1 Seminar on Construction Contracts :Legal Subtleties NATIONAL SEMINAR ON CONSTRUCTION CHALLENGES LEGAL SUBTLETIES 16 November 2012, Bangalore Poornima Hatti Neela Badami
2 OVERVIEW Introduction: Forms of Dispute Resolution Arbitration Structural Framework in India Why Arbitration? Construction Contracts Meaning Parties Involved Interpretation Standard Form Contracts Problems in the Construction Industry that could lead to disputes Specific heads brought under arbitration Determination of the agreement Payment and time Execution of work and delay Neutralization of risks: Proactive approach Arbitration in construction contracts Concept of Damages in Construction Contracts
3 CHOICE OF DISPUTE RESOLUTION MECHANISM Arbitration: Intl or domestic Mediation Domestic litigation Expert determination Conciliation 3
4 MEDIATION KEY FEATURES Voluntary Confidential Non-binding the mediator s mandate is only to facilitate discourse between the parties, not to make judgment Informal Quick and cheap Room for creativity Preservation of business relationship between the parties High success rate 4
5 MEDIATION STEP BY STEP Agreement to mediate Selection of mediator Pre-mediation contact Preparation Initial joint meeting Private meetings Settlement/concluding phase Costs of the mediation 5
6 MEDIATION - MYTHS A sign of weakness Unnecessary Negotiation has failed why should mediation succeed? Thee mediator adds no value Full disclosure is necessary before mediation can be entertained Mediation wastes time and money if no settlement is achieved Mediation only delays progress of court or arbitral proceedings 6
7 Arbitration A method of private, binding and enforceable dispute resolution Part of a growing group of alternative dispute resolution procedures, along with conciliation, mediation and expert determination. By written agreement Parties can select arbitrators, based on expertise and background Parties can select choice of law and forum.
8 WHY ARBITRATION? Speedier resolution of disputes Less costly as compared to litigation Confidentiality: The parties can subject the whole dispute to confidentiality through agreement. Ability to choose an arbitrator who is an expert on the subject matter, as compared to inability to choose a judge in litigation. More informal process. Higher likelihood of parties remaining on good terms even after settlement of disputes, as compared to litigation. Party autonomy
9 STRUCTURAL FRAMEWORK OF ARBITRATION IN INDIA India enacted its Arbitration and Conciliation Act in 1996, based on the UNCITRAL Model Law. The Act provides for domestic arbitration international commercial arbitration, enforcement of foreign award and conciliation
10 KEY ISSUES THAT MAY ARISE IN ANY ARBITRATION Competence Competence Section 9 remedy Section 11 role Limited scope of appeal- unless there is a serious concern. Appreciation of evidence is at the best in the trial. Different choices of law. Institutional v. ad hoc arbitration
11 INCREASING POPULARITY OF ARBITRATION Increasing use of arbitration to settle international disputes Increasing number of international commercial transactions and disputes. International contracts parties increasingly reluctant to rely on jurisdiction of home courts of other side. International arbitration gained wide acceptance in international business and legal communities. One study: 90% international contracts contain arbitration clause. Increasing use of arbitration in Asia Number of cases involving Asian parties on the rise: 1983: 3% of ICC arbitrations involved one or more Asian parties. 2006: 17% of ICC arbitrations involved one or more Asian parties. Investor-state arbitration has also begun to grow in Asia. Cases have included: Bangladesh, Indonesia, Malaysia, Mongolia, Pakistan and the Philippines. Increasing number of Asian states have entered into BITs. 11
12 PROBLEMS PECULIAR TO THE CONSTRUCTION INDUSTRY WHICH COULD POTENTIALLY LEAD TO DISPUTES Inherent nature of the industry. Building construction is not like the manufacture of goods in a factory. The size of the project, site conditions, the use of many materials and the employment of various kinds of operatives make it virtually impossible to achieve the same degree of perfection that a manufacturer can. It must be a rare new building in which every screw and every brush of paint is absolutely correct. - Emson Eastern v. EME Developments (1991) 55 BLR 114 Multiplicity of parties (general contractor, sub-contractor, supplier, engineer, architect, owner, etc.) When there are so many parties involved, it is difficult to point out default. Finger pointing becomes a problem, when each party blames the other. Weather conditions, site specifications.
13 CONTD.. Tendency of faults to show up late: A construction project is a continuous one, usually spread over a number of years. A fault may turn up at any time. If it happens in the beginning, again, it can upset the whole time schedule of the construction unless the dispute is resolved quickly. Neighbouring constructions: Since the project cannot exist in isolation, owners of neighbouring sites can present difficulties. Laws relating to nuisance, planning, environmental impact and neighbourhood proprietor interests will come into play. Delivery procedure is unique to construction industry.
14 CONTD.. Changing nature of the work and unforeseen circumstances: Manpower shortage: The work may not go as planned, and may require, for example, more manpower. In one case, for example, the drawings and designs were changed in the course of construction of the works. This resulted in an abnormal increase in the quantum of work and, consequently, the contractor claimed a higher amount. These types of problems are common. Shortage of material Accidents, through fire, flood etc. Design that proves to be impossible to construct.
