1 Innovative capture and modeling of existing building conditions using 3D laser scanning Entry B Submission
2 Executive Summary As a large owner organization, understanding and developing new technologies to document as-built conditions of our capital asset inventory is a major strategic goal of our BIM Program. During 2007, our program initiated, documented and implemented numerous 3D laser scanning projects with tangible, quantified benefits. This entry focuses on our progress and influence on industry in using 3D laser scanning technology. On a project level, gains included faster, more accurate, and less expensive production of 2D and 3D models of existing building conditions. On a program level, we developed and tested a process for documenting existing conditions across a wide portfolio of building types, and provided lessons learned and sample contract language to facilitate procurement across our organization. Industry-wide our efforts has continued to foster competition and encourage market penetration of 3D laser scanning technologies. Finally, by providing detailed case studies and collaborating with industry leaders and research organizations, such as universities and SPAR Point Research LLC, we have educated ourselves and members of the community as to the potential of laser scanning technology, regarding its current state and future developments.
3 The business need for 3D Laser Scanning As an owner organization, our ability to capture, validate, and report the spatial information of our building assets (e.g., dimensions, areas, and locations of rooms; elevation/fenestration details; mechanical equipments and ductwork; etc.) has a significant impact on our core business. Specific business needs include: Real Estate Portfolio Management s reliance on available and most up-to-date spatial information to align business, management, and optimization strategies Property Development s need to provide site data and existing spatial information about the buildings to their architects/engineers for design in renovations and alterations projects Property Management s objective to ensure that the spatial alterations from any construction work is being captured in the as-builts Historic preservation officers and specialists desire to incorporate, maintain, and analyze an archive of building assets with historic significance
4 The business need for 3D Laser Scanning (2) Our organization s traditional standard practice for capturing current conditions is founded on a manual CAD process in which the most up-todate as-built information is maintained by documenting all spatial changes in two-dimensional (2D) AutoCAD-based drawings. This manual data capturing process is supplemented by spot verifications in the field with conventional survey technology such as tape measurer or point-topoint laser survey beam. Current practice is error-prone and the accuracy of the spatial information is largely dependent on the individuals producing and updating the archive drawings. Furthermore, these drawings do not account for construction tolerance and the deformations of the building over time. Reliance on spot verifications has been random and insufficient to assure the quality of the as-builts and re-measurement is frequently requested. Objectives for innovative 3D laser scanning technology adoption include improved: Historical documentation Facility condition visualization Physical deviation assessment BIM development
5 Innovative Technology 3D imaging systems are instruments that rapidly measure (typically on the order of thousands of measurements per second or faster) the range and bearing, and/or the 3D coordinates, of points on an object or within a region of interest. In general, 3D imaging uses either a pulsed time-of-flight or phased-based system to obtain 3D information of a scene, and rely on line of sight (LOS) instruments.
6 Pilot Project Implementation In 2007, 3 Pilot Projects using 3D Laser Scanning were completed: Historical Building, Brooklyn, New York Office Building, Atlanta, Georgia Campus, Miami, Florida
7 Historic Building, Brooklyn, NY Project Description On the National Register of Historic Places and designated as a New York City Landmark, this building is approximately 72,450 SF. The structure has an original 1892 section and a newer 1933 addition. 3D laser scanning was used to provide a current-condition record of the existing masonry architecture and assist in future renovation designs and terra cotta fabrication. The objective of the scanning was to provide 2D-CAD elevations required to document as-built conditions including: planning for replacement of deteriorated terra cotta cladding on the 1933 facades using new terra cotta or alternate materials; restoration of all existing granite cladding on both buildings; and replacement of the entire slate mansard roofing system on both structures. The produced elevations assisted architecture and engineering firms in developing their restoration and renovation designs.
8 Office Building, Atlanta, Georgia Project Description This 30,000 SF mid-century high-rise office building in Atlanta, Georgia was planned for rolling renovation. The building did not have 2D CAD drawings and significant deficiencies in the original construction lacked as-built documentation. Existing conditions included: aluminum window frames and glazing out of specification and requiring replacement; concrete columns, beams, and balconies constructed out of specification, with observable spalling. The primary objective of 3D Laser Scanning was to provide accurate 2D elevations of the exterior of the facility to the architects and engineers to assist in the development of force protection measures and new window assemblies.
