Bespoke ECO2 software for calculating savings: features for software development



Similar documents
Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Performance Certificate

Domestic Green Deal and Energy Company Obligation in Great Britain, Monthly report

Energy Performance Certificate

By

tap into opportunities to develop your business

Energy Performance Certificate

Energy Performance Certificate

Green Deal, Energy Company Obligation and traditional buildings

Domestic Insulation Surveyor Training

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

Energy Performance Certificate

Energy Companies Obligation (ECO) Customer Journey

GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS.

The Future of the Energy Company Obligation

Recommendations for the cost-effective improvement of energy performance

Your guide to the Energy Company Obligation (ECO) How we can make it work for you. A5_ECOguide_AW.indd 2 24/10/ :04

SAP 2012 IN A NUTSHELL

Low Carbon Domestic Refurbishment

BER Assessors Dwellings Technical Bulletin

main heating: pre1998 ducted warm air system main heating fuel: mains gas main heating SAP efficiency: 70.0% main heating controls: programmer

Pilot Analysis of the Government's New Green Deal Initiative

4. Comparison with DECC (2014) Estimated impacts of energy and climate change policies on energy prices and bills

Energy Performance Certificates (EPCs) and renting homes: A landlord s guide

Private Sector Landlords. Making your properties more energy efficient

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings

Non Domestic energy consumption 2013 Kent Local Authorities (Previously Industrial & Commercial energy use)

Four of the twelve Kent districts (Dartford, Gravesham, Shepway and Thanet were below the National average (4,099 kwh) for electricity

Information for the Supply Chain on Green Deal Measures. Version 1

Air-to-water heat pumps: Making the most of renewables. Richard Pickford, Daikin UK

Domestic energy consumption in Barnet has reduced but remains higher than the British average:

Appendix S: Reduced Data SAP for existing dwellings

Condition Report SAMPLE. Property address. Client s name. Date of inspection

GREEN DEAL Saving money by understanding the Energy Agenda. Dave Princep BSc LLB MCIEH

Penwithick Green Deal Pilot project: Final report

Big Energy Saving Network Training for Frontline Workers

Home Energy Conservation Act Report of Stratford on Avon District Council

RdSAP Conventions. Issued 13 December 2012 (v6.0) New and amended conventions for v6.0 indicated by light blue background.

Feed in Tariffs for Microgeneration. Jos Mister Energy Saving Trust

Energy UK response to the Ofgem consultation on Energy Companies Obligation (ECO) : Guidance for Suppliers

Improving the energy efficiency of our buildings

Information Guide. The Application of Heat Pump Boilers. Issue Eighteen >

EPC and Licenses - UK

Fuel Poverty: 2014 update

Renewable energy and sustainable building Training Prospectus. Issue 3 Including Green Deal. Greenworks training academy

Response to the Green Deal and Energy Company Obligation consultation

Code for Sustainable Homes Guidelines

Welcome to a warmer home. You could qualify for: Your guide to a gas supply and central heating system

Part L1B & What you need to know to get your building to pass. Mike Andrews DipNDEA, DipDEC, DipOCDEA, DipHI

Methodology for the production of Display Energy Certificates (DEC)

Lump Sum Lifetime Mortgage Terms and Conditions. Version 1

THE CODE FOR SUSTAINABLE HOMES

The Green Deal. **Presenters name here**

A guide to energy performance certificates for the Construction, sale and let of non-dwellings

What is an Energy Performance Certificate and Why Do You Need One?