15 SPECIFIC HEADS OF DISPUTES BROUGHT UNDER ARBITRATION Determination of the agreement The failure of the contractor or sub-contractor to proceed in a competent, diligent and satisfactory rate The contractor or sub-contractor ceasing work on site The employer repudiating the contract by denying contractor access to site, not making progress payment, being insolvent or claiming to determine the contract. Payment and Time Non-payment of progress claims by contractor or sub-contractor Non-payment of amount certified in final account Extension of time costs claims by contractor or sub-contractor Liquidated and ascertained damages charged against the contractor or sub-contractor Contractor claim sums for fluctuation of prices.
16 CONTD.. Execution of work and delay Changes in sub-structure design and lack of temporary support during excavations Defective materials and claims of negligent manufacture and supply Poor quality of workmanship including defects in brickworks, tiling, footing and wall construction Delays and extension of time due to local authorities requirements Negligence and nuisance.
17 NEUTRALIZATION OF RISKS: PROACTIVE APPROACH Example: In the Parbati Stage III project there arose a situation where there was water inflow of more than 100 litres/second, and silt and debris flow, which needed ground treatment. But there was no provision in the contract providing for ground treatment, which resulted in the project being stuck at this stage for several months. The same problem, when it arose in the Niagara Tunnel Project, Canada and the Karahnjukar Hydroelectric Project in Iceland, was averted because bad ground situations was already anticipated and provided for in the contract. As we have discussed, construction contracts are prone to varying conditions, including increase in rate of taxes and duties, promulgation of new taxes, increase in price of raw materials, not to mention weather and site-specific risks. These risks should be offset by a suitable provision in the contract.
18 NEUTRALIZATION OF RISKS: PROACTIVE APPROACH If during the course of execution there are extra items of work required to be executed, a schedule of the following items should be appended to the contract, to enable both parties to arrive at the figure payable, and to avoid claims at a later date. Overheads to include all indirect cost at site including interest on borrowings, bank guarantees etc. to be spelt out as a percentage of cost Supervision Profit Day rates for workmen of all categories Day work for all supervisory staff Day work/ hourly rates for all equipment Hard costs will be worked out on actual.
19 ARBITRATION IN CONSTRUCTION CONTRACTS Advantages in arbitrating construction contracts: In the construction industry, insofar as international disputes are concerned, arbitration is fast becoming the preferred method of dealing with disputes. This is basically due to: Neutrality: If a risk analysis is undertaken, most contractors, due to a natural fear of litigating in foreign ground, would prefer not to choose a situation where a foreign court will have the final say. They would much prefer a neutral arbitrator. Enforcement: The judgments or orders of foreign courts would be extremely difficult to enforce in other jurisdictions. However this problem can be resolved through arbitration, especially after the New York Convention. With over a hundred countries signatories, the New York Convention ensures that any award given in any of these states is enforceable in the other. Expert: The construction industry is extremely complex and a technical area, and a choice of arbitrators can ensure that an expert considers the questions.
20 PROBLEMS WITH ARBITRATION IN THE CONSTRUCTION INDUSTRY Difficulty in Joinder: Since there are multiple parties, joinder will be a problem. For example, the CIAC Rules regarding joinder say: If the parties so agree, the Tribunal shall also have the power to add other parties (with their consent) to be joined in the arbitration and make a single Final Award determining all disputes between them. (Rule 33.2) Thus clearly, only if the parties so wish, joinder can be effected. Invariably, in an industry with differing interests and conflicts, and several parties, it is unlikely that all parties will agree to a joinder. Difficulty in consolidation: For the same reason, consolidation into one hearing or under one arbitrator will be problematic. This might lead to separate proceedings having to be commenced, different arbitrators likely to be appointed, and separate findings of fact or law as a result.
21 CONSTRUCTION INDUSTRY ARBITRATION COUNCIL (CIAC) CIAC is a body that works under the aegis of the Construction Industry Development Council (CIDC), an apex body for the Construction Industry established by the Planning Commission and construction industry. It provides an institutional mechanism for the resolution of construction and infrastructure related disputes. The CIAC was set up by the CIDC in cooperation with the Singapore International Arbitration Centre (SIAC). The arbitration centre in India provides facilities for alternative dispute resolution, both international and domestic arbitration.
22 FIDIC A 100 year old industry body International Federation of Consulting Engineers. Widespread knowledge about consulting engineering which have been crystalized into various standard forms of contracts. Specific Dispute Adjudication Boards with stringent tests for adjudicators. Appeal to ICC arbitration usually. Other recognised and well established arbitrations include ICC, LCIA, SIAC, Nani Palkhivala Centre.
23 DAMAGES IN CONSTRUCTION CONTRACTS Some basics of contract law What are contracts? agreements enforceable by law, must be performed at the time fixed for performance, consideration not void or voidable Breaches Kinds of breaches, with examples: Failure to perform Refusal to perform Disability to perform Consequences of breach of contract, with examples: Specific performance Injunction Damages Damages Liquidated Damages
24 SOME FEATURES OF CONSTRUCTION CONTRACTS RELEVANT TO A DISCUSSION ON DAMAGES Time is of the essence i.e, if contract not performed within specified time, other party can treat contract as repudiated (broken) Obligations imposed on employer and principal what must he / it be doing to enable you (engineer / contractor) to perform your role? Environmental factors how provided for? Force majeure clauses what are covered? How can you (engineer / contractor) make use of the above to your advantage?