9 Federal Campus, Miami, Florida Project Description The campus includes five federal buildings linked together with bridges and tunnels all in various lifecycle states. The site was in need of renovation. Accurate as-built drawings did not exist. The objective of this project was to use 3D laser scanning technology to provide a detailed 3D model and 2D elevations of the buildings exterior along the central pedestrian promenade, as well as develop an integrated model that incorporated the five campus buildings into a single cohesive BIM site model. The goals of the project were to assist the A/E firm construct a highly accurate as-built condition for facility and later use the model to assist in training and tracking of various circulation routes throughout the campus.
10 The 3D-laser scanning process: From Building Features to 3D model In 3D laser scanning, the x-y-z coordinates of the spatial data is collected in the time it takes a laser beam to hit a surface point and return. Similarly, a photo and color intensity of the spatial data is captured. By gathering millions of these point-specific data, a point-cloud data set can be created instantaneously in the field. Such data set can be archived for historic preservation and as-built documentation purposes, allowing users to directly query 3-dimensional spatial data (e.g., distance, ceiling height, volume, etc.) directly from the data set. Furthermore, postprocessing the data set can output architectural drawings (CAD) and building models (BIM) for specific business needs. 2D Model Building Features Point Cloud 3D Model
11 Results: 2D drawings were created from point cloud models to accurately represent as-built elevations.
12 Results: 3D models were developed from point cloud data to document building conditions.
13 Results: Accurate field measurements were captured and documented in 3D models.
14 Results: Detailed site models were created
15 Results: Historical façade work was captured in both the point-cloud data and 3D models.
16 Results: Precise conditions of distinctive windows were captured.
17 Successes on Pilot Implementations In one pilot project, independently contracted laser scanning services created an as-built 3D model that resulted in the Design Team providing monetary credit to our organization for the use of the model. Laser scanning services were able to identify several discrepancies between documented (2D drawing) and actual (existing) wall conditions. Open and competitive bidding resulted in lower than expected project costs for laser scanning services, and on several pilot projects, our organization was able to exercise all options.
18 Discernable Benefits Value: BIM technology is often perceived to benefit new construction projects only. However with 3D laser scanning, all project modernizations can benefit from the technology via as built 3D model generated with accuracy, efficiency, flexibility and non invasive methods to develop a basis for the design start and construction. Accuracy: 3D laser scanning offered rich data sets at ¼ of accuracy for a range of 3 feet to 150 feet. Even higher resolution and range would have been possible with more specialized equipment. Conventional practice relies on incorporating changes and alterations into 2D archive drawings. Laser scanning minimized the risks of incorporating design changes into prior faulty documentation, reducing the likelihood of error propagation. Efficiency: 3D laser scanning averaged 100,000 points per minute. As typical, 3D laser scanning equipment supported a 360-degree spherical coverage. In one application an entire building was scanned (with coverage redundancy) in one day using multiple teams and multiple scanners (contrast to the time it takes to perform spot measurements with tape measurer or static laser beam). Such efficiency is valuable as it minimizes the disruptions to the ongoing operations or security of our tenants. Non-Invasiveness: 3D laser scanning offers a non-invasive means and methods to document building elements that are of high historical value and may be difficult to access (e.g., ceiling space, building elevation, subterranean utility, etc.). Scanning was conducted when buildings were in operation with minimal disruption to the tenants. Flexibility: 3D laser scanning has the capability to stitch multiple scenes together with overlapping registrations. On one project, a complex site map was created from 33 scan positions by a team consisting of two qualified surveyors operating daily for two weeks.
19 Collaboration and Partnering To support these efforts and promote industry advancement, our organization has fostered: Industry collaborations with NIST, ASTM, and SPAR Point Research LLC to promote open standards and best practices. Academic partnerships with Harvard University, Carnegie Mellon University, and Stanford University to advance 3D-laser scanning technology, interoperability, and implementation processes. 5 completed and ongoing industry contracts awarded for laser scanning data capture and modeling.
20 Draft BIM Guide on 3D Laser Scanning 1: introduction Our publicly available draft BIM Guide on laser scanning captures best practices, lessons learned, and process maps and is open for industry comments and feedback.
