Enhanced Hydrocarbon Recovery Via Proven & Safe Chemical Tank Cleaning



Similar documents
HYDROCARBON REMOVAL FROM AMINES DEMONSTRATED EXPERIENCE ABSTRACT

Remediation Services & Technology

CITY OF GOLDEN DEPARTMENT OF PUBLIC WORKS, ENVIRONMENTAL SERVICES DIVISION

RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT

MATERIAL SAFETY DATA SHEET Description: SAF DRAIN Revision Number: 00

CIMAC Guideline

T r a i n i n g S o l u t i o n s

Specifications For Rehabilitation Hudson #1A Hudson #2 Foster Island Well #41

WATER TABLE WINNERS!

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities

Willacy Oil Services. Online Removal and Sludge Management

Dispelling the Myths of Heat Transfer Fluids. Kevin Connor The Dow Chemical Company

TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

7. Chemical Waste Disposal Procedures

Florida Department of Environmental Protection

Automotive Base Oil Presentation

********** An short and simple explanation of how oil is converted into gasoline and then brought to you, the consumer.

AQUCAR PS 75 Water Treatment Microbiocide

WASTE COOKING OIL TO FUEL PROGRAM HOW TO START YOUR OWN BIODIESEL FUEL PROGRAM

APPENDIX 2A. Shah Deniz Production Sharing Agreement Extract

ABC CIRCUITS 10 Circuit Drive Circuit Town, IN SLUG CONTROL PLAN

Best Management Practices

Unit A: Studying Materials Scientifically

PRODUCT DATA SHEET DESCRIPTION:

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

A Guide to Hazardous Substance Storage Capacity

Remediation of Water-Based Drilling Fluids and Cleaning of Cuttings

GE Power & Water Water & Process Technologies. Water and Process Solutions for the Refining Industry

Guidelines for Selecting and Maintaining Glycol Based Heat Transfer Fluids

Introducing an All New Line of Cleaning Chemicals

Removing Heavy Metals from Wastewater

Waste Oil Collection / Storage

Hydrogen Sulfide in Petroleum. Mike Nicholson/Tim O BrienO Baker Petrolite Corporation

CAS NO. A >94.19 % WT >94.19 % VOL SARA 313 NO

Safety Data Sheet Avesta Neutralization Agent 502

Water Efficiency. Water Management Options. Boilers. for Commercial, Industrial and Institutional Facilities. Boiler Water Impurities

SPILLS & SPILL KITS. Spills -General Guidelines:

Backup Fuel Oil System Decommissioning & Restoration Plan

SOLVENT CLEANER MSDS Page 1 of 5 SAFETY DATA SHEET. (To comply with OSHA s Hazard Communication Standard 29CFR /ANSI z400.

GE Power & Water Water & Process Technologies. Water Treatment Solutions for Unconventional Gas

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

Bio-Clean. for Septic Systems. Tips for Using Bio-Clean. Page Index METRIC CONVERSIONS

SAFETY DATA SHEET LIGHT NEUTRAL BASE OIL

Guidelines for Precast Concrete Grease Interceptors

Objectives. Describing Waterflooding. Infill Drilling. Reservoir Life Cycle

Laboratory Hazardous Waste Disposal Guidelines

David O. Ahrens, Commercial Marine Manager Caterpillar Engine Products Division

Material Safety Data Sheet Ampicillin, sodium salt MSDS

Advantages and Disadvantages of Low VOC Vegetable Based Metalworking Fluids

I DDEDICATION 15O P T M S E SERVICES TO OPTIMISE EVERY PART OF THE OIL, GAS AND CHEMICALS INDUSTRY

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

ISANE Isoparaffin Products

MOL Biohyd 46 biodegradable hydraulic oil

KODAK Developer System Cleaner and Neutralizer

PRODUCT SAFETY DATA SHEET According to 91/155 EC 1. IDENTIFICATION OF THE SUBSTANCE / PREPARATION AND OF THE COMPANY / UNDERTAKING

Industry Description and Practices. Waste Characteristics

Johnson Controls Parts Centre. Sabroe S68 refrigeration oil

Crude Assay Report. Crude Oil sample marked. "AL SHAHEEN CRUDE OIL" dated 10th April On Behalf Of. Maersk Oil Qatar AS

Handling of Specific Chemicals

FracPT FZE. Stimulation Training Courses & Consulting.

