1 The Current Situation and Circumstances Regarding the Great Earthquake Damage Ishinomaki District Water Supply Authority Junichi Takaki, Deputy Technology Director 116 Shinkaminuma Hebita Ishinomaki-city Miyagi Japan Abstract The cities of Ishinomaki and Higashi Matsushima in Miyagi Prefecture, which our corporation's supplies water, are located on the Sanriku Coast in the Tohoku region, so they sustained massive damage from the earthquake, moreover from the unprecedented gigantic tsunami caused by seismic activity. About one and a half years have passed since the disaster and emergency restoration has been completed. Our corporation has situated this fiscal year as the first year of reconstruction, and is systematically driving business operations forward. The biggest job is the relocation of the water treatment plant. The Hebita water treatment plant, which has the capacity to process 55,000m3 of water per day, was shaken by the seismic activity, and the area surrounding the structure along with its support base was liquefied, which created cracks and leakage in the settling basin and caused massive damage to the pipes in the plant. In the case that an earthquake of such magnitude occurs again, it is feared that water processing will stop functioning, and that there will be a water outage for a long period of time. Restoring at the current location will require time and money because of operating the existing facilities at the same time. So we have a plan to transfer all functions of the Hebita water treatment plant to the Sueyama water treatment plant, which has a solid foundation and wasn t affected by the tsunami, until FY2014. In addition, the decrease of the population supplied with water and the suspension of operations at the plant that many people use have caused an extreme decrease in income from water utilities charges. On the one hand, it is expected that restoration work will cost a lot of money. So in order to continue the stable administration of water supply operations from here forward, it is important for us to secure the source of the strong financial support, for example the support we have received from the country, along with reducing the cost of providing water. The areas which received massive damage from the tsunami have carried out restoration in the reconstruction plans of Ishinomaki and Higashi Matsushima, and it is requested for us that the improvement of water supply facilities has to be flexible in response to a variety of reconstruction measures such as the relocation of disaster prevention groups and the construction of roads with high embankments. Keywords Ishinomaki Higashimatusima The Great Tohoku Earthquake Introduction A little more than a year has passed since the Great Tohoku Earthquake. I would like to take this opportunity to once again express our deepest thanks for the unsparing support and continued cooperation we are receiving from the whole country's water supply corporations and everyone who is related to water services in each area, beginning with the Japan Water Works Association along with the Japan Water Supply Technology Research Center, in response to the earthquake and tsunami damage. Today, since our corporation has taken this opportunity to report, I would like to present on ''The Current Situation and Circumstances Regarding the Great Earthquake's Damage.'' The Current Situation and Circumstances of the Great Earthquake's Damage The coast of Tohoku area received catastrophic damage from the tremors and the unprecedented giant tsunami caused by the Great Tohoku Earthquake. Within our corporation's water supply

2 district, the maximum seismic intensity was recorded at the 6th highest level, and it was confirmed that the land sank as much as 1.2m depending on the area. In addition, the giant tsunami, centering on the coastal areas, was observed at a height of 8.6m in the city of Ishinomaki. 110k m2, that is 16.7% of the combined area of Ishinomaki and Higashi Matsushima, were flooded by the tsunami. In these two cities 4,882 people are dead or missing and 25,187 houses were completely destroyed; that number comes to 60,685 houses including largely destroyed, half destroyed, and partly destroyed houses. Current Business Volume The damage caused by the tsunami has greatly affected our business volume. At the end of 2011, we supplied water to 192,304 people and 72,506 houses, 11,537 people and 2,780 houses less than 2010, before the disaster. Restoration Progress Our water treatment plants stopped functioning due the power outage which continued after the outbreak of the disaster, and all of the 75,673 houses lost their water supply. Beginning with water supplies from emergency medical institutions such as the Ishinomaki Red Cross Hospital five days after the disaster, on the 16th of March, we steadily continued to restore our operations in conjunction with emergency water supplies, but all of the houses lost their water supply again due to the aftershock on the 7th of April, and the many pipes were damaged again. The areas which suffered from the tsunami had to continue emergency restoration while disposing of the scattered rubble and the accumulated toxic sludge; furthermore, there was flooding due to the sinking of the land along with the rise of the sea level and the underground water level; restoration work was extremely difficult. Currently, aside from the areas which received tremendous damage from the tsunami, restoration work is largely completed. The Situation of the Damaged Water Supply Facilities There were 187 cases of damage to water supply facilities such as water treatment plants as of October, Among those, our organization's main water treatment plant in Hebita, which had the ability to process 55,000 cubic meters of water, was flooded 50cm by the tsunami, and in addition the structure along with the pipes inside received a tremendous amount of damage from the shaking and the liquefaction caused by the earthquake. The section which connects the mixing basin to the water conduit and the first and second settling basins were cracked all the way down to their bases, and damage to the expansion joint caused leakage. The main parts of the pumping structure, such as the pillars and beams, were damaged, and there were many incidents of leakage from the pipes inside; the damage was tremendous. 68 cases of damage inside the Hebita water treatment plant were confirmed, and the functioning of one of the three water treatment systems, which processed 15,000m³ of water, stopped for four months. Currently, we have finished emergency restoration to the extent that there are no obstacles to our water processing, but due to the sinking of the land's foundation caused by the phenomenon of