25 DAMAGES Basic principle of damages under contract is to give a person the gains that were expected from the performance of the contract. Section 73 and Section 74 of the Indian Contract Act, 1872 codify the principles for the grant of damages under Indian law. Section 73 (general damages) provides that when a contract is breached, the person suffering is entitled to compensation from the breaching party. However, remote or indirect losses are not covered. Section 74 (liquidated damages) provides that if the contract specifies a sum payable on breach, or, any other penalty stipulation, the suffering party is entitled to reasonable compensation not exceeding the amount stipulated.
26 LIQUIDATED DAMAGES Employer / principal s objective is to get the project or construction completed on time Hence, LDs act as the stick in the carrot / stick approach in the contract (with the carrot being consideration or milestone payments) Typically provided for in the event construction is not completed on time (time being of the essence in construction contracts). Genuine pre-estimate of damages
27 SAMPLE LIQUIDATED DAMAGES CLAUSES IN CONSTRUCTION CONTRACTS The tentative schedule for completing the construction of super-structure shall be months from the construction oil the entire super-structure under the present agreement. If the construction is not completed within this specified time, then the developer shall pay to the owner, damages at the rate of Rs. per month. Any willful delay on the part of the second party in completing the construction within the stipulated period will render him liable to pay liquidated Rs. * per day which will be deducted from payments due to him. The first party may cancel the contract and take recourse to such other action as deemed appropriate once the total amount of liquidated damages exceeds 2 % of the contract amount. (Note : The amount of liquidated damages per day should be determined at 0.05 % of the contract value of the works and indicated here)
28 WHEN IS THE CONTRACTOR NOT LIABLE TO PAY LIQUIDATED DAMAGES? When the employer has waived the right to insist upon them, such as when the employer has failed to deduct or retain them in cases where it is imperative on his part under the contract to do so. Where the liquidated damages are stipulated for at a certain amount per day or per week, there must be a definite date from which they are to run. If no such date is fixed by the contract, the liquidated damages clause shall not be effective. When the delay is caused by the employer.
29 CONCLUSION Points to ponder
30 Thank you! CHENNAI Suite# 672, CitiCentre, Level 6, 10/11 Dr. Radhakrishnan Salai (formerly Cathedral Road) Chennai BANGALORE 62/1, Palace Road, Vasanthnagar, Bangalore NEW DELHI No. 62, First Floor, Sahyog Apartments, Mayur Vihar Phase I, New Delhi
Managing Payment Risks on International Construction Projects
Managing Payment Risks on International Construction Projects January 23, 2006 (The following outline was used in a presentation to the Overseas Construction Association of Japan, Inc. (OCAJI) on July
More informationNorth London Plumbing & Heating Terms and Conditions
North London Plumbing & Heating Terms and Conditions Christopher Michael Darby North London Plumbing & Heating 2 Perth Road Wood Green London N22 5RB 0203 592 4340/07400 616 686 info@nlph.org 1 DEFINITIONS
More informationTerms and Conditions of Offer and Contract (Works & Services) Conditions of Offer
Conditions of Offer A1 The offer documents comprise the offer form, letter of invitation to offer (if any), these Conditions of Offer and Conditions of Contract (Works & Services), the Working with Queensland
More informationRegulation and Adjudication in Construction Contracts
Regulation and Adjudication in Construction Contracts Jidesh Kumar Advocate & Managing Partner King Stubb & Kasiva Advocates E-mail: bangalore@ksandk.com New Delhi I Bangalore I Mumbai I Chennai Why do
More informationGENERAL TERMS AND CONDITIONS
GENERAL TERMS AND CONDITIONS Contents A. SCOPE...3 B. CONFIDENTIALITY, NAME, INTELLECTUAL PROPERTY AND TAX EXEMPT STATUS OF THE WTO...3 B.1. Confidentiality...3 B.2. Use of the name, logo or official seal
More information(INDIVIDUALS ONLY) IndContPkge Version: 1.7 Updated: 18 Jul. 03
INDEPENDENT CONTRACTOR PACKAGE (INDIVIDUALS ONLY) IndContPkge Version: 1.7 Updated: 18 Jul. 03 Contents Preface 2 Checklist 3 Helpful Hints 4 Frequently Asked Questions 5 Agreement with an Independent
More informationSTUDENT LOAN DEFAULT MANAGEMENT SERVICES AGREEMENT Between. and HARRISBURG AREA COMMUNITY COLLEGE
STUDENT LOAN DEFAULT MANAGEMENT SERVICES AGREEMENT Between and HARRISBURG AREA COMMUNITY COLLEGE This Agreement is made between Harrisburg Area Community College (HACC), whose primary address is One HACC
More informationVOLVO CONSTRUCTION EQUIPMENT. CARETRACK LICENCE (Version 3 April 2010)
CARETRACK LICENCE () This licence is issued by VOLVO CONSTRUCTION EQUIPMENT DIVISION, VOLVO GROUP UK LTD incorporated and registered in England and Wales with company number 2190944, whose registered office
More informationPurchasing Terms and Conditions
Purchasing Terms and Conditions ( Terms and Conditions ) Wincor Nixdorf Pte Ltd 1 Purchase Order and Acknowledgement of Order 1.1 These Terms and Conditions shall apply to all orders and/or agreements
More informationProfessional Indemnity Select
