AMENDMENT RECORD : Summary of Change Whole Policy 4.0 05 Nov 08 Complete re-issue Whole Policy 4.1 10

More information

Council Policy. Records & Information Management

Council Policy. Records & Information Management Council Policy Records & Information Management COUNCIL POLICY RECORDS AND INFORMATION MANAGEMENT Policy Number: GOV-13 Responsible Department(s): Information Systems Relevant Delegations: None Other Relevant

More information

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1

More information

Derbyshire Trading Standards Service Quality Manual

Derbyshire Trading Standards Service Quality Manual Derbyshire Trading Standards Service Quality Manual This Quality Manual has been developed to give a broad outline of how the Trading Standards Division s range of services comply with the requirements

More information

Director of Performance & Academic Standards

Director of Performance & Academic Standards Job Description for: Responsible to: Head of Academic Standards Director of Performance & Academic Standards POST SUMMARY: The post holder will, by working with appropriate Directors and Academic Managers,

More information

Central Hosting. Case Study

Central Hosting. Case Study Central Hosting Case Study October, 2014 Central Hosting Case Study Background An Chéim was originally set up to procure, distribute and implement key MIS systems (hardware and software) for the Institutes

More information

RSA Household Insurance Claim Form and Guidance Notes

RSA Household Insurance Claim Form and Guidance Notes RSA Household Insurance Claim Form and Guidance Notes Customer Service Customer Complaints Procedure We are anxious to provide the highest quality of customer service at all times. We are eager therefore

More information

BS EN 16001 Energy Management Systems VICTORIA BARRON, PRODUCT MARKETING MANAGER, BSI

BS EN 16001 Energy Management Systems VICTORIA BARRON, PRODUCT MARKETING MANAGER, BSI BS EN 16001 Energy Management Systems VICTORIA BARRON, PRODUCT MARKETING MANAGER, BSI Agenda Energy Management in context Why Energy Management? Business Needs How BS EN 16001 helps organisations meet

More information

BUSINESS MANAGEMENT SYSTEM MANUAL

BUSINESS MANAGEMENT SYSTEM MANUAL BUSINESS MANAGEMENT SYSTEM MANUAL MS-MA-001-10 Page 1-15 Table 1: AMENDMENTS Amendment Number Description of Change Page No Effective Date 09 Full manual revision Full Document October 2012 10 Amendment

More information

Business Continuity Management Framework 2014 2017

Business Continuity Management Framework 2014 2017 Business Continuity Management Framework 2014 2017 Blackpool Council Business Continuity Framework V3.0 Page 1 of 13 CONTENTS 1.0 Forward 03 2.0 Administration 04 3.0 Policy 05 4.0 Business Continuity

More information

DEFENCE INSTRUCTIONS (GENERAL)

DEFENCE INSTRUCTIONS (GENERAL) DEFENCE INSTRUCTIONS (GENERAL) New instruction 0 LOG 4 5 012 Regulation of technical integrity of Australian Defence Force materiel Department of Defence CANBERRA ACT 2600 10 September 2010 Issued with

More information

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT THE MASTER VERSION OF JSP 886 IS PUBLISHED ON THE DEFENCE INTRANET. FOR TECHNICAL REASONS,

More information

CEA Base requirements for Installers of Automatic Fire Detection and Alarm Systems (AFDS), Intruder Alarm Systems (IAS) and/or CCTV-Systems

CEA Base requirements for Installers of Automatic Fire Detection and Alarm Systems (AFDS), Intruder Alarm Systems (IAS) and/or CCTV-Systems 26 Boulevard Haussmann F 75009 Paris Tél. : +33 1 44 83 11 83 Fax : +33 1 47 70 03 75 www.cea.assur.org Square de Meeûs, 29 B 1000 Bruxelles Tél. : +32 2 547 58 11 Fax : +32 2 547 58 19 www.cea.assur.org

More information

The Property Services Officer (PSO) will assist the Property Services Team to provide a first class property maintenance service which:

The Property Services Officer (PSO) will assist the Property Services Team to provide a first class property maintenance service which: JOB DESCRIPTION POSITION: Property Services Officer (Draft) GRADE: EVH Grade 7 (Spinal Points PA22 PA25: 28,434-31,223) January 2013 INTRODUCTION The Property Services Officer (PSO) will assist the Property

More information

ATHENA Ethical Framework (Version 1- February 2014)

ATHENA Ethical Framework (Version 1- February 2014) ATHENA Ethical Framework (Version 1- February 2014) ATHENA is co-funded by the European Commission, Executive Research Agency, Seventh Framework Programme (SEC call FP7-SEC-2012.6.1.30) 1. Introduction

More information

INTERNAL AUDIT FRAMEWORK

INTERNAL AUDIT FRAMEWORK INTERNAL AUDIT FRAMEWORK April 2007 Contents 1. Introduction... 3 2. Internal Audit Definition... 4 3. Structure... 5 3.1. Roles, Responsibilities and Accountabilities... 5 3.2. Authority... 11 3.3. Composition...

More information

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification Protocol] is maintained on the Bonsucro website: www.bonsucro.com.

More information

Document Title: Trust Approval and Research Governance

Document Title: Trust Approval and Research Governance Document Title: Trust Approval and Research Governance Document Number: SOP034 Staff involved in development: Job titles only Document author/owner: Directorate: Department: For use by: RM&G Manager, R&D

More information

Asbestos Management Policy (Version 3)

Asbestos Management Policy (Version 3) Asbestos Management Policy (Version 3) Contents Page Introduction 3 College Policy Statement for Asbestos Management 3 Objectives (of this Policy and Procedure) 3 Application of Policy 4 Licensed Asbestos

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

Example of a food company quality

Example of a food company quality Appendix A manual Example of a food company quality Contents Date: 13/03/95 RME-QLMN-OO Page 1 of 3 Section Title ISO 9001 reference 01 In trod uction 02 Purpose 03 Scope 04 Definitions 05 Management responsibility

More information

Jonathan Wilson. Sector Manager (Health & Safety)

Jonathan Wilson. Sector Manager (Health & Safety) Jonathan Wilson Sector Manager (Health & Safety) OHSAS 18001:2007 Making Life Easier For Health & Safety Managers Workshop Agenda 1. Introduction 2. Why Manage Health & Safety 3. OHSAS 18001 and OHSMS

More information

RSPO Supply Chain Certification Systems

RSPO Supply Chain Certification Systems RSPO Supply Chain Certification Systems November 2009 Approved by RSPO Executive Board 5 November 2009 1 History of Document These RSPO Supply Chain Certification Systems are based on the outcome of the

More information

Quality Management Plan

Quality Management Plan 6500m HOV Project Stage 1: A-4500 HOV Document Control No.: 0000000 3-November-2009 WOODS HOLE OCEANOGRAPHIC INSTITUTION WOODS HOLE, MA 02543 Document Control Sheet Date Originator Description 07-28-09

More information

Facilities Maintenance Contract

Facilities Maintenance Contract Re-tendering the Facilities Maintenance Contract Asset Management Services UTAS Property Portfolio Total Asset Management Reviewing options and preferences Contract structure & deliverables Tendering process

More information

ISO 9001 : 2000 Quality Management Systems Requirements

ISO 9001 : 2000 Quality Management Systems Requirements A guide to the contents of ISO 9001 : 2000 Quality Management Systems Requirements BSIA Form No. 137 February 2001 This document is the copyright of the BSIA and is not to be reproduced without the written

More information

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS LEC (Company Audit) Guidance Notes Glossary of Terms Transport for London (TfL) London Low Emission

More information

INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT

INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT 2.0 HEALTH, SAFETY & ENVIRONMENT MANUAL 2.1 HAZARD MANAGEMENT

More information

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document. 2 of 34 Revision Summary Revision Number Date Description of Revisions Initial issue of the document. Table of Contents Item Description Page 1. Introduction and Purpose... 5 2. Project Management Approach...