3 liquefaction, the stakes directly below the frame's base are protruding and a gap has formed, so restoration is under difficult circumstances. In the case that we are once again struck by a big earthquake like this one, it is feared that water treatment will stop functioning and that about 50% of our district will lose its water supply for an extended period of time. As a result, we will transfer all of the functions of the Hebita water treatment plant to the Sueyama water treatment plant, which is situated on high ground and has a strong foundation, until 2014 because we need time and money for restoration at the current location. The water treatment capacity of the Sueyama plant, which was 25,000m³ of water per day, has become 80,000m³ since all of the functions of the Hebita water treatment plant were transferred, and it has become a rapid filtration-style water treatment plant. Next, concerning the coastal areas, Ogatsu district's Ohhama water treatment plant, almost no time after being outfitted, along with Kitakami district's Aikawa water treatment plant received catastrophic damage from the tsunami as their membrane filtration-style equipment was destroyed. Currently, temporary portable membrane filtration-style equipment is installed and water supply has commenced. Concerning the drawing of water at the Aikawa and Ohhama water treatment plants, from now on it is necessary to make sure of the water quality in these districts in such ways as measuring the density of chloride ions in the water and continually inspecting the electrical conductivity of the water and so on using water quality gauges because the water quality at the source is unstable due to the increase of chloride ions. And the introduction of maintenance and renewal programs based on asset management is also under consideration for the restoration of water supply facilities. The Circumstances of Damage to Pipes 2,356 incidents of pipe damage occurred including all of the water conveyance, water transmission, water distribution, and water supply pipes. Among those, there were 1,396 incidents involving water supply pipes, the most numerous, comprising about 60% of the whole. There were 623 incidents of damage to the actual pipes and 62 incidents of damage to attached facilities, 0.37 incidents per kilometer. The details are as follows: 1 69 incidents of damage to cast-iron pipes, mostly leakage from the joints incidents of damage to ductile cast-iron pipes. Among those, 0 incidents of damage occurred in the 172.2km of earthquake-resistant joints. 332 incidents of damage to steel pipes incidents of damage to PVC pipes, the most numerous, in the form of damage to joints. 532 incidents of damage to asbestos cement pipes. 613 incidents of damage to polyethylene pipes. The damage of the coastal areas was massive; roads and piers are crumbling and water distribution pipes are exposed due to the tsunami, and there was damage to the bridge-attached pipes due to ruptures and contact with flotsam. Currently, these have been urgently restored by temporary stainless steel pipes and polyethylene pipes. Summary of Plans and Policies for Reconstruction

4 Reconstruction plans for the areas which received catastrophic destruction from the tsunami, are being implemented with the plans for Ishinomaki and Higashi Matsushima. A ten year plan for fundamental disaster reconstruction for the two cities is being decided on, and there is the idea to promote the outfitting of such things as water distribution pipes together with this plan because such measures as transferring disaster prevention groups and constructing roads with high embankments are being included in these discussions. But the following four issues are being considered on top of promoting reconstruction: First of all, it is being requested that pipe re-laying be included in the plans to outfit roads with high embankments, which will also act as seawalls. Secondly, pipes are to be laid at a lower depth depending on the embankments because the land has sunken 70cm to 1.2m in some areas, so the person in charge of maintaining the pipes in ways such as discovering and repairing leaks will have difficulty. Thirdly, the re-suspension of bridge-attached pipes needs to accompany the re-suspension of the bridges due to the sinking of the land. Fourthly, the work to relocate water transmission and distribution pipes which will hinder the accompanying work to restore roads and sewers must be presented. The Water Supply Business' Issues While various projects are proposed accompanying such disaster reconstruction, our income from water service charges, which supports our core management, is drastically decreased due to fewer customers and the suspension of the operation of factories and such with a large number of users. Our income has decreased about 44%, 2.4B, compared to 2011, and our effective water ratio, the proportion of water used effectively without leaking, plummeted from 94% before the disaster to 72.5% at the end of The approximately 22% decrease of our effective water ratio has become a great loss to us in the middle of strict management conditions where we can't even hope for income from water service charges. For that reason we are thinking that from this April we started to carry out leakage investigations in our entire water supply district, and we want to return to predisaster levels as quickly as possible. What Should We Do Now? Taking such an administrative environment into account, at present we are considering whether to cancel or suspend project plans that we have continually promoted up to this point, such as outfitting waterworks facilities, outfitting simple integrated water facilities, and updating our asbestos cement pipes, until we have a clear view of reconstruction. From now on, with a view to decrease disasters, we are thinking that we have to outfit our water supply facilities in conformance with the region's actual circumstances. The Deployment of Reconstruction Support Personnel Since the disaster, 19 staff members have been dispatched from the 11 water supply corporations through the ''Great Tohoku Earthquake Federated Water Services Reconstruction Support Committee,'' which was organized by the Ministry of Health, Labor, and Welfare along with the Water Services Association, as we are racking our brains to get disaster-related work started in earnest in addition to continuing the regular duties which we have performed up to this point. Receiving such business assistance is incredibly reassuring and encouraging. Words cannot express our deep feelings of gratitude for the staff members we have received from these water supply

5 corporations, which understand our corporation s circumstances even though they are not in a position to spare anything at all. Conclusion More than a year has passed since the disaster and we are finally at the starting line facing toward reconstruction, having finished temporary emergency restoration. We humbly request your continued support and cooperation from now on because we are systematically promoting projects to construct a stable supply system at an early stage, situating this year as the first year of revival.