21 Conclusions Our organization tested technologies across applications on a variety of project types including: Archiving Historic Building Elements (e.g., ornamentation details constructed in a virtual 3D computer model) Current Condition of an Existing Building planned to undergo Major Modernization (e.g., the elevation, underground utility, HVAC ductwork, and interior partitions of a 40-year old office building) As-Built Assessment of Site Conditions (e.g., the as-built site plan of an existing campus to align design with existing conditions) We created detailed Case Studies from pilot project implementation to document the lessons learned. We fostered industry dialogue and promoted collaboration in support of technological advancement and process harmonization. We developed a publicly available draft guide outlining 3D imaging services, available software applications, and implementation methods.
U.S. General Services Administration Public Buildings Service Office of the Chief Architect. January 2009
U.S. General Services Administration Public Buildings Service Office of the Chief Architect January 2009 This version of the GSA Building Information Modeling Guide Series: 03 GSA BIM Guide for 3D Imaging
More informationDrawing Accurate Ground Plans from Laser Scan Data
Drawing Accurate Ground Plans from Laser Scan Data Kevin Cain Institute for the Study and Integration of Graphical Heritage Techniques (INSIGHT) Abstract. In addition to the kinds of standard documentation
More informationSpecifying Laser Scanning Services. A Quantapoint White Paper
A Quantapoint White Paper ABSTRACT Specifying Laser Scanning Services to Help Ensure Trusted and Accurate Results As-built documentation created using laser scanning is rapidly being adopted as the tool
More informationBIM Department. BIM Modeling Using Faro Focus3D Laser Scanner
BIM Modeling Using Faro Focus3D Laser Scanner Contents What is Laser Scanning? Advantages of Laser Scanning BIM Workflow Process Scanner Unit Set-up and Scanning Processing Scan Files BIM Software Creating
More informationFrom 3D Laser Scanning to Revit. Processes, Products and Questions
From 3D Laser Scanning to Revit Processes, Products and Questions Topics Scanning Overview Recommended Processes Best Practices Up-front questions to ask Tools and Technologies, including the new Scan
More informationOlilo's AEC Design Services. SrinSoft Inc, Partners of
Olilo's AEC Design Services SrinSoft Inc, Partners of Olilo provides design services that include design and analysis, cost estimation, 3D modeling, 2D drafting, conversion from 2D to 2D, quantity take-off,
More informationPoint Clouds-To-BIM For Sustainability
Point Clouds-To-BIM For Sustainability Cliff Moser, AIA 35 years in the Design and Construction Industry. VP BIM Services Neilsoft (www.neilsoft.com) Past Chair of ASQ Design and Construction Division
More informationNAPCS Product List for NAICS 54134: Drafting Services
NAPCS List for NAICS 54134: Drafting Services National 54134 1 Drafting Producing detailed layouts, plans, drawings, illustrations, graphics or models based on engineering or architectural specifications,
More informationASSESSMENT OF VISUALIZATION SOFTWARE FOR SUPPORT OF CONSTRUCTION SITE INSPECTION TASKS USING DATA COLLECTED FROM REALITY CAPTURE TECHNOLOGIES
ASSESSMENT OF VISUALIZATION SOFTWARE FOR SUPPORT OF CONSTRUCTION SITE INSPECTION TASKS USING DATA COLLECTED FROM REALITY CAPTURE TECHNOLOGIES ABSTRACT Chris Gordon 1, Burcu Akinci 2, Frank Boukamp 3, and
More informationBIM Extension into Later Stages of Project Life Cycle
BIM Extension into Later Stages of Project Life Cycle Pavan Meadati, Ph.D. Southern Polytechnic State University Marietta, Georgia This paper discusses the process for extending the implementation of the
More informationSchematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
More informationWILSON TRANSFER STATION CONSULTING PARTIES MEETING. Chicago Transit Authority
WILSON TRANSFER STATION CONSULTING PARTIES MEETING Chicago Transit Authority AGENDA I. Welcome II. What is Section 106? III. Consulting Parties Introduction IV. Community Outreach V. Project Purpose and
More informationBIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am
BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow
More informationDesign Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
More information3D Laser Scanning for Manufacturing Facilities Developing the Business Case. By Bill Campbell Founder, Digital Dimensions 360, LLC
3D Laser Scanning for Manufacturing Facilities Developing the Business Case By Bill Campbell Founder, Digital Dimensions 360, LLC Table of Contents Introduction The Importance of Accuracy Workflow and
More informationHigh Resolution RF Analysis: The Benefits of Lidar Terrain & Clutter Datasets
0 High Resolution RF Analysis: The Benefits of Lidar Terrain & Clutter Datasets January 15, 2014 Martin Rais 1 High Resolution Terrain & Clutter Datasets: Why Lidar? There are myriad methods, techniques
More informationBuilding Information Modeling Management To Facility Management
To Building Information Modeling Management To Facility Management I: INTRODUCTION - aaecs Team Thomas J. Jeff Prine, CCM, LEED AP COO Program / Facility Management Specialist Bonnie K. Gorman, Assoc.
