In a recent T&D utility rate case, Docket No , 154 the Commission determined that

Size: px
Start display at page:

Download "In a recent T&D utility rate case, Docket No. 28840, 154 the Commission determined that"

Transcription

1 In a recent T&D utility rate case, Docket No , 154 the Commission determined that gradualism should not apply to T&D rates. The Commission held: The Commission declines to apply gradualism in this case. This proceeding develops the T&D rates, as opposed to the broader rates developed for a fully integrated utility. As the T&D rates are only a subset of the total rates paid by customers, changes to the T&D rates would not have as large an impact as they would if the broader rates for a customer class were changed by the same percentage. Therefore, gradualism will not be used in this case. 155 Clearly, the basis for the Commission's decision not to apply gradualism in Docket No was that T&D rates were the only charges at stake and changes in T&D rates do not have as large an impact as changes in overall rates paid by customers. The same circumstances are squarely present in Oncor's case. Based upon the Commission's decision in Docket No , gradualism should not be applied to rates determined in this case. However, if the ALJs or Commission should decide to apply gradualism in this case, it should be applied to the proposed residential rate because the proposed residential rate includes the largest of increases proposed by Oncor for the various retail customer classes while some retail classes are proposed to receive a rate decrease. Furthermore, if the ALJs or Commission should decide to apply gradualism to the proposed wholesale rate increases and distribute the balance to retail classes, the distribution should be applied among all the retail classes so as to equalize the impact of this distribution in conjunction with the impact of the other rate changes for the retail classes. isa Application of AEP Texas Central Company For Authority To Change Rates, Docket No , Order (August 15, 2005). "s Id. at 23 and

2 4. Other Allocation Issues OPC recommends that the ALJs and Commission make three adjustments to Oncor's cost of service study: Allocation of Costs of Major Account Representatives Like most utilities, Oncor incurs costs associated with providing services directly and exclusively to large customers and national chains. Oncor employs "major account representatives." Oncor regards "major accounts" as customers with loads over 1500 kw. Oncor spends about $1,775,370 on services to major accounts. 156 As OPC witness Bill Marcus explained in his testimony, most of these costs are in various A&G accounts where they are allocated to all customers. This allocation is unreasonable because large customers are not paying their fair share of these Costs. 157 Mr. Marcus testified: For example, under Oncor's cost allocation, transmission voltage customers are assigned a total of only $370 in customer services and information costs for the distribution function (and a few more dollars for metering and billing), even though Oncor claims that it spends almost $120,000 for major account representatives serving transmission customers. In essence, residential and the smallest commercial customers are paying for services that Oncor admits it provides to large commercial and industrial customers. 158 To correct this unfair allocation, Mr. Marcus recommended two allocation process adjustments: (1) Reclassifying major account representative costs in Accounts 920, 921 and to Account 908 for cost allocation purposes. This reclassification assures that these costs are properly assigned when calculating labor overheads; and (2) Directly assigning the costs to classes using the percentages that Oncor provided as the approximate percentages of time the major account 156 Exh. OPC-5 (Marcus Direct) at 9; Exh. OPC-6 (Marcus Work Papers) at Exh. OPC-5 (Marcus Direct) at d. at

3 representatives spend on each class - 75% to Secondary service, 15% to Primary service, and 10% to Transmission service. Mr. Marcus also recommended a rate design adjustment because over 99% of the customers in the Secondary class and 88% of customers in the primary class have loads under 1500kW and therefore, do not use the services of the major account representatives. Mr. Marcus recommended that rates should be designed to recover the major account representative costs from only customers with loads over a megawatt.' 59 TIEC's Mr. Pollock criticized Mr. Marcus' recommendation because Mr. Pollock believed that "a full and complete analysis" the entire FERC accounts 908, 920, 921 and would have to be done to determine the reasonableness of the allocation factors. However, Mr. Pollock suggested no other misallocation of costs in these FERC accounts. Mr. Pollock also did not quarrel with Mr. Marcus's basis for re-allocating costs associated per se with major account representatives or re-designing rates to collect these costs from only customers with loads over a megawatt. Analyzing all of the other costs in these accounts would serve no purposes because the other costs do not relate to the major account representative costs and the appropriateness of the assignments of other costs to these accounts has no relationship to the lack of appropriateness of the assignment of the major account representative costs that Mr. Marcus found. Further, Mr. Pollock's characterization of the adjustment as "piecemeal" is unwarranted inasmuch as assignment or allocation of costs at this level is typically on an item-by-item basis. 160 Similarly, Mr. Sherburne for Oncor did not dispute the accuracy or basis for Mr. Marcus's reclassification of costs associated with major account representatives. Mr. Sherburne's only concern was that if someone questions one part of Oncor's classification of 's9ld. at See Oncor Exh. 35 (Sherburne Direct) at

4 costs and recommends adjustments, others might do the same. The correct assignment of costs should not raise anyone's costs if it is done correctly the first time, and it will result in rates that are fairer and that better achieve the goal of cost causation. OPC requests that the ALJs and Commission make the allocation and rate design adjustments that OPC recommends in regard to costs associated with major account representatives. Allocation of Economic Development Expenses Oncor allocates its economic development expenses ($605,567) in FERC Account 908 by the number of customers. Since residential customers make up 84% of the total number of Oncor's customers, 84% of economic development expenses are charged to residential customers. 16' As OPC witness Mr. Marcus testified, the benefit of Oncor's incurrence of economic development expenses is increased revenue to Oncor from the new or expanded customers attracted to its service area. Because the benefits of Oncor's incurring economic development expenses flow to all of Oncor's customers roughly in proportion to Oncor's revenues, these expenses should, be allocated by the retail revenue allocation factor instead of the number of customers. 162 In opposition to Mr. Marcus' recommendation, Mr. Pollock asserted that the goal of economic development is to provide additional jobs and tax revenues for the local economy. He opined that residential customers and cities benefit from additional jobs and increased tax revenues, but he was uncertain about benefits to larger customers. Clearly, Oncor as a whole and all of its customers benefit from increases in jobs and tax revenues in the local economy. The 16' Exh. OPC-5 (Marcus Direct) at Id. 53

5 benefits are directly reflected in the increase in revenues that Oncor receives.163 Consequently, allocating these expenses according to Oncor's retail revenues is certainly more appropriate than an allocation based upon the number of customers. Even though this correction to the allocation of economic development expenses is not a large one,164 it better aligns costs with revenues and furthers the goal of cost causation. OPC requests that the ALJs and Commission allocate Oncor's economic development expenses according to Oncor's retail revenues. Allocation of Revenues Received as Rent for Utility Property OPC witness Mr. Marcus testified that Oncor allocates revenue it receives from rent for electric property in Account 454 (Rent from Utility Property) by the aggregate of all distribution plant including substations, overhead and underground lines, services, meters, and street lights. However, over 70% of the revenue recorded in Account 454 comes from pole attachment fees. Mr. Marcus recommended that these revenues should be allocated according to a more precise and reasonable allocation factor for these revenues, namely the allocation factor for Account 364 (poles, towers and fixtures) rather than total distribution plant.165 No witness testified in opposition to Mr. Marcus' recommendation. OPC requests that the ALJs and Commission allocate Oncor's revenues in Account 454 according to the allocation factor for Account 364 to better align the revenues with the distribution facilities that generate the revenues. 163 Id 164 Mr. Sherburne's only criticism of Mr. Marcus' recommendation to allocate economic development expenses by retail revenues. 16s Exh. OPC-5 (Marcus Direct) at

6 E. Waiver of Demand Ratchet Provisions Oncor bills demand charges to customers in the large Primary service and large Secondary service classes (Primary Service > 10kW and Secondary Service >10kW).166 Customers in these classes have IDR meters that measure electrical demand. Demand charges are based upon the assumption that the customer's maximum load at any time in a month has a correlation (or coincidence) with the system peak loads.167 Oncor's demand charges incorporate a ratchet equal to 80 percent of the customer's highest use in the previous 12 months if higher than the highest 15 minutes of use in the current month.168 OPC recommends that the ALJs and Commission approve Oncor's proposal to waive the demand ratchet for customers with maximum annual loads of 20kW or less and for municipally owned loads. 1. Loads with Maximum Annual Demand of 20kW or Less OPC witness Bill Marcus explained that demand charges tend not to reflect cost causation well for customers with low load factors. It is well known that where a customer's load factor is below a certain level, the coincidence of the customer's maximum demand with system peak demand periods is significantly lower than for customers with higher load factors.169 Oncor's proposal to waive the demand ratchet for customers with maximum annual demands of 20 kw or less is reasonable because these loads are small, and a relatively small change in the customer's load in a particular month can result in relatively large increases in the customer's bills over a 12-month period or longer. In addition, application of a ratchet to these loads is very confusing to customers such as small business owners, youth sports associations and other non-profit 166 Oncor Exh. 35 (Sherburne Direct) at 26; Exh. OPC-5 (Marcus Direct) at Exh. OPC-5 (Marcus Direct) at 13. '68 Id. at 14. '69 Exh. OPC-5 (Marcus Direct) at