Great East Japan Earthquake and research and development for network resilience and recovery

Great East Japan Earthquake and research and development for network resilience and recovery WTSA-12 Side Events on Disaster Relief Systems, Network Resilience and Recovery Great East Japan Earthquake and research and development for network resilience and recovery 23 November 2012 Noriyuki Araki

More information

Tokyo Waterworks supports the capital of Tokyo

Tokyo Waterworks supports the capital of Tokyo Tokyo Waterworks supports the capital of Tokyo Tokyo, the Japanese capital, is the largest city in Japan with a population of about 13.16 million, which is about 10% of the country s entire population

More information

Damage to Sewage Treatment Systems caused by the Great East Japan Earthquake and the Government s Response

Damage to Sewage Treatment Systems caused by the Great East Japan Earthquake and the Government s Response Damage to Sewage Treatment Systems caused by the Great East Japan Earthquake and the Government s Response Manabu MATSUHASHI, H. KATO, W. FUKATANI, I. TSUSHIMA, T., YOKOTA, and N. HORIE. National Institute

More information

Local Government Responses to the Great East Japan Earthquake

Local Government Responses to the Great East Japan Earthquake Local Government Responses to the Great East Japan Earthquake Takehiko Imai, Counselor of the Information Policy Department, Sendai City Most of the speeches today started with the speaker relating how

More information

EMERGENCY-RESPONSE CAPACITY OF LIFELINES AFTER WIDE-AREA EARTHQUAKE DISASTERS

EMERGENCY-RESPONSE CAPACITY OF LIFELINES AFTER WIDE-AREA EARTHQUAKE DISASTERS Proceedings of the International Symposium on Engineering Lessons Learned from the 211 Great East Japan Earthquake, March 1-4, 212, Tokyo, Japan EMERGENCY-RESPONSE CAPACITY OF LIFELINES AFTER WIDE-AREA

More information

Small Businesses Resilience after the Great East Japan Earthquake

Small Businesses Resilience after the Great East Japan Earthquake Small Businesses Resilience after the Great East Japan Earthquake Sendai s Earthquake and Tsunami Damage & Restoration Efforts Sendai City Earthquake Disaster Reconstruction Plan Post-Disaster Reconstruction

More information

3. Observed Damage in Railway Viaducts

3. Observed Damage in Railway Viaducts Structural Damage of Tohoku Shinkansen Viaducts by the Off the Pacific Tohoku Earthquake First Report on March 16, 2011 Dr. Yoshikazu Takahashi, Associate Professor Disaster Prevention Research Institute,

More information

Damage to Drinking Water Systems and Restoration Measures after the Great East Japan Earthquake and Tsunami. July 2011

Damage to Drinking Water Systems and Restoration Measures after the Great East Japan Earthquake and Tsunami. July 2011 JWRC Damage to Drinking Water Systems and Restoration Measures after the Great East Japan Earthquake and Tsunami July 2011 The Japan Water Research Center 1 Summary of the Great East Japan Earthquake Date

More information

Moving Forward to Ensure People s Safety and Security

Moving Forward to Ensure People s Safety and Security Moving Forward to Ensure People s Safety and Security アタリ The Great East Japan Earthquake was the worst natural disaster in the long history of Japan, a country that experiences more natural disasters

More information

Proposal for Establishment of Reconstruction Fund and Reconstruction Solidarity Tax to Finance Rehabilitation after Great Earthquake of Unprecedented

Proposal for Establishment of Reconstruction Fund and Reconstruction Solidarity Tax to Finance Rehabilitation after Great Earthquake of Unprecedented Proposal for Establishment of Fund and Solidarity Tax to Finance Rehabilitation after Great Earthquake of Unprecedented Scale Daiwa Institute of Research 18 March 2011 1. Preliminary Work to Support Earthquake

More information

Reconstruction Support after the Great East Japan Earthquake

Reconstruction Support after the Great East Japan Earthquake Advanced Maintenance, Energy Saving, Environment Reconstruction Support after the Great East Japan Earthquake Kan Kumagai Keyword Earthquake disaster reconstruction, Temporary restoration, Reuse, Diagnosis

More information

The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station

The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station May 2012 Government and TEPCO s Mid-to Long Term Countermeasure Meeting Management Council Outline

More information

ABSTRACT INTRODUCTION PURPOSE

ABSTRACT INTRODUCTION PURPOSE EVALUATION OF TSUNAMI DISASTER BY THE 2011 OFF THE PACIFIC COAST OF TOHOKU EARTHQUAKE IN JAPAN BY USING TIME SERIES SATELLITE IMAGES WITH MULTI RESOLUTION Hideki Hashiba Associate Professor Department