Social policy for energy a fair deal for all consumers. Jonathan Stearn Consumer Focus

Ecodan Air Source Heat Pump and Flow Temperature Controller 2

Top-down and Bottom-up evaluation of government policies on fuel poverty March 2015

Energy Company Obligation: Carbon Saving Community Obligation Guidance

ASSET MANAGEMENT STRATEGY

Green Deal and Energy Company Obligation

Energy Company Obligation (ECO2) Boiler Assessment Checklist

Electronic Security Systems Certification

Code for Sustainable Homes

The Types of Standard 2 Guidance on the Standards 2 Changes to Legislation 2

APPLICATION FOR LANDLORDS CONSENT TO ALTERATIONS AND LICENCE

The Government s Standard Assessment Procedure for Energy Rating of Dwellings

Ofgem Carbon Savings Community Obligation (CSCO) Eligibility System

UNNUMBERED LETTERS ISSUED FOR THE MAY OF 2014

DEPARTMENT OF ENERGY AND CLIMATE CHANGE. GREEN DEAL CODE OF PRACTICE (Version 4)

FABRIC ENERGY EFFICIENCY FOR PART L 2013

Is an air source heat pump the right choice for my home? Important information and key things to consider before installing an air source heat pump

In 2013, the Spanish economy emits million tonnes of greenhouse effect gases, 7.8% less than in 2012

Improving the energy efficiency of our buildings

The Green Deal 5 Months In (Nearly)

A User Guide to isbem

The Green Deal & ECO 8 Months In

Improving the energy efficiency of our buildings

Fall in love with your heating again. Reduce your heating bills with

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

BER Assessors Dwellings Technical Bulletin

RdSAP Conventions. Issued xx June 2014 (v7.0) New and amended conventions for v7.0 indicated by light blue background.

BESPOKE EMX Guidance for SME s

HELPING FAMILIES WITH ENERGY COSTS

All information in this booklet is correct as of September 2015.

PUBLIC G5 - Supplier CFD Credit Cover. EMRS Guidance

Warm Homes for Older People

Why the New Energy Saving Measure Could Be an Obligation for suppliers

Elaine Harvie & Jeremy Cruickshank Jan 10

RBS s true carbon emissions 2012

MAKING YOUR HOME WARMER

London Fuel Poverty Hub Borough Information: Ealing

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

Energy usage in households with Solar PV installations

Module 3.7. Thermal bridging

Rainwater Harvesting

Empty Property (Landlord) Grant

Information Guide Domestic Air Source Heat Pumps

An Introduction to BREEAM and the Code for Sustainable Homes

The Government s methodology for the production of Operational Ratings, Display Energy Certificates and Advisory Reports

Transcription:

Bespoke ECO software for calculating savings: features for software development When a supplier notifies us of a measure under the Energy Company Obligation (ECO), it must provide the carbon saving or cost score associated with that measure. We understand that suppliers, and other stakeholders working on behalf of suppliers, may wish to develop or adapt software to assist with calculating savings. The table below lists factors to be considered when developing bespoke ECO software for calculating savings. This note and the table below must be read in conjunction with the ECO Guidance: Delivery and ECO Measures Table. We have grouped features into the following categories: A Inputs Data to be entered into the scoring tool. B Outputs Data relating to the carbon saving or cost score of a measure which suppliers must notify to Ofgem following completion of that measure. Developers of scoring software should be aware of the ECO Data Dictionary, in which we describe the format and requirements for all data to be notified to us by suppliers. C Outputs to be made available on request Data relating to the carbon saving or cost score of a measure that must be kept by a supplier for each measure. This data should be made available to Ofgem, technical monitoring agents and auditors on request. D Processes Processes and calculations that are carried out within the software to calculate the carbon saving and cost score of a measure. E Updates Periodic updates that must be made to the scoring tool. F Checks Checks that can be carried out during data input to provide assurance that the data is accurate. The table below indicates features to be built into bespoke software for calculating ECO savings. Some of these features are mandatory requirements and any bespoke ECO software must have them. Software that does not contain all of the required features will not meet our requirements. We require any ECO bespoke software for calculating savings to be approved by an appropriate UKAS-accredited body. Our ECO Guidance: Delivery explains the factors that suppliers must take into account when calculating and notifying carbon savings and cost savings for measures installed. Any person developing bespoke ECO software must refer to the Guidance for additional details and should not rely on this note alone. The guidance may be amended in the future, and we may publish guidance that supplements the main guidance. Potentially, such amendments and supplements may change the factors that suppliers must take into account when calculating and notifying savings. Bespoke ECO software for calculating savings should be designed to be able to take account of such changes. Available at: https://www.ofgem.gov.uk/ofgem-publications/7/deliveryguidance.pdf. Available at: https://www.ofgem.gov.uk/ofgem-publications/00/ecomeasurestablefinal.pdf. Available at: https://www.ofgem.gov.uk/ofgem-publications/75/ecodatadictionaryv.0.pdf.

