City of Barrie. Corporate Asset Management Strategy Asset Management Plan Appendix A: Environmental Services. November 2011 Final

Size: px
Start display at page:

Download "City of Barrie. Corporate Asset Management Strategy Asset Management Plan Appendix A: Environmental Services. November 2011 Final"

Transcription

1 City of Barrie Corporate Asset Management Strategy Asset Management Plan Appendix A: Environmental Services Note that this appendix is part of the Whole of Government Asset Management Plan for the City of Barrie November 2011 Final

2 Contents 1. Introduction Content of this Asset Management Plan Purpose of this Asset Management Plan Relationship to Other City Documents/Outputs 2 2. Asset Portfolio Overview of Environmental Service Delivery Hierarchy of Assets Replacement Cost of Asset Inventory Installation Profile of Assets 7 3. Levels of Service Growth & Demand Future Levels of Service Corporate References and City Studies; Future Demand for Environmental Services Projected Future Demand Factors Influencing Demand Projected Growth and Demand on Services Impact of Changes in Demand of Asset Utilization Lifecycle Analysis Estimated Remaining Life Maximum Potential Life (MPL) Asset Consumption by Asset Type Consequence of Failure (CoF) Probability of Failure (PoF) Redundancy Business Risk Exposure by Asset Type Lifecycle Activities Lifecycle Activities by Asset Type Long-Term Funding Analysis Sustaining the Existing Asset Portfolio 60 GHD City of Barrie AM Plan Appendix A: Environmental i

3 8. Short-Term Investments Corporate 10-Year Capital Program Needs 68 Figure Index Figure 1-1 AM Plan Relationship to other City Documents 3 Figure 2-1 Environmental Assets Costs, 2011$ 6 Figure 2-2 Asset Installation Profile Environmental (Total) 7 Figure 2-3 Asset Installation Profile Water Facilities SWTP 7 Figure 2-4 Asset Installation Profile Water Facilities WPS & Wells 8 Figure 2-5 Asset Installation Profile Water Facilities Underground Reservoirs 8 Figure 2-6 Asset Installation Profile Water Facilities Water Towers 8 Figure 2-7 Asset Installation Profile Water Facilities Booster Stations 9 Figure 2-8 Asset Installation Profile Water Linear Mains 9 Figure 2-9 Asset Installation Profile Water Linear Hydrants & Valves 9 Figure 2-10 Asset Installation Profile Water Linear Service Meters 10 Figure 2-11 Asset Installation Profile Wastewater Facilities WPCC 10 Figure 2-12 Asset Installation Profile Wastewater Facilities ORO Biosolids Facility 11 Figure 2-13 Asset Installation Profile Wastewater Facilities SPS 11 Figure 2-14 Asset Installation Profile Wastewater Linear Sanitary Sewers 11 Figure 2-15 Asset Installation Profile Storm Linear Storm Sewers 12 Figure 2-16 Asset Installation Profile Storm Linear Culverts 12 Figure 2-17 Asset Installation Profile Storm Facilities Storm Detention Ponds 12 Figure 2-18 Asset Installation Profile Waste Management Collection 13 Figure 2-19 Asset Installation Profile Waste Management Disposal 13 Figure 2-20 Asset Installation Profile Waste Management Resource Recovery 13 Figure 5-1 Sewer Deterioration Curve 28 Figure 5-2 Asset Consumption Distribution Environmental (Total) 35 Figure 5-3 Asset Consumption Distribution Water Facilities SWTP 35 Figure 5-4 Asset Consumption Distribution Water Facilities WPS & Wells 35 Figure 5-5 Asset Consumption Distribution Water Facilities Underground Reservoirs 36 Figure 5-6 Asset Consumption Distribution Water Facilities Water Towers 36 Figure 5-7 Asset Consumption Distribution Water Facilities Booster Stations 36 Figure 5-8 Asset Consumption Distribution Water Linear Mains 37 Figure 5-9 Asset Consumption Distribution Water Linear Hydrants & Valves 37 Figure 5-10 Asset Consumption Distribution Water Linear Service Meters 37 GHD City of Barrie AM Plan Appendix A: Environmental ii

4 Figure 5-11 Asset Consumption Distribution Wastewater Facilities - WPCC 38 Figure 5-12 Asset Consumption Distribution Wastewater Facilities ORO Bio Solids Facility 38 Figure 5-13 Asset Consumption Distribution Wastewater Facilities SPS 38 Figure 5-14 Asset Consumption Distribution Wastewater Linear Sanitary Sewers 39 Figure 5-15 Asset Consumption Distribution Storm Facilities Storm Detention Ponds 39 Figure 5-16 Asset Consumption Distribution Storm Linear Culverts 39 Figure 5-17 Asset Consumption Distribution Storm Linear Storm Sewers 40 Figure 5-18 Asset Consumption Distribution Waste Management Collection 40 Figure 5-19 Asset Consumption Distribution Waste Management Disposal 40 Figure 5-20 Asset Consumption Distribution Waste Management Resource Recovery 41 Figure 7-1 Long Term Funding Needs Environmental (Total) 60 Figure 7-2 Long Term Funding Needs Water Facilities SWTP 61 Figure 7-3 Long Term Funding Needs Water Facilities WPS & Wells 61 Figure 7-4 Long Term Funding Needs Water Facilities Underground Reservoirs 61 Figure 7-5 Long Term Funding Needs Water Facilities Water Towers 62 Figure 7-6 Long Term Funding Needs Water Facilities Booster Stations 62 Figure 7-7 Long Term Funding Needs Water Linear Mains 62 Figure 7-8 Long Term Funding Needs Water Linear Hydrants & Valves 63 Figure 7-9 Long Term Funding Needs Water Linear Service Meters 63 Figure 7-10 Long Term Funding Needs Wastewater Facilities WPCC 63 Figure 7-11 Long Term Funding Needs Wastewater Facilities ORO Bio Solids Facility 64 Figure 7-12 Long Term Funding Needs Wastewater Facilities - SPS 64 Figure 7-13 Long Term Funding Needs Sanitary Sewers 64 Figure 7-14 Long Term Funding Needs Storm Linear Storm Sewers 65 Figure 7-15 Long Term Funding Needs Storm Linear Culverts 65 Figure 7-16 Long Term Funding Needs Storm Facilities Storm Detention Ponds 65 Figure 7-17 Long Term Funding Needs Waste Management Collection 66 Figure 7-18 Long Term Funding Needs Waste Management Disposal 66 Figure 7-19 Long Term Funding Needs Waste Management Resource Recovery 66 Table Index Table 2-1 Asset Hierarchy Environmental Services 5 Table 3-1 Corporate Balanced Scorecard Environmental 14 Table 3-2 MPMP Measures Environmental 16 Table 3-3 OMBI Performance Measures Water & Wastewater Services 18 GHD City of Barrie AM Plan Appendix A: Environmental iii

5 Table 3-4 OMBI Performance Measures Waste Management 19 Table 4-1 Factors Affecting Future Demand 24 Table 5-1 City of Barrie Age/Rating Ranking Material 1 27 Table 5-2 City of Barrie Age/Rating Ranking Material 2 27 Table 5-3 City of Barrie Age/Rating Ranking Material 3 27 Table 5-4 Watermain Break Life Reduction Factor 28 Table 5-5 Environmental Assets MPL Waste Management Facilities 29 Table 5-6 Environmental Assets MPL Storm Drainage Facilities 29 Table 5-7 Environmental Assets MPL Wastewater Facilities 30 Table 5-8 Environmental Assets MPL Water Facilities 32 Table 5-9 Environmental Assets MPL Linear 34 Table 5-10 Water Asset Facility Hierarchy Level CoF 41 Table 5-11 Water Asset Facility Hierarchy Level CoF 43 Table 5-12 Wastewater Facility Level CoF 45 Table 5-13 Wastewater Asset Level CoF 46 Table 5-14 Sanitary Sewer Asset Level CoF 48 Table 5-15 Storm Water Facility Asset Level CoF 48 Table 5-16 Storm Water Linear Asset Level CoF 51 Table 5-17 Waste Management Asset Level CoF 52 Table 5-18 Environment PoF Age or Condition 53 Table 5-19 Asset Business Risk Exposure Environment (Total) 54 Table 5-20 Asset Business Risk Exposure Water Facilities 55 Table 5-21 Asset Business Risk Exposure Water Linear 55 Table 5-22 Asset Business Risk Exposure Wastewater Facilities 56 Table 5-23 Asset Business Risk Exposure Wastewater Linear 56 Table 5-24 Asset Business Risk Exposure Storm Facilities 57 Table 5-25 Asset Business Risk Exposure Storm Linear 57 Table 5-26 Asset Business Risk Exposure Waste Management 58 Table 7-1 Comparison of Past Expenditures / Budget to Sustainable Renewal AmountsError! Bookmark Table 8-1 Extreme BRE Assets Risk Reduction Program 68 GHD City of Barrie AM Plan Appendix A: Environmental iv

6

7 1. Introduction 1.1 Content of this Asset Management Plan This document forms Appendix A of the City of Barrie s Asset Management Plan (AM Plan) and addresses the City s Right of Way Assets only. Assets included in this AM Plan are: Solid Waste Assets Storm Facilities Storm Linear Wastewater Facilities Wastewater Linear Water Facilities Water Linear. The body of the AM Plan details the approach and methodology taken in determining the framework for the AM Plan and discusses results at the corporate level. Each Appendix to the main report describes specific results from a study of each asset service area including Environmental (Appendix A), Transportation (Appendix B), Recreation and Culture (Appendix C), Facilities (Appendix D), and Fleet (Appendix E). Note that environmental related facility and fleet assets are included in Appendices D and E respectively. 1.2 Purpose of this Asset Management Plan This AM Plan is intended to improve the City of Barrie s ability to achieve its corporate goals and objectives in a way that best services its customers. It provides a rational framework that enables systematic and repeatable processes to manage costs, risks and levels of service for the City s asset portfolio. The AM Plan identifies expected future costs and assists in predicting future barriers to efficient and effective service delivery. With this understanding, the City s asset managers and operators will be better equipped to remove physical, financial and political barriers before they negatively impact customer levels of service. This is the second set of AM Plans for the City of Barrie. Additional data has been amended to the original set of plans which improves the confidence in the results. It is intended that the continual improvement of asset management practices within the City of Barrie will result in further updates to this document. As such, this AM Plan is a living document that will require ongoing refinement to reflect the evolution of asset management maturity within the City of Barrie over time. 1.3 Relationship to Other City Documents/Outputs The relationship of this AM Plan to other City Documents and planning outputs is illustrated in the figure below. The AM Plan is the base framework (tool) to assist the City in developing appropriate direction and inputs to budget forecasts, master plans, and associated studies/outputs. GHD City of Barrie AM Plan Appendix A: Environmental 2

8 Figure 1-1 AM Plan Relationship to other City Documents GHD City of Barrie AM Plan Appendix A: Environmental 3

9 2. Asset Portfolio 2.1 Overview of Environmental Service Delivery The City of Barrie is responsible for a broad portfolio of assets that support goals of environmental services delivery. These goals include: Water and Wastewater To ensure that adequate water supply and treatment and sewage collection and treatment are provided to the residents of the City. To ensure that development within the City is serviced by municipal sanitary sewers and municipal water. To ensure that the expansion of urban services and development extends in a contiguous pattern from the established service system. To ensure that servicing of development shall employ best management practices to ensure sensitivity to the natural environment and efficiency of City services and operations. To minimize any negative impact that a public utility may have on the natural environment and cultural heritage resources. To maintain a high standard of water quality in Kempenfelt Bay and in the numerous watercourses within the City. To provide safe, sanitary, environmentally sound and efficient methods of water treatment and distribution and sanitary sewage collection and treatment for residents, businesses, institutions and industries. To encourage measures which promote the conservation of water through appropriate engineering and building requirements. Environmental Protection To ensure the health and safety of area residents and prevent the loss of life and minimize property damage due to flooding, erosion, steep slopes and unstable soils. To protect, preserve and enhance land with environmentally significant natural features and ecological functions and to maintain and improve where possible the diversity of natural features or the ecological functions for which an area is identified. To maintain Environmental Protection Areas as viable and natural ecosystems through the protection of the wildlife and aquatic habitats, the maintenance of the flood control and storage capacities of the flood plain and the enhancement of the water quality and the natural water filtration capability of the system. To protect and enhance the water quality and environmental, aesthetic and recreational potential of the City's watercourses, Little Lake and Kempenfelt Bay. GHD City of Barrie AM Plan Appendix A: Environmental 4

10 To encourage effective stormwater management in order to control flooding, erosion, sedimentation and maintain and enhance water quality in the receiving watercourses and water bodies. To promote the incorporation of natural waterways, valleys and ponds into continuous green corridors for wildlife habitat, open space, and parkland. To ensure stormwater management practices minimize stormwater peak flows and contaminant loads, and maintain or increase the extent of vegetative and pervious surfaces. Waste Management To provide facilities for the clean, safe, economic and efficient disposal and/or recycling of waste. To provide for the safe and compatible development of lands adjacent to the Waste Management Facility. To ensure that the City is continually provided with landfill facilities by pursuing long-term plans for the location and development of alternative sites and the efficient reduction of unnecessary or nonrecyclable waste. 2.2 Hierarchy of Assets Asset information is needed to support decision-making. The asset hierarchy provides the framework for segmenting the City asset portfolio into appropriate classifications and describing the linkages. The asset hierarchy used for this AMP is shown below. Table 2-1 Asset Hierarchy Environmental Services Level 1 Level 2 Level 3 Storm Facilities Mechanical Devices Storm Facilities Natural Ponds Watershed Storm Facilities Storm Detention Ponds Watershed Storm Linear Culverts Watershed, Size, Material Storm Linear Storm Sewers Type, Size, Material Wastewater Facilities ORO Bio-Solids Facility Process Area, Component Wastewater Facilities SPS Component Wastewater Facilities WPCC Process Area, Component Wastewater Linear Sanitary Sewers Type, Size, Material Water Facilities Booster Stations Component Water Facilities SWTP Process Area, Component Water Facilities Underground Reservoirs Component Water Facilities Water Towers Component Water Facilities WPS & Wells Component GHD City of Barrie AM Plan Appendix A: Environmental 5

11 Level 1 Level 2 Level 3 Water Linear Hydrants & Valves Purpose, Size Water Linear Mains Type, Size, Material Water Linear Service Meters Size Waste Management Collection Waste Management Disposal Waste Management Resource Recovery 2.3 Replacement Cost of Asset Inventory To focus needs for investments, it is helpful to understand the number of assets and replacement value of assets against the hierarchy. The following figure outlines the replacement value of the City s environmental asset portfolio, in 2011$. Figure 2-1 Environmental Assets Costs, 2011$ GHD City of Barrie AM Plan Appendix A: Environmental 6

12 2.4 Installation Profile of Assets To assist the City with future funding needs analysis, it is helpful to understand the installation profile of the asset profile portfolio. The following graphs show the replacement value of the assets by year of installation, in 2011$. The story these graphs tell is that the majority of City assets were installed between 1980 and Within this timeframe, the graphs show two main periods of growth, at which a significant number and value of assets were installed. The first being in the mid to late 1980 s, and the second being from 1995 to Please note a significant change from the 2009 AMP; portion of most Environmental Facilities has been moved to Corporate Facilities. This can most notably be seen in reviewing the WPCC assets installed in 1989 which are now incorporated instead with Corporate Facilities management. Figure 2-2 Asset Installation Profile Environmental (Total) Figure 2-3 Asset Installation Profile Water Facilities SWTP GHD City of Barrie AM Plan Appendix A: Environmental 7

13 Figure 2-4 Asset Installation Profile Water Facilities WPS & Wells Figure 2-5 Asset Installation Profile Water Facilities Underground Reservoirs Figure 2-6 Asset Installation Profile Water Facilities Water Towers GHD City of Barrie AM Plan Appendix A: Environmental 8

14 Figure 2-7 Asset Installation Profile Water Facilities Booster Stations Figure 2-8 Asset Installation Profile Water Linear Mains Figure 2-9 Asset Installation Profile Water Linear Hydrants & Valves GHD City of Barrie AM Plan Appendix A: Environmental 9

15 Figure 2-10 Asset Installation Profile Water Linear Service Meters Figure 2-11 Asset Installation Profile Wastewater Facilities WPCC GHD City of Barrie AM Plan Appendix A: Environmental 10

16 Figure 2-12 Asset Installation Profile Wastewater Facilities ORO Biosolids Facility Figure 2-13 Asset Installation Profile Wastewater Facilities SPS Figure 2-14 Asset Installation Profile Wastewater Linear Sanitary Sewers GHD City of Barrie AM Plan Appendix A: Environmental 11

17 Figure 2-15 Asset Installation Profile Storm Linear Storm Sewers Figure 2-16 Asset Installation Profile Storm Linear Culverts Figure 2-17 Asset Installation Profile Storm Facilities Storm Detention Ponds GHD City of Barrie AM Plan Appendix A: Environmental 12

18 Figure 2-18 Asset Installation Profile Waste Management Collection Figure 2-19 Asset Installation Profile Waste Management Disposal Figure 2-20 Asset Installation Profile Waste Management Resource Recovery GHD City of Barrie AM Plan Appendix A: Environmental 13

19 3. Levels of Service 3.1 Corporate Balanced Scorecard The City of Barrie Balanced Scorecard includes four quadrants: Community Services, Finance, Process, and People. The scorecard reports Target, Previous Year, and Current Year for a number of indicators, including the following indicators related to environmental services: Table 3-1 Corporate Balanced Scorecard Environmental Key Result Area Performance Indicator Year Finance Water Operations (Net $) $8,864,951 $8,859,666 $9,441,206 Finance Wastewater Operations (Net $) $3,205,922 $3,878,093 $3,795,045 Process Water - Total # of Systems Adverse Process Residential Waste Diversion Rate 45.00% 49.00% 48.00% Process % of Unbilled Water to Water Produced 0.00% -8.51% % These metrics can be plotted over time to provide a better picture of trends. Figure 3-1 Corporate Balanced Scorecard Water & Wastewater Operations (Net$) $10,000,000 $9,000,000 $8,000,000 $7,000,000 $6,000,000 $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 $0 Water Operations (Net $) Wastewater Operations (Net $) 2008 Actual 2009 Actual 2010 Actual 2010 Target GHD City of Barrie AM Plan Appendix A: Environmental 14

20 Figure 3-2 Corporate Balanced Scorecard Water: Total # of Systems Adverse Number Water - Total # of Systems Adverse 2008 Actual 2009 Actual 2010 Actual 2010 Target Figure 3-3 Corporate Balanced Scorecard Residential Waste Diversion Rate (%) GHD City of Barrie AM Plan Appendix A: Environmental 15

21 Figure 3-4 Corporate Balanced Scorecard % of Unbilled Water to Water Produced Percentage % of Unbilled Water to Water Produced 0% -2% -4% -6% -8% -10% -12% -14% 2008 Actual 2009 Actual 2010 Actual 2010 Target 3.2 Provincial Municipal Performance Measures Effective for the 2000 fiscal year, the Provincial Ministry of Municipal Affairs and Housing implemented a mandatory Municipal Performance Measurement Program (MPMP) for all Ontario municipalities. This program requires municipalities to provide information on how the municipality conducted business and provided services in the previous year by September 30, based on key factors and indicators. Some of these measures can be compared between municipalities and serve as benchmarks for local governments to strive to deliver more efficient and effective services to their property owners and residents. Both effectiveness and efficiency measures are needed to properly assess service delivery. Without effectiveness measures, the least cost form of service delivery would be perceived as optimal because it would yield the lowest cost per unit of delivery. With effectiveness measures, other factors are evaluated, such as how well services meet municipal service goals and the expectations of the public. The MPMP measures, objectives and indicators related to water and wastewater services are provided in Table 3-2 below. Table 3-2 MPMP Measures Environmental Measure Objective Type Indicator Drinking Water Drinking water treatment Drinking water distribution Efficient municipal water treatment services Efficient municipal water distribution services Efficiency Efficiency Operating costs for the treatment of drinking water per megalitre Operating costs for the distribution of drinking water per kilometre of water distribution pipe GHD City of Barrie AM Plan Appendix A: Environmental 16

22 Measure Objective Type Indicator Drinking water integrated system Efficient municipal water system (integrated system) Efficiency Operating costs for the treatment and distribution of drinking water per megalitre (integrated System) Boil water advisories Water is safe and meets local needs Effectiveness Weighted number of days when a boil water advisory issued by the Medical Officer of Health, applicable to a municipal water supply, was in effect Breaks in water mains Improve system reliability Effectiveness Number of water main breaks per 100 kilometres of water distribution pipe in a year Wastewater Wastewater collection Efficient municipal wastewater collection services Efficiency Operating costs for the collection of wastewater per kilometre of wastewater main Wastewater treatment & disposal Efficient municipal wastewater treatment and disposal services Efficiency Operating costs for the treatment and disposal of wastewater per megalitre Wastewater integrated system Efficient wastewater system (integrated system) Efficiency Operating costs for the collection, treatment and disposal of wastewater per megalitre (integrated system) Wastewater main backups Municipal sewage management practices prevent environmental and human health hazards Effectiveness Number of wastewater main backups per 100 kilometres of wastewater main in a year Wastewater bypasses treatment Municipal sewage management practices prevent environmental and human health hazards Effectiveness Percentage of wastewater estimated to have bypassed treatment Storm Water Urban storm water management and operations Efficient operation and expenditure of urban storm water systems Efficiency Operating costs for urban storm water management for the total km of urban drainage systems Rural storm water management and operations Efficient operation and expenditure of rural storm water systems Efficiency Operating costs for rural storm water management for the total km of urban drainage systems 3.3 OMBI Benchmarking The Ontario Municipal Benchmarking initiative (OMBI) is a collaboration of 15 Ontario municipalities that represent 9.3 million citizens or 73% of the population of Ontario. This initiative is led by the Chief Administrative Officers (CAOs) and City Managers in each participating municipality. OMBI is intended to foster a culture of service excellence in municipal government by creating new ways to measure, share GHD City of Barrie AM Plan Appendix A: Environmental 17

23 and compare performance statistics and allow experts in participating municipalities to share ideas on operational practices. The City of Barrie recently joined the OMBI initiative. The following performance measures are relevant to environmental services (MPMP measures are not repeated). Table 3-3 OMBI Performance Measures Water & Wastewater Services KPI No. KPI Type Measure Report Type WATR105 Community Impact # of Household Days with Mandatory Water Restrictions Publicly Reportable WATR115 Community Impact # of Household Days with Boil Water Advisories Publicly Reportable WATR120 Community Impact Average Age of Water Pipe Publicly Reportable WATR205 Service Level Kms of Distribution / Transmission Water Pipe (excluding service connections and hydrant supply leads) Publicly Reportable WATR210 Service Level Megalitres of Treated Water per 100,000 Population Publicly Reportable CAO Measure WATR212 Service Level Percentage of Water Utilized for Industrial, Commercial and Institutional Uses Publicly Reportable WATR215 Service Level Water use (Megalitres Distributed) per Household Publicly Reportable WATR220 Service Level Percentage of Households Serviced by Municipal Water Publicly Reportable WATR221 Service Level Average Occupancy Ratio = Serviced Population /Serviced Households Publicly Reportable WATR230 Service Level Non Revenue Water in Litres per Connection per Day WATR235 Service Level Non Revenue Water In Cubic Metres per km of Main per Day WATR240 Service Level Infrastructure Leakage Index (ILI) = (Current Annual Real Losses Unavoidable Annual Real Losses) WATR405 Customer Service Percentage of Compliance to Drinking Water Standards Publicly Reportable WATR415 Customer Service Number of Enquiries/Complaints on Water Outage, Low Pressure, Taste, Odour, Colour/Turbidy per 1,000 Households Publicly Reportable CAO Measure WWTR105 Community Impact Average Age of Wastewater Pipe Publicly Reportable WWTR205 Service Level Km of Wastewater Pipe (excluding connections) Publicly Reportable WWTR210 Service Level Megalitres of Treated Wastewater per 100,000 Population Publicly Reportable CAO Measure GHD City of Barrie AM Plan Appendix A: Environmental 18

24 Table 3-4 OMBI Performance Measures Waste Management KPI No. KPI Type Measure Report Type SWST105M Community Impact Total tones of residential solid waste diverted Publicly Reportable CAO Measure SWST115 Community Impact Total tones of multi-residential solid waste diverted Publicly Reportable SWST205 Service Level Tonnes of all material collected per household residential SWST220 Service Level Tonnes of all material disposed per household residential SWST235 Service Level Tonnes of solid waste diverted per household residential Publicly Reportable CAO Measure Publicly Reportable CAO Measure Publicly Reportable CAO Measure SWST311M Efficiency Operating costs for garbage collection per tonne residential Publicly Reportable CAO Measure SWST325M Efficiency Operating cost for solid waste disposal per tonne all streams Publicly Reportable CAO Measure SWST330M Efficiency Operating cost for solid waste diversion per tonne residential Publicly Reportable CAO Measure SWST405M Customer Service Number of solid waste complaints per 1,000 households (per year) CAO Measure SWST901M Community Impact Total number of solid waste management facilities owned by the Municipality with an MOE Certificate of Approval. Publicly Reportable SWST902M Community Impact Number of days per year when an MOE compliance order for remediation concerning an air or groundwater standard was in effect for a Municipality owned solid waste management facility SWST903M Efficiency Solid waste cost per tonne all streams Publicly Reportable GHD City of Barrie AM Plan Appendix A: Environmental 19

25 4. Growth & Demand The City of Barrie expects to enter a period growth over the coming years with the addition of annexed lands to the south of the City and new employment lands coupled with a prioritized expansion of transit options. This section documents how the City of Barrie is working towards understanding and preparing for this coming period of growth. This includes: Future Levels of Service Corporate References and Studies Projected Future Demand Factors Influencing Demand Projected Growth and Demand on Services Impact of Changes in Demand of Asset Utilization. 4.1 Future Levels of Service Future demand forecasts are essential if the future impact on existing assets is to be appreciated. An understanding of future levels of service develops a foundation to base the need for future investment. Changes to current levels of service need to be identified, and considered and approved by City Council before they are implemented. This business process is described in more detail within the parent document which outlines the corporate asset management policy and framework for the City of Barrie. The discussion with the City Council should be a balanced trade-off discussion between: Levels of service The cost of that service, customers willingness to pay and the budgets necessary to meet the service levels The inherent risk profile in the infrastructure program related to delivering the agreed level of service and the budget provided. Water and Wastewater Assets It is anticipated that future levels of service necessitated by growth within the City can be adequately met due to the construction of the new surface water treatment plant (due for completion in 2011) and the recent expansion of the existing WPCC facility. These capital improvements, coupled with existing water and wastewater infrastructure, will meet foreseeable future levels of service within the City of Barrie. Other Environmental Assets At this point in time, no future levels of service are anticipated for other environmental assets such as stormwater facilities and solid waste facilities. Future levels of services for environmental assets will be continually assessed. The quantity of levels of service to be provided will however, increase with the growth of the City. GHD City of Barrie AM Plan Appendix A: Environmental 20

26 4.2 Corporate References and City Studies; Future Demand for Environmental Services The future demand for environmental services has been defined in various studies commissioned by the City of Barrie over the last 20 years. This is particularly evident for drainage and sanitary assets. Studies and master plans completed by the City relevant to environmental services are as follows. Barrie South Sanitary Master Plan, prepared by Aecom Canada Ltd, August 2009; Update of the Existing City of Barrie Water Model Study Report. Aecom Canada Ltd Industrial Sanitary Drainage Area Master Plan, prepared by Skelton Brumwell and Associates Inc, revised February 2006; Kidd s Creek Master Drainage Plan Class Environmental Assessment, prepared by the City of Barrie Engineering Department, January 2005; Master Drainage Plan, Municipal Class Environmental Assessments, Dyments Creek, prepared by Jones Consulting Group Ltd, June 2004; Sophia Creek Watershed Master Drainage Plan, prepared by Skelton Brumwell and Associates Inc, February 2002; Hotchkiss Creek Master Drainage Plan Update Environmental Assessment Document, prepared by RG Robinson and Associates, April 2000; Lovers Creek and Hewitts Creek Master Watershed Plans, prepared by Cumming Cockburn Limited, December 1995; North Sanitary Drainage Area Master Plan, prepared by Skelton Brumwell and Associates Inc, April 1995; Lakeshore Sanitary Drainage Plan Master Plan, prepared by Skelton Brumwell and Associates Inc, February 1990; and Cundles Sanitary Drainage Area Master Plan, prepared by Skelton Brumwell and Associates Inc, February South Sanitary Drainage Area The most recent of these plans, prepared by Aecom in August 2009 outlines recommended alternatives for an implementation strategy for the South Sanitary Drainage Area. These recommendations should be considered in future growth plans of the City. The recommendations are as follows. Alternative 2C (highest priority) Implement the Essa Road Sewershed source control investigation study at an estimated cost of approximately $200,000 Alternative 2A Implement Essa Road Sewershed conveyance improvements at an estimated cost of $1,430,000 Alternative 3 Implement Paddison Farms Sewershed conveyance improvements at an estimated implementation cost of $1,420,000 GHD City of Barrie AM Plan Appendix A: Environmental 21

27 Hydraulic Model Update Study Recommendations The City Hydraulic Model Update Study Report, completed by Aecom, outlines many recommendations, some of which relate to future growth and demand of water assets. Recommendations/conclusions relating to growth and demand from this study are as follows. Several areas are being considered for future commercial land use. Fire flow requirements cannot be met with the current infrastructure demands. It is recommended that infrastructure upgrades be planned to overcome these problems. If pressure zones are treated as independent zones, with no interaction, there is a deficit of storage in zones 3S and 2N. It is recommended the City collect power monitoring data for facilities to be able to update and use the energy model successfully within InfoWater. This could assist in forecasting energy usage of the future growth of the City. Fire flow analysis shows deficiencies in meeting fire flow requirements with respect to the City s fire flow criteria. Several areas exhibit insufficient capacity to carry fire flows due to small diameter mains, dead end mains and high elevation areas. Local systems should be reviewed and augmented appropriately. Intensification Study In April 2009, the City of Barrie s Planning Services Department completed an intensification study as part of the City s overall growth management plan. The intent of the study was to define: A long term vision and establish specific principles to guide future decisions on development; Asses the City s capacity to meet the intensification targets established through the Provincial growth plan; and To recommend policies and performance standards for the Official Plan and Zoning By-law. With regards to the environmental services, the intensification study has made the following statements in terms of growth and demand specific to sanitary, water and storm assets. Only those works identified in the 2011 capital program have been included in the forecasts in this AM Plan. 4.3 Projected Future Demand For the purpose of this AM Plan it has been assumed the growth of Environmental Services asset portfolio is commensurate with the City s population growth, with the exception of water and wastewater facilities, which are assumed to be at build out once the work in progress is complete. Which requirements and recommendations from the afore referenced plans have the best value for meeting future levels of service is somewhat ambiguous due to the age of some documents. As such, specific future demands for the environmental services asset portfolio should be addressed in an updated master plan and study. Near term capital improvements to cater for future demands are discussed below with assumptions applying to all assets relating to: Water linear; Wastewater facilities; GHD City of Barrie AM Plan Appendix A: Environmental 22

28 Wastewater linear; Storm drainage facilities; Storm drainage linear; and Solid waste facilities. Sanitary: The City Water Pollution Control Centre (WPCC) has been planned and designed to accommodate a maximum population of 175,000. To accommodate additional population, the WPCC will likely require membrane filter technology at the outlet to meet maximum daily phosphorous limits of 3.1 tonnes recently imposed by the Ministry of the Environment. Alternatively, further reduction in per capita water used throughout the City would need to be realized, however, the City of Barrie already has a low per capita water consumption compared to other municipalities. Additional modelling would be needed to identify required local sewer improvements specific to each intensification study. Water: The City water system has also been planned and designed on the basis of a maximum population of 160,000. Additional population will require expansion of the Surface Water Treatment Facility. The City s water model needs to be run to identify required local water main improvements specific to each intensification area. Storm: There are several intensification areas that are regulated by the Lake Simcoe Region Conservation Authority as well as the Nottawasaga Valley Conservation Authority that will limit developable area and may limit required servicing works. Storm drainage would require local sewer system upgrades associated with additional road surface widths. The increase in asphalt surface would increase the need for additional storm water quality measures including pond retro fits and larger oil grit separator structures. Intensification would require storm water runoff controls that limit peak flows to existing conditions. Yonge Street Nodes and Corridors Sanitary: As the trunk sanitary sewers are not located along the corridor or intersecting arterial roads, local sanitary sewers that convey the flows, from the corridor to the trunk sewer, will likely require upgrades in some areas. Water: Additional watermain works will likely be required for system looping. Specifically a watermain upgrade on Yonge between Big Bay Point Road and Little Avenue is anticipated. Essa Road Nodes and Corridors Sanitary: The existing industrial trunk sanitary sewers will be reaching the end of their service life and will be requiring replacement along with capacity upgrades to convey additional flows from intensification. Local sewers do not exist south of Ferndale Drive, and would be required to accommodate intensification of the corridor. Water: Additional watermain works will likely be required for system looping. GHD City of Barrie AM Plan Appendix A: Environmental 23

29 Dunlop Street Nodes and Corridors Sanitary: The corridor area west of Ferndale Drive has limited servicing. Additional local sewers would have to be constructed along the Dunlop Street right of way. The industrial trunk sewer would also require upgrade in areas due to lack of capacity. Bayfield Street Nodes and Corridors Sanitary: The sanitary sewer should be adequate but this needs to be confirmed through modeling. Duckworth/Codrington Street Nodes and Corridors Sanitary: The existing sewers along the corridor will be reaching the end of their service life and will be requiring replacement along with capacity upgrades to convey additional flows from intensification. 4.4 Factors Influencing Demand Multiple interconnected factors will continue to influence demand for assets within the Environmental Services portfolio. These factors are outlined below in Table 4-1: Table 4-1 Factors Affecting Future Demand Factor Development and population growth Weather patterns and global climate change Consumer preference Legislation Discussion Development and population growth are significant factors influencing future water demand for the City of Barrie The City of Barrie has identified eight key elements for focus in its Strategic Plan. This includes directing and managing economic development for attracting, promoting and engaging industry for the purpose of establishing the City as a centre for excellence in innovation and entrepreneurship. The City has also identified the management of this approaching growth period as priority. This includes the allocation and planning of employment and annexed lands whereby growth will be within these designated growth areas. Weather patterns influence the demand for services within the City of Barrie. The variation in monthly demand for several assets within the Environmental Services portfolio can be attributed to the natural cyclical seasonal variation and does not impact long term demand. However, long term cyclical variations, such as El Nino and enhanced human influenced global climate change, can influence air temperatures and have the potential to influence the resulting long term future demand for assets. Consumer preference can influence demand is linked to user attitudes and behaviours. Understanding consumer preference is critical to understanding the potential for which demand management technics can be used to influence consumers and subsequently control future demand. This includes sustainable development which strives to foster and support a wide range of solutions to meet evolving community needs. The preference of customers within the City of Barrie has been examined via a citizen satisfaction report which strives to represent customer opinions against a scale of priority. Many assets within the Environmental Services portfolio are regarded by citizens as a generally expected part of their lifestyle. Legislation and policy changes, perhaps as far reaching one day as to affect building codes to restrict water usage of appliances, can have both a direct and indirect influence on the future demand for the City of Barrie s Environmental Services asset portfolio. Volumetric user charges GHD City of Barrie AM Plan Appendix A: Environmental 24

30 Factor Technology change and usage efficiency Network and operational efficiency Discussion and tax incentives can also influence demand through the pricing signal it sends to primary customers. Technology changes increasing efficiency can result in the obsolescence or substitution of fixed assets. This can influence future residential, industrial and commercial demand. Software can enable structured network analysis and renewal prioritization against specified criteria such as levels of services and demand divers to ensure the City continues to meet ongoing asset needs. Real time monitoring and control can used to control capacity, which can increase infrastructure asset life and yield maximum economic benefits for meeting short term changes in demand. Business improvement initiatives such as performance monitoring, leakage identification and repair and registered metering can be expected to result in a reduction of asset demand for the City. The adoption of genetic algorithms and heuristic modelling techniques can yield greater network efficiencies and can increase capacity to meet the short term needs of a growing community. 4.5 Projected Growth and Demand on Services Development and population forecasts along with future demand projects for the City of Barrie are currently under study for the upcoming Master Plan. Population growth along with industrial and commercial growth and other growth forecasts or projections for existing urban areas, designated growth areas and rural regions within the City of Barrie and annexed lands will be included in the next set of asset management plans. It is recommended that an understanding of all users, especially including those which consume services at a higher rate than others, be projected or the City such that demand on services can be planned for and met adequately. It is important to note that residential demand may fall from current consumption should the City implement demand management plans, usage efficiency improvement programs or increase the density of residential housing development within growth areas. An understanding of regional, provincial and national demand is also suggested to understand alignments and variances between the City of Barrie growth forecasts and Statistics Canada forecasts to ensure confidence in any projected estimations. 4.6 Impact of Changes in Demand of Asset Utilization There is expected to be minimal material impacts to demand within this period covered by this AMP due to the nature of supply in services generated by the City of Barrie s Environmental Services asset portfolio. Demand and demand impacts will be met by sufficient capacity provided by the new surface water treatment plant (currently in testing phase with first water expected to be distributed before end of year end, 2011) while the continued development of existing and growth areas can be expected to be serviced through capacity in existing infrastructure assets. GHD City of Barrie AM Plan Appendix A: Environmental 25

31 5. Lifecycle Analysis This section of the AMP describes the Environmental Services infrastructure assets for which the City of Barrie is responsible. Information is provided about the maintenance plan, renewal and replacement plan and creation/acquisition/augmentation plan works. This includes Estimated Remaining Life Maximum Potential Life Asset Consumption Estimates Assigned Consequence of Failure Values and Asset Redundancies. 5.1 Estimated Remaining Life The imminent failure mode for an asset is defined as the failure mode with the lowest estimated remaining life. Asset remaining life was estimated using various techniques, depending on the asset type, as described below, however, the dominate strategy is physical mortality of the asset only (maximum potential life). Water and Wastewater Facility Assets For the majority of facilities, the remaining life of asset components was determined based on the estimated maximum potential life, the year installed and the calculated age. Comparing the calculated age with the estimated maximum potential life for the asset component provides a proxy of the condition that the assets may be in. The maximum potential lives are provided in Section 5.2. For the water pumping stations and wells, the remaining life was based on the probability of failure, as estimated by City staff at the AM Plan workshop. Linear Wastewater (Sewer) Mains The method for assessing pipe condition ratings, which assists in determine remaining life is as follows: 1. Determine Material 2. Determine the age of construction for the pipe section 3. With this information apply the following assessment (rankings out of 5) GHD City of Barrie AM Plan Appendix A: Environmental 26

32 Table 5-1 City of Barrie Age/Rating Ranking Material 1 Material Age/Rating CONC and older Material Rating Table 5-2 City of Barrie Age/Rating Ranking Material 2 Material Age/Rating PVC and older Material Rating Table 5-3 City of Barrie Age/Rating Ranking Material 3 Material Age/Rating CSP and older Material Rating From the CCTV video data determine the defect severity this rating is assessed in the video process. The defect severity is rated 1-5 (5 being the worst). From the CCTV video data determine the defect density this rating is assessed in the video process. The defect severity is rated 1-5 (5 being the worst). With these three values apply the following formula to determine the condition rating: Condition Rating = Age Material Rating + Defect Severity + Defect Density 3 Effective Life Consumed was calculated as -0.05CR^ CR 0.5, where CR is the Condition Rating determined using the above formula (this is a best fit equation for a deterioration curve (reference NRC MIIP Report: The State of Canadian Sewers Analysis of Asset Inventory and Condition, 2006). See figure below. GHD City of Barrie AM Plan Appendix A: Environmental 27

33 Figure 5-1 Sewer Deterioration Curve y = -0.05x x Series1 Poly. (Series1) Note that the MPL s for storm and sanitary sewers were modified from a generic 85 years to reflect the material type (as recommended in the above listed document). Linear Water For linear water (watermains), the remaining life was determined based on a Maximum Potential Life of 85 years, modified by: Year Installed and Age of Pipe: The age of pipes was calculated from the installation dates of the pipes. This data, when combined with the estimated maximum potential life (85 years), gives an indication of the condition that the pipes may be in. Break History: The history of main breaks can be a predictor of future breaks or other failures. The break history data was provided by City and used to estimate whether the expected physical effective lives of the pipes should be reduced, according to the following table. For example, if a watermain has a maximum potential life of 85 years, is 50 years old with 2 breaks within its history, the estimated remaining life is calculated as follows. Table 5-4 No. of Previous Breaks (85-50) x 0.5 = 17.5 years Watermain Break Life Reduction Factor Effective Life Reduction Factor None >2 0.2 GHD City of Barrie AM Plan Appendix A: Environmental 28

34 5.2 Maximum Potential Life (MPL) The MPL for environmental assets was discussed at the AM Plan workshops held with the City s maintenance and operational staff. Due to lack of data on assets to determine the MPL, MPL has been derived from the age or condition of the asset for all assets in the environmental portfolio. The MPL for environmental services assets are summarised below. Table 5-5 Environmental Assets MPL Waste Management Facilities Level 1 Level 2 Level 3 Level 4 MPL Waste Mgmt Collection Bins / Storage Bulk Hazardous Liquid Waste Tanks 10 Waste Mgmt Collection Bins / Storage Metal Roll Off Bins / Containers 10 Waste Mgmt Collection Bins / Storage Waste Collection Bins 5 Waste Mgmt Disposal Equipment Laboratory Equipment / Samplers 5 Waste Mgmt Disposal Equipment Radios 10 Waste Mgmt Disposal Erosion Protection Fill Material & Vegetation 20 Waste Mgmt Disposal Liner & Leachate U/D System Gallery & Leachate Collection System 20 Waste Mgmt Disposal Liner & Leachate U/D System Geosythinc Liner 100 Waste Mgmt Disposal Pressure Washer System Pressure Washer System 10 Waste Mgmt Disposal Scale System Scale System 10 Waste Mgmt Disposal Security System Security System 10 Waste Mgmt Disposal Traffic Control System Traffic Control System 5 Waste Mgmt Disposal Landfill Wells Gas Observation Well 50 Waste Mgmt Disposal Landfill Wells Groundwater Observation Well 50 Waste Mgmt Disposal Landfill Wells Leachate Gallery Investigation Well 50 Waste Mgmt Disposal Landfill Wells Leachate Observation Well 50 Waste Mgmt Disposal Landfill Wells Leachate Purge Well 50 Waste Mgmt Resource Recovery Composting Pad 20 Waste Mgmt Resource Recovery Composting Irrigation 10 Table 5-6 Environmental Assets MPL Storm Drainage Facilities Level 1 Level 2 Level 3 Level 4 MPL Storm Facilities Mechanical Devices 40 Storm Facilities Natural Ponds 9999 Storm Facilities Storm Detention Ponds 40 GHD City of Barrie AM Plan Appendix A: Environmental 29

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

City of Barrie. Corporate Asset Management Plan. November 2011 Final

City of Barrie. Corporate Asset Management Plan. November 2011 Final City of Barrie Corporate Asset Management Plan November 2011 Final Contents 1. Introduction 5 1.1 Corporate Asset Status Report 5 1.2 What is an Asset Management Plan 5 1.3 Purpose of this Asset Management

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Aquatera 2015/16 Business Plan Highlights

Aquatera 2015/16 Business Plan Highlights Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality

More information

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate 2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February

More information

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.

More information

2015-18 Department Business Plan. Utilities

2015-18 Department Business Plan. Utilities 2015-18 Department Business Plan Utilities Updated June 2016 I am pleased to introduce Utilities 2015-18 Department Business Plan. The goals capture four main areas where Utilities will contribute to making

More information

City of Barrie. Corporate Asset Management Strategy Asset Management Plan Appendix E: Fleet. November 2011 Final

City of Barrie. Corporate Asset Management Strategy Asset Management Plan Appendix E: Fleet. November 2011 Final City of Barrie Corporate Asset Management Strategy Asset Management Plan Appendix E: Fleet Note that this appendix is part of the Whole of Government Asset Management Plan for the City of Barrie November

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

Township of Terrace Bay Drinking Water System Financial Plan

Township of Terrace Bay Drinking Water System Financial Plan Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance

More information

2015-18 Department Business Plan. Utilities

2015-18 Department Business Plan. Utilities 2015-18 Department Business Plan Utilities I am pleased to introduce Utilities 2015-18 Department Business Plan. The goals capture four main areas where Utilities will contribute to making Strathcona County

More information

Asset Management Plan Public Works and Social Housing Infrastructure City of Brantford, Ontario

Asset Management Plan Public Works and Social Housing Infrastructure City of Brantford, Ontario 2013 Asset Management Plan Asset Management Plan City of Brantford, Ontario November 29, 2013 Prepared by: Capital Planning Facilities and Asset Management, Public Works Corporation of the City of Brantford

More information

Town of Mattawa Asset Management Plan. December 2013

Town of Mattawa Asset Management Plan. December 2013 Town of Mattawa Asset Management Plan December 2013 2 P a g e Town of Mattawa Asset Management Plan Executive Summary This Asset Management Plan is intended to describe the infrastructure owned, operated,

More information

ASSET MANAGEMENT PLAN

ASSET MANAGEMENT PLAN ASSET MANAGEMENT PLAN REPORT Prepared for: Township of South Frontenac December 2013 RVA 132914 This report is protected by copyright and was prepared by R.V. Anderson Associates Limited for the account

More information

Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07

Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07 Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07 TABLE OF CONTENTS TABLE OF Contents... 2 1. INTRODUCTION... 4 1.1 MUNICIPAL DRINKING WATER LICENSING PROGRAM... 4 1.2

More information

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,

More information

Toronto s Wet Weather Flow Master Plan

Toronto s Wet Weather Flow Master Plan Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...

More information

County of Oxford Asset Management Plan 2014. 1.0 Executive Summary... 2. 2.0 Introduction... 7. 3.0 Purpose and Methodology... 10

County of Oxford Asset Management Plan 2014. 1.0 Executive Summary... 2. 2.0 Introduction... 7. 3.0 Purpose and Methodology... 10 Asset Management Plan AUGUST 2014 County of Oxford Asset Management Plan 2014 Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 7 3.0 Purpose and Methodology... 10 4.0 State of Infrastructure...

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Table of Contents Executive Summary... 5 Asset Management Plan... 6 Introduction... 6 Financial Overview... 10 Conclusion... 10 Attached Appendices... 10 Asset Management Strategy...

More information

THE CORPORATION OF THE CITY OF COURTENAY STAFF REPORT

THE CORPORATION OF THE CITY OF COURTENAY STAFF REPORT THE CORPORATION OF THE CITY OF COURTENAY STAFF REPORT To: Council File No.: 1705-20 / 1830-05 From: Chief Administrative Officer Date: January 21, 2015 Subject: PURPOSE: The purpose of this report is to

More information

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation 2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation Version 1 Table of Contents Executive Summary... 5 1.1 Background... 5 1.2 State of Local Infrastructure... 5 1.3 Desired Levels

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT April 1, 2015 B. M. ROSS AND ASSOCIATES

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s

More information

Asset Management Plan

Asset Management Plan Corporation of the Town of Innisfil Asset Management Plan Prepared by: AECOM 55 Cedar Pointe Drive, Suite 620 705 721 9222 tel Barrie, ON, Canada L4N 5R7 705 734 0764 fax www.aecom.com Project Number:

More information

NAPA COUNTY WATERSHED SYMPOSIUM

NAPA COUNTY WATERSHED SYMPOSIUM Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Introduction Community facilities play an important role in ensuring a quality standard of living for Township residents, as well as impacting the location

More information

CITY OF GREATER SUDBURY. Municipal Roads, Structures and Related Infrastructure. Final Report. July 10, 2012

CITY OF GREATER SUDBURY. Municipal Roads, Structures and Related Infrastructure. Final Report. July 10, 2012 CITY OF GREATER SUDBURY Financial Planning for Municipal Roads, Structures and Related Infrastructure Final Report July 10, 2012 Financial Planning for Roads Table of Contents I. Financial Planning for

More information

How to Implement Asset Management

How to Implement Asset Management How to Implement Asset Management Without Breaking the Bank Pat Miller, Director, Utility Services, Sun Peaks Utilities Co., Ltd. & Wade Turner, Community Infrastructure Consultant, Urban Systems Ltd.

More information

Operations, Maintenance and Monitoring Branch Status Update

Operations, Maintenance and Monitoring Branch Status Update Operations, Maintenance and Monitoring Branch Status Update Presentation to Committee of the Whole Brett Bloxam Director, Operations, Maintenance and Monitoring March 20, 2014 #5405920 Agenda Overview

More information

Clear Water Projects in Cooksville Creek Watershed

Clear Water Projects in Cooksville Creek Watershed Clear Water Projects in Cooksville Creek Watershed Armstrong Manufacturing Inc. What is a Watershed? No matter where you are, you are in a watershed. A watershed is the area of land that catches rain and

More information

Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers

Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers Andy Bell Infrastructure Engineer AECOM Canada Inc Vancouver, CANADA Andrew.Bell@aecom.com Introduction The Ministry of Environment

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

2014 FINAL BUDGET TOWN OF AURORA. I. Simanovskis, Director of Infrastructure & Environmental Services

2014 FINAL BUDGET TOWN OF AURORA. I. Simanovskis, Director of Infrastructure & Environmental Services TOWN OF AURORA GENERAL COMMITTEE REPORT No. IES14-007 SUBJECT: FROM: Water, Wastewater and Stormwater Budget I. Simanovskis, Director of Infrastructure & Environmental Services DATE: January 20, 2014 RECOMMENDATIONS

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

The Corporation of the Municipality of Callander. Asset Management Plan

The Corporation of the Municipality of Callander. Asset Management Plan The Corporation of the Municipality of Callander Asset Management Plan April 2014 1 Index A) Executive Summary P. 3 B) Introduction P. 4 C) State of Local Infrastructure P. 7 D) Expected Levels of Service

More information

Environmental Management Services Business Plan - 2007/8

Environmental Management Services Business Plan - 2007/8 Environmental Management Services Business Plan - 2007/8 H1 Mission: To deliver environmental management services that protect natural systems and continually improve the quality of life for the community.

More information

ENGINEERING & PUBLIC WORKS ASSET MANAGEMENT PLAN

ENGINEERING & PUBLIC WORKS ASSET MANAGEMENT PLAN ENGINEERING & PUBLIC WORKS ASSET MANAGEMENT PLAN NOVEMBER 2010 TABLE OF CONTENTS TABLE OF CONTENTS 1. Introduction...4 2. Mission Statements and Goals...5 3. How does the Asset Management Plan Support

More information

Re: Proposal for Innovative Options for Providing Stormwater Infrastructure and Services

Re: Proposal for Innovative Options for Providing Stormwater Infrastructure and Services Adir Gupta, P.Eng., MBA Manager, Financial Policy - Corporate Finance City of Toronto 416-392-8071 agupta@toronto.ca Dear Mr. Gupta, Re: Proposal for Innovative Options for Providing Stormwater Infrastructure

More information

Chapter 2 Asset Management

Chapter 2 Asset Management Chapter 2 Asset Management Effectively Managing the City s Infrastructure Systems In 2013, the replacement value of the City of Portland s built infrastructure was estimated at $31.3 billion. 2 Providing,

More information

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located

More information

Summary: Introduction

Summary: Introduction Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with

More information

HOW DOES THIS SERVICE CONTRIBUTE TO THE QUALITY OF LIFE IN THE CITY OF LONDON?

HOW DOES THIS SERVICE CONTRIBUTE TO THE QUALITY OF LIFE IN THE CITY OF LONDON? Service: Program: 3.4. Wastewater Removal & Storm Water Management Environmental Services HOW DOES THIS SERVICE CONTRIBUTE TO THE QUALITY OF LIFE IN THE CITY OF LONDON? The desired population results in

More information

Asset Management Plan Final Report

Asset Management Plan Final Report AssetManagementPlan FinalReport DillonConsultingLimited 10FifthStreetSouth Chatham,ONN7M4V4 T:519-352-7802 F:519-354-2050 May,2014 www.dillon.ca EXECUTIVE SUMMARY Public infrastructure is central to our

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace

STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace City of Toronto Toronto & North York District Prepared For: Oxford Properties Group 130 Adelaide Street

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward.

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward. HALDIMAND COUNTY Report PW-GM-01-2014 of the General Manager of Public Works For Consideration by RE: 2014 Asset Management Plan OBJECTIVE: To present Council with an Asset Management Plan and recommended

More information

MBJ Environmental Programmes

MBJ Environmental Programmes MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Settlements Must Be Integrated with Nature

Settlements Must Be Integrated with Nature Settlements Must Be Integrated with Nature Why it Matters Besides reducing the impact of new development on land and vegetation, BC communities must also become more integrated with the natural world.

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

Tab 22 - Infrastructure, Development and Enterprise Services. Tab 23 - Building Services. Tab 24 - Engingeering Services. Tab 25 - Enterprise Services

Tab 22 - Infrastructure, Development and Enterprise Services. Tab 23 - Building Services. Tab 24 - Engingeering Services. Tab 25 - Enterprise Services Tab 22 - Infrastructure, Development and Enterprise Services Tab 23 - Building Services Tab 24 - Engingeering Services Tab 25 - Enterprise Services Tab 26 - Planning Services Tab 27- Solid Waste Resources

More information

City of Fort Collins Water Supply and Demand Management Policy

City of Fort Collins Water Supply and Demand Management Policy City of Fort Collins Water Supply and Demand Management Policy The City of Fort Collins Water Supply and Demand Management Policy provides a foundational framework for water supply and demand management

More information

Water Security Agency. Plan for 2015-16. saskatchewan.ca

Water Security Agency. Plan for 2015-16. saskatchewan.ca Water Security Agency Plan for 2015-16 saskatchewan.ca Statement from the Minister I am pleased to present the Water Security Agency s Plan for 2015-16. The Honourable Scott Moe Minister Responsible for

More information

Adaptation to a Changing Climate

Adaptation to a Changing Climate Adaptation to a Changing Climate City Infrastructure Preparedness David MacLeod City of Toronto Environment Office March 3, 2011 WHAT IS CITY INFRASTRUCTURE? Physical (Hard) Infrastructure Buildings Municipal

More information

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies: ASSET MANAGEMENT STRATEGY BRIDGES AND LARGE CULVERTS (>3m Span) Inventory Anticipated Asset Life Cycle Fifteen (15) bridges and eleven (11) large culverts with a span greater than 3m (refer to PSAB 3150

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

This plan forms one part of a suite of Asset Management Plans that have been developed:

This plan forms one part of a suite of Asset Management Plans that have been developed: E: D1: Levee Footpath Bank Asset Management Plan March July 2014 2015 This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpaths

More information

action plan water for life water for life action plan 1

action plan water for life water for life action plan 1 action plan water for life water for life action plan 1 ISBN 978-0-7785-7672-3 November 2009 2 water for life action plan TABLE OF CONTENTS Introduction 3 Alberta Water Council renewal recommendations

More information

COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE

COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE MODULE 4 EVALUATE WATER SYSTEM MANAGEMENT, OPERATION AND MAINTENANCE PRACTICES Source Protection Emergency Response Training Treatment Multiple

More information

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or

More information

Iowa Smart Planning. Legislative Guide March 2011

Iowa Smart Planning. Legislative Guide March 2011 Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The

More information

Stormwater Credit Open House Q&A

Stormwater Credit Open House Q&A Stormwater Credit Open House Q&A Stormwater Charge Project GENERAL INFORMATION AND APPLICATION PROCESS FOR STORMWATER CREDITS Question: What is the response time for an application - 30 business days or

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

ATTACHMENT 1. 2012 Annual Report. Water & Wastewater Treatment Branch

ATTACHMENT 1. 2012 Annual Report. Water & Wastewater Treatment Branch ATTACHMENT 1 2012 Annual Report Water & Wastewater Treatment Branch The Water Treatment Plant is responsible for the operation and maintenance of the City s Water Treatment Plant, Raw Water Intake and

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan This environmental management plan outlines Red Bus Services objectives and strategies for protecting the environment. This plan sets out how Red Bus Services intends to comply

More information

Village of Newbury Asset Management Plan

Village of Newbury Asset Management Plan Village of Newbury Asset Management Plan 7 Candle Crescent, Kitchener Ontario, N2P 2K7 www.4roads.ca 7 Candle Crescent, Kitchener Ontario, N2P 2K7 May 14, 2014 Village of Newbury 22910 Hagerty Road, PO

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014

REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014 REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014 City of Waterloo Asset Management Plan EXECUTIVE SUMMARY The City of Waterloo has prepared this asset management plan in accordance with the Ministry

More information

f) That expenditures associated with employee insurance & benefits be increased by $319,000;

f) That expenditures associated with employee insurance & benefits be increased by $319,000; 2014 BUSINESS PLAN with GC amendments included 1. That the 2014 tax-supported base operating budget for municipal operations, with total gross expenditures of $179.2 million and a net property tax levy

More information

2006 Standard Application Processing Time. 10 months. 14 months

2006 Standard Application Processing Time. 10 months. 14 months Air and Radiation Management Administration General Permit to Construct - without expanded public review Air Quality Permit to Construct - with expanded public review but limited public interest 11 months

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

PE9.4 Corrected Report

PE9.4 Corrected Report PE9.4 Corrected Report STAFF REPORT ACTION REQUIRED Toronto s 2013 Greenhouse Gas Inventory Date: December 17, 2015 To: From: Wards: Reference Number: Parks and Environment Committee Chief Corporate Officer

More information

COMPREHENSIVE ASSET MANAGEMENT STRATEGY

COMPREHENSIVE ASSET MANAGEMENT STRATEGY COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY

More information

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment WATER AND SEWER UTILITY OPERATION AND MAINTENANCE Although sewage systems the operation and maintenance of public utilities are not considered themselves are not a chronic sources of stormwater pollution,

More information

2013-2015. Milwaukee Metropolitan Sewerage District STRATEGIC PLAN

2013-2015. Milwaukee Metropolitan Sewerage District STRATEGIC PLAN Milwaukee Metropolitan Sewerage District STRATEGIC PLAN 2013-2015 The Strategic Plan identifies the District s strengths, weaknesses, opportunities, and threats, and provides direction and focus to help

More information

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike

More information

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies SECTION A: Climate Change 1. Ensure that climate change impacts are addressed in long range plans and in the review

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

LONDON CORPORATE ASSET MANAGEMENT PLAN 2014

LONDON CORPORATE ASSET MANAGEMENT PLAN 2014 LONDON CORPORATE ASSET MANAGEMENT PLAN 2014 ACKNOWLEDGEMENT Acknowledgement The Corporate Asset Management office would like to acknowledge the efforts of the staff of the individual City of London Service

More information

Water Quality and Water Usage Surveys

Water Quality and Water Usage Surveys Appendix 1 Water Quality and Water Usage Surveys This appendix contains copies of the Water Quality Survey and the Lake Usage Survey that we used to complete the watershedbased community assessments. We

More information