1 MASTER SCIENCE PLAN OVERVIEW DOCUMENTATION (MEX-EST-PL-11912, Draft Issue 1.5) PART III IMPLEMENTATION OF THE MASTER SCIENCE PLAN Planetary Missions Division Research and Scientific Support Department

2 : 2 Document Issue Record Prepared by Affiliation Issue P. Martin SCI-SB, ESTEC Issue May 2003 P. Martin SCI-SB, ESTEC Draft Issue November 2004 Checked by Affiliation PST ESTEC August 2004 Mission Manager ESTEC September 2004 Applicable and Reference Documents Both applicable and reference documents provide additional supportive information for a better understanding of the information given in the present documentation. Applicable and reference documents are listed in Annex 1 and 2, respectively. Cross-references to applicable and reference documents are indicated throughout this document by a combination of a letter code and sequential numbers, such as ADxx for applicable documents and RDxx for reference documents. 2

3 : 3 Table of Contents 1. Building the Introduction How to Implement the MSP Scope of this Release General Constraints and Conventions Plan Start Plan End Guidelines for Data Acquisition Payload Commissioning Coordination with Orbital or Landed Mars Missions Time Convention Orbit Numbering Spacecraft Geometry Planetary Constants Use and validation of auxiliary data; SPICE kernels

4 : 4 1. Building the 1.1. Introduction The (MSP) is aimed to be a compilation of payload objectives and consolidated high-level operation timelines for each orbit of the Mars Express mission. The implementation of the MSP constitutes the start of the scheduling, at MTP level, of the acquisition of science data by the Mars Express spacecraft in a way that is consistent with both the scientific objectives of the mission and the resources available for that data collection. Those resources (e.g., power, OBDH bandwidth, on-board data storage, telemetry bandwidth, spacecraft visibility from the ESA New Norcia (NNO) or NASA DSN ground stations, available bandwidth between NNO/DSN and ESOC) constitute important constraints on the planning and on the operations, as they shall be sufficiently dimensioned to allow the mission and payload scientific objectives to be achieved during the time that Mars Express will be operational. The Mars Express science data acquisition periods will be distinctly defined on an orbitby-orbit basis, allowing flexibility in the implementation of the science operations of the mission. Although each orbit might end up being different from any other, which may imply time-consuming planning activities, the goal is to optimize the science data acquisition without altering the available flexibility. This can be achieved by, for instance, planning sequences of orbits for which the observations to be performed by one or several instruments repeat themselves for a certain number of orbits (e.g., to fulfill the global mapping objective). This is also certainly achieved by developing powerful planning tools that will greatly facilitate the detailed planning activities and reduce the time spent for conflict resolution. The is the result of that optimization, the core of the MSP being materialized by the orbit-based, harmonized MIRA request files. During the Mars Commissioning phase, the Commissioning and Verification Plan constitutes the driving document for the payload operations. The becomes the driver of the science operations during the routine operations phase. The Flight Operations Plan (FOP) is always used as reference for all operations How to Implement the MSP The MSP shall contain the science windows and approved science observation periods, the payload instruments pointing requirements, and the corresponding selected instrument main science observation modes as imposed by the mission operations conditions (e.g., global data return, pericentre illumination, occultation and eclipse seasons). Due to the limited onboard (storage capacity) and ground (contact time) resources together with 4

5 : 5 conflicting instrument observation requests, the building of the MSP is extremely complex and time-consuming (see Part IV about assumptions and constraints). To prepare the, one must first specify the relationships between the mission goals and the detailed scientific objectives of each payload experiment. Then the scientific objectives agreed for a given science sub-phase representing a specific period of the mission lifetime shall be implemented and tuned according to the payload operating requirements and operational constraints. The major payload requirements are pointing requirements, instrument activity modes, duration of data acquisition periods, and selectable instruments data rates. This specification of operating requirements is to be checked against spacecraft and subsystems capabilities and iteratively revised until being a good match with the available resources. Power usage, science/communications consolidation and OBDH bandwidth usage are the major constraints of the Mars Express mission. The main information that is needed by PST and POS to build the MSP is the instrumentspecific information (e.g., objectives, requirements, priorities, target lists, constraints) and the assumptions and constraints for operating the spacecraft and ground systems. The Mission Planning System Operations Constraints and Budget Document (OCD; RD25), together with the PID-B (RD31) and instrument Flight User Manuals constitute the primary source of instrument-specific information that is to be used as input for science operations. Assumptions and constraints compiled for the Mars Express mission are summarized in Part IV. Other documents such as the CREMA (RD2) provide further detail on the mission operations profile and constraints. Detailed planning constraints and assumptions are also listed in the Mission Planning Concept (RD24 and RD44). The planning and implementation of the MSP is based on material and parameters prepared or known before the launch of Mars Express, such as the frozen ground track orbit configuration, or on information known following launch, Mars orbit insertion or even resulting from unforeseen events (e.g., power anomaly, MARSIS deployment delay). Therefore, a key issue is to check that the payload scientific timelines and the corresponding resulting scientific measurements and surface coverage match all predicted parameters. Re-planning of payload operations may be necessary for various reasons, at least in the form of refinement of the previous planning, in order to ensure that the science objectives of the mission are reached. This may likely take place during the medium-term planning, but could in some cases be done at a higher level of the scientific planning. The high-level science planning and implementation of the is characterized by the definition of a number of science sub-phases and a planning rationale linked to the scientific goals of Mars Express, combined with the adoption of a dedicated science planning policy and strategy that shall streamline the conflict resolution process. Part VI brings this rationale, policy and strategy forward. 5

6 : 6 2. Scope of this Release Issue 1.0 of the MSP documentation was released at the time of the launch of the Mars Express mission, and therefore did not include updated information with regard to a number of decisions or events such as the selection of the eq100 orbit, the changes in the planning concept resulting from the approval of a second ground station or from the power subsystem anomaly, or the commissioning and routine detailed planning scheme and strategy (with delayed MARSIS antenna deployment). This released Issue 1.5 of the overview documentation includes all the relevant and up-to-date information, covers the payload commissioning phase including the initial scientific operations conducted in this phase, gives further details on the post-commissioning planning when the Payload Operations Service was phased in, and covers the beginning of the routine phase of the nominal mission. The orbit-by-orbit planning of the payload operations that is laid out in Annexes 8 and 9 of this release spans the time from early payload operations (January 2004) until about January The next issue of this MSP documentation is expected to cover a period of 24 months from the time of MOI, corresponding to the entire duration of the nominal mission. This document will be updated if and when necessary with new data or due to changes of constraints. In this release are specified and/or updated: The general constraints and conventions The assumptions, mission operations profile and operational constraints The scientific data downlink process, planning rules and constraints The payload detailed scientific rationale and objectives The payload scientific targets of interest The declared payload scientific priorities The payload contingency plans The special events and targets of opportunity The payload operating requirements and configuration The definition of science phases and sub-phases The science planning policy and strategy The orbit-based payload operations timelines * * May be specified for the period covered, orbit by orbit: The graphic representation of the orbit configuration/geometry The spacecraft pointing profile The consolidated timeline of payload events The information on each scientific observation (goal, target) 6