More informationCERTIFICATE OF APPROPRIATENESS Planning and Development Department, Neighborhood Services
Owner: Midas Equity, LLC. Applicant: Nine Lite Construction Time Frame Date Accepted April-12-2011 90-day Waiver N/A SITE INFORMATION: Lot 7, Block 247, Houston Heights Subdivision,, Harris County, Texas.
More informationWilliamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages)
INNOVATIVE BUILDING AND ARCHITECTURE CONSULTANTS Mr. Bud Hall Senior Vice President of construction Turnberry Associates 19501 Biscayne Boulevard, Suite 400 Aventura, FL 33180 Subject: The Nashville Hilton
More informationPS.12. 4D Scheduling A Case Study
PS.12 4D Scheduling A Case Study Mr. Abhimanyu Basu PE PSP A 4D schedule is a 3 dimensional CAD model How long would it take. attached to the fourth dimension of time via a schedule. The concept of 4D
More informationd e n v e r a r t m u s e u m
d e n v e r a r t m u s e u m The Denver Art Museum Expansion will be a dramatic addition to the downtown Denver skyline and will help place Denver among the top art centers in the nation. The new addition
More informationA Guide to Renovation and Repair Contract Warranties
A Guide to Renovation and Repair Contract Warranties By Gerald A. Dalrymple, PE A fter being retained to review the merits of several major disputes involving the scope of warranties in renovation and
More informationExterior Elevated Elements Inspection Guidelines
Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code
More informationTurner Innovation Series BIM Conference Istanbul May 2012. Brian Krause, Dan Gramer, Turner Construction Company
1 Why BIM? Excessive Re-Work and Waste TURNER INNOVATION SERIES May 2012 BIM for Design, Preconstruction, & Construction Brian Krause Manager, Integrated Building Solutions bkrause@tcco.com Value Value
More informationThe GSA s BIM Pilot Program
GSA PBS Office of the Chief Architect Presents The GSA s BIM Pilot Program Submission to the AIA TAP Knowledge Community First Annual BIM Awards Competition Presented By: Charles Matta, FAIA Acting Director,
More informationBROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208
BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING
More informationGUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES
GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES PAGE 13 DESIGN GUIDELINES The following design guidelines have been developed to guide appropriate design in the Downtown
More informationHEATING, VENTILATING, AND AIR CONDITIONING EQUIPMENT. Application Guidelines
HEATING, VENTILATING, AND Application Guidelines The Landmarks Preservation Commission (LPC) is the Mayoral agency charged with designating and regulating individual landmarks and historic districts. The
More informationHow To Fuse A Point Cloud With A Laser And Image Data From A Pointcloud
REAL TIME 3D FUSION OF IMAGERY AND MOBILE LIDAR Paul Mrstik, Vice President Technology Kresimir Kusevic, R&D Engineer Terrapoint Inc. 140-1 Antares Dr. Ottawa, Ontario K2E 8C4 Canada paul.mrstik@terrapoint.com
More informationESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY
ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY HOWARD COUNTY MARYLAND ARCHITECTURAL DESIGN ACADEMY Architectural Design 1 Introduction / Overview of Course This course will introduce the basic principles
More informationYale Arts Complex. The design results from the integration of programmatic, structural and mechanical needs. It includes
New Haven, Connecticut 1 2 Yale University s Rudolph Building formerly known as the Art and Architecture Building was designed in 1963 by the modern master and then chair of the School of Architecture,
More informationJOSEPH P. SOLINSKI. Membership affiliations and committee board standings are maintained with the following industry organizations:
JOSEPH P. SOLINSKI Page 1 of 5 SUMMARY Diversified experience within the Curtain Wall Industry has provided a complete spectrum of background and training. Mr. Solinski s more than 29 years of experience
More information3D Laser Scanning For Digital Modeling & Documentation