Allianz Insurance plc Professional Indemnity Select Cover Overview Professional Indemnity Select Cover Overview Contents Thank you for choosing Allianz Insurance plc. We are one of the largest general
More informationProfessional Indemnity Select
Allianz Insurance plc Professional Indemnity Select Policy Overview Policy Overview Professional Indemnity Select Contents Thank you for choosing Allianz Insurance plc. We are one of the largest general
More informationISSUES OF CONTRACTUAL CHAIN AND SUB- CONTRACTING IN THE CONSTRUCTION INDUSTRY
ISSUES OF CONTRACTUAL CHAIN AND SUB- CONTRACTING IN THE CONSTRUCTION INDUSTRY Wai Fan Wong and Charles Y.J. Cheah School of Civil and Environmental Engineering, Nanyang Avenue, Nanyang Technological University,
More informationRisks in International Consultancy Appointments: The FIDIC White Book
Risks in International Consultancy Appointments: The FIDIC White Book An increasing number of UK based consultants are involved in international projects. Given the forecasted growth in global construction
More informationTEMPLE LITIGATION ADVANTAGE INSURANCE FOR DISBURSEMENTS AND OPPONENT S COSTS Certificate of Insurance
TEMPLE LITIGATION ADVANTAGE INSURANCE FOR DISBURSEMENTS AND OPPONENT S COSTS Certificate of Insurance In return for the payment of the Premium specified in the Schedule and based on any Information that
More informationDr. Simon Chee, Professor Michael Hor, Distinguished Guests, Ladies and. 2. Hong Kong has never been short of infrastructure and construction
Speech by the Hon Rimsky Yuen, SC, JP, Secretary for Justice Hong Kong Construction Arbitration Centre & University of Hong Kong Joint Conference on Construction Dispute Resolution 2015 Resolution of Construction
More informationBasic Guide. General Conditions of Contract for Construction Works (GCC 2004)
Basic Guide General Conditions of Contract for Construction Works (GCC 2004) February 2008 Preface The Construction Industry Development Board (CIDB) is a national body established by an Act of Parliament
More informationWritten evidence for the Department of Business, Innovation and Skills: a small business commissioner
Written evidence for the Department of Business, Innovation and Skills: a small business commissioner About ACCA ACCA is the global body for professional accountants. We aim to offer business-relevant,
More informationDispute Resolution. White Paper. This document on Dispute Resolution outlines the four main approaches to resolving contractual disputes.
White Paper Dispute Resolution This document on Dispute Resolution outlines the four main approaches to resolving contractual disputes. CIPS members can record one CPD hour for reading a CIPS Knowledge
More information7.4.1 Be required to make exhaustive or continuous on-site reviews;
SUPPLEMENTARY CONDITIONS TO THE CANADIAN STANDARD FORM OF CONTRACT FOR ARCHITECTURAL SERVICES DOCUMENT SIX 2006 EDITION RAIC 6 2006 FRASER HEALTH PROJECTS The following Supplementary Conditions are specific
More informationTerms and Conditions for Tax Services
Terms and Conditions for Tax Services In the course of delivering services relating to tax return preparation, tax advisory, and assistance in tax controversy matters, Brady, Martz & Associates, P.C. (we
More informationArticle 2. Offers and quotations
1 Article 1. General 1. These terms and conditions apply to all offers, quotations and agreements between Smets Food Trading B.V., with registered offices in (6131 GR) Sittard, at Odasingel 473, hereinafter
More informationTerms & Conditions Domain Names, Web Hosting, Project Consultancy
CATERSOFT LTD Terms & Conditions Domain Names, Web Hosting, Project Consultancy Definitions In these definitions the following terms shall have the following meanings: Customer means a party entering into
More informationQUOTATION DOCUMENTS TERMS AND CONDITIONS OF AGREEMENT
Page 1 of 5 INTERPRETATION QUOTATION DOCUMENTS TERMS AND CONDITIONS OF AGREEMENT FOR THE SUPPLY AND DELIVERY OF FOODSTUFF OR AMENITIES ITEM(S) FOR THE PERIOD SPECIFIED IN THE AWARD LETTER In these Terms
More informationAlternative Dispute Resolution (ADR) Procedures
Alternative Dispute Resolution (ADR) Procedures The background Traditional dispute resolution procedures Private Negotiation 1. A lost skill, negotiation is a process of the parties themselves or via skilled
More informationHow To Write A Short Form Prime Prime Prime Contract Between A Contractor And Owner
SHORT FORM PRIME CONTRACT BETWEEN OWNER & CONTRACTOR This Agreement ( Contract ) is made this day of, 20, between ( Contractor ) and ( Owner ) at The work described in Section 1 below shall be performed
More informationGENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES
GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES GENERAL CONDITIONS OF CONTRACT FOR MINOR WORKS PAGE 1 BASE D ON WA LOCAL GOVERNMENT ASSOCIATION MODEL 2010 TABLE OF CONTENTS 1 INTERPRETATION 2 RISE
More informationPROPERTY MANAGEMENT AGREEMENT
PROPERTY MANAGEMENT AGREEMENT OWNER: AGENT: PROPERTY: APN: Owner and Property Manager, as hereinafter identified, agree as follows: 1. APPOINTMENT OF AGENT: Owner hereby appoints and grants Property Manager
More informationMemorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information
Memorandum Important information related to requirements of state or local laws to include additional provisions in residential construction contracts Potentially Affected AIA Contract Documents AIA Document
