1 Major Hazard Plant ( Seveso Installations) Safety Report (Law 334/1999 Implementation of EU Seveso Directive) Ufa, 1-2 March 2005
2 Safety Authorization Process D.Lgs.334/99 (Seveso II) Preliminary Safety Report New Plant New or modificat.? Modification of existing plant Increase in haz. Subst. quantity? > 25% Safety Report Approval process by CTR (Regional Technical Committe.) on the basis of technical review and compatibility with territory Declaration END no Approved? yes Building Permit (with possible requirements) Safety Report (RdS) Approval Process by CTR Approved? no yes Operating Permit
3 The Safety Report shall be developed according to specific requiremetns and Table of contents by LAw. It contains: Identification data and Plant Location; General information on plant management and technology; Analisi ad Indici (Risk Indexes) and Historical analysis; Accidental events identification and consequence analysis; Design criteria; mitigation and protection measures
4 Compatibility The Safety Reports results are judged on the basis of the Ministry Decree 9/5/2001 on Land use compatibility Criteria: Probability of events Damage category Classe di probabilitа degli eventi Lethality Categoria di effetti Beginning Serious wounds lethality Elevata letalitа Inizio letalitа Lesioni irreversibili Wounds Lesioni reversibili < 10-6 DEF CDEF BCDEF ABCDEF EF DEF CDEF BCDEF F EF DEF CDEF > 10-3 F F EF DEF A F correspond to Land Use types (A = highly populated; F = Industrial areas)
5 Layout
6 Main Information Plant Operator ( Owner ): Responsible for the Report issue and the Plant Operation Rules and Standards adopted in design Production capacity and hazardous substances present (quantity in storage adn process) Detailed process and safety systems description
7 Main Information Hazardous Substances: Thresholds (Law) Quantities (Total, Storage, Process) SOSTANZA ALLEGATO I - PARTE 1 Gas liquefatti estremamente infiammabili e gas naturale D. Lgs. 334/99 Soglia Art. 8 (t) 200 Quantitа presenti (t) Totale Stoccaggio Impianto Propilene Etilene Gas Naturale liquefatto , ALLEGATO I - PARTE 2 6. INFIAMMABILI Gasolio 8 8 Note
8 Risk Indexes ( Analisi per Individuare Aree Critiche ) Analysis according to specific decrees (for processes and storage) (Ministry Decrees DM 15/5/96 and 20/10/98) Plant divided into Units (homogeneous) Risk index classified according to substances, characteristics of processes, safety systems, specific conditions
9 The Safety Report to be developed according to Law 334/99 contains: Identification data and Plant Location; General information on plant management and technology; Analisi ad Indici (Risk Indexes); Accidental events identification and consequence analysis; Design criteria; mitigation and protection measures
10 Safety Analysis - Main Assumptions To define a lower bound for frequency to discriminate between credible and non-credible events (usually 1.E-07 /year). For on credible events no consequence analysis is done; Process generated accidents identified by HAZOP; frequency calculated by Fault Tree analysis; Accidental events related to loss of containment events postulated on the basis of historical data. Usually a set of cases (e.g. two cases considered : hole diameter 5% and 20% of pipe diameter) are considered for each isolatable section; Historical analysis to check past experiences and show if design can avoid past experiences.