Hazardous Waste Procedures. Faculty of Science University of Ottawa

New York State Department of Environmental Conservation 625 Broadway, Albany, NY Environmental Self Audit For Small Businesses

WATER-SOLUBLE METALWORKING FLUIDS

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Partnering with Nature for a Cleaner Tomorrow

SPE Distinguished Lecturer Program

WASTE WATER TREATMENT SYSTEM (OPERATING MANUALS )

Ingredient % content Hazard data Cross linked Sodium Polyacrylite CAS No: Non chemical fillers Zeolite 1-10

Container Management for Hazardous Waste Generators Technical Guidance Document HW-2005-G1

Incident Reporting Requirements

RULE ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS

Christopher Harto Argonne National Laboratory

Material Safety Data Sheet

Goliat Produced Water Management

National Precast Concrete Association

Environmental Technology March/April 1998

Oily Water Separator SKIT/S-DEB

Created by: Beata Boguszewska ... Arrangements made by: 1. Hanna Laskowska. 2. Tadeusz Głos. I approve for applying From

SPILL PREVENTION PLAN

[L] If the top of the tank is level with or above ground level, finding it should not be a problem.

REGISTRATION EXAMINATION, JUNE 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Current version : 2.0.1, issued: Replaced version: 2.0.0, issued: Region: GB

Chemical Spill Response Guideline

Metal Rescue Rust Remover Technical Data

Disposal of chemical waste must be regarded as an integral part of all research projects and teaching programs involving chemical use.

Environmental Forensics

CHEMICAL SPILL MANAGEMENT GUIDELINES

Pollution Liability Exposure: Adjustments your automotive business should consider to maintain compliance

TABLE OF CONTENT

US Safety Data Sheet GEAR OIL SAE 10W/30 GEAR OIL SAE 10W/30

The QED Advantage. Put Our Experience to Work for You Now! How Free Product and DNAPL Remediation Site Conditions Affect Equipment Selection

TABLE OF CONTENT

**** MATERIAL SAFETY DATA SHEET **** STABIL Fuel Stabilizer **** SECTION 1 - CHEMICAL PRODUCT AND MANUFACTURER IDENTIFICATION ****

AspiroTM. EOR Polymers and Surfactants

Fuel Treatment and Conditioning Systems

Boiler Blowdown. Boiler Blowdown Benefits. Best Operating Practices for Boiler Blowdown

BHS CANDLE FILTER APPLICATIONS FOR CLARIFICATION / RECOVERY OF SOLIDS FROM CHEMICAL SLURRIES

Environmental and Economical Oil and Groundwater Recovery and Treatment Options for hydrocarbon contaminated Sites

Transcription:

Enhanced Hydrocarbon Recovery Via Proven & Safe Chemical Tank Cleaning

Contents Introduction Tank Storage and Cleaning - Main Issues Vision Petroleum s Solution Features Benefits of the V6 Sludge Breaker Tank Cleaning Experience Preventative Maintenance Local Content Health & Safety The Environment Summary

Introduction to Vision Petroleum Vision Petroleum Malaysia (ViP) is a Chemical Technology based company offering the Oil and Gas Industry s only engineered chemistry crude recovery solution. ViP have many years of experience servicing Malaysian based Oil Producers and are now looking to expand their services globally. ViP s goal is to maximise their Clients Oil production and at the same time generate additional Oil revenues where previously there was none! Irvine Engineering Pte Ltd have joined with ViP to assist bringing their product to market, effectively using industry world wide contacts to introduce the product too.

