INTEGRATING EMS AND ISMS



Similar documents
INFORMATION FOR USE IN INTEGRATING ENVIRONMENTAL MANAGEMENT SYSTEMS (EMS) INTO INTEGRATED SAFETY MANAGEMENT SYSTEMS (ISMS) Prepared by:

Brookhaven Site Office Environment, Safety & Health Management Plan. January 2013

ISO EMS and OHSAS OH&S Programs Development, Benefits and Incentives

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEMS MANUAL

ISO Registration Guidance Document

Design and Development of Dallas/Fort Worth International Airport s [DFW s] Compliance-Focused Environmental Management System [EMS] 1

DOE O 226.1A, IMPLEMENTATION OF DEPARTMENT OF ENERGY OVERSIGHT POLICY CONTRACTOR ASSURANCE SYSTEMS CRITERIA ATTACHMENT 1, APPENDIX A

Chapter 1. The ISO 9001:2000 Standard and Certification Process

Aerospace Guidance Document

INTEGRATED MANAGEMENT SYSTEMS AUDITS: INTERNAL AUDIT TOOL *

TG TRANSITIONAL GUIDELINES FOR ISO/IEC :2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

May 2005 Lear Corporation For use by Lear Corporation and its Suppliers only. Copies or reproduction for any other purpose is permitted only by prior

4 QUALITY ASSURANCE 4.1 INTRODUCTION

COMPANY NAME. Environmental Management System Manual

Outline for Today s Presentation. Objectives of Environmental Regulations/Laws.

Module 17: EMS Audits

Quality Assurance Program Plan. July U.S. Department of Energy Office of Legacy Management

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

Multi-Site Project Management A Program for Reducing the Cost of Technology Deployment at Department of Energy Sites

REQUIREMENTS FOR CERTIFICATION BODIES TO DETERMINE COMPLIANCE OF APPLICANT ORGANIZATIONS TO THE MAGEN TZEDEK SERVICE MARK STANDARD

Business Management System Manual. Context, Scope and Responsibilities

Implementing ISO 9000 Quality Management System

INTEGRATED SAFETY MANAGEMENT SYSTEM GUIDE

Quality, Environmental, Health and Safety Manual Toshiba International Corporation

How DCMA Helps To Ensure Good Measurements

Lessons Learned: Integrating EMS and Environmental Compliance Auditing

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

OUTSOURCING STRATEGIES & RISKS FROM AN ISO PERSPECTIVE. Amera-Veritas. Amera-Veritas. Experts in in Quality, Safety & Supply Chain Assurance

CHAPTER TEN. Quality Assurance and Quality Control MAINE RIGHT OF WAY MANUAL

Shell s Health, Safety and Environment (HSE) management system (see Figure 11-1) provides the framework for managing all aspects of the development.

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

ISO/IEC Registration Guidance Document

Summary of Requirements for ISO 14001:2004 February 24, 2005

Programs Implementing Management System Elements AT&T Environment, Health and Safety Management System ISO EMS Element 4.1General 4.

SAFETY SOFTWARE QUALITY ASSURANCE FUNCTIONAL AREA QUALIFICATION STANDARD. DOE Defense Nuclear Facilities Technical Personnel

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

Basic Environmental Management System (EMS) Template

U.S. Department of Energy Office of Environmental Management Strategic Sourcing Initiative

How To Support A Small Business Subcontracting Plan At Idaho National Laboratory

ISO at Ford: Certification and Beyond. EMFeature. Feature. by John Connor and Robert W. Niemi

Using ISO 9001 or ISO to Gain a Competitive Advantage

UNCONTROLLED DOCUMENT ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL UNCONTROLLED DOCUMENT

IAF Mandatory Document for Duration of QMS and EMS Audits

Background on ISO Process Quality Standards

Certification Process Requirements

EHS Auditing at Pfizer

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Table of Contents. Chapter 5: EMS AS A COMPLIANCE ASSURANCE TOOL Self-Disclosure of Violations... 10

Committed to Environment, Health, & Safety

ENVIRONMENTAL MANAGEMENT POLICY MANUAL

Canadian Air Transport Security Authority

Certification Procedure of RSPO Supply Chain Audit

API Q2 Specification for Quality Management System Requirements for Service Supply Organizations for the Petroleum and Natural Gas Industries

Selection and use of the ISO 9000 family of standards

City of Raleigh Public Utilities Department. Wastewater EMS Manual

This Business Management System Manual is based on ISO 9001:2008 requirements

ISO Laboratory Quality Management. ISO Course Descriptions.