3D Laser Scanning For Digital Modeling & Documentation Company Profile Direct Dimensions is dedicated to tackling the most difficult challenges with the most advanced 3D technologies available. Direct
More informationNicholas Vann, State Historical Architect
FEDERAL INVESTMENT TAX CREDIT B E L L I N G H A M M A Y 2 9, 2 0 1 3 Nicholas Vann, State Historical Architect DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION FEDERAL INVESTMENT TAX CREDITS 20% Federal
More informationPELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT. November 2007
PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT November 2007 PURPOSE OF INVESTIGATION Determine possible locations of moisture intrusion into and through facade. Determine cause of horizontal and vertical
More informationRadiological characterisation by means of 3D-laser modelling and positioning of measurements
Radiological characterisation by means of 3D-laser modelling and positioning of measurements Robert Hedvall 1, Patrik Johansson 1, Peter Erixon 1, Fredrik Ekenborg 1, Feng Quanhong 2 and PA Andersson 3
More information2012 BIM Guidelines and Standards (Rev. 00) University at Albany
A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested
More informationASHULIA APPARELS LTD. Client Summary Report
Revision : Issue 1 Date: 18 March 2014 ASHULIA APPARELS LTD Samad Mansion, Sec # 6, Block # kha, Road No# 1, Plot #14, Shenpara Parbata, Mirpur, Dhaka (23.8065N,90.3683E) 4th March 2014 Client Summary
More informationHIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL
HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL Prepared for: Public Works and Government Services Canada Parliamentary Precinct Branch Prepared by: Halsall Associates 210 Gladstone
More information1. Name of Property. 6. Function or Use Historic Functions (Enter categories from instructions) Current Functions (Enter categories from instructions)
Site Inventory Form State Inventory No. 92-00505 New Supplemental State Historical Society of Iowa Part of a district with known boundaries (enter inventory no.) 92-00349 (November 2005) Relationship:
More informationSECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
More informationSlavic Village Building Condition Review
Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities
More informationBuilding Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationArticle 5: Building Regulations
Article 5: Building Regulations Division 37: Additional Building Regulations for Archaic Materials and Methods of Construction (Added Additional Building Regulations for Archaic Materials and Methods of
More informationBIM Test At ASHRAE HQ
This article was published in ASHRAE Journal, April 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not be
More informationLaser Scanning for an Integrated BIM
Laser Scanning for an Integrated BIM By: Duane Gleason Lake Constance 5D-Conference 2013 Constance, 28th-29th of October Introduction The application of laser scanning technology has been popular in the
More informationSaint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
More informationPresentation: Proposed Plan Amendments
Epstein s Rehabilitation Plan Presentation: Proposed Plan Amendments MORRISTOWN REDEVELOPMENT ENTITY March 14, 2013 Epstein s Rehabilitation Plan Presentation Part 1: Morristown Planning Division Neighborhood
More informationCityzenith s 5D Smart City platform empowers users with a simple way to make sense of the torrent of data in our cities, corporate
5D Smart City Cityzenith s 5D Smart City platform empowers users with a simple way to make sense of the torrent of data in our cities, corporate campuses, and universities, revolutionizing the way we access,
More informationConstruction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
More informationHistoric Renovation. passionate principals + committed professionals + unparalleled service
Historic Renovation passionate principals + committed professionals + unparalleled service HISTORIC RENOVATION Construction work on a historic building may include preservation, restoration, repair, refurbishment,
