1 TOWN OF CARLETON PLACE 175 Bridge Street Carleton Place, ON K7C 2V8 Building Permit Application Kit RESIDENTIAL NEW CONSTRUCTION Pre-Consultation We encourage the applicant to pre-consult with the Planning Department by calling and the Building Department at to discuss the proposed building design. Application Checklist Complete this checklist and bring this page with you at the time you apply for a permit. Failure to submit any of the following may delay the application and permit approval process. The purpose of this checklist is to provide assistance to permit applications but does not address all the requirements in the Ontario Building Code and other applicable law. PROJECT ADDRESS: Has the proposed construction been through a preliminary review or approval with Planning? IMPORTANT: If the proposed project is not a single or semi-detached dwelling the applicant must first go through a Development Permit approval process before applying for a building permit Is the proposed construction near the river and regulated by the Mississippi Valley Conservation Authority? Is the property on a well or septic system? Is there an easement on the property? (No structure may be built within an easement) No Required Provided Detail of Documents & Fees Required No Residential New Construction Permit Application with ALL SECTIONS completed Schedule 1 completed and signed by qualified designer Note 1 Letter of Authorization Form from property owner Application Fee (refer to Section F) 2 Copies Legal survey showing proposed structure 2 Copies Grading & Drainage Plan (refer to Section G) 2 Copies Drawings of proposed work: floor plans, elevations including colour and cladding type, building section, details and specifications (refer to Section C) Note 2 2 Copies Floor joist and roof truss layouts from manufacturer Sump Pit Detail Sign-off (refer to Section H) Energy Efficiency Design Form (2012 Energy Requirements) Complete Proposed Plumbing Work Form Note 3 2 Copies Professional Engineer s letter (or seal on drawings) SEE NOTES ON NEXT PAGE

2 Notes to table on required documents: 1. The letter of authorization form is required only if the person signing the application is NOT the building/property owner. 2. Separate roof truss and floor joist layouts are required by manufacturer if not proposing conventional framing. 3. A structural engineer is required where proposed work does not fall under the design limitations nor meets the residential tables of the Ontario Building Code. Note: Architects and/or Engineers are typically required for larger multi-residential projects. Have these professionals complete a Commitment to General Reviews by Architect & Engineers form. Personal Information: Personal information contained in this permit application and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be used in the administration and enforcement of the Building Code Act, Questions about the collection of personal information may be addressed to: a) the Chief Building Official of the municipality or upper-tier municipality to which this application is being made, or, b) the inspector having the powers and duties of a Chief Building Official in relation to sewage systems or plumbing for an upper-tier municipality, Board of Health or Conservation Authority to whom this application is made, or, c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing 777 Bay Street, 2 nd Floor, Toronto, M5G 2E5 (416) Forms: 1) For the purpose of the Designer Form, individual means the person referred to in Clause (1) of Division C, Article of Division C, and all other persons who are exempt from qualification under Subsections and of Division C. 2) Schedule 1 is not required to be completed by a holder of a licence, temporary licence, or a certificate of authorization, issued by the Ontario Association of Architects. Schedule 1 is also not required to be completed by a holder of a licence to practise, a limited licence to practise, or a certificate of authorization, issued by the Association of Professional Engineers of Ontario. For Office Use NOTES: APPLICATION IS RECEIVED (complete / incomplete)

3 Drawings Two copies of each of the following drawings are required for a complete application: Site Grading and Services Drawing Detail Provide a drawing which shows all existing services and details existing grading which also shows all proposed alterations. Site Plan based on a Legal Survey Provide a drawing based on a legal survey which shows property lines, setbacks from property lines to existing and proposed building(s), distances between buildings and parking details, including all the dimensions. Plans Foundation plans, floor plans, building elevations, building sections, wall sections, mechanical ventilation design and specifications. Provide enough information to demonstrate compliance with the Ontario Building Code. Roof Truss Truss drawings, engineered by a truss manufacturing company (if not showing conventional framing on plans). Floor Design Floor joist layout drawing, engineered by a joist manufacturing company (if not showing conventional framing on plans). Approval Process Upon receipt of a complete application, building staff will review the proposed work and within 10 business days (for house category) or within 15 business days (for small building category) advise that: The application is approved and that the permit is available to pick up at reception upon payment of the building permit fee; or The application proposes work which does not comply (detailed reasons will be provided to the applicant or the designer). Other Approvals: The following may be required before a building permit can be issued: Mississippi Valley Conservation Authority approval - if near the river Health Unit approval for private services only Planning approval must conform to the Development Permit By-Law Geotechnical Report by Soils Engineer ** Materials should not be ordered and work shall not begin until a building permit has been issued **

4 Inspection Guidelines The following will help you complete your inspections successfully. Site Copy Drawings Once a permit is issued you will receive a building permit and your site copy drawings & documents. All site copies must be on site at time of construction and at time of the inspection. Your building permit is to be posted on site in a place visible to the public. Booking Inspections The permit will indicate which inspections will be required and the number to book an inspection prior to the work being covered. Please refer to the civic address, the permit number and provide a contact number when calling for an appointment. The Province requires a Municipality to provide an inspection within 48 business hours of the request. AIR BARRIER INSPECTION STAGE IS REQUIRED TO BE INSPECTED BEFORE COVERING. REFER TO THE INSTALLATION REQUIREMENTS OF YOUR AIR BARRIER PRODUCT AND THE OBC. Occupancy Inspection The following are required prior to receiving an occupancy permit: Hydro Final Certificate of Inspection (Electrical Safety Authority ESA-SAFE) All professional certificates (if any) of on-site review for soils Structural Review Letter for on-site installation of Professional Engineer s design (where required) Mechanical Ventilation Design Summary, Heat Loss Calculation & Mechanical Layout Payment of Development Fees. Copy of any certifications required by Part 12 Energy Resource Conservation Confirmation of insulation in attic space, walls, above grade and basement walls. Note: No deposit will be refunded if the developer allows the building to be occupied prior to correcting identified deficiencies and receiving an occupancy permit. Final Inspection The following are required prior to closing a permit file and releasing the building permit deposit: Copy of as built survey showing foundation location and setbacks (if applicable) Confirmation that altered grading complies with approved grading plan (by Engineer in subdivision) Note: No deposit will be refunded if a final inspection report has not been successfully completed within one year from the date of permit issuance. Responsibilities The owner or contractor is responsible for booking inspections and for providing revised drawings (where changes or modifications are made to the designs already submitted). Additional permit fees may apply for revisions to approved drawings. ALL OF THE FOLLOWING TRADES REQUIRE A VALID CONTRACTOR S LICENSE TO WORK IN ONTARIO; plumbers, electricians, septic installers, sheet metal workers and refrigeration