A Inputs Ofgem requirements for bespoke ECO scoring software Requirements Mandatory Optional Notes Full RdSAP inputs Full SAP inputs Obligation category (CERO, CSCO, HHCRO, Rural) Date of completed installation 5 Lifetime (L) Please refer to the ECO Measures Table for more information. 6 In use factor (IUF) Only applied to CERO and CSCO measures. Please refer to the ECO Measures Table for more information. Applied to the annual saving for CERO and CSCO measures if SAP 7 Weighted average factor for converting CO e to CO. or RdSAP. are used. The factor will not be applied if a (0.5) measure installed in Scotland is scored using SAP 00 as the savings will already be in tco. 8 HHCRO multiplier For certain HHCRO measures a relevant HHCRO multiplier may also be applied as part of the score calculation. This multiplier may result in an increased or decreased score. Please see chapter 7.b of the ECO Guidance: Delivery for more information and details of the HHCRO multipliers. Ability to enter multiple wall insulation types (EWI, IWI, CWI) for a single property, and the relevant percentages of the total exterior walls for each insulation type 0 Ability to enter multiple roof insulation types (joists, rafters, flat roof, room in roof) for a single property, and the relevant percentages of the total roof area for each insulation type Information (name, company, relevant qualifications) relating to original assessor, and any other persons who have subsequently been involved in calculating the score Pre-installation fuel type for the main space heating Must be completed for CERO, CSCO and HHCRO measures Post-installation fuel type for the main space heating Must be completed for CERO, CSCO and HHCRO measures B Outputs EPC reference number (where relevant) Building number Building name Flat name/number 5 Street name 6 Town 7 Post code Applicable if input data from a lodged EPC is used. This field should not be populated if the input data is from an unlodged EPC.

8 Total floor area (m ) Pre-installation fuel type for the main space heating Must be completed for CERO, CSCO and HHCRO measures 0 Post-installation fuel type for the main space heating Must be completed for CERO, CSCO and HHCRO measures Percentage of measure installed Is the measure installed to an extension of the premises (as defined in RdSAP)? Annual carbon savings (tco ) Annual cost savings ( ) This is the amount of the measure actually installed compared to the full installation of that measure. For example, if a house has 00m of exterior-facing cavity walls, and 75m is insulated with CWI, then percentage of measure installed = 75%. This allows an extension to be differentiated from the main dwelling. Annual carbon savings should be expressed in tco to three decimal places. it is recommended that cost and carbon savings are calculated for each measure, regardless of obligation category. Annual cost savings should be expressed in pounds and pence to decimal places. It is recommended that cost and carbon savings are calculated for each measure, regardless of obligation category. 5 Name and version of scoring tool used Format should be exactly as detailed in the approved software list. 6 Lifetime Please refer to the ECO Measures Table for more information. 7 In use factor (IUF) Only applied to CERO and CSCO measures. Please refer to the ECO Measures Table for more information. 8 Weighted average factor for converting CO e to CO Applied to the annual saving for CERO and CSCO measures if SAP. or RdSAP. are used. The factor will not be applied if a measure installed in Scotland is scored using SAP 00 as the savings will already be in tco. Carbon savings (tco ) 0 Cost score ( ) PCDB version used for scoring calculations Scores on a measure-by-measure basis C Information (name, company, relevant qualifications) relating to original assessor, and any other persons who have subsequently been involved in calculating the score Reports - to be made available on request File showing all inputs used for calculation, all outputs and any information required to match the calculation to the measure. This file should be easy to read, and available both electronically and in hard copy. Lifetime carbon savings should be expressed in tco to three decimal points. Lifetime cost scores should be expressed in pounds sterling to zero decimal places. If multiple measures are installed at a premises, each measure, and its associated savings, must be calculated separately. 'History file' showing source of inputs, all people who have been involved in calculating the score, their relevant qualifications etc.

