Summary of Requirements for Contracted Work - Ontario Operations

Size: px
Start display at page:

Download "Summary of Requirements for Contracted Work - Ontario Operations"

Transcription

1 SECTION 2 MANAGING GROUP REQUIREMENTS: PMO GROUPS REVISIONS Rev # Description Approved By Issue Date 1 Development of all Contract Requirements Documents T. Hirschfeld June 13/2012 sections 2-4 Merged with Rev 5 to align to DM System versions T. Hirschfeld Oct 17/ Major revisions to this Section 2 document. It has now T. Hirschfeld Oct 17/2013 been aligned for all Ontario Operations PMO Groups. Revisions include updates to the majority of sections to gain this alignment, update to numbering scheme to align with the other sections Daily Reporting: updated manpower reporting requirement to at least one working shift prior to the start of shift Daily Reporting updated to include requirement for Contracting Party Reps to attend pre-shift line up meetings with Operations if that Plant / Mine has a current protocol to do so Post-Contract Documents updated to include Quality Assurance Plan template number Pre-Job Conferences: included verbiage to review any potential conflicts between unionized and nonunionized contract workers. T. Hirschfeld Jan 21/15 DM # v6 Page 1 of 6

2 Table of Contents 2. MANAGING GROUP REQUIREMENTS: PMO GROUPS SAFETY Applicable Standards Training Requirements Safety Plan Compliance Audits by Vale First Aid Contract-Specific Safety Plan Safety Plan Documentation HEALTH ENVIRONMENT QUALITY ASSURANCE SCOPE SCHEDULE CONTRACT MANAGEMENT Daily Reporting Weekly Reporting for On Site-Work Post-Contract Documents Pre-Job Conferences SITE OFFICES & TEMPORARY FACILITIES PERMITS AND PASSES DEFINITIONS... 6 DM # v6 Page 2 of 6

3 2. MANAGING GROUP REQUIREMENTS: PMO GROUPS 2.1 SAFETY Note: the Contracting Party is to review the following documents as applicable to the work and in conjunction with the associated contract documents: General Requirements for Ontario Operations Managing Group Requirements Contract-Specific Requirements Plant-Specific Requirements Note: all items below are in addition to the items specified in the other documents listed above. Also: for PMO Projects, the Vale Representative is the PMO Construction Coordinator in all cases Applicable Standards Training Requirements Safety Plan Compliance Audits by Vale The Vale Representative will complete a weekly audit of the compliance to the Contract-Specific Safety Plan (NAV-TP-0095). The audit report (NAV-TP-0023) will be forwarded to the Contracting Party, complete with all the related documentation. All noted deficiencies must be addressed immediately First Aid All Construction work sites shall include a First Aid kit and the poster entitled In case of Injury at work (form 82) all as described in the First Aid Requirements regulation Contract-Specific Safety Plan A Contract-Specific Safety Plan (NAV-TP-0095) must be submitted, including a schedule listing all of the planned safety activities such as of Construction PHR Reviews, Toolbox Meetings, Safety Meetings, Site Inspections & Audits, Mobile Equipment Pre-operational Inspections, and JHSC Joint Inspections etc. This is to be submitted in the standard format for Vale s Surface / Mines PMO Group projects. This must be posted onsite. DM # v6 Page 3 of 6

4 2.1.6 Safety Plan Documentation 2.2 HEALTH 2.3 ENVIRONMENT The Contracting Party must record all safety activities listed in the Contract-Specific Safety Plan (NAV-TP-0095), and maintain copies of these documents at the site office. During the execution of the Work, the Contracting Party shall submit Weekly Safety Compliance Reports (NAV-TP-0023) to the Vale Representative. These reports shall include the associated documentation to confirm the Contracting Party s compliance to the Contract-Specific Safety Plan activities. The report is to be submitted in the standard format for Vale s Surface / Mines PMO Group projects. No additional requirements see Section 1 General Requirements or Section 3 Contract Specific Requirements. 2.4 QUALITY ASSURANCE 2.5 SCOPE 2.6 SCHEDULE 2.7 CONTRACT MANAGEMENT Daily Reporting The Contracting Party shall contact the Vale Representative at least one working shift prior to the start of the shift (ideally, the previous calendar day) with the following information: Description of the daily activities Number of workers Duration of shift Description of the daily safety information provided to the workers Any potential issues, delays, safety concerns that have been identified Coordination requirements with Vale or other parties DM # v6 Page 4 of 6

5 Where required by Plant / Mine protocols, the Contracting Party s Representative is to attend the pre-shift line up meeting with Vale Operations. The Contracting Party shall submit the following documents to the Vale Representative, to the agreed-upon time & format: a) Any schedule revisions. b) Time and Material sheets for the previous shift, where appropriate. Time and Material sheets must be signed and a copy provided to the Vale Representative within 24 hours of the work being performed. The original Time and Material sheet must be attached to the associated invoice as confirmation. c) Written notification of any extra work identified during previous shift, complete with the estimated cost & schedule impacts. See Field Work Instruction in the Section 1 General Requirements document. d) Note: if there is a change in the manpower requirements and / or duration of the scheduled work for that day, the Vale Representative must be notified immediately Weekly Reporting for On Site-Work One or more representatives of the Contracting Party shall attend the Weekly Construction Review Meeting arranged by the Vale Representative. The Contracting Party shall submit the following documents to the Vale Representative weekly, by the agreed-upon day & time, and in the agreed-upon format: a) Weekly Safety Plan Compliance Audit (NAV-TP-0023) b) Follow-up from any related Incident / Injury Investigation Reports, if applicable c) New or Revised PHR s and Job Procedures, if applicable d) Total number of man-hours worked during the past week broken as per the Weekly Safety Plan Compliance Audit (NAV-TP-0023) e) Total number of man-hours worked to date on the contract f) Updated Schedule, showing work completed to date, details of work scheduled for the upcoming week, and milestone activities to end of the contract g) Description of the work completed in the previous week and planned work for the upcoming week. h) All required QA/QC reports, such as NDE reports, outstanding work inspections, and related project data. i) Estimated contract cost for the past week, and the total contract cost to date j) Forecasted costs for the next week and forecasted cost to completion of the contract DM # v6 Page 5 of 6