Audit Report. Implementation of the Recovery Act at the Savannah River Site

Introduction to Social Compliance & Its Business Benefits

SCS FSC Chain-of-Custody Guidance for Certification of Multiple Sites

1. Organization and Management of UNR Safety Programs

FY2011 Combined 1 st & 2 nd Quarter Progress Report

ENVIRONMENTAL MANAGEMENT SYSTEM PLANNING GUIDANCE UNDER THE TOXICS USE REDUCTION ACT (TURA)

IAF Informative Document for the Transition of Food Safety Management System Accreditation to ISO/TS 22003:2013 from ISO/TS 22003:2007

TURF ISN T THE ONLY THING THAT SHOULD BE GREEN TRAINING AND CERTIFICATION FROM SGS

Quality Management Systems & Certification Consulting

Asset Management Systems Scheme (AMS Scheme)

ISO/TS 16949:2002 Guidance Document

EXAM PREPARATION GUIDE

Analysis of ISM Activity-level Work Planning and Control Within DOE. Stephen L. Domotor Office of Analysis Office of Health, Safety and Security

Awarding body monitoring report for: English Speaking Board (International) Ltd (ESB) May Ofqual/09/4637

Integrated Environment, Safety, & Health Management Plan

Implementing ISO 9001

PREQUALIFICATION INFORMATION

EMS Example Example EMS Audit Procedure

FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements

Rules for the certification of Environmental Management Systems

June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS)

ETSI EN V2.2.2 ( )

Paul Scheihing, U.S. Department of Energy Joe Almaguer, Dow Chemical Company Pamela de los Reyes and Tracy Fisher, Energetics Incorporated

for Energy Efficiency Parminder Sandhu, P. Eng

ETSI TS V2.1.1 ( )

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard.

Frequently Asked Questions. Unannounced audits for manufacturers of CE-marked medical devices. 720 DM a Rev /10/02

Transcription:

DOE 450.1 IMPLEMENTATION WORKSHOP SITE EXPERIENCE IN INTEGRATING EMS AND ISMS Steven R. Woodbury Panel Moderator 1

DOE Panel Ron Peterson, SR Jerry Granzen, BAO Brent Smith, SPRPMO Cliff Clark, RL Teresa Perkins, ID Moderator Steven Woodbury, EH-41 2

INTRODUCTION DOE sites have implemented ISMS Several DOE sites have EMSs which are third-party recognized These sites have integrated EMS with ISMS Presentation is structured around a series of questions 3

ISMS CORE FUNCTIONS 4

Q: How did your facility go about developing its EMS? How did you ensure that the EMS is integrated with ISMS? Ron Peterson, Savannah River Office Jerry Granzen, Brookhaven Area Office Brent Smith, SPRMPO 5

SRS EMS Development SRS held a DOE-wide EMS Workshop in Augusta in 1995 Determined that existing procedures and practices were close to conforming to ISO 14001 SRS staff sought and obtained the top management s support and involvement in implementing an EMS that would conform to the requirements of ISO 14001 SRS-EMS Task Committee was formed 6

SRS EMS Development (cont) Subcommittees addressed necessary elements of ISO 14001 (e.g., Site EMS policy statement, gap analysis of existing procedures and practices.) Top Management decided SRS-EMS should be third-party certified Early 1997 -- SRS-EMS Policy Statement adopted RFP for certified registrar September 1997 -- entire site certified in conformance with ISO 14001 7

SRS Integration with ISMS ISMS Verification December 1999 SRS-EMS, since it was already certified in conformance with international standard ISO 14001, met or exceeded the ISMS environmental requirements EMS was immediately available for integration into the SRS ISMS by reference. 8

BNL EMS Development External Drivers: EPA Memorandum of Agreement New M&O Contractor Scope Development: EPA Memorandum of Agreement emphasized P2, Compliance, and Community Outreach Brookhaven Science Associates committed to ISO 14001 Registration 9

BNL EMS Development (cont.) Implementation Project Management Approach Contractor Appointed Full Time Project Manager Prepared Project Management Plan Project Execution Senior Management Support Lab Director Project Team included Department EMS Representatives Quarterly Status Presentations to Lab Management Critical Project Milestones were incorporated as Contract Performance Measures 10

BNL EMS Development (cont.) Implementation (continued) ISO 14001 Registration Registrar selection board Department registration first then site-wide External regulators invited to observe Project Transition Project Manager role phased out EMS coordinator assumed responsibilities 11

BNL EMS / ISMS Integration EMS and ISMS were implemented simultaneously Project Managers worked cooperatively ISMS gaps (w/respect to EMS) were identified and filled Certain ISM components were accelerated to meet EMS schedule needs Certain distinct subsystems were implemented solely for EMS Currently, EMS and ISMS are built on the Integrated Management Concept 12

SPR EMS Development ISO 14001 serves as the environmental portion of SPR s ISMS Implementation included: ISO 14001 Gap Analysis Environmental Management Review (EMR) by EPA Region 6 Lead Auditor & Implementation Training DOE/M&O Contractor Pre-Assessment Audits 13