Tank Storage and Cleaning - Main Issues Long term sludge in storage tanks is an accumulating problem. Sludge volume takes up valuable crude storage space. Typical conventional acid based sludge removal: Health & safety risks are high for personnel and facilities (long term exposure to tanks and ignition risks). Quality and amount of any recovered oil is unknown, a lost resource and revenue to producers. Storage tanks out of commission, typically ~12 to18 months. Solids in sludge (sand) requires further cleaning/treatment. Water from sludge requires further treatment. A personnel and equipment intensive operation. Is an expensive and timely operation to the producer/operator.

The Past and the Present! V6 Sludge Breaker Tank Cleaning Operation Conventional Acid Tank Cleaning Operation

Vision Petroleum s Solution - Features Formulated Site Specific V6 Sludge Breaker: Guaranteed safe and rapid sludge removal, typically ~4 weeks! The formulation itself maximises sludge breakers interaction with the sludge. Maintains fluidity of the sludge, creating processible crude. Assist with surfactant dispersion & penetration. Minimizes and prevents wax formation. No toxic byproducts, leaves wet solids for easy disposal. V6 Sludge Breaker Properties: Low temperature, nano chemistry hydrocarbon recovery agent. Surfactant based sand control chemical. Low temperature, nano chemistry heavy oil viscosity modifier. Low dosage nano chemistry core demulsifier. Nano chemistry sand oil surfactant. Universal parafinic pour point depresant.

Laboratory Test Performance Data Summary of Results Rapid oil-water separation (10-20 minutes); Separated water has 10.6-12.4 ppm oil content, which is within operational limit of 30 ppm (Petronas Standard); No re-emulsification even after re-agitation; Complete BS&W reduction at higher dosages (60 ppm); Tested for crude compatibility with no impact - density, metal content (100% organic), sulfur (ASTM D4294), mercury (UOP 398), salt content.

Laboratory Test Performance Data Summary of Results Fluidized sludge by reducing viscosity (80-90%). No cooling impact - fluids mobile at 20 C. Works at ambient temperature - no heating required. No re-emulsification with clean crude (diluent) - 100% solubility in hydrocarbon solvent. Separated solids are water-wet. Surfaces are water-wet. No impact on Micro Carbon Residue Test (ASTM D4530) i.e. will not cause fouling on metal surfaces.

V6 Separation Examples Sludge Sample Sludge Sample with V6 Added, Displays the Separation Process, Typically under 4 minutes

V6 Separation Examples cont d Untreated Sludge Sample V6 Treated Sludge Sample

V6 Separation Examples cont d Sludge Sample @ ambient 20 0 C (Untreated) Sludge Sample @ ambient 20 0 C (Treated with V6)

Overall Tank Cleaning Method and Approximate Timings Tank is Ready for Service (complete operation start to finish ~7 weeks) Tank Pre-survey Sampling for Laboratory Tests (2 weeks) Site Team Mobilisation (1 week) Remaining Non Hazardous Solids Removed (1 week) Site Tank Verification Sampling (1 week) Liberated Crude Piped to Process facility (Pumping 5 days) Note: Does not take into account contractual agreement time Does not take into account personnel availability Water is Drawn Off (1 day) Injection of V6 with Carrier Crude, Chemical Reaction (1 week)

The V6 Sludge Breaker Pre-Survey Process 1. 2. 3. 4. Pre-survey Clients Crude & Sludge Samples are sent for Laboratory Analysis V6 is Introduced to the Crude Site Samples, Various Testing Formulations are Prepared to Obtain the Optimum Formulation Each Sample is Mixed with Actual Site Tank Crude, Simulation Exercise Testing is Complete Within 4 to 7 Minutes where the Optimum Formulation is then Found

PFD Tank Sludge Profile, Samples Taken at All Tank Sampling Points

Benefits of the V6 Sludge Breaker >90% crude recovery from the sludge. Recovered crude meets with sales crude quality turning sludge into a substantial revenue. Rapid cleaning schedule, typically 4 weeks (conventional acid cleaning methods can be as long as 18 months!). Rapid tank turnaround time. Typically a 5 person team with minimal equipment. Excellent mechanical tank cleaning process. Greatly improved health and safety liability as far less tank exposure to personnel. More environmentally friendly as remaining solids and water are treated within the process.