7 organizations. These customers do not have the resources necessary to effectively manage their electrical consumption to avoid paying ratcheted charges.170 In some instances, these customers' demand is seasonal, similar to the seasonal agricultural customers who the Commission has already exempted from the demand ratchet.171 These customers are not "free riders," as Mr. Pollock asserted. Typically, the waiver of the demand ratchet for these customers serves a community or public purpose that indirectly benefits all customers. 2. Municipally-Owned Loads Municipally-owned loads also serve the public good and should be exempted from demand ratchet billing. Many municipal loads are off-peak loads, such as ball park lighting and water pumping. The public interest requires that the electrical demand of a municipality vary in response to the public need at the time. The variation in municipal load should not result in increased charges for the municipality because its electrical use is responsive in nature to matters over which it has minimal or no control. A municipality cannot respond to price signals as commercial customers can.' 72 Because of the unique characteristics of a municipality as an electricity customer and the unique aspects of its use of electricity, OPC agrees that waiving the demand ratchet for municipally owned loads is not unreasonably preferential and does not result in unreasonable discrimination against other customers in the same customer class Oncor Exh. 55 (Sherburne Rebuttal) at Docket No , Order No. 40 at Cities' Exh. 3 (Nalepa Direct at See generally, Oncor Exh. 55 (Sherburne Rebuttal) at

8 K. Rider EECRF - Energy Efficiency Cost Recovery Factor Commission Rule (f)(6) now authorizes that the EECRF may be billed by an energy charge or a monthly customer charge.174 Oncor has been recovering about 80% of its energy efficiency costs through base rates set in Docket No Oncor allocated these energy efficiency costs to each rate class based 50% on customer count and 50% on demand. 115 Oncor currently recovers the remainder of its energy efficiency costs through an incremental EECRF.176 However, the rule provides for the removal of energy efficiency costs from base rates in the utility's first base rate case filed after December 31, 2007 and recovery of these costs through the EECRF.'7' Given that the purpose of Oncor's energy efficiency programs is to reduce energy consumption, energy costs and peak demand,178 OPC recommends that Oncor's EECRF be based upon an energy rate. In his rebuttal testimony, Mr. Sherburne advocated billing energy efficiency costs on a fixed customer charge basis for administrative convenience.179 However, he acknowledged that some energy efficiency programs are related to energy consumption or demand in terms of building size and corresponding air-conditioning load.180 As far as administrative convenience is concerned, OPC witness Bill Marcus illustrated in Exhibit WBM-5 in his testimony that implementation of an energy rate to recover energy efficiency costs is 174 P.U.C. Subst. R (f)(6). 175 Oncor Electric Delivery Company LLC's Request for Approval of Energy Efficiency Cost Recovery Factor, Docket No , Order at 4 (Oct. 31, 2008). "6 Id. "' P.U.C. Subst. R (f). 178 P.U.C. Subst. R (a). 179 Oncor Exh. 55 (Sherburne Rebuttal) at 52. iso Id. 57

9 equally easy to administer. Mr. Marcus also correctly pointed out that it is important to collect costs in a way that reflects the size of the customer because the costs should follow the benefits received from the energy efficiency programs. Larger customers within each class, particularly the residential class, have more opportunities to take advantage of and benefit from energy efficiency programs.181 Therefore, OPC recommends that energy efficiency costs recovered through the EECRF be recovered on an energy basis. Respectfully submitted, Don Ballard Public Counsel State Bar No ^-^^ s K. Rourke, Jr. ssistant Public Counsel State Bar No OFFICE OF PUBLIC UTILITY COUNSEL 1701 N. Congress Avenue, Suite P.O. Box Austin, Texas / / (Facsimile) '$' Exh. OPC-5 (Marcus Direct) at

10 APPENDIX LIST OF DOCKETS DOCKET Docket No. 178, Application of Texas Power and Light Company for Authority to Change Rates Docket No. 527, Application of Texas Electric Service Company (City of Arlington) for a Rate Increase Docket No. 2572, Application of Dallas Power & Light Company for a Rate Increase within Collin, Dallas, Denton, Kaufman and Rockwall Counties' BRIEF DESCRIPTION 1976 TP&L Rate Case 1977 TESCO Rate Case 1979 DP&L Rate Case Docket No. 2606, Petition of Texas Electric Service Company (TESCO) for Authority to Change Rates Docket No. 2676, Application of Houston Lighting & Power Company for Authority to Increase Rates within Austin, Brazoria, Chambers, Colorado, Fort Bend, Galveston, Harris, Liberty, Matagorda, Montgomery, Waller and Wharton Counties 1979 TESCO Rate Case 1979 HL&P Rate Case Docket No. 3780, Application of Texas Power & Light for a Rate Increase within a Systemwide Area Docket No. 5200, Application of Texas Electric Service Company for a Rate Increase 1981 TP&L Rate Case 1983 TESCO Rate Case Docket No. 5256, Application of Dallas Power and Light Company for Authority to Change Rates 1983 DP&L Rate Case Docket No. 5560, Application of Gulf States Utilities for a Rate Increase 1984 GSU Rate Case 59

11 DOCKET Docket No. 5640, Application of Texas Utilities Electric Company for a Rate Increase BRIEF DESCRIPTION 1984 TUEC Rate Case (lst rate case as a single merged entity) Docket No. 5779, Application of Houston Lighting and Power Company for a Rate Increase 1984 HL&P Rate Case Docket No. 6350, Application of El Paso Electric Company for Authority to Change Rates 1985 El Paso Rate Case Docket No. 6525, Application of Gulf States Utilities Company Authority to Change Rates (GSU) Docket No. 8218, Inquiry of the General Counsel into the WA TS Prorate Credit Docket No. 8363, Application of El Paso Electric Company for Authority to Change Rates Docket No. 8585, Petition of General Counsel to Inquire into the Reasonableness of the Rates and Services of Southwestern Bell Telephone Company Docket No. 9300, Application of Texas Utilities Electric Company for Authority to Change Rates Docket No , Application of Texas Utilities Electric Company for Authority to Change Rates 1985 GSU Rate Case 1988 Inquiry into WATS Prorate Credit 1988 El Paso Rate Case 1989 SWBT Rate Inquiry 1990 TUEC Rate Case 1993 TUEC Rate Case (Last fully litigated rate case prior to unbundling cost of service rate case) Docket No , Application of Central Power and Light Company for Authority to Change Rates 1995 CP&L Rate Case Docket No , Application of Texas 1995 TUEC Fuel Reconciliation Case Utilities Electric Company for the Reconciliation of Fuel Costs 60

12 DOCKET BRIEF DESCRIPTION Docket No , Texas Utilities Electric 1997 TUEC first TCOS case Company Filing in Compliance with Subst. R Docket No , Application of Entergy, Gulf States, Inc. for Approval of its Transition to Competition Plan and the Tariffs Implementing the Plan, and for the Authority to Reconcile Fuel Costs, to set Revised Fuel Factors, and to Recover a Surcharge for Underrecovered Fuel Costs 1996 EGS Transition to Competition Plan Docket No , Texas Utilities Electric Company Filing in Compliance with Docket No to Consider Certain Issues Associated with Rates for Distribution-Level Service, Transformation Service, and Tex-La Distribution Service Docket No , Joint Application to Reduce Texas Utilities Electric Company Base Rates and Approval of Certain Accounting Procedures Docket No , Generic Issues Associated With Applications For Approval Of Unbundled Cost Of Service Rate Pursuant To PURA Section And Public Utility Commission Subst. R Docket No , Application Of Sharyland Utilities, LP For Approval Of Unbundled Cost Of Service Rate Pursuant To PURA And Public Utility Commission Substantive Rule TUEC Transmission Service (Rates DLS and XFMR) rate proceeding 1997 TUEC Rate Reduction and Earnings Cap Stipulation rate proceeding (to transition to expected market restructuring) 2000 Unbundling (UCOS) Generic Issues case 2000 Sharyland Unbundling (UCOS) case Docket No , Application of TXU 2000 TXU Electric Unbundling (UCOS) case - Electric Company for Approval of Unbundled last completed TXU Electric rate case prior to Cost of Service Rate Pursuant to PURA current Docket No and Public Utility Commission 'Substantive Rule