5 Fee Table The amounts in bold are required at the time a permit is applied for. Permit Work for New Residential Permit Fee (Minimum) (Plus) Deposit Residential New Construction $12.00/m² Plumbing $10.00 an appliance/fixture ($100.00) $ / new unit. (Maximum Unfinished basement with plumbing rough $ $ /block) Garages (max 15 metres squared per bay) $100.00/bay Other Revision to Permit (Changes that require Building Code analysis or that affect the size or safety of the building and its components) $ N/A Penalty Fee (Starting to construct prior to permit issuance) 100% of normal permit fees for the type of project or $ whichever is greater Development Fee (downtown district and strategy properties as defined by the Official Plan are exempt) By cheque at permit issuance (postdated 60 days but no longer than occupancy inspection) N/A Charge (per new unit) Single, Semi-Detached or Duplex $4, Multiples including town houses, garden homes, row houses, a triplex or $3, other multiple type dwelling units where no other dwelling unit is located above or below it. Multiples including apartments and other multiple type dwelling units where another dwelling unit is constructed above and/or below it and the said dwelling unit contains two or more bedrooms (or 1 bedroom + a den, family room, etc.) $3, Multiples including bachelor apartments and one bedroom $1, Multiples including seniors style which do not include kitchen or cooking $1, facilities County Development Charge to new residential units at the time of permit issuance (charges range from $ $ per unit). Call Lanark County at to verify the amount for your project. Sewer and Water Fee (downtown district and strategy properties as defined by the Official Plan are exempt) Charge (per new unit) Single or Semi-Detached $5, Multi Residential (more than two bedrooms) $5, Multi Residential (two bedrooms or less) $4, Other - Special Area Charges may apply (Town will review application and advise) Deposits are not refundable upon cancellation of applications

6 Elevation Worksheet FOR INFILL LOTS ONLY Civic Address - The following worksheet may be used to help set the elevation of your slab and finished grade. Setting the correct slab elevation will ensure the building services will have proper drainage to the Town s service at street level (service elevations may be obtained from the Public Works Department). Setting the correct finished grade will ensure surface drainage is directed away from the building and not adversely affecting neighbouring properties. The elevations calculated on this form may be transferred to a proper site plan.

7 Sump Pit Detail Sign-off Civic Address - The following drawings illustrate the different sump pti details. Every new dwelling must contain a sump pit (and in some areas a sump pump) as per these details provided by the Town of Carleton Place. By initialing in the boxes provided, you are indicating which detail applies to your application and that you understand these requirements.

8 PLEASE PRINT 1. AUTHORIZATION LETTER OF AUTHORIZATION FORM The Property owner shall complete this section (1) when anyone other than the owner is signing the permit application. I (property owner) authorize the Applicant, being or any person acting on behalf of the Applicant to apply for and obtain a Building Permit to (describe the scope of the work) at the following location (civic address or legal description) Signature Date (mm/dd/yyyy) Contact Information PLEASE PRINT 2. HERITAGE STATUS Building No. DECLARATION OF HERITAGE STATUS FORM The owner shall complete this section (2) for all permit applications except for new construction or detached accessory structures. Street Name Municipality Province Postal Code Owner s Last Name Owner s First Name Contact Number Declaration of owner: I have applied for a building permit to; Create an addition to the building Alter/repair the building Demolish the building at the above address and I certify that; the property is not designated under Part IV of the Ontario Heritage Act; the property is designated under Part IV of the Ontario Heritage Act and the project, identified in the Building Permit Application, has been approved by the Municipal Heritage Committee and Council (attach copy of approval). Signature Date (mm/dd/yyyy)

9 Application number: Date received: RESIDENTIAL NEW CONSTRUCTION PERMIT APPLICATION This form is authorized under subsection 8(1.1) of the Building Code Act. For use by Principal Authority Permit number: Roll number: Application submitted to: TOWN OF CARLETON PLACE A. Project Information Building number, street name Unit # Lot/Concession Municipality Postal code Plan number/other description Project value est. $ Area of work (m²) B. Purpose of Application New Construction Addition to an existing building Alteration/repair Demolition Proposed use of building Conditional Permit Current use of building Description of proposed work C. Applicant Applicant is: Owner Authorized agent of owner Last name First name Corporation or partnership Street address Unit # Lot/Concession Municipality Postal code Province Telephone number Fax Cell number ( ) ( ) ( ) D. Owner (if different from applicant) Last name First name Corporation or partnership Street address Unit number Municipality Postal code Province Lot/Concession Telephone number ( ) Fax ( ) Cell number ( )

10 E. Builder (optional) Last name First name Corporation or partnership Street address Unit # Lot/Concession Municipality Postal code Province Telephone number Fax Cell number ( ) ( ) ( ) F. Tarion Warranty Corporation (Ontario New Home Warranty Program) Is it proposed construction for a new home as defined in the Ontario New Home Warranties Plan Act? If no, go to section G Is registration required under the Ontario New Home Warranites Plan Act? If yes to ii) provide registration number(s): G. Required Schedules - Attach Schedule 1 for each individual who reviews and takes responsibility for design activities. - Attach Schedule 2 where application is to construct on-site, install or repair a sewage system. H. Completeness and Compliance with Application Law This application meets all the requirements of clauses (5)(a) to (d) of Division C of the building code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted). Payment has been made of all fees that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, 1992, to be paid when the application is made. This application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, This application is accompanied by the information and documents prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable the Chief Building Official to determine whether the proposed building, construction or demolition will contravene any applicable law. The proposed building, construction or demolition will not contravene any applicable law. I. Declaration of Applicant I delare that: (print name) 1. The information contained in this application, attached schedules, attached plans and specifications, and other attached documentation is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. No No No No No No No Date Signature of Applicant

11 SCHEDULE 1: DESIGNER INFORMATION Use one form for each individual who reviews and takes responsibilty for design activites with respect to the project. A. Project Information Building number, street name Unit # Lot/con. Municipality Postal code Plan number/other description B. Individual who reviews and takes responsibility for design activities Name Firm Street address Unit # Lot/con. Municipality Postal code Province address Telephone number Fax number Cell number ( ) ( ) ( ) C. Design activities undertaken by individual identified in Section B. (Building Code Table of Division C) House HVAC - House Building Structural Small Buildings Building Services Plumbing - House Large Buildings Detection, Lighting and Power Plumbing All Buildings Complex Buildings Fire Protection On-site Sewage Sysetms Description of designer s work: D. Declaration of Designer I declare that (choose one as appropriate): I review and take responsibility for the design work on behalf of a firm registered under subsection of Division C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories. Individual BCIN: Firm BCIN: I review and take responsibility for the design and am qualified in the appropriate category as an other designer under subsection of Division C, of the Building Code Individual BCIN: Basis for exemption from registration: The design work is exempt from the registration and qualification requirements of the Building Code. Basis for exemption from registration and qualificiation: I certify that: 1. The information contained in this schedule is true to the best of my knowledge. 2. I have submitted this application with the knowledge and consent of the firm. Date Signature of Designer