More informationEfficient alternative dispute resolution (ADR) for intellectual property disputes
13.1 Efficient alternative dispute resolution (ADR) for intellectual property disputes More and more rights holders are recognizing the benefits of using private neutral mechanisms that allow parties to
More informationAlternative Dispute Resolution
Alternative Dispute Resolution Michael Cohen, Chairman Emeritus, The Academy of Experts, Past President, EuroExpert Before even starting to look at ADR (Alternative Dispute Resolution) it is important
More informationTRANSFER OF STRUCTURED SETTLEMENT PAYMENT RIGHTS
For more information please visit Strategic Capital Corporation at www.strategiccapital.com, or contact us at Toll Free: 1-866-256-0088 or email us at info@strategiccapital.com. TRANSFER OF STRUCTURED
More informationForm 6A ALTERNATIVE DISPUTE RESOLUTION (ADR) FORM
Form 6A ALTERNATIVE DISPUTE RESOLUTION (ADR) FORM The State Courts regard Alternative Dispute Resolution (ADR) as the first stop of a court process. ADR is crucial in the cost-effective and amicable resolution
More informationSERVICES AGREEMENT. In consideration of the rights and obligations herein set forth, the parties do hereby agree as follows:
SERVICES AGREEMENT THIS AGREEMENT is between, with offices at (hereinafter referred to as COMPANY ), and the University of Delaware, a nonprofit institution of postsecondary education chartered under the
More informationFUNDING AGREEMENT GENERAL TERMS
1. Appointment FUNDING AGREEMENT GENERAL TERMS 1.1. In consideration of the Foundation agreeing to make the Grant to the Recipient, the Recipient: 2. Term a) appoints the Foundation as [a/the] [major/exclusive]
More informationShtokman Development AG
Shtokman Development AG Integrated Development of the Shtokman Gas- Condensate Field. Phase 1 SDAG Standard EPC Contract. Main Principles. EPC Contracts What is an EPC contract? - Contract for Engineering,
More informationSEO Agreement SEARCH ENGINE OPTIMIZATION AND REPORTING AGREEMENT
SEO Agreement SEARCH ENGINE OPTIMIZATION AND REPORTING AGREEMENT This Search Engine Optimization and Reporting Agreement ("Agreement") is hereby entered into between India Market Softech (P)Ltd. (hereinafter
More informationLaw 2735/1999 (the Law) governs international commercial arbitration taking place in Greece. It is based on the UNCITRAL model law.
Ελλάδα Greece Europe Key points Law 2735/1999 (the Law) governs international commercial arbitration taking place in Greece. It is based on the UNCITRAL model law. There are two major arbitral bodies:
More information1.1 In these Terms and Conditions, the following words shall have the following meanings:
1. DEFINITIONS / INTERPRETATIONS 1.1 In these Terms and Conditions, the following words shall have the following meanings: Claims shall mean all causes of action, demands of any kind, court costs and expenses
More informationBGE/BE/TAC/0710. NQH Business electricity Terms and conditions
BGE/BE/TAC/0710 NQH Business electricity Terms and conditions These are our standard terms and conditions of NQH business electricity supply. As a NQH business customer you will be deemed to have accepted
More informationEscrow Agreement INSTRUCTIONS STOCKHOLM CHAMBER OF COMMERCE ESCROW MODEL AGREEMENT 2014
SCC Escrow Account No... (For SCC to fill in) Escrow Agreement INSTRUCTIONS STOCKHOLM CHAMBER OF COMMERCE ESCROW MODEL AGREEMENT 2014 This is a model agreement, which means that the parties should adapt
More informationNominated Subcontractors on International Projects: Approaches to Risk Allocation
Nominated Subcontractors on International Projects: Approaches to Risk Allocation September 5, 2005 (he following outline was used in a presentation to the Overseas Construction Association of Japan, Inc.
More informationAfDB New Procurement Policy: Training Program for the Bank s Procurement Staff. Risk Allocation in Construction Contracts
11 AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff Risk Allocation in Construction Contracts Risks 2 In the absence of a contract, all risks are the owner's Contracting is
More informationMODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS
MODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS International Trade Centre, August 2010 Contents Foreword Acknowledgements Chapter 1 International Contractual Alliance ITC
More informationStandard Terms & Conditions for Supply of Software Development Services
Sell your Products Online and Web by Numbers are brands of Web by Numbers Ltd (hereinafter referred to as Web by Numbers ) Standard Terms & Conditions for Supply of Software Development Services These
More informationLek Securities Corporation. Agreement for Prime Broker Clearing Services
Lek Securities Corporation Agreement for Prime Broker Clearing Services This Agreement by and between Lek Securities Corporation ( LSC ), on its own behalf or on behalf of its Correspondent firm for which
More informationBLACKBERRY AUTHORIZED ONLINE RETAILER BLACKBERRY HANDHELD REPAIR SERVICE TERMS AND CONDITIONS
BLACKBERRY AUTHORIZED ONLINE RETAILER BLACKBERRY HANDHELD REPAIR SERVICE TERMS AND CONDITIONS THESE BLACKBERRY AUTHORIZED ONLINE RETAILER BLACKBERRY HANDHELD REPAIR SERVICE TERMS AND CONDITIONS (THIS AGREEMENT
More informationBiller is the person or entity to which you wish a bill payment to be directed or from which you receive electronic bills, as the case may be.