11 Isolatable Sections For each section, process and design data are collected for the probability and consequence analysis
12 Safety Analysis - Main Assumptions Event Tree (ET) Analysis to identify Accident Scenarios and associated probabilities. The ET analysis considers meteorological conditions, safety systems, ignition sources
13 Accidental Scenario identification Ignition probability in Event Tree Analysis from literature data: Leak Flow rate Portata del Rilascio Probabilità di Innesco Immediato (kg/s) Rilascio Liquido Rilascio Gassoso < > Massa Infiammabile (kg) Probabilità di Innesco Ritardato < > Immediate ignition Liquid Gas Delayed ignition Flammable Mass Massa Infiammabile (kg) Probabilità di Esplosione se innescata < Probabilità di Flash Fire se innescata UVCE Flash Fire
14 Loss of Containment cases Release cases are considered for Isolatable Sections, where process conditions and inventory ( duration of releases) vary
15 Frequency Analysis Main Data: PROCESS LINES: Historical data abses, e.g. API 581, E&P Forum, TNO etc. Pipelines: EGIG (European Incident Data gropu for Gas), CONCAWE (for Oil lines) External events (e.g. collisions): probabilistic analysis. Considering actual design and site conditions, including effect of Safety Management Systems
16 Events Localisation on Map
17 Consequence Analysis Damage levels defined by Law on the basis of International Literature: Soglie di Danno a Persone e Strutture Scenario Incidentale Incendio (radiazione termica stazionaria) Flash-fire (1) (radiazione termica istantanea) UVCE (3) (Sovrappressione di picco) Elevata letalità Inizio letalità Livello di Danno Lesioni Lesioni irreversibili reversibili Danni alle strutture Effetti Domino 12,5 kw/m 2 7 kw/m 2 5 kw/m 2 3 kw/m 2 12,5 kw/m 2 LFL (2) 0,5 LFL ,3 bar (0,6 bar in spazi aperti) Rilascio tossico LC50 30 min (4) IDLH (5) 0,14 bar 0,07 bar 0,03 bar 0,3 bar Fireball/BLEVE Raggio fireball 350 kj/m kj/m kj/m m da parco bombole 600 m da stoccaggio in sfere 800 m da stoccaggio in cilindri High Mortality Minor injuries Domino effects
18 Consequence Analysis Damage distances for each accidental scenario are calculated
19 Consequence Analysis Mapping Events are mapped on the site to allow assessment of land use compatibility, analysis of domino effects, emergency planning etc.
20 Compatibility
21 Risk Contours (UK, Netherlands) Risk Contours can be used to assess the Plant Safety (together with Social Risk criteria)
Seveso basic principles and tools. EU Seveso Directive. Main principles and tools for application. Page 1
EU Seveso Directive Main principles and tools for application Page 1 Seveso Directive history in brief European Union, after Seveso accident, has adopted a specific Directive relevant to the control of
More informationConsequence Analysis: Comparison of Methodologies under API Standard and Commercial Software
511 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 36, 2014 Guest Editors: Valerio Cozzani, Eddy de Rademaeker Copyright 2014, AIDIC Servizi S.r.l., ISBN 978-88-95608-27-3; ISSN 2283-9216 The
More informationOverview of pipelines in Europe advantages and disadvantages
Overview of pipelines in Europe advantages and disadvantages Dr. Georgios A. Papadakis Industrial Risk Management Technical University of Crete,, Greece tel: : +30-28210 28210-37316 e-mail: gpap@dpem.tuc.gr
More informationOn-Site Risk Management Audit Checklist for Program Level 3 Process
On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:
More informationQUANTITATIVE RISK ASSESSMENT FOR ACCIDENTS AT WORK IN THE CHEMICAL INDUSTRY AND THE SEVESO II DIRECTIVE
QUANTITATIVE RISK ASSESSMENT FOR ACCIDENTS AT WORK IN THE CHEMICAL INDUSTRY AND THE SEVESO II DIRECTIVE I. A. PAPAZOGLOU System Reliability and Industrial Safety Laboratory National Center for Scientific
More informationMajor Hazard Risk Assessment on Ammonia Storage at Jordan Phosphate Mines Company (JPMC) in Aqaba, Jordan
Major Hazard Risk Assessment on Ammonia Storage at Jordan Phosphate Mines Company (JPMC) in Aqaba, Jordan Jehan Haddad, Salah Abu Salah, Mohammad Mosa, Royal Scientific Society, Jordan Pablo Lerena, Swiss
More informationUsing CFD in Platform Design
Using CFD in Platform Design Eric Peterson, PhD. Principal Consultant Quantitative Risk Analyst Scandpower Inc., Houston,TX Hans Nordstand, Scandpower Inc., Houston, TX Sverre Nodland, Scandpower Inc.,
More informationUsing the Linear Risk Integral (LRI) approach in pipeline QRA for a better application of risk mitigation measures
Using the Linear Risk Integral (LRI) approach in pipeline QRA for a better application of risk mitigation measures Urban Neunert, ILF Consulting Engineers, Germany Abstract Minimizing the risks resulting
More informationCHAPTER 4: OFFSITE CONSEQUENCE ANALYSIS
CHAPTER 4: OFFSITE CONSEQUENCE ANALYSIS RMP OFFSITE CONSEQUENCE ANALYSIS GUIDANCE This chapter is intended for people who plan to do their own air dispersion modeling. If you plan to do your own modeling,
More informationDo you speak SAFETY?