12 COMMITMENT TO GENERAL REVIEWS BY ARCHITECT AND ENGINEERS THIS FORM TO BE COMPLETED BY THE OWNER S AUTHORIZED AGENT, AND SIGNED BY ALL CONSULTANTS RETAINED FOR GENERAL REVIEWS Project Description: Address of Project: Municipality: Whereas the Ontario Building Code requires that the project described above be designed and reviewed during construction by an architect, professional engineer or both that are licensed to practice in Ontario; Now therefore the Owner, being the person who intends to construct or have the building constructed hereby warrnts that: 1) The undersigned architect and/or professional engineers have been retained to provide general reviews of the construction of the building to determine whether the construction is in general conformity with the plans and other documents that form the basis for the issuance of a building permit, in accordance with the performance standards of the Ontario Association of Architects (OAA) and/or Professional Engineers Ontario (PEO); 2) All general review reports by the architect and/or professional engineers will be forwarded promplty to the Chief Building Official, and 3) Should any retained architect or professional engineer cease to provide general reviews for any reason during construction, the Chief Building Official will be notified in writing immediately, and another architect or engineer will be appointed so that general review continues without interruption during construction. The undersigned thereby certifies that he/she has read and agrees to the above Name of Owner: Date: Address of Owner: Telephone: Signature of Owner/officer of Corporation: Print Name: Fax: Co-ordinator of the work of all consultants: Telephone: Address: Fax:

13 The undersigned architect and/or professional engineer(s) hereby certify that they have been retained to provide general reviews of the parts of construction of the building indicated, to determine whether the construction is in general conformity with the plans and other documents that form the basis for the issuance of a building permit, in accordance with the performance standards of the OAA and/or PEO. To be completed by consultants Architectural Structural Mechanical Electrical Site Services Other (Specify) Consultant Name: Signature: Print Name: Date: Telephone: Fax: Address: Architectural Structural Mechanical Electrical Site Services Other (Specify) Consultant Name: Signature: Print Name: Date: Telephone: Fax: Address: Architectural Structural Mechanical Electrical Site Services Other (Specify) Consultant Name: Signature: Print Name: Date: Telephone: Fax: Address:

14 Application Number: ENERGY EFFICIENCY DESIGN SUMMARY (PART 9 RESIDENTIAL) This form is used to summarize the energy efficiency design of the project. Information on completing this form is attached. For use by Principal Authority Model/Certification Number: A. Project Information Building number, street name Unit no. Lot/con. Municipality Postal code Plan number/other description B. Compliance Option SB-12 Prescriptive (SB ) Table: Package: A B C D E F G H I J K L M (circle one) SB-12 Performance* (SB ) *Attach energy performance calculations using an approved software Energy Star * (SB ) *Attach BOP form EnerGuide 80 * (SB ) *House must be evaluated by NRCan advisor and meet a ring of 80 C. Project Design Conditions Cliatic Zone (SB-1) Heating Equipment Efficiency Space Heating Fuel Scource Zone 1 (< 5000 days) Zone 2 ( 5000 days) 90% AFUE 78%<90% AFUE Windows+Skylights+Glass Doors Gross Wall Area = m² Gross Window + Area = m² % Windows + % Gas Propane Solid Fuel Oil Electric Earth Energy Other Building Conditions ICF Basement Walkout Basement ICF Above Grade Slab-on-ground Log/Post & Beam D. Building Specifications (provide values and ratings of the energy efficiency components proposed, or attach Energy Star BOP form) Building Component RSI / R Values Building Component Efficiency Ratings Thermal Insulation Windows & Doors¹ Ceiling with Attic Space Windows/Sliding Glass Doors Ceiling without Attic Space Exposed Floor Walls Above Grade Skylights Mechanicals Space Heating Equipment² Basement Walls HRV Efficiency (%) Slab (all>600mm below grade) Slab (edge only 600mm below grade) Slab (all 600mm below grade, or heated) DHW Heater (EF) Notes: 1) Provide U-Value in W/m2.K, or ER rating 2) Provide AFUE or indicate if condensing type combined system used.

15 E. Performance Design Verification (complete applicable sections if SB-12 Performance, Energy Star or EnerGuide80 options used) SB-12 Performance: The annual energy consumption using Subsection SB-12 Package is Gj (1 Gj=1000M) The annual energy consumption of this house as designed is Gj The software used to simulate the annual energy use of the building is The building is being designed using an air leakage of air changes per 50Pa. Energy Star: BOP form attached. The house will be labeled on completion by: Energy Star and EnerGuide80: Evaluator/Advisor/Rater Name: Evaluator/Advisor/Rater Licence #: F. Designers (names of designers who are responsible for the building code design and whose plans accompany the permit application) Architectural Mechanical Form authorized by OHBA, OBOA, LMCBO, February 6, 2012 ***************************************************************************************************************** GUIDE TO THE ENERGY EFFICIENCY DESIGN SUMMARY FORM The Energy Efficiency Design Summary form summarizes the compliance path used by a house designer to comply with energy efficiency requirements of the Ontario Building Code. This form is completed by the person responsible for the energy efficiency design of the project, and must be submitted with the building permt application. The information on this form MUST reflect the drawings and specificiations being submitted, or the building permit will be refused. Refer to Supplementary Stanard SB-12 for details about building code compliance requirements. Further information about energy efficiency requirements for new buildings is available from the Provincial Building Code website at or the Municipal Building Department. As of January 1, 2012 a house designer must use one of four energy efficency compliance options in the building code: 1. Comply with the SB-12 Prescriptive design tables 2. Use the SB-12 Performance compliance method, and model the design against the prescriptive standards 3. Design to Energy Star standards, or 4. Evaluate the design according to EnerGuide technical procedures and achieve a rating of 80 or more.

16 COMPLETING THE FORM B. Compliance Options Indicate the compliance option being used. SB-12 Prescriptive requires that the building conforms to a package of thermal insulation, window and mechanical system efficiency requirements set out in Subsection of SB-12. Energy efficiency design modeling and testing of the building is not required under this option. SB-12 Performance refers to the alternative method of compliance set out in Subsection of SB-12. Using this approach the designer must use recognized energy simulation software (HOT2000 V9.34c1.2 or newer), and submit documents which show that the annual energy use of the building is equal to a prescriptive package. Energy Star houses must be designed to Energy Star requirements and be labelled on completion by Enerquality or other agency. The Energy Start BOP form must be submitted with the permit documents. EnerGuide80 houses are validated by NRCan authorized energy advisors and must achieve a rating of 80 or more when evaluated in accordance with EnerGuide administrative and technical procedures. C. Project Design Conditions Climatic Zone: The number of degree days for Ontario cities is contained in Supplementary Standard SB-1. Windows, Skylights and Glass Doors: If the ratio of the total gross area of windows, sidelights, skylights and glass doors to the total gross area of walls is more than 17%, higher efficiency glazing is requried. If the ratio is more than 22% the SB-12 Prescriptive option may not be used. The total area is the sum of all the structural rough openings. Some exceptions apply. Refer to of SB-12 for further details. Fuel Source and Heating Equipment Efficiency: The fuel source and efficiency of the proposed heating equipment must be specified in order to determine which SB-12 Prescriptive compliance package table applies. Other Building Conditons: These construction conditions affect SB-12 Prescriptive compliance requirements. D. Building Specifications Thermal Insulation: Indicate the RSI or R-value being proposed where they apply to the house design. Under the SB-12 Prespective option, RSI 3.52 wall insulation is permitted in certain conditions where other design elements meet higher standards. Refer to SB-12 for further details. E. Performance Design Summary This section is not required to be completed if the SB-12 Prescriptive option is being used. AIR TIGHTNESS REQUIREMENTS FOR NEW HOUSES All houses must comply with increased air barrier requirements in the building code. Notice of air barrier completion must be provided and an inspection conducted prior to it being covered. A blower door test to verify the air tightness of the house must be conducted during construction if the NRCan EnerGuide80 option is used, of if the SB-12 Performance or Energy Star options are used and an air tightness of less than Pa in the case of detached houses, or Pa in the case of attached houses is necessary to meet the required energy efficiency standard. ENERGY EFFICIENCY LABELING FOR NEW HOUSES Energy Star and EnerGuide issue lables for new homes constructed under their energy efficiency programs. The building code does not regulate new home labelling.