SERVICE DEFINITIONS Service means the Bill Payment Service offered by Edward Jones through Fiserv, Inc.. Agreement means the Terms and Conditions of the bill payment service. Biller is the person or entity
More informationDraft SHG, Inc./ XYZC0 Business Development Agreement February 2002
Draft SHG, Inc./ XYZC0 Business Development Agreement February 2002 This Business Development Agreement ( Agreement ) is made and entered into by and between XYZCO, a (state) corporation with its principal
More informationTHE SUSTAINABLE ENERGY AUTHORITY OF IRELAND PURCHASE ORDER TERMS AND CONDITIONS OF PURCHASE
THE SUSTAINABLE ENERGY AUTHORITY OF IRELAND PURCHASE ORDER TERMS AND CONDITIONS OF PURCHASE WHEREAS The Sustainable Energy Authority of Ireland (hereinafter called SEAI ) of Wilton Park House, Wilton Place,
More informationTT ELECTRONICS INTEGRATED MANUFACTURING SERVICES LIMITED CONDITIONS OF PURCHASE
TT ELECTRONICS INTEGRATED MANUFACTURING SERVICES LIMITED CONDITIONS OF PURCHASE DEFINITIONS In these conditions of purchase: the Buyer means TT electronics integrated manufacturing services Ltd., the Supplier
More informationCHAPTER NINE DISPUTES SETTLEMENT ARTICLE 187 Scope of the Chapter The provisions of this Chapter shall apply to the settlement of disputes concerning
CHAPTER NINE DISPUTES SETTLEMENT ARTICLE 187 Scope of the Chapter The provisions of this Chapter shall apply to the settlement of disputes concerning the interpretation and application of the Treaty, including:
More informationAIA Document A312 - Electronic Format. Performance Bond
AIA Document A312 - Electronic Format Performance Bond THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION
More informationTerms and Conditions of Sale
Broadberry Data Systems Limited ("The Company") Terms and Conditions of Sale 1. General a) Unless otherwise expressly agreed in writing by a Director (or authorised executive) of the Company all goods
More informationMUSIC RESOURCES TERMS AND CONDITIONS FOR SCHOOLS ( Conditions )
MUSIC RESOURCES TERMS AND CONDITIONS FOR SCHOOLS ( Conditions ) Please ensure all relevant staff have read and understood these Conditions before signing. Please complete, sign and return the Music Resources
More information1.1 The contract shall be deemed to have been entered into upon receipt of supplier s written acknowledgement stating its acceptance of the order.
Kendrion (Switzerland) AG Albisstrasse 26 CH-8915 Hausen am Albis of Contract (Rev. 1, valid from 01.01.2013) 1 General 1.1 The contract shall be deemed to have been entered into upon receipt of supplier
More informationB R e s t o R i n g C o n f i d e n C e
B u i l d i n g B C Options for Resolving Residential Construction Disputes R e s t o r i n g C o n f i d e n c e Canadian Cataloguing in Publication Data Main entry under title: Options for resolving
More informationEXHIBIT "B" CRITERIA AND BILLING FOR EXTRA SERVICES
EXHIBIT "B" CRITERIA AND BILLING FOR EXTRA SERVICES The following Extra Services to the Agreement shall be performed by Architect if needed and if authorized or requested by the District: 1. Making revisions
More informationThe Foundation of the International Association of Defense Counsel SURVEY OF INTERNATIONAL LITIGATION PROCEDURES: A REFERENCE GUIDE
Responses submitted by: Name: Roddy Bourke Law Firm/Company: McCann FitzGerald Location: Dublin, Ireland 1. Would your jurisdiction be described as a common law or civil code jurisdiction? The Republic
More informationBlispay Card agreement
Blispay Card agreement 1. Definitions 2. How Blispay Card works 3. Making payments 4. Fees and interest 5. When things go wrong 6. Arbitration Provision 7. Legal 8. Communications and information sharing
More informationConditions of Supply of Internet Services
Conditions of Supply of Internet Services Terms and Conditions for domain name registrations Print this page. The Kirby Group Registration Agreement In this registration agreement ('Agreement'), the terms
More informationALTERNATIVE DISPUTE RESOLUTION
ALTERNATIVE DISPUTE RESOLUTION Presented by Carmella Ben-Simon Barrister Victorian Bar Owen Dixon Chambers West 17th floor 525 Lonsdale Street Melbourne 3000. T 92258585 F 9225 8024 DX 92 Melbourne Clerk
More informationThese Terms & Conditions may only be used by members of Koninklijke Metaalunie.
METAALUNIE CONDITIONS General delivery and payment conditions of Koninklijke Metaalunie (the Dutch organisation for small and medium-sized enterprises in the metal industry), referred to as the METAALUNIE
More informationGENERAL TERMS AND CONDITIONS (version 3.0)
GENERAL TERMS AND CONDITIONS (version 3.0) OF: The private company with limited liability Global Data Collection Company BV, with its registered office in Rotterdam, and having its principal place of business
More informationIMPROVING THE RESOLUTION OF TAX TREATY DISPUTES
ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT IMPROVING THE RESOLUTION OF TAX TREATY DISPUTES (Report adopted by the Committee on Fiscal Affairs on 30 January 2007) February 2007 CENTRE FOR TAX
More informationHosting Service Agreement
tesseract-online.com Hosting Service Agreement Cranbox Limited T/A Tesseract Commencement Date: 1. Agreement 1.1. This Agreement is made between you (the 'Customer') and Cranbox Limited trading as Tesseract
More informationALM GL ch. 231C, 1 (2004) 1. Definitions.