D Processes Use the ECO-specific methodology for scoring packages of measures, including scoring by date of installation and not SAP/RdSAP default order. Must not include bespoke occupancy assessment Calculations must be based on weather data for each postcode Same fuel prices used for both 'before' and 'after' calculations 5 Use ECO-specific methodology for scoring repair or replacement of qualifying boilers 6 Use ECO-specific methodology for scoring repair or replacement of qualifying electric storage heaters 7 Use ECO-specific order of scoring for boilers and heating controls Where heating controls are installed at a premises by the same supplier in the same calendar month as a qualifying boiler replacement or repair is conducted, the following sequence of installation must be assumed: a. Qualifying boiler repair or replacement, and b. Installation of compatible heating controls. 8 When scoring other measures at the same property as the repair or replacement of a qualifying electric storage heater or qualifying boiler, apply normal SAP/RdSAP conventions for the other measures Extensions and new builds: only the part of the measure which exceeds building regulations should be taken into consideration for calculating the ECO savings 0 Carbon saving (tco )= S x L x (00% - IUF) S = SAP/RdSAP annual carbon saving (tco ) L = lifetime of measure (years) IUF = in-use factor of the measure Annual carbon saving will be calculated by applying the factor of 0.5 to convert CO e into CO. The factor will not be applied if a measure installed in Scotland is scored using SAP 00 as the savings will already be in tco. E Cost score ( )= S x L x HHCRO Multiplier S = SAP/RdSAP annual cost saving L = lifetime of measure (years) Updates HHCRO Multiplier is only applied to certain HHCRO measures HHCRO scores do not consider IUFs. Monthly PCDB Including boiler efficiencies, fuel prices. Ofgem will publish any updates to lifetimes on our website in the Any changes to ECO In-Use Factors and Lifetimes Measures Table. Additions to list of eligible measures Please refer to the ECO Measures Table for updates.

F Checks to be carried out during operation of software (we will build on this list once we have had further discussions with suppliers, software companies and UKAS bodies. No individual check is mandatory however we expect software to include a range of checks to ensure accuracy) The aggregated area of all wall insulation types (CWI, EWI, IWI etc.) should not exceed the total wall area of the property The aggregated area of all roof insulation types (joists, rafters, flat roof, room in roof) should not exceed the total roof area of the property CERO secondary measures should be installed within 6 months of primary measures (except for connections to a DHS) The minimum condition means that insulation must be installed to at least 50%, as applicable, of: CERO secondary measures should only be installed if the primary measure meets certain conditions, including the minimum condition. the exterior-facing wall area of a premises, the roof area of a premises, or the ceiling, floor and wall area of a mobile home. The total area in all of the above cases includes all areas not suitable for insulation. In the case of loft insulation, to meet the minimum condition it must also be: insulated to a depth of no greater than 50mm before installation, and insulated to a depth of at least 50mm after insulation. Acronyms ECO- Energy Company Obligation CERO - Carbon Emissions Reduction Obligation CSCO - Carbon Saving Community Obligation HHCRO - Home Heating Cost Reduction Obligation IUF - In-Use Factor tco - Tonnes of carbon dioxide tcoe Tonnes of carbon dioxide equivalent SAP - Standard Assessment Procedure RdSAP - Reduced Data Standard Assessment Procedure PCDB - Product Characteristics Database CWI - Cavity Wall Insulation EWI - External Wall Insulation IWI - Internal Wall Insulation UKAS The United Kingdom Accreditation Service 5