13 DOCKET Docket No , Application of Reliant energy HL&P for Approval of Unbundled Cost of Service Rate Pursuant to PURA and Public Utility Commission Substantive Rule Docket No , Application ofaep Texas Central Company for Authority to Charge Rates BRIEF DESCRIPTION 2000 Reliant Unbundling (UCOS) case 2003 AEP Texas Central Rate Case Docket No , Application of CenterPoint Energy Houston Electric LLC, Texas Genco, LP and Reliant Energy Retail Services LLC to Determine Stranded Costs and Other Balances--CenterPoint Stranded Cost Case Docket No , TXU Electric Delivery Company Nuclear Decommission Cost Study and Funding Analysis Pursuant to Subst. Rule (t)(2) 2004 CenterPoint Stranded Cost Case 2005 TXU Electric Delivery Nuclear Decommissioning Cost Study and Funding Analysis Docket No , Application of PUC Legal for Approval of Energy Efficiency Pilot Program Template Docket No , Petition by Commission Staff for a Review of the Rates of Centerpoint Energy Houston Electric, LLC Pursuant to PURA Template to Implement SB 712 Energy Efficiency Pilot Programs 2006 PUC Staff Inquiry into Centerpoint Rates Docket No , Commission Staff's 2006 Proceeding to Implement SB 712 Application for Approval of Plan to Implement Funding for Low-Income Energy Efficiency Targeted Low-Income Energy-Efficiency Programs Programs 62

14 DOCKET BRIEF DESCRIPTION Docket No , Application of 2006 Southwestern Public Service Rate Case Southwestern Public Service Company for (1) Authority to Change Rates; (2) Reconciliation of its Fuel Costs for 2004 and 2005; (3) Authority to Revise the Semi-Annual Formula Originally Approved in Docket No Used to Adjust its Fuel Factors; and (4) Related Relief Docket No , Application of AEP Texas Central Company for Authority to Change Rates 2006 AEP Texas Central Rate Case Docket No , Application of AEP Texas North Company for Authority to Change Rates 2006 AEP Texas North Rate Case Docket No , Commission Staff's Petition for Designation of Competitive Renewable Energy Zones Docket No , Application of Electric Transmission Texas, LLCfor a Certificate of Convenience and Necessity, for Regulatory Approvals, and Initial Rates 2007 Staff Petition for Designation of CREZ 2007 Electric Transmission Texas CCN and Rate Proceeding Docket No , Commission Staff's Petition 2007 PUC Staff Inquiry into TXU ED Rates for Review of the Rates of TXU Electric (withdrawn pursuant to Docket No Delivery Company stipulation) Docket No , Joint Report and Application of Oncor Electric Delivery Company and Texas Energy Future Holdings Limited Partnership Pursuant to PURA Docket No , Petition of Texas Legal Services Center and Texas Ratepayers' Organization to Save Energy to Modify the Commission's Final Order in Docket No and to Reform the Agreement to Implement Weatherization Programs Docket No , Application of Entergy Gulf States, Inc. for Authority to Change Rates and to Reconcile Fuel Costs 2007 Oncor and Texas Energy Future Holdings PURA Section Proceeding relating to purchase of TXU Corp. ("merger case") 2008 Petition related to administration of Low Income Weatherization Programs 2007 Entergy Gulf States Rate Case 63

15 DOCKET BRIEF DESCRIPTION Docket No , Commission Staff's Wholesale Transmission Service Application to Set 2008 Wholesale Rate case Transmission Service Rates for the Electric Reliability Council of Texas Docket No , Oncor Electric Delivery Company LLC's Request for Approval of Energy Efficiency Cost Recovery Factor Docket No , Commission Staffs Petition for the Selection of Entities Responsible for Transmission Improvement Necessary to Deliver Renewable Energy from Competitive Renewable Energy Zones 2008 Oncor EECRF Proceeding 2008 CREZ Selection proceeding Docket No , Oncor Electric Delivery 2008 Oncor Advanced Metering System Company LLC's Request for Approval of Deployment Plan & Surcharge Advanced Metering System (AMS) Deployment Plan and Request for AMS Surcharge Docket No , Application of Southwestern Public Service Company Authority to Change Rates to Reconcile Fuel and Purchased Power Costs for 2006 and 2007 and to Provide a Credit for Fuel Cost Savings 2008 SPS Rate Case Docket No , Application of Oncor Electric Delivery Company For Rate Case Expenses Related to PUC Docket No Oncor Rate Case Expense Docket 64

16 APPENDIX LIST OF ACRONYMS A&G - Administrative and General ABILL - Additional Billing Services AC - Air Conditioning ADFIT - Accumulated Deferred Federal Income Taxes AEP - American Electric Power AGA - American Gas Association ALJ - Administrative Law Judge AMR - Advanced Meter AMS - Advanced Metering System AMT - Alternative Minimum Tax APBO - Accumulated Post-retirement Benefit Obligation APSC - Arkansas Public Service Commission APT - Arbitrage Pricing Theory ARAM - Average Rate Assumption Method ARC - Additional Resource Charges ARM - Alliance for Retail Markets ATOC - Alliance of TXU/Oncor Customers BPL - Broadband over Power Lines BPO - Business Process Outsourcing CAPM - Capital Asset Pricing Model CBOE - Chicago Board Options Exchange CCN - Certificate of Convenience and Necessity CD - Competitive Division CDD - Cooling Degree Days CE- Comparable Earnings CEA - Concentric Energy Advisors CFO - Chief Financial Officer CG - Capgemini CGE - Capgemini CgE - Capgemini Cl - Conformance Index CIAC - Contribution in Aid to Construction CILCO - Central Illinois Light CIO - Chief Information Officer CLECO - Central Louisiana Electric Company CML - Capital Market Line CMMS - Computerized Maintenance Management System COO - Chief Operating Officer COS - Cost of Service CP - Coincident Peak CPA - Certified Public Accountant CPCU - Chartered Property Casualty Underwriter 65

17 CPI - Consumer Price Index CPL - Central Power & Light CPR - Continuing Property Record CREZ - Competitive Renewable Energy Zone CSW - Central and Southwest CTA - Consolidated Tax Adjustment CTSA - Consolidated Tax Savings Adjustment CV - Curriculum Vitae CWC - Cash Working Capital DBA - Doing Business As DC - Direct Current DCF - Discounted Cash Flow DCSI - Distribution Control Systems Inc. DFIT - Deferred Federal Income Tax DIST - Distribution DLS - Distribution Line Service DP&L - Dallas Power & Light Company EAIP - Executive Annual Incentive Plan ECI - Employment Cost Index ECOM - Excess Cost Over Market EDF - Environmental Defense Fund EDS - Electronic Data Systems EECRF - Energy Efficiency Cost Recovery Factor EEI - Edison Electric Institute EESP - Energy Efficiency Service Provider EFH - Energy Future Holdings EPBO - Expected Post-retirement Benefit Obligation EPHFU - Electric Plant Held for Future Use EPRI - Electric Power Research Institute ERCOT - Electric Reliability Council of Texas ERP - Emergency Restoration Plan ESD - Electric Service Division FAS - Financial Accounting Standard FASB - Financial Accounting Standards Board FCAS - Fellow of the Casualty Actuarial Society FERC - Federal Energy Regulatory Commission FFCRF - Franchise Fee Cost Recovery Factor FIT - Federal Income Tax FTE - Full-time Equivalent G&T - Generation & Transmission GAAP - Generally Accepted Accounting Principles GDP - Gross Domestic Product GE - General Electric GIC - The Government of Singapore Investment Corporation GPI - General Performance Indicator GUD - Gas Utility Docket 66

18 H&M - Harris and Marston HB - House Bill HDD - Heating Degree Days HL&P - Houston Light & Power Company HR - Human Resources IBEW - International Brotherhood of Electrical Workers ID - Identification IDR - Interval Data Recorder IEEE - Institute of Electrical and Electronics Engineers IFRS - International Financial Reporting Standards IIEC - Illinois Industrial Energy Consumers IMP - Integrated Maintenance Program IP - Internet Provider IRA - Individual Retirement Account IRS - Internal Revenue Service IT - Information Technology KKR - Kohlberg Kravis Roberts KKR/TPG - Kohlberg Kravis Roberts / Texas Pacific Group KPI - Key Performance Indicator kva - Kilovolt Amps kw - kilowatt kwh - kilowatt hour LBO - Leveraged Buy-Out LDC - Local Distribution Company (gas utilities) LLC - Limited Liability Company LTIP - Long-term Incentive Plan M&O - Maintenance and Operations MDMS - Meter Data Management System MEHC - MidAmerican Energy Holding Companies MET - Metering System Services MFA - Master Framework Agreement MTC - Minimum Tax Credit MTP - Market Transformation Program NARUC - National Association of Regulatory Utility Commissioners NCP - Non-Coincident Peak NDC - Nuclear Decommissioning Charge NERC - North American Electric Reliability Corporation NOAA - National Oceanic and Atmospheric Administration NOLs - Net Operating Losses NUA - Non-Unaimous Agreement O&M - Operation and Maintenance OBM - Office of Business Management OPC - Office of Public Utility Counsel OPEB - Other Post Employment Benefits OPUC - Office of Public Utility Counsel P&B - Pension and Benefits 67