For more information please visit Strategic Capital Corporation at www.strategiccapital.com, or contact us at Toll Free: 1-866-256-0088 or email us at info@strategiccapital.com. ANNOTATED LAWS OF MASSACHUSETTS
More informationMOTOR VEHICLE ACCIDENT CLAIMS ACT
Province of Alberta MOTOR VEHICLE ACCIDENT CLAIMS ACT Revised Statutes of Alberta 2000 Chapter M-22 Current as of April 1, 2015 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s
More informationAre you covered? Coverage issues for construction professionals Part 2
Professional Risks - Construction Part 2 June 2015 Are you covered? Coverage issues for construction professionals Part 2 In this two part guide we will be looking at issues that frequently arise when
More informationGeneral Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES
General Terms of Public Procurement in Service Contracts January 2015 Contents Introduction...3 Issues to be observed in applying...5 General Terms of Public Procurement in Service Contracts ()...9 1 Definitions...9
More informationJRI S STANDARD TERMS OF PURCHASE. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business.
JRI S STANDARD TERMS OF PURCHASE 1. INTERPRETATION 1.1 Definitions. In these Conditions, the following definitions apply: Business Day: a day (other than a Saturday, Sunday or public holiday) when banks
More informationTaking Action. Dispute resolution, legal action and claims for negligence
Taking Action Dispute resolution, legal action and claims for negligence Taking Action Part 3: Dispute Resolution, taking legal action and claims for negligence Introduction If you believe an architect
More informationNOTE: SERVICE AGREEMENTS WILL BE DRAFTED BY RISK SERVICES SERVICE AGREEMENT
NOTE: SERVICE AGREEMENTS WILL BE DRAFTED BY RISK SERVICES SERVICE AGREEMENT Between: And: XXXXXX (the Contractor") Langara College 100 West 49 th Avenue Vancouver, BC V5Y 2Z6 (the College") The College
More informationMEDIATION PROCEDURES FOR RESOLVING BUSINESS-TO-BUSINESS DISPUTES
6465 Wayzata Blvd., Suite 470 Minneapolis, MN 55426 Phone: 800-474-2371 Fax: 952-345-1160 www.adrforum.com MEDIATION PROCEDURES FOR RESOLVING BUSINESS-TO-BUSINESS DISPUTES July 11, 2014 1 FORUM Request
More information549 COSTS, DISBURSEMENTS STRUCTURED SETTLEMENTS
For more information please visit Strategic Capital Corporation at www.strategiccapital.com, or contact us at Toll Free: 1-866-256-0088 or email us at info@strategiccapital.com. MINNESOTA ANNOTATED STATUTES
More informationAgreement for 2015 S Corporation Income Tax Preparation
Agreement for 2015 S Corporation Income Tax Preparation Dear Client: We will prepare the federal, resident state and city S-corporation income tax returns for for the year ended December 31, 2015 and we
More informationCLAUSES REQUIRED ON ALL HOME IMPROVEMENT CONTRACTS ($500.00 on up)
CLAUSES REQUIRED ON ALL HOME IMPROVEMENT CONTRACTS ($500.00 on up) 1. The name, address and license number of the contractor, and the name and registration number of any salesperson who solicited or negotiated
More informationEntee Global Services General Terms and Conditions
Entee Global Services General Terms and Conditions These General Terms & Conditions and any information relating to the Service provided by Entee Global Services forms the Agreement between Us. By accepting
More informationSAQ IT SUPPORT CONTRACT SPECIFIC TERMS AND CONDITIONS
Contents DEFINITIONS... 2 POINT OF CONTRACT... 2 COMMENCEMENT AND TERMINATION... 3 LIABILITY... 4 FORCE MAJEURE... 4 RATES... 5 GENERAL... 5 COVERING LAW... 6 AGREEMENT... 7 SEMTEC Limited Page 1 DEFINITIONS
More informationJUST INVEST VIRTUAL OFFICE AGREEMENT
JUST INVEST VIRTUAL OFFICE AGREEMENT Between Just Invest Registration Number 2008/029526/07 (Hereinafter referred to as Just Invest ) With chosen domicilium address, namely: Unit F02 First Floor, Block
More informationPUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS
PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS 2014 Public Sector Standard Conditions of Contract for Construction Works 2014 Building and Construction Authority First published 1995
More informationWebsite Development Agreement
Website Development Agreement This WEB SITE DEVELOPMENT AGREEMENT ("Agreement") is an agreement between India Market Softech Pvt. Ltd. (indiamarkethub.com) and the party set forth in the related order
More informationTERMS AND CONDITIONS OF SALE OF HARDWARE AND SOFTWARE
1/6 TERMS AND CONDITIONS OF SALE OF HARDWARE AND SOFTWARE These Terms and Conditions apply to hardware and software ordered and purchased from Vector, regardless of the customer s terms and conditions
More informationICC UNIFORM RULES FOR CONTRACT BONDS
ICC UNIFORM RULES FOR CONTRACT BONDS issued as ICC publication No. 524, adopted by the ICC Executive Board on 23 April 1993, come into effect on 1 January 1994 Copyright 1993 International Chamber of Commerce.