Tank Cleaning Experience Sludge Breaker was originally subjected to extended third party lab testing to ensure it s properties met with companies high recovery standards. Between 2010 and 2012 the Sludge Breaker was successfully introduced at three different tank site locations where it out performed company expectations. The three Petronas locations were at: Miri, Malaysia Melaka, Malaysia Terengganu, Malaysia (TCOT) Since 2012 Sludge Breaker has undergone further refinement resulting in an improved version, V6. This version is now ready for full global market release.

Laboratory & Site Methodology - Process Overview 1. 2. 3. 4. 5. Pre-surv ey Clients Crude & Sludge Samples are sent for Laboratory Analysis Samples are Introduced to the V6 formula where a first pass Analysis is Made to align a Correct V6 Formulation A Report is Made to Client Confirming a V6 Cleaning Schedule and Site Specific Work Methodology, an Ev entual Contractual Agreement is Later Agreed Tank Cleaning personnel are Mobilised to site along with Equipment and the V6 6. 7. 8. 9. After Tank is Emptied of Crude, Further Samples are Taken from the Tank sampling points to generate a full Sludge Tank Profile and make ready Fresh Samples for Further Analysis with the V6 The Tank Sludge Profile Identifies the Required Amount of V6 needed for the Cleaning & Sludge Crude Recov ery Samples are giv en a Final at Site Analysis with the V6 where any V6 Concentrations may be Varied V6 is Introduced with Crude Carrier to the Tank v ia the Tank s Transfer Pump, water is then Draw n off and Production Quality Crude is Pumped out to the Sites Production Facility Non Hazardous Clean Sand Solids are then Remov ed and Taken Away

Tank Solids Profiling Objectives: Obtain solids heights and viscosities data throughout the tank floor level via sample holes. Sludge Thickness & Depth at Various Levels Floating Roof Sampling Points Tank Profile View Maintenance Level Data is used to optimise V6 formulation. Sludge Data is also used to obtain solids quantity for crude recovery estimation as well as residual solids and water information. Sampling Pole with Depth Shelves Tank Plan View Sampling Points

Tank Cleaning Experience Example - TCOT Pre- survey Testing, Crude and Sludge Samples: Client: Project: Country: Application: Work Scope: Capacity: Performance: Date: Petronas PCSB-PMOT T-446 Malaysia 1% Sludge Breaker Mixed with 10% Carrier Crude & T-446 Sludge. Stirred 30 mins then Settled 4 Hours Pre-survey Sample Testing to Align Sludge Breaker Formula with Sample 1 Drum Performance 20/11/2010 Within 4 hours, crude and water separated into 2 phases (with solids dropped in the bottom); Crude %BS&W reduced to less than 0.2% (export quality); Viscosity reduced by 90% at 30 C; Recovered Crude does not reemulsify and compatible with clean crude; Maximize crude oil recovery (>95%); Separated solid is water-wet, and easily flushed to clean residual oil for disposal; No adverse effect on produced water quality

Tank Cleaning Experience Example - TCOT T422 Tank Cleaning Results at TCOT: Client: Project: Country: Application: Work Scope: Capacity: Performance: Date: Petronas PCSB-PMOT T-446 Malaysia 100 ppm, 2 cycles chemical injected into rundown (carrier) crude Complete Tank Cleaning Operation Complete Storage Tank 95% Crude Oil Recovery from Sludge 20/01/2011 100 ppm, 2 cycles chemical injected into rundown (carrier) crude. Reduced sludge viscosity to pumping grade (lower than 2,000 cp; untreated sludge viscosity ~ 80,000 cp). 2.8 meters sludge level reduced to 0.1 meter. Recovered crude meets export quality (%BS&W below 0.5%, TMB samples as low as 0% emulsion; SGS data). Crude recovery from sludge valued at >RM 10 million (date 2011) (30,000 bbl) - extraction cost was substantially less.