19 PBO - Projected Benefit Obligation PEP - Performance Enhancement Plan PFD - Proposal for Decision PG&E - Pacific Gas & Electric PIP - Performance Incentive Plan PLC - Power Line Carrier POD - Point of Delivery POI - Point of Interconnection PP&E - Property, Plant and Equipment PSO - Public Service Company of Oklahoma PUC - Public Utility Commission PUCT - Public Utility Commission of Texas PURA - Public Utility Regulatory Act RCEC - Rayburn Country Electric Cooperative RCT - Railroad Commission of Texas REAP - Reduce Energy in Apartments and Projects REI - Retirement Experience Index REP - Retail Electric Provider RF - Radio Frequency RFI - Request for Information RFP - Request for Proposal or Rate Filing Package ROE - Return on Equity RPI - Reporting Performance Indicator RRC - Reduced Resource Credit RTT - Retail Transformation Tariff S&P - Standard & Poor's SA - Specific Account SAIDI - System Average Interruption Duration Index SAIFI - System Average Interruption Frequency Index SB - Senate Bill SCADA - Supervisory Control and Data Acquisition SCUD - State College and University Discount SEC - Securities and Exchange Commission or System Emergency Center SEER - Seasonal Energy Efficiency Ratio SOAH - State Office of Administrative Hearings SOP - Standard Offer Program SOW - Statement of Work SLM - Street Light Maintenance SLT - Senior Leadership Team SPR - Simulated Plant Record SPS - Southwestern Public Service T&D - Transmission and Distribution TACAA - Texas Association of Community Action Agencies TAMT - Tentative Alternative Minimum Tax TBILL - Transmission and Distribution Utility Billing System Services TBO - Total Benefit Obligation 68

20 TC - Transmission Charge TCC - Texas Central Company TCEH - Texas Competitive Electric Holdings Company TCOS - Transmission Cost of Service TD - Transmission and Distribution TDCS - Transmission and Distribution Customer Services TDHCA - Texas Department of Housing and Community Affairs TDSP - Transmission and Distribution Service Provider TDU - Transmission and Distribution Utility TEF - Texas Energy Future Holdings Limited Partnership TESCO - Texas Electric Service Company Tex-La - Tex-La Electric Cooperative TFO - To From and Over TGM - Transmission Grid Management Organization TIEC - Texas Industrial Energy Consumers TLSC - Texas Legal Services Center TMS - Transmission Management System TNC - Texas North Company TNP or TNMP - Texas New Mexico Power TP&L - Texas Power and Light Company TRAN - Transmission TSA - Tax Sharing Agreement or Transmission Service Agreement TSO - Transmission System Operations TSP - Transmission Service Provider TX ROSE - Texas Ratepayers Organization to Save Energy TUEC - Texas Utilities Electric Company TUMCO - Texas Utilities Mining Company TWACS - Two-way Automated Communications Systems U.S. - United States UCOS - Unbundled Cost of Service UFCRF - Underground Facilities Cost Recovery Factor USA - United States of America USAA - United Services Automobile Association USDA - United States Department of Agriculture VEBA - Voluntary Employee Beneficiary Association VIX - Volatility Index (Chicago Board of Options Exchange) WACC - Weighted Average Cost of Capital XFMR - Transformer 69

21 CERTIFICATE OF SERVICE SOAH Docket No PUC Docket No I certify that on March 4, 2009, I served a true copy of the foregoing Office of Public Utility Counsel's Post-Hearing Initial Brief on all parties of record via United States First-Class Mail, hand-delivery or facsimile. s=rourke, Jr. 70

GDS Associates, Inc. Senior Project Manager Page 2 of 7

GDS Associates, Inc. Senior Project Manager Page 2 of 7 Ellen Blumenihal GDS Associates, Inc. Senior Project Manager Page 2 of 7 taxes, Affiliate transactions, Oil and gas exploration and development. Reviewed the books and business records of public utilities

More information

ENERGY EFFICIENCY ACHIEVEMENTS IN TEXAS

ENERGY EFFICIENCY ACHIEVEMENTS IN TEXAS ENERGY EFFICIENCY ACHIEVEMENTS IN TEXAS Jay Zarnikau, PhD Frontier Associates LLC South-Central Partnership for Energy Efficiency as a Resource August 5, 2014 About Frontier At Frontier Associates, we

More information

Transmission Charge See TCRF Transmission Charge (per 4CP kw) $1.79 NCP 20 kw $4.38. Non-IDR customers $0.0000

Transmission Charge See TCRF Transmission Charge (per 4CP kw) $1.79 NCP 20 kw $4.38. Non-IDR customers $0.0000 Comparison of Utilities' Generic T&D Rates Schedule Commission-1 Generic Transmission and Distribution Rates CenterPoint - Docket 38339/41072 Oncor - Docket 38929 AEP TCC TNC TNMP - Docket 38480 Sharyland

More information

Senate Bill No. 7 Texas Electric Restructuring Act

Senate Bill No. 7 Texas Electric Restructuring Act Senate Bill No. 7 Texas Electric Restructuring Act This summary of Texas newly enacted electric restructuring law was prepared by the Office of Public Utility Counsel for National Association of State

More information

Tariff Development II: REVIEW of Basic Allocation and Rate Design Principles

Tariff Development II: REVIEW of Basic Allocation and Rate Design Principles Tariff Development II: REVIEW of Basic Allocation and Rate Design Principles Robert Manning Public Utility Commission of Texas Briefing for the NARUC/INE Partnership 1 Overview Steps in Setting Rates Establish

More information

Control Number : 36234. Item Number : 18. Addendum StartPage : 0

Control Number : 36234. Item Number : 18. Addendum StartPage : 0 Control Number : 36234 Item Number : 18 Addendum StartPage : 0 ^^. ^ ^a r 0 OPEN MEETING COVER SHEVitr Tr^ E MEETING DATE: September 26, 2014 DATE DELIVERED: September 19, 2014 AGENDA ITEM NO.: 13 CAPTION:

More information

TEXAS COMPETITIVE ELECTRIC HOLDINGS COMPANY LLC UNAUDITED PRO FORMA CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

TEXAS COMPETITIVE ELECTRIC HOLDINGS COMPANY LLC UNAUDITED PRO FORMA CONDENSED CONSOLIDATED FINANCIAL STATEMENTS UNAUDITED PRO FORMA CONDENSED CONSOLIDATED FINANCIAL STATEMENTS TCEH derived these unaudited pro forma condensed consolidated financial statements by applying pro forma adjustments to the historical consolidated

More information

DANIEL J. LAWTON LAWTON CONSULTING B.A. ECONOMICS, MERRIMACK COLLEGE M.A. ECONOMICS, TUFTS UNIVERSITY

DANIEL J. LAWTON LAWTON CONSULTING B.A. ECONOMICS, MERRIMACK COLLEGE M.A. ECONOMICS, TUFTS UNIVERSITY Page 1 of 9 DANIEL J. LAWTON LAWTON CONSULTING B.A. ECONOMICS, MERRIMACK COLLEGE M.A. ECONOMICS, TUFTS UNIVERSITY Prior to beginning his own consulting practice Diversified Utility Consultants, Inc., in

More information

PUC DOCKET NO. 41474 DIRECT TESTIMONY AND EXHIBITS RALPH G. GOODLET, JR. ON BEHALF OF SHARYLAND UTILITIES, L.P. May 31, 2013

PUC DOCKET NO. 41474 DIRECT TESTIMONY AND EXHIBITS RALPH G. GOODLET, JR. ON BEHALF OF SHARYLAND UTILITIES, L.P. May 31, 2013 PUC DOCKET NO. 1 APPLICATION OF SHARYLAND UTILITIES, L.P. TO ESTABLISH RETAIL DELIVERY RATES, APPROVE TARIFF FOR RETAIL DELIVERY SERVICE, AND ADJUST WHOLESALE TRANSMISSION RATE PUBLIC UTILITY COMMISSION

More information

Austin Energy Quarterly Report. Austin Energy. April 26, 2011. Mission: Deliver clean, affordable, reliable energy and excellent customer service.

Austin Energy Quarterly Report. Austin Energy. April 26, 2011. Mission: Deliver clean, affordable, reliable energy and excellent customer service. Austin Energy Quarterly Report Austin Energy April 26, 2011 Mission: Deliver clean, affordable, reliable energy and excellent customer service. Agenda Electric Rate Design Status Report Residential Rate

More information

PUBLIC UTILITY COMMISSION OF TEXAS PAGE 1 OF 9 SUBSTANTIVE RULE, CHAPTER 25. ELECTRIC.