More informationResolving IP and Technology Disputes Through WIPO ADR. Getting back to business
Resolving IP and Technology Disputes Through WIPO ADR Getting back to business Intellectual property (IP) is a central component of today s knowledge economy, and its efficient exploitation is of growing
More informationbout your HOUSE Hiring a contractor
A bout your HOUSE Hiring a contractor CE 26 a At some time, most homeowners will hire someone for repairs or renovations. Even a homeowner experienced in home repairs may have to hire a contractor or renovator
More informationKentucky Department of Education Version of Document A312 2010
Kentucky Department of Education Version of Document A312 2010 Performance Bond CONTRACTOR: (Name, legal status and address) SURETY: (Name, legal status and principal place of business) OWNER: (Name, legal
More informationProvince of Alberta LIMITATIONS ACT. Revised Statutes of Alberta 2000 Chapter L-12. Current as of December 17, 2014. Office Consolidation
Province of Alberta LIMITATIONS ACT Revised Statutes of Alberta 2000 Current as of December 17, 2014 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer 5 th Floor, Park Plaza
More informationThis AGREEMENT is made as of the day of in the year of, by and between the following parties, for the sale of materials.
MCPU Standard Contract 101 Agreement Between Seller and Buyer For Sale on Credit This document has important legal consequences. Consultation with an attorney is recommended with respect to its completion,
More informationDATED 2016 [SURETY] and [CONTRACTOR] and SCHOOL OF ORIENTAL AND AFRICAN STUDIES PERFORMANCE BOND
DATED 2016 [SURETY] (1) and [CONTRACTOR] (2) and SCHOOL OF ORIENTAL AND AFRICAN STUDIES (3) PERFORMANCE BOND relating to NEC3 OPTION A TERM SERVICE CONTRACT FOR INTEGRATED FACILITIES MANAGEMENT SERVICES
More informationGuide to. arbitration
R epresenting P roducers and D i str i b utors w orldwide Guide to IFTA Arbitration IFTA Arbitration Independent Film & Television Alliance 10850 Wilshire Boulevard / 9th Floor Los Angeles, CA 90024-4321
More informationAGREEMENT FOR PROFESSIONAL LAND SURVEYING SERVICES WITNESSETH: ARTICLE 1
AGREEMENT FOR PROFESSIONAL LAND SURVEYING SERVICES This Agreement, made as of the 29 th day of January, 1999, by and between the County of Wake (hereinafter, the "Owner") and McKim & Creed Engineers, P.A.,
More informationIT Outsourcing Contracts Guidance On Building The Legal Infrastructure And Dispute Resolution Strategies
IT Outsourcing Contracts Guidance On Building The Legal Infrastructure And Dispute Resolution Strategies Rajesh Sreenivasan Partner, Rajah & Tann 14 July 2005 1 Outsourcing Agreements - General The transfer
More informationDischarge 3/14/2012. Chapter 16 Performance and Discharge. 2005 Byron Lilly De Anza College. 2005 Byron Lilly De Anza College
Chapter 16 Performance and Discharge 1 Discharge A party is discharged when she has no more duties under a contract. Most contracts are discharged by full performance. That s why this chapter is called
More informationMako Networks Sales & Marketing, Inc. Terms & Conditions for End User System Access, Use & Service Supply
Mako Networks Sales & Marketing, Inc. Terms & Conditions for End User System Access, Use & Service Supply 1. Introduction a. Binding Terms: These terms and conditions constitute a legally binding agreement
More informationThames Water Utilities Limited. Settlement deed
Thames Water Utilities Limited Settlement deed DATED [ ] THAMES WATER UTILITIES LIMITED the Undertaker [ ] the Owner DEED relating to the mitigation of the effects of settlement arising from the construction
More informationNEW MEXICO SELF-INSURERS' FUND WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY PLAN
NEW MEXICO SELF-INSURERS' FUND WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY PLAN In return for the payment of the premium and subject to all terms of this Policy, we agree with you as follows. GENERAL
More informationContract Disputes How to prevent them; How to deal with them
Contract Disputes How to prevent them; How to deal with them Presentation by Geoff Browne, Victorian Small Business Commissioner to the Victorian Waste Management Association 27 May 2014 Thank you for
More informationWINTERSHALL NORGE AS GENERAL TERMS & CONDITIONS I FOR ONSHORE GOODS. Table of Content
WINTERSHALL NORGE AS GENERAL TERMS & CONDITIONS I FOR ONSHORE GOODS Table of Content Page 1. APPLICATION... 2 2. DEFINITIONS... 2 3. PURCHASE ORDER; ORDER CONFIRMATION... 2 4. THE GOODS... 2 5. QUALITY
More informationENGINEERING COUNCIL OF SOUTH AFRICA
ADVISORY NOTE FOR THE PUBLIC: THE ROLE, RESPONSIBILITIES AND CONDUCT OF PERSONS REGISTERED WITH ECSA APPOINTED FOR SMALL BUILDING WORKS Revision One: 26 April 2012 FOREWORD The Engineering Council of South
More informationGeneral Terms and Conditions of the Association of Dutch Designers (BNO) February 2013
General Terms and Conditions of the Association of Dutch Designers (BNO) February 2013 1 Agreement, offer and confirmation 1.1 These General Terms and Conditions ( General Terms and Conditions ) govern
More information