17 PROPOSED PLUMBING WORK FORM Project Address: Date: Name Address Telephone # Owner Authorized Agent Plumbing Contractor License No. DESCRIPTION OF WORK Application is to Construct New Repair Existing Renew Alter Plumbing Only Classification of Building: NUMBER OF FIXTURES/APPLIANCES Items Basement 1 st Storey 2 nd Storey 3 rd Storey Other Basins Baths Showers Water Closets Lavatories Laundry Tubs Clothes Washers Hot Water Tanks Dishwashers Urinals Bidets Water Fountains Floor Drains Grease Traps Oils Interceptors Cleanouts Pumps Backwater Valves Hose Bibs Others Subtotals Total

18 RESIDENTIAL MECHANICAL VENTILATION DESIGN SUMMARY Location of Installation Building number, street name Unit no. Lot/con. Municipality Postal code Legal description Builder Name: Builder Address: Phone Number: Fax Number: Installing Contractor Name: Installing Contractor Address: Phone Number: Fax Number: Combustion Appliances (1) Direct vent (sealed combustion only) Natural draft, B-Vent or Induced draft fireplace Positive venting induced draft (except fireplaces) Solid fuel (including fireplaces) Heating Systems Forced Air Non Forced Air Electric Space Heat House Type (2) I) Type a) or b) appliances, no solid fuel II) Type I) except with solid fuel (including fireplace) III) Any type c) appliance IV) Type I) or II) with electric space heater Other: Type I), II) or IV) no forced air Total Ventilation Capacity (1) Basement & Master 10 L/S L/S Other 5 L/S L/S Bathroom & 5 L/S L/S Other 5 L/S L/S TOTAL L/S Principal Ventilation Capacity (1) Master 15 L/S L/S Other 7.5 L/S L/S TOTAL L/S Principal Exhaust Fan Capacity Model: Location L/S Sones HVI Heat Recovery Ventilator Model: L/S High L/S Low % Sensible -25 C HVI

19 Supplemental Ventilation Capacity Total Ventilation Capacity L/S Less Principal Vent. Capacity L/S Required Supplemental Vent. Cap L/S Supplemental Fans Location Model L/S Sones HVI System Design Option 1. Exhaust Only/Forced Air System 2. HRV with Exhaust Ducts/Forced Air System 3. HRV Simplified Connection to Air System 4. HRV Full Ducting/Not Coupled to Forced Air System Part 6 Design DESIGNER CERTIFICATION I hereby certify that this ventilation system has been designed in accordance with the Ontario Building Code. Name: HRAI #: Signature: Date:

20 VENTILATION SYSTEM DECISION TREE Dwelling has electric service? Dwelling intended for occupancy on a continuing basis in winter? to both Mechanical ventilation is required Part 9 residential occupancy? 4 or less bedrooms? Self-contained ventilation system serving single dwelling unit? Builder wants to use Part 9 Design? to all above Non solid fuel fireplaces are direct vent? Other non-solid fuel appliances are direct vent or induced draft? to both Part 9 of the Code applies Select one of the system options described? Part 9 of the Code applies Select one of the system options described? to either Type II or Type IV dwelling HRV required Couple ventilation to F/A heating system? No to either Mechanical ventilation is not required Provide natural ventilation as per and of Code No to any of above Design to Part 6 No to either Type III dwelling Design to Part 6 No Type III dwelling Design to Part 6 No to both Type I dwelling Couple ventilation to FF/A system? No No Option 2 & 3 Option 2 & 3 Option 2 & 3 Option 2 & 3 CO sensors required if house contains solid fuel-fired combustion appliance. HOUSE TYPES: TYPE I Only direct vented or mechanically induced draft fuel-fired combustion appliance: no solid fuel-fired combustion appliance: only direct vented fuel-fired fireplaces; no electric space heat. TYPE II Type I house which contain solid fuel-fired combustion appliances. TYPE III All houses containing natural draft non-solid fuel-fired combustion appliances or mechanically vented induced draft non-solid fuel-fired fireplaces. OPTIONS: OPTION 1 Exhaust only ventilation. OPTION 2 HRV coupled to a forced air heating system. Extended exhaust ductwork. OPTION 3 HRV coupled to a forced air heating system. Simplified exhaust ductwork. OPTION 4 HRV not coupled to a forced air heating system.

21 TOWN OF CARLETON PLACE URBAN FORREST COMMITTEE GUIDELINES & STANDARDS FOR TREE PLANTING AND CONSERVATION PLANS The Town shall require Conservation Plans and Tree Planting Plans for all development including residential, commercial, and industrial uses. Conservation Plan: The conservation plan will have a preliminary assessment by a qualified professional (certified arborist, registered professional forester or other qualified professional), which will determine stands of trees or individual trees on the property which warrant protection. This plan should consider such matters as: The existing health of the tree, grouping of trees or woodlot, hackberry and the quality of such Its degree of sensitivity to grade changes, drainage disruption, changes in water table or any other factors, which may affect the trees Measures that can be taken to protect the trees (tree wells) If trees cannot be protected, consider the reasons why Opportunities for tree planting to mitigate loss of tree or forest cover. The conservation plan will identify how these trees will be protected both above and below ground, as it is important to protect the root systems from soil compaction. The following measures will be undertaken to protect these trees: 1. The identified tree or trees to be protected will be fenced off, a minimum, to the drip line (furthest point of extension of branches) to protect the roots from soil compaction. 2. Above ground utilities shall avoid, where possible, the crowns of the trees. 3. Below ground utilities shall avoid where possible damaging the root system of trees. If utilities are to be placed below ground they are to be placed directly under the tree so not to damage the fine root hairs of the extended root system. 4. Tree roots that will be damaged must be cut cleanly to avoid ragged edges so they will heal properly. If exposed, they must be moistened immediately and covered with moist material. 5. No equipment, trucks or storage of supplies shall be inside the fenced area. 6. No grading shall take place around the protected tree or trees. In short, the professional should be asking these questions: 1. Are there trees that can be protected due to size, rareness or are they a healthy stand that would add to the community. 2. If trees are going to be protected how will this be done during construction and after the project is complete. 3. If trees cannot be protected why not. 4. If trees cannot be protected what is the mitigating measure going to be for loss of trees, (i.e. enhanced tree-planting program).