More information

Certification Procedure of RSPO Supply Chain Audit

Certification Procedure of RSPO Supply Chain Audit : 1 of 19 Table of Contents 1. Purpose 2. Scope 3. Unit of Certification 3.1 Identity Preserved, Segregation, Mass Balance, 3.2. Book and Claim 4. Definitions 5. Responsibilities 5.1 Head of the Certification

More information

OH&S Management Systems Audit Checklist (NAT, E3)

OH&S Management Systems Audit Checklist (NAT, E3) 3.1.2 3.1.1 Introduction OH&S Management Systems Audit Checklist (NAT, E3) This audit checklist is based on Element 3 (Implementation) of the National Self-Insurers OHS Audit Tool. For a full copy of the

More information

NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS

NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS Edition A Version 1 April 2013 NORTH ATLANTIC TREATY ORGANIZATION ALLIED ADMINISTRATIVE PUBLICATION

More information

How To Comply With The Loss Prevention Certification Board

How To Comply With The Loss Prevention Certification Board Loss Prevention Standard LPS 1014: Issue 5.3 This Loss Prevention Standard is the property of BRE Global Ltd. and is made publicly available for information purposes only. Its use for testing, assessment,

More information

Records Management plan

Records Management plan Records Management plan Prepared for 31 October 2013 Audit Scotland is a statutory body set up in April 2000 under the Finance and Accountability (Scotland) Act 2000. We help the Auditor General for Scotland

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and

More information

Outsourcing Risk Guidance Note for Banks

Outsourcing Risk Guidance Note for Banks Outsourcing Risk Guidance Note for Banks Part 1: Definitions Guideline 1 For the purposes of these guidelines, the following is meant by: a) outsourcing: an authorised entity s use of a third party (the

More information

Corporate Health and Safety Policy

Corporate Health and Safety Policy Corporate Health and Safety Policy November 2013 Ref: HSP/V01/13 EALING COUNCIL Table of Contents PART 1: POLICY STATEMENT... 3 PART 2: ORGANISATION... 4 2.1 THE COUNCIL:... 4 2.2 ALLOCATION OF RESPONSIBILITY...

More information

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution

More information

How DCMA Helps To Ensure Good Measurements

How DCMA Helps To Ensure Good Measurements How DCMA Helps To Ensure Good Measurements Speaker/Author: Robert Field Defense Contract Management Agency 605 Stewart Avenue Garden City, New York 11530 Email: robert.field@dcma.mil Phone: (516) 228-5886;

More information

NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION AQAP 2110 (June 2003) I ORIGINAL Page blank II ORIGINAL NORTH ATLANTIC TREATY ORGANIZATION NATO STANDARDISATION AGENCY (NSA) NATO

More information

Entrepreneurs Programme - Business Growth Grants

Entrepreneurs Programme - Business Growth Grants Entrepreneurs Programme - Business Growth Grants Version: 15 July 2015 Contents 1 Purpose of this guide... 4 2 Programme overview... 4 2.1 Business Management overview... 4 3 Business Growth Grant... 5

More information

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS WELDING FABRICATOR CERTIFICATION SCHEME DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS 6 th Edition July 2012 Issued under the authority of the Governing Board for Certification All correspondence should

More information

Achieve ISO Certification

Achieve ISO Certification Achieve ISO Certification Risk Management & Compliance Services Main UK Office 020 3432 2854 Midlands Office 01332 896 478 Wales & West Office 029 2000 4623 Assent 1st Floor, 120 London Road, Benfleet,

More information

Quality Management Subcontractor QM Guide-Section Two

Quality Management Subcontractor QM Guide-Section Two SECTION TWO QUALITY MANAGEMENT SYSTEMS Version No 1. PREFACE This document has been developed to assist subcontractors to meet Monaco Hickeys (MHPL) Quality Management (QM) requirements whilst working

More information

QUALITY MANAGEMENT SYSTEM MANUAL LEC MARINE (KLYNE) LTD

QUALITY MANAGEMENT SYSTEM MANUAL LEC MARINE (KLYNE) LTD QUALITY MANAGEMENT SYSTEM MANUAL For LEC MARINE (KLYNE) LTD In Accordance with the Principles Contained in BS EN ISO 9001:2008 Page 1 of 39 : Issue 12: Authorised by WM Sawyer June 2012 REVISION SHEET