Do you speak SAFETY? Convegno:Terminologie specialistiche e prodotti terminologici Orvieto 28-29 maggio 2010 1 Leadership in Safety: le sette aspettative 1. Creazione della Safety Vision 2. Costante focalizzazione
More informationDEEP PANUKE TECHNICAL NOTE
DEEP PANUKE Page 1 of 33 TECHNICAL NOTE Topic: Removal of Beach Valve Station Isolation Valve Assembly (P74-SDV-011) Assessment Background: The Deep Panuke gas export pipeline is approximately 175km in
More informationFor further information, contact Penspen Integrity:
This document was downloaded from the Penspen Integrity Virtual Library For further information, contact Penspen Integrity: Penspen Integrity Units 7-8 St. Peter's Wharf Newcastle upon Tyne NE6 1TZ United
More informationAPPLICATION OF QUALITATIVE AND QUANTITATIVE RISK ANALYSIS TECHNIQUES TO BUILDING SITING STUDIES
APPLICATION OF QUALITATIVE AND QUANTITATIVE RISK ANALYSIS TECHNIQUES TO BUILDING SITING STUDIES John B. Cornwell, Jeffrey D. Marx, and Wilbert W. Lee Presented At 1998 Process Plant Safety Symposium Houston,
More informationAssessment of Hydrocarbon Explosion and Fire Risks. Professor Jeom Paik. The LRET Research Collegium Southampton, 11 July 2 September 2011
Assessment of Hydrocarbon Explosion and Fire Risks by Professor Jeom Paik The LRET Research Collegium Southampton, 11 July 2 September 2011 1 Assessment of Hydrocarbon Explosion and Fire Risks in Offshore
More informationCHAPTER 7 RISK ASSESSMENT AND ONSITE EMERGENCY PLAN
CHAPTER 7 RISK ASSESSMENT AND ONSITE EMERGENCY PLAN 7.1 Hazard Identification Identification of causes and types of hazards is the primary task for planning for risk assessment. Hazard can happen because
More informationSensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident
Sensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident Sanglog Kwak, Jongbae Wang, Yunok Cho Korea Railroad Research Institute, Uiwnag City, Kyonggi-do, Korea Abstract: After the subway
More informationESReDA Working Group on Fire Risk Analysis
Rev. 0 - SEPTEMBER 2009 ESReDA Working Group on Fire Risk Analysis Fire Risk Analysis Process and Oil & Gas Industries Standard and Regulations, State of the Art & Methodologies D'Appolonia Contribution
More informationThe SPE Foundation through member donations and a contribution from Offshore Europe
Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as
More informationPROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks)
PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks) LIABILITY OF THE COMPANY DOES NOT COMMENCE UNTIL THE PROPOSAL HAS BEEN ACCEPTED AND THE PREMIUM PAID THE TERRITORIAL
More informationINSTITUTION OF GAS ENGINEERS AND MANAGERS. Founded 1863 IGEM/TD/2 Edition 2 Royal Charter 1929 Communication XXXX Her Majesty the Queen
INSTITUTION OF GAS ENGINEERS AND MANAGERS IGEM/TSP/12/156 Founded 1863 IGEM/TD/2 Edition 2 Royal Charter 1929 Communication XXXX Patron Her Majesty the Queen ASSESSING THE RISKS FROM HIGH PRESSURE NATURAL
More informationA Triple Bottom Line approach to QRA
A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 26, 2012 Guest Editors: Valerio Cozzani, Eddy De Rademaeker Copyright 2012, AIDIC Servizi S.r.l., ISBN 978-88-95608-17-4; ISSN 1974-9791 The Italian
More informationA Review of HSE s Risk Analysis and Protection Based Analysis Approaches for Land-Use Planning. Final Report
A Review of HSE s Risk Analysis and Protection Based Analysis Approaches for Land-Use Planning Final Report www.erm.com September 2004 Delivering sustainable solutions in a more competitive world HSE A
More informationThe Behaviour Of Vertical Jet Fires Under Sonic And Subsonic Regimes
The Behaviour Of Vertical Jet Fires Under Sonic And Subsonic Regimes Palacios A. and Casal J. Centre for Technological Risk Studies (CERTEC), Department of Chemical Engineering, Universitat Politècnica
More informationMAJOR HAZARDS OF NATURAL GAS STORAGE
MAJOR HAZARDS OF NATURAL GAS STORAGE Alan Tyldesley, Haztech Consultants Ltd, UK INTRODUCTION Ever since coal gas was developed as a source of heat and light in Victorian times, we have needed to store
More informationHazard and Risk Assessment