22 Species of Trees for Planting in Carleton Place The Urban Forest /River Corridor Advisory Committee recommends the following trees for the Carleton Place planting programs. Trees must be grown from seed from plant hardiness zone 4b, 4a or 5a or seed zones 35 and 36. For Parks / Natural Areas in Carleton Place Sugar Maple Acer saccharum (drier sites) Silver Maple Acer saccharium (large planting locations) Red Maple Acer rubrum (moist sites near the river) Red Oak Quercus rubra Bur Oak Quercus macrocarpa Hackberry Celtis occidentalis Horse Chestnut Aesulus hippocast anum White Spruce Picea glaoca Norway Spruce Picea abies White Pine Pinus strobes Eastern White Cedar Thuja occdentalis Tamarack Larix laricina For Residential Streets/Residential Development Areas: Sugar Maple Acer saccharum (large planting locations) Red Maple Acer rubra (large planting spot) Silver Maple Acer saccharium (large planting locations) Freeman Maple Acer x fremani (large planting locations) Red Oak Querus rubra (large planting locations) Bur Oak Querus macrocarpa (large planting locations Hackberry Celtis occidentalis (large planting locations) Maidenhair Tree Ginko biloba (male clone only) Honey Locust Gleditsia triacanthos (small planting locations) Service Berry Amelanchier (small planting locations) White Spruce Picea glaoca (large planting spot) Norway Spruce Picea abies (large planting locations) Tamarack Thuja occidentalis ((medium planting locations) Showy Mountain- Ash Sorbus decora (small planting locations) Flowering crab Malus (small planting locations) For Hard Zones (Bridge St./Highway/Parking Lot Plantings) Red Oak Quercus rubra Freeman Maple Acer x freemanii Hackberry Celtis occidentalis Honey Locust Gleditisia triacanthos Colorado Blue Spruce Picea pungens Little Leaf Linden- Tilia cordata Amur maple Acer ginnala

23 Shrubs to Plant in Carleton Place: The Urban Forest /River Corridor Advisory Committee recommends the following shrubs for the Carleton Place planting programs. Trees must be from seed and from plant hardiness zone 4b, 4a or 5a or seed zones 35 and 36. False Spira lovely creamy-white plumes of flowers, grows quickly, will grow anywhere good for holding soils on banks. Spireas- Bridal Wreath (taller 5ft, white flowers), Goldflame, not Goldmound (3 ft. pink flowers, very attractive leaves all year) Anthony Waterer (3.5 ft. dark leaves, lovely deep pink flowers) Potentillas- wide variety, 3 feet, white or yellow flowers, very hardy Purple Leaf Sandcherry- can get tall, responds to pruning, but will grow into a nice shrubby tree if not pruned, maroon leaves. Nanking Cherry- will get quite large- up to 7 ft. - but easily pruned, round growth habit, white blooms, red berries. Burning Bush 4-5 ft., red fall colour, branches break in very heavy snow. Flowering Dogwood shiny red berries through fall and early winter. Crimson autumn colour. Tree Planting Plan for Developers: The planting plan will identify where additional trees are to be planted, which species and sizes of trees to be planted and how these trees will be planted and maintained. The planting plan will identify: 1. Where trees will be planted: - The site plan must identify where trees will be planted. - At least one tree shall be planted for each residential lot developed unless a large number of trees have been removed for the development then an enhanced tree planting program will be undertaken. - Industrial and commercial development site plans shall incorporate multiple trees. - Prior to planting the developer must identify the location of underground utilities; present, planned and potential future locations. 2. Species and size of trees to be planted: - Trees will be from seed from plant hardiness zone 4b, 4a or 5a or seed zones 35 and The developer will plant a 60mm (2.5 ins) caliper deciduous tree or a conifer tree minimum height 2.0 m. - To avoid monocultures at least 4 deciduous and 1 conifer species will be selected from the list (Table 1) and approved by Town staff.

24 Species of Tree for planting by Developers Larger Trees for Larger Lots Deciduous Sugar Maple (Acer saacharum) Red Maple (Acer rubrum) Silver maple(acer saccharium) Freeman maple(acer xfremani) Red Oak (Quercus rubra) Bur Oak (Quercus macrocarpa) Hackberry (Celtis occidentalis) Freeman Maple (Acer x fremanii) Conifer White Pine (Pinus strobes) White Spruce (Picea glaoca) Norway Spruce (Picea abies) Blue Spruce (Developers are encouraged to use this species on the harder sites i.e. Hwy 7) Medium Sized Trees Smaller Trees for Smaller Lots White Birch (Betula papyrifera) Little Leaf Linden (Tilia cordata) (Developers are encouraged to use this species on the harder site i.e. Hwy 7) Showy Mountain Ash (Sorbus decora) Serviceberry (Amelanchier) Crabapple (Malus) Honey Locust (Gleditisia triacanthos) Eastern White Cedar (Thuja occidentalis) Tamarack (Larix laricina) 3. Tree planting: The International Society of Arborists, the Canadian Nursery Trades Association or Landscape Ontario standards of planting and maintenance are to be followed: - Excavate to a depth 200mm deeper than the height of the root ball, with a width 750 mm greater than the root ball. - Loosen the planting hole to a depth of 200mm - Loosen burlap and cut away minimum at least 50% of the burlap without disturbing the root ball (if in a wire basket cut away as much of the wire basket while the tree is in the hole) - Place plant material to a depth equal to the depth they were originally growing in the nursery. - Tamp soil around the root system in layers of 150 mm to eliminate air pockets. When 2/3 of the planting soil has been placed, fill the hole with water. After the water has penetrated into the soil, complete backfilling. - Build a 100mm deep saucer around the outer edge of the hole to assist with watering. - The hardwood trees will be staked following International Society of Arborist standards. - The trees will be mulched to a depth of 10 mm filling the saucer leaving 50 mm free around the trunk to avoid trunk rot. - The trees will be watered one week after planting and every 2 weeks thereafter, pending weather conditions, until the area developed is no longer the responsibility of the developer. Jim McCready R.P.F./ ISA Certified Arborist December 1, 2014

Building Permit Application

Building Permit Application Building Permit Application CBO: Don Reed / Inspector: Scott Richardson -All applications must be filled out in full -Residential applications will be issued or denied within 10 working days -Multi-residential

More information

Requirements to Obtain a Building Permit for a NEW HOME. 1. Completed application form. (Boxes A, B, C, D & E if applicable F and I)

Requirements to Obtain a Building Permit for a NEW HOME. 1. Completed application form. (Boxes A, B, C, D & E if applicable F and I) Requirements to Obtain a Building Permit for a NEW HOME 1. Completed application form. (Boxes A, B, C, D & E if applicable F and I) 2. Proof of Ownership (New Development Only, Copy of Deed or Tax Bill)

More information

Building Permit Application

Building Permit Application Building Permit Application Front of Yonge Township Office 1514 County Road 2, P.O. Box 130 Mallorytown ON, K0E 1R0 Tel: 613-923-2251 Fax: 613-923-2421 admin@frontofyonge.com www.mallorytown.ca Last Updated