More information

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project

More information

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL 130 Wisbech Road Outwell Wisbech Cambridgeshire PE14 8PF Tel: (01945) 772578 Fax: (01945) 773135 Copyright 2003. This Manual and the information contained herein are the property Bloom & Wake (Electrical

More information

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: pcn@bindt.org CP14 ISSUE 5 DATED 1 st OCTOBER

More information

Integrated management systems Ship operating companies

Integrated management systems Ship operating companies Integrated management systems Ship operating companies Safety, Quality, Environment and Occupational Health and Safety DNV Maritime Preamble Organisations of all kinds are increasingly concerned about

More information

Phoenix Security (Essex) Ltd.

Phoenix Security (Essex) Ltd. DESCRIPTION PROCEDURES INDEX. APPENDICES INDEX. CIRCULATION LIST OP 101 CONTRACT REVIEW. OP 102 PURCHASING. OP 103 RECORDS OP 104 DOCUMENT CONTROL. OP 105 APPROVED SUPPLIERS. OP 106 GOODS IN INSPECTION.

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

DOCUMENT. General Purchase Conditions

DOCUMENT. General Purchase Conditions 1. Scope 1.1 These general purchase conditions (hereinafter the GPC ) shall apply to all kinds of materials, articles, products and services related to them, (hereinafter Products ), offered, sold or supplied

More information

COMPANY QUALITY MANUAL

COMPANY QUALITY MANUAL COMPANY QUALITY MANUAL QM/BI/001(03) THE APPROACH TO QUALITY This manual and information within is the property of The Benbow Group Limited. The information contained herein may not be disclosed in whole

More information

Gladstone Ports Corporation Limited

Gladstone Ports Corporation Limited Gladstone Ports Corporation Limited Human Resources Committee Charter #159378v5 Adopted by Board 17/7/07 1 Table of Contents 1. TERMS OF REFERENCE... 3 2. ROLE AND RESPONSIBILITIES... 3 3. RELATIONSHIP

More information

Contract Management Guideline

Contract Management Guideline www.spb.sa.gov.au Contract Management Guideline Version 3.2 Date Issued January 2014 Review Date January 2014 Principal Contact State Procurement Board Telephone 8226 5001 Contents Overview... 3 Contract

More information

Foreign Exchange Policy and Procedures

Foreign Exchange Policy and Procedures Foreign Exchange Policy and Procedures Commencement Date: 23 August, 2006 Category: Finance 1. PURPOSE The purpose of this policy is to regulate Foreign Currency transactions of Material amounts and to

More information

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained

More information

Definition of Quality. New Definition of Quality. The changing trend... INTRODUCTION. Vendor Approval & Performance Monitoring

Definition of Quality. New Definition of Quality. The changing trend... INTRODUCTION. Vendor Approval & Performance Monitoring INTRODUCTION Vendor Approval & Performance Monitoring Evolutionary Process has made CHANGE THE ONLY CONSTANT Changes in Technology, Customer s needs and likings, Innovations, Economic, Social and Environmental

More information

Manufacturing Capability profile

Manufacturing Capability profile Manufacturing Capability profile MANUFACTURING Our capabilities and our people BAE Systems offers the Australian Defence Force (ADF) and security customers total capability across the defence and security

More information

Rolls Royce s Corporate Governance ADOPTED BY RESOLUTION OF THE BOARD OF ROLLS ROYCE HOLDINGS PLC ON 16 JANUARY 2015

Rolls Royce s Corporate Governance ADOPTED BY RESOLUTION OF THE BOARD OF ROLLS ROYCE HOLDINGS PLC ON 16 JANUARY 2015 Rolls Royce s Corporate Governance ADOPTED BY RESOLUTION OF THE BOARD OF ROLLS ROYCE HOLDINGS PLC ON 16 JANUARY 2015 Contents INTRODUCTION 2 THE BOARD 3 ROLE OF THE BOARD 5 TERMS OF REFERENCE OF THE NOMINATIONS

More information

How To Inspect A Blood Bank

How To Inspect A Blood Bank Site visit inspection report on compliance with HTA minimum standards Belfast Cord Blood Bank HTA licensing number 11077 Licensed for the procurement, processing, testing, storage, distribution and import/export

More information

JOB DESCRIPTION: CENTRE MANAGER, ELECTRIC WORKS.