More information

Niigata as a temporary water works relay base: support for teams in a major seismic disaster

Niigata as a temporary water works relay base: support for teams in a major seismic disaster Niigata as a temporary water works relay base: support for teams in a major seismic disaster Etsuro Kawase 1 Abstract Water works support in Niigata for the Great East Japan Earthquake in 2011 allowed

More information

Restoration Status for Damage Caused by the Great East Japan Earthquake and Future Responses

Restoration Status for Damage Caused by the Great East Japan Earthquake and Future Responses Restoration Status for Damage Caused by the Great East Japan Earthquake and Future Responses May 2011 0 The forward-looking statements and projected figures concerning the future performance of NTT and

More information

(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line

(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line Report by the First Joint Survey Team of the JSCE Concrete and Structural Engineering Committees on the damage caused by the Great East Japan Earthquake April 5, 2011 (First Report) 1. Survey team members

More information

Gas Explosion at a Subway Construction Site

Gas Explosion at a Subway Construction Site Gas Explosion at a Subway Construction Site Apr. 8th, 1970, Osaka city KOBAYASHI, Hideo (Tokyo Institute of Technology) (Summary) On April 8th, 1970, a huge gas explosion occurred at the site of construction

More information

Understanding the Seismic Vulnerability of Water Systems

Understanding the Seismic Vulnerability of Water Systems Understanding the Seismic Vulnerability of Water Systems Lessons Learned and What You Can Do Donald Ballantyne October 2, 2013 Regional Water Providers Consortium Board Overview Oregon Resilience Plan

More information

Enhancing the Gas and Electricity Business Model to Meet Social Needs

Enhancing the Gas and Electricity Business Model to Meet Social Needs In addition to supplying city gas, Tokyo Gas is actively engaged in power generation from natural gas, taking advantage of its LNG Value Chain. Efforts are underway to stably supply gas and electricity

More information

recovery Tokyo, Japan A large caused training in practical Library (NDL) damaged books. salvage books. Meeting: Training

recovery Tokyo, Japan A large caused training in practical Library (NDL) damaged books. salvage books. Meeting: Training http://conference.ifla.org/ifla78 Date submitted: 15 June 2012 Lessons learned: Training programs for post disaster recovery from the Great East Japan Earthquake Akiko Okahashi Preservation Division of

More information

Measures for recovery against seismic damage to wastewater systems

Measures for recovery against seismic damage to wastewater systems Measures for recovery against seismic damage to wastewater systems TANAKA Shuji Director, Water Quality Control Department, National Institute for Land and Infrastructure Management, Ministry of Land,

More information

Response to the Great East Japan Earthquake by General Insurance Industry

Response to the Great East Japan Earthquake by General Insurance Industry World Forum 2011 Response to the Great East Japan Earthquake by General Insurance Industry Montego Bay, Jamaica on October 25-26, 2011 Japan Earthquake Reinsurance Co., Ltd. 1 History(of(Earthquake(Insurance(

More information

Communications network damage by the Great East Japan Earthquake and securing communications

Communications network damage by the Great East Japan Earthquake and securing communications Communications network damage by the Great East Japan Earthquake and securing communications March 16, 2012 Natsuo Minamikawa Senior Vice President General Manager of Miyagi Branch Executive Manager of

More information

( 1 ) Overview of Safety Measures ( 2 ) Overview of Measures for Attaining Greater Safety and Reliability

( 1 ) Overview of Safety Measures ( 2 ) Overview of Measures for Attaining Greater Safety and Reliability Contents 1 Effort for New Regulatory Requirements ( 1 ) Overview of a Gist of New Regulatory Requirements in Nuclear Regulation Authority ( 2 ) Major Requirements of a Gist of New Regulatory Requirements

More information

ARTICLE XV - NONCONFORMING USES. 15-1.1 If at the time of enactment of this ordinance, any legal activity which is being

ARTICLE XV - NONCONFORMING USES. 15-1.1 If at the time of enactment of this ordinance, any legal activity which is being ARTICLE 15-1 CONTINUATION 15-1.1 If at the time of enactment of this ordinance, any legal activity which is being pursued, or any lot or structure legally utilized in a manner or for a purpose which does

More information

EWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness

EWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness EWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness 2015 PNWS-AWWA Annual Conference Bellevue, WA W a l l y M c C u l l o u g h, P E Presentation Outline EWEB s Water System

More information

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE

More information

Progress of Collaboration in Disaster Preparedness for Cultural Properties after the Great East Japan Earthquake

Progress of Collaboration in Disaster Preparedness for Cultural Properties after the Great East Japan Earthquake Submitted on: August 8, 2013 Progress of Collaboration in Disaster Preparedness for Cultural Properties after the Great East Japan Earthquake Naoko Kobayashi Acquisitions and Bibliography Department, National

More information

ー Reconstruction after the Great East Japan Earthquake ー

ー Reconstruction after the Great East Japan Earthquake ー ー Reconstruction after the Great East Japan Earthquake ー June, 2011 1 The Great East Japan Earthquake: 14:46, March 11, 2011 Level 7 (seismic intensity) Size (Richter Scale): M9.0 Maximum Seismic Intensity:

More information

Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408]

Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408] Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408] ORDER NUMBER: 4408 DATE AVAILABLE: July 2012 PRINCIPAL INVESTIGATORS: John Eidinger and Craig A. Davis PROJECT PURPOSE: The purpose

More information

Faced with the Great Eastern Japan Earthquake Disaster What can the Japanese Association of Rehabilitation Medicine (JARM) do?