More information

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

Township Of Blandford-Blenheim Permit Guide

Township Of Blandford-Blenheim Permit Guide Township Of Blandford-Blenheim Permit Guide When do I require a building permit? Building Permits are required before any construction can begin. The following is a typical list of project that DO REQUIRE

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application for a Permit to Construct or Demolish P10 This form is authorized under subsection 8(1.1) of the Building Code Act. Application number: For use by Principal Authority Permit number (if different):

More information

Small Business Permit Service

Small Business Permit Service Small Business Permit Service Building Permit Requirements For a Unit Finish or Interior Alteration Industrial, Commercial or Institutional Occupancies Building Permit Application The following documents

More information

BUILDING APPLICATION CHECK LIST

BUILDING APPLICATION CHECK LIST TOWNSHIP OF NORTH FRONTENAC BUILDING DEPARTMENT P.O. Box 97, Plevna, Ontario K0H 2M0 Telephone: (613) 479-2231 or 1-800-234-3953, Fax: (613) 479-2352, or www.northfrontenac.ca George Gorrie, Chief Building

More information

A HOMEOWNERS GUIDE TO BUILDING PERMITS

A HOMEOWNERS GUIDE TO BUILDING PERMITS A HOMEOWNERS GUIDE TO BUILDING PERMITS As a homeowner, you may find that you have outgrown your present home. Renovation is today s answer to moving, and can include anything from adding a room, fixing

More information

Applications for building permits will not be reviewed until all of the required information has been submitted.

Applications for building permits will not be reviewed until all of the required information has been submitted. NOTICE: Applications for building permits will not be reviewed until all of the required information has been submitted. Once all items are submitted a minimum of ten (10) working days are required to

More information

Demo Permit Guide For Homeowners

Demo Permit Guide For Homeowners Demo Permit Guide For Homeowners Building Services Tel: 705-436-3710 ext. 3504 or 3506 Fax: 705-436-7120 2101 Innisfil Beach Road, Innisfil, ON L9S 1A1 Website: www.innisfil.ca A Demo Permit Guide for

More information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519

More information

A Guide for the Homeowner/Builder

A Guide for the Homeowner/Builder A Guide for the Homeowner/Builder To repair, alter, add to or construct a new home, carport, garage, sundeck or other work Plus other related information Table of Contents 1. Introduction... 1 2. Building

More information

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:

More information

RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING

RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING BUILDING CODEACT, 1992 RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING Pursuant to clause 29(l)(b) of the Building Code Act, 1992. as amended, the Director of the Building and Development Branch

More information

Residential Plan Routing Information

Residential Plan Routing Information Residential Plan Routing Information BUILDING INSPECTIONS 800 4th AVENUE EAST WEST FARGO, ND 58078 PHONE: 701-433-5480 The building Inspection s Department receives and issues all applications for building

More information

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means

More information

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1 A Guide to Building Permits for Home Owners / Renovators Address: 1 Carden Street Guelph, Ontario N1H 3A1 Oct 2009 Telephone: 519-837-5615 Committee of Adjustment 519-837-5615 option #5 email: cofa@guelph.ca

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most

More information

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations

More information

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling October 2014 contents General Information

More information

CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714

CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714 CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714 BUILDING DIVISION (714) 961-7120 Single Family Residential New Construction, Additions & Alterations Submittal Requirements Required agency approvals

More information

PLUMBING PERMIT REQUIREMENTS AND CHECKLIST

PLUMBING PERMIT REQUIREMENTS AND CHECKLIST Town of North Hempstead Department of Building Safety Inspection and Enforcement 210 Plandome Road, Manhasset, NY 11030-2327 Tel. (516) 869-6311 Fax. (516) 869-7662 PLUMBING PERMIT REQUIREMENTS AND CHECKLIST

More information

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS AIM AND APPLICATION OF THE GUIDE This guide is intended to help you better understand the requirements for building as set by applicable law, which could

More information

APPLICATION FOR NEW CONSTRUCTION

APPLICATION FOR NEW CONSTRUCTION CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT

More information

NEW HOME CONSTRUCTION

NEW HOME CONSTRUCTION NEW HOME CONSTRUCTION A New Home Purchaser s Guide to the Construction of New Subdivisions and Homes in the City of Brampton Provided by Developer/Builder Responsibilities Ontario Building Code Compliance

More information

Building FAQ s. Answers to Frequently Asked Questions about Building & the Building Permit Process

Building FAQ s. Answers to Frequently Asked Questions about Building & the Building Permit Process Building FAQ s Answers to Frequently Asked Questions about Building & the Building Permit Process BU-110-4/15 April 2015 NOTE: Although every attempt has been made to provide accurate information at the

More information

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone: Choctaw Date Recorded: Permit # RESIDENTIAL - BUILDING Permit APPLICATION Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone: YES NO Sec., Township, Range/Subdivision: Acres/Block:

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

A Homeowner s Guide to Building Permits

A Homeowner s Guide to Building Permits A Homeowner s Guide to Building Permits Building Division City of London 300 Dufferin Ave. P.O. Box 5035 London, ON N6A 4L9 Table of Contents What is a Building?... 3 Planning Your Project... 3 When is

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

Planting and Tree Care for Roxborough Park. Keith Worley, Forester ISA Certified Arborist

Planting and Tree Care for Roxborough Park. Keith Worley, Forester ISA Certified Arborist Planting and Tree Care for Roxborough Park Keith Worley, Forester ISA Certified Arborist Where We Live: High elevation at the edge of Mountains and Plains. Harsh climates with: High winds. Drought periods

More information

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT ATTACHED ARE THE REQUIREMENTS FOR OBTAINING A BUILDING PERMIT INCOMPLETE SUBMISSIONS WILL BE RETURNED IN THEIR ENTIRETY -- NO EXCEPTIONS!!

More information

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL 33408 Phone: (561) 656-0302 Fax: (561) 775-0812

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL 33408 Phone: (561) 656-0302 Fax: (561) 775-0812 TOWN OF JUNO BEACH 340 Ocean Drive Phone: (561) 656-0302 Fax: (561) 775-0812 Application for Building Permit & Certificate of Occupancy OFFICE USE ONLY: Date: Permit #: Tracking #: Job Address: Property

More information

24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by

24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by 24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL ENERGY CONSERVATION CODE (1) The Department of Labor and Industry adopts and incorporates by reference the International Code Council's International

More information

Energy Analysis Pre-Build Report for:

Energy Analysis Pre-Build Report for: AmeriSpec of Lethbridge 100 Laval Blvd. W Lethbridge, AB TEL (403) 381-8636 FAX (403) 381-8763 ryan.leavitt@amerispec.ca Energy Analysis Pre-Build Report for: According to the plans and specifications

More information

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions) CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions) When is a permit required? Section 403.42 and Section 403.62 of the Uniform Construction Code states: Any owner

More information

C I T Y O F P E A R S A L L

C I T Y O F P E A R S A L L The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read