PUBLIC UTILITY COMMISSION OF TEXAS PAGE 1 OF 9 SUBSTANTIVE RULE, CHAPTER 25. ELECTRIC. PUBLIC UTILITY COMMISSION OF TEXAS PAGE 1 OF 9 The Public Utility Commission of Texas (commission) adopts an amendment to 25.237, relating to Fuel Factors with no changes to the proposed text as published

More information

Update on Texas Restructuring. NAESB Conference September 24, 2002 Baltimore, MD Chairman, Rebecca Klein

Update on Texas Restructuring. NAESB Conference September 24, 2002 Baltimore, MD Chairman, Rebecca Klein Update on Texas Restructuring NAESB Conference September 24, 2002 Baltimore, MD Chairman, Rebecca Klein OUTLINE State of the National Energy/Electric Industry State of Texas Electricity Industry Status

More information

Residential Electricity Bill Comparisons Final Report

Residential Electricity Bill Comparisons Final Report Austin Energy Affordability Benchmarking Study Evaluation of Electricity Rates and Bills Residential Electricity Bill Comparisons Final Report November 5, 2010 Bills Produced by R. W. Beck, Inc. November

More information

Control Number : 41446. Item Number : 59. Addendum StartPage : 0

Control Number : 41446. Item Number : 59. Addendum StartPage : 0 Control Number : 41446 Item Number : 59 Addendum StartPage : 0 SOAH DOCKET NO. 473-13-4070 PUC DOCKET NO. 41446 APPLICATION OF SOUTHWESTERN BEFORE THE*1'16)[E^^I PUBLIC SERVICE COMPANY TO ^ ADJUST ITS

More information

The Art of Turning Wholesale Rates into Retail Rates. Paul Garcia The Prime Group, LLC

The Art of Turning Wholesale Rates into Retail Rates. Paul Garcia The Prime Group, LLC The Art of Turning Wholesale Rates into Retail Rates Larry Feltner/ Paul Garcia The Prime Group, LLC Wholesale Rates are Important! Represent 60% - 70% of coops costs Based on structure, can promote or

More information

How To Write A Letter To The Public Utility Commission Of Texas

How To Write A Letter To The Public Utility Commission Of Texas Control Number : 42786 Item Number: 2 Addendum StartPage : 0 PROJECT NO. 42786 PUBLIC UTILITY COMMISSION OF TEXAS PUBLIC NOTICE OF WORKSHOP AND REQUEST FOR COMMENTS 1^'^'^1 1 ^. _ 3 ptf 3. The staff of

More information

DANIEL J. LAWTON PRINCIPAL, DIVERSIFIED UTILITY CONSULTANTS, INC. B.A. ECONOMICS, MERRIMACK COLLEGE M.A. ECONOMICS, TUFTS UNIVERSITY

DANIEL J. LAWTON PRINCIPAL, DIVERSIFIED UTILITY CONSULTANTS, INC. B.A. ECONOMICS, MERRIMACK COLLEGE M.A. ECONOMICS, TUFTS UNIVERSITY Uocket No. 060658 Page 1 of 8 DANEL J. LAWTON PRNCPAL, DVERSFED UTLTY CONSULTANTS, NC. B.A. ECONOMCS, MERRMACK COLLEGE M.A. ECONOMCS, TUFTS UNVERSTY Prior to beginning his own consulting practice, Diversified

More information

RR1-455 of 566 00584

RR1-455 of 566 00584 DOCKET NO. 00 APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES AND TO RECONCILE FUEL AND PURCHASED POWER COSTS FOR THE PERIOD JULY 1, 01 THROUGH JUNE 0, 01 PUBLIC UTILITY

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES. 25.181. Energy Efficiency Goal. (a) (b) (c) Purpose. The purpose of this section is to ensure that: (1) electric utilities administer energy efficiency incentive programs in a market-neutral, nondiscriminatory

More information

Experience in Electricity Market Restructuring. Texas: Mostly Good. Jay Zarnikau Frontier Associates And University of Texas at Austin.

Experience in Electricity Market Restructuring. Texas: Mostly Good. Jay Zarnikau Frontier Associates And University of Texas at Austin. Experience in Electricity Market Restructuring Texas: Mostly Good Jay Zarnikau Frontier Associates And University of Texas at Austin September 2005 1 Outline Texas is unique Overview of wholesale market

More information

Market Design 2009: The Texas Deregulated Electricity Market. September 17, 2009 Commissioner Donna L. Nelson Public Utility Commission of Texas, USA

Market Design 2009: The Texas Deregulated Electricity Market. September 17, 2009 Commissioner Donna L. Nelson Public Utility Commission of Texas, USA Market Design 2009: The Texas Deregulated Electricity Market September 17, 2009 Commissioner Donna L. Nelson Public Utility Commission of Texas, USA Statistics About Texas Texas is home to 24.3 million

More information

APSC FILED Time: 9/26/2014 11:13:03 AM: Recvd 9/26/2014 11:01:49 AM: Docket 14-099-U-Doc. 1

APSC FILED Time: 9/26/2014 11:13:03 AM: Recvd 9/26/2014 11:01:49 AM: Docket 14-099-U-Doc. 1 Arkansas Public Service Commission Docket Summary Cover Sheet (For all dockets other than Rate Cases, "TD", "C" and "TF" Dockets Must be filed with each new docket filed at the Commission STYLE OF DOCKET:

More information

Fuel and purchased power expenses decreased primarily due to:

Fuel and purchased power expenses decreased primarily due to: Entergy Gulf States Louisiana, L.L.C. Management's Financial Discussion and Analysis The Louisiana Act 55 financing tax settlement sharing variance results from a regulatory charge because the benefit

More information

PUC DOCKET NO. 24418 ORDER

PUC DOCKET NO. 24418 ORDER PUC DOCKET NO. 24418 COMMISSION STAFF S APPLICATION TO SET 2001 WHOLESALE TRANSMISSION SERVICE CHARGES FOR THE ELECTRIC RELIABILITY COUNCIL OF TEXAS PUBLIC UTILITY COMMISSION OF TEXAS ORDER This Order

More information

ONCOR ELECTRIC DELIVERY COMPANY LLC

ONCOR ELECTRIC DELIVERY COMPANY LLC Tariff for Transmission Service Oncor Electric Delivery Company LLC 1616 Woodall Rodgers Fwy Dallas, Texas 75202-1234 Contents Sheet: 1 Revision: Six Effective Date: May 30, 2014 Page 1 of 2 CONTENTS 1.0

More information

Retail Competition in Texas: A Success Story

Retail Competition in Texas: A Success Story Commonwealth of Pennsylvania Public Utility Commission Investigation of Pennsylvania s Retail Electricity Market Docket No. I-2011-2237952 2237952 Retail Competition in Texas: A Success Story The mission

More information

CenterPoint Energy Electric & Natural Gas Utilities in Texas Bill Rogers, EVP & Chief Financial Officer Scott Doyle, SVP Regulatory & Public Affairs

CenterPoint Energy Electric & Natural Gas Utilities in Texas Bill Rogers, EVP & Chief Financial Officer Scott Doyle, SVP Regulatory & Public Affairs CenterPoint Energy Electric & Natural Gas Utilities in Texas Bill Rogers, EVP & Chief Financial Officer Scott Doyle, SVP Regulatory & Public Affairs September 30, 05 Cautionary Statement This presentation

More information

Electricity Procurement. Budget, Finance and Audit Committee June 15, 2015

Electricity Procurement. Budget, Finance and Audit Committee June 15, 2015 Electricity Procurement Budget, Finance and Audit Committee June 15, 2015 Provide a brief overview of City electricity program Discuss current energy market Discuss an opportunity to take advantage of

More information

Oncor Electric Delivery Company, LLC Transmission and Distribution Rates. City Council Briefing April 20, 2016

Oncor Electric Delivery Company, LLC Transmission and Distribution Rates. City Council Briefing April 20, 2016 Oncor Electric Delivery Company, LLC Transmission and Distribution Rates City Council Briefing April 20, 2016 Purpose Review background related to current and proposed ownership of Oncor Electric Delivery

More information

University of Denver, MBA, Business Administration, 1973 Regis University, BS, Business Administration, 1972

University of Denver, MBA, Business Administration, 1973 Regis University, BS, Business Administration, 1972 Resume of Michael J. McFadden MICHAEL J. MCFADDEN AREAS OF QUALIFICATION Rates, regulatory affairs, strategic planning, electric and gas utility operations, corporate finance, financial analysis, asset

More information

Energy Efficiency Program Overview

Energy Efficiency Program Overview Energy Efficiency Program Overview Clean Air Through Energy Efficiency CATEE Conference November 18-20, 2014 Dallas, TX General Overview State of Texas enacted legislation requiring Transmission and Distribution

More information

Delaware Public Service Commission

Delaware Public Service Commission Proposal To: Delaware Public Service Commission for Consulting Services to Review Utility Standard Offer Service Electricity Procurement 919 CONGRESS AVENUE SUITE 800 AUSTIN, TEXAS 78701 512.494.0369 866.611.3791

More information

a. Does Oncor currently maintain a working capital fund?

a. Does Oncor currently maintain a working capital fund? Docket No. 45188 OPC RFI Set No. 2 (Oncor) Question No. 2-28 Page 1 of I Req uest Regarding the "appropriate" working capital fund referred to on page 17, lines 29-30 and page 18, lines 1-2 in the Direct