Faced with the Great Eastern Japan Earthquake Disaster What can the Japanese Association of Rehabilitation Medicine (JARM) do? Faced with the Great Eastern Japan Earthquake Disaster What can the Japanese Association of Rehabilitation Medicine (JARM) do? Meigen Liu, Masahiro Kohzuki, Masazumi Mizuma, Masami Akai, Katsunori Yoshinaga

More information

Water Distribution Solution for More Efficient Operation of Water Supply

Water Distribution Solution for More Efficient Operation of Water Supply Hitachi Review Vol. 64 (215), No. 9 564 Featured Articles Water Distribution Solution for More Efficient Operation of Water Supply Shinsuke Takahashi, Ph.D. Shingo Adachi Takeshi Takemoto Minoru Umeki

More information

Guidelines (Master Plan) for Disaster Waste Management after the Great East Japan Earthquake

Guidelines (Master Plan) for Disaster Waste Management after the Great East Japan Earthquake Guidelines (Master Plan) for Disaster Waste Management after the Great East Japan Earthquake May 16, 2011 Ministry of the Environment 1. Introduction To manage waste resulting from the Great East Japan

More information

SECTION 8 Industrial Facilities Field Investigation

SECTION 8 Industrial Facilities Field Investigation SECTION 8 Industrial Facilities Field Investigation Types of Data to Be Collected and Recorded Warehouses, manufacturing facilities, energy-producing facilities, and factories should be inspected for performance

More information

Sharing and coordinating the response to disaster relief and restoration

Sharing and coordinating the response to disaster relief and restoration Field survey of the area affected by the Great East Japan Earthquake conducted by Nihon Bus Association from May 9 11, 2011 Sharing and coordinating the response to disaster relief and restoration May

More information

Earthquake hazard mapping for community resilience in Japan

Earthquake hazard mapping for community resilience in Japan Earthquake hazard mapping for community resilience in Japan -the role of the government- Understanding Risk Forum Focus day session Let s shake your community earthquake hazard mapping approach for community

More information

Local Government Responses to the Great East Japan Earthquake

Local Government Responses to the Great East Japan Earthquake Local Government Responses to the Great East Japan Earthquake (November 24, 2011) Takehiko Imai Information Policy Department, General Affairs and Planning Bureau, Sendai City 1. Comparison between the

More information

IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI

IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI Tokyo, Fukushima Dai-ichi NPP, Fukushima Dai-ni NPP and Tokai NPP, Japan 24

More information

Asset Management in Water Utility

Asset Management in Water Utility Circumstances Surrounding the Waterworks Facilities Renewed in Japan Japan s waterworks facilities have been developed, peaking around 1975 and 1998. The coverage of the water supply system is approximately

More information

Creation of a Highly Disaster-resistant City

Creation of a Highly Disaster-resistant City Creation of a Highly Disaster-resistant City Improvement of Districts with Close-set Wooden Houses In the event of earthquakes, districts with close-set wooden houses are expected to suffer major damage

More information

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice M. R. Zare 1, S. Wilkinson 2, R. Potangaroa 3 1. PhD candidate, University of Auckland, Auckland, New

More information

Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station. March 29, 2013 Tokyo Electric Power Company

Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station. March 29, 2013 Tokyo Electric Power Company Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station March 29, 2013 Tokyo Electric Power Company Purpose of Installing the Multi-nuclide Removal Equipment Installation

More information

SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM

SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Page 1 of 9 SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Program Overview: The Distribution Integrity Management Program ( DIMP ) activities are focused on obtaining and evaluating information

More information

Lessons learned from the tsunami disaster caused by the 2011 Great East Japan Earthquake and improvements in JMA's tsunami warning system

Lessons learned from the tsunami disaster caused by the 2011 Great East Japan Earthquake and improvements in JMA's tsunami warning system Lessons learned from the tsunami disaster caused by the 2011 Great East Japan Earthquake and improvements in JMA's tsunami warning system October 2013 Japan Meteorological Agency Lessons learned from the

More information

Initiative in Preparation for Emergencies

Initiative in Preparation for Emergencies Robust Network Construction Introducing 4G LTE-Compatible Wide- Zone Base Station for Disasters In preparation for an earthquake occurring directly beneath the Tokyo metropolitan area, KDDI is reviewing