More information

Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4

Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4 New Construction Permit Application Village of Shorewood Building Division One Towne Center Blvd Shorewood, IL 60404 (815)553-2310 Fax (815)744-6766 SUBMISSION CHECKLIST - Complete this application and

More information

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the

More information

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS Village of Airmont BUILDING AND ZONING DEPARTMENT 251 CHERRY LANE, AIRMONT, NEW YORK Mailing Address: P.O. BOX 578, TALLMAN, NEW YORK 10982 Telephone: 845-369-8813 Fax: 845-357-8307 Website: www.airmont.org

More information

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH BUILDING PERMIT RESIDENTIAL BASEMENT FINISH DOCUMENTS YOU WILL NEED 1. Building Permit Residential Basement Finish Package 2. Contractors copy of state and business license ADDITIONAL FORMS YOU MAY NEED

More information

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh Accessory Apartment Construction Guide For Single Detached Dwelling and Semi-Detached Dwellings that have been in existence for at least five (5) years Notes: Buildings that are less than five (5) years

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Residential Building Permits

Residential Building Permits LANE COUNTY PUBLIC WORKS Residential Building Permits LAND MANAGEMENT DIVISION 3050 N. DELTA HWY, EUGENE OR 97408 i CONTACT PHONE NUMBERS: Building Program: (541) 682-4651 Inspection Requests: (888) 299-2821

More information

City of Elk River BASEMENT Office Use Only

City of Elk River BASEMENT Office Use Only City of Elk River BASEMENT Office Use Only Fire and Building Safety Division (FABS) Building Permit Application Notes Scan Permit Total Date Permit # PID # $ Site Address Suite/Unit Structure Type Single

More information

Botetourt County, Virginia. Frequently Asked Questions

Botetourt County, Virginia. Frequently Asked Questions Botetourt County, Virginia Development Services Construction Compliance Frequently Asked Questions Permits... 2 When is a permit required?... 2 When is a permit NOT required?... 2 Who may apply for a permit?...

More information

RESIDENTIAL WINDOW REPLACEMENT

RESIDENTIAL WINDOW REPLACEMENT 3S258 MANNING AVENUE WARRENVILLE, IL 60555 PH: 630.393.9050 FAX 630.393.1531 RESIDENTIAL WINDOW REPLACEMENT A building permit is required for the installation or replacement of windows in a residence.

More information

Inspection Item COMMENTS

Inspection Item COMMENTS APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

Single Family Residential Basement Finish

Single Family Residential Basement Finish How to Use This Guide Building Guide Pottawattamie County Planning & Development Department Building & Safety Division Single Family Residential Basement Finish Provide two (2) sets of plans and complete

More information

Development Variance Permit Application Package

Development Variance Permit Application Package When do I need a Development Variance Permit? Development Variance Permit Application Package If my proposed development does not meet the standards set out in the Zoning Regulation Bylaw on matters that

More information

BUILDING MOVE PROCESS INSIDE CITY LIMITS

BUILDING MOVE PROCESS INSIDE CITY LIMITS To move a building from outside or within the City to a site within City limits, the following STEPS must be taken before the move can take place: 1. A written request to relocate a dwelling must be provided

More information

A Building Permit Guide For Homeowners

A Building Permit Guide For Homeowners A Building Permit Guide For Homeowners Town of Innisfil Building Services Tel: 705-436-3710 ext. 3506 or 3510 Fax: 705-726-4731 2101 Innisfil Beach Road, Innisfil, ON L9S 1A1 Website: www.innisfil.ca WHY

More information

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3 TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete

More information

DEVLOPMENT APPLICATION PROCEDURES

DEVLOPMENT APPLICATION PROCEDURES DEVLOPMENT APPLICATION PROCEDURES Bylaw No. 2444 and amendments thereto CONSOLIDATED FOR CONVENIENCE ONLY This is a consolidation of the bylaws listed below. The amending bylaws have been consolidated

More information

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES 1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee

More information

TREE PROTECTION POLICY AND SPECIFICATIONS FOR CONSTRUCTION NEAR TREES

TREE PROTECTION POLICY AND SPECIFICATIONS FOR CONSTRUCTION NEAR TREES ` Parks, Forestry & Recreation Urban Forestry Table of Contents TREE PROTECTION POLICY AND SPECIFICATIONS FOR CONSTRUCTION NEAR TREES 1. Introduction 2. Table 1 - Tree Protection Zones 3. Tree Protection

More information

ENERGY STAR Certified Homes, Version 3 Cost & Savings Estimates

ENERGY STAR Certified Homes, Version 3 Cost & Savings Estimates November 1, 2013 Contents ENERGY STAR Certified Homes, Version 3 Section 1: Executive Summary... 3 Section 2: Detailed Incremental Cost Estimates... 6 Section 3: Incremental Cost & Savings of the Thermal

More information

Owner: Phone # Mailing Address: Contractor: Phone # Fax #

Owner: Phone # Mailing Address: Contractor: Phone # Fax # CITY OF EASTON BUREAU OF CODES AND INSPECTIONS 2 nd Floor, 123 South Third Street, Easton, PA 18042 phone (610) 250-6724 - fax (610) 250-6607 email codes@easton-pa.gov PERMIT APPLICATION Owner: Phone #

More information

Drainage By-law. WM-4 Consolidated April 18, 2011. This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada

Drainage By-law. WM-4 Consolidated April 18, 2011. This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada Drainage By-law WM-4 Consolidated April 18, 2011 This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada Disclaimer: The following consolidation is an electronic

More information

City of Peterborough

City of Peterborough City of Peterborough Building Division Basement Finishing Guide Residential Information Guides This information is intended to be used as an guide that outlines minimum requirements when finishing a basement,

More information

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME PERMIT # TOWN OF ASHLAND, NEW HAMPSHIRE 20 HIGHLAND STREET PO BOX 517 ASHLAND, NH 03217 603-968-4432 FAX 603-968-3776 www.ashland.nh.gov PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY

More information

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your email.

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your email. Residential Building Permit Application Checklist For 1 & 2 Family Building Department, City of Marlborough While this office shall make every attempt to process your application in a timely manner, we

More information

Sample Drawing Package for One and Two Family Dwelling Applications

Sample Drawing Package for One and Two Family Dwelling Applications Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx

More information

Residential Use. Contents. Building Permits. Drawing Requirements: Sample Drawings. Drawing Requirements. Applications.