Tidy V6 Pump / Injection Arrangement V6 Tra nsportation Tanks V6 Injection Point to Tank Inlet Piping Ma i n Injection Pump together with Back-up Pump

Solids Sampling Pole Sampling Pole Taking Sludge Samples, these will be used for Further Analysis and Data for Tank Solids Profiling Sampling Pole Displaying Sample Shelves for Taking Samples of Solids at Different Heights

Petronas Verification Exercise Petronas Clients Witnessing V6 Separation Ability at Site Left Barrel, non Treated Sludge, Right Barrel V6 Treated Sludge Sludge Stuck to Sa mpling Pole No Sludge on Sa mpling Pole

Waste Water Draw Off and Sampling Drain disposal quality!

Remaining Solids Remaining Non Hazardous Solids with over 90% Crude Removal

V6 Comparison with Other Methods

Preventative Maintenance After initial V6 tank cleaning a tank preventative maintenance (PM) cleaning program can be scheduled. Tank PM either quarterly or half-yearly, chemical batching depending on sludge input to tanks. Site truck deployment with V6 supplies simple testing facility to support chemical batching. Tank V6 batching method for PM supports site deployment with zero chemical handling at site.

Local Content Option Easy site deployment of V6 allows for fast-track training of local support personnel (preferable) - minimal mechanical operations required. Local personnel trained and managed by Vision Petroleum in all operational aspects including health and safety. Site-specific standard testing procedure allows thorough testing instructions and training for local personnel.

Health and Safety V6 requires no heating, no boilers or fuel at site. V6 requires minimal equipment at site. Small, typically 5 person team. V6 is non-flammable. V6 has no acid content. No personnel tank entry required at any part of the cleaning process.

HSE - Industrial Hygiene Discharged water quality - ph is neutral, no further neutralisation treatment required. Low dosage with V6 reduced any V6 carryover into the discharged water. Low dosage with V6 also reduces chemical handling by personnel - supplied in tote tanks, i.e. zero handling at site. Low chemical volume reduced risk of chemical spill (compared to acid sludge breaker).

The Environment V6 is an environmentally friendly chemical, 100% organic. V6 is injected with carrier crude, 100% soluble, no contact with the environment and easily recovered from the crude at the crude processing stage. V6 has no impact on any metal content including nickel, vanadium, ferum and sodium due to it s 100% organic makeup. V6 has no impact on sulphur, mercury or salt content.

V6 Summary V6 is a novel engineered safe to use chemical solution. Rapid, typically 4 week tank cleaning turnaround. Generates a substantial revenue from recovered crude. Safe and minimal site disturbance at tank location. Leaves minimal non hazardous inert solids. No further remediation of solids required Leaves drain disposal quality water (ph neutral). No toxic emissions or byproducts. Can create local employment Proven at Petronas Tank Facilities, V6 will Deliver the Same for You!

Enhanced Hydrocarbon Recovery Via Proven & Safe Chemical Tank Cleaning Thank You

Contacts For further information on our designs and services please contact: Singapore Office: 39, Pandan Road, Singapore. 609281 Tel.: +65 91093201 +65 68539106 Malaysia Office: 11, Jalan 14/2, Taman Tar, Ampang, Salangor, Kuala Lumpur. 68000 Tel.: +60 342665601 Mob.: +60 123210824 +60 178810807 Irvine Engineering Pte Ltd - Registered Address: 60 Paya Lebar Road, #08-43 Paya Lebar Square, Singapore. 409051 Tel.: +65 68539106 Dubai Office: Jumeirah Lake Towers, P.O. Box: 643593, Cluster C, Goldcrest Executive Tower Office 706, Dubai. UAE. Tel.: + 971 4 447 0897 Fax: + 971 4 447 0896 Mob.: + 971 567451923 (Main Company Contact) enquiries@irvineeng.com