Q: How is the DOE field office integrated into the site ES&H management system? Ron Peterson, Savannah River Office Cliff Clark, Richland Operations Office 14

SRS SR/DOE Management System The DOE Savannah River Operations Office is a signatory to the SRS-EMS Policy Statement The DOE Savannah River Site is specifically listed on the Site s Certificate of Conformance to ISO 14001 The DOE Savannah River Operations Office s Environmental Quality Management Division performs regular evaluations of the Site s organization s conformance to ISO 14001 and now to Executive Order 13148 15

RL/DOE RL Integrated Management System (RIMS) RL developed a DOE-only system Designed to meet needs of DOE in managing federal functions & providing federal products and services RL contractors each have their own ISMS systems RL system is an Integrated Management System B, E, S, H, and SES are all integrated into a single system RL system is requirements based Each element of RIMS includes requirements, and procedures for accomplishing requirements 16

RL/DOE RL Integrated Management System (RIMS) (cont.) RIMS is entirely computer based and is available to over the internet to anyone who wishes to have access All RL personnel from the Manager down are able to access the system from their desk over intranet All elements of RIMS are cross-referenced and interlinked with hot links One element of RIMS is an EMS 17

RL/DOE RL Integrated Management System (RIMS) (cont.) EMS element addresses environmental regulatory requirements Defines requirements and processes for acquiring permit, managing compliance actions, etc. It takes entire RIMS system to meet DOE Order 450.1, since it is truly and totally integrated. 18

Q: How do you go about identifying the environmental aspects and impacts of activities at your site? How do you integrate NEPA into this process? Teresa Perkins, Idaho Operations Office Brent Smith, SPRPMO 19

INEEL Aspects & Impacts INEEL environmental aspects/impacts were identified through interviews with project and program managers Determined inputs to activities, i.e. chemicals, radioactive materials, transportation activities Determined the activity outputs, i.e. waste products, air emissions, cultural resource impacts Approximately 20 environmental aspects identified A subgroup of environmental aspects with the potential for significant impacts has been identified 20

INEEL NEPA & EMS NEPA is first integrated into the ISMS/EMS through our environmental checklist process Project managers are required to describe the project and identify the associated environmental aspects The project analysis is used to document a NEPA determination The environmental aspect identification is used to determine regulatory and other requirements that the project must meet to control impacts 21

SPR Environmental Aspects/Impacts & NEPA Integration Initial identification of environmental aspects/impacts accomplished through on-site ISO 14001 implementation training SPR has created a dynamic process to identify environmental aspects and keep them current SPR employs pre-existing NEPA framework to evaluate new projects and activities NEPA documents are prepared for every Engineering Design Review, all purchases, and for evaluation of upset conditions PMO NEPA Compliance Officer revised NEPA Review document format to identify aspects and impacts and had aspects/impacts entered into EMS Manual 22

Q: How do you flow down environmental requirements to procedures at the work level? Teresa Perkins, Idaho Operations Office 23

INEEL Flowdown of Requirements A single, activity-based environmental procedure is used that: Applies to all INEEL activities Identifies all relevant environmental requirements, based on the activities being performed The process has personnel do what they do best Project managers describe their projects as a combination of activities, such as installing and operating a generator. Integrates requirements into project procedures Environmental personnel identify and communicate all environmental regulatory requirements & mitigation 24

INEEL Flowdown of Req ts (cont.) Emerging environmental requirements, such as proposed Federal and State regulations, are systematically reviewed by environmental personnel to: Determine applicability and impacts Determine and initiate appropriate changes to procedures as the regulations take effect 25

Q: What EMS training did you provide? How did you develop or select training materials? Brent Smith, SPRPMO Teresa Perkins, Idaho Operations Office Cliff Clark, Richland Operations Office 26

SPR EMS Training Key Individuals for DOE and Contractor have taken ISO 14001 Lead Auditor Training DOE/M&O Contractor Staff involved with ISO 14001 Implementation and Auditing had ISO 14001 Implementation Training All M&O contractor employees currently required to take annual ISO 14001 CBT Focuses on Policy, Environmental Aspects/Impacts and Operational Controls 27

INEEL EMS Training Web-based general EMS training for all personnel Reviews the Environmental Policy, EMS & its purpose Reviews the employee s responsibilities for complying with the policy and protecting the environment Reviews the employee s tools for complying with the policy and protecting the environment. Use of procedures and processes for performing work Use individual stop-work authority if an activity could not be performed as planned. ISO 14001 Training for Key Personnel 28

INEEL EMS Training (cont.) EMS team and training organization cooperation The EMS team determined What and when EMS-related information was needed by: all personnel personnel with significant aspect responsibilities The training organization Determined the methods of conveying the information Economical & effective Tracked and recorded completion of training (>96% of employees completed training by the scheduled completion date.) 29