Residential Use. Contents. Building Permits. Drawing Requirements: Sample Drawings. Drawing Requirements. Applications. Contents Building Permits Frequently Asked Questions: What is a Building Permit? Why is it important?. 3 When is a Building Permit required?. 4 Building Permit Process Flowchart. 5 Preparing a Building

More information

Inspection Report. Dream Home Inspections. www.timinspects.com. 415 Second Ave. Frisco CO 80443-1789 (970) 368-2668

Inspection Report. Dream Home Inspections. www.timinspects.com. 415 Second Ave. Frisco CO 80443-1789 (970) 368-2668 Inspection Report Property Address: 123 Dream Home Way Frisco, CO 80443 Prepared for: Inspector: Tim Nixon Tim Nixon Inspection date: 3/28/2014 1 of 9 General Information Property Information Address:

More information

City of St. Charles Basement Finish or Remodel

City of St. Charles Basement Finish or Remodel City of St. Charles Basement Finish or Remodel Building & Code Enforcement Division 2 East Main Street St. Charles IL 60174 630.377.4406 (Office) 630.443.4638 (Fax) http://www.stcharlesil.gov Please direct

More information

Development Services Guidelines

Development Services Guidelines Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look

More information

APPLICANT / CONTACT:_

APPLICANT / CONTACT:_ New Single Family House Permit Application Office Use Only SECTION 1 PERMIT INFORMATION Project Address: (Provide at least one of the following) Please note: it can not be an intersection PROJECT ADDRESS

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is ~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions

More information

BUILDING PERMIT APPLICATION FOR NON-COMPLEX BUILDINGS

BUILDING PERMIT APPLICATION FOR NON-COMPLEX BUILDINGS BUILDING PERMIT APPLICATION FOR NON-COMPLEX BUILDINGS NON-REFUNDABLE APPLICATION FEE $ NON-COMPLEX BUILDING AS DEFINED BY BYLAW NO. 4900 A building of three storeys or less in building height, having a

More information

Minimum Housing and Health Standards

Minimum Housing and Health Standards APPENDIX M.O. 57/2012 Minimum Housing and Health Standards Original version July 20, 1999. Revisions to Part lll, Housing Premises, sections 3 and 4, June 30, 2012 (all revisions are bolded and underlined).

More information

Bureau Veritas Contact Information

Bureau Veritas Contact Information Bureau Veritas Contact Information Permit Submittal The permit documents and fees will be submitted to the city. Submittal documents should be complete to expedite plan review and permit issuance. Please

More information

City of Mandeville. Guidelines for Construction and Development

City of Mandeville. Guidelines for Construction and Development City of Mandeville Guidelines for Construction and Development 1 Application for Permitting Requirements The following items must accompany any application for a permit for the construction of single family

More information

Basement Development Construction requirements for the development of basements in residential dwellings.

Basement Development Construction requirements for the development of basements in residential dwellings. PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Basement Development Construction requirements for the development of basements in residential dwellings. June 2009 contents GENERAL INFORMATION 3 BUILDING

More information

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen May 2008 Wisconsin Area PO BOX 115 Lake Geneva, WI 53147 CELL (414) 550-4765 Home Performance with ENERGY STAR Evaluation Report Customer

More information

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx. cityoflavernia@lavernia-tx.gov Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be

More information

VILLAGE OF SHOREHAM. Instructions for obtaining a building permit for a new home for all one-family dwellings (with required forms)

VILLAGE OF SHOREHAM. Instructions for obtaining a building permit for a new home for all one-family dwellings (with required forms) Instructions for obtaining a building permit for a new home for all one-family dwellings (with required forms) This New Home Building Permit Application Package is online at: www.shorehamvillage.org Please

More information

Seller s Property Disclosure Statement. Property address: Seller:...

Seller s Property Disclosure Statement. Property address: Seller:... Seller s Property Disclosure Statement Property address: Seller:... A seller must disclose to a buyer all known material defects about property being sold that are not readily observable. This disclosure

More information

Development Services Guidelines

Development Services Guidelines Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look

More information

WHEN IS A PERMIT REQUIRED?

WHEN IS A PERMIT REQUIRED? WHEN IS A PERMIT REQUIRED? Any owner, builder, contractor, or other authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure,

More information

Building Permits: When are they required?

Building Permits: When are they required? Building Permits: When are they required? Generally, you need to obtain a building permit from the City whenever you construct, enlarge, alter, repair, move, remove, improve, convert, or demolish a building

More information

Building Permit, Fire Inspection and Operating Permit Fee Schedule

Building Permit, Fire Inspection and Operating Permit Fee Schedule Chenango County Code Enforcement Building Permit, Fire Inspection and Operating Permit Fee Schedule Building Permit Exceptions: Buildings being used solely for the purpose of agriculture. As per Agricultural,

More information

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows: THE CORPORATION OF THE CITY OF GUELPH By-law (1993)-14515 A by-law respecting storm water disposal from private property in the City of Guelph, to amend By-law (1987)-12602 and to adopt Municipal Code

More information

Residential Building Permit Process

Residential Building Permit Process Residential Building Permit Process Planning and Economic Development Department Development Services Division INTRODUCTION The City of Tulsa is committed to economic development and to being a helpful

More information

Practice Note 2014-62

Practice Note 2014-62 Practice Note 2014-62 Documentation Required for Applications for Building Permits Reference to the Building Code of Australia (BCA) in this Practice Note means Volume One and Volume Two of the National

More information

TOWN OF SPENCER Office of Development & Inspectional Services

TOWN OF SPENCER Office of Development & Inspectional Services Planning Board Zoning Board of Appeals Conservation Commission Board of Health Town Planner Inspector of Buildings Health Agent TOWN OF SPENCER Office of Development & Inspectional Services BUILDING PERMIT

More information

PDmB, Inc. Definitions

PDmB, Inc. Definitions Page 1 of 11 Definitions S Satisfactory Meets industry standards for proper material and installation NP Not Present Condition or item was not present at time of inspection NI Not Inspected Condition or

More information

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all

More information

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

PLEASE REFER TO YOUR INDIVIDUAL QUOTE STANDARD INCLUSIONS AND EXCLUSIONS SECONDARY DWELLING 16/04/2014 PLEASE REFER TO YOUR INDIVIDUAL QUOTE Inclusions Super Structure: Timber Frames including Roof Trussing and Framing, Internal and External

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

Energy Efficiency Evaluation Reportii House file number: 9900D00001ii

Energy Efficiency Evaluation Reportii House file number: 9900D00001ii Energy Efficiency Evaluation Reportii House file number: 9900D00001ii Household, John, 123 Main St., Ottawa, Ontario, K1K 1K1 64 EnerGuide ratingii 74! Your house currently rates 64.! If you implement

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO 80440 719-836-4255 Fax: 719-836-4268 Inspections: 719-836-4257 www.parkco.

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO 80440 719-836-4255 Fax: 719-836-4268 Inspections: 719-836-4257 www.parkco. PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO 80440 719-836-4255 Fax: 719-836-4268 Inspections: 719-836-4257 www.parkco.us Welcome to the Park County Building Department. The following information

More information

Arapahoe County Residential Water Heater Installation and Inspection Guide

Arapahoe County Residential Water Heater Installation and Inspection Guide Arapahoe County Residential Water Heater Installation and Inspection Guide The attached handout is designed to be a general permit submittal and inspection guide covering most installation instances, however

More information

IECC Compliance Guide for Homes in Virginia

IECC Compliance Guide for Homes in Virginia IECC Compliance Guide for Homes in Virginia Amended Version of 2012 International Energy Conservation Code July 14, 2014 Climate Zone Since the entire state of Virginia falls in the IECC Climate Zone 4,