More informationFIRE LOSS STATISTICAL CONSIDERATIONS IN RELATING FAILURE AND BUILDING DAMAGE TO THE BUILDING CODE OBJECTIVES
FIRE LOSS STATISTICAL CONSIDERATIONS IN RELATING FAILURE AND BUILDING DAMAGE TO THE BUILDING CODE OBJECTIVES P.L. Senez*, K.D. Calder, Hsing H (Isabella) Li Sereca Fire Consulting Ltd., Canada INTRODUCTION
More informationBTC. Building Technology Consultants, PC 1845 E. Rand Road, Suite L-100 Arlington Heights, Illinois 60004 Main: (847) 454-8800, Fax: (847) 454-8801
BTC Structural Engineer Hpreicher@btcpc.com Patrick E. Reicher is a Structural Engineer at Building Technology Consultants, PC. 6BREGISTRATIONS Licensed Structural Engineer (SE), Illinois Certified Construction
More information201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
More informationCONSERVATION MAINTENANCE WORKSHEET Universal Checklist
3.1 SITE 1 Concrete curbs Check for cracks, spalling, growth from joints X 2 Stone curbs Check for cracks, spalling, growth from joints X 3 Concrete walkways Look for uneven surfaces, ponding, growth from
More informationI n making decisions about the future R ENOVATION, REHABILITATION O FFICE B UILDINGS AND R ESTORATION OF. By Daniel P. Coffey
R ENOVATION, REHABILITATION AND R ESTORATION OF O FFICE B UILDINGS By Daniel P. Coffey Reprinted with the permission of the American Society of Real Estate Counselors'. Before After I n making decisions
More informationDavid C. Barrow Elementary School 100 Pinecrest Drive, Athens, GA 30605
David C. Barrow Elementary School 100 Pinecrest Drive, Athens, GA 30605 Winner of the 2014 Cold-Formed Steel Engineers Institute (CFSEI) Design Excellence Award May 2014 The David C. Barrow Elementary
More informationBuilding Foundation and Structure
Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original
More informationDADE COUNTY COURTHOUSE 73 WEST FLAGLER STREET
DADE COUNTY COURTHOUSE 73 WEST FLAGLER STREET Designation Report City of Miami REPORT OF THE CITY OF MIAMI PLANNING DEPARTMENT TO THE HERITAGE CONSERVATION BOARD ON THE POTENTIAL DESIGNATION OF DADE COUNTY
More informationAutomotive Applications of 3D Laser Scanning Introduction
Automotive Applications of 3D Laser Scanning Kyle Johnston, Ph.D., Metron Systems, Inc. 34935 SE Douglas Street, Suite 110, Snoqualmie, WA 98065 425-396-5577, www.metronsys.com 2002 Metron Systems, Inc
More informationBuilding Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationJEDDAH HISTORICAL BUILDING INFORMATION MODELING "JHBIM" OLD JEDDAH - SAUDI ARABIA
JEDDAH HISTORICAL BUILDING INFORMATION MODELING "JHBIM" OLD JEDDAH - SAUDI ARABIA A.Baik a,, J. boehm b, S. Robson c a Dept. of Geomatic Engineering, University College London, Gower Street, London, WC1E
More informationArchitectural Precedents of Style Facade Diagrams, Image Influences
120' - 2" 23' - 8" 66' - 10" 121' - 2 1/4" 29' - 8" 23' - 8" 12' - 0" 14' - 0" 19' - 4" 21' - 6" 29' - 8" 36' - 8" 13' - 0" 20' - 4" 21' - 6 1/4" 99' - 5 1/4" 41' - 3 1/4" 58' - 2" 29' - 0" 10' - 8" 1'
More informationHigh speed 3D capture for Configuration Management DOE SBIR Phase II Paul Banks Paul.banks@tetravue.com
High speed 3D capture for Configuration Management DOE SBIR Phase II Paul Banks Paul.banks@tetravue.com Advanced Methods for Manufacturing Workshop September 29, 2015 1 TetraVue does high resolution 3D
More informationCARMEL PLACE, NEW YORK, NY
CARMEL PLACE, NEW YORK, NY Carmel Place (formerly known as MY MICRO NY), winner of the adapt NYC competition, optimizes modular construction to provide the city with housing solutions for the expanding
More informationConstruction layout and scanning solutions for the MEP contractor
Middle East Construction layout and scanning solutions for the MEP contractor Trimble Field Solutions Trimble Robotic Total Stations and 3D scanners allow you to both layout your MEP services as designed,
More informationBIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE
Division BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE Mark Sawyer General Manager, Division Trimble Navigation Limited, Inc. Lifecycle Strategy PROJECT TEAM s Engineers General Contractor Subcontractors