JOB DESCRIPTION: CENTRE MANAGER, ELECTRIC WORKS. JOB DESCRIPTION: CENTRE MANAGER, ELECTRIC WORKS. Context Electric Works provides serviced office accommodation for small and medium-sized companies working in a range of creative, digital and knowledge

More information

Health, Safety and Environment Management System

Health, Safety and Environment Management System Health, Safety and Environment Management System For Bridgeport Energy Ltd Level 7, 111 Pacific Highway North Sydney 2011 June, 2010 DOCUMENT CONTROL Title: Document Number: Health, Safety and Environmental

More information

BUSINESS CONTINUITY POLICY RM03

BUSINESS CONTINUITY POLICY RM03 BUSINESS CONTINUITY POLICY RM03 Applies to: All NHS LA employees, contractors, secondees and consultants, contractors and/or any other parties who will carry out duties on behalf of the NHS LA Version:

More information

Managed Services. New Vibrations. Contents. Key Articles

Managed Services. New Vibrations. Contents. Key Articles Managed Services New Vibrations New Vibrations is a global staffing and services company dedicated to the Telecommunications, IT and Rail sectors. Founded in Portugal in early 2005, New Vibrations quickly

More information

Scheme rules for thermal insulation products for building equipment and industrial installations - VDI certification scheme

Scheme rules for thermal insulation products for building equipment and industrial installations - VDI certification scheme Scheme rules for thermal insulation products for building equipment and industrial installations - certification scheme April 6, 2011 1. Introduction This document presents the rules of the product certification

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998)

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998) 1 APPLICABILITY VDA 6.1: Section: 3.1; 7 new: In addition to the applicability for supplier sites for production, services and their subcontractors for: products and production materials, or services like

More information

Revision: 3. Author: J McGuire Department: Company. Category: Contract Management. Appr. Signature: CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE...

Revision: 3. Author: J McGuire Department: Company. Category: Contract Management. Appr. Signature: CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... POLICY Title: QAL Contract Management Policy Policy No: P801.001 Issue: 2 Revision: 3 Operative Date: 10/11/2009 Author: J McGuire Department: Company Sect./Classification: Company Category: Contract Management

More information

Supplier Performance Management Program. CEA Edmonton Buildings Committee November 13, 2012

Supplier Performance Management Program. CEA Edmonton Buildings Committee November 13, 2012 Supplier Performance Management Program CEA Edmonton Buildings Committee November 13, 2012 Supplier Performance Management Program - Background Consulting Services Review (Dec 14, 2009): The Office of

More information

GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page

GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page 7/11/12 Supplier Quality 1 of 18 7/11/12 Supplier Quality 2 of 18 Table of Contents 1.0 Introduction 3 2.0 Manual 4 2.1 Application 4 2.2 Quality Management System of the Supplier 4 2.3 Quality Management

More information

ROYAL HOLLOWAY, UNIVERSITY OF LONDON

ROYAL HOLLOWAY, UNIVERSITY OF LONDON ROYAL HOLLOWAY, UNIVERSITY OF LONDON ASBESTOS MANAGEMENT POLICY (Version 2) This Policy defines the College s arrangements for the management of asbestos and the measures to be taken for the protection

More information

EU F-Gas Regulation Guidance Information Sheet 15: Fire Protection System Contractors

EU F-Gas Regulation Guidance Information Sheet 15: Fire Protection System Contractors Information Sheet 15: Fire Protection System Contractors Target audience for this Information Sheet This Information Sheet is aimed at contractors that carry out installation, maintenance and decommissioning

More information