Appendix C Hazard and Risk Assessment C1 Preliminary Hazard Analysis C2 Kurnell Buncefield Review Appendix 1 Preliminary Hazard Analysis Caltex Refineries (NSW) Pty Ltd Proposed Kurnell Product Terminal
More informationEmergency Isolation Valves at Pump Suction: Application for Flammable Liquids
667 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 48, 2016 Guest Editors: Eddy de Rademaeker, Peter Schmelzer Copyright 2016, AIDIC Servizi S.r.l., ISBN 978-88-95608-39-6; ISSN 2283-9216 The
More informationIGEM/UP/16 Communication 1756
Communication 1756 Design for Natural Gas installations on industrial and commercial premises with respect to hazardous area classification and preparation of risk assessments Founded 1863 Royal Charter
More informationSingapore s Approach to Process Safety Management
Process Safety Management Seminar - APCChE 2012 Singapore s Approach to Process Safety Management Go Heng Huat Deputy Director OSHD, Ministry of Manpower 1 Presentation Outline 1. Development of Process
More information3.4.4 Description of risk management plan Unofficial Translation Only the Thai version of the text is legally binding.
- 1 - Regulation of Department of Industrial Works Re: Criteria for hazard identification, risk assessment, and establishment of risk management plan B.E. 2543 (2000) ---------------------------- Pursuant
More informationDANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES
DANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES REV. 0 December 2012 TABLE OF CONTENT TABLE OF CONTENT... 2 DOCUMENT CONTROL...
More informationEPA RISK MANAGEMENT PROGRAM RULE TO IMPACT DISTRIBUTORS AND MANUFACTURERS
EPA RISK MANAGEMENT PROGRAM RULE TO IMPACT DISTRIBUTORS AND MANUFACTURERS I. Introduction Under an EPA rule designed to prevent chemical accidents, certain distributors, formulators and manufacturers of
More informationGAS DISPERSION WITH OPENFOAM
GAS DISPERSION WITH OPENFOAM Chris Dixon Major Hazards Management Centre of Expertise October 2012 1 DEFINITIONS AND CAUTIONARY NOTE Resources: Our use of the term resources in this announcement includes
More informationPractical Examples of Fire Protection Engineering Practices and Technology for PSM
Practical Examples of Fire Protection Engineering Practices and Technology for PSM Presented at: Mary Kay O'Connor Process Safety Center International Symposium Beyond Regulatory Compliance, Making Safety
More informationEnvironmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
More informationGuidance on Process Safety Performance Indicators
Guidance on Process Safety Performance Indicators Table of contents 01 INTRODUCTION 02 OBJECTIVE 02 SCOPE 03 CRITERIA 06 DATA REPORTING 08 PROCESS SAFETY PERFORMANCE 08 CONCLUSIONS 09 DEFINITIONS 09 REFERENCES
More informationSafety Assessment for a major hazard facility
Guidance Note Safety Assessment Advice for operators of major hazard facilities on conducting and documenting a Safety Assessment. May 2011 1. Introduction 1 1.1. What is a Safety Assessment? 1 1.2. Features
More informationIngredion ANZ Pty Ltd
Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)
More informationA Response Surface Model to Predict Flammable Gas Cloud Volume in Offshore Modules. Tatiele Dalfior Ferreira Sávio Souza Venâncio Vianna
A Response Surface Model to Predict Flammable Gas Cloud Volume in Offshore Modules Tatiele Dalfior Ferreira Sávio Souza Venâncio Vianna PRESENTATION TOPICS Research Group Overview; Problem Description;
More informationHow To Determine A Class Of Auto Insurance In Massachusetts
Mass Auto Category Placement Rule Placement Variables ƒ Prior Insurance ƒ Years with Massachusetts Homeland Insurance Company or the Prior Carrier ƒ Quote Date ƒ Lapse in Insurance Coverage in the last
More informationUniversity of Paderborn Software Engineering Group II-25. Dr. Holger Giese. University of Paderborn Software Engineering Group. External facilities
II.2 Life Cycle and Safety Safety Life Cycle: The necessary activities involving safety-related systems, occurring during a period of time that starts at the concept phase of a project and finishes when
More informationA PROGRESSIVE RISK ASSESSMENT PROCESS FOR A TYPICAL CHEMICAL COMPANY: HOW TO AVOID THE RUSH TO QRA