7 : 7 3. General Constraints and Conventions 4.1. Plan Start The start of long-term science planning activities as established in this release of the MSP overview documentation is constrained by the mission operations profile. The start of the payload operations planning is set at the beginning of the scientific involvement in the mission once the spacecraft has arrived safely and is in a stable orbit around Mars. The first in-orbit scientific activities on Mars Express started at the beginning of January Early after Mars orbit insertion, interleaved Mars commissioning activities (spacecraft, payload) and initial payload operations took place to fulfill the mission s scientific goals and in preparation of the phasing-in of the routine operations. The payload commissioning and early scientific activities at Mars were planned as part of the Commissioning and Verification Plan (RD14) Plan End This release covers (i) the initial payload operations that took place during the first few months of the mission at Mars (during Mars Commissioning Phase) and (ii) the first 10 months of routine payload operations until end of March 2005, planned using the MTP planning cycle scheme with the Payload Operations Service (POS) fully involved and operational. The complete MSP documentation shall be constituted of the cumulated LTP and MTP payload timelines covering a number of defined science sub-phases (see Part VI), the total of which corresponding to the entire duration of the nominal mission Guidelines for Data Acquisition The allocation and regulation of scientific data acquisition is constrained by mission operations parameters (e.g., mission profile, spacecraft and ground resources, spacecraft safety) and by the planning rules and guidelines advised by the Payload Support Team and the MOC, in consultation with the SOWG and SWT. Planning rules and guidelines are established with respect to: Time, frequency, duration and priority of science data acquisition Pointing requirements Instrument data rate Data volume shares and data downlink Communication versus observation periods Power usage Spacecraft maintenance and commanding 7

8 : 8 Part IV of this MSP documentation is dedicated to giving some insight into the various assumptions, constraints and rules that have been established to regulate and optimize the planning of the Mars Express payload operations. Some of these rules may need to be revised as experience is gained during the mission and depending on the occurrence of unforeseen events or changes in the spacecraft or payload configuration Payload Commissioning The payload checkout, calibration and commissioning activities are described and planned in the Commissioning and Verification Plan (RD14). The latter document specifies the goals and constraints for all payload-commissioning activities during the Near-Earth Verification Phase, the Cruise Phase and the Mars Commissioning Phase. It also indicates the activities required at spacecraft platform and ground segment level. The Commissioning and Verification Plan is the driving document for all operation activities at the beginning of the mission, until the Mars Express Commissioning Results Review (CRR) declares the spacecraft and its scientific payload ready for routine operations. The payload commissioning activities at Mars are compiled in this MSP documentation as they play a critical role in the understanding of the payload instruments (e.g., their performance) and in the preparation of the routine science mission. Initial payload observations acquired during the Mars Commissioning Phase are to be taken as part of achieving the scientific objectives of the mission. Indeed, the first few weeks of the inorbit mission are critical from a scientific point of view as the ground track coverage and observation conditions lead to nearly unique opportunities for scientific data collection. The commissioning activities in orbit around Mars take place under various operational conditions, leading to the definition of 6 commissioning sub-phases. These sub-phases are defined in Part VI of this documentation. The relevant payload operations timelines are distributed in Annex Coordination with Orbital or Landed Mars Missions This planning documentation is intended to deal with the data acquisition from the Mars Express orbiter instruments. As such, it does not generally take account of requests to coordinate the data acquisition from Mars Express with the data acquisition from other spacecraft missions (such as NASA orbiter and landed missions) or from Earth-based experiments. However, coordinated science operations between the Mars Express orbiter instruments and the instruments onboard the NASA Mars Exploration Rovers (MER) Spirit and Opportunity have been undertaken and more are foreseen. These operations are therefore planned as part of the regular MSP activities. See Part V and Annexes 8 and 9 that give 8

9 : 9 further detail regarding the relevant coordinated scientific objectives and payload operations timelines. Coordination is also foreseen in terms of communication data relays between the Mars Express telecommunication subsystem MELACOM and the MER rovers or Mars Odyssey spacecraft. The planning of the relevant communication sessions appears in the MSP/MTP timelines, as the required spacecraft resources (pointing, power, data) influence the planning of operations by the scientific payload onboard Mars Express. Several such coordinated communication sessions have been successfully conducted, demonstrating the capabilities of having for the first time a network for communications around another planet. For information, the interfaces of the Mars Express mission in the context of the international collaboration are given in Figure 18 below. The coordination of the Mars Express lander science operations with the orbiter payload operations was to be part of this documentation as well, and was preliminarily described in the Coordination of Mars Express and Beagle-2 Science Operations Document (RD32). Following the fate of Beagle-2, this activity did not take place. 9

10 : 10 Figure 18: Telecommand and telemetry flow in international collaboration around Mars. 10

11 : Time Convention For planning purposes, most information provided by the instrument teams is specified and supplied as orbit number and time offset from pericentre. The purpose of this is to allow for a slight drift in the time of orbit events between planning and actual execution. This is essentially the case for all inputs to the MIRA planning tool. and time information is given in UTC in some cases. The format used is the following: YY-DDD'T'HH:MM:SS Z YY are two characters to specify the last two numbers of the year. DDD are three characters to specify the day within this year T00:10:10Z specifies the 10th day of the year 2003 (see CRID; RD28). All date and time information in the MSP will use this format. All date and time information in the PIOR will use this format (See POS Commanding Scenario; RD23). Orbit and Attitude files use TDB as time standard with the following format: YYYY-MM-DDTHH:MM:SS.sssssss. On board the spacecraft, all telemetry data are packetised in source packets. Each source packet is time-tagged with the OnBoard clock Time (OBT). The field in the TC packet containing the OBT has 6 bytes (48 bits). This field contains the SCET (SpaceCraft Elapsed Time; DDID; RD29), which represents the number of seconds elapsed from the last reset of the clock. This field is coded as follows: 4 bytes for seconds and 2 bytes for fractions of second (up to fractions of a second). This time corresponds to the OBT time when the data were measured by the instrument onboard the spacecraft. On reception, the TC packets are wrapped with a header to be distributed via the DDS. The contents of the packet are unprocessed, and only that header is attached to its beginning. The header contains the SCET time in UTC format (the UTC when the data were measured by the instrument onboard the spacecraft). The time correlation coefficients are employed to calculate the UTC time of the DDS header from the data acquisition start time in OBT. The time format used to code the UTC in the DDS packet header is the Sun Modified Julian Time, as standard on Sun Solaris UNIX platforms. It corresponds to the number of seconds since 00:00:00 UTC on 1 st Jan 1970 with leap seconds taken into account. The time correlation coefficients are produced on the ground station, using a procedure involving data from the spacecraft. The onboard spacecraft clock is sampled on the spacecraft, placed into the standard spacecraft time source packet in CUC format (4 bytes for seconds, 2 bytes for fractions of second) and transmitted to ground. On reception, all 11

12 : 12 packets are time-tagged with the current UTC (obtained from the station clock which is synchronized to UTC) and routed to the control system at ESOC. This time is called Earth Reception Time (ERT). The ERT is extracted and several corrections are applied to obtain the onboard time in UTC format. The ERT is corrected for the delay introduced in the ground station (transmission from the antenna to the equipment where the ERT is time-stamped on the frame), propagation delay (the time taken for the signal to travel from the spacecraft to the ground station antenna) and the delay in processing the packet on the spacecraft. The result of all these corrections is a time correlation packet that contains both UTC and OBT formats, i.e., the same event measured in the two time scales. All these time correlation packets are used to calculate the time correlation coefficients by a least square fit. The time correlation between the spacecraft onboard clock and the UTC time shall be updated on a regular basis (e.g., every couple of weeks). In case the instrument teams want to correlate their instrument time counter values to an appropriate UTC time, the relevant chapter in the DDID explains the usage of the time correlation file (TCF) Orbit Numbering It is expected that the Mars Express spacecraft will execute 2293 orbits around the planet Mars during the nominal mission. The nominal injection sequence has been addressed and presented by ESOC (see RD2 and Figure 19). As a result, the numbering convention that has been chosen is such that Orbit 1 is the first closed orbit after MOI (from the first apocentre to the second apocentre). A certain number of orbits were performed to reach a stabilized polar elliptical orbit with a 7.5-hours orbital period around the planet. The Eq100 mapping orbit was reached on 28 January 2004, at the orbit number 57. During the entire nominal mission, the spacecraft starts a new orbit number as it passes through the apocentre. All predicted data from the MOC are based on this concept. The Mission Planning Concept (RD24) gives further information on orbit numbering. 12

13 : Spacecraft Geometry Figure 19: Nominal injection sequence. The spacecraft geometry (AOCS reference frame) is as follows in Figure 20, with indication of the axes of rotation used by Flight Dynamics. Characterization of the pointing modes with respect to the various rotational axes is described in the Mission Planning Concept (RD24). For further information, Figure 21 shows in detail the layout of the payload platform in the mechanical reference frame used by the prime contractor EADS-Astrium. From the convention used for the AOCS and mechanical spacecraft reference frames, the X axis is equivalent to the Xb axis, the +Z axis is equivalent to the Zb axis, and the Y axis is equivalent to the Yb axis. 13

14 : 14 Figure 20: Spacecraft geometry (AOCS frame) with rotational axes. From RD2. Figure 21: Mars Express payload platform layout and spacecraft mechanical frame. 14

15 : Planetary Constants The use of planetary constants for the Mars Express mission is such that: The IAU 2000 cartographic convention is adopted for Mars Express. The planning tools MIRA and MAPPS have been converted to run with this agreed convention. There is an agreement between JPL and ESOC to use the same planetary constants as applicable for the Mars Exploration Rovers (MER) and Mars Reconnaissance Orbiter (MRO) missions. The document to be used as reference document is the Planetary Constants and Models document (RD33). Minor differences with the constants to be used by JPL on its missions are stated in the ESOC/JPL Navigation ICD (RO-ESC- IF-5011; RD34) and are related to navigation. The Phobos and Deimos ephemeredes is understood to be different from the one used by JPL. The Mars gravity field will be used inside the sphere of influence of Mars Use and validation of auxiliary data; SPICE kernels The files giving access to orbit, event and attitude data for the Mars Express spacecraft and the original software used to produce and process this data are delivered by ESOC (DDID; RD29 and RD30). Following requests made by several PIs, ESA decided to offer the ancillary data of Mars Express in SPICE format, in addition to the original ESOC format. SPICE (Spacecraft, Planets, Instrument, C-Kernel, Events) is a toolkit maintained by the Navigation and Ancillary Information Facility (NAIF) at JPL/NASA, which aims to offer a common information system that allows scientists and engineers to access navigation and other ancillary spacecraft data from many planetary missions. The primary SPICE data sets are called "kernels" or "kernel files". There are several types of kernel files: SPK for spacecraft and planets ephemeris data, CK for attitude data, FK for reference frames, SCLK for time correlation, IK for instrument information, PCK that contains the planetary constants and LSK with time conversion constants and leap seconds. During the Mars Express pre-launch activities, the NAIF team has developed the software and kernels to be used for the mission, supported by all instrument teams and the PST. The SPK and CK kernels are generated at ESTEC in real-time during the mission, without human intervention, the process being supervised by PST. These files are generated from the ESOC orbit and attitude data respectively. LSK and PCK files are created by NAIF whenever it is required (due to updates in the constant s values or introduction of new leap seconds by the International Earth Rotation and reference system Service). The PST generates SCLK kernels every time a new time correlation packet is released by MCS (this process shall be automated at medium-term). An FK file 15

16 : 16 containing all the mission specific frames has been created and it shall be updated if required. An IK file is produced for each instrument describing its sensor s characteristics and special features. The use of different data sets requires careful and accurate validation of all data and planning tools produced for the Mars Express mission. The auxiliary data conversion into SPICE kernels and the relevant data distribution is explained in RD35. 16

PART II OVERVIEW OF MARS EXPRESS SCIENCE OPERATIONS

PART II OVERVIEW OF MARS EXPRESS SCIENCE OPERATIONS MASTER SCIENCE PLAN OVERVIEW DOCUMENTATION (MEX-EST-PL-11912, Draft Issue 1.5) PART II OVERVIEW OF MARS EXPRESS SCIENCE OPERATIONS Planetary Missions Division Research and Scientific Support Department

More information

ANNEX 3 GLOSSARY OF ACRONYMS AND ABBREVIATIONS

ANNEX 3 GLOSSARY OF ACRONYMS AND ABBREVIATIONS MASTER SCIENCE PLAN OVERVIEW DOCUMENTATION (MEX-EST-PL-11912, Draft Issue 1.5) ANNEX 3 GLOSSARY OF ACRONYMS AND ABBREVIATIONS Planetary Missions Division Research and Scientific Support Department : 2

More information

DATA MANAGEMENT PLAN

DATA MANAGEMENT PLAN MARS EXPLORATION PROGRAM DATA MANAGEMENT PLAN Raymond E. Arvidson Susan H. Slavney Jennifer G. Ward McDonnell Center for the Space Sciences Dept. of Earth and Planetary Sciences Washington University St.

More information

Operability in the SAVOIR Context

Operability in the SAVOIR Context SAVOIR Avionics Reference Architecture Operability in the SAVOIR Context Avionics, Data Control & Software Systems Workshop 23/10/2012 Implementing Operability The CCN Standoff & the SOIRD SOIRD & Standarisation

More information

Guidelines for Development of a DATA MANAGEMENT PLAN (DMP) Earth Science Division NASA Science Mission Directorate

Guidelines for Development of a DATA MANAGEMENT PLAN (DMP) Earth Science Division NASA Science Mission Directorate Guidelines for Development of a DATA MANAGEMENT PLAN (DMP) Earth Science Division NASA Science Mission Directorate National Aeronautics and Space Administration Version 1.0 January 2011 Contents Preface...3

More information

ESTRACK Management System Support for the CCSDS Space Communication Cross Support Service Management

ESTRACK Management System Support for the CCSDS Space Communication Cross Support Service Management ESTRACK Management System Support for the CCSDS Space Communication Cross Support Service Management Alexander Hoffmann 1 VEGA Space GmbH, Europaplatz 5, D-64293 Darmstadt, Germany Holger Dreihahn 2 and

More information

Dawn Mission to Vesta and Ceres L-0 Data from Vesta Gravity Science Instrument Archive Volume Software Interface Specification

Dawn Mission to Vesta and Ceres L-0 Data from Vesta Gravity Science Instrument Archive Volume Software Interface Specification Dawn Mission to Vesta and Ceres L-0 Data from Vesta Gravity Science Instrument Archive Volume Software Interface Specification Version 1.2 August 28, 2014 CHANGE LOG DATE CHANGES REASON REVISION 12/30/13

More information

USE OF SCILAB FOR SPACE MISSION ANALYSIS AND FLIGHT DYNAMICS ACTIVITIES

USE OF SCILAB FOR SPACE MISSION ANALYSIS AND FLIGHT DYNAMICS ACTIVITIES USE OF SCILAB FOR SPACE MISSION ANALYSIS AND FLIGHT DYNAMICS ACTIVITIES Thierry Martin CNES Scilabtec 09 Use of Scilab for space mission analysis Page 1 Use of Scilab in CNES Scilab is now widely used

More information

Autonomous Operations for Small, Low-Cost Missions: SME, EOR (STEDI), DATA, and Pluto Express OUTLINE. Visions for Future, Low-Cost Missions

Autonomous Operations for Small, Low-Cost Missions: SME, EOR (STEDI), DATA, and Pluto Express OUTLINE. Visions for Future, Low-Cost Missions Autonomous Operations for Small, Low-Cost Missions: SME, EOR (STEDI), DATA, and Pluto Express Introduction Challenges Solutions Technologies Technology Gaps OUTLINE Visions for Future, Low-Cost Missions

More information

Spacecraft Operations Course

Spacecraft Operations Course , DLR Spacecraft Operations Course Course Content The following subjects and topics will be addressed during the Spacecraft Operations Course Table of Content Spacecraft Operations Course, DLR TABLE OF

More information

Automated Spacecraft Scheduling The ASTER Example

Automated Spacecraft Scheduling The ASTER Example Automated Spacecraft Scheduling The ASTER Example Ron Cohen ronald.h.cohen@jpl.nasa.gov Ground System Architectures Workshop 2002 Jet Propulsion Laboratory The Concept Scheduling by software instead of

More information

date: 20th December 2000 issue 1 - revision 0 page 1 Findings,Recommendations and Conclusions

date: 20th December 2000 issue 1 - revision 0 page 1 Findings,Recommendations and Conclusions page 1 Findings,Recommendations and Conclusions page 2 page 3 T A B L E O F C O N T E N T S 1 Introduction...4 2 Identification of the Problem...5 3 Findings...6 4 Conclusions and Recommendations...7 5

More information

'l'ehisat. A IfICROSATBLLI'l'E SYS'l'EH FOR AlJ'rONOHOUS ENVIRONIfElI'.rAL IfONI'l'ORING SERVICR

'l'ehisat. A IfICROSATBLLI'l'E SYS'l'EH FOR AlJ'rONOHOUS ENVIRONIfElI'.rAL IfONI'l'ORING SERVICR 'l'ehsat A fcrosatbll'l'e SYS'l'EH FOR AlJ'rONOHOUS ENVRONfEl'.rAL fon'l'orng SERVCR Brunella Paves! (1), Giuseppe Rondinelli (1) Nikolaos Balteas (2) (1) f!lesp1zo S.p.a. - Via 'l'iburtlna 965-00156 ROJa,

More information

UC CubeSat Main MCU Software Requirements Specification

UC CubeSat Main MCU Software Requirements Specification UC CubeSat Main MCU Software Requirements Specification 23 November 2012 Adam Goodwin Table of Contents 1. Introduction... 3 2. Problem Statement and Scope... 3 3. Software Sequences... 4 3.1. Overall

More information

Space Flight Project Work Breakdown Structure

Space Flight Project Work Breakdown Structure APPENDIX G. (WBS) Space Flight Project Work Breakdown Structure G.1 Introduction G.1.1 The Project Work Breakdown Structure (WBS) is a key element of project management. The purpose of a WBS is to divide

More information

SOFTWARE DEVELOPMENT STANDARD FOR SPACECRAFT

SOFTWARE DEVELOPMENT STANDARD FOR SPACECRAFT SOFTWARE DEVELOPMENT STANDARD FOR SPACECRAFT Mar 31, 2014 Japan Aerospace Exploration Agency This is an English translation of JERG-2-610. Whenever there is anything ambiguous in this document, the original

More information

Database Administration for Spacecraft Operations The Integral Experience

Database Administration for Spacecraft Operations The Integral Experience r bulletin 103 august 2000 Database Administration for Spacecraft Operations The Integral Experience J. Houser & M Pecchioli Mission Operations Department, ESA Directorate of Technical and Operational

More information

A Generic Science Operation Planning Concept for Planetary Missions and its Implementation on the First ESA Lunar Mission SMART-1

A Generic Science Operation Planning Concept for Planetary Missions and its Implementation on the First ESA Lunar Mission SMART-1 A Generic Science Operation Planning Concept for Planetary Missions and its Implementation on the First ESA Lunar Mission SMART-1 vorgelegt von Diplom-Ing. Mehran Sarkarati Von der Fakultät V - Verkehrs-

More information

Mars Express Mission Planning: An example of successful software reuse

Mars Express Mission Planning: An example of successful software reuse Mars Express Mission Planning: An example of successful software reuse Thierry Bru European Space Operation Centre (ESOC) Robert Bosch Strasse 5, D-64293 Darmstadt, Germany Fax +49 (0) 6151 902067, E-mail:

More information

Operations Planning for the International Space Station

Operations Planning for the International Space Station Operations Planning for the International Space Station R. Leuttgens & J. Volpp ESA Directorate for Technical and Operational Support, ESOC, Darmstadt, Germany Introduction As a consequence of the ISS

More information

The PACS Software System. (A high level overview) Prepared by : E. Wieprecht, J.Schreiber, U.Klaas November,5 2007 Issue 1.

The PACS Software System. (A high level overview) Prepared by : E. Wieprecht, J.Schreiber, U.Klaas November,5 2007 Issue 1. The PACS Software System (A high level overview) Prepared by : E. Wieprecht, J.Schreiber, U.Klaas November,5 2007 Issue 1.0 PICC-ME-DS-003 1. Introduction The PCSS, the PACS ICC Software System, is the

More information

ESA s Data Management System for the Russian Segment of the International Space Station

ESA s Data Management System for the Russian Segment of the International Space Station iss data management system ESA s Data Management System for the Russian Segment of the International Space Station J. Graf, C. Reimers & A. Errington ESA Directorate of Manned Spaceflight and Microgravity,

More information

Sea Mammal Research Unit. GPS Phone Tags. www.smru.st-and.ac.uk. Introduction. University of St Andrews. e-mail: telemetry@st-and.ac.

Sea Mammal Research Unit. GPS Phone Tags. www.smru.st-and.ac.uk. Introduction. University of St Andrews. e-mail: telemetry@st-and.ac. GPS Phone Tags A major advance in marine mammal telemetry, featuring: GPS quality locations Detailed individual dive and haulout data Efficient and cheap data relay via mobile phone GSM Introduction The

More information

What, Why and How. Hosted Payloads: A guide to commercially hosted government payloads from the Hosted Payload Alliance. www.hostedpayloadalliance.

What, Why and How. Hosted Payloads: A guide to commercially hosted government payloads from the Hosted Payload Alliance. www.hostedpayloadalliance. Hosted Payloads: What, Why and How A guide to commercially hosted government payloads from the Hosted Payload Alliance The Hosted Payload Alliance (HPA) is a satellite industry alliance formed in 2011

More information

TIMED Mission System Engineering and System Architecture

TIMED Mission System Engineering and System Architecture TIMED Mission System Engineering and System Architecture David Y. Kusnierkiewicz Aspace mission consists of more than just a spacecraft and scientific instruments. It also includes a ground system to support

More information

Cluster-II: Evolution of the Operations Concept

Cluster-II: Evolution of the Operations Concept Cluster-II: Evolution of the Operations Concept M. Warhaut, S. Matussi & P. Ferri Mission Operations Department, ESA Directorate of Technical and Operational Support, ESOC, Darmstadt, Germany Introduction

More information

Satellite technology

Satellite technology Satellite technology Overview What is a satellite? The key elements of orbital position Satellite manufacturers and design The components of a satellite: payload and bus Digital versus analogue How do

More information

presented at the ISPRS Working Group IV/8 Planetary Mapping and Spatial Data Bases Berlin, September 24/25, 2015

presented at the ISPRS Working Group IV/8 Planetary Mapping and Spatial Data Bases Berlin, September 24/25, 2015 NEW SPIN AXIS, SPIN RATE AND PRIME MERIDIAN EXPRESSIONS FOR PRECISION MARS CARTOGRAPHY by T. Duxbury, George Mason University, Fairfax, VA, USA W. Folkner and T. Parker, Jet Propulsion Laboratory, Pasadena,

More information

Rotorcraft Health Management System (RHMS)

Rotorcraft Health Management System (RHMS) AIAC-11 Eleventh Australian International Aerospace Congress Rotorcraft Health Management System (RHMS) Robab Safa-Bakhsh 1, Dmitry Cherkassky 2 1 The Boeing Company, Phantom Works Philadelphia Center

More information

PROJECT DATA MANAGEMENT PLAN

PROJECT DATA MANAGEMENT PLAN PROJECT DATA MANAGEMENT PLAN For The Mars Express ASPERA-3 Processing and Archiving Facility (APAF) SwRI Project No. 15-03561 Prepared by: S. Jeffers Southwest Research Institute Space Science and Engineering

More information

Dawn - Overview, Science Objectives, Mission Progress. Hap McSween For PI Chris Russell

Dawn - Overview, Science Objectives, Mission Progress. Hap McSween For PI Chris Russell Dawn - Overview, Science Objectives, Mission Progress Hap McSween For PI Chris Russell Presentation to Decadal Survey Primitive Bodies Panel, Washington, DC, Sep 2009 Spacecraft configuration, assembly

More information

Mission Spacecraft and Operations Overview MAVEN Science Community Workshop December 2, 2012

Mission Spacecraft and Operations Overview MAVEN Science Community Workshop December 2, 2012 Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission Mission Spacecraft and Operations Overview MAVEN Science Community Workshop December 2, 2012 Chris Waters Spacecraft Design Lead Lockheed Martin MAVEN

More information

REGIONAL ROVER FOR 1: MARS ANNEXE B SYSTEM REQUIREMENTS SCOUTING AND SAMPLE COLLECTION PART MARS ROVER CHASSIS DOCUMENT

REGIONAL ROVER FOR 1: MARS ANNEXE B SYSTEM REQUIREMENTS SCOUTING AND SAMPLE COLLECTION PART MARS ROVER CHASSIS DOCUMENT document title/ titre du document REGIONAL MARS ROVER FOR SCOUTING AND SAMPLE COLLECTION PART 1: MARS ROVER CHASSIS ANNEXE B 1: SYSTEM REQUIREMENTS DOCUMENT prepared by/pré paré par ESA reference/ré ference

More information

5.2 Telemetry System Concept

5.2 Telemetry System Concept 126 Chapter 5 Traditionally, telemetry transmitted from spacecraft was formatted with a time-division multiplexing (TDM) scheme, where data items were multiplexed into a continuous stream of fixed-length

More information

Mission Planning Software Design 5 December 2006

Mission Planning Software Design 5 December 2006 Gamma-ray Large Area Space Telescope Mission Planning Software Design 5 December 2006 Bryson Lee blee@slac.stanford.edu 650-926-2866 1 Purpose and Definitions Mission Planning == Process by which the LAT

More information

Software System Development for Spacecraft Data Handling & Control Data Handling System Concepts and Structure

Software System Development for Spacecraft Data Handling & Control Data Handling System Concepts and Structure Software System Development for Spacecraft Data Handling & Control Data Handling System Concepts and Structure Document No.: Date: 13.09.99 Issue: 1 Revision: - Distribution: TERMA Prepared by: Gert Caspersen

More information

FlexPlan: An Operational Mission Planning & Scheduling COTS Used Internationally

FlexPlan: An Operational Mission Planning & Scheduling COTS Used Internationally FlexPlan: An Operational Mission Planning & Scheduling COTS Used Internationally J.A. Tejo, M. Pereda, Iker Veiga GMV S.A. Calle Isaac Newton, 11 PTM-Tres Cantos 28760 Madrid, SPAIN +34 91 807 2100 jatejo@gmv.es

More information

Attenuation (amplitude of the wave loses strength thereby the signal power) Refraction Reflection Shadowing Scattering Diffraction

Attenuation (amplitude of the wave loses strength thereby the signal power) Refraction Reflection Shadowing Scattering Diffraction Wireless Physical Layer Q1. Is it possible to transmit a digital signal, e.g., coded as square wave as used inside a computer, using radio transmission without any loss? Why? It is not possible to transmit

More information

RS platforms. Fabio Dell Acqua - Gruppo di Telerilevamento

RS platforms. Fabio Dell Acqua - Gruppo di Telerilevamento RS platforms Platform vs. instrument Sensor Platform Instrument The remote sensor can be ideally represented as an instrument carried by a platform Platforms Remote Sensing: Ground-based air-borne space-borne

More information

STUDY ON ASSESSMENT METHOD FOR SPACE SCIENCE REQUIREMENT SATISFACITON BASED ON ANP MODEL. Ligang Li SECESA2014 10/10/2014

STUDY ON ASSESSMENT METHOD FOR SPACE SCIENCE REQUIREMENT SATISFACITON BASED ON ANP MODEL. Ligang Li SECESA2014 10/10/2014 STUDY ON ASSESSMENT METHOD FOR SPACE SCIENCE REQUIREMENT SATISFACITON BASED ON ANP MODEL Ligang Li SECESA2014 10/10/2014 Table of Contents 1. INTRODUCTION 2. OVERVIEW OF ANP MODEL? 3. MISSION CHARACTERIZATION

More information

Criteria for Flight Project Critical Milestone Reviews

Criteria for Flight Project Critical Milestone Reviews Criteria for Flight Project Critical Milestone Reviews GSFC-STD-1001 Baseline Release February 2005 Approved By: Original signed by Date: 2/19/05 Richard M. Day Director, Independent Technical Authority

More information

JPL ANOMALY ISSUES. Henry B. Garrett Jet Propulsion Laboratory California Institute of Technology Pasadena, CA, 91109

JPL ANOMALY ISSUES. Henry B. Garrett Jet Propulsion Laboratory California Institute of Technology Pasadena, CA, 91109 JPL ANOMALY ISSUES Henry B. Garrett Pasadena, CA, 91109 Space Weather Anomaly Concerns for JPL Robotic Mission AGENDA Overview of Space Weather Anomalies on JPL Missions Space Weather Products used by

More information

C-S TEAM. Page 1 of 5

C-S TEAM. Page 1 of 5 Title: Medium/large vehicle tracking system Primary POC: Jacoba Auret Organization: C-S Team (Cape Peninsula University of Technology-Stellenbosch University) POC email: 14807599@sun.ac.za Need We exist

More information

8. Master Test Plan (MTP)

8. Master Test Plan (MTP) 8. Master Test Plan (MTP) The purpose of the Master Test Plan (MTP) is to provide an overall test planning and test management document for multiple levels of test (either within one project or across

More information

How To Write A Call To Action For Terrasar-X

How To Write A Call To Action For Terrasar-X Doc.: TX-PGS-PL-4127 TerraSAR-X Announcement of Opportunity: Utilization of the TerraSAR-X Archive 1 Page: 2 of 11 TABLE OF CONTENTS TERRASAR-X... 1 ANNOUNCEMENT OF OPPORTUNITY: UTILIZATION OF THE TERRASAR-X

More information

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS 1. INTRODUCTION Navigation technologies with precision approach and landing systems, for civilian and military purposes, enable aircrafts to perform their

More information

3D BASED ROVER OPERATIONS CONTROL SYSTEM

3D BASED ROVER OPERATIONS CONTROL SYSTEM 3D BASED OPERATIONS CONTROL SYSTEM Luc Joudrier (1), Konstantinos Kapellos (2), Kjetil Wormnes (3) (1) ESTEC, Keplerlaan 1, 2201AZ Noordwijk, The Netherlands, Email: luc.joudrier@esa.int (2) TRASYS, Terhulpsesteenweg

More information

SCADE Suite in Space Applications

SCADE Suite in Space Applications SCADE Suite in Space Applications at EADS David Lesens 09/10/2008 Overview Introduction Historical use of SCADE at EADS Astrium ST Why using SCADE? The Automatic Transfer Vehicle (ATV) M51 and Vega R&T

More information

From Single to Formation Flying CubeSats: An Update of the Delfi Programme

From Single to Formation Flying CubeSats: An Update of the Delfi Programme From Single to Formation Flying CubeSats: An Update of the Delfi Programme Jian Guo, Jasper Bouwmeester & Eberhard Gill 1 Outline Introduction Delfi-C 3 Mission Delfi-n3Xt Mission Lessons Learned DelFFi

More information

Frequencies for Mars Local High-Rate Links

Frequencies for Mars Local High-Rate Links IPN Progress Report 42-153 May 15, 2003 Frequencies for Mars Local High-Rate Links D. Hansen, 1 M. Sue, 1 T. Peng, 2 and F. Manshadi 2 This article considers the options for frequency choice for high-data-rate

More information

ICES Guidelines for Profiling Float Data (Compiled January 2001; revised April 2006)

ICES Guidelines for Profiling Float Data (Compiled January 2001; revised April 2006) ICES Guidelines for Profiling Float Data (Compiled January 2001; revised April 2006) Profiling floats are neutrally buoyant devices that periodically surface to transmit data to a satellite system. The

More information

Technical Bulletin. Enabling Arista Advanced Monitoring. Overview

Technical Bulletin. Enabling Arista Advanced Monitoring. Overview Technical Bulletin Enabling Arista Advanced Monitoring Overview Highlights: Independent observation networks are costly and can t keep pace with the production network speed increase EOS eapi allows programmatic

More information

5. Security in the IPN

5. Security in the IPN 1. Introduction 2. Inter-Internet Dialogs 3. Building a stable Backbone for the IPN 4. IPN Nodes 5. Security in the IPN 6. Deployed Internets in the IPN 7. Working conclusions 5. Security 5.1. Introduction

More information

telemetry Rene A.J. Chave, David D. Lemon, Jan Buermans ASL Environmental Sciences Inc. Victoria BC Canada rchave@aslenv.com I.

telemetry Rene A.J. Chave, David D. Lemon, Jan Buermans ASL Environmental Sciences Inc. Victoria BC Canada rchave@aslenv.com I. Near real-time transmission of reduced data from a moored multi-frequency sonar by low bandwidth telemetry Rene A.J. Chave, David D. Lemon, Jan Buermans ASL Environmental Sciences Inc. Victoria BC Canada

More information

Lecture 10: Managing Risk" Risk Management"

Lecture 10: Managing Risk Risk Management General ideas about Risk" Risk Management" Identifying Risks" Assessing Risks" Case Study:" Mars Polar Lander" Lecture 10: Managing Risk" 2012 Steve Easterbrook. This presentation is available free for

More information

Computer Time Synchronization

Computer Time Synchronization Michael Lombardi Time and Frequency Division National Institute of Standards and Technology Computer Time Synchronization The personal computer revolution that began in the 1970's created a huge new group

More information

Telepresence for Deep Space Missions Project

Telepresence for Deep Space Missions Project ABSTRACT Incorporating telepresence technologies into deep space mission operations can give the crew and ground personnel the impression that they are in a location at time that they are not. NASA s space

More information

102 26-m Antenna Subnet Telecommunications Interfaces

102 26-m Antenna Subnet Telecommunications Interfaces DSMS Telecommunications Link Design Handbook 26-m Antenna Subnet Telecommunications Interfaces Effective November 30, 2000 Document Owner: Approved by: Released by: [Signature on file in TMOD Library]

More information

MOIS. Manufacturing and Operations Information System

MOIS. Manufacturing and Operations Information System MOIS Manufacturing and Operations Information System Agenda 1. Common System Developer/Operator Problems 2. Solutions 3. What is MOIS? 4. MOIS Missions 5. MOIS Toolset Overview 2 Procedures Used to formalise

More information

DEOS. Deutsche Orbitale Servicing Mission. The In-flight Technology Demonstration of Germany s Robotics Approach to Service Satellites

DEOS. Deutsche Orbitale Servicing Mission. The In-flight Technology Demonstration of Germany s Robotics Approach to Service Satellites DEOS Deutsche Orbitale Servicing Mission The In-flight Technology Demonstration of Germany s Robotics Approach to Service Satellites B. Sommer, K. Landzettel, T. Wolf, D. Reintsema, German Aerospace Center

More information

AIDA: Asteroid Impact & Deflection Assessment A Joint ESA-NASA Mission. Joint ESA NASA AIDA Team

AIDA: Asteroid Impact & Deflection Assessment A Joint ESA-NASA Mission. Joint ESA NASA AIDA Team AIDA: Asteroid Impact & Deflection Assessment A Joint ESA-NASA Mission Joint ESA NASA AIDA Team Chelyabinsk Meteor on 15 February 2013 AIDA Asteroid Deflection Test AIDA international cooperation First

More information

Dancing in the Dark: How GNSS Satellites Cross the Earth s Shadow

Dancing in the Dark: How GNSS Satellites Cross the Earth s Shadow Dancing in the Dark: How GNSS Satellites Cross the Earth s Shadow F. Dilssner, T. Springer, G. Gienger, R. Zandbergen European Space Operations Centre (ESOC), Darmstadt 24 January 2011 Technische Universität

More information

Performances Optimization of Remote Sensing Satellite Constellations: a Heuristic Method

Performances Optimization of Remote Sensing Satellite Constellations: a Heuristic Method Performances Optimization of Remote Sensing Satellite Constellations: a Heuristic Method Sergio De Florio Microwaves and Radar Institute, DLR Oberpfaffenhofen Münchner Str. 20, 82234 Wessling, Germany

More information

EChO Ground Segment: Overview & Science Operations Assumptions

EChO Ground Segment: Overview & Science Operations Assumptions EChO Ground Segment: Overview & Science Operations Assumptions Matthias Ehle & the Science Ground Segment Working Group EChO Science Operations Study Manager ESA-ESAC, Madrid Science Operations Department/Division

More information

Mars Sample Return Campaign: An Overview. Dr. Firouz Naderi Associate Director NASA s JPL

Mars Sample Return Campaign: An Overview. Dr. Firouz Naderi Associate Director NASA s JPL Mars Sample Return Campaign: An Overview Dr. Firouz Naderi Associate Director NASA s JPL 1 Why Sample Return? Why Now? Compelling Science Informed Landing Site Selection International Interest Good Engineering

More information

Perennisation et Valorisation Nov 7, 2002

Perennisation et Valorisation Nov 7, 2002 Elaine Dobinson PDS Project Manager Perennisation et Valorisation Nov 7, 2002 Topics Introduction and Background Challenges Solution Implementation Benefits Next Steps 2 PDS Overview The PDS acquires,

More information

COL- CC and ESA Ground Segment. Page 1

COL- CC and ESA Ground Segment. Page 1 COL- CC and ESA Ground Segment Page 1 M&C Antenna Ground Station SpACE DLR has implemented a new antenna ground station M&C Framework for the Weilheim antennas. It will be the M&C software for the existing

More information

Embedded Critical Software Testing for Aerospace Applications based on PUS

Embedded Critical Software Testing for Aerospace Applications based on PUS XI Workshop de Testes e Tolerância a Falhas 119 Embedded Critical Software Testing for Aerospace Applications based on PUS Rodrigo P. Pontes 1, Eliane Martins 2, Ana M. Ambrósio 3, Emília Villani 1 1 Instituto

More information

Satellite Telemetry, Tracking and Control Subsystems

Satellite Telemetry, Tracking and Control Subsystems Satellite Telemetry, Tracking and Control Subsystems Col John E. Keesee 1 Overview The telemetry, tracking and control subsystem provides vital communication to and from the spacecraft TT&C is the only

More information

Propsim enabled Aerospace, Satellite and Airborne Radio System Testing

Propsim enabled Aerospace, Satellite and Airborne Radio System Testing www.anite.com Propsim enabled Aerospace, Satellite and Airborne Radio System Testing Anite is now part of Keysight Technologies Realistic and repeatable real-time radio channel emulation solutions for

More information

The European Space Agency

The European Space Agency 3 Agreement between the Government of Australia and the European Space Agency for a Co-operative Space Vehicle Tracking Program Done at Cape Town on 5 October 2011 Introduction 3.1 The Agreement between

More information

The NASA Global Differential GPS System (GDGPS) and The TDRSS Augmentation Service for Satellites (TASS)

The NASA Global Differential GPS System (GDGPS) and The TDRSS Augmentation Service for Satellites (TASS) The Global Differential GPS System (GDGPS) and The TDRSS Augmentation Service for Satellites (TASS) Yoaz Bar-Sever, Larry Young, Frank Stocklin, Paul Heffernan and John Rush s Global Differential GPS System

More information

RECOMMENDATION ITU-R F.1113. (Question ITU-R 157/9) b) that systems using this mode of propagation are already in service for burst data transmission,

RECOMMENDATION ITU-R F.1113. (Question ITU-R 157/9) b) that systems using this mode of propagation are already in service for burst data transmission, Rec. ITU-R F.1113 1 RECOMMENDATION ITU-R F.1113 RADIO SYSTEMS EMPLOYING METEOR-BURST PROPAGATION (Question ITU-R 157/9) (1994) Rec. ITU-R F.1113 The ITU Radiocommunication Assembly, considering a) that

More information

IOAG SERVICE CATALOG #1 IOAG. document title/ titre du document. prepared by/préparé par. Gian Paolo Calzolari (Editor)

IOAG SERVICE CATALOG #1 IOAG. document title/ titre du document. prepared by/préparé par. Gian Paolo Calzolari (Editor) D O C U M E N T document title/ titre du document IOAG SERVICE CATALOG #1 prepared by/préparé par Gian Paolo Calzolari (Editor) issue/édition 1 revision/révision 4 date of issue/date d édition 18/06/2013

More information

Local Sidereal Time is the hour angle of the First Point of Aries, and is equal to the hour angle plus right ascension of any star.

Local Sidereal Time is the hour angle of the First Point of Aries, and is equal to the hour angle plus right ascension of any star. 1 CHAPTER 7 TIME In this chapter we briefly discuss the several time scales that are in use in astronomy, such as Universal Time, Mean Solar Time, Ephemeris Time, Terrestrial Dynamical Time, and the several

More information

Model-Based Testing of Spacecraft Flight Software

Model-Based Testing of Spacecraft Flight Software Model-Based Testing of Spacecraft Flight Software Maria Hernek Virtual 12/09/2013 Objective/Outline Objective: To present the result and achievements of ESA study Model Based Testing of flight SW and discuss

More information

Congresso della SAIT Museo della Scienza e della Tecnologia di Milano 15 Maggio 2014

Congresso della SAIT Museo della Scienza e della Tecnologia di Milano 15 Maggio 2014 Congresso della SAIT Museo della Scienza e della Tecnologia di Milano 15 Maggio 2014 Francesca Esposito INAF Osservatorio Astronomico di Capodimonte (Napoli) ExoMars Mission The ExoMars Program is carried

More information

Quest- 1 Satellite Functional Description

Quest- 1 Satellite Functional Description Quest- 1 Satellite Functional Description Overview The Quest- 1 Satellite is based on the CubeSat Standard that measures 10 cm x 10 cm x 10 cm and weighs less than 1.33 kilograms. The Quest- 1 Satellite

More information

Assembly, Integration & Verification of Systems-of-Systems Simulation capability applied to the Galileo Mission Segment

Assembly, Integration & Verification of Systems-of-Systems Simulation capability applied to the Galileo Mission Segment SESP 2012: Simulation and EGSE facilities 1 ESTEC Noordwijk Assembly, Integration & Verification of Systems-of-Systems Simulation capability applied to the Galileo Mission Segment Richard Lowe (1), Simon

More information

PART 5D TECHNICAL AND OPERATING CHARACTERISTICS OF MOBILE-SATELLITE SERVICES RECOMMENDATION ITU-R M.1188

PART 5D TECHNICAL AND OPERATING CHARACTERISTICS OF MOBILE-SATELLITE SERVICES RECOMMENDATION ITU-R M.1188 Rec. ITU-R M.1188 1 PART 5D TECHNICAL AND OPERATING CHARACTERISTICS OF MOBILE-SATELLITE SERVICES Rec. ITU-R M.1188 RECOMMENDATION ITU-R M.1188 IMPACT OF PROPAGATION ON THE DESIGN OF NON-GSO MOBILE-SATELLITE

More information

The National Strategy, Current Activities for Space Technology Development and Application

The National Strategy, Current Activities for Space Technology Development and Application 14-18 November 2011, Putrajaya, Malaysia The National Strategy, Current Activities for Space Technology Development and Application Lai Anh Khoi Space Technology Institute, VAST, Vietnam Bief History Space

More information

Computer Time Synchronization

Computer Time Synchronization Michael Lombardi Time and Frequency Division NIST email: lombardi@boulder.nist.gov Computer Time Synchronization The personal computer revolution that began in the 1970's created a huge new group of time

More information

A Fractionated Space Weather Base at L 5 using CubeSats & Solar Sails

A Fractionated Space Weather Base at L 5 using CubeSats & Solar Sails A Fractionated Space Weather Base at L 5 using CubeSats & Solar Sails Paulett C. Liewer, Andrew T. Klesh, Martin W. Lo, Neil Murphy, Robert L. Staehle, Vassilis Angelopoulos, Jet Propulsion Laboratory,

More information

Precision on earth. Reliability in space. RUAG Space.

Precision on earth. Reliability in space. RUAG Space. Precision on earth. Reliability in space. RUAG Space. Image: ESA Precision on earth. Reliability in space. RUAG Space is the leading supplier of products for the space industry in Europe. Experience, outstanding

More information

Request-Driven Scheduling for NASA s Deep Space Network

Request-Driven Scheduling for NASA s Deep Space Network Request-Driven Scheduling for NASA s Deep Space Network Mark D. Johnston, Daniel Tran, Belinda Arroyo, and Chris Page Jet Propulsion Laboratory/California Institute of Technology 4800 Oak Grove Drive Pasadena,

More information

Mission Operation Ground. Assurance @ ESA. Mario Merri GSAW, Los Angeles, USA 2 Mar 2011 ESA UNCLASSIFIED

Mission Operation Ground. Assurance @ ESA. Mario Merri GSAW, Los Angeles, USA 2 Mar 2011 ESA UNCLASSIFIED Mission Operation Ground Software Systems Product Assurance @ ESA Mario Merri GSAW, Los Angeles, USA 2 Mar 2011 The European Cooperation for Space Standardisation (ECSS) Established: in 1993 Goal: coherent,

More information

Use of CCSDS File Delivery Protocol (CFDP) in NASA/GSFC s Flight Software Architecture: core Flight Executive (cfe) and Core Flight System (CFS)

Use of CCSDS File Delivery Protocol (CFDP) in NASA/GSFC s Flight Software Architecture: core Flight Executive (cfe) and Core Flight System (CFS) Use of CCSDS File Delivery Protocol (CFDP) in NASA/GSFC s Flight Software Architecture: core Flight Executive (cfe) and Core Flight System () Jonathan Wilmot Software Engineering Division NASA/Goddard

More information

Request-Driven Scheduling for NASA s Deep Space Network

Request-Driven Scheduling for NASA s Deep Space Network Request-Driven Scheduling for NASA s Deep Space Network Mark D. Johnston, Daniel Tran, Belinda Arroyo, and Chris Page Jet Propulsion Laboratory/California Institute of Technology 4800 Oak Grove Drive Pasadena,

More information

GSSC Report. David Band for the GLAST SSC. GLAST Science Support Center

GSSC Report. David Band for the GLAST SSC. GLAST Science Support Center GSSC Report David Band for the GLAST SSC GLAST Users Committee Meeting Outline User Support Documents Testing Ingest and Databases Observing Timelines GUC Meeting 2 USER SUPPORT GUC Meeting 3 Source Detectability

More information

Monitoring Software using Sun Spots. Corey Andalora February 19, 2008

Monitoring Software using Sun Spots. Corey Andalora February 19, 2008 Monitoring Software using Sun Spots Corey Andalora February 19, 2008 Abstract Sun has developed small devices named Spots designed to provide developers familiar with the Java programming language a platform

More information

Trajectory Design with STK/Astrogator. New Horizons Mission Tutorial

Trajectory Design with STK/Astrogator. New Horizons Mission Tutorial Trajectory Design with STK/Astrogator New Horizons Mission Tutorial STK/Astrogator New Horizons Mission Tutorial Page 2 Mission Overview In this tutorial, we will model a Mission to Pluto. Starting from

More information

FRACTAL SYSTEM & PROJECT SUITE: ENGINEERING TOOLS FOR IMPROVING DEVELOPMENT AND OPERATION OF THE SYSTEMS. (Spain); ABSTRACT 1.

FRACTAL SYSTEM & PROJECT SUITE: ENGINEERING TOOLS FOR IMPROVING DEVELOPMENT AND OPERATION OF THE SYSTEMS. (Spain); ABSTRACT 1. FRACTAL SYSTEM & PROJECT SUITE: ENGINEERING TOOLS FOR IMPROVING DEVELOPMENT AND OPERATION OF THE SYSTEMS A. Pérez-Calpena a, E. Mujica-Alvarez, J. Osinde-Lopez a, M. García-Vargas a a FRACTAL SLNE. C/

More information

TDRS / MUST. and. what it might do for you

TDRS / MUST. and. what it might do for you TDRS / MUST and what it might do for you Dr. Marcus G. F. Kirsch XMM-Newton Deputy Spacecraft Operations Manager with Inputs from José-Antonio Martínez nez-heras, Black Hat S.L., Spain European Space Agency

More information

Proc. IJCAI 09 Workshop on Artificial Intelligence in Space, Pasadena, California, US 17 18 July 2009 (ESA SP-673, September 2009)

Proc. IJCAI 09 Workshop on Artificial Intelligence in Space, Pasadena, California, US 17 18 July 2009 (ESA SP-673, September 2009) INTELLIGENT AGENTS FOR SCHEDULING SPACE COMMUNICATIONS Pete Bonasso, Debra Schreckenghost TRACLabs, Inc., 1012 Hercules, Houston,. TX 77058 bonasso@traclabs.com, schreck@traclabs.com ABSTRACT The evolving

More information

INTERNATIONAL TELECOMMUNICATION UNION. SERIES V: DATA COMMUNICATION OVER THE TELEPHONE NETWORK Interfaces and voiceband modems

INTERNATIONAL TELECOMMUNICATION UNION. SERIES V: DATA COMMUNICATION OVER THE TELEPHONE NETWORK Interfaces and voiceband modems INTERNATIONAL TELECOMMUNICATION UNION ITU-T V.24 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (02/2000) SERIES V: DATA COMMUNICATION OVER THE TELEPHONE NETWORK Interfaces and voiceband modems List of

More information

MicroMag3 3-Axis Magnetic Sensor Module

MicroMag3 3-Axis Magnetic Sensor Module 1008121 R01 April 2005 MicroMag3 3-Axis Magnetic Sensor Module General Description The MicroMag3 is an integrated 3-axis magnetic field sensing module designed to aid in evaluation and prototyping of PNI

More information

INDEPENDENT VERIFICATION AND VALIDATION OF EMBEDDED SOFTWARE

INDEPENDENT VERIFICATION AND VALIDATION OF EMBEDDED SOFTWARE PREFERRED RELIABILITY PRACTICES PRACTICE NO. PD-ED-1228 PAGE 1 OF 6 INDEPENDENT VERIFICATION AND VALIDATION OF EMBEDDED SOFTWARE Practice: To produce high quality, reliable software, use Independent Verification

More information

Description of the AAU satellite Project. CubeSat Concept. Financing. Organization

Description of the AAU satellite Project. CubeSat Concept. Financing. Organization Projects Catalogue for AAU satellite /DRAFT by Rafael Wisniewski (I8), Ole Thybo (15), Stig Munk Nielsen (I14), Brian Nielsen (I16), Thomas Bak (I8), Lasse Rosendahl (I14) Description of the AAU satellite

More information

PTAB Test Audit Report for. National Space Science Data Center (NSSDC) Prepared by

PTAB Test Audit Report for. National Space Science Data Center (NSSDC) Prepared by PTAB for National Space Science Data Center () Prepared by Primary Authorisation Body (PTAB) 2012-01-23 TABLE OF CONTENTS 1 Introduction... 3 2 Site Summary... 4 2.1 Site History and Background... 4 2.2

More information

NuSTAR Ground Systems and Operations Approach Lessons Learned

NuSTAR Ground Systems and Operations Approach Lessons Learned University of California, Berkeley Space Sciences Laboratory NuSTAR Ground Systems and Operations Approach Lessons Learned Manfred Bester, Bryce Roberts, Mark Lewis, and William Marchant Space Sciences

More information