More information

DOCKET NO. 42004. DIRECT TESTIMONY of DANE A. WATSON. on behalf of SOUTHWESTERN PUBLIC SERVICE COMPANY. (Revenue Requirement) Table of Contents

DOCKET NO. 42004. DIRECT TESTIMONY of DANE A. WATSON. on behalf of SOUTHWESTERN PUBLIC SERVICE COMPANY. (Revenue Requirement) Table of Contents DOCKET NO. 42004 APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES AND TO RECONCILE FUEL AND PURCHASED POWER COSTS FOR THE PERIOD JANUARY 1, 2010 THROUGH JUNE 30, 2012 PUBLIC

More information

Overview. Rate Setting. Bonbright s Principles for Rates. Rate Setting Objectives

Overview. Rate Setting. Bonbright s Principles for Rates. Rate Setting Objectives Overview Tariff Development II: Rate Design for Electric Utilities Jess Totten, Director Public Utility Commission of Texas Briefing for the NARUC/INE Partnership Objectives of Rate Design Steps in Setting

More information

What is Cost of Service Regulation? Basic Issues in Rate Proceedings. Basic COS Component: Operating Expenses

What is Cost of Service Regulation? Basic Issues in Rate Proceedings. Basic COS Component: Operating Expenses Tariff Development I: The Basic Ratemaking Process The Ratemaking Formula and Basic Components Darryl Tietjen Public Utility Commission of Texas Briefing for the NARUC/INE Partnership 1 2 What is Cost

More information

Evaluation of Advanced Metering System (AMS) Deployment in Texas

Evaluation of Advanced Metering System (AMS) Deployment in Texas Evaluation of Advanced Metering System (AMS) Deployment in Texas Report of Investigation July 30, 2010 Navigant Consulting (PI) LLC Navigant Consulting (PI) LLC 98 San Jacinto, Suite 900 Austin, TX 78701

More information

Commercial and Industrial Rate Classes Comparisons Final Report

Commercial and Industrial Rate Classes Comparisons Final Report Austin Energy Affordability Benchmarking Study Evaluation of Electricity Rates and Bills Commercial and Industrial Rate Classes Comparisons November 5, 2010 Austin Energy Affordability Benchmarking Study

More information

Alice Miller Energy Consultant September 28, 2011

Alice Miller Energy Consultant September 28, 2011 Rate Design and Billing Systems Alice Miller Energy Consultant September 28, 2011 What is Rate Design? Principal goals of rate design Meet revenue requirement Equity among service classes Customer impacts

More information

ELECTRICITY PRICES IN TEXAS

ELECTRICITY PRICES IN TEXAS Snapshot Report AUGUST 2015 ELECTRICITY PRICES IN TEXAS tcaptx.com P1 2015 Electricity Prices in Texas Executive Summary Texans living under retail electric deregulation have paid less for electricity

More information

Control Number : 36234. Item Number : 23. Addendum StartPage : 0

Control Number : 36234. Item Number : 23. Addendum StartPage : 0 Control Number : 36234 Item Number : 23 Addendum StartPage : 0 PROJECT NO. 36234 ADVANCED METERING SYSTEM B^F`(^^TH>^ ^' 16 LOW-INCOME PROGRAMS PUBLIC AJTILITY N COMIY,iISSION,, J,.-^... V ^^iiliat^\ i'

More information

Energy Future Holdings Reports First Quarter 2013 Results

Energy Future Holdings Reports First Quarter 2013 Results News Release FOR IMMEDIATE RELEASE Energy Future Holdings Reports First Quarter 2013 DALLAS May 2, 2013 Energy Future Holdings Corp. (EFH) today reported consolidated financial results for the first quarter

More information

PROJECT NO. 40269 ORDER ADOPTING AMENDMENTS TO 25.52 AS APPROVED AT THE OCTOBER 12, 2012 OPEN MEETING

PROJECT NO. 40269 ORDER ADOPTING AMENDMENTS TO 25.52 AS APPROVED AT THE OCTOBER 12, 2012 OPEN MEETING PROJECT NO. 40269 PRIORITIES FOR POWER RESTORATION TO CERTAIN MEDICAL FACILITIES PUBLIC UTILITY COMMISSION OF TEXAS ORDER ADOPTING AMENDMENTS TO 25.52 AS APPROVED AT THE OCTOBER 12, 2012 OPEN MEETING The

More information

AN ENERGY FUTURE HOLDINGS BANKRUPTCY?

AN ENERGY FUTURE HOLDINGS BANKRUPTCY? Snapshot Report: AN ENERGY FUTURE HOLDINGS BANKRUPTCY? MARCH 2014 tcaptx.com P1 An Energy Future Holdings Bankruptcy? Energy Future Holdings ( EFH ), the Dallas-based energy giant, teeters close to bankruptcy.

More information

Order Authorizing Sale of Interests in Nuclear Generating Units. American Electric Power Company, Inc., ( AEP ), a registered holding company,

Order Authorizing Sale of Interests in Nuclear Generating Units. American Electric Power Company, Inc., ( AEP ), a registered holding company, SECURITIES AND EXCHANGE COMMISSION (Release No. 35-27968; 70-10253) American Electric Power Company, Inc. and AEP Texas Central Company Order Authorizing Sale of Interests in Nuclear Generating Units May

More information

YOUR RIGHTS AS A CUSTOMER

YOUR RIGHTS AS A CUSTOMER YOUR RIGHTS AS A CUSTOMER This summary of is based on customer protection rules adopted by the Public Utility Commission of Texas (PUCT). These rules apply to all retail electric providers (REPs) and the

More information

No Indicate By Check Mark - Review of Current Financial Statements

No Indicate By Check Mark - Review of Current Financial Statements UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-K [ ] ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the Fiscal Year Ended December

More information

ConnectivityWeek 2010

ConnectivityWeek 2010 SmartMeterTexas.com Access to the Smart Grid for all of Texas CenterPoint Energy Robert B. Frazier Director of Technology Houston Electric 1 WHO IS CENTERPOINT ENERGY? Public company traded on the New

More information

Energy Efficiency Accomplishments of Texas Investor-Owned Utilities Calendar Year 2013

Energy Efficiency Accomplishments of Texas Investor-Owned Utilities Calendar Year 2013 Energy Efficiency Accomplishments of Texas Investor-Owned Utilities Calendar Year 2013 1 Accomplishments Frontier Associates LLC In 2013, the majority of the Texas investor-owned utilities (IOUs) exceeded

More information

Addendum StartPage : 0

Addendum StartPage : 0 Control Number : 40625 Item Number : 36 Addendum StartPage : 0 P.U.C. DOCKET NO. 40625 SOAH DOCKET NO. 473-13-081 ^: ---, - _ COMPLAINT OF FELIX PUBLIC UTILITY COM^-^S*N CARRILLO D/B/A RANCHO VIEJO AGAINST

More information

1800 St. James Place Suite 211 Houston TX 77056 1-877-909-POWER (7693) 281-888-5328 YOUR RIGHTS AS A CUSTOMER. Page 1 of 7 Version No.

1800 St. James Place Suite 211 Houston TX 77056 1-877-909-POWER (7693) 281-888-5328 YOUR RIGHTS AS A CUSTOMER. Page 1 of 7 Version No. This document describes Your Rights as a Retail Electric Customer, and is a required disclosure for all residential electricity customers regardless of Retail Electric Provider. Discount Power is a Retail

More information

We Energies Electric Rates

We Energies Electric Rates We Energies Electric Rates for Michigan customers July 2015 The rates in this brochure reflect the authorized base rates of Wisconsin Electric Power Company, doing business under the name of We Energies,

More information

Texas Competitive Electric Holdings Company LLC

Texas Competitive Electric Holdings Company LLC Texas Competitive Electric Holdings Company LLC Delaware 75-2967817 (State of organization) (I.R.S. Employer Identification No.) 1601 Bryan Street, Dallas, TX 75201-3411 (214) 812-4600 (Address of principal

More information

Thompson, et al. ORGANIZATION bill analysis 5/6/2011 (CSHB 3610 by Cook) Allowing periodic rate adjustments by electric utilities

Thompson, et al. ORGANIZATION bill analysis 5/6/2011 (CSHB 3610 by Cook) Allowing periodic rate adjustments by electric utilities (The House considered SB 1693 by Carona, the Senate companion bill, in lieu of HB 3610, the House version of the bill, which had been set on the daily calendar and was analyzed by the. The bill subsequently

More information

Control Number : 42867. Item Number : 125. Addendum StartPage : 0

Control Number : 42867. Item Number : 125. Addendum StartPage : 0 Control Number : 42867 Item Number : 125 Addendum StartPage : 0 ia5 SOAH DOCKET NO. 473-14-5138.WS PUC DOCKET NO. 42857. R^ 7 C E I ^^'- D 2014 DEC29 PM12:54 PETITION OF NORTH AUSTIN UTILITY DISTRICT NO.