INEEL EMS Training (cont.) The INEEL provides web-based, activity-specific, EMS training to employees whose jobs have the potential to significantly impact the environment. Identifies the specific potential impacts, such as release of radioactive material Identifies the specific controls in place, such as operating procedures Reviews the employee responsibilities to conduct activities within the controls 30

RL/DOE EMS Training RL does not do separate EMS Training RIMS is totally integrated EMS requirements are built in with business management, safety management, safeguards and security, and other management elements All RL employees, including Senior Management, are trained on RIMS requirements and procedures 31

Q: How do you assess (audit) environmental compliance and environmental management systems at your site? Role of DOE, contractors? Protocols used? Integration with ISMS reviews? Jerry Granzen, Brookhaven Area Office Brent Smith, SPRPMO 32

BNL Environmental Assessment/Audit Compliance: Contractor (BSA) Self-Assessment Program Program is managed as part of site-wide integrated assessment program Focus on Compliance Subject Areas (Air, PCB s, etc.) Topics determined based upon risk, prior issues, prior audits, etc. Assessment Team is led by Contractor s Env t l Services Division Has served as a Contract Performance Measure DOE has option to observe or participate on Team DOE-led Environmental Assessments/Audits have been reduced since ISO 14001 Registration DOE, or BNL Office of Independent Oversight may conduct for cause assessments 33

BNL Env t l Assessment/Audit (cont.) EMS Self Assessment: BNL (contractor) EMS Self-Assessments Each Department is required to conduct one assessment annually Important part of registration audit always looked at DOE participation is optional Numerous contractor employees have received Lead Auditor training 34

BNL Env t l Assessment/Audit (cont.) Annual EMS Management Review: a very Important Part of EMS Conducted by each Department Each EMS coordinator presents the environmental status to the Department/Division Manager Fosters line management involvement in environmental issues, and critiques adequacy of their EMS 35

BNL Env t l Assessment/Audit (cont.) Independent EMS audits (by independent subcontractor) Significant planning is required Registration Audit is comprehensive Surveillance Audits consist of a sampling of Departments and EMS criteria 36

SPR Environmental Compliance & EMS Audits/Assessments Integrated assessments include: Environmental Compliance Audit EMS Audits M&O Contractor Organizational Assessment Programs DOE On-Site Management Appraisals Each SPR site has annual audit/assessment by M&O Contractor Each SPR site has annual audit/assessment by DOE 37

Q: Did you seek third-party registration or recognition for your EMS? Why or why not? How does EMS relate to other external recognition programs? Brent Smith, SPRPMO Ron Peterson, Savannah River Office Cliff Clark, Richland Operations Office Teresa Perkins, Idaho Operations Office 38

SPR EMS Third-Party Registration & Recognition SPR facilities received multi-site ISO 14001 certification on May 19, 2000 Other Programs/Recognition Louisiana Environmental Leadership Program (1996) EPA s National Environmental Performance Track (11/00) Texas EMS Regulatory Incentives Program (pending) ISO 9001 Quality Management System Implementation (02/01) Voluntary Protection Program (VPP) STAR Facility for 4 sites (07/01) Louisiana Environmental Management Award (12/02) OHSAS 18001 Gap Analysis (02/03) 39

SRS Third Party Registration SRS-EMS was certified to ISO 14001 in September 1997 and again in September 2000. Top management of the SRS wanted to be recognized as a center of excellence in environmental management SRS wanted to improve its relationships with interested external parties such as regulators, citizen groups, state and local planning groups, etc SRS wanted to position itself in good standing to receive new DOE missions In February 2002, the top management of SRS decided that the Site would no longer seek third-party certification of its EMS 40

RL EMS Third-Party Registration RL has not sought third-party certification RL contractors have obtained or are considering third party certification Battelle Pacific Northwest has obtained formal certification to ISO 14001 Bechtel Hanford is actively pursuing self-certification and is considering third party certification to ISO 14001 Fluor Hanford is considering self-certification 41

INEEL Third-Party Registration ISO 14001 Registration June 2002 DOE and Contractor agreed: ISO 14001 registration should be, and is, a contract requirement ISO 14001 registration is a desirable credential for our Research and Development programs Third party registration: Provides independent validation of the EMS Increases the credibility of the EMS to the public and regulatory agencies Provides an effective, and economical, means for periodic external review of the EMS 42

Questions from the Audience 43

For More Information: ronald.peterson@srs.gov, 803-725-8146 jerryg@bnl.gov, 631-344-4089 clifford_e_cliff_clark@rl.gov, 509-376-9333 perkintl@id.doe.gov, 208-526-1483 brent.smith@spr.doe.gov, 504-734-4970 steven.woodbury@eh.doe.gov, 703-425-5943 44