More informationProject Report. Structural Investigations Hotel del Sol Yuma, Arizona
Project Report Structural Investigations Yuma, Arizona Prepared by: 2619 Spruce Street Boulder, CO 80302 303-444-3620 Prepared for: Principle Engineering Group, Inc. 833 East Plaza Circle, Suite 100 Yuma,
More informationRequirements for Building Application Submission
THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: phyplskb@caribsurf.com To: Architects, Designers
More informationRIEGL VZ-400 NEW. Laser Scanners. Latest News March 2009
Latest News March 2009 NEW RIEGL VZ-400 Laser Scanners The following document details some of the excellent results acquired with the new RIEGL VZ-400 scanners, including: Time-optimised fine-scans The
More informationThe process components and related data characteristics addressed in this document are:
TM Tech Notes Certainty 3D November 1, 2012 To: General Release From: Ted Knaak Certainty 3D, LLC Re: Structural Wall Monitoring (#1017) rev: A Introduction TopoDOT offers several tools designed specifically
More information3rd Annual Design Drafting Contest
3rd Annual Design Drafting Contest YTI Career Institute 3 rd Annual Design Drafting Contest The purpose of this contest is to encourage excellence in effort and discipline, and to give recognition to outstanding
More informationDAMAGED ROAD TUNNEL LASER SCANNER SURVEY
University of Brescia - ITALY DAMAGED ROAD TUNNEL LASER SCANNER SURVEY Prof. Giorgio Vassena giorgio.vassena@unibs.it WORKFLOW - Demand analysis - Instruments choice - On field operations planning - Laser
More informationTIMMS : FAST, ACCURATE & COST-EFFECTIVE INDOOR MAPPING
TIMMS : FAST, ACCURATE & COST-EFFECTIVE INDOOR MAPPING Designed for ease-of-use and maneuverability, TIMMS is a high-productivity tool for accurately measuring, georeferencing and modeling interior spaces
More informationGIS Solutions for FTTx Design. David Nelson, GISP
GIS Solutions for FTTx Design David Nelson, GISP Telecom GIS Manager, Black & Veatch Agenda Intro to GIS Telecom GIS Vision GIS Strategy Project Execution Mobile Online Services Dashboards Client Deliverables
More information1 RCNY 101-14 CHAPTER 100. (b) References. See Administrative Code sections 28-105.1, 28-105.4, item 6 and 28-105.4.2.1.
1 RCNY 101-14 CHAPTER 100 Subchapter A Administration 101-14 Categories of work that may or may not require a permit. (a) Scope. This rule establishes categories of work that may be classified as a minor
More information3D BYZANTINEB 3D ARCHAEOA. 3D Crypts. 3D Sub Divo RCHAEO
Electronic Imaging 2003 20/01/2003 Electronic Imaging 2003 Santa Clara, California Videometrics VII Wednesday 22 January Santa Clara, USA J-A Beraldin(1), Picard(1), El-Hakim(1), M. S.F. G. V. Valzano(2),
More informationTable of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9
Table of Contents I Introduction 2 II Definitions & Area Calculation 2 III Room Numbering 7 IV Appendix A 9 I. Introduction A. Purposes The purposes of this document are to: B. Benefits 1. Clarify and
More informationInvestment Outlook. Creative build-out brings additional returns to aging industrial assets and potentially for new product. Los Angeles Fall 2015
Investment Outlook Creative build-out brings additional returns to aging industrial assets and potentially for new product Los Angeles Fall 2015 2 Industrial Creative July 2015 By utilizing the intrinsic
More informationBuilding Information Modeling for MEP Engineering. Revit MEP 2008
Building Information Modeling for MEP Engineering Revit MEP 2008 Design Intuitively with Tools That Work the Way Engineers Think Revit MEP software is an intuitive design tool that works the way engineers
More informationReal Estate Advisory Services. Cost Management. Project Management. Cost Segregation
Real Estate Advisory Services Cost Management Project Management Cost Segregation 161 N. Clark St. Suite 2050 Chicago, IL 60601 312.424.0250 330 E. Kilbourn Ave. Suite 565 Milwaukee, WI 53202 414.225.5305
More informationRDH Building Sciences Inc.