A PROGRESSIVE ASSESSMENT PROCESS FOR A TYPICAL CHEMICAL COMPANY: HOW TO AVOID THE RUSH TO QRA R. Gowland European Process Safety Centre, U.K. The Seveso Directive and the Establishment operators own internal
More informationRR749. Comparison of risks from carbon dioxide and natural gas pipelines
Health and Safety Executive Comparison of risks from carbon dioxide and natural gas pipelines Prepared by the Health and Safety Laboratory for the Health and Safety Executive 2009 RR749 Research Report
More informationExplosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy
Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy UVCE Storage tank Hydrocarbons Steam coil Corrosion Steam Instrumentation
More informationRegulation of Natural Gas Pipelines. June 23, 2008
Regulation of Natural Gas Pipelines June 23, 2008 Federal and State Regulations Federal: 49 United States Code 60101. et. seq. Title 49 Code of Federal Regulations The Office of Pipeline Safety (OPS),
More informationGas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000
Gas Standards and Safety Guidance Note January 2015 (GN106) Version 1.0 GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000 A guide to assist in the design of biogas
More informationUSING INSTRUMENTED SYSTEMS FOR OVERPRESSURE PROTECTION. Dr. Angela E. Summers, PE. SIS-TECH Solutions, LLC Houston, TX
USING INSTRUMENTED SYSTEMS FOR OVERPRESSURE PROTECTION By Dr. Angela E. Summers, PE SIS-TECH Solutions, LLC Houston, TX Prepared for Presentation at the 34 th Annual Loss Prevention Symposium, March 6-8,
More informationUniversity of Nottingham Emergency Procedures and Recovery Policy
University of Nottingham Emergency Procedures and Recovery Policy Guidelines for High Hazard Schools and Departments 1. Introduction The University of Nottingham is committed to the identification and
More informationWASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE
SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.
More informationLPG, Flammable Liquids, Toxic and Corrosive Substances
LPG, Flammable Liquids, Toxic and Corrosive Substances LPG, Flammable Liquids, Toxic and Corrosive Substances Safe Storage and Handling Today s focus is Dangerous substances under the Dangerous Substances
More informationSAFETY REPORT: MAINTAINING STANDARD AND REVIEWING
SAFETY REPORT: MAINTAINING STANDARD AND REVIEWING Sa ari Mustapha* and Izani Mohd Zain** *Department of Chemical and Environmental Engineering, Faculty of Engineering University Putra Malaysia, 43400 UPM
More informationChapter 12 Hazard Analysis and Risk Assessment (Unplanned Events)
Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events) TABLE OF CONTENTS 12 HAZARD ANALYSIS AND RISK ASSESSMENT... 12-1 12.1 Introduction... 12-1 12.1.1 Principles of Hazard and Risk Management...
More informationEnvironmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
More informationSKILLS. Magalie LAMBERLIN Safety and Risk Engineer 1 / 7
She has a significant experience in safety and industrial risk as she has worked for various industrial plants from chemical, oil and gas to mining. Her main skills are permitting, safety studies, risk
More informationRisk Management Tools For Port Security, Critical Infrastructure, and Sustainability. NATO Advanced Research Workshop
Risk Management Tools For Port Security, Critical Infrastructure, and Sustainability NATO Advanced Research Workshop Protection of hazardous installations and critical infrastructures - complementarity
More informationInvestigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software
th International Conference on Structural Mechanics in Reactor Technology (SMiRT ) Espoo, Finland, August 9-4, 9 SMiRT -Division 3, Paper 56 Investigations of a Long-Distance MW Heat Transport System with
More informationBharat Petroleum Corporation Limited,
Bharat Petroleum Corporation Limited, Ennore Installation, Survey No: 1556 B Vallur village and 354/1 Athipattu village, Chennai 600081 RECEIPT, STORAGE & DISTRIBUTION OF MOTOR SPIRIT (MS), HIGH SPEED
More informationEXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT
EXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT OVERVIEW ASSESSING THE RISK RELATIONSHIP BETWEEN FIRES AND EXPLOSIONS CLASSIFYING HAZARDOUS AREAS INTO ZONES