More information

Your Rights as a Customer of STAT Energy

Your Rights as a Customer of STAT Energy Your Rights as a Customer of STAT Energy This summary of Your Rights as a Customer is based on the customer protection rules adopted by the Public Utility Commission of Texas ( PUCT ). These rules apply

More information

lllll Ill II IIIIII IIII I) Control Number: 20366

lllll Ill II IIIIII IIII I) Control Number: 20366 lllll Ill II IIIIII IIII I) Control Number: 20366 IIIII Ill 11111111 I1 Item Number: 553 Addendum StartPage: 0 TXU Business Services 1601 Bryan Street Dallas TX 752013411 Tel, 214812 1255 Fax 214 8123221

More information

ITC Midwest, LLC For the 12 months ended 12/31/2016

ITC Midwest, LLC For the 12 months ended 12/31/2016 MW2016 Discount ITC Midwest, LLC Projected Rate Computation with Rate Discount Projected Year 2016 No. 1 Revenue Requirement without discount $ 350,373,980 2 3 Discount (Note) $ 4,125,000 4 5 Revenue Requirement

More information

Texas Demand Response Programs Cirro Energy Services an NRG Energy Company

Texas Demand Response Programs Cirro Energy Services an NRG Energy Company Texas Demand Response Programs Cirro Energy Services an NRG Energy Company April 04, 2014 Fazil Shaikh, Sales Manager Melissa Karner, Energy Consultant Outline Introduction ERCOT Resource Adequacy and

More information

AN ENERGY FUTURE HOLDINGS BANKRUPTCY

AN ENERGY FUTURE HOLDINGS BANKRUPTCY Snapshot Report: AN ENERGY FUTURE HOLDINGS BANKRUPTCY MARCH 2014 tcaptx.com P1 An Energy Future Holdings Bankruptcy Energy Future Holdings ( EFH ), the state s largest electric company, has declared bankruptcy.

More information

State and Local Taxation of the Electric Industry in Texas

State and Local Taxation of the Electric Industry in Texas State and Local Taxation of the Electric Industry in Texas December 2014 The Association of Electric Companies of Texas, Inc. (AECT) is a trade organization of electric companies in Texas. Organized in

More information

Table of Contents. Electric Utilities The Big Picture

Table of Contents. Electric Utilities The Big Picture Table of Contents Electric Utilities The Big Picture Deregulated Service Areas... 1 Regulated Service Areas... 1 Municipally Owned Utilities... 2 Rural Electric Cooperatives... 2 Who do I contact if I

More information

DOCKET NO. TEXAS-NEW MEXICO POWER COMPANY AND THE ELECTRIC RELIABILITY COUNCIL OF TEXAS

DOCKET NO. TEXAS-NEW MEXICO POWER COMPANY AND THE ELECTRIC RELIABILITY COUNCIL OF TEXAS DOCKET NO. COMPLAINT OF CHAMPION ENERGY SERVICES, LLC AGAINST TEXAS-NEW MEXICO POWER COMPANY AND THE ELECTRIC RELIABILITY COUNCIL OF TEXAS ^^ ^o c.i;. ;, P14 ^ k f!,... T PUBLIC UTILITY COAl^T^^^^ OF TEXAS`

More information

NEW COMMERCIAL Rates. Understanding the. Commercial Customers

NEW COMMERCIAL Rates. Understanding the. Commercial Customers Understanding the NEW COMMERCIAL Rates The Austin City Council increased Austin Energy s base rates, which pay for operations and maintenance, for the first time in 18 years. The new rates, which amount

More information

Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause. Direct Testimony and Exhibits

Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause. Direct Testimony and Exhibits Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause Table of Contents Direct Testimony and Exhibits David M. Wilkinson James D. Jackson, Jr. Paul B. Haynes Filing Schedule 46 Filing

More information

SENATE COMMITTEE ELECTRIC UTILITY RESTRUCTURING INTERIM REPORT TO THE 79TH TEXAS LEGISLATURE ON BUSINESS AND COMMERCE AND RENEWABLES

SENATE COMMITTEE ELECTRIC UTILITY RESTRUCTURING INTERIM REPORT TO THE 79TH TEXAS LEGISLATURE ON BUSINESS AND COMMERCE AND RENEWABLES SENATE COMMITTEE ON BUSINESS AND COMMERCE ELECTRIC UTILITY RESTRUCTURING AND RENEWABLES INTERIM REPORT TO THE 79TH TEXAS LEGISLATURE Interim Charges Numbers Five and Six EXECUTIVE SUMMARY During the

More information

YOUR RIGHTS AS A CUSTOMER

YOUR RIGHTS AS A CUSTOMER YOUR RIGHTS AS A CUSTOMER This document summarizes Your Rights as a Customer ( YRAC ) and is based on customer protection rules adopted by the Public Utility Commission of Texas ( PUCT ). You may view

More information

ELECTRICITY PRICES IN TEXAS

ELECTRICITY PRICES IN TEXAS SNAPSHOT REPORT JUNE 2016 ELECTRICITY PRICES IN TEXAS tcaptx.com P1 2016 Electricity Prices in Texas Executive Summary Residents in Houston and Dallas can choose among dozens of competitive electricity

More information

Energy Management. Electric Procurement Strategies. August 27, 2007

Energy Management. Electric Procurement Strategies. August 27, 2007 Energy Management Electric Procurement Strategies August 27, 2007 1 Presentation Outline Purpose Background City of Dallas procurement goals Procurement term Environmental goals Energy products Energy

More information

R8-67 RENEWABLE ENERGY AND ENERGY EFFICIENCY PORTFOLIO STANDARD (REPS) (a) Definitions. (1) The following terms shall be defined as provided in G.S.

R8-67 RENEWABLE ENERGY AND ENERGY EFFICIENCY PORTFOLIO STANDARD (REPS) (a) Definitions. (1) The following terms shall be defined as provided in G.S. R8-67 RENEWABLE ENERGY AND ENERGY EFFICIENCY PORTFOLIO STANDARD (REPS) (a) Definitions. (1) The following terms shall be defined as provided in G.S. 62-133.8: "Combined heat and power system"; "demand-side

More information

City Council Briefing. June 16, 2010

City Council Briefing. June 16, 2010 City Council Briefing June 16, 2010 1 Review the City s electricity procurement program and upcoming contract for the period beginning January 1, 2011. How we buy electricity How well we did on our last

More information

ONCOR ELECTRIC DELIVERY COMPANY LLC TARIFF FOR TRANSMISSION SERVICE TO, FROM AND OVER CERTAIN INTERCONNECTIONS REVISION NO. 13

ONCOR ELECTRIC DELIVERY COMPANY LLC TARIFF FOR TRANSMISSION SERVICE TO, FROM AND OVER CERTAIN INTERCONNECTIONS REVISION NO. 13 ONCOR ELECTRIC DELIVERY COMPANY LLC TARIFF FOR TRANSMISSION SERVICE TO, FROM AND OVER CERTAIN INTERCONNECTIONS REVISION NO. 13 Sheet No. CONTENTS 1.0 Utility Operations... 5 1.1 Authority... 5 2.0 Wholesale

More information

Ameren Illinois Company Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 47 Electric Service Schedule Ill. C. C. No. 1

Ameren Illinois Company Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 47 Electric Service Schedule Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 47 PURPOSE OF RIDER The Hazardous Materials Adjustment Clause (HMAC) shall operate to recover allowable HMAC Costs (as defined herein) of the Company. APPLICABLE

More information

EFH BANKRUPTCY FAQs. 3. What should I expect as a result of TXU s bankruptcy filing?

EFH BANKRUPTCY FAQs. 3. What should I expect as a result of TXU s bankruptcy filing? EFH BANKRUPTCY FAQs 1. Who is Energy Future Holdings? Energy Future Holdings (EFH) is the parent company of TXU Energy,4Change Energy, and Luminant ET Services (ET Services) which are retail electric providers

More information

TruSmart Energy Smart PrePay TERMS OF SERVICE AGREEMENT

TruSmart Energy Smart PrePay TERMS OF SERVICE AGREEMENT TruSmart Energy Smart PrePay TERMS OF SERVICE AGREEMENT Welcome to TruSmart Energy ( TruSmart Energy )! We are glad that you have chosen dpi Energy LLC d/b/a TruSmart Energy to serve as your retail electric

More information

PG&E Corporation. UBS Natural Gas, Electric Power and Coal Conference March 5, 2009

PG&E Corporation. UBS Natural Gas, Electric Power and Coal Conference March 5, 2009 PG&E Corporation UBS Natural Gas, Electric Power and Coal Conference March 5, 2009 Cautionary Language Regarding Forward-Looking Statements This presentation contains management s guidance for PG&E Corporation

More information

Energy Efficiency as a Resource in Texas

Energy Efficiency as a Resource in Texas Energy Efficiency as a Resource in Texas Whitepaper prepared for The SPEER Commission on Energy Efficiency SPEER Staff August 2014 1 P a g e Energy Efficiency as a Resource For the SPEER Commission on