More information

TELECOMMUNICATIONS PERFORMANCE IN THE M=9.0 OFF-SHORE EAST COAST OF JAPAN EARTHQUAKE AND TSUNAMI, MARCH 11, 2011

TELECOMMUNICATIONS PERFORMANCE IN THE M=9.0 OFF-SHORE EAST COAST OF JAPAN EARTHQUAKE AND TSUNAMI, MARCH 11, 2011 Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan TELECOMMUNICATIONS PERFORMANCE IN THE M=9.0 OFF-SHORE

More information

Magnitude 8.8 OFFSHORE MAULE, CHILE

Magnitude 8.8 OFFSHORE MAULE, CHILE A great 8.8-magnitude struck central Chile early Saturday. The quake hit 200 miles (325 kilometers) southwest of the capital Santiago. The epicenter was just 70 miles (115 kilometers) from Concepcion,

More information

We worked in coordination with local response agencies and the government to:

We worked in coordination with local response agencies and the government to: JAPAN 1REPORT YEAR One year ago, coastal communities in Northern Japan were devastated by a 9.0 earthquake and subsequent tsunami that destroyed countless homes and livelihoods and killed more than 15,600

More information

Part II. Trend in MLIT Policies

Part II. Trend in MLIT Policies Part Trend in MLIT Policies Section 1 The Current Status and Measures towards Restoration and Reconstruction Chapter 1 Section 1 The Current Status and Measures towards Restoration and Reconstruction Accelerating

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

CHAPTER SEISMIC RISK MITIGATION PRACTICES IN SCHOOL BUILDINGS IN ISTANBUL, TURKEY

CHAPTER SEISMIC RISK MITIGATION PRACTICES IN SCHOOL BUILDINGS IN ISTANBUL, TURKEY CHAPTER 13 SEISMIC RISK MITIGATION PRACTICES IN SCHOOL BUILDINGS IN ISTANBUL, TURKEY Özal Yüzügüllü, Gülay Barbarosoglu and Mustafa Erdik Kandilli Observatory and Earthquake Research Institute Bogaziçi

More information

Long Term Recovery from the 3.11 East Japan Earthquake Disaster: Evaluating Resettlement Projects after Tsunami Disasters

Long Term Recovery from the 3.11 East Japan Earthquake Disaster: Evaluating Resettlement Projects after Tsunami Disasters Long Term Recovery from the 3.11 East Japan Earthquake Disaster: Evaluating Resettlement Projects after Tsunami Disasters Norio MAKI Research Center for Disaster Reduction Systems, DPRI, Kyoto University,

More information

Providing Aerial Photographs and Geographic Information of the Disaster Area by the Great East Japan Earthquake 43

Providing Aerial Photographs and Geographic Information of the Disaster Area by the Great East Japan Earthquake 43 Providing Aerial Photographs and Geographic Information of the Disaster Area by the Great East Japan Earthquake 43 Providing Aerial Photographs and Geographic Information of the Disaster Area by the Great

More information

Response to the Great East Japan Earthquake By the Ministry of Health, Labour and Welfare, the Government of Japan

Response to the Great East Japan Earthquake By the Ministry of Health, Labour and Welfare, the Government of Japan Response to the Great East Japan Earthquake By the, the Government of Japan 23 October 2012 Ministry of Health, Labour, and (MHLW) Government of Japan 1 1. Damage caused by Great East Japan Earthquake

More information

Cover page. Introduction to the Earthquake Resistance Capacity Assessment and Reinforcement of Taipei Water Department Office Building.

Cover page. Introduction to the Earthquake Resistance Capacity Assessment and Reinforcement of Taipei Water Department Office Building. Cover page Title: Authors: Introduction to the Earthquake Resistance Capacity Assessment and Reinforcement of Taipei Water Department Office Building. Ming-Fuw Wang (Presenter and Contact person) Chief

More information

CAUSES AND MEASURES OF FALL ACCIDENTS ON RESTORATION WORK AFTER THE GREAT EAST JAPAN EARTHQUAKE

CAUSES AND MEASURES OF FALL ACCIDENTS ON RESTORATION WORK AFTER THE GREAT EAST JAPAN EARTHQUAKE CAUSES AND MEASURES OF FALL ACCIDENTS ON RESTORATION WORK AFTER THE GREAT EAST JAPAN EARTHQUAKE Hiroki Takahashi 1, Tomohito Hori 1 and Yasuo Toyosawa 1 1 National Institute of Occupational Safety and

More information

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects

More information

Roadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station, TEPCO. Progress Status

Roadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station, TEPCO. Progress Status Appendix 1-2 Roadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station, TEPCO Progress Status July 19 th, 2011 Nuclear Emergency Response Headquarters Government-TEPCO Integrated

More information

SOCALGAS APROACH TO PIPELINE INTEGRITY

SOCALGAS APROACH TO PIPELINE INTEGRITY SUMMER 2011 SOCALGAS APROACH TO PIPELINE INTEGRITY Southern California Gas Company (SoCalGas ) is committed to providing clean, safe and reliable natural gas to its customers and takes important steps

More information

Basic system of measures for flood damage mitigation in Japan. Preparedness for major floods