MAK LTR 2007 03 26 Proposal for Building Enclosure Consulting Services RDH Building Sciences Inc. 509 FAIRVIEW AVENUE N SEATTLE WA 98109-5507 TEL 206 324 2272 FAX 206 324 6339 SEA@RDHBE.COM WWW.RDHBE.COM
More informationBIM and Cost Estimating
REVIT BUILDING INFORMATION MODELING BIM and Cost Estimating This white paper explores how the reliable information held within a building information model can be used to support cost estimating. The paper
More informationAll substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
More informationTECHNICAL PRESERVATION GUIDELINES
TECHNICAL PRESERVATION GUIDELINES APRIL 2009 hvac upgrades in historic buildings Caroline Alderson EXECUTIVE SUMMARY Effective coordination between preservation, sustainability, architecture, and engineering
More informationBuilding Code Clarifications - 7. Fire Resistance
Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,
More informationNew Zealand BIM Handbook Appendix D - BIM Uses definitions July 2014. A guide to enabling BIM on building projects
New Zealand BIM Handbook Appendix D - BIM Uses definitions July 2014 A guide to enabling BIM on building projects Appendix D BIM USES DEFINITIONS CONTENTS BIM Uses 2 Existing Condition Modelling... 4 Cost
More informationHartsfield-Jackson Atlanta International Airport s
Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,
More informationBuilding Measurement Services
Building Measurement Services Robert Parfet Excerpt from The Architect s Handbook of Professional Practice, Update 2003 Building owners and landlords need accurate measurements and area calculations to
More informationMaking Better Medical Devices with Multisensor Metrology
Making Better Medical Devices with Multisensor Metrology by Nate J. Rose, Chief Applications Engineer, Optical Gaging Products (OGP) Multisensor metrology is becoming a preferred quality control technology
More informationPOLICY NUMBER: C450B SUPERSEDES: C450A. Policy to Encourage the Designation and Rehabilitation of Municipal Historic Resources in Edmonton
CITY POLICY REFERENCE: City Council 1988 October 25 Historical Resources Act RSA 2000 ADOPTED BY: City Council 2008 October 29 SUPERSEDES: C450A PREPARED BY: Planning and Development DATE: 2008 September
More informationTeaching Using 3D Laser Scans
Teaching Using 3D Laser Scans Pavan Meadati, Ph.D., LEED AP Southern Polytechnic State University Marietta, Georgia Javier Irizarry, Ph.D., PE. Georgia Institute of Technology Atlanta, Georgia Fwu-shin
More informationCAD Standards Guideline For Facility Documentation and Construction Projects
CAD Standards Guideline For Facility Documentation and Construction Projects Implemented March 2010 Page 1 of 9 Table of Contents A. Software B. CAD Methods 1. Layer Standards 2. Font 3. Lineweights 4.
More information17,280 square feet Overview:
CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The
More informationOccupied Refurbishment Tilburg Town Houses (NL)
Occupied Refurbishment Tilburg Town Houses (NL) A. Gumpp 1 Occupied Refurbishment Tilburg Town Houses (NL) Dipl.-Ing. Alexander Gumpp Gumpp & Maier GmbH DE-Binswangen 2 Occupied Refurbishment Tilburg Town
More informationSpace Planning. Gretchen Addi, Associate AIA, and Jacqueline Lytle, IIDA, Associate AIA. Summary CLIENT NEEDS
Excerpt from The Architect s Handbook of Professional Practice, 13th edition, 2000 Space Planning Gretchen Addi, Associate AIA, and Jacqueline Lytle, IIDA, Associate AIA Space planning is an integral part
More informationUniversity of Arizona THE CAMPUS SPATIAL DATA INITIATIVE
University of Arizona THE CAMPUS SPATIAL DATA INITIATIVE Presentation Review 1. Background on Campus Mapping and Spatial Data 2. The Campus Spatial Data Users Research / Teaching / Outreach Administration
More informationCIM for sustainability appraisal of conceptual ILCM of the disaster restoration
Japan Construction Information Center CIM for sustainability appraisal of conceptual ILCM of the disaster restoration April 2015 Japan Construction Information Center Foundation Chief Researcher Katsunori
More informationCAD Standards Guideline For Facility Documentation and Construction Projects
CAD Standards Guideline For Facility Documentation and Construction Projects Page 1 of 12 Table of Contents A. Software B. CAD Methods 1. Layer Standards 2. Font 3. Lineweights 4. External References 5.
More informationNEW YORK CITY DEPARTMENT OF DESIGN + CONSTRUCTION
NEW YORK CITY DEPARTMENT OF DESIGN + CONSTRUCTION July 2012 BIM Guidelines Michael R. Bloomberg, Mayor David J. Burney, FAIA, Commissioner David Resnick, AIA, Deputy Commissioner TABLE OF Contents Message
More information