More information

FILED IN THE MATTER OF THE P TITION OF ) ENTERGY ARKANSAS, INC. FOR AN ) ACCOUNTING ORDER AUTHORIZING ) ESTABLISHMENT OF A REGULATORY )

FILED IN THE MATTER OF THE P TITION OF ) ENTERGY ARKANSAS, INC. FOR AN ) ACCOUNTING ORDER AUTHORIZING ) ESTABLISHMENT OF A REGULATORY ) BEFORE THE r r r ARKANSAS PUBLIC SERVICE COMMI&@ FILED IN THE MATTER OF THE P TITION OF ) ENTERGY ARKANSAS, INC. FOR AN ) ACCOUNTING ORDER AUTHORIZING ) ESTABLISHMENT OF A REGULATORY ) DOCKET NO. 08 -

More information

Perspectives on Texas Efforts

Perspectives on Texas Efforts Perspectives on Texas Efforts Briefing March 31, 2005 Public Utility Commission of Texas Section 1 A Year or So in Cartoon Public Utility Commission of Texas 2 Almost Two Years Ago, I Was Basking in the

More information

RESIDENTIAL ENERGY BILL CHARGES. The following charges may appear on your Electric bill:

RESIDENTIAL ENERGY BILL CHARGES. The following charges may appear on your Electric bill: Distribution/Delivery Service The following charges may appear on your Electric bill: Delivery/Distribution charges are applicable to company full-service and retail open access (electric customer choice)

More information

TITLE PAGE MINNESOTA POWER ELECTRIC RATE BOOK

TITLE PAGE MINNESOTA POWER ELECTRIC RATE BOOK MINNESOTA POWER SECTION I PAGE NO. 1 ELECTRIC RATE BOOK REVISION 4 th TITLE PAGE MINNESOTA POWER ELECTRIC RATE BOOK This book contains Minnesota Power's retail rates and related information per the Minnesota

More information

CenterPoint Energy Robert B. Frazier Director of Electric Technology

CenterPoint Energy Robert B. Frazier Director of Electric Technology Smart Grid The Texas Experience CenterPoint Energy Robert B. Frazier Director of Electric Technology WHO IS CENTERPOINT ENERGY? Public company traded on the New York Stock Exchange (CNP) Headquartered

More information

REPORT ON EFFORTS TO REDUCE ELECTRIC PEAK DEMAND

REPORT ON EFFORTS TO REDUCE ELECTRIC PEAK DEMAND REPORT ON EFFORTS TO REDUCE ELECTRIC PEAK DEMAND Orjiakor N. Isiogu, Chairman Monica Martinez, Commissioner Greg R. White, Commissioner MICHIGAN PUBLIC SERVICE COMMISSION Department of Energy, Labor &

More information

Energy Future Holdings Corp /TX/ 10-Q

Energy Future Holdings Corp /TX/ 10-Q Energy Future Holdings Corp /TX/ 10-Q Quarterly report pursuant to sections 13 or 15(d) Filed on 10/28/2011 Filed Period 09/30/2011 Table of Contents UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington,

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION ) OF SOUTHWESTERN ELECTRIC POWER ) COMPANY FOR APPROVAL OF PROPOSED ) REVISIONS TO THE ENERGY COST ) RECOVERY RIDER TO RECOVER

More information

Convergence of Wholesale And Retail Markets: The Texas Experience

Convergence of Wholesale And Retail Markets: The Texas Experience Convergence of Wholesale And Retail Markets: The Texas Experience 1 COMMISSIONER KENNETH W. ANDERSON, JR. PUBLIC UTILITY COMMISSION OF TEXAS PRESENTATION FOR HARVARD ELECTRICITY POLICY GROUP JUNE 12, 2014

More information

Control Number : 40915. Item Number: 1. Addendum StartPage: 0

Control Number : 40915. Item Number: 1. Addendum StartPage: 0 Control Number : 40915 Item Number: 1 Addendum StartPage: 0 DOCKET NO. AGREED SETTLEMENT AND PUBLIC UTILITY COMMISUIY"^ PROPOSED AND CONSENT `

More information

GENERAL INFORMATION - Continued. (General Information - Continued on Leaf No. 172)

GENERAL INFORMATION - Continued. (General Information - Continued on Leaf No. 172) PSC NO: 9 GAS LEAF: 171 COMPANY: CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. REVISION: 5 INITIAL EFFECTIVE DATE: 03/01/14 SUPERSEDING REVISION: 4 Special Adjustments 1. Weather Normalization Adjustment

More information

AMI Fact Book 4Q 2009

AMI Fact Book 4Q 2009 Synopsis This report is a catalog of current and future AMI and smart meter deployments in the U.S. It includes profiles of utilities, government agencies, and private organizations influencing the development

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff. Brazos Electric

More information

Before the Department of Energy Washington, D.C. 20585 ) ) ) ) ) ) NBP RFI: Data Access, Third Party Use, and Privacy

Before the Department of Energy Washington, D.C. 20585 ) ) ) ) ) ) NBP RFI: Data Access, Third Party Use, and Privacy Before the Department of Energy Washington, D.C. 20585 In the Matter of Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy )

More information

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549. FORM 10-Q (Mark One)

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549. FORM 10-Q (Mark One) ================================================================================ UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-Q (Mark One) [ X ] QUARTERLY REPORT PURSUANT

More information

Orange and Rockland Utilities, Inc. 2011 Annual Financial Statements and Notes

Orange and Rockland Utilities, Inc. 2011 Annual Financial Statements and Notes Orange and Rockland Utilities, Inc. 2011 Annual Financial Statements and Notes Financial Statements Report of Independent Registered Public Accounting Firm Consolidated Income Statement Consolidated Statement

More information

New ISO-NE Return on Equity Rate Could Impact Future Transmission Decisions

New ISO-NE Return on Equity Rate Could Impact Future Transmission Decisions RESEARCH North America Power and Utilities Energy Efficiency New ISO-NE Return on Equity Rate Could Impact Future Transmission Decisions Continued Transmission Investments Key to Electric Grid Reliability

More information

PROJECT NO. 41622 ORDER ADOPTING NEW 25.245 AS APPROVED AT THE JULY 10, 2014 OPEN MEETING

PROJECT NO. 41622 ORDER ADOPTING NEW 25.245 AS APPROVED AT THE JULY 10, 2014 OPEN MEETING PROJECT NO. 41622 RULEMAKING TO PROPOSE NEW SUBST. R. 25.245, RELATING TO RECOVERY OF EXPENSES FOR RATEMAKING PROCEEDINGS PUBLIC UTILITY COMMISSION OF TEXAS ORDER ADOPTING NEW 25.245 AS APPROVED AT THE

More information

Control Number: 38339. Item Number : 301. Addendum StartPage : 0

Control Number: 38339. Item Number : 301. Addendum StartPage : 0 Control Number: 38339 Item Number : 301 Addendum StartPage : 0 301 SOAH DOCKET NO. 473-10-5001 DOCKET NO. 38339 APPLICATION OF CENTERPOINT BEFORE THE ENERGY HOUSTON ELECTRIC, LLC STATE OFFICE OF,m{ FOR

More information

eport DECEMBER 2013 Snapshot Report DECEMBER 2013 ELECTRICITY ECTRICITY PRICES TEXAS tcaptx.com tcaptx.com

eport DECEMBER 2013 Snapshot Report DECEMBER 2013 ELECTRICITY ECTRICITY PRICES TEXAS tcaptx.com tcaptx.com Snapshot Report DECEMBER 2013 eport DECEMBER 2013 ECTRICITY ELECTRICITY PRICES IN ICES TEXAS XAS tcaptx.com tcaptx.com Table of Contents The Analysis 1 Key Findings 2 Background History 3 Additional Findings

More information

RESIDENTIAL ENERGY BILL CHARGES. The following charges may appear on your Electric bill:

RESIDENTIAL ENERGY BILL CHARGES. The following charges may appear on your Electric bill: Distribution/Delivery Service The following charges may appear on your Electric bill: Delivery/Distribution charges are applicable to full-service and retail open access (electric choice) customers. Delivery

More information

DIRECT TESTIMONY OF JAY JOYCE ON BEHALF OF APPALACHIAN POWER COMPANY AND WHEELING POWER COMPANY

DIRECT TESTIMONY OF JAY JOYCE ON BEHALF OF APPALACHIAN POWER COMPANY AND WHEELING POWER COMPANY JJ Exhibit No. 1 DIRECT TESTIMONY OF JAY JOYCE ON BEHALF OF APPALACHIAN POWER COMPANY AND WHEELING POWER COMPANY CASE NO. 10-0699-E-42T JJ Exhibit No. 1 TABLE OF CONTENTS POSITION AND QUALIFICATIONS...

More information

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION Sheet 1 Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services from the Distribution Company, with the exception of

More information