Basic system of measures for flood damage mitigation in Japan. Preparedness for major floods Basic system of measures for flood damage mitigation in Japan Preparedness for major floods Past major floods and state-level efforts Role of the 2 MLIT's disaster prevention efforts Disaster prevention

More information

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or

More information

Managing the Island s Water Resources Planning for the future

Managing the Island s Water Resources Planning for the future Managing the Island s Water Resources Planning for the future www.jerseywater.je Executive summary The Water Resources Management Plan identifies the effects of climate change and population, on the water

More information

Status Report on Settlement. City Council Briefing December 15, 2014

Status Report on Settlement. City Council Briefing December 15, 2014 Status Report on Settlement City Council Briefing December 15, 2014 1 City Response Timeline November 21: SDOT informed of minor settlement (~0.1 ) December 3: SDOT informed of measurement anomaly in deep

More information

Final Report on the Accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company --- Recommendations ---

Final Report on the Accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company --- Recommendations --- Final Report on the Accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company --- Recommendations --- Investigation Committee on the Accident at Fukushima Nuclear Power Stations of Tokyo

More information

Emergency Management Audit For Businesses

Emergency Management Audit For Businesses Emergency Management Audit For Businesses Sponsor Acknowledgement: This manual is sponsored by NZ Safety Limited and produced for the Ministry of Civil Defence Public Education Advisory Committee by Auckland

More information

Provisional Translation Basic Policy for the Contaminated Water Issue at the TEPCO s Fukushima Daiichi Nuclear Power Station

Provisional Translation Basic Policy for the Contaminated Water Issue at the TEPCO s Fukushima Daiichi Nuclear Power Station Provisional Translation Basic Policy for the Contaminated Water Issue at the TEPCO s Fukushima Daiichi Nuclear Power Station September 3, 2013 Nuclear Emergency Response Headquarters 1. Basic Policy The

More information

Replacement Project of Aged Pipes in Tokyo

Replacement Project of Aged Pipes in Tokyo Replacement Project of Aged Pipes in Tokyo IWA World Water Congress VIENNA 2008 Waterworks Bureau of Tokyo Metropolitan Government Rights Reserved. 1 Table of Contents 1.Outline of Services in Tokyo Waterworks

More information

ー Reconstruction after the Great East Japan Earthquake ー. December, 2011

ー Reconstruction after the Great East Japan Earthquake ー. December, 2011 ー Reconstruction after the Great East Japan Earthquake ー December, 2011 1 Details about Great East Japan Earthquake Earthquake Main earthquake M9.0 (14:46) 500kmx200km. Largest ever recorded. Immediately

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT

ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT MRP Engineering Newsletter February 2012 The world recently experienced several major earthquakes, which caused severe local impacts and major worldwide repercussions.

More information

DAMAGE ASSESSMENT ANNEX E

DAMAGE ASSESSMENT ANNEX E DAMAGE ASSESSMENT ANNEX E E1. Purpose, Situation, and Assumptions E1.1 Purpose The purpose of this Damage Assessment Functional Annex is to guide and coordinate agencies and organizations in conducting

More information

SEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES

SEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES SEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES Ryoji ISOYAMA 1, Eisuke ISHIDA 2, Kiyoji YUNE 3 And Toru SHIROZU 4 SUMMARY This paper presents a practical procedure for estimating damage

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )

More information

Earthquake Disaster Recovery Plan in TMG

Earthquake Disaster Recovery Plan in TMG Earthquake Disaster Recovery Plan in TMG Pre-disaster Management Measures by District and Recovery from Expected Earthquake Directly Underneath Tokyo Planning Section Urban Development Projects Division

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

The NTT Group s response to the Great East Japan Earthquake

The NTT Group s response to the Great East Japan Earthquake Special report The NTT Group s response to the Great East Japan Earthquake At 2:46 p.m. on March 11, 2011, an M9 earthquake the strongest since Japan started measuring such events struck off Miyagi Prefecture

More information

Reconstruction & Renewal of Bhuj City

Reconstruction & Renewal of Bhuj City Reconstruction & Renewal of Bhuj City The Gujarat Earthquake Experience - Converting Adversity into an Opportunity a presentation by: Rajesh Kishore, CEO, Gujarat State Disaster Management Authority Gujarat,

More information

Lebanon Hotspot Report: the Garbage Mountain

Lebanon Hotspot Report: the Garbage Mountain International POPs Elimination Project Fostering Active and Efficient Civil Society Participation in Preparation for Implementation of the Stockholm Convention Lebanon Hotspot Report: the Garbage Mountain

More information

How To Understand The History Of Infrastructure Failures In Seattle

How To Understand The History Of Infrastructure Failures In Seattle Infrastructure Failures Key Points Infrastructure is the network of utilities that supplies our basic needs for mobility, power, water, sewer and communications. This chapter covers major structural failures

More information

Japanese Life Insurance Industry s Response

Japanese Life Insurance Industry s Response 2011 HLS Japan-U.S. Symposium Japanese Life Insurance Industry s Response to the Great East Japan Earthquake Shizuharu KUBONO The Life Insurance Association of Japan 1. Concept of Our Response to the Disaster