6 2.7.3 Post-Contract Documents The Contracting Party shall submit the following documents to the Vale Representative upon completion of the Work: a) Finalized Contract Specific Safety Plan Compliance Audit (NAV-TP-0023) b) Finalized Quality Assurance Checklist / Plan (NAV-TP-0168), with all back-up documents c) Total Man-hours worked on the contract on the Compliance Audit (NAV-TP-0023) d) As-built drawings e) Commissioning documents, where required f) All equipment manuals, reference documents, and technical reports associated with the Scope of Work g) Final Invoice, with a final Outstanding Claims Notice / Claims Waiver h) Contract Completion Certificate (NAV-TP-0195) i) Where applicable, Statutory Declaration, WSIB Clearance Certificate, Statement of Invoices (NAV-TP-0199), Deficiency List(NAV-TP-0185) Pre-Job Conferences For contracts involving greater than 5,000 total man-hours of labour, the Contracting Party shall hold a Pre-Job Conference ( Mark-up Meeting ) with representatives from the local Trades Unions applicable to the Work, to review the scope of work and the assignment by Trade. The Pre-Job Conference is to be held after award of contract, and prior to mobilizing to site. Representatives of all subcontractors must attend. The Vale Representative is to be invited. The Contracting Party shall document the outcomes of the Pre-Job Conference as per PMO standards, and distribute to all participants. In the event that non-unionized workers will be employed onsite for the contracted work review any potential conflicts between unionized and non-unionized workers with the Contracting Party. 2.8 SITE OFFICES & TEMPORARY FACILITIES 2.9 PERMITS AND PASSES 2.10 DEFINITIONS DM # v6 Page 6 of 6

EMS Example Example EMS Audit Procedure

EMS Example Example EMS Audit Procedure EMS Example Example EMS Audit Procedure EMS Audit Procedures must be developed and documented with goals which: Ensure that the procedures incorporated into the EMS are being followed; Determine if the

More information

ADMINISTRATIVE PROCEDURE

ADMINISTRATIVE PROCEDURE ADMINISTRATIVE PROCEDURE D1:2A Safety and Security Occupational Health and Safety Annual Inspection Page 1 of 2 Annual School Inspection Protocol Worker members of the Joint Health & Safety Committee are

More information

Measuring your capabilities in Workplace Safety Management

Measuring your capabilities in Workplace Safety Management Working with business Measuring your capabilities in Workplace Safety Management ACC Workplace Safety Management Practices Audit Standards Contents Section 1 Audit standards for ACC s Workplace Safety

More information

About injury management and staying at or returning to work

About injury management and staying at or returning to work About injury management and staying at or returning to work Returning to work after an injury is an essential part of rehabilitation and can help you improve the health and wellbeing of staff. It can also

More information

SECTION 2: Support to Employees HEALTH AND SAFETY POLICY: WORKPLACE SAFETY AND INSURANCE BOARD (WSIB)

SECTION 2: Support to Employees HEALTH AND SAFETY POLICY: WORKPLACE SAFETY AND INSURANCE BOARD (WSIB) Page 1 of 5 POLICY 1. Community Living Quinte West shall take all reasonable precautions to protect all employees from illness and injury. 2. The employer shall work cooperatively with employees, the bargaining

More information

SAMPLE using TEMPLATE 1

SAMPLE using TEMPLATE 1 SAMPLE using TEMPLATE 1 Title: 8.1 Inspections by Managers 8.2 Inspections by JHSC or HS Representative 8.3 Operator Pre-Use Inspections Approved by: John Idnc Location: all facilities and equipment Date

More information

Policy Number: 022 Injury Management and Return to Work

Policy Number: 022 Injury Management and Return to Work Policy Number: 022 Injury Management and Return to Work July 2015 Policy Details 1. Owner Manager, Business Operations 2. Compliance is required by Staff, contractors and volunteers 3. Approved by The

More information

Contractor Performance Report Scoring Guide

Contractor Performance Report Scoring Guide Report Main Roads Western Australia Table of Contents CONTRACTOR PERFORMANCE REPORT SCORING GUIDE... 3 1. APPLICATION... 3 2. REPORTING... 3 2.1 Objectives... 3 2.2 Frequency... 3 2.3 Responsibility...

More information

Contractor Safety Management

Contractor Safety Management 1.0 Introduction Memorial University will ensure that a diligent contractor management process is established. This procedure establishes requirements for contract administration and oversight of contractor

More information

Guide Document for Development of WHS Management Plans

Guide Document for Development of WHS Management Plans DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS

More information

AUDIT STANDARDS EFFECTIVE FROM 1 APRIL 2002 ACC 440

AUDIT STANDARDS EFFECTIVE FROM 1 APRIL 2002 ACC 440 AUDIT STANDARDS EFFECTIVE FROM 1 APRIL 2002 ACC 440 What s new? These are the ACC Partnership Programme audit standards effective from 1 April 2002. They replace the audit standards released by ACC in

More information

THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL

THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL OCTOBER, 2013 TABLE OF CONTENTS 1. CHECKLIST PAGE NO. 2. CHECKLIST DETAILS A. Design Path 3 B. Property Acquisition 6 C. Outside

More information

No - one single database for all modules

No - one single database for all modules Email: johnr@marksystemsusa.com General Questions How many different software products are required for a complete implementation? 1 Is support delivered through a single source, or does each product provide

More information

AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT CONSTRUCTION AUDIT PROGRAM

AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT CONSTRUCTION AUDIT PROGRAM GENERAL: Some of the Districts largest capital expenditures are from new construction, facility upgrades, and renovations. A single project can run into the millions of dollars, involving engineering,

More information

WORK HEALTH AND SAFETY

WORK HEALTH AND SAFETY WORK HEALTH AND SAFETY SCOPE POLICY Work Health and Safety System Work Health and Safety Objectives Roles and Responsibilities Executive Responsibilities Manager Responsibilities Worker Responsibilities

More information

FLOWCHART OF PROJECT EXECUTION

FLOWCHART OF PROJECT EXECUTION CHECKLIST FOR AUTOMATION PROJECT EXECUTION APPENDIX 1/1 FLOWCHART OF PROJECT EXECUTION kick-off execution termination plan Schedule Selection of supplier and subcontractor Procurement and deliveries Documentation

More information

SCOTLAND S COMMISSIONER FOR CHILDREN AND YOUNG PEOPLE STANDARD CONDITIONS OF CONTRACT FOR SERVICES

SCOTLAND S COMMISSIONER FOR CHILDREN AND YOUNG PEOPLE STANDARD CONDITIONS OF CONTRACT FOR SERVICES SCOTLAND S COMMISSIONER FOR CHILDREN AND YOUNG PEOPLE STANDARD CONDITIONS OF CONTRACT FOR SERVICES 1 1 Definitions In these conditions:- We means Scotland s Commissioner for Children and Young People,

More information

Constituent Union HSPBA Enhanced Disability Management Program: Overview

Constituent Union HSPBA Enhanced Disability Management Program: Overview Constituent Union HSPBA Enhanced Disability Management Program: Overview The EDMP is a collaborative holistic program between the employer, employee and union. All regular employees must be referred to

More information

Measuring your capabilities in Fleet Safety Management ACC Fleet Saver

Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety

More information

Contractor Management Program 2015

Contractor Management Program 2015 Contractor Management Program 2015 Print Date: 9/29/2015 Contractor Management Program Rev. 5.0 Page 1 of 35 TABLE OF CONTENTS 1.0 Introduction 3 1.1 Intent & Purpose 3 1.2 Scope & Applicability 3 1.3

More information

Oil Sands And In Situ Contractor Safety Regional General Manual

Oil Sands And In Situ Contractor Safety Regional General Manual Document Number: RGM10001 Revision Date: 2015/07/09 Revision: 2 Oil Sands And In Situ Contractor Safety Regional General Manual Business Process Manual General Facility: Regional Wood Buffalo FLOC: TABLE

More information

Honorable Mayor and Members of the City Council. Submitted by: David W. Hodgkins, Director, Human Resources

Honorable Mayor and Members of the City Council. Submitted by: David W. Hodgkins, Director, Human Resources Office of the City Manager November 9, 2010 To: From: Honorable Mayor and Members of the City Council Phil Kamlarz, City Manager Submitted by: David W. Hodgkins, Director, Human Resources Subject: Audit

More information

injury management practices

injury management practices audit guidelines injury management practices guidelines to understanding the audit standards for the injury management section of the acc partnership programme ACC2465 Printed September 2006 These guidelines

More information

CD 1/14/2015 10:17:00 AM LP 1/14/2015 10:37:00 AM V.1

CD 1/14/2015 10:17:00 AM LP 1/14/2015 10:37:00 AM V.1 CD 1/14/2015 10:17:00 AM Client Information Insured: Postal Address: Trading Addresses Full Description of Activities: FCA Client Classification: Waste Managememtn Resources Ltd 7-10 Penhall Road, London,

More information

& Repair Project. REQUEST FOR PROPOSAL (RFP) Well Abandonments

& Repair Project. REQUEST FOR PROPOSAL (RFP) Well Abandonments & Repair Project REQUEST FOR PROPOSAL (RFP) Well Abandonments PROPOSAL DATE February 15, 2016 PROPOSAL DUE DATE March 15, 2016, 12:00 pm INDEX 1.0 GENERAL INFORMATION & INSTRUCTIONS 2.0 SCOPE OF WORK 3.0

More information

004. Scope. This rule shall apply to all title insurers authorized to do business in Nebraska and all title insurance agents licensed in Nebraska.

004. Scope. This rule shall apply to all title insurers authorized to do business in Nebraska and all title insurance agents licensed in Nebraska. Title 210 - NEBRASKA DEPARTMENT OF INSURANCE Chapter 34 - TITLE INSURANCE 001. Authority. This rule is adopted and promulgated by the Director of Insurance of the State of Nebraska pursuant to the Title

More information

Premium Audit Guide. What is a premium audit? Types of audits. Payroll as a premium basis. Information requested at time of audit

Premium Audit Guide. What is a premium audit? Types of audits. Payroll as a premium basis. Information requested at time of audit Premium Audit Guide What is a premium audit? The purpose of a premium audit is to verify information necessary to calculate an insured s final premium for a specific policy term. When a policy is initially

More information

ACC AUDIT GUIDELINES - INJURY MANAGEMENT PRACTICES

ACC AUDIT GUIDELINES - INJURY MANAGEMENT PRACTICES ACC AUDIT GUIDELINES - INJURY MANAGEMENT PRACTICES Guidelines to understanding the audit standards for the Injury Management Section of the ACC Partnership Programme Please note: There is a separate guideline

More information

CONTRACTOR MANAGEMENT SYSTEM

CONTRACTOR MANAGEMENT SYSTEM CONTRACTOR MANAGEMENT SYSTEM NEW CONTRACTOR QUESTIONNAIRE Version 1 A Centre of Regional Excellence. December 2011 QUESTIONNAIRE TO BE RETURNED TO THE RISK MANAGEMENT SERVICE UNIT WITH SUPPORTING DOCUMENTATION

More information

County of Elgin Section: 9. Policy Number: 9.30. Code - A Date Approved: Oct. 1/87. Page 1 of 20 Date Last Revision: April 13/10

County of Elgin Section: 9. Policy Number: 9.30. Code - A Date Approved: Oct. 1/87. Page 1 of 20 Date Last Revision: April 13/10 Page 1 of 20 Date Last Revision: April 13/10 COMMITMENTS The County of Elgin and its employees have a mutual interest and shared responsibilities for the maintenance of regular attendance and effective

More information

Module 17: EMS Audits

Module 17: EMS Audits Module 17: EMS Audits Guidance...17-2 Figure 17-1: Linkages Among EMS Audits, Corrective Action and Management Reviews...17-5 Tools and Forms...17-7 Tool 17-1: EMS Auditing Worksheet...17-7 Tool 17-2:

More information

Business Continuity Policy and Business Continuity Management System

Business Continuity Policy and Business Continuity Management System Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain

More information

A Guide to the. Occupational Health and Safety Act

A Guide to the. Occupational Health and Safety Act A Guide to the Occupational Health and Safety Act A Guide to the Occupational Health and Safety Act March 2015 The Guide and other Guides, Statutes and Regulations relating to Occupational Health and

More information

City of Brantford Vendor Performance Scorecard for Consultant Services

City of Brantford Vendor Performance Scorecard for Consultant Services Vendor Performance Scorecard for Consultant Services Consultant Name Vendor Performance Scorecard, as per City of Brantford Purchasing Policy, Chapter 12 Contract Reference Number Contract Title / Description

More information

CONTRACTOR SAFETY MANAGEMENT PROGRAM

CONTRACTOR SAFETY MANAGEMENT PROGRAM CONTRACTOR SAFETY MANAGEMENT PROGRAM 16 th June 2010 TABLE OF CONTENTS 1.0 PURPOSE AND SCOPE 1.1 Intent 1.2 Scope 1.3 Program Elements 2.0 REGULATORY REQUIREMENTS 3.0 BACKGROUND AND GLOSSARY 3.1 Background

More information

Critical Infrastructure Private Guarding Company Requirements Checklist

Critical Infrastructure Private Guarding Company Requirements Checklist Critical Infrastructure Private Guarding Company Requirements Checklist Introduction 1. Secure and protected critical infrastructure sites are vital to the security and stability of each EU Member State

More information

Corporate Standard. Contractor Management

Corporate Standard. Contractor Management Corporate Standard Contents Purpose... 2 Scope... 2 Definitions... 2 Background... 3 Specific Requirements... 4 Responsibilities... 11 Review Date... 11 References... 11 Date Issued July 2010 Management

More information

Construction Management Standards of Practice

Construction Management Standards of Practice Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388

More information

MARITIME AND PORT AUTHORITY OF SINGAPORE SHIPPING CIRCULAR TO SHIPOWNERS NO. 4 OF 2013

MARITIME AND PORT AUTHORITY OF SINGAPORE SHIPPING CIRCULAR TO SHIPOWNERS NO. 4 OF 2013 MARITIME AND PORT AUTHORITY OF SINGAPORE SHIPPING CIRCULAR TO SHIPOWNERS NO. 4 OF 2013 MPA Shipping Division 460 Alexandra Road #21-00, PSA Building Singapore 119963 Fax: 6375-6231 http://www.mpa.gov.sg

More information

Replacement of Heat System Components

Replacement of Heat System Components STATEMENT OF WORK FOR Replacement of Heat System Components At Warehouse Takoraudantie 4 08/17/2013 REV 8-24-13 Project 2013-021 Page 1 of 6 1.0 INTRODUCTION 1.1 Overview: The U.S. Embassy Helsinki has

More information

Management Systems Recognition Booklet

Management Systems Recognition Booklet Management Systems Recognition Booklet Page 1 of 15 Contents Revision History... 4 Related Documents... 4 1 Management Systems Recognition Booklet... 5 2 Accreditation Status... 5 3 The Recognition Process...

More information

Health and Safety Activity Checklist

Health and Safety Activity Checklist Health and Safety Activity Checklist Workplace Health, Safety and Compensation Commission of New Brunswick WHSCC CSSIAT Commission de la santé, de la sécurité et de l indemnisation des accidents au travail

More information

Human Resources Officer Job Description

Human Resources Officer Job Description Human Resources Officer Job Description Job Title: HR Officer Reports To: Manager, Recruitment Department: Human Resources Location: Nairobi Grade: 5 Date: 3 September 2012 Job Purpose: Responsible for

More information

Business Unit/Area: N/A. Protocol No.: COR-05-EHS8-PR

Business Unit/Area: N/A. Protocol No.: COR-05-EHS8-PR Page 1 Overview Purpose This protocol defines the required Environmental, Health and Safety (EHS) process for the selection, evaluation, approval, auditing and monitoring of contractors. Scope This protocol

More information

Manager, Support and Equity Unit Approved by

Manager, Support and Equity Unit Approved by Recovery Team Procedure Related Policy Recovery Team Policy Responsible Officer Manager, Support and Equity Unit Approved by Manager, Support and Equity Unit Approved and commenced March, 2011 Review by

More information

CONTRACT FOR ENGAGING INFORMATION TECHNOLOGY CONSULTANT SERVICES [PROJECT TITLE] BETWEEN HER MAJESTY THE QUEEN AND [CONSULTANT]

CONTRACT FOR ENGAGING INFORMATION TECHNOLOGY CONSULTANT SERVICES [PROJECT TITLE] BETWEEN HER MAJESTY THE QUEEN AND [CONSULTANT] CONTRACT FOR ENGAGING INFORMATION TECHNOLOGY CONSULTANT SERVICES [PROJECT TITLE] BETWEEN HER MAJESTY THE QUEEN AND [CONSULTANT] CONTRACT NO. [CONXXXXXXX] ALBERTA TRANSPORTATION Contract for Engaging Information

More information

G2 Contract Management Plan Date: July 2014 Edition 1 / Revision 0

G2 Contract Management Plan Date: July 2014 Edition 1 / Revision 0 G2 Contract Management Plan Date: Edition 1 / Revision 0 REVISION REGISTER Ed/Rev Number Ed 1 / Rev 0 Clause Number All G2.1 G2.2 G2.3 G2.4 G2.5 G2.5 G2.6.1 G2.6.2 G2.6.3 G2.6.4 G2.6.5 G2.6.6 G2.6.7 G2.7

More information

www.superstaff.co.nz PO Box 11766 Ellerslie 1542 Auckland 0800 787379 TERMS OF BUSINESS

www.superstaff.co.nz PO Box 11766 Ellerslie 1542 Auckland 0800 787379 TERMS OF BUSINESS The Engagement of Temporary Employees TERMS OF BUSINESS 1. You ( the Client ) are deemed to have accepted the Terms of Business by engaging a Temporary Employee ( Temporary ) introduced to the Client by

More information

CSC-DIVISION 1-MASTER SECTIONS Description

CSC-DIVISION 1-MASTER SECTIONS Description CSC-DIVISION 1-MASTER SECTIONS Description 01 11 00 Summary of Work by Consultant 01 12 00 Multiple Contract Summary by Consultant 01 14 00 Work Restrictions see below 01 21 00 Allowances by Consultant

More information

Developer Constructed Headworks Process Information Guide

Developer Constructed Headworks Process Information Guide Information Guide CONTENTS PAGE 1.0 Introduction 3 1.1 Purpose and Objectives 3 1.2 The Developer Constructed Headwork Process 3 1.3 Fully Developer Funded Assets 3 2.0 The High Level process Steps 4 2.1

More information

How To Evaluate A Dod Cyber Red Team

How To Evaluate A Dod Cyber Red Team CHAIRMAN OF THE JOINT CHIEFS OF STAFF MANUAL J-6 CJCSM 6510.03 DISTRIBUTION: A, B, C DEPARTMENT OF DEFENSE CYBER RED TEAM CERTIFICATION AND ACCREDITATION Reference(s): Enclosure F. 1. Purpose a. This manual,

More information

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS LEC (Company Audit) Guidance Notes Glossary of Terms Transport for London (TfL) London Low Emission

More information

Janison Terms and Conditions. Updated Jan 2013

Janison Terms and Conditions. Updated Jan 2013 Janison Terms and Conditions Updated Jan 2013 Terms and Conditions 1. Interpretation 1.1. In this Agreement, unless otherwise indicated by the context (a) (b) (c) (d) (e) (f) (g) (h) (i) words importing

More information

11.4.2.4 DURATION: Permanent, except as provided in 11.4.2.8 NMAC. [6/1/96; 11.4.2.4 NMAC - Rn, 11 NMAC 4.2.4, 11/30/04]

11.4.2.4 DURATION: Permanent, except as provided in 11.4.2.8 NMAC. [6/1/96; 11.4.2.4 NMAC - Rn, 11 NMAC 4.2.4, 11/30/04] TITLE 11 CHAPTER 4 PART 2 LABOR AND WORKERS' COMPENSATION WORKERS COMPENSATION DATA REPORTING AND SAFETY REQUIREMENTS 11.4.2.1 ISSUING AGENCY: Workers Compensation Administration. [6/1/96; 11.4.2.1 NMAC

More information

Classification: SAFETY PROGRAM. Accountabilities

Classification: SAFETY PROGRAM. Accountabilities Program #SAF-CON-P-01 Page: 1 of 21 Authorization Cover Letter Responsible Person: Manager of Safety Training Code: Target Audience: Ontario Operations Key words: Contractor, Training, Contract, Accountabilities

More information

CASSESSMENT OF CONTRACTOR COMPETENCE & RRESOURCES CDM REGULATIONS 2016. Please complete and return this questionnaire: By (date) To (name) Email

CASSESSMENT OF CONTRACTOR COMPETENCE & RRESOURCES CDM REGULATIONS 2016. Please complete and return this questionnaire: By (date) To (name) Email Please complete and return this questionnaire: By (date) To (name) Email 1.0 Contractor Details Name of Contractor Date Address of Contractor Telephone Email Website Activities of Business Number of employees

More information

University Students Council of the University of Western Ontario EARLY AND SAFE RETURN TO WORK POLICY

University Students Council of the University of Western Ontario EARLY AND SAFE RETURN TO WORK POLICY EFFECTIVE: 30 th October 2012 SUPERSEDES: 15 th November 2011 AUTHORITY: General Manager RATIFIED BY: Executive Council 30 th OCTOBER 2012 RELATED DOCUMENTS: PAGE 1 of 8 PURPOSE: This Policy is created

More information

Internal Audit Report. Toll Operations Contract Management TxDOT Office of Internal Audit

Internal Audit Report. Toll Operations Contract Management TxDOT Office of Internal Audit Internal Audit Report Toll Operations Contract Management TxDOT Office of Internal Audit Objective To determine whether the Toll Operations Division (TOD) contract management structure is designed and

More information

InterAcct for Contractors

InterAcct for Contractors InterAcct for Contractors Why InterAcct? Integrated Simple Flexible Practical Reliable One integrated database of information to record new enquiries, estimating, quoting, job costing, accounting, and

More information

NHS North Somerset Clinical Commissioning Group

NHS North Somerset Clinical Commissioning Group NHS North Somerset Clinical Commissioning Group HR Policies Managing Sickness Absence Approved by: Quality and Assurance Group Ratification date: September 2013 Review date: September 2016 Elaine Edwards

More information

SAMPLE using TEMPLATE 2

SAMPLE using TEMPLATE 2 SAMPLE using TEMPLATE 2 Element 11 Senior Management Title: 11.1(a) Continuous Improvement Plan Date of Issue: July 2005 Approved by: President, Jack A.L. Rabbit Location: needs to be adapted for each

More information

ArcelorMittal Dofasco Inc. Third Party Health, Safety and Environment Program

ArcelorMittal Dofasco Inc. Third Party Health, Safety and Environment Program ArcelorMittal Dofasco Inc. Third Party Health, Safety and Environment Program Copyright by ArcelorMittal Dofasco Inc., 2013 All Rights Reserved Questions or Comments Contact the Manager of ArcelorMittal

More information

Jigsaw24 Support Contract Terms & Conditions

Jigsaw24 Support Contract Terms & Conditions Version 1.1 Jigsaw24 Support Contract Terms & Conditions These conditions together with the provisions of the Agreement or a Scope of Work (SOW) are the only contractual terms upon which Jigsaw Systems

More information

CATSA Screening Contractor Management System Standard (2015)

CATSA Screening Contractor Management System Standard (2015) Public Works and Government Services Canada Canadian General Standards Board Travaux publics et Services gouvernementaux Canada Office des normes générales du Canada CATSA Screening Contractor Management

More information

CHAPTER 5 - SAFETY ASSESSMENTS, LOG OF DEFICIENCIES AND CORRECTIVE ACTION PLANS

CHAPTER 5 - SAFETY ASSESSMENTS, LOG OF DEFICIENCIES AND CORRECTIVE ACTION PLANS CHAPTER 5 - SAFETY ASSESSMENTS, LOG OF DEFICIENCIES AND CORRECTIVE ACTION PLANS A. INTRODUCTION... 1 B. CHAPTER-SPECIFIC ROLES AND RESPONSIBILITIES... 1 C. SAFETY PROGRAM ASSESSMENT PROCESS... 3 D. FACILITY-MAINTAINED

More information

FOR THE CONSTRUCTION SECTOR

FOR THE CONSTRUCTION SECTOR Transportation Courses FOR THE CONSTRUCTION SECTOR Transportation of Dangerous Goods Lift Truck Operator Defensive Driving and more... Returning home safe to your loved ones is a promise you make everyday.

More information

DESIGN-BUILD QUALITY MANAGEMENT PLAN OUTLINE

DESIGN-BUILD QUALITY MANAGEMENT PLAN OUTLINE DESIGN-BUILD QUALITY MANAGEMENT PLAN OUTLINE DESIGN-BUILD PROJECT In developing its own QMP, the Design-Builder is encouraged to follow the organization and format of this QMP Outline. The Design-Builder

More information

Checklist for Completing and Submitting Life Insurance Applications under the European Union (Insurance and Reinsurance) Regulations 2015

Checklist for Completing and Submitting Life Insurance Applications under the European Union (Insurance and Reinsurance) Regulations 2015 2015 Checklist for Completing and Submitting Life Insurance Applications under the European Union (Insurance and Reinsurance) Regulations 2015 Applicant Central Bank of Ireland Checklist Notes: Complete

More information

VERSION 07-0 GOLD SEAL SAMPLE QUESTIONS CANADIAN CONSTRUCTION ASSOCIATION LEVEL "PRACTICE EXAMINATION" NATIONAL GOLD SEAL COMMITTEE

VERSION 07-0 GOLD SEAL SAMPLE QUESTIONS CANADIAN CONSTRUCTION ASSOCIATION LEVEL PRACTICE EXAMINATION NATIONAL GOLD SEAL COMMITTEE VERSION 07-0 GOLD SEAL SAMPLE QUESTIONS CANADIAN CONSTRUCTION ASSOCIATION LEVEL "PRACTICE EXAMINATION" NATIONAL GOLD SEAL COMMITTEE SAMPLE EXAM QUESTIONS FOR GOLD SEAL APPLICANTS VERSION 07-0 Multiple

More information

Terms of Business for Registered Support Providers

Terms of Business for Registered Support Providers Terms of Business for Registered Support Providers The National Disability Insurance Scheme Act 2013 provides for the making of Rules and requirements for registered providers of support. The Rule National

More information

Health and Safety Resources Caution to Users

Health and Safety Resources Caution to Users Health and Safety Resources Caution to Users Many of the resources in this archive were originally prepared by WSN s predecessor organizations for use by industry clients. While much of the information

More information

Vendor Management Program

Vendor Management Program The Corporation of the City of Kawartha Lakes is committed to the provision of a safe and healthy work environment for its employees, contractors and visitors. To promote this type of environment, the

More information

GUIDELINE. Professional Engineers Providing Project Management Services. Published by Association of Professional Engineers of Ontario

GUIDELINE. Professional Engineers Providing Project Management Services. Published by Association of Professional Engineers of Ontario GUIDELINE Professional Engineers Providing Project Management Services 1991 Published by Association of Professional Engineers of Ontario CONTENTS FOREWORD...3 1.0 GENERAL INFORMATION AND DEFINITIONS...3

More information

Managing Occupational Health and Safety on Queensland Government Building Projects A Management Systems Approach D Evans

Managing Occupational Health and Safety on Queensland Government Building Projects A Management Systems Approach D Evans OCCUPATIONAL HEALTH AND SAFETY THE CARING CLIENT? Case Study MANAGING OCCUPATIONAL HEALTH AND SAFETY ON QUEENSLAND GOVERNMENT BUILDING PROJECTS A MANAGEMENT SYSTEMS APPROACH David Evans Queensland Department

More information

SPILL RESPONSE PROCEDURE

SPILL RESPONSE PROCEDURE SPILL RESPONSE PROCEDURE Queen's University Spill Response Procedure May 2000 1 SOP-HAZMAT-01 1.0 Preamble This document outlines emergency spill response procedures as part of the overall Queen's University

More information

Home repairs and improvement

Home repairs and improvement Home repairs and improvement Top tips for businesses March 2012 OFT1410 Crown copyright 2012 You may reuse this information (not including logos) free of charge in any format or medium, under the terms

More information

How To Report To Mshda

How To Report To Mshda Management Agent Training Information Contents Important Websites... 2 Affirmative Fair Housing Marketing Plans... 2 Initial Plans... 2 Updated Plans... 2 Requirements... 2 Completing the Form... 3 Employee

More information

Freedom of Information PM&C Business Rules

Freedom of Information PM&C Business Rules Freedom of Information PM&C Business Rules Key FOI process milestones Time (in working days) Milestones Stage 1 Day 0 Request submitted Days 0-1 Determine validity, identify decision maker and initial

More information

Section 9: JIB Benefits. Section 9. JIB Benefits

Section 9: JIB Benefits. Section 9. JIB Benefits Section 9: JIB Benefits Section 9 JIB Benefits 241 JIB Handbook 2015 INDEX Page 1. JIB BENEFITS SCHEMES 243 1.1 General Rules 243 1.2 Private Medical Cover 244 1.3 Sick Pay 245 1.4 Death in Service Cover

More information

A Guide to Workers Compensation and Return to Work

A Guide to Workers Compensation and Return to Work A Guide to Workers Compensation and Return to Work STEP 01 If an employee suffers from a work-related accident or injury This guide provides Victorian Catholic schools with practical advice to support

More information

First Steps in the Claims Process: Insurers

First Steps in the Claims Process: Insurers First Steps in the Claims Process: Insurers First Steps - Insurers Insurer notified of injury by employer, employee or 3 rd party Contact the worker and employer within 3-days Consult with relevant parties,

More information

INTRODUCTION TO THE WORK HEALTH AND SAFETY ACT

INTRODUCTION TO THE WORK HEALTH AND SAFETY ACT INTRODUCTION TO THE WORK HEALTH AND SAFETY ACT Harmonisation Topics Agenda Person Conducting a Business or Undertaking (PCBU s) Directors & Officers inc due diligence Workers Consultation Health & Safety

More information

Physical Therapy Contract. Reference guide to understanding your contract

Physical Therapy Contract. Reference guide to understanding your contract Physical Therapy Contract Reference guide to understanding your contract Revised February 2011 HC-429 REV FEB 2011 Copyright 2009 at WCB Health Care Services Page 2 of 13 PHYSICAL THERAPY PROVIDER EXPECTATIONS

More information

September 2012 Health & Safety Department Lambton Kent District School Board

September 2012 Health & Safety Department Lambton Kent District School Board September 2012 Health & Safety Department Lambton Kent District School Board Asbestos Management Program Overview All LKDSB Buildings contain asbestos to some extent with the exception of P. E. McGibbon

More information

Contract / Construction Management. November 2006

Contract / Construction Management. November 2006 Contract / Construction Management November 2006 Presentation Outline I. Introduction Project Management II. Contract/Construction Management Stage 1: Construction Period Stage 2: Defects Liability Period

More information

Acquisition Guide Chapter 42.5 Attachment 1 CMP Template. CONTRACT MANAGEMENT PLAN TEMPLATE (Optional) CONTRACT MANAGEMENT PLAN

Acquisition Guide Chapter 42.5 Attachment 1 CMP Template. CONTRACT MANAGEMENT PLAN TEMPLATE (Optional) CONTRACT MANAGEMENT PLAN CONTRACT MANAGEMENT PLAN TEMPLATE (Optional) CONTRACT MANAGEMENT PLAN CONTRACTING ACTIVITY NAME CONTRACT NUMBER DATE Name Contracting Officer Office Symbol, Telephone Number Date Name Head of Contracting

More information

Procedure: OHS CONTRACTOR MANAGEMENT

Procedure: OHS CONTRACTOR MANAGEMENT Procedure: OHS CONTRACTOR MANAGEMENT. Purpose This procedure outlines the occupational health and safety (OHS) requirements for the management of contractors engaged to perform tasks or services for Greater

More information

Your Readymix Prices & Services explained. No hidden extras.

Your Readymix Prices & Services explained. No hidden extras. Your Readymix Prices & Services explained. No hidden extras. Effective January 2016 Contents Welcome 3 Welcome 4 Products and quality 5 Our prices 6 Delivery and returns 7 Payment and support We are delighted

More information

004. Scope. This rule shall apply to all title insurers authorized to do business in Nebraska and all title insurance agents licensed in Nebraska.

004. Scope. This rule shall apply to all title insurers authorized to do business in Nebraska and all title insurance agents licensed in Nebraska. Title 210 - NEBRASKA DEPARTMENT OF INSURANCE Chapter 34 - TITLE INSURANCE 001. Authority. This rule is adopted and promulgated by the Director of Insurance of the State of Nebraska pursuant to the Title

More information

AWARE ENTERPRISE SYSTEM

AWARE ENTERPRISE SYSTEM AWARE ENTERPRISE SYSTEM The Aware Enterprise System from Aware Business Systems Pty Ltd is a remarkable software package designed for Australian manufacturers and distributors. Designed and developed in

More information

ITD Project Management and System Development Procedure ITD PROJECT MANAGEMENT AND SYSTEM DEVELOPMENT PROCEDURE

ITD Project Management and System Development Procedure ITD PROJECT MANAGEMENT AND SYSTEM DEVELOPMENT PROCEDURE PURPOSE ITD PROJECT MANAGEMENT AND SYSTEM DEVELOPMENT PROCEDURE ITD s core business is to implement IT solutions. The purpose of this procedure is to facilitate the identification, management and monitoring

More information

GENERAL TERMS AND CONDITIONS OF PURCHASE

GENERAL TERMS AND CONDITIONS OF PURCHASE GENERAL TERMS AND CONDITIONS OF PURCHASE of EGSTON Eggenburger System Elektronik Gesellschaft m.b.h. and EGSTON System Electronic spol. s.r.o. (hereinafter referred to as "EGSTON") Table of contents Clause

More information

FINANCING AND BUDGETING POLICIES. Development Program. January 2015

FINANCING AND BUDGETING POLICIES. Development Program. January 2015 FINANCING AND BUDGETING POLICIES Development Program January 2015 Bell Fund DEVELOPMENT Financing and Budgeting Policies January 2015 Page 1 Table of Contents Table of Contents... 2 A. Digital Media Development

More information

JOSEPH SWAN ACADEMY REDUNDANCY POLICY. Date approved by Governors March 2014. Date of next review Signed by name (..) Signed:...

JOSEPH SWAN ACADEMY REDUNDANCY POLICY. Date approved by Governors March 2014. Date of next review Signed by name (..) Signed:... JOSEPH SWAN ACADEMY REDUNDANCY POLICY Author Head Teacher Date approved by Governors March 2014 Reviewed every 3 years Date of next review Signed by name (..) Signed:... Introduction The Academy is committed

More information

Design Consultant Project Management Requirements

Design Consultant Project Management Requirements Design Consultant Project Management Requirements Version 2 April 25, 2013 AWTP Program Design Consultant Contents 1.0 Introduction... 1 2.0 General Management... 1 3.0 Project Management Plan... 1 4.0

More information

Temporary Worker Safety Checklist

Temporary Worker Safety Checklist Temporary Worker Safety Checklist The following checklists provide guidance for staffing agencies and employers that hire temporary workers regarding the steps each party should take to ensure it is meeting

More information

SCHEDULE 10.1A PRICING FORMAT REQUIREMENTS SCHEDULE 10.1.A

SCHEDULE 10.1A PRICING FORMAT REQUIREMENTS SCHEDULE 10.1.A SCHEDULE 10.1.A APRIL 25, 2005 Table of Contents 1.0 General Financial Requirements...1 1.1 Pricing Structure and Fees...1 1.2 Transition Services and Fees...2 1.3 Annual Fees...3 1.4 Resource Usage Fees...3

More information

ARTWORK COMMISSION AGREEMENT

ARTWORK COMMISSION AGREEMENT ARTWORK COMMISSION AGREEMENT THIS AGREEMENT is made the day of in the year BETWEEN the Minister for Works of Level 6, 16 Parkland Road, Osborne Park, WA 6017 being the body corporate created under Section

More information

Job Centre. Cooperative Education Policies and Procedures

Job Centre. Cooperative Education Policies and Procedures Job Centre Cooperative Education Policies and Procedures Revised: January 2010 Policies and Procedures - 2 - Table of Contents 1. Absences During the Work Term... 4 2. Access to Cooperative Education Information...

More information

How To Audit A Health And Safety Management System

How To Audit A Health And Safety Management System Introduction to Auditing 2015 Safety Groups Advantage Program 1 ! Emergency! Phones! Break(s)! Questions OVERVIEW! Objective! Principles of Auditing! Audit Process! Audit Review 3 OBJECTIVE To provide

More information