More informationENGINEERED DRAWINGS FOR PETROLEUM STORAGE TANKS
Facility Name: ENGINEERED DRAWINGS FOR PETROLEUM STORAGE TANKS The following is intended to be used as a guideline for information required to appear on engineered drawings involving petroleum storage
More informationSeptember 2008 AFC 4.6.2.1.(2) Page 1 of 5. Maximum Size and Aggregate Capacities of Aboveground Storage Tank Systems at Fuel Dispensing Stations
FIRE CODE VARIANCE September 2008 AFC 4.6.2.1.(2) Page 1 of 5 ISSUE Maximum Size and Aggregate Capacities of Aboveground Storage Tank Systems at Fuel Dispensing Stations The Alberta Fire Code (AFC) limits
More informationLNG SAFETY MYTHS and LEGENDS
LNG SAFETY MYTHS and LEGENDS Doug Quillen ChevronTexaco Corp. Natural Gas Technology Investment in a Healthy U.S. Energy Future May 14-15, 2002 Houston Introduction North America is Becoming the Focal
More informationRegulations for bunkering LNG
Regulations for bunkering LNG CCNR round table LNG, 13-11-2012 Erik Büthker, chairman of Dutch standards committee LNG refuelling stations Discipline naam [1] Content Ballast Nedam What is a standard,
More informationMaterial Safety Data Sheets (MSDS), Spill Clean-Up
Material Safety Data Sheets (MSDS), Spill Clean-Up Definitions Flammable: A substance having a flash point below 100 degrees Fahrenheit - easily ignited and quick burning. Toxic: A substance which has
More informationINDUSTRIAL PUBLIC LIABILITY INSURANCE
REGD. OFFICE: BHARTI AXA GENERAL INSURANCE COMPANY LIMITED First Floor, The Ferns Icon, Survey No. 28, Next to Akme Ballet, Doddanekundi, Off Outer Ring Road, Bangalore- 560037, Toll-Free Helpline: 1800-103-2292
More informationSPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA
SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA Regulated Substance Management: All Regulated Substances, including chemical wastes, are to be managed
More informationNORSOK STANDARD RISK AND EMERGENCY PREPAREDNESS ANALYSIS
NORSOK STANDARD RISK AND EMERGENCY PREPAREDNESS ANALYSIS Z-013 Rev.1, March 1998 This NORSOK standard is developed by NTS with broad industry assistance. Please note that whilst every effort has been made
More informationControlling Risks Risk Assessment
Controlling Risks Risk Assessment Hazard/Risk Assessment Having identified the hazards, one must assess the risks by considering the severity and likelihood of bad outcomes. If the risks are not sufficiently
More informationRisk Assessment Data Directory. Report No. 434 6.1 March 2010. Ignition probabilities
Risk Assessment Data Directory Report No. 434 6.1 March 2010 Ignition probabilities I n t e r n a t i o n a l A s s o c i a t i o n o f O i l & G a s P r o d u c e r s P ublications Global experience The
More informationFAQ SHEET - LAYERS OF PROTECTION ANALYSIS (LOPA)
FAQ SHEET - LAYERS OF PROTETION ANALYSIS (LOPA) Acronyms and Abbreviations Used ANSI - American National Standards Institute IPL - Independent Protection Layer ISA - The Instrumentation, Systems and Automation
More informationHUMAN FAILURE IN THE ASSESSMENT OF MAJOR HAZARD RISK: A CASE STUDY FOR THE HUMAN FACTORS SAFETY CRITICAL TASK ANALYSIS (HFSCTA) METHODOLOGY
HUMAN FAILURE IN THE ASSESSMENT OF MAJOR HAZARD RISK: A CASE STUDY FOR THE HUMAN FACTORS SAFETY CRITICAL TASK ANALYSIS (HFSCTA) METHODOLOGY Charlotte Hill 1, Liz Butterworth 1 and Steve Murphy 2 1 Human
More informationASME B31.3 Process Piping. Scope of B31.3 Course
ASME B31.3 Process Piping Charles Becht IV, PhD, PE Don Frikken, PE Instructors BECHT ENGINEERING COMPANY, INC. Introduction -1 Scope of B31.3 Course This course covers piping as typically used in process
More informationSafety Analysis of Accidents and Project Management
Dominant underlying factors of work related accidents 3 rd International Conference Working on Safety September 2006 workingonsafety.net C.M. Pietersen Msc TNO Safety Solutions Consultants BV 1 General
More informationQAT - TECHNICAL ASSESSMENT QUESTIONNAIRE: Domestic Suppliers 1. TECHNICAL ASSESSMENT
COMPANY: ADDRESS: TEL- FAX- E-MAIL: PERSON RESPONSIBLE: QAT - TECHNICAL ASSESSMENT QUESTIONNAIRE: Domestic Suppliers Cemig Suppliers Award OBJECTIVE: The purpose of this questionnaire is to obtain information
More informationDET NORSKE VERITAS. Report Corrib Onshore Pipeline QRA. Shell E&P Ireland Ltd. Report no/dnv Reg No.: 01/ 12LKQW5-2 Rev 01, 2010-05-18
DET NORSKE VERITAS Report Corrib Onshore Pipeline QRA Shell E&P Ireland Ltd. Report no/dnv Reg No.: 01/ 12LKQW5-2 Rev 01, 2010-05-18 DET NORSKE VERITAS Report for Shell E&P Ireland Ltd. Corrib Onshore
More informationCompany Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number]
Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN For [site name] [EPL number] Pollution Incident Response Management Plan for [insert site name] Contents [need to check correct page numbers]
More informationPopulation Vulnerability Assessment around a LPG Storage and Distribution Facility near Cochin using ALOHA And GIS
International Journal of Engineering Science Invention ISSN (Online): 2319 6734, ISSN (Print): 2319 6726 Volume 4 Issue 6 June 2015 PP.23-31 Population Vulnerability Assessment around a LPG Storage and
More informationThe Control of Major Accident Hazards Regulations (Northern Ireland) 2015
STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September
More informationApplication for Approval to Construct or Upgrade and Operate a Storage Facility October 2015 CSB CSB13001
Application for Approval to Construct or Upgrade and Operate a Storage Facility October 2015 CSB CSB13001 In accordance with the Hazardous Substances and Waste Dangerous Goods Regulations, I hereby apply
More informationReporting dangerous goods incidents. Guideline (6th edition)
Reporting dangerous goods incidents Guideline (6th edition) Reference The recommended reference for this publication is: Department of Mines and Petroleum, 2011, Reporting dangerous goods incidents guideline
More informationCHAPTER 1: GENERAL APPLICABILITY
CHAPTER 1: GENERAL APPLICABILITY 1.1 INTRODUCTION The purpose of this chapter is to help you determine if you are subject to Part 68, the risk management program rule. Part 68 covers you if you are: The
More informationClassification of incidents. Code: NT.00036.GN
Technical standard Classification of incidents Code: NT.00036.GN Edition: 1 The following text is a translation of the original Procedure "Clasificación de incidentes (NT.00036.GN), Version 1, in order
More informationArea Classification Why? Where? How? Who? When?
Area Classification Why? Where? How? Who? When? Patrick Leroux TOTAL AREA CLASSIFICATION Why? A brief history of accidents Severe accidents in coal mines occurred through the world in the 19 th and 20
More informationLNG regasification terminals: comparing the inherent safety performance of innovative technologies
LNG regasification terminals: comparing the inherent safety performance of innovative technologies Alessandro Tugnoli 1, Nicola Paltrinieri 1, Gabriele Landucci 2, Valerio Cozzani 1 (1) Dipartimento di
More informationInternational Format for Material Safety Data Sheets
International Format for Material Safety Data Sheets Canada s occupational health and safety agencies have agreed to allow the use of an internationally recognized format for material safety data sheets
More informationProcess Safety & Barrier Management. Lessons from major hazard industries
Process Safety & Barrier Management Lessons from major hazard industries Engineers Ireland, Fire & Safety Division Conference. Robert Sherman, Principal Consultant, MMI. email: rsherman@mmiengineering.com
More informationProcess Safety Management
Process Safety Management U.S. Department of Labor Occupational Safety and Health Administration OSHA 3132 2000 (Reprinted) This informational booklet is intended to provide a generic, non-exhaustive overview
More informationAnnex H. Quantitative Risk Assessment Specialist Report
Annex H Quantitative Risk Assessment Specialist Report Burgan Oil Cape Terminal Major Hazard Installation Risk Assessment for EIA v4.0 Ref: 0220778 MHI 0012 EXECUTIVE SUMMARY Burgan Oil Cape Terminal
More informationSAFETY MANAGEMENT SYSTEM FOR MAJOR HAZARD FACILITIES - BOOKLET 3: Part 7.17
EMERGENCY PLANNING EXTRACTION FROM: SAFETY MANAGEMENT SYSTEM FOR MAJOR HAZARD FACILITIES - BOOKLET 3: Part 7.17 An extraction from: Safety Management System for Major Hazard page 1 of 14 7.17 Emergency
More informationIs This Combustible Dust?
1 of 5 8/6/2012 1:16 PM Is This Combustible Dust? Thursday, 19 July 2012 Dust explosions and fires are serious hazards in the process industries that have lead to loss of life, injury to plant personnel
More informationTOXIC AND FLAMMABLE GAS CLOUD DETECTORS LAYOUT OPTIMIZATION USING CFD
Introduction to the case Gas detectors are commonly installed in process facilities to automatically alarm and trigger safety measures in response to hazardous leaks. Without effective leak detection,
More informationOutline. Background. NFPA 820 Applicability to Wastewater Treatment Facilities. Hazardous Area Classifications. Treatment Plant Area Classifications
Outline Background NFPA 820 Applicability to Wastewater Treatment Facilities Hazardous Area Classifications Treatment Plant Area Classifications Locations of Concern Background NFPA 820 Standard for fire
More informationMSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY
INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 Telex: 23588 IMOLDN G IMO E Ref. MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE
More informationMeasures adopted for Monitoring Safety of Natural Gas Pipelines
Measures adopted for Monitoring Safety of Natural Gas Pipelines By S. P. Garg General Manager (HSE) Corporate HSE Department GAIL (India) Limited Email: sp.garg@gail.co.in Conference on Chemical (Industrial)
More informationVersion: 1.0 Last Edited: 2005-10-27. Guideline
Process hazard and risk Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:johan.hedberg@sp.se -1- Summary This report will try
More informationWaste Oil Collection / Storage
ENVIRONMENTAL & REGULATORY SERVICES Storage Tank Regulation Section P. O. Box 7837 Madison, Wisconsin 53707-7837 TDD #: (608) 264-8777 http://www.commerce.state.wi.us http://www.wisconsin.gov Jim Doyle,
More informationGuide for Preparing SHIPPING PAPERS
Guide for Preparing SHIPPING PAPERS One of the most frequently cited safety violations of the Hazardous Materials Regulations (HMR), Title 49 CFR Parts 100-185, is the failure of the shipper to properly
More informationProposed Development Phase IV at CRC Oil Terminal, Tsing Yi - Refrigerated Storage Tanks for Liquefied Gas
in association with China Resources Petrochems (Group) Co. Ltd Proposed Development Phase IV at CRC Oil Terminal, Tsing Yi - Refrigerated Storage Tanks for Liquefied Gas Project Profile July 2005 CONTENTS
More informationQUANTITATIVE RISK ASSESSMENT - QRA FOR
QUANTITATIVE RISK ASSESSMENT - QRA FOR TOWN GAS COMPANY PART - II Pressure Reduction and Odorant Station at Greater Cairo Jan 2006 Report # PS-GZT-TG 001 Rev.0 PS-GZT-TG-001 Revision (1) Jan 2006 Table
More informationJOINT CBA AND SIA GUIDANCE FOR THE STORAGE OF FLAMMABLE LIQUIDS IN SEALED PACKAGES IN SPECIFIED EXTERNAL STORAGE AREAS
JOINT CBA AND SIA GUIDANCE FOR THE STORAGE OF FLAMMABLE LIQUIDS IN SEALED PACKAGES IN SPECIFIED EXTERNAL STORAGE AREAS 1 JOINT CBA AND SIA GUIDANCE FOR THE STORAGE OF FLAMMABLE LIQUIDS IN SEALED PACKAGES
More informationMechanical Systems Competency 1.20
Competency 1.20 Mechanical systems personnel shall demonstrate a working level knowledge of the safety and health fundamentals of mechanical systems and/or components. 1. Supporting Knowledge and Skills
More informationPREVENTION of the RISKS OF MAJOR INDUSTRIAL ACCIDENTS (BEKRA LEGISLATION) GUIDANCE FOR OPERATORS
This Project is co-financed by European Union and Republic of Turkey TECHNICAL ASSISTANCE ON INCREASING THE IMPLEMENTATION CAPACITY OF THE SEVESO II DIRECTİVE PREVENTION of the RISKS OF MAJOR INDUSTRIAL
More information