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

symptoms of a faulty foundation

symptoms of a faulty foundation symptoms of a faulty foundation How does drought impact your home's foundation? For many Texas families, their home becomes the single largest investment and also the family fortune. The home's foundation

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Final Report May 2014 EXECUTIVE SUMMARY Adequate municipal infrastructure such as roads, bridges, and underground water and sewage pipes are essential to economic development, citizen

More information

Midterm Management Plan 2014

Midterm Management Plan 2014 Midterm Management Plan 2014 FY2012~ FY2014 May-10-2012 Contents 1.Review the Revised Management Plan 1 2.Recognize the business environment 2 3. Management Target 3 4. Basic policy 4 5. Specific measures

More information

Tohoku University and the Great East Japan Earthquake Our Role, Responsibility and Mission. Susumu SATOMI President, Tohoku University

Tohoku University and the Great East Japan Earthquake Our Role, Responsibility and Mission. Susumu SATOMI President, Tohoku University Tohoku University and the Great East Japan Earthquake Our Role, Responsibility and Mission Susumu SATOMI President, Tohoku University 1 The Great East Japan Earthquake: Outline Multi hazards Mega Earthquake,

More information

(1) State of Disaster and Issues Stemming from Tropical Storm Ondoy and Typhoon Pepeng

(1) State of Disaster and Issues Stemming from Tropical Storm Ondoy and Typhoon Pepeng Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: Republic of the Philippines Project: Post Ondoy and Pepeng Short-Term Infrastructure Rehabilitation Project Loan Agreement: May 26,

More information

How to Prevent Liquid Damage Property Losses

How to Prevent Liquid Damage Property Losses 1. The leading cause of property losses is from liquid damage. A review of Zurich North America claims data highlights the problem. 2. Water damage originates from a number of sources: Domestic water lines

More information

Chapter 7 Earthquake Hazards Practice Exam and Study Guide

Chapter 7 Earthquake Hazards Practice Exam and Study Guide Chapter 7 Earthquake Hazards Practice Exam and Study Guide 1. Select from the following list, all of the factors that affect the intensity of ground shaking. a. The magnitude of the earthquake b. Rather

More information

Great East Japan Earthquake and the seismic damage to the NPSs

Great East Japan Earthquake and the seismic damage to the NPSs Great East Japan Earthquake and the seismic damage to the NPSs As of 15:30 July 3rd, 2011 (JST) Ministry of Economy, Trade and industry Earthquake and automatic shut-down of nuclear reactors The Great

More information

THE GAS UTILITIES S AND THE JAPAN GAS ASSOCIATION S EFFORTS TO IMPROVE SAFETY

THE GAS UTILITIES S AND THE JAPAN GAS ASSOCIATION S EFFORTS TO IMPROVE SAFETY THE GAS UTILITIES S AND THE JAPAN GAS ASSOCIATION S EFFORTS TO IMPROVE SAFETY Kunihiro Hara Assistant Manager of Safety Technology Sec.,Gas Technology Dept., The Japan Gas Association 1. City Gas Safety

More information

APPENDIX J GAS DISTRIBUTION

APPENDIX J GAS DISTRIBUTION APPENDIX J GAS DISTRIBUTION Ji Jii APPENDIX J GAS DISTRIBUTION NEIL G. THOMPSON, PH.D. 1 SUMMARY The natural gas distribution system includes 2,785,000 km (1,730,000 mi) of relatively small-diameter, low-pressure

More information

SWAN. The Value of Online Water Network Monitoring SUMMARY

SWAN. The Value of Online Water Network Monitoring SUMMARY SWAN S m a r t W a t e r N e t w o r k s F o r u m The Value of Online Water Network Monitoring SUMMARY Online water monitoring is the use of data transmitted from network elements, meters and sensors

More information

Seismic Damage Information (the 231st Release) (As of 14:00 August 16, 2011)

Seismic Damage Information (the 231st Release) (As of 14:00 August 16, 2011) Extract August 16, 2011 Nuclear and Industrial Safety Agency Seismic Damage Information (the 231st Release) (As of 14:00 August 16, 2011) The Nuclear and Industrial Safety Agency (NISA) confirmed the current

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

KNOWLEDGE NOTE 3-2. Emergency Communication. CLUSTER 3: Emergency Response. Public Disclosure Authorized. Public Disclosure Authorized

KNOWLEDGE NOTE 3-2. Emergency Communication. CLUSTER 3: Emergency Response. Public Disclosure Authorized. Public Disclosure Authorized KNOWLEDGE NOTE 3-2 CLUSTER 3: Emergency Response Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 Prepared by Rajib Shaw, Brett Peary,

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even

More information

Presentations. Session 1. Slide 1. Earthquake Risk Reduction. 1- Concepts & Terminology

Presentations. Session 1. Slide 1. Earthquake Risk Reduction. 1- Concepts & Terminology Earthquake Risk Reduction Presentations Session 1 Slide 1 Earthquake Risk Reduction 1- Concepts & Terminology Welcome to the World Bank Institute s (WBI) Distance Learning (DL) course on Earthquake Risk

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings